TASEKO MINES LIMITED Management's Discussion and Analysis
Operations Analysis
Full Year Results
Gibraltar produced 122.6 million pounds of copper for the year compared to 97.0 million pounds in 2022. The higher production was attributable to improved ore grades and recoveries as the lower benches of the Gibraltar pit provided the expected higher grades and more consistent mineralized zones. Copper grades for the year averaged 0.25% copper compared to 0.20% in 2022 and copper recoveries for 2023 were 82.6% compared to 79.5% in 2022.
A total of 88.1 million tons were mined in the year compared to 88.7 million tons mined in 2022. The strip ratio of 1.3 was lower than the prior year as mining operations were focused in the Gibraltar pit in 2023 which has a lower strip ratio. Ore stockpiles also increased by 9.1 million tons, including oxide ore from the upper benches of the Connector pit.
Total site costs* at Gibraltar of $430.7 million (which includes capitalized stripping of $55.6 million) was $28.3 million higher than 2022, primarily due to higher repairs and maintenance costs and labour costs, partially offset by lower diesel costs and lower grinding media costs.
Molybdenum production was 1.2 million pounds in the year compared to 1.1 million pounds in the prior year. Molybdenum prices strengthened in 2023 with an average molybdenum price of US$24.19 per pound, an increase of 29% compared to the 2022 average price of US$18.73 per pound.
Off-property costs per pound produced* were US$0.38 for the year, which is US$0.02 higher than the prior year primarily due to an increase in treatment and refining charges (TCRC) rates.
Total operating costs per pound produced (C1)* was US$2.37 for the year, compared to US$2.98 in the prior year as shown in the bridge graph below: