Exploration Program Recommendations
5. The Cutoff grades were determined using average block grade values within the estimation domains and an Au price of US$1,200/oz, and Process Recovery of 93%, Open Pit mining costs of C$10.00/t, Underground mining costs of C$70.00/t, Process and G&A costs of approximately C$75/t and an exchange rate of 1.25 US$/C$.
6. A bulk density values value of 3.15 t/m3 was assigned based on available SG measurements.
7. Differences may occur in totals due to rounding.
Exploration Program Recommendations
The following summarizes the work programs recommended by the authors of the Committee Bay Technical Report Summary for the Committee Bay Project. The Phase 1 program is anticipated to include collection of 15,000 infill detailed till samples and 7,500 m of Diamond drilling along the shear zone sub-parallel to the Three Bluffs deposit. The Phase 1 program is estimated to cost approximately $5 million Details of the recommended Phase I program can be found below.
A Phase 2 exploration program will be drill intensive. An additional 10,000 - 15,000m of diamond drilling should be completed at the Three Bluffs deposit to explore the down dip potential of the limb mineralization as well as tying in the newly identified shear zone hosted mineralization with the ultimate goal of updating the Mineral Resource Estimate. An additional 10,000m of drilling should be allocated to regional targets defined from the Phase 1 program. The Phase 2 program is estimated to cost between $15 and $20 million. Details of the recommended Phase 2 program can be found below.
Recommended Work Programs for 2024 and beyond
| Phase 1 | ||
|---|---|---|
| Type | Details | Cost Estimate (C$) |
| Labour | Staff Wages, Technical and Support Contractors | 350,000 |
| Assaying | Sampling and Analytical | 150,000 |
| Drilling | Three Bluffs Diamond Drilling (7,500 meters at $220/m) | 1,650,000 |
| Till Sampling | Detailed sampling program | 120,000 |
| Land Management | Consultants. Assessment Filing, Lease Payments | 250,000 |
| Community Relations | Community Tours, Outreach | 30,000 |
| Information Technology | Remote site communications and IT | 35,000 |
| Safety | Equipment, Training and Supplies | 15,000 |
| Expediting | Expediting (Rankin Inlet, Baker Lake, Churchill) | 150,000 |
| Camp Costs | Equipment, Maintenance, Food, Supplies | 250,000 |
| Freight and Transportation | Freight, Travel, Helicopter, Fixed Wing | 450,000 |
| Fuel | 1,000,000 | |
| General and Administration | 100,000 | |
| Sub-total | 4,550,000 | |
| Contingency (10%) | 455,000 | |
| Total | 5,005,000 | |