Skip to main content

TECK RESOURCES LTD

For the period ended Oct 28, 2026. Filed Oct 30, 2026.

View on SEC.gov

About this filing

What a company based outside the US has published at home or sent to its shareholders. It is how many foreign companies share results and news between annual reports.

Oct 28, 2026 · Filed Oct 30, 2026

Use the contents to explore the available documents and sections.

TECK$60.46+0.9%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.2 · ZINC SEGMENT

ZINC SEGMENT

Three months ended September 30,Nine months ended September 30,
(CAD$ in millions)2026202520262025
Zinc price (realized – US$/pound)$1.70$1.29$1.65$1.27
Production (000’s tonnes)
Refined zinc6253186162
Zinc in concentrate1107122325375
Sales (000’s tonnes)
Refined zinc6352187165
Zinc in concentrate1251273343399
Gross profit$465$305$1,153$641
Gross profit before depreciation and amortization2$638$454$1,378$838
Property, plant and equipment expenditures$117$85$252$198

Performance

Gross profit from our zinc segment was $465 million in the third quarter, an increase of $160 million compared to the same period last year. The increase was primarily due to higher zinc prices and higher by-product revenues at both Red Dog and Trail, partially offset by higher cost of sales attributable to increased concentrate purchase costs and royalty costs compared to the same period last year. Gross profit before depreciation and amortization 2 at Trail Operations improved significantly in the third quarter to $169 million from $54 million in the same period last yeardue to our continued focus on improving Trail's profitability and cash generation through value driven optimization of feed sources and production, including prioritizing the processing of residues in the near term based on suitable market conditions. The benefit of these initiatives, combined with improved pricing for by-products such as silver and germanium, contributed to an increase in gross profit before depreciation and amortization 2 in the third quarter compared to the same period last year.

Zinc production at Red Dog in the third quarter decreased by 15,500 tonnes from the same period last year to 106,500 tonnes, primarily due to lower grades, as expected in the mine plan. Red Dog's lead production of 20,600 tonnes decreased by 6,800 tonnes compared to the same period last year due to lower grades. Zinc in concentrate sales volumes from Red Dog of 246,700 tonnes in the third quarter were 26,100 tonnes lower than the same period last year, and were within our previously disclosed guidance range of 220,000 to 270,000 tonnes.

Refined zinc production at Trail Operations in the third quarter was 61,900 tonnes, an increase of 9,300 tonnes compared to the same period last year higher as a result of the zinc electrolytic plant running at full capacity through the quarter, compared to the same period last year where we were operating at lower rates. We continued to optimize feed sources, including balancing the processing of stockpiled residues with the processing of residues generated from the zinc circuit, as expected during the quarter.

Notes:

1.Excludes co-product zinc production and sales from our 22.5% proportionate interest in Antamina.
2.This is a non-GAAP financial measure or ratio. See “Use of Non-GAAP Financial Measures and Ratios” for further information.
18Teck Resources Limited 2026 Third Quarter News Release

The table below summarizes the change in gross profit in our zinc segment for the quarter.

Gross Profit (CAD$ in millions)Three months ended September 30,
As reported in the third quarter of 2025$305
Increase (decrease):
Zinc price realized251
Sales volumes(33)
Unit operating costs(98)
Co-product and by-product contribution89
Royalties(40)
Foreign exchange15
Depreciation(24)
Net increase$160
As reported in current quarter$465

Property, plant and equipment expenditures in the third quarter totalled $117 million, including $42 million for sustaining capital, of which $17 million related to our Trail Operations and $25 million related to our Red Dog Operations. The remainder of the expenditures related to our Red Dog mine life extension project.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.