Skip to main content

Venture Global, Inc.

For the period ended Dec 31, 2025. Filed Mar 2, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Mar 2, 2026

VG$11.53+0.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-03-06.

0002007855-25-000010

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2025-12-31; filed 2026-03-02.

0002007855-26-000013

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 323 previous paragraphs and 235 current paragraphs.

66 unchanged; 68 reworded; 96 added; 181 removed; 8 previous and 5 current paragraphs rearranged.

Tables are not compared: 11 previous and 12 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (96)

Current report

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report

During the year ended December 31, 2025, the Company's sales and shipping business met the criteria to be a reportable segment. Prior to the year ended December 31, 2025, sales and shipping was not quantitatively material for reporting purposes and was combined with corporate activities as corporate, other and eliminations. Prior period presentations included within Item 7. ––Management's discussion and Analysis of Financial Condition and Results of Operationsof this form 10-K has been recast to conform to the current segment reporting structure.

Current report

For discussion of the Company's year ended December 31, 2024 compared to the year ended December 31, 2023, refer to Item 7.—Management's Discussion and Analysis of Financial Condition and Results of Operations in our 2024 Form 10-K filed with the SEC on March 6, 2025.

Current report

(1) Includes sales prices indexed to foreign gas markets, exclusive of an implied commodity fee, and fixed liquefaction fees.

Current report

Our income from operations for the year ended December 31, 2025 increased compared to the prior year primarily due to higher sales volumes at our Plaquemines Project from the commencement of LNG production in December 2024 and continued ramp up of LNG production during 2025. This was partially offset by lower weighted average LNG sales prices at our Calcasieu Project due to the commencement of LNG sales under its post-COD SPAs and the higher cost of feed gas.

Current report

Calcasieu Project. Our initial LNG export facility declared COD and commenced the sale of LNG to its customers under our post-COD SPAs on April 15, 2025. Prior to COD, the Calcasieu Project sold LNG under LNG Commissioning Sales Agreements.

Current report

CP2 Project. In June 2025, we commenced site work on our third LNG export facility, following receipt of final approval and notices to proceed with on-site construction from the FERC. In July 2025, Phase 1 of the CP2 Project achieved FID and obtained $15.1 billion in project financing to fund the development and construction of Phase 1 of the CP2 Project. During the year ended December 31, 2025, we incurred $6.5 billion of project costs primarily associated with construction activities and purchases of equipment procurement, of which $6.3 billion was capitalized and $203 million was expensed.

Current report

In February 2026, the CP2 Project executed a 20-year post-COD SPA for the delivery of 1.5 mtpa from Phase 2 of the CP2 Project, increasing the total expected capacity post-COD under contract from 26.0 mtpa to 27.5 mtpa.

Current report

Our Strategic Developments. In 2025, we formally initiated the development process for the Plaquemines Expansion Project with expected annual peak production capacity of 31.0 mtpa. See Item 1A.—Business for further discussion.

Current report

We took delivery of four LNG tankers during the year ended December 31, 2025, and one LNG tanker in the first quarter of 2026. This brought our total owned fleet of LNG tankers to seven with an additional two LNG tankers that are currently under construction and will be delivered in 2026. In 2025, we used our LNG tankers to transport 61 cargos from our LNG facilities.

Current report

In September 2025, Blackfin entered into the Blackfin Credit Facilities totaling $1.6 billion. Proceeds from the Blackfin Credit Facilities were used to reimburse $889 million to VGLNG for prior expenditures related to the development and construction of the Blackfin Pipeline.

Current report

In November 2025, VGLNG entered into the VGLNG Revolving Credit Facility totaling $2.0 billion. Proceeds from the VGLNG Revolving Credit Facility will be used for general corporate purposes of VGLNG and its subsidiaries.

Current report

LNG Sales. We sell LNG throughout the full lifecycle of our LNG facilities—during testing and commissioning, operations under contracted sales agreements, and through the sale of excess production capacity. We employ a portfolio contracting approach designed to sell sufficient term liquefaction capacity to support financing while optimizing revenue and cash flow.

Current report

LNG pricing structure. The LNG sales price structure under our Contracted SPAs generally includes (i) a fixed liquefaction fee, a portion of which is subject to an annual adjustment for inflation; (ii) a variable commodity fee equal to at least 115% of Henry Hub per MMBtu of LNG; and (iii) a transportation charge, if sold on a DPU basis. The LNG sales price structure of both our commissioning sales and excess capacity sales generally aligns with our Contracted SPAs for FOB delivery, whereas our DES agreements are structured with a single sales price that includes a transportation charge and is indexed to foreign gas markets, such as TTF or JKM.

Current report

Gross proceeds, before deducting the cost of feed gas, attributable to Test LNG sales generated prior to the Plaquemines Project facilities being in service from an accounting perspective, and therefore recognized as an adjustment to construction in progress and not as revenue, were $132 million for the year ended December 31, 2025.

Current report

Cost of sales was $5.9 billion for the year ended December 31, 2025, a $4.6 billion increase from $1.4 billion for the year ended December 31, 2024. This increase was due to

Current report

•$3.8 billion from higher LNG sales volumes primarily at the Plaquemines Project due to the commencement of LNG production in December 2024 and continued ramp up of LNG production throughout 2025;

Current report

•$609 million due to higher costs of feed gas primarily at the Calcasieu Project; and

Current report

•$123 million unfavorable change in the fair value of our natural gas supply contracts.

Current report

Costs attributable to the production of Test LNG sales, primarily consisting of the cost of feed gas, incurred prior to the Plaquemines Project facilities being in service from an accounting perspective, and therefore recognized as an adjustment to construction in progress and not as cost of sales, was $63 million for the year ended December 31, 2025.

Current report

Depreciation and amortization was $941 million for the year ended December 31, 2025, a $619 million, or 192%, increase from $322 million for the year ended December 31, 2024. This increase was primarily due to placing a portion of the Plaquemines Project assets in service from an accounting perspective starting in December 2024 and throughout 2025 and placing additional LNG tankers in service throughout 2025. This increase was partially offset by a decrease of $46 million at the Calcasieu Project primarily due to an extension of the estimated useful lives of certain LNG facility assets in 2025 to align with the extended remaining terms of certain land leases to which the LNG facility assets are affixed.

Current report

Income from operations was $5.2 billion for the year ended December 31, 2025, a $3.4 billion, or 192%, increase from $1.8 billion for the year ended December 31, 2024. This increase was the result of higher revenue due to increased sales volumes, primarily at the Plaquemines Project, partially offset by lower weighted average LNG sales prices, at the Calcasieu Project subsequent to COD in April 2025, and lower development expense. These were partially offset by, higher cost of sales due to increased volumes and the cost of feed gas, higher depreciation expense, and higher operating and maintenance expense, as discussed above.

Current report

Interest expense, net was $1.5 billion for the year ended December 31, 2025, a $870 million, or 149%, increase from $584 million for the year ended December 31, 2024. This increase was primarily due to higher non-capitalizable interest costs due to placing a portion of the Plaquemines Project assets in service in accordance with the applicable accounting guidance and an increase in our average outstanding debt.

Current report

Loss on interest rate swaps was $220 million for the year ended December 31, 2025, a $994 million, or 128%, unfavorable change from a gain on interest rate swaps of $774 million for the year ended December 31, 2024. This unfavorable change was primarily due to a decrease in the forward interest rate curves during the year ended December 31, 2025, compared to an increase during the year ended December 31, 2024, resulting in the following:

Current report

•a $908 million unfavorable change on the Plaquemines Project interest rate swaps, which were partially settled during the year ended December 31, 2025;

Current report

•a $66 million unfavorable change on the CP2 Project interest rate swaps, which were entered into in 2025; and

Current report

•a $33 million unfavorable change on the Calcasieu Project interest rate swaps.

Current report

These were partially offset by a $13 million favorable change on the Blackfin Credit Facility interest rate swaps, which were entered into in the fourth quarter of 2025.

Current report

Loss on foreign currency transactions was $3 million for the year ended December 31, 2025.

Current report

Income before income tax expense was $3.4 billion for the year ended December 31, 2025, a $1.2 billion, or 54%, increase from $2.2 billion for the year ended December 31, 2024. This increase was primarily a result of an increase in income from operations, partially offset by an unfavorable change in the gain (loss) on interest rate swaps, higher interest expense and and higher loss on financing transactions, as discussed above.

Current report

Net income attributable to non-controlling interests was $36 million for the year ended December 31, 2025, a $23 million, or 39%, decrease from $59 million for the year ended December 31, 2024. This decrease was primarily due to the allocation of earnings to the Calcasieu Holdings Class B common unit holders based on ownership interests subsequent to COD of the Calcasieu Project.

Current report

•an increase in cost of sales of $835 million due to higher costs of feed gas of $685 million, an increase in LNG sales volumes of $101 million, and an unfavorable change in fair value of natural gas supply contracts of $49 million; and

Current report

◦a net decrease of $1.2 billion due to lower LNG sales prices after COD in April 2025 offset by higher LNG sales prices prior to COD in April 2025, partially offset by

Showing the first 40 of 96 passages. Open the source sections for the rest.

Removed paragraphs (181)

Previous report

In September 2023, we engaged in a series of reorganization transactions, or the Reorganization Transactions, that ultimately resulted in Venture Global becoming the principal parent company of our entire enterprise. See Item 8.—Financial Statements and Supplementary Data—Note 2 – Summary of Significant Accounting Policies of this Form 10-K for further information.

Previous report

On January 27, 2025, the Company effectuated an approximately 4,520.3317-for-one forward stock split of its Class A common stock in connection with its IPO which was completed on January 27, 2025. All Class A common stock share and per share amounts in these consolidated financial statements have been retroactively adjusted to reflect the impact of the Stock Split. See Item 8.—Financial Statements and Supplementary Data—Note 25 – Subsequent Events for further discussion of the IPO.

Previous report

Calcasieu Project. In 2024, production and sales of LNG from our initial LNG export facility remained ongoing, although not at full nameplate capacity levels, while we continued to address significant remaining work related to commissioning, carryover completions, rectification, reliability testing, and other incomplete aspects of the facility. Sales from our Calcasieu Project commenced in March 2022. LNG cargos exported in 2024 totaled 140 (504.5 TBtu of LNG) compared to 143 (506.0 TBtu of LNG) in 2023.

Previous report

CP2 Project. In 2024, we significantly advanced the development of our third LNG project, amidst a fluctuating political and regulatory environment. During the year, we incurred $2.7 billion of project costs primarily associated with engineering and design, equipment procurement, and off-site manufacturing work, a portion of which was capitalized and a portion of which were expensed. In 2024, we issued purchase orders and notices to proceed thereunder to Baker Hughes for both the liquefaction train and power island systems for Phase 2 of the project, among other development and procurement activities. We also continued to see change in regards to the CP2 Project’s regulatory landscape, as discussed below:

Previous report

•FERC authorization. In June 2024, we received authorization from FERC to site, construct and operate the CP2 Project. In July 2024, a group of opponents, composed mostly of environmental groups, filed a request for rehearing of FERC’s authorization. In November 2024, FERC issued an order on rehearing that, among other things, (i) generally rejected the opposition’s arguments, (ii) stated that FERC would prepare a supplemental EIS to further address air impacts of certain emissions, and (iii) that FERC will address the emissions topic in a future order. In addition, FERC announced that, due to its initiation of supplemental environmental review, it will not issue authorizations to proceed with construction until the

Previous report

Commission issues a further merits order. In February 2025, FERC prepared its draft supplemental EIS which reaffirmed that CP2 Project emissions impacts are “not significant”.

Previous report

•DOE non-FTA authorization. In January 2024, the Biden administration announced a temporary pause on approvals from the DOE to export natural gas to Non-FTA Nations. In January 2025, President Trump issued an Executive Order that, among other things, directed the DOE to resume reviews of such export applications.

Previous report

Our Strategic Advancements. In July 2024, we took delivery of our first two of nine LNG tankers that we have contracted to construct and/or acquire. In addition, in 2024, we executed two medium-term and two short-term charters for additional LNG tankers, bringing our shipping portfolio to a total of thirteen vessels. In 2024, eight of our cargos from LNG produced by the Calcasieu Project and the Plaquemines Project were sold or in-transit on as delivered terms utilizing our owned or chartered LNG tankers. In 2024, we signed an agreement for 1 mtpa of regasification capacity, or approximately 12 cargos annually, at the Alexandroupolis LNG regasification terminal in Greece for five years, which is expected to begin in October 2025.

Previous report

LNG Market Environment. In 2024, average LNG prices experienced a significant decline compared to 2023 as a result of various supply and demand factors, including high inventories in Europe and relatively stable natural gas supply conditions. In the U.S., the Henry Hub natural gas spot price averaged $2.25 per MMBtu in 2024 a decline of 11% from 2023. In Europe, the Title Transfer Facility, or TTF, price averaged $10.89 per MMBtu in 2024, a decline of 15% from 2023. The Japan-Korea-Marker, or JKM, price, a key benchmark for LNG in East Asia, averaged $11.91 per MMBtu in 2024, a decline of 14% from 2023. See Item 1A.—Risk Factors—Risks Relating to Our Business—Our ability to generate proceeds from sales of commissioning cargos is subject to significant uncertainty and volatility in such proceeds, given significant volatility in spot-market prices of this Form 10-K.

Previous report

Our Financial Results. Our net income for the year ended December 31, 2024 decreased $1.9 billion, from $3.6 billion in 2023 to $1.7 billion in 2024, primarily due to the decrease in income from operations of $3.1 billion, from $4.9 billion in 2023 to $1.8 billion in 2024. This decrease was primarily due to a reduction in the weighted average price of LNG commissioning sales in 2024 compared to 2023. The impact on net income attributable to volumes sold was less significant between the periods.

Previous report

(2) Delivered to customer and recognized in results of operations.

Previous report

(3) Contracted spot and/or forward prices, generally consisting of a liquefaction fee and commodity charge.

Previous report

◦Contract price under our SPAs. Our existing post-COD SPAs will require our export customers to pay us a fixed facility charge per MMBtu, plus a variable commodity charge per MMBtu, in an amount equal to, depending on the applicable SPA, 115% or more of the Henry Hub gas price. The fixed facility charge varies across our post-COD SPAs and a portion of the fixed facility charge will be adjusted for inflation. For any additional post-COD SPAs that we may enter into in the future which include a fixed facility charge, that amount will be based on several factors, including market conditions at the time we enter into the relevant contract. Final terms for any additional post-COD SPAs we may enter into in the future will not be known until those contracts are executed and will impact our future revenue, as well as our operating margins.

Previous report

◦Henry Hub gas price. As described above, the variable commodity charge under our post-COD SPAs requires our customers to pay 115% or more of the Henry Hub gas price per MMBtu, which is intended to cover the price of the feed gas and gas transportation costs, and is also intended to cover certain of our operating expenses and partially adjust for inflation. We anticipate that any additional post-COD SPAs we enter into in the future will similarly require our export customers to pay a similar variable commodity charge. As a result, changes in the Henry Hub gas price will impact our future revenue, as well as our operating margins. In addition, there may be differences, and such differences may be material, between the actual price we pay for feed gas and the Henry Hub gas price used to calculate the variable commodity charges payable by our customers under the relevant post-COD SPAs, which could affect our operating margins.

Previous report

Revenue was $5.0 billion for the year ended December 31, 2024, a $2.9 billion, or 37%, decrease from $7.9 billion during the year ended December 31, 2023. This decrease was primarily due to lower LNG sales prices for the sale of commissioning cargos of $2.8 billion and lower LNG sales volumes of $139 million.

Previous report

Cost of sales was $1.4 billion for the year ended December 31, 2024, a $333 million, or 20%, decrease from $1.7 billion during the year ended December 31, 2023. This decrease was primarily due to the combined impact of a decrease in the net cost of natural gas and improved plant efficiency of $311 million and a decrease in LNG sales volumes of $22 million.

Previous report

Development expense was $635 million for the year ended December 31, 2024, a $145 million, or 30%, increase from $490 million during the year ended December 31, 2023. This increase was primarily due to higher development costs of $91 million for engineering and environmental services related to the CP2 Project and $32 million related to pipeline projects and higher lease costs of $33 million, partially offset by a decrease of $36 million in legal costs related to construction contractor disputes at the Calcasieu Project.

Previous report

Depreciation and amortization was $322 million for the year ended December 31, 2024, a $45 million, or 16%, increase from $277 million during the year ended December 31, 2023. This increase was primarily attributable to placing $11.4 billion of property, plant and equipment at the Plaquemines Project in service from an accounting perspective in December 2024 and the acquisition of two LNG tankers.

Previous report

Insurance recoveries, net were $19 million for the year ended December 31, 2023, due to the recognition of our portion of insurance claims received in connection with Hurricane Laura. There was no similar activity during the year ended December 31, 2024.

Previous report

Income from operations was $1.8 billion for the year ended December 31, 2024, a $3.1 billion, or 64%, decrease from $4.9 billion during the year ended December 31, 2023. This decrease was primarily the result of lower revenue, partially offset by lower cost of sales, from the sale of LNG, as discussed above. In addition, there were increases in operating and maintenance expense, development expense, general and administrative expense, and depreciation and amortization, as discussed above.

Previous report

Interest expense, net was $584 million during the year ended December 31, 2024, a $57 million, or 9%, decrease from $641 million during the year ended December 31, 2023. This decrease was primarily due to lower commitment fees of $34 million, primarily at the Plaquemines Project, and higher capitalizable interest costs of $15 million.

Previous report

Gain on interest rate swaps was $774 million for the year ended December 31, 2024, a $600 million increase from $174 million during the year ended December 31, 2023. This increase was primarily due to an increase in the gain on the Plaquemines Project interest rate swaps of $572 million, driven by favorable changes in the forward interest rate curves over higher notional amounts, and a favorable change on the Calcasieu Project interest rate swaps of $30 million, driven by favorable changes in the forward interest rate curves over lower notional amounts.

Previous report

Income before income tax expense was $2.2 billion for the year ended December 31, 2024, a $2.2 billion, or 51%, decrease from $4.4 billion during the year ended December 31, 2023. This decrease was primarily the result of the decrease in our income from operations partially offset by an increase in our gain on interest rate swaps, as discussed above.

Previous report

Net income attributable to non-controlling interests was $59 million for the year ended December 31, 2024, a $746 million, or 93%, decrease from $805 million during the year ended December 31, 2023. This decrease was primarily due to the 2023 repurchase of VGLNG common stock by VGLNG and the 2023 Reorganization Transactions resulting in no non-controlling interest at the VGLNG level after September 30, 2023.

Previous report

Revenue was $7.9 billion for the year ended December 31, 2023, a $1.4 billion, or 22%, increase from $6.4 billion during the year ended December 31, 2022. This increase was primarily due to $7.1 billion from higher LNG sales volumes, partially offset by a decrease of $5.8 billion due to lower pricing. The Calcasieu Project facility assets were in service from an accounting perspective and generating revenue for the entire year ended December 31, 2023, as compared to being placed in service from an accounting perspective on a sequential basis between April and August 2022, and therefore generating revenue for only a portion of the year ended December 31, 2022. The proceeds attributable to test LNG sales generated prior to the Calcasieu Project facilities being in service from an accounting perspective, and therefore recognized as construction in progress and not as revenue, were $1.8 billion for the year ended December 31, 2022.

Previous report

Cost of sales was $1.7 billion for the year ended December 31, 2023, a $409 million, or 20%, decrease from $2.1 billion during the year ended December 31, 2022. This decrease was due to $2.8 billion from lower natural gas prices and higher efficiency, partially offset by an increase of $2.4 billion from higher LNG sales volumes. The Calcasieu Project facility assets were in service from an accounting perspective and incurring cost of sales for the entire year ended December 31, 2023, as compared to being placed in service from an accounting perspective on a sequential basis between April and August 2022, and therefore incurring cost of sales for only a portion of the year ended December 31, 2022. The cost attributable to the production of test LNG sales incurred prior to the Calcasieu Project facilities being in service from an accounting perspective, and therefore recognized as construction in progress and not as cost of sales, was $723 million for the year ended December 31, 2022.

Previous report

General and administrative expense was $224 million for the year ended December 31, 2023, a $33 million, or 17%, increase from $191 million during the year ended December 31, 2022. This increase was primarily due to increased personnel costs due to an increase in employee headcount.

Previous report

Depreciation and amortization was $277 million for the year ended December 31, 2023, a $119 million, or 75%, increase from $158 million during the year ended December 31, 2022. This increase was primarily due to placing additional property, plant and equipment at the Calcasieu Project in service from an accounting perspective throughout the year ended December 31, 2022.

Previous report

Insurance recoveries, net were $19 million for the year ended December 31, 2023, a $19 million increase from the year ended December 31, 2022. This increase was mainly due to the recognition of our portion of insurance claims received in connection with Hurricane Laura storm costs during the year ended December 31, 2023, with no similar activity during the year ended December 31, 2022.

Showing the first 40 of 181 passages. Open the source sections for the rest.

Reworded paragraphs (68)

Previous wording

The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our audited consolidated financial statements and the accompanying notes thereto, included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K. In addition to historical consolidated financial information, the following discussion contains forward-looking statements that reflect our plans, estimates, and beliefs that involve significant risks and uncertainties. Our actual results could differ materially from those discussed in the forward-looking statements. Factors that could cause or contribute to those differences include those discussed below and elsewhere in Item 1A.—Risk Factors and Cautionary Statement Regarding Forward-Looking Statements of this Form 10-K.

Current wording

The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our audited consolidated financial statements and the accompanying notes thereto, included in Item 8.—Financial Statements and Supplementary Data of this Form 10-K. In addition to historical consolidated financial information, the following discussion contains forward-looking statements that reflect our plans, estimates, and beliefs that involve significant risks and uncertainties. Our actual results could differ materially from those discussed in the forward-looking statements. Factors that could cause or contribute to those differences include those discussed below and elsewhere in Item 1A.—Risk Factors and Cautionary Statement Regarding Forward-Looking Statements of this Form 10-K. Except for per MMBtu amounts, or as otherwise specified, dollar amounts presented within tables are stated in millions.

Previous wording

Plaquemines Project. In December 2024, we first produced LNG from our second LNG export facility, and as of December 31, 2024, we exported one cargo from the Plaquemines Project, which was in-transit to our customer. In December 2024, a portion of the facility’s assets, representing $11.4 billion of costs, were placed in service in accordance with GAAP. As of December 31, 2024, physical construction of the Plaquemines Project was ongoing and the project’s commissioning program remained underway. In 2024, we incurred $9.3 billion of project costs, the majority of which were capitalized.

Current wording

Plaquemines Project. Production and sales of LNG from our second LNG export facility increased during the period while physical construction and the commissioning program of the project continued to advance. During the year ended December 31, 2025, we incurred $3.9 billion of project costs, the majority of which were capitalized, and we placed an additional $13.4 billion of assets in service in accordance with the applicable accounting guidance.

Previous wording

Our Sources of Capital. In July 2024, VGLNG issued $1.5 billion of 7.000% senior secured notes maturing January 2030. In September 2024, VGLNG issued 3 million shares of 9.000% Series A Fixed-Rate Reset Cumulative Redeemable Perpetual Preferred Stock for gross proceeds of $3.0 billion. In early 2025, we completed our IPO, issuing and selling 70 million shares of our Class A common stock at a public offering price of $25.00 per share. In connection with the IPO, we effectuated a 4,520.3317-for-one forward stock split of our Class A common stock, which has been retrospectively incorporated into this Form 10-K, as applicable.

Current wording

VGLNG Sources of Capital. In January 2025, we completed our IPO, issuing 70 million shares of our Class A common stock at a public offering price of $25.00 per share for total net proceeds of $1.7 billion. In connection with the IPO, we effectuated a 4,520.3317-for-one forward stock split of our Class A common stock.

Previous wording

Sales of LNG during commissioning of our projects. We aim to generate cash proceeds from the sale of LNG produced during the commissioning phase of each of our projects. Our ability to generate such cash proceeds, and the amount of any such cash proceeds, will depend primarily on the duration of the commissioning phase for each of our projects, the volume of LNG that we are able to produce during the commissioning phase, our ability to negotiate sales of LNG produced during the commissioning phase, as well as the market price for LNG at the time of such sales. As a result, the amount of cash proceeds we are able to generate from such sales of commissioning cargos will likely differ from period to period and from project to project, and such differences could be material.

Current wording

Sales of LNG during commissioning. We generally sell LNG produced during the commissioning phase of our projects, prior to COD, on a forward spot or short-term contracted basis. Our ability to generate cash proceeds from the sale of commissioning LNG, and the amount of any such cash proceeds, depends primarily on the duration of the commissioning phase for each of our projects, the volume of LNG that we are able to produce during the commissioning phase, as well as the market price for LNG at the time such sales are executed. As a result, the amount of cash proceeds we are able to generate from the sale of commissioning LNG will likely differ from period to period and from project to project, and such differences could be material.

Previous wording

Sales of LNG post-COD of our projects. We aim to generate cash proceeds from the sale of LNG produced after COD for each of our projects under a combination of long-term 20-year post-COD SPAs as well as short- and medium-term post-COD SPAs to optimize the average fixed facility charge across our SPAs. Further, to the extent our projects generate excess capacity relative to the nameplate capacity, we expect to sell such excess capacity as described below. None of our projects have achieved COD as of the date of this Form 10-K. Our ability to generate cash proceeds from such sales, and the amount of any such cash proceeds that we are able to generate, will be contingent upon achieving COD at each of our projects, and will vary depending on the following key factors:

Current wording

Sales of Contracted LNG. We sell LNG under post COD-SPAs and Firm-start SPAs leveraging a combination of long-term 20-year Contracted SPAs as well as short- and medium-term Contracted SPAs to optimize the average fixed liquefaction fee across our SPAs. Our ability to generate revenue, and the amount of any associated cash proceeds that we are able to generate, will be contingent upon achieving COD at each of our projects, and will vary depending on the fixed liquefaction fee under our Contracted SPAs, the variable commodity fee indexed to the Henry Hub price of gas, as well as the volume and sales prices of LNG produced in excess of committed sales under Contracted SPAs.

Previous wording

◦Sales of uncommitted and excess LNG. We intend to market and sell any uncommitted LNG and any excess capacity through our wholly owned subsidiary, VG Commodities, which manages our shipping business, providing the flexibility to optimize pricing for such sales. Our ability to generate cash proceeds from such sales, and the amount of any such cash proceeds that we are able to generate, will depend primarily on the volume of LNG that has been contracted under post-COD SPAs and the amount of LNG that we are able to produce at any project in excess of the nameplate capacity, our ability to negotiate sales of such uncommitted and excess LNG, as well as the market price for LNG at the time of such sales or the terms of any SPA we are able to negotiate with respect to such sales. As a result, the amount of cash proceeds we are able to generate from such sales of uncommitted and excess LNG, if any, will likely differ from period to period and from project to project, and such differences could be material.

Current wording

Sales of uncommitted excess LNG. We sell LNG produced above our Contracted SPA commitments under short‑, medium‑, or long‑term arrangements, providing commercial and pricing flexibility. Our ability to generate cash proceeds from such sales, and the amount of any such revenue that we are able to generate, will depend primarily on the volume of LNG that has been contracted under post-COD SPAs and the amount of LNG that we are able to produce at any project in excess of the nameplate capacity and the market price for LNG at the time such sales are executed. As a result, the amount of revenue and cash proceeds we are able to generate from the sale of uncommitted excess LNG, if any, will likely differ from period to period and from project to project, and such differences could be material.

Previous wording

Cost of feed gas. The direct costs of purchasing, transporting and converting natural gas to LNG for sale to our customers are the main component of our cost of sales. Under the post-COD SPAs and substantially all of the commissioning cargo sales that we have executed to date, our export customers pay a fixed facility charge (which includes a CPI-linked component) per MMBtu, plus a variable commodity charge per MMBtu, in an amount equal to, depending on the applicable SPA, 115% or more of the Henry Hub gas price, which is intended to cover the price of the feed gas and gas transportation costs, and is also intended to cover certain of our operating expenses and partially adjust for inflation. If we are successful in producing and selling excess LNG produced by our projects, we expect our cost of sales to increase as we will be required to purchase more feed gas to produce more LNG.

Current wording

Cost of feed gas. The direct costs of purchasing, transporting and converting natural gas to LNG are the primary component of our cost of sales. Under our Contracted SPAs and substantially all of our commissioning LNG sales executed to date, our customers pay a fixed liquefaction fee (which includes a CPI-linked component) per MMBtu, plus a variable commodity fee per MMBtu, in an amount equal to, depending on the applicable SPA, 115% or more of the Henry Hub gas price, which is intended to cover the price of the feed gas and gas transportation costs, and is also intended to cover certain of our operating expenses and partially adjust for inflation.

Previous wording

Project costs and expenses. We currently have five projects in various stages of development. We expect our development, construction and commissioning expenses for any particular project to increase significantly as we approach and commence the construction phase, and we expect these expenses will continue to be significant until the commissioning phase has been completed and the relevant project reaches its COD. Moreover, our project costs may be higher than we currently estimate due to many factors outside of our control, which could lead to higher development, construction and commissioning expenses for our projects. In addition, we expect to increase our project‑dedicated staff as we progress towards the commencement of construction of the CP2 Project, the CP3 Project and the Delta Project and when we subsequently commence operation at our facilities. As a result, we anticipate that operating and maintenance expenses will increase significantly as we approach commissioning and operation of our projects (as was the case for the Calcasieu Project). We outsource certain major equipment maintenance activities under long-terms service arrangements, but our various operating subsidiaries are responsible for performing day-to-day operations and maintenance work for our projects. See Item 1.—Business—Major Consultants and Contractors of this Form 10-K for more information. Once one of our projects has commenced full commercial operations, we anticipate that the timing of the operating and maintenance costs under the long-term service arrangements for that project will be relatively predictable, subject to inflation, and will generally increase during periods in which regularly scheduled or other maintenance is performed. Increases in operating and maintenance expenses would impact our operating margins. Further, we anticipate that insurance premiums for LNG projects may increase due to losses and claims that have arisen or been experienced in respect of other unrelated projects in other regions, or losses and claims that are large enough to impact the broader insurance market even if an LNG project is not involved.

Current wording

Operating costs. We expect to increase our project‑dedicated staff as we commence operations at our facilities. As a result, we anticipate that operating and maintenance expenses will increase significantly as we continue commissioning and operation of our projects. We outsource certain major equipment maintenance activities under long-terms service arrangements, but our various operating subsidiaries are responsible for performing day-to-day operations and maintenance work for our projects. Once projects commence full commercial operations, we anticipate that the timing of the operating and maintenance costs under the long-term service arrangements for that project will be relatively predictable, subject to inflation. Increases in operating and maintenance expenses would impact our operating margins. Further, we anticipate that insurance premiums for LNG projects may increase due to losses and claims that have arisen or been experienced in respect of other unrelated projects in other regions, or losses and claims that are large enough to impact the broader insurance market even if an LNG project is not involved.

Previous wording

Effective tax rates and regulations. We utilize various tax incentive programs the State of Louisiana offers, including the industrial tax exemption, to offset local and state taxes that would otherwise be payable. However, the industrial tax exemption will expire after two 5‑year periods, which would begin on the last day of the tax year in which the Calcasieu Project, the Plaquemines Project and the CP2 Project assets, as applicable, are placed in service from an accounting perspective, and afterwards ad valorem taxes may be levied against our properties. We anticipate similar tax exemptions will be available for the CP3 Project and the Delta Project, although any such exemptions may only be available at lower rates. The future rates at which any taxes (including ad valorem taxes, inventory taxes, franchise taxes and utility taxes) will be levied against us will impact our operating margins.

