Western Copper & Gold Corp
For the period ended Dec 31, 2023. Filed Mar 29, 2024.
View on SEC.govAbout this filing
The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.
FY2023 · Filed Mar 29, 2024
Use the contents to explore the available documents and sections.
Contents
EX-99.2 · Feasibility Study
Feasibility Study
On June 28, 2022, the Company released the results of its Feasibility Study (the "Study") on its wholly-owned Casino copper-gold-molybdenum deposit. The Study considered the Project being constructed as an open pit mine, with a concentrator processing 120,000 tonnes per day (t/d) to recover copper, gold, molybdenum and silver, as well as a 25,000 t/d oxide heap leach facility to recover gold, silver and copper.
The Study supersedes all previous studies and incorporates an updated mineral resource and mineral reserve with an effective date of April 29, 2022. The Study examines the development of the Casino Project, which comprises the processing of 1.43 billion tonnes of Mineral Reserve for both the mill and heap leach, with deposition of mill tailings and mine waste in the Tailings Management Facility ("TMF") consistent with the design concepts considered during the Best Available Tailings Technology ("BATT") Study as a base case development.** **
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
|---|---|
| Year ended December 31, 2023 | |
| (Expressed in Canadian dollars, unless otherwise indicated) | |
Unless otherwise indicated, all references to "$" are to Canadian dollars and references to "US$" are to United States dollars.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.