HAWAIIAN ELECTRIC INDUSTRIES INC
For the period ended Dec 31, 2024. Filed Feb 24, 2025.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Feb 24, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-02-29.
0000354707-24-000012
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-24.
0000354707-25-000013
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 342 previous paragraphs and 290 current paragraphs.
93 unchanged; 103 reworded; 88 added; 140 removed; 6 previous and 6 current paragraphs rearranged.
Tables are not compared: 31 previous and 24 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (88)
Current report
Effective November 1, 2024, HEI and Hawaiian Electric entered into two definitive settlement agreements (collectively, the Settlement Agreements) to settle the tort-related legal claims in the litigation arising out of the Maui windstorm and wildfires (expressly excluding securities and derivative actions) on a global basis without any admission of liability. Under the Settlement Agreements, subject to certain conditions (including those described below), HEI and Hawaiian Electric, along with other defendants (the State of Hawaii, the County of Maui, Kamehameha Schools, entities affiliated with the West Maui Land
Current report
Co., Hawaiian Telcom, and Spectrum/Charter Communications) have agreed to settle the claims of those who filed lawsuits in state and federal courts, or who may have claims but have not yet filed lawsuits, in connection with the Maui windstorm and wildfires. One Settlement Agreement is between the defendants, class counsel, and class plaintiffs (the Class Settlement Agreement), and the other is between the defendants and over 30 lawyers representing numerous individual plaintiffs who have brought their own lawsuits (the Individual Settlement Agreement). The Settlement Agreements do not resolve claims with insurers who have asserted or could assert subrogation claims in separate lawsuits and such insurers are not parties to the Settlement Agreements, but resolving such claims in the manner set forth in the Settlement Agreements (described below) is a condition that must be satisfied before any payment is due from the defendants. Both Settlement Agreements remain subject to court approval and other conditions, including those set out below.
Current report
Under the Settlement Agreements, HEI and Hawaiian Electric are obligated to contribute a total of $1.99 billion (out of a total defendant contribution of approximately $4.04 billion), which includes $75 million previously contributed for the One ‘Ohana Initiative(a humanitarian aid fund to provide payments outside of litigation to the beneficiaries of those who died, as well as compensation for personal injury damages). The total settlement amount is to be divided between two settlement funds, one for the benefit of individual plaintiffs, and the other for the benefit of the class plaintiffs. HEI and Hawaiian Electric must pay such amounts in four equal annual installments of approximately $479 million, with the first installment expected to be made no earlier than the fourth quarter of 2025. HEI and Hawaiian Electric have the option to accelerate the payments, in whole or in part, with such accelerated payments to be discounted at a rate of 5.5% per annum. HEI transferred the amount of the first payment, $479 million, into a new subsidiary, which is restricted from disbursing such funds except in connection with the initial payment to the settlement funds. Additionally, under the Settlement Agreements, HEI and Hawaiian Electric are obligated to contribute a share to the settlement administration fees only if certain other sources are exhausted when those fees are due, for which $3.5 million was accrued as of December 31, 2024 based on the best estimate at that time.
Current report
The Settlement Agreements are intended to resolve all of the tort-related legal claims related to the Maui windstorm and wildfires. The Class Settlement Agreement provides releases by plaintiffs to the defendants, and among defendants, for acts and omissions relating to the Maui windstorm and wildfires. The Individual Settlement Agreement provides that individual plaintiffs who elect to accept the settlement will sign releases. The releases in the Settlement Agreements, including those among defendants (subject to certain conditions), are effective on the initial payment due date. The Settlement Agreements also provide that $500 million of the total settlement payments will be reserved and made available to defendants to defray the cost to resolve any claims brought by plaintiffs who do not release claims as part of the settlements. Defendants have the right to terminate the Settlement Agreements under certain circumstances, including if more than specified thresholds of plaintiffs choose not to participate in the settlement.
Current report
The Settlement Agreements contain multiple conditions that must be met before any payment from HEI and Hawaiian Electric to the settlement funds are due. Those conditions include, among others, resolving claims of the insurers (either through agreement or a final court order stating that the insurers cannot maintain independent lawsuits against the defendants), legislation appropriating money from the state, and court approval of the Settlement Agreements.
Current report
The Settlement Agreements do not resolve claims with insurers who have asserted subrogation claims in separate lawsuits, and such insurers are not parties to the Settlement Agreements. However, the Settlement Agreements provide that all subrogation claims by insurers that have been or could be brought against defendants arising out of the Maui windstorm and wildfires must be resolved in order for HEI and Hawaiian Electric’s payment obligation to arise. The Settlement Agreements include a condition to the defendants’ obligations providing that by May 19, 2025, either (a) insurers that have brought claims arising out of the Maui windstorm and wildfires enter into a written agreement that provides for releases of all claims against the defendants, or (b) that there is a final and unappealable court order providing that if the final definitive agreement between the plaintiffs and the defendants becomes effective, then those same insurers’ exclusive remedy for any claims against the defendants would be limited to asserting liens against the settlement amounts obtained by the individual plaintiffs. On February 6, 2025, after briefing was complete, the Supreme Court of Hawaii heard argument on three reserved questions regarding the scope of Hawaii subrogation law concerning the condition described in this paragraph in the manner described in (b) above. On February 10, 2025, the Hawaii Supreme Court issued an order regarding the reserved questions providing that, once the settlement becomes final, the exclusive remedy for insurers seeking to recover amounts paid to settling plaintiffs is to assert liens against their policyholders pursuant to HRS 663-10. The Hawaii Supreme Court is expected to issue a written opinion providing further detail on its decision in the coming weeks.
Current report
The Company intends to vigorously defend itself in the litigation if a definitive settlement is ultimately not achieved. There is no assurance that the Company will be successful in the defense of the litigation or that insurance will be available or adequate to fund any potential settlements, judgments, or costs associated with the litigation. If additional liabilities were to be incurred, the loss could be material to the Company’s results of operations, financial position and cash flows and could result in violations of the financial covenants in the Company’s debt agreements. If any such losses were to be sufficiently high, the
Current report
Company may not have liquidity or the ability to access liquidity at levels necessary to satisfy such losses. However, any possible loss in excess of the amount recorded cannot reasonably be estimated at this time.
Current report
The foregoing descriptions of the Settlement Agreements do not purport to be complete and are qualified in their entirety by reference to the full text of the Settlement Agreements attached as exhibits to the Form 8-K that was filed with the SEC on November 5, 2024.
Current report
HEI and Hawaiian Electric determined that making payments under the terms of the Settlement Agreements in four equal annual installments is the most viable option and have classified the first $479 million installment as a current liability based on expected timing of the payment and the remaining $1.44 billion as a noncurrent liability on HEI’s and the Utilities’ Consolidated Balance Sheets. The Settlement Agreements contain no admission of any liability by HEI or the Utilities and reflect the collective efforts of the State, HEI and the Utilities, and other defendants to seek a comprehensive resolution of the litigation arising out of the Maui windstorm and wildfires. The Utilities have recorded an additional $40 million in “Accounts receivable and unbilled revenues, net” and “Other accounts receivable, net” on HEI’s and the Utilities’ Consolidated Balance Sheets, respectively, as of December 31, 2024, based on the amounts expected to be remaining under the applicate insurance policies at time of settlement payment.
Current report
In an effort to finance the first settlement payment, on September 25, 2024, HEI completed the sale of 62.2 million shares of common stock. The shares were issued under a registration statement registering up to $575 million of common stock. The net proceeds from the sale of common stock amounted to approximately $557.7 million. In addition, on September 19, 2024, HEI filed with the SEC an at-the-market (ATM) offering program under which HEI may offer and sell, from time to time at its sole discretion, its common stock, without par value, having an aggregate offering price of up to $250 million. To date, HEI has not sold any common stock under this program. HEI is working with its financial advisors on additional financing plans to raise capital necessary to fund the remaining $1.44 billion settlement amount.
Current report
The Company is also named in securities class action and shareholder lawsuits related to the Maui windstorm and wildfires. An unsuccessful mediation was held on January 22, 2025. There is no assurance that the Company will be successful in the defense of the litigation or that insurance will be available or adequate to fund any potential settlement or judgment or the litigation costs of the action. The Company is unable to predict the ultimate outcome and is unable to make a reasonable estimate of the amount or range of loss, if any, that could result from any unfavorable outcome.
Current report
On April 16, 2024, the County of Maui Department of Fire and Public Safety (MFD) released its After-Action Report (AAR) on the Maui windstorm and wildfires, the purpose of which was to enable future enhancements to mitigate the impact of future similar major events. The AAR identified 17 issues that the MFD faced during the Maui windstorm and wildfires or needs to address and provided 111 recommendations to consider for addressing these challenges. The issues and recommendations focus on the MFD. Some of the key areas for improvement include addressing the lack of apparatus, personnel and fire stations and the need for mutual aid and communication programs. The AAR did not address the cause or origin of the fires.
Current report
On April 17, 2024, the Hawaii Attorney General released the first of three reports regarding its investigation into the Maui windstorm and wildfires (the first AG report). The first AG report chronologically details the major events and response efforts related to the Maui windstorm and wildfires, with a focus on the events concerning the Lahaina area between 2:55 p.m. on August 8, 2023, and 8:30 a.m. on August 9, 2023. It did not address the cause or origin of the fires.
Current report
On September 13, 2024, the Hawaii Attorney General released the second of three reports, concerning the timeline and facts of the Maui windstorm and wildfires (the second AG report). The second AG report focused on the events that occurred prior to, during, and immediately following the fire in Lahaina in the afternoon of August 8, 2023, including preparedness efforts, weather and its impact to infrastructure, and other fires occurring on Maui. It did not address the cause or origin of the fires.
Current report
On October 2, 2024, the MFD released its Origin and Cause Report on the fires in Lahaina on August 8, 2023, incorporating the investigative report by the Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF). The MFD/ATF reports conclude that the afternoon Lahaina fire on August 8, 2023 was a rekindle of the morning fire, and that the morning fire was caused by a damaged Maui Electric powerline that emitted sparks that ignited overgrown vegetation. The MFD/ATF reports classified the cause of the fire as “accidental.”
Current report
On January 14, 2025, the Hawaii Attorney General released the third of three reports, which, according to a press release issued the same day by the Attorney General, “organizes the findings from the first AG report and the second AG report and prioritizes a list of action items the state and all counties can use to make improvements to Hawaii’s future preparation for and response to wildfires, including recommendations on how to address each priority.”
Current report
In 2024, Governor Josh Green announced the creation of a Hawaii Climate Advisory Team (CAT), which the Governor’s office stated in a news release would “recommend steps to create a durable fund to mitigate the impacts of dynamic climate change and to develop a fair and comprehensive structure to resolve claims related to future disasters” including “develop[ing] a customized go-forward fund structure and related claims settlement mechanics.”
Current report
In January 2025, the CAT released a report titled “Policy Recommendations on Climate Disaster Resilience, Recovery and Funding.” The report recommends the creation of a $500 million disaster recovery fund, which would provide funding to certain low-income individuals for wildfires, hurricanes, floods, or other natural disasters that meet an aggregate damages threshold. Separately, the report notes that the CAT is “supportive of efforts to establish a separate disaster mitigation fund that would provide benefits to Hawaii residents,” with participation by utilities.
Current report
See “Recent developments” in Hawaiian Electric’s MD&A for additional updates.
Current report
1 Includes the results of ASB’s operations through the date of the sale of the common shares, and the loss on the sale of the common shares. See Note 5 of the Consolidated Financial Statements for more information.
Current report
Note: Total may not foot due to rounding.
Current report
1 Represents the provision to record the Utilities’ settlement of all wildfire tort-related legal claims and cross claims as of December 31, 2024. See Note 2 of the Consolidated Financial Statements.
Current report
2 Includes $18.4 million ($16.6 million by the Utilities) pursuant to an agreement to settle indemnification claims asserted by the State of Hawaii, for 2024. Also includes $3.5 million accrual related to the Utilities’ share of settlement administration fees for 2024. See Note 2 of the Consolidated Financial Statements.
Current report
4 Excludes expenses related to discontinued operations amounting to $1.3 million and $11.3 million for the years ended December 31, 2024 and 2023, respectively.
Current report
From August 8, 2023 through December 31, 2024, HEI and its subsidiaries have incurred approximately $2.2 billion of Maui windstorm and wildfires related expenses, including the Utilities’ estimate of the losses related to a settlement of all wildfire tort-related legal claims and cross claims and the One ‘Ohana Initiative contribution. Certain of these costs are reimbursable under excess liability insurance, professional liability and directors and officers liability insurance policies. As of December 31, 2024, HEI and its subsidiaries have approximately $13 million, nil and $122 million of insurance coverage remaining under the excess liability, professional liability and directors and officers liability policies, respectively, after deducting applicable retention amounts, amounts that have been recovered under insurance policies (including the One ‘Ohana Initiative contribution), and amounts expected to be recovered for incurred costs and recognized as a receivable as of year-end.
Current report
With the Company accruing its losses related to a settlement of all wildfire tort-related legal claims and cross claims as of December 31, 2024, the Company expects the Electric utility and HEI to use the remaining $13 million of insurance coverage under its excess liability policy primarily for legal expenditures, in excess of amounts deferred, in connection with the Maui windstorm and wildfires.
Current report
UHERO forecasts full year 2025 real GDP growth of 2.9%, an increase in total visitor arrivals of 2.8%, an increase in real personal income of 1.7%, and an unemployment rate of 2.8% for the state. The post-wildfire recovery of the Maui visitor industry has stalled, while tourism across the rest of the state has been flat. Although the 2024 U.S. economy continued to expand, supported by consumer and government spending, some deceleration is expected as consumers face weakening employment conditions and rising financial stress.
Current report
Note: Total may not foot due to rounding.
Current report
In late February 2024, Hamakua Energy’s first combustion turbine (CT1) and its leased combustion turbine (leased CT) unexpectedly sustained damages resulting in a plant shut down on Hawaii Island. Due to the generation capacity shortfall on Hawaii Island, unit age and extensive timeline and cost to repair CT1, in April 2024, Hamakua Energy purchased a new combustion turbine and installed the unit in May 2024 at a total cost of approximately $8.3 million. The new CT1 was placed into service in June 2024. The leased CT was returned to the lessor and a new leased CT had been delivered and placed into service in September 2024 bringing Hamakua Energy back to full capacity. Pursuant to the lease pool program agreement, Hamakua Energy is reimbursing the lessor for damages of the leased CT and accordingly, accrued $4.9 million of estimated repair costs as of December 31, 2024. Hamakua Energy’s second combustion turbine (CT2) is currently in a scheduled overhaul which has incurred delays due to supply shortages. The CT2 overhaul is expected to be completed and the unit placed back into service in the first quarter of 2025. After conducting an investigation into the root cause of the damages, it was determined that contaminated fuel led to the turbine damages. Hamakua Energy is currently working with its legal counsel and insurance company on seeking recovery of its losses related to damages sustained to its plant facilities.
Current report
In March 2024, a fire destroyed the cooling tower at the Mahipapa facility on Kauai. The fire was ignited from a vendor’s welding activities being performed on the cooling tower during its scheduled maintenance. As a result, the plant was shut down while repairs were being performed. Mahipapa completed repairs to its facility and commenced operations in early December 2024 with an expectation to ramp up to full capacity in the first quarter of 2025. As of December 31, 2024, Mahipapa has received initial insurance proceeds of $0.8 million under its business interruption policy. In addition to working with its insurance company, Mahipapa is currently working with its legal counsel on seeking reimbursement of its losses related to damages sustained to its plant facilities.
Current report
In September 2024, Pacific Current recorded a pretax long-lived asset impairment charge of $35.2 million after determining it was more-likely-than-not that the long-lived assets of Pacific Current will be sold significantly before the end of their previously estimated useful life and that the fair value of certain long-lived assets of Pacific Current were less than its carrying value. In addition, HEI forgave its intercompany loan receivable from Mahipapa, including accrued interest, amounting to $9.6 million. Concurrently, Mahipapa classified its intercompany loan payable to HEI, including accrued interest, of an equivalent amount as an equity contribution. These transactions were accounted for as equity transactions and offset in the Company’s Consolidated Balance Sheets. The impairment charge and intercompany loan transactions were non-cash in nature and did not affect the Company’s current liquidity, cash flows or any debt covenants under the Company’s existing credit agreements.
Current report
As part of HEI’s comprehensive review of strategic options for certain assets of Pacific Current, on February 7, 2025, Pacific Current entered into a Securities Purchase Agreement to sell all the membership interests in Hamakua Holdings, LLC, a wholly owned subsidiary of Pacific Current, to an unaffiliated third party for cash consideration to be determined under the provisions of the agreement. Hamakua Holdings, LLC has two wholly-owned subsidiaries: Hamakua Energy, LLC, which owns a 60-MW combined cycle power plant that sells power to Hawaii Electric Light under an existing power purchase agreement, and HAESP, LLC (created in connection with the current on-going Stage 3 RFP process). Upon closing, both Hamakua Energy and HAESP, LLC as wholly-owned subsidiaries of Hamakua Holdings will no longer be owned by Pacific Current. The close of the transaction is subject to the satisfaction of certain customary closing conditions and is expected to be finalized in March 2025. The sale transaction is not expected to have a material impact to the Company’s consolidated financial statements.
Current report
Liquidity and capital resources. HEI’s and the Utilities’ future results of operations involve significant risks and uncertainties. Factors that could affect HEI’s and the Utilities’ future operating results and could cause actual results to vary materially from expectations include, but are not limited to, access to capital, ability to attract and retain key personnel, and pending or threatened litigation (including recent wildfire related litigation noted above).
Current report
As of December 31, 2024, HEI and Hawaiian Electric had $173 million and $166 million, respectively, drawn on their revolving credit facilities and no commercial paper outstanding. As of December 31, 2024, the total amount of available borrowing capacity under HEI’s and Hawaiian Electric’s revolving credit facilities was $2 million and $34 million, respectively (see Note 6 of the Consolidated Financial Statements for additional information). As of December 31, 2024, HEI consolidated had $2.8 billion of long-term debt, net, of which $110 million is due within 12 months and $263 million is due within 24 months (see Note 7 of the Consolidated Financial Statements for additional information).
Current report
As of December 31, 2024, the Utilities accrued estimated wildfire liabilities of approximately $1.92 billion (pre-tax), related to the settlement of the Maui windstorm and wildfire tort-related claims (see Note 2 of the Consolidated Financial Statements). For 2024, HEI and its subsidiaries incurred net losses from continuing operations of approximately $1.32 billion.
Current report
When preparing financial statements for each annual and interim reporting period, management has the responsibility to evaluate whether there are conditions or events, considered in the aggregate, that raise substantial doubt about the Company’s ability to continue as a going concern within one year after the date that the financial statements are issued. In making their evaluation, the Company considers, among other things, risks and/or uncertainties related to their results of operations, contractual obligations, near-term debt maturities, dividend requirements, debt covenant compliance, or other factors impacting the Company’s liquidity and capital resources.
Current report
The Company previously concluded that as of June 30, 2024, conditions existed that raised substantial doubt about its ability to continue as a going concern, and that while the Company was working with its financial advisors on a financing plan to raise the capital necessary to mitigate those conditions, there was no assurance that management’s plans would be successful. As a result, the Company disclosed in the condensed consolidated financial statements included in the Company’s Quarterly Report on Form 10-Q for the quarter ending June 30, 2024 there was substantial doubt about the Company’s, including the Utilities’, ability to continue as a going concern.
Current report
In the third quarter of 2024, the Company determined that making payments under the terms of the Settlement Agreements in four equal annual installments is the most viable option and have classified the first $479 million installment as a current liability based on expected timing of the payment and the remaining $1.44 billion as a noncurrent liability on the Consolidated Balance Sheet. To finance the first installment payment, in September 2024, HEI completed the sale of 62.2 million shares of common stock. The shares were issued under a registration statement registering up to $575 million of common stock. The net proceeds from the sale of common stock amounted to approximately $557.7 million. In addition, HEI filed with the SEC an at-the-market (ATM) offering program under which HEI may offer and sell, from time to time at its sole discretion, its common stock, without par value, having an aggregate offering price of up to $250 million. To date, HEI has not sold any common stock under this program. In November 2024, HEI transferred the first installment payment to GLST1, a wholly-owned subsidiary created for the specific purpose of holding the first installment payment pursuant to the settlement of the Maui windstorm and wildfire tort-related legal claims (see Note 2 of the Consolidated Financial Statements). The cash of the first installment payment is classified as restricted cash on the Consolidated Balance Sheet as of December 31, 2024.
Current report
On December 31, 2024, HEI completed the sale of 90.1% of the common stock of ASB, amounting to $405.5 million, to various investors including certain officers and directors of ASB, while retaining a 9.9% noncontrolling investment in ASB amounting to $44.6 million. No investor acquired more than 9.9% of the common stock of ASB. The proceeds from the sale will be used to pay down HEI’s debt in 2025.
Showing the first 40 of 88 passages. Open the source sections for the rest.
Removed paragraphs (140)
Previous report
Bank. ASB is a full-service community bank serving both consumer and commercial customers in the State of Hawaii and has 35 branches on the islands of Oahu (25), Maui (4), Hawaii (3), Kauai (2), and Molokai (1).
Previous report
The circumstances surrounding the Maui windstorm and wildfires are currently the subject of several investigations.
Previous report
For a discussion of 2021 results, please refer to the “HEI consolidated results of operations” section in Item 7, “Management Discussion and Analysis of Financial Condition and Results of Operations—HEI Consolidated,” in the Company’s 2022 Form 10-K.
Previous report
1 Includes insurance receivable of $75 million related to the One ‘Ohana Initiative contribution.
Previous report
The Company expects the Electric utility and HEI to continue to incur significant expenditures in connection with the Maui windstorm and wildfires; however, the Company has partially mitigated the financial impact through insurance recoveries as well as the Utilities obtaining deferral treatment for incremental non-labor expense.
Previous report
While economic conditions appear to be trending favorably, the Utilities’ kWh sales in 2023 were down by 1.5%, compared to 2022 due to a decrease in Maui sales from the Maui windstorm and wildfires and the continued adoption of energy efficiency measures and distributed energy resources. While the level of kWh sales does not affect Utility revenues due to decoupling, it may increase or decrease the price per kWh paid by customers. See “Decoupling” in Note 4 of the Consolidated Financial Statements for a discussion of the decoupling mechanism.
Previous report
Since its peak in June of 2022, monthly inflation rates have decreased as reflected in the U.S. Consumer Price Index (CPI). Although the inflation rate, as measured by CPI, appears to be cooling off from last year’s peak, the rate is still at a moderately-high level of 3.4% as of December 2023. These inflationary pressures are expected to continue over the near- to medium-term and have led to higher costs for O&M and capital projects and higher interest expense at the Utilities and HEI, as well as higher compensation and benefits cost at the Bank.
Previous report
UHERO forecasts full year 2024 real GDP growth of 1.5%, an increase in total visitor arrivals of 2.0%, an increase in real personal income of 1.6%, and an unemployment rate of 2.7%. The Maui visitor industry has been recovering faster than anticipated and visitors to the rest of the state have reached record levels. The forecast anticipates visitors to Hawaii will be nearly flat in 2024, before returning to moderate growth in 2025. Hawaii has seen softer visitor spending in 2023 due to the disruption of high-priced Maui tourism along with the weak yen, which has weighed on Oahu spending. Real visitor spending is expected to drop in 2024 and 2025. The U.S. outperformed most advanced economies in 2023, but high interest rates have weighed on investment, and the labor market has softened. Consumer spending will slow as excess savings decrease, which will help bring inflation into the Fed’s target range and achieve a “soft landing” 1.1% growth in 2024. If economic conditions worsen from current levels or remain depressed for an extended period of time, it could have a material unfavorable impact on the Company’s financial position or results of operations.
Previous report
As of December 31, 2023, HEI had $175 million drawn on its revolving credit facility and no commercial paper outstanding, and $137 million of cash and cash equivalents. As of December 31, 2023, Hawaiian Electric had $200 million drawn on its revolving credit facility and no commercial paper outstanding, and $106 million of cash and cash equivalents.
Previous report
As of December 31, 2023, the total amount of available borrowing capacity (net of commercial paper outstanding) under HEI’s and Hawaiian Electric’s committed lines of credit was nil (see Note 6 of the Consolidated Financial Statements). As of December 31, 2022, the total amount of available borrowing capacity (net of commercial paper outstanding) under HEI’s and Hawaiian Electric’s committed lines of credit was approximately $125 million and $112 million, respectively.
Previous report
As of December 31, 2023, ASB’s unused FHLB borrowing capacity was approximately $1.9 billion and ASB had unpledged investment securities of $0.6 billion that were available to be used as collateral for additional borrowing capacity.
Previous report
On March 16, 2023, HEI executed a private placement under which HEI authorized the issue and sale of $100 million of unsecured senior notes that were fully drawn on May 30, 2023. The proceeds of the unsecured senior notes, HEI Series 2023A for $39 million and HEI Series 2023B for $61 million, were used to repay the $100 million term loan facility on May 31, 2023. The HEI Series 2023A and 2023B bear interest at 6.04% and 6.10%, respectively and are due June 15, 2028 and June 15, 2033, respectively. See Note 7 of the Consolidated Financial Statements for additional information.
Previous report
At ASB, liquidity remains at satisfactory levels. ASB’s cash and cash equivalents was $435 million as of December 31, 2023, compared to $156 million as of December 31, 2022. ASB remains well above the “well capitalized” level under the FDIC Improvement Act prompt correction action capital category, and while the Hawaii economic outlook remains stable, there are emerging risks from potential continued turmoil in the banking industry, inflation, higher interest rates and the tightening of monetary policy that increase the risk of a recession which could create increased uncertainty regarding the impact on loan performance and the allowance for credit losses (see “Recent Developments” in the Bank section below).
Previous report
Operating activities provided net cash of $551 million in 2023 and $454 million in 2022. Investing activities used net cash of $257 million in 2023 and $1,129 million in 2022. In 2023, net cash used in investing activities was primarily due to capital expenditures and a net increase in loans receivable, partly offset by proceeds from sale of securities, receipt of repayments from available-for-sale investment securities, proceeds from sale of commercial loans and repayments from held-to-maturity investment securities. In 2022, net cash used in investing activities was primarily due to net increase in loans receivable, purchases of available-for-sale investment securities, capital expenditures, purchases of loans held for investment and net purchases of stock from Federal Home Loan Bank, partly offset by receipt of repayments from available-for-sale and held-to-maturity investment securities.
Previous report
HEI’s commercial paper borrowings and line of credit facility were as follows:
Previous report
Note: This table does not include Hawaiian Electric’s separate commercial paper issuances and line of credit draws on its revolving credit facility, which are disclosed below under “Electric utility—Liquidity and capital resources”. The maximum amount of HEI’s short-term commercial paper borrowings in 2023 was $99 million. As of December 31, 2023, available committed capacity under HEI’s line of credit facility was nil.
Previous report
1 Prior to the August 2023 downgrades, Moody’s long-term debt rating was withdrawn because HEI did not have any outstanding, publicly traded debt. In December 2023, Moody’s assigned HEI a long-term corporate family rating of “B1.” Moody’s continues to rate Hawaiian Electric’s long-term debt. See ‘Electric utility–Liquidity and capital resources’ below.
Previous report
2 In December 2023, Moody’s revised HEI’s outlook from “Review for Downgrade” to “Stable” due to several positive developments, including proactive efforts by the State of Hawaii to develop a plan to address the financial and legal issues raised by the wildfires.
Previous report
Although the Company is unable to predict the ultimate outcome of the Maui windstorm and wildfires investigation, it is reasonably possible that the Company may incur losses related to the Maui windstorm and wildfires which may be material beyond the $75 million contribution to the One ‘Ohana Initiative and incurred legal costs. In addition, on November 6, 2023, the Hawaii Insurance Division of the State of Hawaii Department of Commerce and Consumer Affairs released preliminary data on Maui windstorm and wildfires claims, and the Hawaii Insurance Division has subsequently provided updated data. Through November 30, 2023, the data collected from over 200 insurers indicated estimated total insured losses for residential and personal property of more than $1.6 billion. The estimated total losses represent insured claims related to personal motor vehicles and residential property (i.e., homeowners insurance, dwelling-fire landlord, condominium unit owner, renters insurance, and other residential property) and do not account for uninsured or underinsured property losses, commercial property losses, interest, attorneys’ fees, fire suppression and clean-up costs, evacuation costs, personal injury or wrongful death damages, medical expenses or other costs, such as potential punitive damages, fines or penalties. It is uncertain whether the insured claims reported to the Hawaii Insurance Division are complete, and together with property damage claims unaccounted for, as mentioned above, the total amount of property damage claims could be materially higher than the amount reported by the Hawaii Insurance Division. The Hawaii Insurance Division did not state whether it intends to provide updated information in the future. See Note 2 of the Consolidated Financial Statements for more information.
Previous report
See Notes 1, 2, 4 and 5 of the Consolidated Financial Statements.
Previous report
For the full year 2023, operation and maintenance expenses were higher by approximately $36 million, or 7%, as compared to 2022. The increase was mainly due to costs incurred associated with the Maui windstorm and wildfires and higher transmission and distribution (T&D) preventative and corrective maintenance resulting primarily from more trouble calls. Higher costs due to inclement weather related issues, higher labor and employee benefits, and higher outside consulting costs on various customer service and information technology projects also contributed to the increase.
Previous report
For the full year 2023, kWh sales volume decreased 1.5% from 2022 levels. Although electricity prices have decreased since the end of 2022, elevated prices over the past year have continued to impact electricity consumption. Another impact leading to a decrease of electricity sales is due to the Maui windstorm and wildfires. Maui had a decrease of 7.1% kWh sales volume in the fourth quarter of 2023 compared to the same period in 2022. Additionally, the continued adoption of energy efficiency measures and distributed energy resources contributed to the reduction of kWh sales.
Previous report
In the second quarter of 2020, the PUC approved the deferral of certain COVID-19 related costs, such as higher bad debt expense, higher financing costs, non-collection of late payment fees, increased personal protective equipment costs, and sequestration costs for mission-critical employees. The Utilities deferred COVID-19 related costs through a PUC approved period that ended on December 31, 2021. In the second quarter of 2022, the Utilities filed an application to seek recovery of the COVID-19 deferred costs, not to exceed the amount of $27.8 million. On December 29, 2023, the PUC issued a decision and order (December 2023 D&O) approving the Utilities’ request to recover the COVID-19 related deferred costs up to $8.8 million through the Z-factor. The PUC directed the Utilities to divide COVID-19 deferred costs evenly over a three-year recovery period from 2024 through 2026. Any additional collection efforts that reduce the amount to be recovered from the Utilities’ customers shall be subtracted from the Year 3 recovery amount. As of December 31, 2023, the Utilities have recorded $8.7 million in regulatory assets for deferral of COVID-19 related costs. (See discussion under “Regulatory assets and liabilities - Regulatory assets for COVID-19 related costs” in Note 4 of the Consolidated Financial Statements).
Previous report
The Utilities cannot predict the ultimate timing and success of securing funding from any federal government programs.
Previous report
On September 1, 2022, the last coal-fired IPP plant in the state, providing approximately 10% of Oahu’s generation, ceased operations, removing a significant source of GHG emissions from the Utilities’ generation mix. In advance of the retirement of the coal-fired IPP plant, the Utilities developed plans, including contingency plans, to ensure reliable service through the transition period. These plans include the anticipated addition of renewable energy/storage projects, reserve capacity from existing generation sources, the acceleration of maintenance work during periods with anticipated higher reserve levels, and multiple demand response/DER programs. For example, from the Stage 1 renewable RFP, a 39 megawatt (MW) solar-plus-storage project reached commercial operations in mid-2022 and a 36 MW Stage 1 solar-plus-storage project reached commercial operations in early 2023. From the Stage 2 renewable RFP, a 185 MW standalone storage facility reached commercial operations in December 2023. In addition, in April 2023, a 30 MW Stage 1 solar-plus-storage project on Hawaii Island reached commercial operations.
Previous report
On June 9, 2021, the PUC issued an order providing guidance to the third Grid Service RFP filed on February 23, 2021. The proposed Grid Service RFP focused only on Oahu and is seeking 132 MW of grid services with focus on capacity reduction (60 MW) similarly in response to the potential reserve shortfall from the AES coal plant retirement that occurred on September 1, 2022. The Utilities executed a Grid Services Purchase Agreements (GSPA) for a total grid services amount of 97.4 MW and filed with the PUC to request approval on March 16, 2022. On July 12, 2023, the PUC approved the GSPA with modifications. The Utilities amended the GSPA and filed with the PUC on December 29, 2023.
Previous report
On October 31, 2022, the PUC issued an order, directing the Utilities to solicit comments from all interested parties and stakeholders on the Utilities’ Draft Grid Services RFP filed on June 30, 2022. The proposed Draft Grid Services RFP focused only on Maui and is seeking 15 MW of grid services. Hawaiian Electric issued the RFP on February 1, 2023 and bids were due on February 1, 2024.