Current wording

Effective tax rates and regulations. We utilize various tax incentive programs offered by the State of Louisiana, including the industrial tax exemption, to offset local and state taxes that would otherwise be payable. However, the industrial tax exemption will expire after two 5‑year periods, which would begin on the last day of the tax year in which the Calcasieu Project, the Plaquemines Project and the CP2 Project assets, as applicable, are placed in service from an accounting perspective, and afterwards ad valorem taxes may be levied against our properties. We anticipate similar tax exemptions will be available for our greenfield and expansion projects, although any such exemptions may only be available at lower rates. The future rates at which any taxes (including ad valorem taxes, inventory taxes, franchise taxes and utility taxes) will be levied against us will impact our operating margins.

Previous wording

Inflation. Inflation remains a variable factor in the United States economy, and it may impact our operating margins and results of operations in the future. In particular, we anticipate that the post-COD SPAs that include a fixed facility charge and that we enter into will only be partially adjusted for inflation over the contract term, as is the case with our existing post-COD SPAs as described above. In addition, we anticipate that our operating costs will experience inflationary pressure over time, and the commodity charge we charge our customers for recovery of these costs is based on the price of natural gas per MMBtu. We also expect to experience inflation with respect to the cost of equipment and personnel necessary to develop, construct and operate our projects. See Item 1 A.—Risk Factors—Risks Relating to Our Projects and Other Assets—Our estimated costs for our projects have been, and continue to be, subject to change due to various factors and Item 1A.—Risk Factors—Risks Relating to Our Business—We and our contractors, including our EPC contractors, may experience increased labor costs, and the unavailability of skilled workers or our failure to attract and retain qualified personnel could adversely affect usof this Form 10-K.

Current wording

Inflation. Inflation remains a variable factor in the United States economy, and it may impact our operating margins and results of operations in the future. In particular, we anticipate that our Contracted SPAs and sales by VG Commodities that include a fixed liquefaction fee will only be partially adjusted for inflation over the contract term, as is the case with certain of our existing Contracted SPAs. In addition, we anticipate that our operating costs will experience inflationary pressure over time. We also expect to experience inflation with respect to the cost of equipment and personnel necessary to develop, construct and operate our projects. See Item 1A.—Risk Factors—Risks Relating to Our Projects and Other Assets—Our estimated costs for our projects have been, and continue to be, subject to change due to various factors and Item 1A.—Risk Factors—Risks Relating to Our Business—We and our contractors, including our EPC contractors, may experience increased labor costs, and the unavailability of skilled workers or our failure to attract and retain qualified personnel could adversely affect usof this Form 10-K.

Previous wording

Seasonality. Seasonal weather can affect demand for LNG and accordingly can impact our ability to sell LNG during the commissioning of our facilities or once our facilities achieve their respective CODs. We have already begun experiencing, and we expect to experience for our other projects, the effects of market volatility and fluctuation in seasonal demand for LNG in our existing markets. For example, temperature and weather in the markets we supply, as well as the amount of natural gas in storage in such markets, may affect both power demand and power generation mix, including the portion of electricity provided through other sources of energy, such as hydroelectric, solar or wind, thus affecting the need for LNG. Further, slower-than-expected inventory withdrawal due to mild weather can decrease the demand for LNG. Other factors, including but not limited to the price spread between European and Asian LNG indices and the availability of LNG tankers and the routes they choose to take due to seasonal and other factors can also affect the price of LNG. As a result, our ability to generate cash proceeds from LNG sales on a spot basis, and to enter into new SPAs for the sale of LNG, may be impacted by such factors, which may in turn result in fluctuations in revenue during quarters of high and low demand, respectively, and could have a disproportionate effect on our results of operations. As such, our results of operations across different fiscal quarters may not be comparable or accurate indicators of our future performance. For more information on these risks, see Item 1A.—Risk Factors—Risks Relating to Our Business—Seasonal fluctuations will cause our business and results of operations to vary among quarters, which could adversely affect our business and results of operations of this Form 10-K.

Current wording

Seasonality. Seasonal weather can affect demand for LNG and accordingly can impact our ability to sell LNG during the commissioning of our facilities or after our facilities achieve their respective CODs. We have already begun experiencing, and we expect to continue to experience, the effects of market volatility and fluctuation in seasonal demand for LNG in our existing markets. For example, temperature and weather in the markets we supply, as well as the amount of natural gas in storage in such markets, may affect both power demand and power generation mix, including the portion of electricity provided through other sources of energy, such as hydroelectric, solar or wind, thus affecting the need for LNG. Further, slower-than-expected inventory withdrawal due to mild weather can decrease the demand for LNG. Conversely, extreme or extended cold conditions in the U.S. may temporarily reduce LNG export volumes as domestic demand increases, reflecting how extreme weather events may influence near-term U.S. natural gas supply-demand balances and our export scheduling flexibility. Other factors, including but not limited to the price spread between European and Asian LNG indices and the availability of LNG tankers and the routes they choose to take due to seasonal and other factors can also affect the price of LNG. As a result, our ability to generate cash proceeds from LNG sales on a spot basis or short-term basis, and to enter into new SPAs for the sale of LNG, may be impacted by such factors, which may in turn result in fluctuations in revenue during quarters of high and low demand, respectively, and could have a disproportionate effect on our results of operations. As such, our results of operations across different fiscal quarters may not be comparable or accurate indicators of our future performance. For more information on these risks, see Item 1A.—Risk Factors—Risks Relating to Our Business—Seasonal fluctuations will cause our business and results of operations to vary among quarters, which could adversely affect our business and results of operations of this Form 10-K.

Previous wording

Macroeconomic Trends. Macroeconomic conditions, such as high inflation and elevated interest rates, continue to be sources of volatility and uncertainty for global economic activity, and may affect our project costs and operations, as discussed above. See Item 1A.—Risk Factors—Risks Relating to Our Business—Our ability to maintain profitability and positive operating cash flows is subject to significant uncertainty of this Form 10-K. Ongoing geopolitical conflicts in Ukraine, the Middle East, and tensions in United States-China relations may drive further economic instability and inflationary pressures, as well as increase risks for the global flow of goods, including energy. In the case of the LNG market, these geopolitical conflicts have and may continue to impact the availability of materials required for the development of LNG projects, in addition to disrupting the supply of LNG, resulting in price volatility on non-SPA volumes. For additional information on historical net spread volatility see Item 1A.—Risk Factors—Risks Relating to Our Business—Our ability to generate proceeds from sales of commissioning cargos is subject to significant uncertainty and volatility in such proceeds, given significant volatility in spot-market prices of this Form 10-K. Historical proceeds from such sales at the Calcasieu Project, which has had an extended commissioning period due to unanticipated challenges with equipment reliability that we are in the process of remediating, may not be indicative of the duration of the commissioning period or the amount of proceeds for any future period or for any of our other projects including bolt-on expansions thereof.

Current wording

Macroeconomic Trends. Macroeconomic conditions, such as high inflation, interest rates, tariffs and global trade policy continue to be sources of volatility and uncertainty for global economic activity, and may affect our project costs and operations, as discussed above. See Item 1A.—Risk Factors—Risks Relating to Our Business—Our ability to maintain profitability and positive operating cash flows is subject to significant uncertainty of this Form 10-K. Ongoing geopolitical conflicts in Ukraine, the Middle East, Venezuela and tensions in United States-China relations may drive further economic instability and inflationary pressures, as well as increase risks for the global flow of goods, including energy. In the case of the LNG market, these geopolitical conflicts have and may continue to impact the availability of materials required for the development of LNG projects, in addition to disrupting the supply of LNG, resulting in price volatility on non-SPA volumes. For additional information on historical net spread volatility see Item 1A.—Risk Factors—Risks Relating to Our Business—Our ability to generate proceeds from sales of commissioning cargos is subject to significant uncertainty and volatility in such proceeds, given significant volatility in spot-market prices of this Form 10-K.

Current wording

Revenue was $13.8 billion for the year ended December 31, 2025, an $8.8 billion, or 177%, increase from $5.0 billion for the year ended December 31, 2024. This increase was primarily due to $10.1 billion from higher LNG sales volumes primarily at the Plaquemines Project due to the commencement of LNG production in December 2024 and continued ramp up of LNG production throughout 2025. This increase was partially offset by lower LNG sales prices of $1.3 billion primarily at the Calcasieu Project after COD in April 2025, partially offset by higher LNG sales prices prior to COD in April 2025.

Previous wording

Operating and maintenance expense was $391 million for the year ended December 31, 2023, a $251 million, or 179%, increase from $140 million during the year ended December 31, 2022. This increase was primarily due to higher operating costs at the Calcasieu Project to support ongoing commissioning and remediation work, personnel costs, and insurance, and higher operating costs in support of the Plaquemines Project primarily due to an increase in non-capitalizable personnel costs and ARO accretion.

Current wording

Operating and maintenance expense was $975 million for the year ended December 31, 2025, a $386 million, or 66%, increase from $589 million for the year ended December 31, 2024. This increase was primarily due to $265 million in higher operating costs in support of the ramp up of LNG production at the Plaquemines Project due to an increase in non-capitalizable personnel costs, commissioning work, and operational insurance costs, as well as $175 million in higher operating costs for our LNG tankers. These increases were partially offset by a $77 million reduction in operating costs at the Calcasieu Project primarily due to lower commissioning and remediation work.

Previous wording

General and administrative expense was $312 million for the year ended December 31, 2024, a $88 million, or 39%, increase from $224 million during the year ended December 31, 2023. This increase was primarily due to higher personnel costs of $43 million due to an increase in employee headcount, increases in promotional activities of $10 million, and increases in external services of $6 million.

Current wording

General and administrative expense was $433 million for the year ended December 31, 2025, an $121 million, or 39%, increase from $312 million for the year ended December 31, 2024. This increase was primarily due to increased personnel costs of $82 million due to higher employee headcount, as well as increased non-personnel costs of $38 million primarily due to increases in legal and other professional service fees, IT and insurance costs.

Previous wording

Development expense was $490 million for the year ended December 31, 2023, a $179 million, or 58%, increase from $311 million during the year ended December 31, 2022. This increase was primarily due to an increase in early development activities and personnel costs related to the CP2 Project, partially offset by the Plaquemines Project being deemed probable in March 2022, and the majority of the costs to develop the facility subsequently being capitalized.

Current wording

Development expense was $344 million for the year ended December 31, 2025, a $291 million, or 46%, decrease from $635 million for the year ended December 31, 2024. This decrease was primarily due to lower development costs that were expensed of $282 million as a result of the CP2 Project being declared probable during 2025, and the majority of the costs to develop the facility subsequently being capitalized.

Previous wording

Interest income was $244 million during the year ended December 31, 2024, a $72 million, or 42%, increase from $172 million during the year ended December 31, 2023. This increase was primarily due to higher average cash balances and interest rates during the year ended December 31, 2024, compared to the same period in 2023.

Current wording

Interest income was $151 million for the year ended December 31, 2025, a $93 million, or 38%, decrease from $244 million for the year ended December 31, 2024. This decrease was primarily due to lower average cash balances and interest rates during the year ended December 31, 2025, compared to the year ended December 31, 2024.

Previous wording

Loss on financing transactions was $14 million for the year ended December 31, 2024, a $109 million, or 89%, decrease from $123 million during the year ended December 31, 2023. This decrease was primarily due to the write-off of debt issuance costs associated with the full prepayment of the Plaquemines Equity Bridge Facility during the year ended December 31, 2024, as compared to the write-off of debt issuance costs associated with the prepayment of a term loan at VGLNG, and the partial prepayments of both the Plaquemines Equity Bridge Facility and the Calcasieu Pass Credit Facilities during the year ended December 31, 2023.

Current wording

Loss on financing transactions was $267 million for the year ended December 31, 2025, a $253 million increase from $14 million for the year ended December 31, 2024. This increase was due to the write-off of debt issuance costs associated with the partial prepayment of the Plaquemines Construction Term Loan and the prepayment of CP2 Bridge Facilities during the year ended December 31, 2025, as compared to the write-off of debt issuance costs associated with the full prepayment of the Plaquemines Equity Bridge Facility during the year ended December 31, 2024.

Previous wording

Income tax expense was $437 million for the year ended December 31, 2024, a $379 million, or 46%, decrease from $816 million during the year ended December 31, 2023, primarily driven by a decrease in pre-tax income. Our effective tax rate was 20.0% for the year ended December 31, 2024, as compared to 18.4% for the year ended December 31, 2023. The 2024 effective tax rate was lower than the statutory income tax rate due to a combination of factors including, research and development tax credits, guaranteed payments to non-controlling interests, and non-deductible expenses.

Current wording

Income tax expense was $630 million for the year ended December 31, 2025, a $193 million, or 44%, increase from $437 million for the year ended December 31, 2024, primarily driven by an increase in income before income tax expense, discussed above, partially offset by a change in our effective tax rate. Our effective tax rate was 18.7% for the year ended December 31, 2025, compared to 20.0% for the year ended December 31, 2024. The 2025 effective tax rate was impacted primarily by the recognition of stock option windfall tax benefits, research and development tax credits, as well as a combination of non-deductible expenses and changes in the valuation allowance against certain deferred tax assets.

Previous wording

Net income was $1.7 billion for the year ended December 31, 2024, a $1.9 billion, or 52%, decrease from $3.6 billion during the year ended December 31, 2023. This decrease was primarily the result of a decrease in income from operations due to lower revenue earned from the sale of LNG, partially offset by lower cost of sales, partially offset by an increase in gain on derivatives and a decrease in income tax expense, as discussed above.

Current wording

Net income was $2.7 billion for the year ended December 31, 2025, a $1.0 billion, or 57%, increase from $1.7 billion for the year ended December 31, 2024. This increase was primarily the result of an increase in income before income tax expense, partially offset by higher income tax expense, as discussed above.

Previous wording

Net income attributable to redeemable stock of subsidiary was $144 million for the year ended December 31, 2024, a $14 million, or 11%, increase from $130 million during the year ended December 31, 2023. This increase was from 2024 paid-in-kind distributions on the Redeemable Preferred Units.

Current wording

Net income attributable to redeemable stock of subsidiary was $167 million for the year ended December 31, 2025, a $23 million, or 16%, increase from $144 million for the year ended December 31, 2024. This increase was due to higher paid-in-kind distributions on the CP Funding Redeemable Preferred Units.

Previous wording

Dividends on VGLNG Series A Preferred Shares were $68 million for the year ended December 31, 2024. This increase was due to the September 2024 issuance of the VGLNG Series A Preferred Shares and the corresponding accumulated but undeclared dividends. There was no similar activity during the year ended December 31, 2023.

Current wording

Dividends on VGLNG Series A Preferred Shares were $270 million for the year ended December 31, 2025, a $202 million, or 297%, increase from $68 million for the year ended December 31, 2024. This increase was due to the issuance of the VGLNG Series A Preferred Shares in late September 2024 and the corresponding difference in the accumulation of dividends.

Previous wording

Net income attributable to common stockholders was $1.5 billion for the year ended December 31, 2024, a $1.2 billion, or 45%, decrease from $2.7 billion during the year ended December 31, 2023. This decrease was primarily resulting from the changes discussed above.

Current wording

Net income attributable to common stockholders was $2.3 billion for the year ended December 31, 2025, a $0.8 billion, or 53%, increase from $1.5 billion for the year ended December 31, 2024. This increase was primarily the result of the changes discussed above.

Previous wording

We have three reportable segments, which consist of the Calcasieu Project, the Plaquemines Project, and the CP2 Project. Each reportable segment includes activity of both the respective liquefaction and export terminal and the associated pipeline facilities that will supply the natural gas to that export terminal. Activities relating to certain development stage projects and our shipping business, overhead costs not directly associated with our LNG projects (for example, general and administrative and marketing expenses) and inter-segment eliminations are not material and therefore are included in corporate, other and eliminations. Our segment performance is evaluated based on income (loss) from operations.

Current wording

We have four reportable segments, which consist of the Calcasieu Project, the Plaquemines Project, the CP2 Project, and our sales and shipping business. Each LNG project includes activity of both the respective liquefaction facility and export terminal and the associated pipeline(s) that will supply the natural gas to that facility. Our sales and shipping business is engaged in the sale and delivery of LNG to our customers and includes the operating costs associated with our fleet of LNG tankers. Activities reported in corporate, other and eliminations include immaterial operating segments, overhead costs not directly associated with our reportable segments (for example, general and administrative and marketing expenses), and inter-segment eliminations. Prior period presentations have been reclassified to conform to the current segment reporting structure to separately disclose our sales and shipping business that is now quantitatively material.

Previous wording

During the year ended December 31, 2024, the Calcasieu Project had income from operations of $2.8 billion, a $2.8 billion, or 50%, decrease from $5.6 billion during the year ended December 31, 2023.

Current wording

For the year ended December 31, 2025, the Calcasieu Project had income from operations of $1.3 billion, a $1.5 billion, or 53%, decrease from $2.8 billion for the year ended December 31, 2024.

Previous wording

During the year ended December 31, 2024, the Plaquemines Project had a loss from operations of $217 million, a $30 million, or 16%, increase from $187 million during the year ended December 31, 2023.

Current wording

For the year ended December 31, 2025, the Plaquemines Project had income from operations of $4.2 billion, a $4.4 billion increase from a loss from operations of $217 million for the year ended December 31, 2024.

Previous wording

Operating and maintenance expense was $589 million for the year ended December 31, 2024, a $198 million, or 51%, increase from $391 million during the year ended December 31, 2023. This increase was primarily due to $67 million higher operating costs at the Calcasieu Project to support ongoing commissioning and remediation work and higher legal costs of $49 million, a $48 million increase in operating costs for our LNG tankers with no corresponding costs in 2023, and $14 million in higher operating costs for the Plaquemines Project mainly resulting from an increase in asset retirement obligation, or ARO, accretion.

Previous wording

•an increase in operating and maintenance expense of $188 million, primarily due to higher operating costs in support of LNG production including costs to support ongoing commissioning and remediation work, personnel costs and insurance costs; and

Current wording

•an increase in operating and maintenance expense of $265 million primarily due to higher operating costs in support of LNG production including higher non-capitalizable personnel costs, commissioning work, and operational insurance costs.

Previous wording

During the year ended December 31, 2024, corporate, other and eliminations had a loss from operations of $333 million, a $134 million, or 67%, increase from $199 million during the year ended December 31, 2023.

Current wording

For the year ended December 31, 2025, corporate, other and eliminations had a loss from operations of $358 million, a $45 million, or 14%, increase from $313 million for the year ended December 31, 2024.

Previous wording

We have a limited operational history and we did not generate any LNG sales proceeds prior to 2022. We may incur losses as we continue to construct and develop our projects and explore the development of other potential natural gas liquefaction and export projects.

Current wording

We have been generating proceeds from the sale of LNG since the first quarter of 2022. We may incur significant costs as we continue to develop our existing and other potential natural gas liquefaction and export projects, pipeline infrastructure projects, and other complementary gas transportation projects and activities.

Previous wording

The operation, commissioning, construction and development of our projects requires significant capital expenditures.

Current wording

The operation, commissioning, construction and development of our projects requires significant capital expenditures. We expect that operating costs at our projects will be funded with cash proceeds generated by the sale of LNG.

Previous wording

We currently estimate that the total project costs for the CP2 Project will be approximately $27.0 billion to $28.0 billion, including EPC contractor profit and contingency, owners’ costs and financing costs. Of the total project costs for the CP2 Project, approximately $4.0 billion had been paid for as of December 31, 2024. Given that we have not executed certain contracts to construct the CP2 Project, including the EPC contract with respect to Phase 2 of the CP2 Project, this estimate is based upon the contracts that we have in place for the CP2 Project and our construction cost experiences with the Calcasieu Project and the Plaquemines Project. The cost estimate for the CP2 Project reflects the current inflationary environment, and may be higher, potentially materially, compared to our current estimates as a result of many factors. In addition, we expect to construct longer pipelines for the CP2 Project than for the Calcasieu Project and the Plaquemines Project. Furthermore, our cost estimates might change due to factors such as unexpected delays in the construction or commissioning of our projects, the execution of any repair or warranty work and change orders or amendments to certain material construction contracts, including final terms of or amendments to any EPC contract for such projects, and/or other construction or supply contracts. For more details on these risks, see Item 1A.—Risk Factors—Risks Relating to Our Projects and Other Assets—Our estimated costs for our projects have been, and continue to be, subject to change due to various factors of this Form 10-K.

Current wording

Our estimated Total Project Cost is based upon our experience to date and reflects the current inflationary environment and the potential impact of tariffs in place as of December 31, 2025. This estimate is based upon the contracts that we have in place for the CP2 Project and our construction cost experiences with the Calcasieu Project and the Plaquemines Project, as well as expected costs to construct longer pipelines for the CP2 Project than for the Calcasieu Project and the Plaquemines Project. The cost estimate for the CP2 Project reflects the current inflationary environment, and may be higher, potentially materially, compared to our current estimates as a result of many factors. Furthermore, our cost estimates might change due to factors such as unexpected delays in the construction or commissioning of our projects, the execution of any repair or warranty work and change orders or amendments to certain material construction contracts, including final terms of or amendments to any EPC contract for such projects, and/or other construction or supply contracts. For more details on these risks, see Item 1A.—Risk Factors—Risks Relating to Our Projects and Other Assets—Our estimated costs for our projects have been, and continue to be, subject to change due to various factors of this Form 10-K.

Previous wording

These estimates do not reflect the potential impact of any new tariffs that have been announced or implemented since December 31, 2024 or that may be implemented in the future. Our project budget estimates included in this Form 10-K reflect all tariffs in place, and Section 232 exemptions secured, as of December 31, 2024. Certain of our products, including our Baker Hughes sourced liquefaction train system modules and power island components, are foreign sourced and specified under our regulatory approvals, offering no domestically sourced alternative and potentially exposing us to the effects of any future tariffs that may be imposed. There can be no assurance as to the extent of any future tariffs, or the impact thereof on any of our estimates of total project costs for our projects, which could have a material adverse effect on our construction budgets and limit our growth prospects.

Current wording

These estimates do not reflect the potential impact of any changes to tariffs that have been announced or implemented since December 31, 2025 or that may be implemented in the future. They do not reflect the potential impact of the U.S. Supreme Court ruling against the validity of the tariffs imposed by the federal government, nor the federal government’s decision to impose incremental baseline tariffs, all of which could have a material impact on our Total Project Cost estimates. Our project budget estimates included in this Form 10-K reflect all tariffs in place, and Section 232 exemptions secured, as of December 31, 2025. Certain of our products, including our Baker Hughes sourced liquefaction train system modules and power island components, are foreign sourced and specified under our regulatory approvals, offering no domestically sourced alternative and potentially exposing us to the effects of any future tariffs that may be imposed. There can be no assurance as to the extent of any future tariffs, or the impact thereof on any of our estimates of Total Project Costs for our projects, which could have a material adverse effect on our construction budgets and limit our growth prospects.

Previous wording

We intend to finance the construction and development of the CP2 Project, the CP3 Project, the Delta Project, and any bolt-on expansions or future LNG projects as well as the related owners’ costs through one or more sources of debt and equity financing. The amount of project-level equity funding that is required for any of our projects relative to the amount of project-level debt financing may differ between our projects. Generally, we expect to finance approximately 50% to 75% of the anticipated construction costs of each of our projects with project-level debt financing (which may include limited recourse debt), and the remaining 25% to 50% with project-level equity (which may consist of equity contributions by us, equity financing transactions, mezzanine financing and/or other similar financing alternatives). The final terms and availability of such debt and equity financing will depend on various factors, including market conditions at the time. We may consider alternative structures to raise capital for those projects and, as a result, there can be no assurance that the financing structure for the CP2 Project, the Delta Project, the CP3 Project or any future project we may develop will be similar to those used for the Calcasieu Project and the Plaquemines Project.

