FIRSTENERGY CORP
For the period ended Dec 31, 2025. Filed Feb 18, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Feb 18, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2024-12-31; filed 2025-02-27.
0001031296-25-000006
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSCurrent report: 10-K
Period ended 2025-12-31; filed 2026-02-18.
0001031296-26-000046
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 590 previous paragraphs and 530 current paragraphs.
120 unchanged; 204 reworded; 188 added; 247 removed; 19 previous and 18 current paragraphs rearranged.
Tables are not compared: 38 previous and 39 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (188)
Current report
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations in this Form 10-K discusses FirstEnergy's 2025 and 2024 results, and year-over-year comparisons between 2025 and 2024. Discussions of 2023 results and year-over-year comparisons between 2024 and 2023 that are not included in this Form 10-K can be found in Item 7., “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of FirstEnergy’s Annual Report on Form 10-K for the fiscal year ended December 31, 2024, filed with the SEC on February 27, 2025.
Current report
Recent Developments
Current report
Investment Strategy
Current report
FirstEnergy recently increased its customer-focused Energize365 investment plan for the 2026 to 2030 time period to $36 billion, approximately 25% higher than the previous 2025 to 2029 five-year plan, and aims to strengthen the grid, improve reliability and support growing customer demand. Through the Energize365 program, system-wide capital investments from 2026 to 2030 are expected to comprise the Distribution segment 28%, the Integrated segment 35%, and the Stand-Alone Transmission segment 35%, focused on the following:
Current report
•Transmission projects awarded through the PJM Open Window to address regional expansion projects.
Current report
Dividend Growth
Current report
Reorganization
Current report
On March 24, 2025, FirstEnergy internally announced organizational changes that are intended to align the organization with its new business model, which is designed to make FirstEnergy more efficient and sustainable while placing responsibility and accountability closer to customers, employees and regulators. The changes are also consistent with FirstEnergy’s focus on operations and maintenance expense discipline. As a result, FirstEnergy recognized a pre-tax charge of approximately $26 million ($5 million at JCP&L) in the first quarter of 2025, which is included within “Other operating expenses” on each of the Registrants' Statements of Income and Comprehensive Income.
Current report
Signal Peak Disposition
Current report
On July 16, 2025, FEV sold its entire 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations, at book value to WMB Marketing Ventures, LLC and Pinesdale LLC for $47.5 million, which is classified within cash flows from investing activities - other of FirstEnergy’s Consolidated Statements of Cash Flows.
Current report
Valley Link
Current report
On February 21, 2025, FET, DominionHV and Transource entered into the Valley Link Operating Agreement, which established the general framework for Valley Link and the Valley Link Subsidiaries to accept, design, develop, construct, own, operate and finance those transmission projects awarded by PJM to Valley Link. This general framework includes parameters regarding the relationship among the three members, confers governance rights to its members so long as certain ownership percentages are maintained, as described below, and defines the list of projects that Valley Link will have the right to develop. Valley Link is the owner of the Valley Link Subsidiaries, which are organized in various states. On February 26, 2025, in response to the PJM 2024 RTEP Long-Term Proposal Window #1, PJM awarded two electric transmission projects to Valley Link estimated to be approximately $3 billion, with FET’s share estimated to be approximately $1 billion.
Current report
Grid Growth
Current report
On February 13, 2026, FET and Transource entered into the Grid Growth Operating Agreement, which established the general framework for FET and Transource to accept, design, develop, construct, own, operate and finance those transmission projects awarded by PJM to certain of the subsidiaries of Grid Growth, on February 12, 2026. This general framework includes parameters regarding the relationship among the two members, confers governance rights to its members so long as certain ownership percentages are maintained and defines the list of projects that Grid Growth will have the right to develop. Grid Growth is the sole owner of Grid Growth Ohio and owns an 80% interest in Grid Growth EHV, with Transource owning the remaining interests. On February 12, 2026, in response to the PJM 2025 RTEP Long-Term Proposal Window #1, PJM awarded a project to Grid Growth estimated to be approximately $1 billion, with FET’s share estimated to be approximately $448 million.
Current report
Regulatory Matters - New Jersey
Current report
Regulatory Matters - Ohio
Current report
On January 31, 2025, the Ohio Companies filed an application with the PUCO for ESP VI, which would have begun concurrently with the effective date of any new base distribution rates resulting from the Ohio Companies’ 2024 base rate case and continued through May 31, 2028. On May 15, 2025, the Ohio Governor signed HB 15, which repealed the statute authorizing ESPs in Ohio, eliminating the PUCO’s ability to authorize future ESPs such as ESP VI. On December 17, 2025, the PUCO dismissed ESP VI due to the repeal of the ESP statute pursuant to HB 15. HB 15 permits the Ohio Companies to continue ESP IV until their final auction delivery period on May 31, 2029, at which time ESP IV must terminate.
Current report
OPEB expense requested in the proceeding and the actual amount each year using this method. Additionally, the Ohio Companies requested recovery of certain incurred costs, including the impact of major storms, a program to convert streetlights to LEDs, and others. On June 14, 2024, the Ohio Companies filed supporting testimony and on July 31, 2024, filed an update with an adjusted net increase of base distribution revenues of approximately $190 million and incorporated matters in the rate case as directed by the PUCO’s ESP V order. On December 18, 2024, the PUCO issued an order approving the Ohio Companies’ withdrawal of ESP V. On January 22, 2025, the PUCO approved the Ohio Companies’ revised ESP IV tariffs, effective February 1, 2025, at which time the Ohio Companies resumed operating under ESP IV. On January 27, 2025, the Ohio Companies notified the PUCO of their intention to update their application for an increase in base distribution rates to remove ESP V related provisions from the base rate case. On November 19, 2025, the PUCO issued an order in the rate case lifting the rate freeze and approving a net increase in base distribution revenues of the Ohio Companies of approximately $34 million, with a return on equity of 9.63% and a hypothetical capital structure of 48.8% debt and 51.2% equity for all three Ohio Companies, which reflects a roll-in of current riders such as DCR and AMI. The PUCO authorized continuance of Rider DCR with a cap increase commensurate with capital investments through January 31, 2025, and approved the Ohio Companies’ proposal to change pension and OPEB recovery to the delayed recognition method. Additionally, the order authorizes recovery of certain deferred costs for storm restoration, operations and maintenance, and energy efficiency. As a result of the order, the Ohio Companies recognized a $352 million pre-tax impairment charge related to the disallowance from future recovery of certain previously capitalized amounts. On November 26, 2025, the Ohio Companies filed proposed compliance tariffs. On December 19, 2025, the Ohio Companies and other parties filed applications for rehearing and on December 29, 2025, the Ohio Companies filed a memorandum against intervenors’ applications for rehearing. On January 7, 2026, the PUCO issued an entry granting rehearing in order to determine whether its November 19, 2025 base rate case opinion and order should be affirmed, abrogated, or modified on rehearing. On January 9, 2026, the Ohio Companies filed an expedited motion for ruling on the proposed compliance tariffs and on February 4, 2026, PUCO staff issued a letter recommending that most of the Ohio Companies’ proposed compliance tariffs be approved. The Ohio Companies cannot predict the outcome of the rehearing, but do not expect material changes to the November 2025 order.
Current report
On May 15, 2025, the Ohio Governor signed HB 15 that, in addition to eliminating ESPs, requires, among other things, triennial base rate cases and allows them to be based on a three-year forecasted test period, expedites PUCO review and disposition of future base rate cases, imposes annual reliability reporting, increases protections for customers shopping with third-party suppliers, requires EDUs to develop and publicly share distribution system hosting capacity maps, and reduces certain transmission and distribution property taxes beginning with property in-serviced in 2026. The legislation became effective August 14, 2025.
Current report
On November 19, 2025, the PUCO issued a separate order which assessed approximately $250 million in monetary penalties upon the Ohio Companies in connection with the PUCO’s ongoing HB 6 audits and investigations. On December 19, 2025, the Ohio Companies and fourteen intervenors filed with the PUCO an unopposed stipulation and recommendation that was intended to resolve several matters pending before the PUCO to which the Ohio Companies were a party. The stipulation and recommendation, which was adopted in its entirety by the PUCO on January 7, 2026, vacated the amounts owed pursuant to the November 19, 2025 order regarding its HB 6 audits and investigations and instead directed the Ohio Companies to pay its customers restitution and refunds totaling approximately $275 million, among other things. The refunds will be paid out over three billing cycles beginning in February 2026.
Current report
The Ohio Companies anticipate filing a base rate distribution case with the PUCO in the second half of 2026.
Current report
Regulatory Matters - West Virginia
Current report
On October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC. To ensure that MP and PE can meet their PJM adequacy requirements, the plan proposes, among other things, near-term market capacity purchases and the addition of 70 MWs of solar generation by 2028 and 1,200 MWs of natural gas combined cycle generation by 2031. On November 26, 2025, the WVPSC issued a procedural order setting a hearing for May 2026.
Current report
On February 13, 2026, MP and PE filed a CPCN to construct and operate a 1,200 MW combined cycle gas turbine plant and 70 MWs of solar generation capacity for an estimated capital investment totaling approximately $2.7 billion as of the date of the filing. The request also includes a surcharge designed to recover financing costs during development and construction of the projects, as well as to transition to recovery in base rates once the projects are placed in-service and approved through a base rate case. An order is expected from the WVPSC in the second half of 2026.
Current report
MP and PE anticipate filing a base rate distribution case with the WVPSC in the second half of 2026.
Current report
Regulatory Matters - Maryland
Current report
PE anticipates filing a base rate distribution case with the MDPSC in the second half of 2026.
Current report
•The absence of $200 million (pre-tax) in charges related to changes in ARO liabilities associated with new CCR rules and the McElroy’s Run impoundment facility in 2024 and a $49 million reduction in ARO liabilities in 2025 based on the completion of engineering studies and field analysis of certain sites;
Current report
• The absence of a $53 million (pre-tax) charge at JCP&L in connection with the base rate case settlement agreement in the first quarter of 2024, as further discussed below;
Current report
• The absence of a $32.5 million (pre-tax) contribution commitment by the Ohio Companies, as a result of the PUCO’s ESP V order in the second quarter of 2024;
Current report
• Higher earnings associated with the implementation of base rate cases in New Jersey, West Virginia and Pennsylvania;
Current report
• Higher customer usage and demand;
Current report
The absence of the $62 million (pre-tax) impairment charge related to the Akron general office in the third quarter of 2024;
Current report
• Lower debt redemptions costs of $61 million (pre-tax); and
Current report
• Higher income tax benefits primarily related to an increase in the remeasurement of excess deferred income taxes compared to 2024, and the absence of discrete tax charges related to the FET Equity Interest Sale and PA Consolidation in the first quarter of 2024.
Current report
•A $352 million (pre-tax) impairment charge recognized in the fourth quarter of 2025 related to disallowances in the Ohio base rate case resulting from the PUCO-approved order;
Current report
•A $275 million (pre-tax) charge recognized in the fourth quarter of 2025 resulting from the Ohio Companies' PUCO-approved settlement that will provide restitution and refunds to customers;
Current report
•The absence of $151 million (pre-tax) net proceeds from the shareholder derivative lawsuit settlement received in the second quarter of 2024;
Current report
• The absence of a $46 million (pre-tax) charge in the fourth quarter of 2024 from the expected elimination of the 50 basis point ROE adder associated with ATSI’s RTO membership as a result of the Sixth Circuit ruling;
Current report
• Higher depreciation expense due to a higher asset base;
Showing the first 40 of 188 passages. Open the source sections for the rest.
Removed paragraphs (247)
Previous report
•The risks and uncertainties associated with government investigations and audits regarding HB 6 and related matters, including potential adverse impacts on federal or state regulatory matters, including, but not limited to, matters relating to rates.
Previous report
•Mitigating exposure for remedial activities associated with retired and formerly owned electric generation assets, including those sites impacted by the legacy CCR rules that were finalized during 2024.
Previous report
During the first quarter of 2024, FirstEnergy’s segment reporting structure was modified to increase transparency for leadership and investors, simplify the presentation to corresponding legal entities, and align FirstEnergy’s earnings, cash flows and balance sheets at the business unit level. FirstEnergy’s reportable segments are as follows:
Previous report
FirstEnergy believes that this segment reporting serves to provide:
Previous report
•Greater transparency into our business unit performance;
Previous report
•Alignment with our cash flow, credit metrics, balance sheet and earnings to the companies comprising each segment;
Previous report
•Simplification of our segment reporting so that each entire entity resides within a segment; and
Previous report
•Consistency with peers.
Previous report
PA Consolidation
Previous report
On January 1, 2024, FirstEnergy consolidated the Pennsylvania Companies into FE PA, rendering FE PA a new, single operating entity and the successor-in-interest to all assets and liabilities of the Pennsylvania Companies. As of January 1, 2024, FE PA is FE’s only regulated distribution power company in Pennsylvania encompassing the operations previously conducted individually by the Pennsylvania Companies. FirstEnergy continues to evaluate the legal, financial, operational and branding benefits of consolidating the Ohio Companies into a single Ohio power company.
Previous report
Also on January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo, and PN and ME contributed their respective Class B equity interests of MAIT to FE, which were ultimately contributed to FET in exchange for a special purpose membership interest in FET. So long as FE holds the FET special purpose membership interests, it will receive 100% of any Class B distributions made by MAIT.
Previous report
FET Equity Interest Sale
Previous report
On February 2, 2023, FE, along with FET, entered into the FET P&SA II with Brookfield and the Brookfield Guarantors, pursuant to which FE agreed to sell to Brookfield at the closing, and Brookfield agreed to purchase from FE, an incremental 30% equity interest in FET for a purchase price of $3.5 billion. The FET Equity Interest Sale closed on March 25, 2024 and FET continues to be consolidated in FirstEnergy’s financial statements. The purchase price was paid in part by the issuance of two promissory notes at closing having an aggregate principal amount of $1.2 billion with: (i) one promissory note having an aggregate principal amount of $750 million, at an interest rate of 5.75% per annum, with a maturity date of September 25, 2025 and (ii) one promissory note having an aggregate principal amount of $450 million, at an interest rate of 7.75% per annum, with a maturity date of December 31, 2024. The remaining $2.3 billion of the purchase price was paid in cash at closing. On July 17, 2024, Brookfield paid FE approximately $1.2 billion in full satisfaction of the promissory notes. Interest income associated with the promissory notes was $24 million for the year ended December 31, 2024 and is reported within “Miscellaneous income, net” on FirstEnergy’s Consolidated Statements of Income. As a result of the consummation of the transaction, Brookfield’s interest in FET increased from 19.9% to 49.9%, while FE retained the remaining 50.1% ownership interests of FET.
Previous report
Asset Retirement Obligations
Previous report
On May 8, 2024, the EPA finalized changes to the CCR regulations addressing inactive surface impoundments at inactive electric utilities, known as legacy CCR surface impoundments, and in November 2024 and January 2025, the EPA made several technical corrections to the rule. The rule extends 2015 CCR rule requirements for groundwater monitoring and protection procedures, operational and reporting procedures, as well as closure requirements for impoundments and landfills that were not originally included for coverage by the 2015 CCR rule. In anticipation of such expenditures, FirstEnergy performed a preliminary assessment of former CCR disposal sites and calculated an initial estimate applying historical experience in remediating comparable sites. As a result, FirstEnergy recorded a $139 million increase to its ARO during 2024, of which $113 million is included in “Other operating expenses” on the Consolidated Statements of Income and was not capitalized as an asset retirement cost since the associated plants do not have future cash flows.
Previous report
Our Strategy
Previous report
Powered by its employees and guided by its experienced leadership team and engaged FE Board, FirstEnergy is accelerating its transformation into a premier electric company. The FE Board and FirstEnergy’s executive management team are aligned behind a business model grounded in investing, operating, recovering costs and financing our regulated electric company operations. This business model aims to create a “virtuous cycle” that, in turn, serves to improve reliability and the customer experience, grow rate base, engage employees, improve returns and maintain a strong balance sheet. Along with an unwavering commitment to ethics and integrity, performance excellence and continuous improvement, FirstEnergy anticipates that strong execution of this model will help achieve its strategic objectives and deliver value to its investors.
Previous report
With a diversified asset mix, improved balance sheet and a strong affordability position, FirstEnergy is well positioned to significantly enhance the customer experience and provide value to its investors.
Previous report
Invest
Previous report
•A robust plan for customer-focused growth, Energize365 is the centerpiece of FirstEnergy’s regulated distribution and transmission capital investment strategy that aims to strengthen the grid and enable the energy transition. Through the Energize365 program, FirstEnergy invested $4.5 billion in 2024, approximately 20% higher than 2023, and expects to spend approximately $28 billion in system-wide capital investments from 2025 through 2029. FirstEnergy expects that these investments will comprise the Distribution segment (26%), the Integrated segment (39%), and the Stand-Alone Transmission segment (34%), focusing on the following:
Previous report
•West Virginia solar generation projects, energy efficiency initiatives, electric vehicle infrastructure and energy storage projects.
Previous report
•On July 26, 2024, FE, VEPCO and Transource Energy, LLC, a subsidiary of AEP, entered into a joint proposal agreement in connection with PJM’s 2024 Regional Transmission Expansion Plan Open Window 1 process. Pursuant to such joint proposal agreement, FET, VEPCO and Transource Energy, LLC jointly proposed certain regional electric transmission projects for PJM's consideration during the Open Window process. On November 25, 2024, FET, Dominion High Voltage MidAtlantic, Inc., as affiliate of VEPCO, and Transource Energy, LLC, formed Valley Link, which is the holding company responsible for managing and executing any projects awarded by PJM, and entered into a limited liability agreement. On February 26, 2025, PJM selected certain of the joint proposed projects, which included approximately $3 billion in investments for Valley Link to both build new and upgrade existing transmission infrastructure.
Previous report
•A refreshed and revitalized leadership team. During 2024, FirstEnergy appointed five executives to oversee the Maryland/West Virginia, Ohio, Pennsylvania, New Jersey and Transmission operations. Additionally, FirstEnergy also announced the hiring of five vice presidents that will be responsible for developing and implementing the financial strategy and oversee relationships with regulators for Pennsylvania, New Jersey, West Virginia, Maryland, Ohio and Transmission.
Previous report
Operate
Previous report
FirstEnergy will continue to engage its skilled, trained, talented and diverse team of employees to effectively implement its investment plans, seek opportunities for continuous improvement as it delivers safe, reliable and affordable electricity to our customers, and deliver value to its investors. It aims to do so through the following:
Previous report
•Enhancing the focus on the customer. FirstEnergy has shifted more decision-making and accountability for our operations closer to our customers, regulators and employees doing the work. FirstEnergy’s new operating structure is organized as follows: Ohio, Pennsylvania, New Jersey, West Virginia/Maryland and FirstEnergy’s Standalone Transmission properties. This structure fosters better execution at the business unit level.
Previous report
•Embracing a continuous improvement mindset. FirstEnergy is focused on operational excellence through strong execution of our capital investments to enhance the customer experience and support the energy transition, managing costs and keeping customer bills affordable and reducing regulatory lag.
Previous report
Recover
Previous report
FirstEnergy is establishing a track record of strong execution. Operating effectively leads to strong, predictable results and enhances credibility with our stakeholders. In turn, FirstEnergy builds supportive relationships with regulators, customers and intervenors in an effort to drive positive rate outcomes that support recovery of its investments.
Previous report
In order to achieve important regulatory milestones, FirstEnergy has an active regulatory calendar to support its regulated growth strategy and address the critical investments that support reliability and a smarter electric grid. This includes the following:
Previous report
•On March 16, 2023, JCP&L filed a base rate case in New Jersey, requesting a $185 million increase in base distribution revenues to support investments to strengthen the energy grid, enhance the customer experience and provide assistance to low-income and senior citizen customers. On February 1, 2024, JCP&L, joined by various parties, filed a stipulated settlement with the NJBPU resolving JCP&L’s request for a distribution base rate increase. The settlement, which was approved by the NJBPU on February 14, 2024, provides for an $85 million annual base distribution revenue increase for JCP&L, which became effective for customers on June 1, 2024.
Previous report
•On December 1, 2023, JCP&L filed a petition with the NJBPU requesting approval of its EE&C Plan II, which covers the January 1, 2025 through June 30, 2027 period and had a proposed budget of approximately $964 million. On October
Previous report
30, 2024, the NJBPU approved the parties’ stipulation of settlement, wherein the parties agreed to a budget of approximately $817 million for EE&C Plan II, including $784 million of investments that will earn a return on equity of 9.6%, with an equity ratio of 52%, and will be recovered over 10 years.
Previous report
•On January 31, 2025, the Ohio Companies filed an application with the PUCO for ESP VI, which would begin concurrently with the effective date of any new base distribution rates resulting from the Ohio Companies’ pending base rate case and continue through May 31, 2028. ESP VI proposes to continue existing riders to support continued maintenance of the distribution system, and to reestablish riders to recover vegetation management and storm restoration expenses. ESP VI also includes provisions supporting affordability and enhancing the customer experience. The PUCO has scheduled a technical conference for March 12, 2025.
Previous report
•On April 12, 2024, the Ohio Companies and certain of the parties filed a stipulation that modified the Ohio Companies’ application for phase two of its grid modernization plan, which was approved by the PUCO on December 18, 2024. The stipulation provides for the deployment of approximately 1.4 million smart meters to the balance of the Ohio Companies’ customers. Phase two of the distribution grid modernization plan, as modified by the stipulation would be completed over a four-year budget period with estimated capital investments of approximately $421 million. On December 18, 2024, the PUCO approved the stipulation and implementation has since begun.
Previous report
•On April 2, 2024, FE PA filed a base rate case with the PPUC seeking a net increase in base distribution revenues of approximately $502 million with a return on equity of 11.3% and capital structure of 46.2% debt and 53.8% equity, and which reflects a roll-in of several current riders such as DSIC, Tax Act, and smart meter. Additionally, FE PA requested an enhanced ten year vegetation management program and recovery of certain incurred costs, including the impact of major storms, COVID-19, a program to convert streetlights to LEDs, and others. On September 13, 2024, FE PA and the active parties to the proceeding filed a joint settlement agreement requesting that the administrative law judges approve FE PA’s requested distribution base rate case increase subject to the terms and conditions of the settlement, which includes, among other things, an annual net revenue increase of $225 million. Other key components of the settlement agreement include recovery of costs incurred for storms and COVID-19, additional cost recovery of ongoing storm costs, inspection and maintenance of overhead lines and transformers, and rate case expenses, as well as an enhanced vegetation management program. On October 15, 2024, the administrative law judges issued a decision recommending that the PPUC approve, without modification, the September 13, 2024 settlement agreement. On November 21, 2024, the PPUC unanimously approved the settlement agreement without modification and the rates became effective on January 1, 2025.
Previous report
•On July 22, 2024, FE PA filed its application with the PPUC seeking approval for the next phase of its LTIIP program, which is expected to result in approximately $1.6 billion in investments, with approximately $1.4 billion of such investments going in service during the five-year period beginning January 1, 2025 and ending December 31, 2029. FE PA’s application was approved by the PPUC on December 19, 2024, and implementation began in January 2025.
Previous report
•On January 13, 2023, MP and PE filed a request with the WVPSC seeking approval of new depreciation rates for existing and future capital assets. On August 22, 2023, the parties filed a unanimous settlement of the case recommending a $33 million annual increase in depreciation expense, effective April 1, 2024, but deferred issues related to a change in the net energy metering credit. An order was issued on March 26, 2024 approving the settlement without modification.
Previous report
•On January 23, 2024, MP, PE and various parties filed a joint settlement agreement with the WVPSC, which recommended a base rate increase of $105 million, inclusive of the $33 million increase in depreciation expense, but deferred issues related to a change in the net energy metering credit. Additionally, the settlement included a new low-income customer advocacy program, a pilot program for service reliability investments and recovery of costs related to storm restoration, retired generation assets and COVID-19. The settlement did not include the request to establish a regulatory asset (or liability) for recovery (or refund) associated with pension and OPEB expense, however, it did not preclude MP and PE from pursuing that in a future separate proceeding. An agreement on the net energy metering credit was subsequently submitted to the WVPSC and was materially approved as part of the base rate case order for rates effective March 27, 2024.
Previous report
We believe that FirstEnergy represents a compelling investment. With sound capital allocation targeting reliability, resiliency, the energy transition and customer experience, and supported by constructive regulatory outcomes, FirstEnergy expects to finance the business at a lower cost of capital, allowing it to begin the virtuous cycle all over again at “Invest.”
Showing the first 40 of 247 passages. Open the source sections for the rest.
Reworded paragraphs (204)
Previous wording
Forward-Looking Statements: This Form 10-K includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties and readers are cautioned not to place undue reliance on these forward-looking statements. These statements include declarations regarding management's intents, beliefs and current expectations. These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” "forecast," "target," "will," "intend," “believe,” "project," “estimate," "plan" and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements, which may include the following (see Glossary of Terms for definitions of capitalized terms):
Current wording
Forward-Looking Statements: This Form 10-K includes forward-looking statements based on information currently available to the Registrants’ management and unless the context requires otherwise, references to “we,” “us,” “our” and “FirstEnergy” refer to the Registrants collectively. Such statements are subject to certain risks and uncertainties and readers are cautioned not to place undue reliance on these forward-looking statements. These statements include declarations regarding management's intents, beliefs and current expectations. These statements typically contain, but are not limited to, the terms “anticipate,” “potential,” “expect,” "forecast," "target," "will," "intend," “believe,” "project," “estimate," "plan" and similar words. Forward-looking statements involve estimates, assumptions, known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements, which may include the following (see Glossary of Terms for definitions of capitalized terms):
Previous wording
•The potential liabilities, increased costs and unanticipated developments resulting from government investigations and agreements, including those associated with compliance with or failure to comply with the DPA, and settlements with the OAG's office and SEC.
Current wording
•The potential liabilities, increased costs and unanticipated developments resulting from government investigations and agreements, including those associated with compliance with or failure to comply with the DPA, and settlements with the OAG's office and the SEC;
Previous wording
•The risks and uncertainties associated with litigation, arbitration, mediation and similar proceedings, particularly regarding HB 6 related matters.
Current wording
•The risks and uncertainties associated with litigation, including the securities class-action lawsuit, regulatory proceedings, arbitration, mediation and similar proceedings;
Previous wording
•Changes in national and regional economic conditions, including recession, volatile interest rates, inflationary pressure, supply chain disruptions, higher fuel costs, and workforce impacts, affecting us and/or our customers and those vendors with which we do business.
Current wording
•Changes in national and regional economic conditions, including recession, volatile interest rates, inflationary pressure, supply chain disruptions, higher fuel costs, and workforce impacts, affecting us and/or our customers and the vendors with which we do business;
Previous wording
•Variations in weather, such as mild seasonal weather variations and severe weather conditions (including events caused, or exacerbated, by climate change, such as wildfires, hurricanes, flooding, droughts, high wind events and extreme heat events) and other natural disasters, which may result in increased storm restoration expenses and negatively affect future operating results.
Current wording
•Variations in weather, such as mild seasonal weather variations and severe weather conditions (including events caused, or exacerbated, by climate change, such as wildfires, hurricanes, flooding, droughts, high wind events and extreme heat events) and other natural disasters, which may result in increased storm restoration expenses or material liability and negatively affect future operating results;
Previous wording
•Legislative and regulatory developments, and executive orders, including, but not limited to, matters related to rates, energy regulatory policies, compliance and enforcement activity, cyber security, climate change, and diversity, equity and inclusion.
Current wording
•Legislative and regulatory developments, and executive orders, including, but not limited to, matters related to rates, generation resource adequacy, co-location of generation and large loads, and compliance and enforcement activity;
Previous wording
•The ability to access the public securities and other capital and credit markets in accordance with our financial plans, the cost of such capital and overall condition of the capital and credit markets affecting us, including the increasing number of financial institutions evaluating the impact of climate change on their investment decisions, and the loss of our status as a well-known seasoned issuer.
Current wording
•The ability to access the public securities and other capital and credit markets in accordance with our financial plans, the cost of such capital and overall condition of the capital and credit markets affecting us, including the increasing number of financial institutions evaluating the impact of climate change on their investment decisions, and the loss of FE’s status as a well-known seasoned issuer;
Previous wording
•Changing market conditions affecting the measurement of certain liabilities and the value of assets held in our pension trusts may negatively impact our forecasted growth rate, results of operations and may also cause us to make contributions to our pension sooner or in amounts that are larger than currently anticipated.
Current wording
•Changing market conditions affecting the measurement of certain liabilities and the value of assets held in FirstEnergy's pension trusts may negatively impact our forecasted growth rate, results of operations and may also cause it to make contributions to its pension sooner or in amounts that are larger than currently anticipated;
Previous wording
•Changes in assumptions regarding factors such as economic conditions within our territories, the reliability of our transmission and distribution system, generation resource planning, or the availability of capital or other resources supporting identified transmission and distribution investment opportunities.
Current wording
•Changes in assumptions regarding factors such as economic conditions within our territories, the reliability of our transmission and distribution system, our generation resource planning in West Virginia, or the availability of capital or other resources supporting identified transmission and distribution investment opportunities;
Previous wording
•Changes to environmental laws and regulations, including, but not limited to, rules finalized by the EPA and SEC, including those currently stayed, related to climate change, and potential changes to such laws and regulations as a result of the new U.S. presidential administration.
Current wording
•Changes to environmental laws and regulations, including, but not limited to, federal and state rules related to climate change, CCRs, and potential changes to such laws and regulations;
Previous wording
•Changes in customers’ demand for power, including, but not limited to, economic conditions, the impact of climate change, emerging technology, particularly with respect to electrification, energy storage and distributed sources of generation.
Current wording
•Changes in customers’ demand for power, including, but not limited to, economic conditions, the impact of climate change, and emerging technology, particularly with respect to electrification, energy storage, co-location of generation and large loads, and distributed sources of generation;
Previous wording
•Any changes in tax laws or regulations, including, but not limited to, the IRA of 2022, or adverse tax audit results or rulings and potential changes to such laws and regulations as a result of the new U.S. presidential administration.
Current wording
•Any changes in tax laws or regulations, including, but not limited to, the IRA of 2022, the OBBBA, or adverse tax audit results or rulings and potential changes to such laws and regulations;
Previous wording
•The ability to meet our goals relating to climate-related and environmental, social and governance matters, opportunities, improvements, and efficiencies, including our GHG reduction goals.
Current wording
•The ability to meet our publicly-disclosed goals relating to climate-related matters, opportunities, improvements, and efficiencies, including FirstEnergy’s GHG reduction goals; and
Previous wording
Dividends declared from time to time on our common stock during any period may in the aggregate vary from prior periods due to circumstances considered by the FE Board at the time of the actual declarations. A security rating is not a recommendation to buy or hold securities and is subject to revision or withdrawal at any time by the assigning rating agency. Each rating should be evaluated independently of any other rating.
Current wording
Dividends declared from time to time on FE’s common stock during any period may in the aggregate vary from prior periods due to circumstances considered by the FE Board at the time of the actual declarations. A security rating is not a recommendation to buy or hold securities and is subject to revision or withdrawal at any time by the assigning rating agency. Each rating should be evaluated independently of any other rating.
Previous wording
These forward-looking statements are also qualified by, and should be read together with, the risk factors included in (a) Item 1A. Risk Factors, (b) Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations, and (c) other factors discussed herein and in FirstEnergy's other filings with the SEC. The foregoing review of factors also should not be construed as exhaustive. New factors emerge from time to time, and it is not possible for management to predict all such factors, nor assess the impact of any such factor on our business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statements. We expressly disclaim any obligation to update or revise, except as required by law, any forward-looking statements contained herein or in the information incorporated by reference as a result of new information, future events or otherwise.
Current wording
These forward-looking statements are also qualified by, and should be read together with, the risk factors included in (a) Item 1A., "Risk Factors", (b) Item 7., "Management’s Discussion and Analysis of Financial Condition and Results of Operations," and (c) other factors discussed herein and in the Registrants’ other filings with the SEC. The foregoing review of factors also should not be construed as exhaustive. New factors emerge from time to time, and it is not possible for management to predict all such factors, nor assess the impact of any such factor on our business or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statements. We expressly disclaim any obligation to update or revise, except as required by law, any forward-looking statements contained herein or in the information incorporated by reference as a result of new information, future events or otherwise.
Previous wording
Forward-looking and other statements in this Annual Report on Form 10-K regarding our Climate Strategy, including our GHG emission reduction goals, are not an indication that these statements are necessarily material to investors or required to be disclosed in our filings with the SEC. In addition, historical, current and forward-looking statements regarding climate matters, including GHG emissions, may be based on standards for measuring progress that are still developing, internal controls and processes that continue to evolve and assumptions that are subject to change in the future.
Current wording
Forward-looking and other statements in this Annual Report on Form 10-K regarding FirstEnergy’s Climate Strategy, including FirstEnergy’s GHG emission reduction goals, are not an indication that these statements are necessarily material to investors or required to be disclosed in FE’s filings with the SEC. In addition, historical, current and forward-looking statements regarding climate matters, including GHG emissions, may be based on standards for measuring progress that are still developing, internal controls and processes that continue to evolve and assumptions that are subject to change in the future.
Previous wording
FirstEnergy is dedicated to integrity, safety, reliability and operational excellence and is principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution, Integrated and Stand-Alone Transmission. Its electric distribution companies form one of the nation's largest investor-owned electric systems, serving over six million customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New York. FirstEnergy’s transmission subsidiaries operate more than 24,000 miles of transmission lines that connect the Midwest and Mid-Atlantic regions and two regional transmission operation centers. As of December 31, 2024, AGC and MP control 3,604 MWs of net maximum generation capacity.
Current wording
FirstEnergy is dedicated to integrity, safety, reliability and operational excellence and is principally involved in the transmission, distribution and generation of electricity through its reportable segments: Distribution, Integrated and Stand-Alone Transmission. Its electric distribution companies form one of the nation's largest investor-owned electric systems, serving over 6 million customers in Ohio, Pennsylvania, New Jersey, West Virginia, Maryland and New York. FirstEnergy’s transmission subsidiaries operate more than 24,000 miles of transmission lines that connect the Midwest and Mid-Atlantic regions and two regional transmission operation centers. In addition, MP and AGC control 3,610 MWs of total generation capacity.
Previous wording
The Distribution segment, which consists of the Ohio Companies and FE PA, representing $11 billion in rate base as of December 31, 2024, distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its provider of last resort, SOS, standard service offer and default service requirements. The segment’s results reflect the costs of securing and delivering electric generation to customers, including the deferral and amortization of certain costs.
Current wording
FirstEnergy's Distribution segment, which consists of the Ohio Companies and FE PA, representing $11.1 billion in rate base as of December 31, 2025, distributes electricity through FirstEnergy’s electric operating companies in Ohio and Pennsylvania. The Distribution segment serves approximately 4.3 million customers in Ohio and Pennsylvania across its distribution footprint and purchases power for its default service or standard service offer requirements. The segment’s results reflect the costs of securing and delivering electric generation to customers, including the deferral and amortization of certain costs.
Previous wording
The Integrated segment includes the distribution and transmission operations under JCP&L, MP and PE, as well as MP’s regulated generation operations, representing $9.6 billion in rate base as of December 31, 2024. The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and operates 3,604 MWs of regulated net maximum generation capacity located primarily in West Virginia and Virginia. The segment will also include MP and PE’s 50 MWs of solar generation at five sites in West Virginia once complete. The first two solar generation sites were completed and placed in service in January and September 2024, representing 24 MWs of net maximum generating capacity. The remaining three sites, once completed, are expected to provide 26 MWs of additional net maximum generation capacity.
Current wording
FirstEnergy's Integrated segment includes the distribution and transmission operations of JCP&L, MP and PE, as well as MP’s regulated generation operations, representing $10.2 billion in rate base as of December 31, 2025. The Integrated segment distributes electricity to approximately 2 million customers in New Jersey, West Virginia and Maryland across its distribution footprint; provides transmission infrastructure in New Jersey, West Virginia, Maryland and Virginia to transmit electricity and operates 3,610 MWs of regulated generation capacity located primarily in West Virginia and Virginia, which includes three solar generation sites, representing 30 MWs of generation capacity. The segment’s results reflect the costs of securing and delivering electric generation to customers, including the deferral and amortization of certain costs. Additionally, on October 1, 2025, MP and PE filed their integrated resource plan with the WVPSC proposing, among other things, the addition of 70 MWs of solar generation by 2028, and 1,200 MWs of natural gas combined cycle generation by 2031, which are expected to require an estimated capital investment of approximately $2.5 billion, as detailed in the filing. See Note 13., "Regulatory Matters," of the Combined Notes to Financial Statements of the Registrants for additional details.
Previous wording
The Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $5.3 billion in rate base as of December 31, 2024, includes transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on FirstEnergy’s transmission facilities. KATCo, which was a subsidiary of FET, became a wholly owned subsidiary of FE prior to the closing of the FET P&SA I and remains in the Stand-Alone Transmission segment. On January 1, 2024, WP transferred certain of its Pennsylvania-based transmission assets to KATCo and prior year results in the Stand-Alone Transmission segment reflect the earnings and results of those WP transmission assets.
Current wording
FirstEnergy's Stand-Alone Transmission segment, which consists of FE's ownership in FET and KATCo, representing $5.4 billion in FirstEnergy-owned rate base as of December 31, 2025, includes transmission infrastructure owned and operated by the Transmission Companies and used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a projected rate base and projected costs, which is subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on FirstEnergy’s transmission facilities.
Previous wording
Corporate/Other reflects corporate support and other costs not charged or attributable to the Electric Companies or Transmission Companies, including FE’s retained pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or businesses that do not constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. Also included in Corporate/Other for segment reporting is 67 MWs of net maximum generation capacity, representing AE Supply’s OVEC capacity entitlement. As of December 31, 2024, Corporate/Other had approximately $6.1 billion of external FE holding company debt.
Current wording
FirstEnergy's Corporate/Other reflects corporate support and other costs not charged or attributable to the Electric Companies or Transmission Companies, including FE’s retained pension and OPEB assets and liabilities of former subsidiaries, interest expense on FE’s holding company debt and other investments or businesses that do not constitute an operating segment, including FEV’s investment of 33-1/3% equity ownership in Global Holding. On July 16, 2025, FEV sold its entire 33-1/3% equity ownership in Global Holding, the holding company for a joint venture in the Signal Peak mining and coal transportation operations, at book value to WMB Marketing Ventures, LLC and Pinesdale LLC for $47.5 million. Also included in Corporate/Other for segment reporting is 67 MWs of generation capacity, representing AE Supply’s OVEC capacity entitlement. As of December 31, 2025, Corporate/Other had approximately $6.8 billion of external FE holding company debt.
Previous wording
FirstEnergy invests in its regulated operations to improve reliability and the customer experience, and in its people to attract, retain and develop talented, diverse and engaged employees to carry out its strategy. This includes the following:
Current wording
FirstEnergy invests in its regulated operations to improve reliability and the customer experience, and in its people to attract, retain and develop talented, diverse and engaged employees to carry out its strategy.
Previous wording
•Distribution and Transmission investments to support improvements in grid reliability and resiliency and support the energy transition, including through:
Current wording
•Distribution and Transmission investments to support improvements in grid reliability and resiliency and support growing customer demand, including through:
Previous wording
◦Programs to drive system resiliency through automation technology and communication, including phases one and two of the Ohio Companies’ distribution grid modernization plans, Pennsylvania's LTIIP, New Jersey's EnergizeNJ, and implementing advanced metering infrastructure;
Current wording
•Programs to drive system resiliency through automation technology and communication, including the Ohio Companies’ distribution grid modernization plans, Pennsylvania's LTIIP, New Jersey's EnergizeNJ, and implementing advanced metering infrastructure;
Previous wording
◦Operational flexibility projects that are expected to build capacity and support the evolving grid such as interconnection of New Jersey offshore wind and data center load;
Current wording
•Operational flexibility projects that are expected to build capacity and support the evolving grid such as projects to support increased data center load;
Previous wording
◦Enhancing system performance by implementing new designs and technologies to reduce load at risk; and
Current wording
•Enhancing system performance by implementing new designs and technologies to reduce load at risk;
Previous wording
◦Upgrading system conditions that enhance reliability.
Current wording
•Upgrading system conditions that enhance reliability; and
Previous wording
•Generation maintenance projects that maintain operations of fossil fuel plants and remain compliant with environmental regulations through the end of their useful life.
Current wording
•Generation maintenance projects that maintain operations of fossil electric generation facilities and remain compliant with environmental regulations through the end of their useful life.
Previous wording
•FirstEnergy believes there is a continued long-term pipeline of investment opportunities for its existing distribution and transmission infrastructure beyond those opportunities identified through 2029, which are expected to strengthen grid and cyber security and make the transmission system more reliable, robust, secure and resistant to extreme weather events, with improved operational flexibility.
Current wording
•FirstEnergy believes there is a continued long-term pipeline of investment opportunities for its existing distribution and transmission infrastructure beyond those opportunities identified through 2030, which are expected to strengthen the grid and cyber security and make the transmission system more reliable, robust, secure and resistant to extreme weather events, with improved operational flexibility.
Previous wording
FirstEnergy aims to do this through a strengthened financial position. Since 2021, FirstEnergy has raised $7 billion in equity capital and issued $1.5 billion in convertible notes in May 2023 to significantly improve its balance sheet. The strength of FirstEnergy’s balance sheet supports its plan to fund Energize365 investments through organic internal cash flows and the issuance of debt rather than incremental equity. FirstEnergy has optimized its financing plan to retain flexibility in an uncertain interest rate environment. FirstEnergy has also taken steps to reduce potential volatility risk associated with its pension plan. In January 2025, FirstEnergy executed an additional pension lift-out transaction associated with over $652 million in pension obligations relating to its former competitive generation employees. This lift-out transaction, combined with the lift-out completed in 2023, removed approximately $1.4 billion in total pension plan assets and obligations associated with approximately 3,900 former competitive generation employees.
Current wording
FirstEnergy aims to execute its Energize365 investment plan through a strengthened financial position. Energize365 capital investments included in the current five-year plan are expected to be funded with a combination of organic cash flows, the issuance of debt, including hybrid securities, and the issuance of common equity. FirstEnergy believes it has optimized its financing plan to retain flexibility in an uncertain interest rate environment. FirstEnergy has also taken steps to reduce potential volatility risk associated with its pension plan. In January 2025, FirstEnergy executed an additional pension lift-out transaction associated with over $652 million in pension obligations relating to its former competitive generation employees. This lift-out transaction, combined with the lift-out completed in 2023, removed approximately $1.4 billion in total pension plan assets and obligations associated with approximately 3,900 former competitive generation employees.
Previous wording
FirstEnergy also expects to continue returning value to shareholders. In March 2024, the FE Board declared a $0.015 per share increase to the quarterly common stock dividend payable June 1, 2024, to $0.425 per share, which represents an approximate 6% increase compared to dividends declared in 2023. Modest dividend growth is expected to enable enhanced shareholder returns, while still allowing for continued substantial regulated investments. Dividend payments are subject to declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings growth, credit metrics and other business conditions.
Current wording
FirstEnergy continues to return value to shareholders. In February 2026, the FE Board declared a $0.02 per share increase to the quarterly cash common stock dividend to $0.465 per share payable June 1, 2026, which represents a 4.5% increase compared to dividends declared in 2025. Modest dividend growth is expected to enable enhanced shareholder returns, while still allowing for continued substantial regulated investments. Dividend payments are subject to declaration by the FE Board, and future dividend decisions determined by the FE Board may be impacted by earnings, cash flows, credit metrics and general economic and other business conditions.
Previous wording
•On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ with the NJBPU that would, among other things, support grid modernization, system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. On February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of the base rate case settlement, to remove the high-priority circuits that are to be addressed in the first phase of its reliability improvement plan and to include the second phase of its reliability improvement plan that is expected to further address certain high-priority circuits that require additional upgrades. EnergizeNJ, if approved as amended, will result in the investment of approximately $930.5 million of total estimated costs over five years. JCP&L and various parties are engaged in settlement discussions with respect to the pending EnergizeNJ petition.
Current wording
On November 9, 2023, JCP&L filed a petition for approval of its EnergizeNJ petition with the NJBPU that would, among other things, support grid modernization, system resiliency and substation modernization in technologies designed to provide enhanced customer benefits. On February 14, 2024, the NJBPU approved the stipulated settlement between JCP&L and various parties, resolving JCP&L’s request for a distribution base rate increase. On February 27, 2024, as part of the stipulated settlement, JCP&L amended its pending EnergizeNJ petition following receipt of NJBPU approval of the base rate case settlement, to remove the high-priority circuits that are to be addressed in the first phase of its reliability improvement plan and to include the second phase of its reliability improvement plan that is expected to further address certain high-priority circuits that require additional upgrades. On April 10, 2025, JCP&L, joined by various parties, filed a stipulated settlement with the NJBPU resolving JCP&L’s amended EnergizeNJ petition. The settlement provides for total program costs of $339 million, including capital investments in JCP&L’s electric distribution system of approximately $203 million, $132 million of matching capital investments and approximately $4 million of O&M expense. Pursuant to the settlement, the program began on July 1, 2025, and will continue through December 31, 2028, and JCP&L has agreed to file a base rate case no later than January 1, 2030.
Previous wording
•On April 5, 2023, the Ohio Companies sought approval from the PUCO for their ESP V. The proposed plan would maintain an eight-year term beginning June 1, 2024, and continue riders recovering costs associated with distribution infrastructure investments and approved grid modernization investments. ESP V additionally proposed new riders that would support reliability, and included provisions supporting affordability and enhancing the customer experience. On May 15, 2024, the PUCO issued an order approving ESP V with modifications, which are described below in “Outlook - State Regulation - Ohio”. On June 14, 2024, the Ohio Companies filed an Application for Rehearing, which was denied by operation of law as the PUCO did not rule on the applications for rehearing within 30 days of filing. Due to the risks and uncertainty resulting from the Ohio Companies’ application for rehearing being denied by operation of law, on October 29, 2024, the Ohio Companies filed a notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV, which was approved by the PUCO on December 18, 2024. On January 22, 2025, the PUCO approved the Ohio Companies’ ESP IV compliance tariffs with an effective date of February 1, 2025, at which point the Ohio Companies resumed operating under ESP IV with modifications, as described below in “Outlook - State Regulation - Ohio”.
Current wording
On April 5, 2023, the Ohio Companies sought approval from the PUCO for their ESP V. The proposed plan would maintain an eight-year term beginning June 1, 2024, and continue riders recovering costs associated with distribution infrastructure investments and approved grid modernization investments. ESP V additionally proposed new riders that would support reliability, and included provisions supporting affordability and enhancing the customer experience. On May 15, 2024, the PUCO issued an order approving ESP V with modifications, which are described in “Outlook - State Regulation - Ohio,” in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations". On June 14, 2024, the Ohio Companies filed an application for rehearing, which was denied by operation of law as the PUCO did not rule on the applications for rehearing within 30 days of filing. Due to the risks and uncertainty resulting from the Ohio Companies’ application for rehearing being denied by operation of law, on October 29, 2024, the Ohio Companies filed a notice of their intent to withdraw ESP V and proposed the terms under which they would resume operating under ESP IV, which was approved by the PUCO on December 18, 2024. On January 22, 2025, the PUCO approved the Ohio Companies’ ESP IV compliance tariffs with an effective date of February 1, 2025, at which point the Ohio Companies resumed operating under ESP IV with modifications, as described in “Outlook - State Regulation - Ohio,” in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations". On April 7, 2025, certain intervenors filed an appeal to the Supreme Court of Ohio challenging the Ohio Companies’ return to ESP IV. On May 22, 2025, the Supreme Court of Ohio granted the Ohio Companies motion to intervene in the appeal as appellees. On July 7, 2025, OCC and NOAC filed their Appellants’ brief. Appellees, including the Ohio Companies, filed their briefs on August 26, 2025, to which the OCC and NOAC replied on September 15, 2025.
Previous wording
On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates based on a 2024 calendar year test period. The Ohio Companies requested a net increase in base distribution revenues of approximately $94 million compared to test period revenues, with a return on equity of 10.8% and capital structures of 44% debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, which reflects a roll-in of current riders such as DCR and AMI. Key components of the base rate case filing include a proposal to change pension and OPEB recovery to the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and OPEB expense requested in the proceeding and the actual amount each year using this method. Additionally, the Ohio Companies request recovery of certain incurred costs, including the impact of major storms, a program to convert streetlights to LEDs, and others. On June 14, 2024, the Ohio Companies filed supporting testimony. On July 31, 2024, the Ohio Companies filed an update that adjusted the net increase in base distribution revenues to approximately $190 million compared to test period revenues and incorporated matters in the rate case as directed by the PUCO’s ESP V order. On January 27, 2025, the Ohio Companies filed a notice in the base rate case notifying parties that they will update their application for an increase in base distribution rates to reflect the withdrawal of ESP V and the reversion to ESP IV. The PUCO Staff hired a third party to assist in the review of the Ohio Companies' base rate case filing, and on February 21, 2025, PUCO staff and the third party auditor each filed their reports. The auditor’s report recommended adjustments which would result in a net increase of the Ohio Companies’ base distribution revenues of approximately $8 million with a return on equity of 9.63% and capital structures of 48.8% debt and 51.2% equity for each of the Ohio Companies. PUCO staff’s report takes limited positions on the auditor’s finding and recommendations and makes additional findings. The Ohio Companies plan to respond and file supplemental testimony by March 24, 2025.
Current wording
On May 31, 2024, the Ohio Companies filed their application for an increase in base distribution rates based on a 2024 calendar year test period. The Ohio Companies requested a net increase in base distribution revenues of approximately $94 million with a return on equity of 10.8% and capital structures of 44% debt and 56% equity for CEI, 46% debt and 54% equity for OE, and 45% debt and 55% equity for TE, which reflects a roll-in of current riders such as DCR and AMI. Key components of the base rate case filing included a proposal to change pension and OPEB recovery to the delayed recognition method and to implement a mechanism to establish a regulatory asset (or liability) to recover (or refund) net differences between the amount of pension and
Previous wording
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the U.S. Attorney’s Office investigation into FirstEnergy relating to FirstEnergy’s lobbying and governmental affairs activities concerning HB 6 related to the federal criminal allegations made in July 2020, against former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. Among other things under the DPA, FE paid a $230 million monetary penalty in 2021 and agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will FirstEnergy seek any tax deduction related to such payment. As of July 22, 2024, FirstEnergy had successfully completed the obligations required within the three-year term of the DPA. Under the DPA, FirstEnergy has an obligation to continue (i) publishing quarterly a list of all payments to 501(c)(4) entities and all payments to entities known by FirstEnergy operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict the DPA; (iii) notifying the U.S. Attorney’s Office of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office until the conclusion of any related investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office, including the January 17, 2025, indictment against two former FirstEnergy senior officers, as described below in “Outlook -- Other Legal Proceedings - United States v. Larry Householder, et al.”. Within 30 days of those matters concluding, and FirstEnergy’s successful completion of its remaining obligations, the U.S. Attorney’s Office will dismiss the criminal information.
Current wording
On July 21, 2021, FE entered into a three-year DPA with the U.S. Attorney’s Office that, subject to court proceedings, resolves the U.S. Attorney’s Office investigation into FirstEnergy relating to FirstEnergy’s lobbying and governmental affairs activities concerning HB 6 related to the federal criminal allegations made in July 2020, against former Ohio House Speaker Larry Householder and other individuals and entities allegedly affiliated with Mr. Householder. Among other things under the DPA, FE paid a $230 million monetary penalty in 2021 and agreed to the filing of a criminal information charging FE with one count of conspiracy to commit honest services wire fraud. The $230 million payment will neither be recovered in rates or charged to FirstEnergy customers, nor will FirstEnergy seek any tax deduction related to such payment. As of July 22, 2024, FirstEnergy had successfully completed the obligations required within the three-year term of the DPA. Under the DPA, FirstEnergy has an obligation to continue: (i) publishing quarterly a list of all payments to 501(c)(4) entities and all payments to entities known by FirstEnergy operating for the benefit of a public official, either directly or indirectly; (ii) not making any statements that contradict the DPA; (iii) notifying the U.S. Attorney’s Office of any changes in FirstEnergy’s corporate form; and (iv) cooperating with the U.S. Attorney’s Office until the conclusion of any related investigation, criminal prosecution, and civil proceeding brought by the U.S. Attorney’s Office, including the January 17, 2025, indictment against two former FirstEnergy senior officers, as described below in “Outlook -- Other Legal Proceedings -U.S. v. Larry Householder, et al.,” in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations". Within 30 days of those matters concluding, and FirstEnergy’s successful completion of its remaining obligations, the U.S. Attorney’s Office will dismiss the criminal information.
Previous wording
Despite the many disruptions FirstEnergy has faced, and continues to currently face, the leadership team remains committed and focused on executing its strategy and running the business. See “Outlook - Other Legal Proceedings” below for additional details on the government investigations, the DPA, and ongoing litigation surrounding the investigation of HB 6. See also “Outlook - State Regulation - Ohio” below for details on the PUCO proceeding reviewing political and charitable spending and legislative activity in response to the investigation of HB 6. The outcome of the government investigations, PUCO proceedings, legislative activity, and any of these lawsuits is uncertain and could have a material adverse effect on FirstEnergy’s financial condition, results of operations and cash flows.
Current wording
See “Outlook - Other Legal Proceedings” in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for additional details regarding the DPA, and ongoing litigation surrounding the investigation of HB 6. See also “Outlook - State Regulation - Ohio” in Item 7., "Management's Discussion and Analysis of Financial Condition and Results of Operations" for details on the now-resolved PUCO proceeding reviewing political and charitable spending and legislative activity in response to the investigation of HB 6. The outcome of the legislative activity, and any of these lawsuits is uncertain and could have a material adverse effect on FirstEnergy’s financial condition, results of operations and cash flows. The FirstEnergy leadership team remains committed and focused on executing its strategy and running the business.
Previous wording
Earnings attributable to FE from continuing operations was $978 million or $1.70 per basic and diluted share in 2024 compared to $1,123 million or $1.96 per basic and diluted share in 2023, representing a decrease of $145 million that was primarily due to the following:
Current wording
Earnings attributable to FE was $1,020 million or $1.77 per basic share ($1.76 per diluted share) in 2025 compared to $978 million or $1.70 per basic and diluted share in 2024, representing an increase of $42 million that was primarily due to the following:
Previous wording
•A $100 million civil penalty resulting from the SEC investigation and a $19.5 million settlement with the OAG's office as further discussed below in “Outlook - Other Legal Proceedings”;
Current wording
•The absence of the $100 million civil penalty resulting from the SEC investigation and the $19.5 million settlement with the OAG’s office in 2024;
Previous wording
These were partially offset by the following:
Current wording
These factors were partially offset by the following:
Previous wording
•$60 million due to the approval in the first quarter of 2024 to recover costs of certain retired generation stations by the WVPSC;
Current wording
• The absence of a $60 million (pre-tax) benefit associated with the approval by the WVPSC to recover costs of certain retired generation stations in the first quarter of 2024;
Showing the first 40 of 204 pairs. Open the source sections for the rest.
Rearranged current paragraphs (18)
Current report — wording carried from elsewhere
• Higher revenues from regulated capital investments that increased rate base;
Current report — wording carried from elsewhere
• The absence of a $53 million pre-tax charge at JCP&L in the first quarter of 2024 associated with certain corporate support costs recorded to capital accounts from the FERC Audit that were determined, as a result of the base rate case settlement agreement, to be disallowed from future recovery; and
Current report — wording carried from elsewhere
•The absence of the $100 million civil penalty resulting from the SEC investigation and the $19.5 million settlement with the OAG's office in 2024;
Current report — wording carried from elsewhere
The following table provides information about the composition of JCP&L's net regulatory assets that do not earn a current return as of December 31, 2025 and 2024, of which approximately $76 million and $45 million, respectively, are currently being recovered through rates over varying periods, through 2068, depending on the nature of the deferral:
Current report — wording carried from elsewhere
Capital investments by business segment for JCP&L are included below:
Current report — wording carried from elsewhere
As of December 31, 2025, JCP&L’s net deficit in working capital (current assets less current liabilities) was primarily due to accounts payable, short-term borrowings, accrued interest, and compensation and benefits. JCP&L believes its cash from operations and available liquidity will be sufficient to meet its current working capital needs. See further discussion on cash from operations below.
Current report — wording carried from elsewhere
(3) Amounts represent committed capital expenditures and other capital-like investments that earn a return.
Current report — wording carried from elsewhere
The 2029 Convertible Notes and 2031 Convertible Notes bear interest at a rate of 3.625% per year and 3.875% per year, respectively, payable semiannually in arrears on January 15 and July 15 of each year, beginning on January 15, 2026. The 2029 Convertible Notes and 2031 Convertible Notes are unsecured and unsubordinated obligations of FE and will mature on January 15, 2029 and January 15, 2031, respectively, unless earlier converted or repurchased in accordance with their terms.
Current report — wording carried from elsewhere
The notes are included within “Long-term debt and other long-term obligations” on the FirstEnergy Consolidated Balance Sheets. Proceeds from the issuance were approximately $2.47 billion, net of issuance costs.
Current report — wording carried from elsewhere
On December 5, 2024, JCP&L issued $700 million of senior unsecured notes due in 2035 in a private offering that included a registration rights agreement in which JCP&L agreed to conduct an exchange offer of these senior notes for like principal amounts registered under the Securities Act. On April 1, 2025, JCP&L filed a registration statement on Form S-4 with the SEC, which became effective on April 11, 2025.
Current report — wording carried from elsewhere
JCP&L has various financial and performance guarantees and indemnifications which are issued in the normal course of business. These contracts include stand-by LOCs and surety bonds. JCP&L enters into these arrangements to facilitate commercial transactions with third parties by enhancing the value of the transaction to the third party. The maximum potential amount of future payments JCP&L could be required to make under these guarantees as of December 31, 2025, was $48 million.
Current report — wording carried from elsewhere
In the normal course of business, JCP&L may enter into physical or financially settled contracts for the sale and purchase of electric capacity, energy, fuel and emission allowances. Certain agreements contain provisions that require JCP&L to post collateral. This collateral may be posted in the form of cash or credit support with thresholds contingent upon JCP&L's credit rating from each of the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty.
Current report — wording carried from elsewhere
JCP&L has posted $28 million of collateral in the form of LOCs as of December 31, 2025. JCP&L is holding $2 million of net cash collateral as of December 31, 2025, from certain generation suppliers, and such amount is included in "Other current liabilities" on JCP&L's Balance Sheets.
Current report — wording carried from elsewhere
These credit-risk-related contingent features stipulate that if JCP&L were to be downgraded or lose its investment grade credit rating (based on its senior unsecured debt rating), it would be required to provide additional collateral. See Note 14., "Commitments, Guarantees and Contingencies," of the Combined Notes to Financial Statements of the Registrants for more information.
Current report — wording carried from elsewhere
On October 31, 2023, offshore wind developer, Orsted, announced plans to cease development of two offshore wind projects in New Jersey—Ocean Wind 1 and 2—having a combined planned capacity of 2,248 MWs. On January 30, 2025, and February 25, 2025, Shell New Energies US LLC and EDF Renewables North America respectively announced that each was exiting its Atlantic Shores partnership to construct wind energy off the shore of New Jersey. On June 4, 2025, Atlantic Shores filed a petition with the NJBPU, requesting consent to terminate its 1.5 GW offshore wind project. These cancellations are not expected to directly affect JCP&L’s awarded projects.
Current report — wording carried from elsewhere
FERC’s Division of Audits and Accounting initiated a nonpublic audit of FESC in February 2019. Among other matters, the audit is evaluating FirstEnergy’s compliance with certain accounting and reporting requirements under various FERC regulations. On
Current report — wording carried from elsewhere
On May 23, 2023, the EPA published a proposed rule pursuant to CAA Section 111 (b) and (d) in line with the decision in West Virginia v. Environmental Protection Agency intended to reduce power sector GHG emissions (primarily CO2 emissions) from fossil fuel based EGUs. On April 25, 2024, the EPA issued a final rule, which we refer to as the GHG rule, that imposed stringent GHG emissions limitations based on fuel type and unit retirement date. In May 2024, a group of 25 states, including West Virginia, filed a challenge to the rule in the D.C. Circuit. Also in May 2024, other utility groups, including the Midwest Ozone Group and Electric Generators for a Sensible Transition, both of which MP is a member, filed petitions for review of the GHG rule as well as motions to stay the rule in the D.C. Circuit. The D.C. Circuit subsequently granted a motion from the EPA placing the litigation in abeyance until further order of the Court. On June 17, 2025, the EPA published a proposed rule to repeal the GHG rule. The EPA is expected to issue a final rule repealing all or portions of the GHG rule in February 2026.
Current report — wording carried from elsewhere
JCP&L's Transmission segment, representing $1.4 billion in rate base as of December 31, 2025, includes transmission infrastructure owned and operated by JCP&L that is used to transmit electricity. The segment’s revenues are primarily derived from forward-looking formula rates, pursuant to which the revenue requirement is updated annually based on a projected rate base and projected costs, which are subject to an annual true-up based on actual rate base and costs. The segment’s results also reflect the net transmission expenses related to the delivery of electricity on JCP&L’s transmission facilities.
Rearranged previous paragraphs (19)
Previous report — wording carried elsewhere
On November 30, 2020, AE Supply submitted a closure deadline extension request to the EPA seeking to extend the cease accepting waste date for the McElroy's Run CCR impoundment facility to October 2024, which request was withdrawn by AE Supply on July 9, 2024, prior to the completion of the technical review by the EPA. As of May 31, 2024, AE Supply ceased accepting waste at the McElroy’s Run CCR impoundment facility from Pleasants Power Station. As of December 31, 2024, AE Supply continues to operate the dry landfill adjacent to McElroy’s Run as a disposal facility for Pleasants Power Station. During the second quarter of 2024, as a result of the evaluation of closure options for McElroy’s Run and the adjacent landfill, AE Supply reviewed its ARO and future expected costs to remediate, resulting in an increase to the ARO liability and corresponding increase to “Other operating expense” of $87 million at Corporate/Other for segment reporting. On February 3, 2025, AE Supply executed an environmental liability transfer agreement with a subsidiary of IDA Power, LLC, whereby AE Supply will transfer the McElroy’s Run CCR impoundment facility and adjacent dry landfill and related remediation obligations. The agreement requires AE Supply to establish a $160 million escrow account that AE Supply will fund over five years. The escrow funding obligation will be secured by a surety bond, which will be guaranteed by FE. The transaction is expected to close before the end of the first quarter of 2025 and the derecognition of the ARO is not expected to have a material impact to FirstEnergy’s financial statements, however, no assurances of the closing of the transfer will be satisfied, including transfer of all required environmental permits. See Note 10, “Asset Retirement Obligations,” of the Notes to Consolidated Financial Statements.
Previous report — wording carried elsewhere
Earnings attributable to FE from continuing operations was $1,123 million or $1.96 per basic and diluted share in 2023 compared to $406 million or $0.71 per basic and diluted share in 2022, representing an increase of $717 million that was primarily due to the following:
Previous report — wording carried elsewhere
These were partially offset by the following:
Previous report — wording carried elsewhere
Detailed segment reporting explanations are included below.
Previous report — wording carried elsewhere
Distribution services by customer class are summarized in the following table:
Previous report — wording carried elsewhere
(1) Reflects the reclassification of certain Pennsylvania customers from Industrial to Commercial. Due to the January 2024 consolidation of the Pennsylvania Companies, certain customers are classified as Commercial effective June 1, 2024. The MWh deliveries prior to the effective date have been adjusted for comparability.
Previous report — wording carried elsewhere
The financial results discussed below in Segment Results of Operations include revenues and expenses from transactions among FirstEnergy’s business segments. A reconciliation of segment financial results is provided in Note 16, “Segment Information,” of the Notes to Consolidated Financial Statements.
Previous report — wording carried elsewhere
•Wholesale generation revenues decreased $62 million in 2024, as compared to 2023, primarily due to lower capacity revenues and lower market prices, partially offset by higher sales volumes. The difference between current wholesale generation revenues and certain energy costs incurred is deferred for future recovery or refund, with no material impact to earnings.
Previous report — wording carried elsewhere
Financial results from Corporate/Other resulted in a $312 million increase in losses attributable to FE from continuing operations for 2024 compared to 2023, primarily due to:
Previous report — wording carried elsewhere
The increase in losses were partially offset by:
Previous report — wording carried elsewhere
Distribution Segment — 2023 Compared with 2022
Previous report — wording carried elsewhere
Integrated Segment — 2023 Compared with 2022
Previous report — wording carried elsewhere
•Retail generation sales increased $115 million in 2023, as compared to 2022, primarily due to higher non-shopping generation auction rates, partially offset by lower sales volumes. Retail generation sales, other than those in West Virginia, have no material impact to earnings.
Previous report — wording carried elsewhere
Transmission revenues increased $36 million in 2023, as compared to 2022, primarily due to higher rate base from regulated investment programs.
Previous report — wording carried elsewhere
•Fuel costs decreased $192 million in 2023, as compared to 2022, primarily due to lower unit costs and consumption volumes. Due to the ENEC, fuel expense has no material impact to earnings.
Previous report — wording carried elsewhere
Stand-Alone Transmission Segment — 2023 Compared with 2022
Previous report — wording carried elsewhere
Corporate/Other — 2023 Compared with 2022
Previous report — wording carried elsewhere
In December 2023, FirstEnergy, executed a lift-out transaction with Banner Life Insurance Company and Reinsurance Group of America that transferred approximately $683 million of plan assets and $719 million of plan obligations, associated with approximately 1,900 former competitive generation employees, who will assume future and full responsibility to fund and administer their benefit payments. There was no change to the pension benefits for any participants as a result of the transfer. The transaction was funded by pension plan assets and resulted in a pre-tax gain of approximately $36 million, which was included in the fourth quarter 2023 pension and OPEB mark-to-market adjustment charge.
Previous report — wording carried elsewhere
Energy Infrastructure Reinvestment Program of the IRA of 2022. JCP&L submitted the second part of its two-part application on March 13, 2024, which was approved on May 17, 2024. The DOE Loan Program Office has initiated a due diligence review of the application.