Previous report
The Utilities filed an application with the PUC on September 30, 2019 for an Advanced Distribution Management System (ADMS) as part of Phase 2 of their Grid Modernization Strategy implementation. However, on December 30, 2019, the PUC suspended the Utilities’ application for the ADMS pending the Utilities’ filing of a supplemental application for the broad deployment of field devices. This supplement and update to the Grid Modernization Strategy Phase 2 field devices application was filed on March 31, 2021. A PUC order was issued on April 27, 2021, unsuspending and resuming consideration of the Phase 2 Application. The Utilities filed the reply statement of position on October 15, 2021, completing the discovery phase of the docket. On November 16, 2021, the PUC suspended the Utilities’ ADMS and Phase 2 field device application to focus the Utilities’ attention on completing Phase 1. The Utilities filed a Motion for Reconsideration with the PUC in response to the suspension, but the motion was denied. The PUC subsequently clarified that the Utilities may resume the Phase 2 docket no earlier than six months before Phase 1 is scheduled to be completed in the third quarter of 2024. Resumption of the Phase 2 proceeding would likely commence six months prior to the scheduled completion date selected by the PUC. On April 17, 2023, the Utilities filed a motion with the PUC, requesting the suspended docket to be reopened and to allow the Utilities to file an updated and supplemented application for updated project costs. The estimated cost for the implementation of Phase 2 over six years, which includes capital, deferred software costs and O&M costs, is $113 million. On May 3, 2023, the PUC granted the motion to resume the docket, and hosted a technical conference on the updated application on May 19, 2023. The Utilities filed the reply statement of position on September 28, 2023, completing the discovery phase of the docket. On January 19, 2024, the Utilities hosted a Technical Conference with the PUC.
Previous report
•On November 16, 2021, Hawaii Electric Light and Hawi Renewable Development, LLC (HRD) entered into an Amended and Restated Power Purchase Agreement (HRD ARPPA). Under the HRD ARPPA, HRD would make modifications to upgrade and repower the existing wind facility to enable it to continue to provide up to 10.56 MW of energy at a cost savings for customers. The HRD ARPPA is delinked from the price of fossil fuel and extends the term of the existing PPA by 20 years following the commercial operations date. On December 17, 2021, Hawaii Electric Light filed an application for approval of the HRD ARPPA, requesting a decision no later than June 15, 2022. On January 11, 2023, Hawaii Electric Light and HRD entered into a First Amendment to the HRD ARPPA (First Amendment). The First Amendment includes an extension of the Guaranteed Commercial Operations Date (GCOD) by 26 months to accommodate the delayed delivery of components, and a temporary price increase until HRD recovers its estimated increased costs specified in the First Amendment. The Amendment was conditionally approved by the PUC on July 12, 2023.
Previous report
See further discussion under “Review of Interconnection Process and Kapolei Energy Storage Power Purchase Agreement” below.
Previous report
Review of Interconnection Process and Kapolei Energy Storage Power Purchase Agreement.
Previous report
• In February 2021, the PUC initiated a docket for the purposes of reviewing the status and interconnection progress of various utility-related renewable projects (i.e. Stage 1 and Stage 2 RFP PPAs and CBRE) and the Utilities’ transition plans for the expiration of the AES power purchase agreement, the retirement of the Kahului Power Plant, and other fossil fuel power plant transition plans, as needed. The Utilities filed initial status updates on the project timelines, steps needed for each of the renewable projects to achieve commercial operation and steps the Utilities are taking to address projected extensions of GCODs for renewable projects under development, which are due to a variety of factors, including those outside of the control of the Utilities. The PUC subsequently held status conferences on the Utilities’ updates. In April 2021, the PUC issued an Order directing the Utilities to establish regulatory liabilities for the difference between the on-peak avoided cost and the unit price included in the applications for approval of the renewable project PPAs, effective with the GCOD included in the applications (the earliest GCOD included in the applications is July 2021) or from the date of the Order for CBRE Phase 1 projects. The amount of regulatory liabilities to be recorded in future periods are not determinable at this time and would be affected by a number of factors, including the length of the GCOD extension period, the monthly on-peak avoided cost, as well as the factors described above. The Utilities filed a Motion for Reconsideration of the entire Order, or in the alternative to clarify that at most the PUC is directing the Utilities to track the information and not record the information at this time. The Utilities further requested a Stay of the Order pending resolution of the Motion. The Utilities maintain that extensions of GCODs are allowed under the PUC-approved contracts and that the Order has the unintended consequence of imposing penalties against the Utilities without due process. In May 2021, the PUC issued an order clarifying its Order and directed the Utilities to track costs to consumers caused by the perceived delay of renewable projects, and that the PUC does not intend to, at this time, impose any penalties on the Utilities. The Utilities report the tracked cost on a monthly basis. The full text of the Order, Motion for Reconsideration and request for a Stay of the Order, and clarification Order as well as the tracked costs can be found on the PUC website at hpuc.my.site.com/cdms/s/search (Docket No. 2021-0024).
Previous report
•During the 2022 Legislative Session, the Hawaii State Legislature passed Senate Bill 2474 SD 2 HD 1 CD 1, which was signed into law on June 27, 2022 as Act 201. The law requires that the PUC contract with a qualified consultant to conduct a study on the accessibility of Hawaii’s electric system and procedures for interconnection to Hawaii’s electric system, including but not limited to the timeliness and costs of interconnection. The PUC contracted with PA Consulting to conduct the study as well as act as the Independent Engineer for the Stage 3 Request for Proposal procurement. The report was submitted to the PUC on December 28, 2022 and did not find any wrongdoing on the part of the utility. The report made minor recommendations for Hawaiian Electric to review interconnection related tariff/rules and revise, if necessary, to provide technical clarity in terms of interconnection requirements, to establish a database for the purpose of centralizing all information related to all interconnection projects they manage, including their self-build and IPP-built projects, and to develop comparable interconnection cost metrics for self-build and IPP-built projects so that interconnection costs can be directly compared. The PUC stated its intent to address the recommendations that are directed to Hawaiian Electric through various proceedings related to the interconnection process. Hawaiian Electric will be working on these recommendations. The contracted consultant has completed a second phase of the study, dated December 28, 2023, which included the assessment and recommendation of remaining issues listed in Act 201 that were not covered in Phase 1.
Previous report
• Also in April 2021, the PUC approved the Kapolei Energy Storage (KES) PPA (one of the PPAs as a result of the Stage 2 Renewable RFP process) (KES Decision and Order), subject to nine conditions, including the Utilities forgoing the second portion of the PIM rewards amounting up to $1.7 million for the Stage 1 RFP PPAs, removing grid constraints for the Utilities’ CBRE Phase 2 projects and for existing and new distributed energy programs, financial retirement of Hawaiian Electric generating units by specified dates and adjusting target revenues at the retirement dates for such retirements, and a requirement to charge the batteries in the project using significant levels of renewable energy generation. The financial retirement of the generating units described in the KES Decision and Order is contrary to the intent of Hawaii Revised Statutes §269-6(d), which encourages the recovery of stranded costs for the retirement of fossil fuel generation, and contrary to the regulatory compact under which in return for agreeing to commit capital necessary to allow utilities to meet their obligation to serve, utilities are assured recovery of their investment and a fair opportunity to earn a reasonable return on the capital prudently committed to the business. Hawaiian Electric filed a Motion for Reconsideration and Stay of the Decision and Order due to potentially significant financial and operational impacts. In May 2021, the PUC granted, in part, Hawaiian Electric’s Motion for Reconsideration and Stay. In this Order, the PUC addressed a number of Hawaiian Electric’s concerns, including removing the condition of the Utilities foregoing the PIM award from Stage 1 RFP projects, agreeing to address grid constraint concerns in respective DER and CBRE dockets and not in the KES docket, removing the minimum thresholds of charging energy coming from renewable energy generation and corresponding deadlines associated with these thresholds and modifying the condition on financial retirement of generating units. The PUC indicated the net book value of generating assets would be addressed at the time of retirement. The full text of the KES Decision and Order and the Motion for Reconsideration and Stay with respect thereto, and the Order granting, in part, Hawaiian Electric’s Motion for Reconsideration can be found on the PUC website at hpuc.my.site.com/cdms/s/search (Docket No. 2020-0136). On October 2, 2023, the PUC issued an order (Order No. 40293) in the proceeding regarding the retirement of Waiau Units 3 and 4, which among other things, removed one of the nine conditions from the April 2021 KES Decision and Order regarding the financial retirement of Waiau and Kahe Units by specified dates. The full text of Order No. 42093 can be found on the PUC website at hpuc.my.site.com/cdms/s/search (Docket 2023-0339).
Previous report
Liquidity and capital resources. As of December 31, 2023, Hawaiian Electric had no commercial paper outstanding, $200 million outstanding on its revolving credit facility and no remaining available borrowing capacity under the Utilities’ committed line of credit. The cash proceeds were invested in highly liquid short-term investments, and as of December 31, 2023 the Utilities’ cash and cash equivalents balance was $106 million, compared to $39 million as of December 31, 2022. The increase was primarily due to line of credit draws on revolving credit facility.
Previous report
Information about Hawaiian Electric’s commercial paper borrowings, borrowings from HEI, and line of credit facility were as follows:
Previous report
** In December 2023, Moody’s revised Hawaiian Electric’s outlook from “Review for Downgrade” to “Stable” due to several positive developments, including proactive efforts by the State of Hawaii to develop a plan to address the financial and legal issues raised by the wildfires. See Note 2 of the Consolidated Financial Statements for further information.
Previous report
SPRBs. SPRBs have been issued by the DBF to finance (and refinance) capital improvement projects of Hawaiian Electric and its subsidiaries, but the sources of their repayment are the non-collateralized obligations of Hawaiian Electric and its subsidiaries under loan agreements and notes issued to the DBF, including Hawaiian Electric’s guarantees of its subsidiaries’ obligations.
Previous report
On June 10, 2019, the Hawaii legislature authorized the issuance of up to $700 million of SPRBs ($400 million for Hawaiian Electric, $150 million for Hawaii Electric Light and $150 million for Maui Electric), with PUC approval, prior to June 30, 2024, to finance the Utilities’ multi-project capital improvement programs (2019 Legislative Authorization).
Previous report
On February 9, 2021, the PUC approved the use of the expedited approval procedure to request the issuance and sale of the remaining/unused amount of SPRBs authorized by the 2019 Legislative Authorization (i.e., total not to exceed up to $400 million for Hawaiian Electric, up to $150 million for Hawaii Electric Light, and up to $150 million for Maui Electric) during the period January 1, 2023 through June 30, 2024. On January 31, 2023, the PUC approved the Utilities’ requests to issue the remaining unused amounts of the SPRBs during the period January 1, 2023 through June 30, 2024, and the certification and approval of supplemental projects eligible to be financed by the SPRB proceeds.
Showing the first 40 of 140 passages. Open the source sections for the rest.
Reworded paragraphs (103)
Previous wording
The following discussion should be read in conjunction with the Consolidated Financial Statements and the related Notes that appear in Item 8 of this report. For information on factors that may cause HEI’s and Hawaiian Electric’s actual future results to differ from those currently contemplated by the relevant forward-looking statements, see “Cautionary Note Regarding Forward-Looking Statements” at the front of this report and “Risk Factors” in Item 1A. The general discussion of HEI’s consolidated results should be read in conjunction with the Electric utility and Bank segment discussions that follow.
Current wording
The following discussion should be read in conjunction with the Consolidated Financial Statements and the related Notes that appear in Item 8 of this report. For information on factors that may cause HEI’s and Hawaiian Electric’s actual future results to differ from those currently contemplated by the relevant forward-looking statements, see “Cautionary Note Regarding Forward-Looking Statements” at the front of this report and “Risk Factors” in Item 1A. The general discussion of HEI’s consolidated results should be read in conjunction with the Electric utility discussion that follows.
Previous wording
Executive overview and strategy. HEI is a holding company with operations primarily focused on Hawaii’s electric utility and banking sectors. In 2017, HEI formed Pacific Current to make investments in non-regulated renewable energy and sustainable infrastructure projects. HEI has three reportable segments—Electric utility, Bank, and Other.
Current wording
Executive overview and strategy. HEI is a holding company with operations primarily focused on Hawaii’s electric utility sector after selling its bank operations on December 31, 2024. In 2017, HEI formed Pacific Current to make investments in non-regulated renewable energy and sustainable infrastructure projects. On December 30, 2024, HEI, ASB, and ASB Hawaii, a wholly owned subsidiary of HEI and ASB’s parent holding company, entered into investment agreements to sell 90.1% of the common stock of ASB to various investors, including certain ASB officers and directors of ASB. The sale transaction closed on December 31, 2024 and no investor acquired more than 9.9% of the common stock of ASB. The proceeds from the sale will be used to primarily strengthen the Company’s balance sheet and promote long-term financial stability which may include partially paying down its long-term debt, funding the wildfire settlement amount, and/or for other corporate purposes. Subsequent to the sale, HEI has one reportable segment: Electric utility. HEI and its other subsidiaries which are not reportable segments are grouped and reported as an “All Other” non-reportable segment.
Previous wording
Other. The Other segment comprises the results of Pacific Current, which invests in non-regulated clean energy and sustainable infrastructure in the State of Hawaii to help reach the state’s sustainability goals, and HEI’s corporate-level operating, general and administrative expenses.
Current wording
All Other. The All Other segment primarily comprises the results of Pacific Current, which invested in non-regulated clean energy and sustainable infrastructure in the State of Hawaii to help reach the state’s sustainability goals, and HEI’s corporate-level operating, general and administrative expenses. However, subsequent to the Maui windstorm and wildfires, HEI and Pacific Current have suspended any new investments while undertaking a comprehensive review of strategic options for certain assets of Pacific Current.
Previous wording
A major focus of HEI’s financial strategy is to grow core earnings/profitability at the Utilities, Bank and Pacific Current in a controlled risk manner and optimize operating, capital and tax efficiencies in order to support its dividend and deliver shareholder value.
Current wording
While a major focus of HEI’s financial strategy is to grow core earnings/profitability at the Utilities and Pacific Current in a controlled risk manner and optimize operating, capital and tax efficiencies in order to support its dividend and deliver shareholder value, HEI is working on strategic financing plans to raise capital necessary to fund the settlement of wildfire tort claims.
Previous wording
Recent developments. On August 8, 2023, a number of brush fires in the West Maui (Lahaina) and Upcountry Maui areas caused widespread property damage, including damage to property of the Utilities, and 101 confirmed fatalities in Lahaina at this time (the Maui windstorm and wildfires). The Maui windstorm and wildfires were fueled by extreme winds and drought-like conditions in those parts of Maui. According to the Maui Police Department’s Preliminary After-Action Report, in addition to the loss of life, over 3,450 acres burned and over 3,000 structures were destroyed in those areas. In Lahaina, a fire was reported at about 6:30 a.m. (the “Morning Fire”) and appears to have been caused by power lines that fell in high winds and spread into a field near Lahaina Intermediate School. The Maui Fire Department responded promptly to the Morning Fire, and according to the Fire Department’s public statement that morning, by 9 a.m. the Morning Fire was “100% contained.” The Maui fire chief subsequently reported that the Fire Department had determined that the Morning Fire was “extinguished” and left the scene. Shortly before 3 p.m. that day, while the power remained off, Utility crew members saw a small fire in the same field about 75 yards away from Lahainaluna Road. They immediately called 911 and reported the fire (the “Afternoon Fire”). At the time of the Afternoon Fire, the Company’s power lines in the area where that fire ignited were not energized and had not been energized for more than six hours. By the time the Maui Fire Department arrived back on the scene, it was not able to contain the Afternoon Fire and it spread out of control toward Lahaina. No determination as to the cause of the Afternoon Fire has been made. The Company believes that most of the property damage and all of the fatalities are from the Afternoon Fire.
Current wording
Recent developments. On August 8, 2023, a number of brush fires in the West Maui (Lahaina) and Upcountry Maui areas caused widespread property damage, including damage to property of the Utilities, and 102 confirmed fatalities in Lahaina (the Maui windstorm and wildfires). The Maui windstorm and wildfires were fueled by extreme winds and drought-like conditions in those parts of Maui.
Previous wording
As of February 27, 2024, HEI and the Utilities have each been named in 108 lawsuits related to the Maui windstorm and wildfires. These civil and class action lawsuits have been filed in the Maui and Oahu Circuit Courts against HEI, the Utilities, and other defendants, including the County of Maui, the State of Hawaii and related state entities, private landowners and developers, and telecommunications companies (collectively, “tort-related legal claims”). Most of these lawsuits allege that the defendants were responsible for, and/or negligent in failing to prevent or respond to the wildfires that led to the property destruction and loss of life. Other claims include, among other things, personal injury, wrongful death, emotional distress and inverse condemnation. One lawsuit asserting similar theories and claims was filed by the County of Maui against HEI and the Utilities and two other lawsuits were filed by approximately 160 subrogation insurers against HEI, the Utilities, a private landowner, and telecommunication companies. Additional lawsuits may be filed against the Company and other defendants in the future. The plaintiffs seek to recover damages and other costs, including punitive damages. In addition to the tort-related legal claims, the Company is also involved in a securities class action and three shareholder lawsuits. Refer to Note 2 of the Consolidated Financial Statements for more information on these lawsuits.
Current wording
As of February 14, 2025, HEI and the Utilities have each been named in approximately 783 lawsuits related to the Maui windstorm and wildfires. These civil and putative class action lawsuits are pending in the Maui Circuit Court against HEI, the Utilities, and other defendants, including the County of Maui, the State of Hawaii and related state entities, private landowners and developers, and telecommunications companies (collectively, tort-related legal claims). One putative class action is also pending in federal court. Most of these lawsuits allege that the defendants were responsible for, and/or negligent in failing to prevent or respond to, the wildfires that led to the property destruction and loss of life. Other claims include, among other things, personal injury, wrongful death, emotional distress and inverse condemnation. One lawsuit asserting similar theories and claims was filed by the County of Maui against HEI and the Utilities, one lawsuit was filed by Spectrum Oceanic, LLC against HEI and the Utilities and other defendants, and other lawsuits were filed by approximately 160 subrogation insurers against HEI, the Utilities, a private landowner, and telecommunications companies. Additional lawsuits may be filed against the Company and other defendants in the future. The plaintiffs seek to recover damages and other costs, including punitive damages. Defendants have asserted cross-claims against one another for indemnification, contribution, and subrogation.
Previous wording
In 2021, the Company identified a number of priorities that reflect the essential connection between the health of Hawaii’s environment, economy and communities and HEI’s long-term success. The key sustainability priorities the Company is working to advance include:
Current wording
In 2021, the Company identified a number of priorities that reflect the essential connection between the health of Hawaii’s environment, economy and communities and HEI’s long-term success. Those sustainability priorities included:
Previous wording
•ensuring resilience as the Company adapts to a changing climate, which is exacerbating conditions that can lead to increasing risk of droughts, severe storms, flooding, wildfires and other extreme weather events and natural disasters;
Current wording
•ensuring resilience, including safety, as the Company adapts to a changing climate, which is exacerbating conditions that can lead to increasing risk of droughts, severe storms, flooding, wildfires and other extreme weather events and natural disasters;
Previous wording
•promoting diversity, equity and inclusion both within the Company and in the ways the Company interacts with and impacts external stakeholders;
Current wording
•promoting inclusion both within the Company and in the ways the Company interacts with and impacts external stakeholders;
Previous wording
•Expanded sustainability goals as part of HEI and Utility executive incentive compensation.
Current wording
•sustainability goals as part of HEI and Utility executive incentive compensation.
Previous wording
The Company issued its first consolidated sustainability report in September 2020. The report was aligned with Sustainability Accounting Standards Board (SASB) guidance—using the electric utilities standard for Hawaiian Electric, and the commercial banks, commercial finance, and mortgage finance standards for ASB. The Company has since further developed its sustainability reporting to include SASB disclosures for Hawaiian Electric and ASB and disclosures regarding risks and opportunities related to climate change, as well as associated risk management and governance processes, based on recommendations from the Task Force on Climate-related Financial Disclosures. It has also outlined key impacts for the Company under two climate scenarios, including a scenario targeted to limit global temperature rise to 2 degrees Celsius or lower. The Company’s most recent reports include HEI’s enterprise-wide GHG emissions inventory, providing the basis to further guide the Company's strategies and enable greater transparency around its progress on climate issues. Net enterprise-wide GHG emissions in measured categories have decreased over time, driven largely by reductions in the utility’s generation-related emissions intensity. The Company’s sustainability reports can be found at www.hei.com/sustainability.
Current wording
The Company issued its first consolidated sustainability report in September 2020. The report was aligned with Sustainability Accounting Standards Board guidance. The Company has since further developed its sustainability reporting to include disclosures regarding risks and opportunities related to climate change, as well as associated risk management and governance processes, based on recommendations from the Task Force on Climate-related Financial Disclosures. It has also outlined key impacts for the Company under two climate scenarios, including a scenario targeted to limit global temperature rise to two degrees Celsius or lower. The Company’s most recent reports include HEI’s enterprise-wide GHG emissions inventory, providing the basis to further guide the Company's strategies and enable greater transparency around its progress on climate issues. Net enterprise-wide GHG emissions in measured categories have decreased over time, driven largely by reductions in the utility’s generation-related emissions intensity. The Company’s sustainability reports can be found at www.hei.com/sustainability.
Previous wording
In 2023, net income for HEI common stock decreased (17)% to $199 million ($1.81 diluted earnings per share), compared to $241 million ($2.20 diluted earnings per share) in 2022, due to $27 million lower net income at ASB and $20 million higher net loss at the “Other” segment, partly offset by $5 million higher net income at the Utilities. The decrease in ASB’s 2023 net income compared to 2022 was primarily due to a loss on the sale of investment securities and Maui wildfires related costs. The decrease in the “Other” segment’s 2023 net income compared to 2022 was primarily due to Maui windstorm and wildfires related costs and higher operating expenses at Pacific Current. The increase in the Utilities’ 2023 net income compared to 2022 was principally due to higher ARA revenues, which included the customer dividend delivered to customers, partially offset by higher operating expenses. See “Electric utility,” “Bank,” and “HEI Consolidated—Other segment” sections below for additional information on year-to-year fluctuations.
Current wording
In 2024, net income (loss) from continuing operations for HEI common stock decreased to $(1,323) million compared to $146 million in 2023, due to $(1,420) million lower net income at the Utilities as a result of recording $1,875 million of provision, net, for wildfire tort-related claims in 2024. In 2023, income from continuing operations decreased 9% to $146 million ($1.33 diluted earnings per share), compared to $161 million ($1.47 diluted earnings per share) in 2022, due to $20 million higher net loss at the “All Other” segment, partly offset by $5 million higher net income at the Utilities. The decrease in the “All Other” segment’s 2023 net income compared to 2022 was primarily due to Maui windstorm and wildfires related costs and higher operating expenses at Pacific Current. The increase in the Utilities’ 2023 net income compared to 2022 was principally due to higher ARA revenues, which included the customer dividend delivered to customers, partially offset by higher operating expenses. See “Electric utility” and “HEI Consolidated—All Other segment” sections below for additional information on year-to-year fluctuations.
Previous wording
The Company’s effective tax rate (combined federal and state income tax rates) was comparable at 18% in 2023, compared to 20% in 2022, primarily due to a decrease in income before income taxes in 2023, which increased the rate impact of certain tax items, higher nontaxable bank-owned life insurance, partially offset by the lower amortization in 2023 of the Utilities’ regulatory liability related to certain excess deferred income taxes resulting from the Tax Act’s decrease in the federal income tax rate.
Current wording
The Company’s effective tax rate (combined federal and state income tax rates) was at 26% tax benefit in 2024, compared to 19% tax expense in 2023, primarily due to the substantial pretax loss resulting from the accrual of the loss contingencies related to the Maui windstorm and wildfires tort-related claims and the impact of permanent items on the effective tax rates including federal research and development tax credit claims in 2024, partially offset by an increase in excess taxes related to vesting of share-based awards and lower amortization in 2024 of the Utilities’ regulatory liability related to certain excess deferred income taxes resulting from the Tax Act’s decrease in the federal income tax rate.
Previous wording
Maui windstorm and wildfires related expenses, net. For 2023, the Company’s incremental expenses related to the Maui windstorm and wildfires, which includes the $75 million contribution and insurance receivable as discussed in Note 2 of the Consolidated Financial Statements, were as follows:
Current wording
Maui windstorm and wildfires related expenses, net. The Company’s incremental expenses related to the Maui windstorm and wildfires, as discussed in Note 2 of the Consolidated Financial Statements, for the years ended December 31, 2024 and 2023 were as follows:
Previous wording
2 Related to the PUC’s order, received on December 27, 2023, approving deferred accounting treatment for the Utilities’ incremental non-labor expenses related to the August 2023 Maui windstorm and wildfires. Amounts were reclassified to a regulatory asset. See Item 1A. “Risk Factors” for further discussion of regulatory risks. See Note 2 of the Consolidated Financial Statements.
Current wording
3 Related to the PUC’s order, received on December 27, 2023, approving deferred accounting treatment for the Utilities’ incremental non-labor expenses related to the August 2023 Maui windstorm and wildfires. Amounts were reclassified to a regulatory asset. See “Risk Factors” in Item 1A. for further discussion of regulatory risks. See Note 2 of the Consolidated Financial Statements.
Previous wording
Note: Other segment Maui windstorm and wildfires related expenses - legal, outside services and other are included in “Expenses-Other” and interest expense is included “Interest expense, net—other than on deposit liabilities and other bank borrowings” on the HEI and subsidiaries Consolidated Statements of Income. See Electric utility and Bank sections below for more detail.
Current wording
Note: All Other segment Maui windstorm and wildfires related expenses - legal, outside services and other are included in “Expenses-Other” and interest expense is included in “Interest expense, net” on the HEI and subsidiaries Consolidated Statements of Income. See Electric utility section below for more detail.
Previous wording
In the fourth quarter, the average daily passenger count was 1.7% higher than the comparable period in the prior year, but down 5.6% compared to the 2019 pre-COVID-19 count. The recovery in total passenger counts from the low levels in 2020, which occurred under COVID-19 restrictions, thus far has been driven by domestic travelers, with international travelers, primarily Japan, remaining at lower levels, but activity is increasing compared to 2022. In the fourth quarter, international visitor arrivals (excluding Japan) have continued to increase at a modest pace, but are still 16% below 2019 levels, whereas Japanese visitors are 45% below 2019 levels.
Current wording
In the fourth quarter, the average daily passenger count was 4.2% higher than the comparable period in the prior year. The recovery in total passenger counts from the low levels in 2020, which occurred under COVID-19 restrictions, thus far has been driven by domestic travelers, with international travelers, including Japanese travelers, remaining at lower levels. In the fourth quarter, international visitor arrivals (excluding Japan) remained 18.9% below 2019 pre-COVID-19 levels. Due to the weak yen, Japanese visitors are 41.8% below 2019 pre-COVID-19 levels.
Previous wording
Hawaii’s seasonally adjusted unemployment rate in December 2023 was 2.9%, which was lower compared to the December 2022 rate of 3.7%. The national unemployment rate in December 2023 was 3.7% compared to 3.5% in December 2022. According to the most recent forecast by UHERO, issued on December 15, 2023, job growth in the state will decrease to 1% for 2024 and 2025. The Maui windstorm and wildfires destroyed a majority of the businesses in Lahaina, and tourism in West Maui is not expected to recover for some time. However, unemployment is forecasted to be lower than initially expected, reflecting faster employment recovery and anticipated outflows from the labor force as some residents relocate off island. Accordingly, unemployment on Maui is predicted to average 4.4% in 2024, receding to 3.1% by 2026.
Current wording
Hawaii’s seasonally adjusted unemployment rate in December 2024 was 3.0%, consistent with the rate observed in December 2023. The national unemployment rate in December 2024 was 4.1% compared to 3.8% in December 2023. According to the most recent forecast by UHERO, issued on December 13, 2024, job growth in the state will decrease to 0.7% for 2025 and 0.6% for 2026. Although visitor recovery after the wildfires was somewhat stronger than expected, that recovery has now stalled as Maui hotels are seeing historically low occupancy rates. Similarly, the labor market on Maui remains constrained by post-fire disruptions and outmigration, with employment remaining well below pre-wildfire levels. Unemployment in Maui County is predicted to recede to 3.2% in 2025 and 2026.
Previous wording
Hawaii real estate activity through December 2023, as indicated by Oahu’s home resale market, resulted in an increase in the median sales price of 1.5% for condominiums and a decrease of 5.1% for single-family homes compared to the same period in 2022, with the December median single-family home price of $996,500, below the record $1,153,500 set in May 2022. The number of closed sales decreased 24.4% for condominiums and 9.9% for single-family residential homes through the fourth quarter of 2023 compared to 2022.
Current wording
Hawaii real estate activity through December 2024, as indicated by Oahu’s home resale market, resulted in an increase in the median sales price of 1.3% for condominiums and an increase of 4.8% for single-family homes compared to the same period in 2023, with the December median single-family home price of $1,054,500, below the record $1,153,500 set in May 2022. The number of closed sales through December 2024 decreased 2.5% for condominiums and increased 9.1% for single-family residential homes compared to the same period in 2023.
Previous wording
Hawaii’s petroleum product prices relate to the crude oil in international markets. The price of crude oil has decreased through July 2023 and since then, gradually increased through September and then decreased through December, although remaining below 2022’s peak.
Current wording
Hawaii’s petroleum product prices relate to the crude oil in international markets. The price of crude oilhas decreased about 10.9% over the same quarter in the prior year.
Previous wording
At its December 13, 2023 meeting, the Federal Open Market Committee (FOMC) decided to maintain the federal funds rate target range of 5.25% - 5.50%. The FOMC is still assessing plans to adjust their stance on monetary policy depending on the economic outlook to achieve maximum employment and inflation at the rate of 2 percent over the long run. The Federal Reserve stated that it will continue to reduce its holdings of Treasury securities and agency mortgage-backed securities.
Current wording
At its December 18, 2024 meeting, the Federal Open Market Committee (FOMC) decided to lower the federal funds rate target range by 1/4 percentage point to 4.25% - 4.5%. The FOMC’s decision reflects their judgement that the risks to achieving its goals of maximum employment and an inflation rate of 2 percent over the longer run, are roughly in balance. The Federal Reserve stated that it will continue to reduce its holdings of Treasury securities, agency debt, and agency mortgage-backed securities.
Previous wording
See also “Recent Developments” in the “Electric utility” and “Bank” sections below for further discussion of the economic impact of recent events.
Current wording
See also “Recent Developments” in the “Electric utility” section below for further discussion of the economic impact of recent events.
Previous wording
Other segment. The “other” business segment (loss)/income includes results of the stand-alone corporate operations of HEI, ASB Hawaii, and Pacific Current.
Current wording
All Other segment. The “All Other” business segment (loss)/income includes results of the stand-alone corporate operations of HEI, ASB Hawaii, GLST1, and Pacific Current.
Previous wording
Liquidity and capital resources. The Company’s objective continues to be to operate a strong, financially healthy enterprise to empower a thriving future for Hawaii. While the fundamentals of its businesses remain strong, the Company took prudent and measured actions to reinforce its commitment to serving the community for the long term. In August 2023, HEI and Hawaiian Electric fully drew down $175 million and $200 million, respectively, on their existing revolving credit facilities. The cash proceeds were primarily invested in highly liquid short-term investments and used for general corporate purposes. The Company has taken additional prudent measures to strengthen its financial position while continuing to provide reliable service to its customers and reinforcing our commitment to serving the community for the long term. Some of these proactive measures include suspending the quarterly cash dividend on HEI’s common stock after payment of the second quarter dividend in September 2023 and reducing or eliminating discretionary costs. At ASB, approximately $185 million of investment securities primarily with below-market yields were sold with the proceeds used to pay down higher cost funding sources. The Company is working with financial advisors to maximize liquidity and believes it has adequate cash to meet its financial obligations and sustain operations in the short term.
Current wording
The Company’s objective continues to be to operate a strong, financially healthy enterprise to empower a thriving future for Hawaii. While the fundamentals of its businesses remain strong, the Company took prudent and measured actions to reinforce its commitment to serving the community for the long term. In August 2023, HEI and Hawaiian Electric fully drew down $175 million and $200 million, respectively, on their existing revolving credit facilities. The cash proceeds were primarily invested in highly liquid short-term investments and used for general corporate purposes. The Company has taken additional prudent measures to strengthen its financial position while continuing to provide reliable service to its customers and reinforcing HEI’s commitment to serving the community for the long term. Some of these proactive measures include suspending the quarterly cash dividend on HEI’s common stock after payment of the second quarter dividend in September 2023 and reducing or eliminating discretionary costs.
Previous wording
The Company believes that its cash and cash equivalents and expected operating cash flow from operations will be sufficient to meet the Company’s cash requirements in the short term based on its current business plans. However, the Company expects that HEI and the Utilities’ liquidity will continue to be impacted as a result of the August 2023 downgrades of their credit ratings to below investment grade which prevents the Company from accessing unsecured, short-term borrowings and will continue to have restricted access to the capital markets and other sources of debt and equity financing in a timely manner and on acceptable terms while the resolution of the Maui windstorm and wildfires and the ongoing related lawsuits are pending. Additionally, higher working capital requirements resulting from lingering COVID-19 impacts to the local economy and elevated fuel prices, could also increase liquidity needs. For the Utilities, while fuel prices have moderated from their highs in 2022, they remain elevated and have increased the cost of carrying fuel inventory and higher customer accounts receivable balances as fuel is consumed and billed to customers. While the accounts receivable balance has decreased since December 2022, it remains elevated coming out of the pandemic and has led to higher bad debt expense and higher write-offs in 2022 and 2023, following the end of the moratorium on disconnections. The higher bad debt expense is expected to continue until the Utilities return to pre-pandemic collection practices, along with a decrease in volume, for delinquent accounts. The Maui windstorm and wildfires have not and are not anticipated to materially impact accounts receivable and higher bad debt expense. As of December 31, 2023, approximately $22 million of the Utilities’ accounts receivables were over 30 days past due. Of the over 30 days past due amounts, approximately 49% were on payment plans. In addition to the cash flow impact from delayed collection of accounts receivable, lower kWh sales relative to the level of kWh sales approved in the last rate case generally result in delayed timing of cash flows, resulting in higher working capital requirements (see “Recent Developments” in the Electric utility section below).
Current wording
For the Utilities, while fuel prices have moderated from their highs in 2022, they remain elevated and have increased the cost of carrying fuel inventory and higher customer accounts receivable balances as fuel is consumed and billed to customers. While the accounts receivable balance has decreased since December 2023, it remains elevated coming out of the pandemic and has led to higher bad debt expense and higher write-offs in 2023 and 2024, following the end of the moratorium on disconnections. The higher bad debt expense is expected to continue until the Utilities return to pre-pandemic accounts receivable balances, along with a decrease in volume, for delinquent accounts. The Maui windstorm and wildfires have not and are not anticipated to materially impact accounts receivable, however, it has and will continue to lead to higher bad debt expense. As of December 31, 2024, approximately $18.3 million of the Utilities’ accounts receivables were over 30 days past due, which is a decrease of approximately 17% since December 2023. In addition to the cash flow impact from delayed collection of accounts receivable, lower kWh sales relative to the level of kWh sales approved in the last rate case generally result in delayed timing of cash flows, resulting in higher working capital requirements (see “Recent Developments” in the Electric utility section below).
Previous wording
If further liquidity is deemed necessary in the short term, the Utilities could also reduce the pace of capital spending related to non-essential projects, manage O&M expenses, seek borrowings on a secured basis, and explore asset sales.
Current wording
If further liquidity is deemed necessary in the short term, Hawaiian Electric could also use its available capacity on its $250 million ABL Facility, reduce the pace of capital spending related to non-essential projects, manage O&M expenses, seek borrowings on a secured basis, and explore asset sales.
Previous wording
HEI Consolidated material cash requirements. Material cash requirements of HEI Consolidated include: Utility related capital expenditures (including capital expenditures related to wildfires and wildfire mitigations), labor and benefit costs, O&M expenses, legal and consulting costs related to the Maui windstorm and wildfires, fuel and purchase power costs, and debt and interest payments; Bank related investments in loans; HEI related labor and benefits costs, shareholder dividends, debt and interest payments and legal and consulting costs related to the Maui windstorm and wildfires; and HEI equity contributions to support Pacific Current’s sustainable infrastructure investments.
Current wording
HEI Consolidated material cash requirements. Material cash requirements of HEI Consolidated include: payments related to settlement of tort-related legal claims and cross claims; Utility related capital expenditures (including capital expenditures related to wildfires and wildfire mitigations), labor and benefits costs, O&M expenses, legal and consulting costs related to the Maui windstorm and wildfires, fuel and purchase power costs, and debt and interest payments; HEI related labor and benefits costs, debt and interest payments and legal and consulting costs related to the Maui windstorm and wildfires; and HEI equity contributions to support Pacific Current’s sustainable infrastructure investments.
Previous wording
Forecasted HEI consolidated “net cash used in investing activities” (excluding “investing” cash flows from ASB) consists primarily of the net capital expenditures of the Utilities principally related to maintaining and modernizing the grid to allow for the integration of more renewable energy, improved customer reliability, greater system efficiency and enhanced resilience. The Utilities’ capital expenditures are forecasted to be funded primarily through a combination of retained earnings and proceeds from other sources of debt financings (see also discussion regarding other material cash requirements under “Financial Condition–Liquidity and capital resources,” contained in the “Electric utility” and “Bank” sections below). In addition to the funds required for the Utilities’ construction programs and debt maturities, with respect to HEI, approximately $50 million will be required in 2025 to repay maturing long-term debt. Debt maturities are expected to be repaid with the proceeds from existing cash on hand, and if available, the issuance of commercial paper, bank borrowings, other medium- or long-term debt, issuance of common stock and/or dividends from subsidiaries. The abilities of certain of HEI’s subsidiaries to pay dividends or make other distributions to HEI are subject to contractual and regulatory restrictions (see Note 15 of the Consolidated Financial Statements). Additional debt and/or equity financing, if available, may be utilized to invest in the Utilities, Bank or Pacific Current; to pay down commercial paper or other short-term borrowings, if any; to pay interest costs; or to fund unanticipated expenditures, such as increases in the costs of, or an acceleration of, the construction of capital projects of the Utilities or unanticipated utility capital expenditures. In addition, existing debt may be refinanced prior to maturity with additional debt or equity financing (or both).
Current wording
Forecasted HEI consolidated “net cash used in investing activities” consists primarily of the net capital expenditures of the Utilities principally related to maintaining and modernizing the grid to allow for the integration of more renewable energy, improved customer reliability, greater system efficiency and enhanced resilience. The Utilities’ capital expenditures are forecasted to be funded primarily through a combination of retained earnings and proceeds from other sources of debt financings (see also discussion regarding other material cash requirements under “Financial Condition–Liquidity and capital resources,” contained in the “Electric utility” section below). In addition to the funds required for the Utilities’ construction programs and debt maturities, with respect to HEI, approximately $50 million will be required in the fourth quarter of 2025 to repay maturing long-term debt if not refinanced. In the future, if the Company is unable to refinance scheduled maturing debt, then debt maturities are expected to be repaid with the proceeds from existing cash on hand, other medium- or long-term debt, and/or dividends from subsidiaries. The ability of Hawaiian Electric to pay dividends or make other distributions to HEI are subject to contractual and regulatory restrictions (see Note 15 of the Consolidated Financial Statements). Additional debt and/or equity financing, if available, may be utilized to invest in the Utilities or Pacific Current; to pay down commercial paper or other short-term borrowings, if any; to pay interest costs; or to fund unanticipated expenditures, such as increases in the costs of, or an acceleration of, the construction of capital projects of the Utilities or unanticipated utility capital expenditures. In addition, existing debt may be refinanced prior to maturity with additional debt or equity financing (or both).
Previous wording
Certain Maui windstorm and wildfires legal-related costs of HEI and the Utilities, including the One ‘Ohana Initiative contribution, are recoverable under $165 million of excess liability insurance and $145 million of directors and officers liability insurance policies (see further information in Note 2 of the Consolidated Financial Statements). As of December 31, 2023, HEI and the Utilities have approximately $66 million and $139 million of insurance coverage remaining under the excess liability and directors and officers liability policies, respectively, after deducting applicable retention amounts and estimated insurance recoveries, including the One ‘Ohana Initiative contribution.
Current wording
Certain Maui windstorm and wildfires legal-related costs of HEI and the Utilities are recoverable under $165 million of excess liability insurance, $25 million of miscellaneous professional liability insurance, and $145 million of directors and officers liability insurance policies (see further information in Note 2 of the Consolidated Financial Statements). As of December 31, 2024, HEI and the Utilities have approximately $13 million, nil and $122 million of insurance coverage remaining under the excess liability, professional liability and directors and officers liability policies, respectively, after deducting applicable retention amounts, amounts that have been recovered under insurance policies (including the One ‘Ohana Initiative contribution), and amounts expected to be recovered for incurred costs and recognized as a receivable as of year-end.
Previous wording
Selected short-term and long-term contractual obligations and commitments. Information about payments under the specified contractual obligations and commercial commitments of HEI and its subsidiaries was as follows:
Current wording
Selected short-term and long-term contractual obligations and commitments. Information about payments under the specified contractual obligations and commitments of HEI and its subsidiaries was as follows:
Previous wording
The table above does not include other categories of obligations and commitments, such as deferred taxes, certain trade payables, amounts that will become payable in future periods under collective bargaining and other employment agreements and employee benefit plans, and potential refunds of amounts collected from ratepayers (e.g., under the earnings sharing mechanism). As of December 31, 2023, the fair value of the assets held in trusts to satisfy the obligations of the Company’s retirement benefit plans did not exceed the retirement benefit plans’ benefit obligation. Minimum funding requirements for retirement benefit plans have not been included in the table above; however, see Note 11 of the Consolidated Financial Statements for 2024 estimated contributions.
Current wording
The table above does not include other categories of obligations and commitments, such as deferred taxes, certain trade payables, amounts that will become payable in future periods under collective bargaining and other employment agreements and employee benefit plans, potential settlements of securities class action and shareholder lawsuits, and potential refunds of amounts collected from ratepayers (e.g., under the earnings sharing mechanism). As of December 31, 2024, the fair value of the assets held in trusts to satisfy the obligations of the Company’s retirement benefit plans did not exceed the retirement benefit plans’ benefit obligation. Minimum funding requirements for retirement benefit plans have not been included in the table above; however, see Note 11 of the Consolidated Financial Statements for 2025 estimated retirement benefit plan obligations and contributions.
Previous wording
See Note 4 of the Consolidated Financial Statements for a discussion of the Utilities’ commitments. See Note 5 of the Consolidated Financial Statements for a further discussion of ASB’s commitments.
Current wording
See Note 4 of the Consolidated Financial Statements for a discussion of the Utilities’ commitments.
Previous wording
Financing activities provided net cash of $196 million in 2023 and $568 million in 2022. In 2023, net cash provided by financing activities included proceeds from other bank borrowings, revolving credit facilities and long-term debt, partly offset by repayment of other bank borrowings and long-term debt, net decreases in deposit liabilities, other bank borrowings and short-term borrowings and payment of common and preferred stock dividends. In 2022, net cash provided by financing activities included net increases in other short-term borrowings and proceeds from issuance of short-term and long-term debt and net increases in short-term borrowings, partly offset by repayment of long-term debt and payment of common and preferred stock dividends.
Current wording
Financing activities provided net cash of $155 million in 2024, $196 million in 2023 and $568 million in 2022, of which financing activities from continuing operations provided net cash of $498 million in 2024, $203 million in 2023 and $6 million in 2022. In 2024, net cash provided by financing activities from continuing operations included issuance of common stock (common stock offering) and increase in short-term debt, partly offset by repayment of long-term debt and revolving credit facilities. In 2023, net cash provided by financing activities from continuing operations included proceeds from revolving credit facilities, long-term debt and short-term debt, partly offset by repayment of long-term and short-term debt, net decreases in short-term borrowings and payment of common and preferred stock dividends. In 2022, net cash provided by financing activities from continuing operations included proceeds from long-term debt and short-term debt and net increases in short-term borrowings, partly offset by repayment of long-term debt and payment of common and preferred stock dividends.
Previous wording
Other than capital contributions from their parent company, intercompany services (and related intercompany payables and receivables), Hawaiian Electric’s periodic short-term borrowings from HEI (and related interest) and the payment of dividends to HEI, the electric utility and bank segments are largely autonomous in their operating, investing and financing activities. (See the electric utility and bank segments’ discussions of their cash flows in their respective “Liquidity and capital resources” sections below.) During 2023, Hawaiian Electric and ASB (through ASB Hawaii) paid cash dividends to HEI of $129 million and $39 million, respectively.
Current wording
Other than capital contributions from their parent company, intercompany services (and related intercompany payables and receivables), Hawaiian Electric’s periodic short-term borrowings from HEI (and related interest) and the payment of dividends to HEI, the electric utility is largely autonomous in its operating, investing and financing activities. (See the electric utility segment’s discussion of its cash flows in its “Liquidity and capital resources” sections below.) During 2024, Hawaiian Electric and ASB (through ASB Hawaii prior to its sale) paid cash dividends to HEI of $26 million and nil, respectively.
Previous wording
In August 2023, due to the potential impact from the Maui windstorm and wildfires, the HEI Board of Directors voted to suspend the quarterly cash dividend, starting after the second quarter dividend. This action is intended to allow the Company to provide additional liquidity and allocate cash to rebuilding and restoring power and help ensure a strong future for the Utilities and Bank. The ASB Board of Directors determined to suspend its quarterly cash dividends to HEI, starting after the second quarter dividend, to help ensure maximum possible Bank liquidity and capital. The Hawaiian Electric Board of Directors reduced its fourth quarter cash dividend to HEI, from $32 million in the third quarter, to $13 million, to allow the Utilities to devote more resources to restoration work on Maui and to make critical capital investments, including for wildfire mitigation. A material reduction or delay in dividends or other distributions from one or more of the operating subsidiaries to HEI for an extended period of time could have a material adverse effect on the Company’s financial condition and results of operation.
Current wording
In August 2023, due to the potential impact from the Maui windstorm and wildfires, the HEI Board of Directors voted to suspend the quarterly cash dividend, starting after the second quarter 2023 dividend. This action is intended to allow the Company to provide additional liquidity and allocate cash to rebuilding and restoring power and help ensure a strong future for the Utilities and the Bank it previously owned. The ASB Board of Directors suspended its quarterly cash dividends to HEI, starting after the second quarter 2023 dividend, and the Hawaiian Electric Board of Directors suspended its quarterly dividends to HEI, starting with the second quarter 2024 dividend, which would have been paid in the third quarter of 2024. The decision of the Hawaiian Electric Board of Directors to suspend its dividend to HEI was based upon the size of the proposed settlement of wildfire tort litigation and the fact that, although HEI and the Utilities have sufficient liquidity to fund the first settlement payment, no definitive funding plan currently exists for the remaining settlement payment liability.
Previous wording
A portion of the net assets of Hawaiian Electric and ASB is not available for transfer to HEI in the form of dividends, loans or advances without regulatory approval. In the absence of an unexpected material adverse change in the financial condition of the electric utilities or ASB, such restrictions are not expected to significantly affect the operations of HEI or its ability to meet its debt or other cash obligations. See Note 15 of the Consolidated Financial Statements.
Current wording
A portion of the net assets of Hawaiian Electric is not available for transfer to HEI in the form of dividends, loans or advances without regulatory approval. In the absence of an unexpected material adverse change in the financial condition of the electric utilities, such restrictions are not expected to significantly affect the operations of HEI or its ability to meet its debt or other cash obligations. See Note 15 of the Consolidated Financial Statements.
Previous wording
The consolidated capital structure of HEI (excluding deposit liabilities and other bank borrowings) was as follows:
Current wording
The consolidated capital structure of HEI was as follows:
Previous wording
In August 2023, the credit ratings of HEI and Hawaiian Electric were subject to multiple downgrades, including to ratings below investment grade, by Fitch, Moody’s and S&P. These rating actions were primarily due to the uncertainty facing the Company due to the damages caused by the Maui windstorm and wildfires. From prior to the August 2023 downgrades, to as of February 15, 2024, the Fitch, Moody’s and S&P ratings of HEI were as follows:
Current wording
In August 2023, the credit ratings of HEI and Hawaiian Electric were subject to multiple downgrades, including to ratings below investment grade, by Fitch, Moody’s and S&P. These rating actions were primarily due to the uncertainty facing the Company due to the damages caused by the Maui windstorm and wildfires. As of February 14, 2025, the Fitch, Moody’s and S&P ratings of HEI were as follows:
Previous wording
Although the Company’s credit rating downgrades related to the Maui windstorm and wildfires will continue to adversely impact its ability to access capital markets and other sources of debt and equity financing, if at all, in a timely manner and on acceptable terms, the Company currently believes that its ability to generate cash, both internally from electric utility and banking operations and the existing cash fully drawn on its revolving credit facilities is adequate to maintain sufficient liquidity to fund its contractual obligations and commercial commitments, its forecasted capital expenditures and investments, its expected retirement benefit plan contributions and other material cash requirements in the short term. However, in the long-term, any material reduction or extended delay in dividends or other distributions from one or more operating subsidiaries to HEI and the potential damages and losses related to the Maui windstorm and wildfires and related lawsuits (see further information in Note 2 of the Consolidated Financial Statements), the economic impact of higher fuel prices, inflation, higher interest rates, tightening of monetary policy and geopolitical situations, create significant uncertainty, and the Company cannot predict the extent or duration of these conditions, the future effects that these conditions will have on the Company’s cost of capital and its ability to access additional capital, or the future impacts on the Company’s financial position, results of operations, and cash flows. See Item 1A. “Risk Factors” in Part I for further discussion of risks and uncertainties.
Current wording
The Company’s credit rating downgrades related to the Maui windstorm and wildfires will continue to adversely impact its ability to access capital markets and other sources of debt and equity financing, if at all, in a timely manner and on acceptable terms. Through the sale of common stock in September 2024, the Company has raised sufficient cash to pay the first installment of the settlement of wildfire tort claims expected to be made no earlier than the fourth quarter of 2025. The Company is currently working with its financial advisors on a financing plan to raise the additional capital required to fund its remaining wildfire tort claims. While management believes the Company will be able to raise the necessary capital, there is no assurance that management’s plans will be successful. The potential damages and losses related to the Maui windstorm and wildfires and related lawsuits (see further information in Note 2 of the Consolidated Financial Statements), the suspension of dividends from Hawaiian Electric, the economic impact of higher fuel prices, inflation, higher interest rates, tightening of monetary policy and geopolitical situations, create significant uncertainty, and the Company cannot predict the extent or duration of these conditions, the future effects that these conditions will have on the Company’s financing plan, cost of capital and its ability to access additional capital, or the future impacts on the Company’s financial position, results of operations, and cash flows.
Previous wording
See “Credit and Capital Market Risk” in Item 1A. Risk Factors. The downgrades of HEI’s and Hawaiian Electric’s credit ratings impacted the Company’s ability to access capital markets and other sources of debt and equity financing, if at all, in a timely manner and on HEI’s acceptable terms.
Current wording
See Item 1A. Risk Factors for further discussion of risks and uncertainties. See “Credit ratings” in Hawaiian Electric’s MD&A for Hawaiian Electric’s credit ratings. The downgrades of HEI’s and Hawaiian Electric’s credit ratings impacted the Company’s ability to access capital markets and other sources of debt and equity financing, if at all, in a timely manner and on HEI’s acceptable terms.
Showing the first 40 of 103 pairs. Open the source sections for the rest.
Rearranged current paragraphs (6)
Current report — wording carried from elsewhere
In December 2024, the consumer price index increased 2.9% over the last 12 months. In Hawaii, the November 2024
Current report — wording carried from elsewhere
Utilities are exploring clean energy tax incentives included in the IRA that may further reduce the Utilities’ recovery under the EPRM and cost to customers. See Note 13 of the Consolidated Financial Statements for additional information.
Current report — wording carried from elsewhere
Project delays have resulted in Guaranteed Commercial Operations Date being missed.
Current report — wording carried from elsewhere
See Notes 6 and 7 of the Consolidated Financial Statements for a brief description of Hawaiian Electric’s loans.
Current report — wording carried from elsewhere
On January 17, 2025, the Utilities requested PUC approval to issue during the three-year period 2025 through 2027, unsecured obligations bearing taxable interest (Hawaiian Electric up to $900 million, Hawaii Electric Light up to $115 million and Maui Electric up to $150 million), to finance capital expenditures, repay long-term and/or short-term debt used to finance capital expenditures, and/or to reimburse funds used for payment of capital expenditures. If approved, the Utilities would forgo the remaining authorized amounts noted in the table above. The Utilities requested PUC approval by July 31, 2025.
Current report — wording carried from elsewhere
On January 27, 2025, the Utilities requested PUC approval to issue and sell each utility’s common stock over a three-year period from January 1, 2025 through December 31, 2027 (Hawaiian Electric sale/s to HEI of up to $210 million, Hawaii Electric Light sale/s to Hawaiian Electric of up to $70 million, and Maui Electric sale/s to Hawaiian Electric of up to $145 million) and the purchase of Hawaii Electric Light and Maui Electric common stock by Hawaiian Electric from 2025 through December 31, 2027. If approved, the Utilities would forgo the unused common stock authorization noted above. The Utilities requested PUC approval by October 31, 2025.
Rearranged previous paragraphs (6)
Previous report — wording carried elsewhere
For a discussion of 2021 operating, investing and financing activities, please refer to the “Liquidity and capital resources” section in Item 7, “Management Discussion and Analysis of Financial Condition and Results of Operations—HEI Consolidated,” in the Company’s 2022 Form 10-K.
Previous report — wording carried elsewhere
•On December 31, 2019, Hawaii Electric Light and Puna Geothermal Ventures entered into an Amended and Restated Power Purchase Agreement (PGV ARPPA). The PGV ARPPA extends the term of the existing PPA by 25 years to 2052, expands the firm capacity of the facility to 46 MW and delinks the pricing for energy delivered from the facility from fossil fuel prices to reduce cost to customers. On March 16, 2022, the PUC issued a D&O, approving the PGV ARPPA, subject to conditions, that include requiring completion of a final environmental review prior to construction.
Previous report — wording carried elsewhere
Credit ratings. In August 2023, the credit ratings of Hawaiian Electric were subject to multiple downgrades, including to ratings below investment grade, by Fitch, Moody’s and S&P. These rating actions were primarily due to the uncertainty facing the Utilities resulting from potential liability related to damages and losses caused by the Maui windstorm and wildfires and increasing number of lawsuits filed to date. From prior to the August 2023 downgrades, to as of February 15, 2024, the Fitch, Moody’s and S&P ratings of Hawaiian Electric were as follows:
Previous report — wording carried elsewhere
compared to the year ended December 31, 2022:
Previous report — wording carried elsewhere
Recent Developments. See also Recent developments in HEI’s MD&A.
Previous report — wording carried elsewhere
Material estimates and critical accounting policies. Also see “Material estimates and critical accounting policies” for Consolidated HEI above.