Current wording

Greenfield and expansion projects. We intend to finance the construction and development of our future greenfield and expansion projects, including the related owners’ costs, through one or more sources of debt and equity financing. The amount of project-level equity funding that is required for any of our projects relative to the amount of project-level debt financing may differ between our projects. Generally, we expect to finance approximately 50% to 75% of the anticipated construction costs of each of our projects with project-level debt financing (which may include non-recourse or limited recourse debt), and the remaining 25% to 50% with project-level equity—which may consist of equity contributions by us, equity financing transactions, mezzanine financing and/or other similar financing alternatives. The final terms and availability of such debt and equity financings will depend on various factors, including market conditions at the time. We may consider alternative structures to raise capital for those projects and, as a result, there can be no assurance that the financing structure for our future greenfield and expansion projects will be similar to those used for our prior or current projects.

Previous wording

We have contractual obligations involving commitments to third parties that impact our liquidity and capital resource needs. In addition to the construction and development obligations discussed above, the following table summarizes our contractual obligations as of December 31, 2024 (in millions):

Current wording

We have contractual obligations involving commitments to third parties that impact our liquidity and capital resource needs. In addition to the construction and development obligations discussed above, the following table summarizes our contractual obligations as of December 31, 2025:

Previous wording

In addition, we have significant debt and associated interest expense obligations at our subsidiaries, consisting of debt incurred by VGLNG as well as debt incurred by subsidiaries of VGLNG in connection with financing the Calcasieu Project and the Plaquemines Project. We anticipate obtaining significant additional financing and incurring related financing fees and interest expense in connection with the CP2 Project, the CP3 Project, the Delta Project, our pipeline development projects, our LNG tankers, and any bolt-on expansions or future LNG projects.

Current wording

In addition, we have significant debt and associated interest expense obligations at our subsidiaries. This consists of debt incurred by VGLNG as well as debt incurred by subsidiaries of VGLNG in connection with financing of various projects. We anticipate obtaining significant additional financing, and incurring related fees and interest, for the development of Phase 2 of the CP2 Project, our greenfield and expansion projects, our pipeline development projects, and our LNG tankers.

Previous wording

Outstanding debt and associated interest expense obligations of subsidiaries of VGLNG have no recourse to nor are guaranteed by the Company or VGLNG. The following table summarizes our debt and associated interest expense obligations of subsidiaries of VGLNG as of December 31, 2024 (in millions):

Current wording

Outstanding debt and associated interest obligations of the project-level subsidiaries of VGLNG have no recourse to nor are guaranteed by Venture Global or VGLNG. The following table summarizes our debt and associated interest obligations of project-level subsidiaries of VGLNG as of December 31, 2025:

Previous wording

(2)Excludes $1.5 billion of redeemable preferred shares of Calcasieu Pass Funding, presented as redeemable stock of subsidiary which is redeemable at the option of the holder thereof upon the occurrence of certain events. See Item 8.—Financial Statements and Supplementary Data—Note 17 – Redeemable Stock of Subsidiaryof this Form 10-K.

Current wording

(2)Excludes $1.7 billion of redeemable preferred shares of Calcasieu Pass Funding, presented as redeemable stock of subsidiary which is redeemable at the option of the holder thereof upon the occurrence of certain events. See Item 8.—Financial Statements and Supplementary Data—Note 17 – Redeemable Stock of Subsidiaryof this Form 10-K.

Previous wording

(3)Inclusive of the expected settlements of interest rate swaps that economically hedge the variable rate interest incurred by the Calcasieu Project and the Plaquemines Project. See Item 8.—Financial Statements and Supplementary Data—Note 11 – Debt of this Form 10-K, for more information.

Current wording

(3)Inclusive of the expected settlements of interest rate swaps that economically hedge our variable rate interest. See Item 8.—Financial Statements and Supplementary Data—Note 11 – Debt of this Form 10-K, for more information.

Previous wording

Outstanding debt and associated interest expense obligations of VGLNG are secured by its equity interests in the direct wholly-owned subsidiaries of VGLNG that directly or indirectly own our LNG projects. The following table summarizes our debt and associated interest expense obligations of VGLNG (including $84 million of indebtedness outstanding as of December 31, 2024, that was incurred by one of our subsidiaries and is guaranteed by VGLNG in certain circumstances) as of December 31, 2024 (in millions):

Current wording

Outstanding debt and associated interest obligations of VGLNG are secured by its equity interests in the direct wholly-owned subsidiaries of VGLNG that directly or indirectly own our LNG projects. The following table summarizes our debt and associated interest obligations of VGLNG as of December 31, 2025:

Showing the first 40 of 68 pairs. Open the source sections for the rest.

Rearranged current paragraphs (5)

Current report — wording carried from elsewhere

Project costs and development expenses. We currently have greenfield and expansion projects in various stages of construction and development. We expect our development, construction and commissioning costs for any particular project to increase significantly as we approach and commence the construction phase, and we expect these expenses will continue to be significant until the commissioning phase has been completed and the relevant project reaches its COD. Moreover, our project costs may be higher than we currently estimate due to many factors outside of our control, which could lead to higher development, construction and commissioning costs for our projects.

Current report — wording carried from elsewhere

This increase was partially offset by:

Current report — wording carried from elsewhere

Change in cash used by investing activities (in billions)

Current report — wording carried from elsewhere

The remedies sought by the other three Calcasieu Project post-COD customers in arbitration proceedings include damages ranging between $3.4 billion and $4.1 billion in the aggregate, rather than the termination of the post-COD SPA. We believe these three disputes are subject to the relevant seller aggregate liability limitation under the applicable post-COD SPA, which amount to $595 million in the aggregate. However, these customers are also disputing whether the liability limitations in such post-COD SPAs are applicable, and therefore are claiming damages in excess of the liability limitations.

Current report — wording carried from elsewhere

For further discussion, see Item 1A.—Risk Factors—Risks Relating to Regulation and Litigation—If we are unsuccessful in any current or potential future legal proceedings with customers, the amounts that we are required to pay may be substantial or certain of our post-COD SPAs may be terminated, which may lead to an acceleration of all our debt for the relevant project and adversely impact the trading price of our Class A common stock, Note 4 – Revenue from Contracts with Customersin Item 8.—Financial Statements and Supplementary Data of this Form 10-K, and Part IItem 3.—Legal Proceedings of this Form 10-K.
Rearranged previous paragraphs (8)

Previous report — wording carried elsewhere

The following table shows a summary of our results of operations for the periods indicated:

Previous report — wording carried elsewhere

Net Income Attributable to Redeemable Stock of Subsidiary

Previous report — wording carried elsewhere

Net Income Attributable to Non-controlling Interests

Previous report — wording carried elsewhere

Net Income Attributable to Common Stockholders

Previous report — wording carried elsewhere

This increase was primarily due to:

Previous report — wording carried elsewhere

The following table shows a summary of our segment income (loss) from operations for the periods indicated:

Previous report — wording carried elsewhere

Plaquemines Project. In May 2022, our subsidiary, VGPL, obtained approximately $9.6 billion in project financing consisting of an approximately $8.5 billion term loan facility, or the Plaquemines Construction Term Loan, and a $1.1 billion working capital revolving facility, or the Plaquemines Working Capital Facility, or collectively, the Plaquemines Credit Facilities, that matures in May 2029, to fund the development and construction of Phase 1 of the Plaquemines Project. The project financing facilities were upsized in March 2023 to fund the development and construction of Phase 2 of the Plaquemines Project. In the aggregate, the upsized Plaquemines

Previous report — wording carried elsewhere

The following table shows a summary of our cash flows for the periods indicated: