IREN Ltd
For the period ended Dec 31, 2025. Filed Feb 5, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Dec 31, 2025 · Filed Feb 5, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-11-06.
0001878848-25-000081
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-12-31; filed 2026-02-05.
0001878848-26-000015
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 170 previous paragraphs and 213 current paragraphs.
82 unchanged; 66 reworded; 48 added; 20 removed; 2 previous and 17 current paragraphs rearranged.
Tables are not compared: 4 previous and 4 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (48)
Current report
Our cash and cash equivalents were $3,260.6 million as of December 31, 2025. Our total revenue was $184.7 million and $116.1 million for the three months ended December 31, 2025 and 2024, respectively, and $425.0 million and $168.9 million for the six months ended December 31, 2025 and 2024, respectively. We generated net income (loss) of $(155.4) million and $(21.9) million for the three months ended December 31, 2025 and 2024, respectively, and $229.2 million and $(73.6) million for the six months ended December 31, 2025 and 2024, respectively.
Current report
Data Centers
Current report
We have seven data center sites with executed grid connection agreements or letters of agreement representing approximately 4,500MW of total power capacity: three in Texas, United States, namely Childress, Sweetwater 1 and Sweetwater 2, three in British Columbia, Canada, namely Canal Flats, Mackenzie and Prince George, and one in Oklahoma, United States.
Current report
Our 80MW Mackenzie site has been operating since April 2022 and, as of December 31, 2025, had approximately 80MW of data center capacity and hashrate capacity of approximately 4.4 EH/s, down from 5.2 EH/s following GPU retrofitting at our Mackenzie site in connection with the Group’s strategic focus on expanding its AI Cloud Services.
Current report
As of December 31, 2025, the Group had secured contractual rights to procure land and 1,600MW of grid-connected power for a new data center site in Oklahoma.
Current report
The Microsoft Agreement contains customary termination rights (including certain cure periods), including, subject to a cure period, a right for Microsoft to terminate if the applicable Group counterparty fails to meet agreed delivery dates and other remedies. The Microsoft Agreement contains other customary provisions for an agreement of this nature, including service level commitments, excluded delays, delay credits, governance reporting, representations and warranties, force majeure, indemnities and limitations of liability. The commencement of the parties’ obligations under the Microsoft Agreement is subject to a delivery acceptance process.
Current report
Convertible Notes Transactions; Equity Offering
Current report
On December 8, 2025, the Company issued $1.15 billion aggregate principal amount of its 2032 Convertible Notes and $1.15 billion aggregate principal amount of its 2033 Convertible Notes. The net proceeds from the offerings of the 2032 Convertible Notes and the 2033 Convertible Notes were approximately $2,270.0 million after deducting the initial purchasers’ discounts, commissions and estimated offering expenses. The Company used $201.0 million of the net proceeds to fund the cost of entering into the capped call transactions, in aggregate, in connection with the 2032 Convertible Notes and the 2033 Convertible Notes.
Current report
In addition, on December 2, 2025, the Company entered into certain separate, privately negotiated transactions with a limited number of holders of the Company’s outstanding (i) 2030 Convertible Notes and (ii) 2029 Convertible Notes to repurchase approximately $227.7 million aggregate principal amount of the 2030 Convertible Notes for approximately $608.2 million, which includes accrued and unpaid interest, and to repurchase approximately $316.6 million aggregate principal amount of the 2029 Convertible Notes for approximately $1,024.2 million, which includes accrued and unpaid interest, for an aggregate purchase price of approximately $1,632.4 million (the “Repurchases”). The Repurchases were completed on or about December 8, 2025. See “—Liquidity and Capital Resources” for additional information.
Current report
On December 2, 2025, in conjunction with the Repurchases, the Company entered into certain share purchase agreements, by and between the Company and certain purchasers, pursuant to which the Company agreed to sell 39,699,102 Ordinary shares in a registered direct offering at a price of $41.12 per share (the “Equity Offering”). The issuance and sale of 39,699,102 Ordinary shares was completed on December 8, 2025.
Current report
Underwriting commitment for GPU Financing
Current report
On February 4, 2026, the Group entered into a binding commitment letter pursuant to which Goldman Sachs Bank USA and JPMorgan Chase Bank, N.A. have, subject to certain conditions, committed to underwrite a delayed draw financing of approximately $3.6 billion to support satisfaction of the Group’s obligations under the Microsoft Agreement. The proposed facility is expected to be secured by the GPUs the Group proposes to utilize to service, and the cash flows to be generated from, the Microsoft Agreement, with phased drawdowns through 2026, and remains subject to execution of definitive agreements and customary closing conditions. No assurances can be given that the delayed draw term loan facility will be entered into in the amount indicated above or at all.
Current report
(3)Debt conversion inducement expense of $111.8 million for the three and six months ended December 31, 2025. See “Results of Operations—Comparison of the three months ended December 31, 2025 and 2024 —Debt conversion inducement expense” and “Results of Operations—Comparison of the six months ended December 31, 2025 and 2024 —Debt conversion inducement expense” for further information on Debt conversion inducement expense.
Current report
(6)Other one-off income includes insurance proceeds relating to the theft of mining hardware in transit.
Current report
The increase in net electricity costs per Bitcoin mined for the three and six months ended December 31, 2025, as compared to the three and six months ended December 31, 2024, was due to a combination of an increase in electricity costs per megawatt and an increase in the average global hashrate bitcoin mining difficulty.
Current report
Impairment of assets for the three months ended December 31, 2025 and 2024 was $31.8 million and nil, respectively. Impairment was primarily due to the S21 Pro miners during the three months ended December 31, 2025. The S21 Pro miners are expected to be displaced from the Group’s data centers as part of the Group’s strategic focus on expanding its AI Cloud Services. Management performed an impairment assessment as of December 31, 2025, resulting in a change to reduce their carrying amount to estimated fair value. See Note 9 of the unaudited condensed consolidated financial statements included in this Quarterly Report for further information.
Current report
Other operating expenses for the three months ended December 31, 2025 and 2024 was $5.5 million and $4.0 million, respectively. During the three months ended December 31, 2025, we incurred $5.5 million in transaction costs relating to the 2031 Capped Call Transactions, 2032 Capped Call Transactions and 2033 Capped Call Transactions. During the three months ended December 31, 2024, we incurred $1.5 million in transaction costs relating to the 2030 Capped Call Transactions and a $2.5 million provision for non-refundable GST, which was subsequently released during the year ended June 30, 2025.
Current report
Finance expense for the three months ended December 31, 2025 and 2024 was $10.7 million and $1.7 million, respectively. The increase was primarily related to a higher principal amount of outstanding convertible notes during the three months ended December 31, 2025. Further, the 2030 Convertible Notes and 2029 Convertible Notes were outstanding for substantially the entire three months ended December 31, 2025 (excluding amounts repurchased), compared to the three months ended December 31, 2024, where the 2030 Convertible Notes were outstanding for less than one month.
Current report
Debt conversion inducement expense
Current report
Debt conversion inducement expense for the three months ended December 31, 2025 and 2024 was $111.8 million and nil, respectively. The increase was primarily related to the induced conversion of a portion of the 2030 Convertible Notes and the 2029 Convertible Notes. Refer to Note 16 of the unaudited condensed consolidated financial statements included in this Quarterly Report for further information.
Current report
Net income (loss) for the three months ended December 31, 2025 and 2024 was $(155.4) million and $(21.9) million respectively. The increase in net loss is primarily attributable to the increase in Unrealized loss on financial instruments, Selling, general and administrative expenses, Depreciation and amortization, Impairment of assets and Debt conversion inducement expense during the three months ended December 31, 2025, offset by increase in Total revenue.
Current report
Comparison of the six months ended December 31, 2025 and 2024
Current report
Bitcoin Mining revenue
Current report
Our Bitcoin Mining revenue for the six months ended December 31, 2025 and 2024, was $400.3 million and $163.1 million, respectively. This revenue was generated from the mining and sale of 3,703 and 2,160 Bitcoin during the six months ended December 31, 2025 and 2024, respectively. The increase in revenue is primarily due to a $75.1 million increase attributable to the increase in the average Bitcoin price and $161.4 million increase attributable to the increase in Bitcoin mined during the six months ended December 31, 2025, reflecting the increase in average operating hashrate, which was partially offset by the increase in the implied global hashrate during the same period. Average operating hashrate increased to 44.1 EH/s for the six months ended December 31, 2025 as compared to 17.5 EH/s for the six months ended December 31, 2024.
Current report
AI Cloud Services revenue
Current report
Selling, general and administrative expenses
Current report
Depreciation and amortization
Current report
Depreciation and amortization consist primarily of the depreciation of Bitcoin mining hardware, GPU hardware and data centers. Depreciation expense for the six months ended December 31, 2025 and 2024 was $184.4 million and $70.0 million respectively. This increase was primarily due to higher operating capacity at Childress compared to the six months ended December 31, 2024, and additional GPUs placed into service during the six months ended December 31, 2025.
Current report
Impairment of assets
Current report
The net gain (loss) on disposal of property and equipment for the six months ended December 31, 2025 and 2024 was nil and $0.2 million, respectively. The net gain during the six months ended December 31, 2024 relates to the gain recorded on the disposal of Bitcoin mining hardware.
Current report
Other operating expenses
Current report
Other operating income
Current report
Other operating income for the six months ended December 31, 2025 and 2024 was $5.6 million and $4.7 million, respectively. This increase is primarily due to a $2.6 million increase in demand response program income at the Group’s site at Childress during the six months ended December 31, 2025, offset by $1.7 million insurance income received during the six months ended December 31, 2024, in relation to theft of mining hardware in transit.
Current report
Finance expense
Current report
Finance expense for the six months ended December 31, 2025 and 2024 was $19.9 million and $1.7 million, respectively. The increase was primarily related to a larger principal amount of outstanding convertible notes during the six months ended December 31, 2025. Further, the 2030 Convertible Notes and 2029 Convertible Notes were outstanding for the entire six months ended December 31, 2025, compared to the six months ended December 31, 2024, where the 2030 Convertible Notes were outstanding for less than one month.
Current report
Interest income
Current report
Interest income for the six months ended December 31, 2025 and 2024 was $22.9 million and $3.9 million, respectively. The increase in interest income was primarily related to an increase in average cash and cash equivalents balance for the six months ended December 31, 2025 as compared to the six months ended December 31, 2024, as a result of the convertible notes and Ordinary shares issued between the six months ended December 31, 2025 and six months ended December 31, 2024, respectively.
Current report
Increase (decrease) in fair value of assets held for sale for the six months ended December 31, 2025 and 2024 was $(6.4) million and $(2.1) million, respectively. This decrease was related to the higher decrease in fair value of S21 Pro miners held for sale as at December 31, 2025, compared to the decrease in fair value of S19j Pro miners held for sale as at December 31, 2024. Refer to Note 9 of the unaudited condensed consolidated financial statements included in this Quarterly Report for further information.
Current report
Unrealized gain (loss) on financial instruments for the six months ended December 31, 2025 and 2024 was $557.6 million and $(32.3) million, respectively. The unrealized gain (loss) during the six months ended December 31, 2025 related to the changes in fair value of the Capped Call Transactions and Prepaid Forward Transactions. Refer to Notes 8 and 10 of the unaudited condensed consolidated financial statements included in this Quarterly Report for further information.
Current report
Debt conversion inducement expense
Showing the first 40 of 48 passages. Open the source sections for the rest.
Removed paragraphs (20)
Previous report
Each of our sites in British Columbia are connected to BC Hydro electricity transmission network and have been 100% powered by renewable energy since commencement of operations (currently approximately 98% sourced from clean or renewable sources, including through hydroelectric sources, wind, solar and biomass, as reported by BC Hydro and approximately 2% accounted for by the purchase of RECs). BC Hydro retains the environmental attributes from the renewable energy they sell us. Our contracts with BC Hydro each had an initial term of one year and shall extend until terminated in accordance with the terms of the agreement upon six months’ notice.
Previous report
During the three months ended September 30, 2025 we signed additional multi-year cloud services contracts with leading AI companies, consisting of approximately 5,000 GPUs of our total fleet of approximately 23,300 GPUs (installed or on order) as of September 30, 2025. In addition, on October 4, 2025 and October 30, 2025, we signed additional cloud services contracts consisting of approximately 4,000 GPUs and 1,100 GPUs, respectively.
Previous report
During the three months ended September 30, 2025,we procured, through a combination of purchases and equipment finance leasing, approximately 21,200 GPUs, to be installed at our Prince George site, that brought the total GPU fleet to approximately 23,300 GPUs (installed or on order) as of September 30, 2025.
Previous report
Transition to U.S. Domestic Issuer Reporting
Previous report
As of December 31, 2024, the Group no longer met the definition of a “foreign private issuer” under U.S. federal securities regulations and is therefore required to file periodic reports on U.S. domestic issuer forms from June 30, 2025. Accordingly, this Quarterly Report contains unaudited condensed consolidated financial statements prepared in accordance with GAAP.
Previous report
Executive Leadership Change
Previous report
On September 8, 2025, we appointed Anthony Lewis as Chief Financial Officer. Our former Chief Financial Officer ceased employment the same day.
Previous report
Convertible Notes Transaction
Previous report
There was no material change to net electricity costs per Bitcoin mined for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024.
Previous report
Finance expense for the three months ended September 30, 2025 and 2024 was $9.3 million and $0.0 million, respectively. The increase was primarily related to interest expense on the convertible notes issued in the second and fourth quarters of the fiscal year 2025.
Previous report
Hardware Purchase Contracts
Previous report
On July 3, 2025, we announced that we entered into a purchase order with respect to approximately 2,400 GPUs for a total purchase price of approximately $130 million, which are to be delivered by the end of calendar year 2025 and installed at our Prince George site.
Previous report
On August 23, 2025, we terminated part of the July purchase order and entered into an equipment lease pursuant to which we agreed to refinance $102 million of the purchase price of such purchase, with the remaining amounts under the July purchase order to be funded from existing cash.
Previous report
Further in August 2025, we entered into a purchase order with respect to an additional approximately 4,200 GPUs for a total purchase price of approximately $193 million and entered into a further purchase agreement for approximately 1,200
Previous report
GPUs for a total purchase price of approximately $71.4 million. We also procured approximately 1,200 GPUs through an equipment lease as detailed below. These additional GPUs are expected to be delivered by end of calendar year 2025 and will be installed at our Prince George site.
Previous report
Further in September 2025, we entered into purchase orders with respect to an additional approximately 4,200 GPUs for a total purchase price of approximately $205.7 million, purchase agreements for approximately 7,100 GPUs for a total purchase price of approximately $429.2 million and a purchase agreement for approximately 1,100 GPUs for a total purchase price of approximately $39.3 million. These additional GPUs are expected to be delivered by the end of the first calendar quarter of 2026 and will be installed at our Prince George site.
Previous report
As noted above, on August 23, 2025 we entered into an arrangement pursuant to which we secured $102 million in financing for the prior purchase of approximately 2,200 GPUs. The financing is structured as a 36-month lease for 100% of the purchase price of the GPUs, with fixed monthly lease payments of $2.8 million. The financing structure incorporates a fair market value purchase option which, at the sole discretion of the Company upon maturity of the 36-month term, allows for the acquisition of the GPUs at the lower of its prevailing fair market value and 18% of the initial purchase cost of approximately $102 million.
Previous report
Further, on August 28, 2025 we entered into an arrangement pursuant to which we secured approximately $96 million in financing to support the acquisition of approximately 1,200 GPUs. The financing is structured as a 24-month lease for 100% of the purchase price of the GPUs, with fixed monthly lease payments of $4.4 million. The financing structure also incorporates a $1 buyout option at the sole discretion of the Company upon maturity of the 24-month term.
Previous report
The Company has provided a parent guarantee with respect to both equipment leases. See Note 24 to our audited financial statements for the year ended June 30, 2025, included in the Annual Report for further information.
Previous report
We are also pursuing a strategy of expanding and diversifying our revenue sources into new markets, and we are continuing to diversify into HPC and AI services pursuant to that strategy.
Reworded paragraphs (66)
Previous wording
Our AI Cloud Services operations generate revenue by providing access to cloud-based GPU computing to customers for AI training and interference workloads. As of September 30, 2025, we had approximately 2,100 GPUs operating in our data centers.
Current wording
Our AI Cloud Services operations generate revenue by providing access to cloud-based GPU computing to customers for AI training and inference workloads. As of December 31, 2025, we had approximately 99,900 GPUs installed or on order for our data centers.
Previous wording
Our Bitcoin mining operations generate revenue by earning Bitcoin through a combination of Block rewards and transaction fees from the operation of our Bitcoin miners and exchanging these Bitcoin for fiat currencies such as USD or CAD. We typically liquidate all the Bitcoin we mine daily and therefore did not have any Bitcoin held on our balance sheet as of September 30, 2025. As of September 30, 2025, we had installed hashrate capacity of approximately 50 EH/s.
Current wording
Our Bitcoin Mining operations generate revenue by earning Bitcoin through a combination of Block rewards and transaction fees from the operation of our Bitcoin miners and exchanging these Bitcoin for fiat currencies such as USD or CAD. We typically liquidate all the Bitcoin we mine daily and therefore did not have any Bitcoin held on our balance sheet as of December 31, 2025. As of December 31, 2025, we had installed hashrate capacity of approximately 46 EH/s.
Previous wording
Our cash and cash equivalents were $1,032.3 million as of September 30, 2025. Our total revenue was $240.3 million for the three months ended September 30, 2025, compared to total revenue of $52.8 million for the three months ended September 30, 2024. We generated net income of $384.6 million for the three months ended September 30, 2025 compared to a net loss of $51.7 million for the three months ended September 30, 2024. We generated EBITDA of $662.7 million and $(18.8) million for the three months ended September 30, 2025 and 2024, respectively. We generated Adjusted EBITDA of $91.7 million and $2.5 million for the three months ended September 30, 2025 and 2024, respectively. EBITDA and Adjusted EBITDA are financial measures not defined by GAAP. For a definition of EBITDA and Adjusted EBITDA, an explanation of our management’s use of these measures and a reconciliation of EBITDA and Adjusted EBITDA to loss after income tax expense, see “Key Indicators of Performance and Financial Conditions”.
Current wording
We generated EBITDA of $(243.9) million and $17.3 million for the three months ended December 31, 2025 and 2024, respectively, and $418.8 million and $(1.4) million for the six months ended December 31, 2025 and 2024, respectively. We generated Adjusted EBITDA of $75.3 million and $62.4 million for the three months ended December 31, 2025 and 2024, respectively, and $167.0 million and $64.9 million for the six months ended December 31, 2025 and 2024, respectively. EBITDA and Adjusted EBITDA are financial measures not defined by GAAP. For a definition of EBITDA and Adjusted EBITDA, an explanation of our management’s use of these measures and a reconciliation of EBITDA and Adjusted EBITDA to loss after income tax expense, see “Key Indicators of Performance and Financial Conditions”.
Previous wording
We generally target development of data centers in regions where there are low-cost and attractive renewable energy sources. Our data centers are currently powered by 100% renewable energy (whether from clean or renewable energy sources or through the purchase of RECs). We also focus on grid-connected power access which we believe not only helps facilitate a more reliable, long-term supply of power, but also provides us with the ability to support the energy markets in which we operate (for example, through potential participation in demand response, ancillary services provision and load management in deregulated markets such as Texas). Over 80% of our operating data center capacity is currently located in the United States.
Current wording
We generally target development of data centers in regions where there are low-cost and attractive renewable energy sources. Our data centers are currently powered by 100% renewable energy (whether from clean or renewable energy sources or through the purchase of renewable energy certificates (“RECs”)). We also focus on grid-connected power access which we believe not only helps facilitate a more reliable, long-term supply of power, but also provides us with the ability to support the energy markets in which we operate (for example, through potential participation in demand response, ancillary services provision and load management in deregulated markets such as Texas). Over 80% of our operating data center capacity is currently located in the United States.
Previous wording
We have three data center sites in Texas, United States with executed grid connection agreements, namely Childress, Sweetwater 1 and Sweetwater 2. Our 750MW Childress site has been operating since April 2023 and, as of September 30, 2025, has approximately 650MW of operating data center capacity and installed hashrate capacity of approximately 40.1 EH/s. We are currently undertaking an expansion of our data center capacity at Childress to support direct-to-chip liquid cooling deployments known as “Horizon 1,” “Horizon 2,” “Horizon 3” and “Horizon 4” with a combined IT load of up to 200MW (based on rack density of up to 200kW, subject to customer requirements) for potential growth opportunities for HPC and AI services. We do not expect a material reduction in hashrate capacity at our Childress site until the full deployment of “Horizon 3” and “Horizon 4.” We procure RECs in respect of 100% of our energy consumption at our Childress site on a periodic basis.
Current wording
Our 750MW Childress site has been operating since April 2023 and, as of December 31, 2025, has approximately 650MW of operating data center capacity and installed hashrate capacity of approximately 40 EH/s. We are currently undertaking an expansion of our data center capacity at Childress to support direct-to-chip liquid cooling GPU deployments known as “Horizon 1,” “Horizon 2,” “Horizon 3” and “Horizon 4” with a combined IT load of up to 200MW. We do not expect a material reduction in hashrate capacity at our Childress site until the full deployment of “Horizon 3” and “Horizon 4.”
Previous wording
Our 1,400MW Sweetwater 1 and 600MW Sweetwater 2 sites are under development and located approximately 40 miles from Abilene, Texas. As of September 30, 2025, we had paid $11.7 million of connection deposits for Sweetwater 1, as well as $13.5 million in connection deposits and $4.1 million in non-refundable connection costs for Sweetwater 2, with such payments facilitating a direct connection to the Electric Reliability Council of Texas (“ERCOT”) grid. We expect to pay up to $13.5 million in connection deposits over the next 12 months, related to our Sweetwater 2 site. Construction of substation infrastructure has commenced at Sweetwater 1 (along with site establishment works such as construction offices, laydown areas and warehouse construction), and we are targeting grid connection and a substation energization date in the second quarter of calendar year 2026 for Sweetwater 1 and the fourth quarter of calendar year 2027 for Sweetwater 2. Design works are complete for a direct fiber loop between Sweetwater 1 and Sweetwater 2.
Current wording
Our 1,400MW Sweetwater 1 and 600MW Sweetwater 2 sites are under development and located approximately 40 miles from Abilene, Texas. We are targeting connection to the Electric Reliability Council of Texas (“ERCOT”) grid and a substation energization date in the second quarter of calendar year 2026 for Sweetwater 1 and the fourth quarter of calendar year 2027 for Sweetwater 2. Design works are complete for a direct fiber loop between Sweetwater 1 and Sweetwater 2.
Previous wording
We also have three data center sites in British Columbia, Canada, namely Canal Flats, Mackenzie and Prince George. Our Canal Flats site was acquired from PodTech Innovation Inc. and certain of its related parties in January 2020, and has been operating since 2019. As of September 30, 2025 it had approximately 30MW of data center capacity and hashrate capacity of approximately 1.6 EH/s. Our Mackenzie site has been operating since April 2022 and, as of September 30, 2025, had approximately 80MW of data center capacity and hashrate capacity of approximately 5.2 EH/s. Our Prince George site has been operating since September 2022 and, as of September 30, 2025, had approximately 50MW of data center capacity and hashrate capacity of approximately 2.1 EH/s. Our AI Cloud Service, comprising approximately 2,200 GPUs as of September 30, 2025, is also currently operated at our Prince George site. We expect that all of the hashrate capacity at Prince George will be displaced following the full deployment of GPUs at the site.
Current wording
Our 30MW Canal Flats site was acquired from PodTech Innovation Inc. and certain of its related parties in January 2020, and has been operating since 2019. As of December 31, 2025 it had approximately 30MW of data center capacity and hashrate capacity of approximately 1.6 EH/s.
Previous wording
As of September 30, 2025, 83% and 17% of the Company’s non-current assets were located in the United States of America and Canada, respectively.
Current wording
As of December 31, 2025, 71% and 29% of the Company’s non-current assets were located in the United States of America and Canada, respectively.
Previous wording
On November 2, 2025, we entered into an agreement with Microsoft Corporation, pursuant to which we will provide Microsoft with dedicated GPU services at “Horizon” data center facilities located in Childress, Texas over a five-year average term. The GPU services will be made available to Microsoft in several tranches targeted for deployment during 2026 (subject to extension in certain circumstances). The total contract value is approximately $9.7 billion through 2031, with 20% of the contract value for each tranche to be paid prior to the applicable delivery date and credited against the service fees due and payable after the 24th calendar month of the applicable GPU service term on a pro rata basis. The GPUs that will be used to provide the GPU services will be installed across four data center facilities at Childress known as “Horizon 1,” “Horizon 2,” “Horizon 3” and “Horizon 4”, representing a combined IT load of approximately 200MW. Cash flows from the Microsoft Agreement will be used to finance part of the approximately $5.8 billion of GPU related capital expenditure anticipated to be required in connection with the agreement.
Current wording
On November 2, 2025, the Group entered into an agreement with Microsoft Corporation (the “Microsoft Agreement”), pursuant to which we will provide Microsoft Corporation with dedicated GPU services at “Horizon” data center facilities located in Childress, Texas over a five-year average term. The GPU services will be made available to Microsoft Corporation in four tranches targeted for deployment during 2026 (subject to extension in certain circumstances). The total contract value is approximately $9.7 billion through 2031, with 20% of the contract value for each tranche to be paid prior to the applicable delivery date and credited against the service fees due and payable after the 24th calendar month of the applicable GPU service term on a pro rata basis. The GPU quantity and the estimated monthly payments are expected to be approximately equal across all four tranches.
Previous wording
On November 2, 2025, the Group entered into a purchase agreement with Dell Marketing L.P. (“Dell”) pursuant to which Dell will supply to the Group GPUs and ancillary products and services, scheduled to be delivered in several tranches from March 2026, for an aggregate purchase price of approximately $5.8 billion payable in installments within 30 days of each tranche shipping. The Company has agreed to provide an unconditional parent guarantee with respect to the obligations under this agreement.
Current wording
On November 2, 2025, the Group entered into a purchase agreement with Dell Marketing L.P. (“Dell”) pursuant to which Dell will supply to the Group GPUs and ancillary products and services, scheduled to be delivered in four tranches during 2026 (commencing March 2026), for an aggregate purchase price of approximately $5.8 billion payable in installments within 30 days of each tranche shipping (the “Dell Purchase Agreement”). The number of GPU server racks are expected to be equal across all four tranches. The Dell Purchase Agreement contains customary representations, warranties, covenants, indemnities and termination rights. The Company has agreed to provide an unconditional parent guarantee with respect to the obligations under the Dell Purchase Agreement.
Previous wording
Additionally, on November 5, 2025, the Group entered into financing arrangements with Dell Financial Services to finance a portion of the Group’s GPU orders. The facility provides $199.8 million of financing, structured as a 24-month lease. The lease includes a purchase option at the Group’s sole discretion, allowing the acquisition of the GPUs upon maturity of the lease for $1. The Company has agreed to provide a parent guarantee with respect to all payment obligations under this facility.
Current wording
Additionally, on November 5, 2025, the Group entered into financing arrangements with Dell Financial Services to finance a portion of the Group’s GPU orders for Prince George. The facility provides $199.8 million of financing, structured as a 24-month lease. The lease includes a purchase option at the Group’s sole discretion, allowing the acquisition of the GPUs upon maturity of the lease for $1. The Company has agreed to provide a parent guarantee with respect to all payment obligations under this facility.
Previous wording
On October 14, 2025, the Group completed the issuance of $1.0 billion aggregate principal amount of 0.00% Convertible Senior Notes due in 2031. Net proceeds from the offering were approximately $979.0 million after deducting initial purchasers’ discounts, commissions, and estimated offering expenses. The Group used approximately $56.7 million of the net proceeds to enter into capped call transactions. See ‘Item 2 - Management’s Discussion and Analysis of Financial Condition and Results of Operations - Liquidity and Capital Resources’ for additional information.
Current wording
On October 14, 2025, the Company issued $1.0 billion aggregate principal amount of its 2031 Convertible Notes. Net proceeds from the offering of the 2031 Convertible Notes were approximately $979.0 million after deducting initial purchasers’ discounts, commissions, and estimated offering expenses. The Company used approximately $56.7 million of the net proceeds to enter into capped call transactions in connection with the 2031 Convertible Notes.
Previous wording
We primarily derive our revenues from Bitcoin mining. We earn rewards from Bitcoin mining that are paid in Bitcoin. We currently liquidate rewards that we earn from mining Bitcoin in exchange for fiat currencies such as USD or CAD, typically on a daily basis. Because the rewards we earn from mining Bitcoin are paid in Bitcoin, our operating and financial results are tied to fluctuations in the value of Bitcoin. In addition, positive or negative changes in the global hashrate impact mining difficulty and therefore the rewards we earn from mining Bitcoin may as a result materially affect our revenue and margins.
Current wording
While we are in the process of expanding and diversifying our revenue sources to include AI Cloud Services, we currently derive our revenues primarily from Bitcoin mining. We earn rewards from Bitcoin mining that are paid in Bitcoin. We currently liquidate rewards that we earn from mining Bitcoin in exchange for fiat currencies such as USD or CAD, typically on a daily basis. Because the rewards we earn from mining Bitcoin are paid in Bitcoin, our operating and financial results are tied to fluctuations in the value of Bitcoin. In addition, positive or negative changes in the global hashrate impact mining difficulty and therefore the rewards we earn from mining Bitcoin may as a result materially affect our revenue and margins.
Previous wording
Conversely, in a rising Bitcoin price environment, additional mining machines may be deployed by miners, leading to increased global hashrate in the overall network. In periods of rising Bitcoin prices we may increase our capital expenditures in mining machines and related infrastructure to take advantage of potentially faster return on investments, subject to availability of capital and market conditions. However, we also note that the global hashrate may also increase or decrease irrespective of changes in the Bitcoin price.
Current wording
Conversely, in a rising Bitcoin price environment, additional mining machines may be deployed by miners, leading to increased global hashrate in the overall network. In periods of rising Bitcoin prices we may increase our capital expenditures in mining machines and related infrastructure to take advantage of potentially faster returns on investments, subject to availability of capital and market conditions. However, we also note that the global hashrate may also increase or decrease irrespective of changes in the Bitcoin price.
Previous wording
While the supply of Bitcoin is capped at 21 million, the price of Bitcoin fluctuates not just because of traditional notions of supply and demand but also because of the dynamic nature of the market for Bitcoin. Having been created in just a little over a decade as of the date of this Quarterly Report, the market for Bitcoin is rapidly changing and subject to global regulatory, tax, political, environmental, cybersecurity, and market factors beyond our control. For a discussion of other factors that could lead to material adverse changes in the market value of Bitcoin, which could in turn result in substantial damage to or even the failure of our business, see “Item 1A. Risk Factors—Risks Related to Our Business” in our Annual Report.
Current wording
While the supply of Bitcoin is capped at 21 million, the price of Bitcoin fluctuates not just because of traditional notions of supply and demand but also because of the dynamic nature of the market for Bitcoin. Given its relative infancy compared to other more established markets, the market for Bitcoin is rapidly changing and subject to global regulatory, tax, political, environmental, cybersecurity, and market factors beyond our control. For a discussion of other factors that could lead to material adverse changes in the market value of Bitcoin, which could in turn result in substantial damage to or even the failure of our business, see “Item 1A. Risk Factors—Risks Related to Our Business” in our Annual Report.
Previous wording
Further, the rewards for each Bitcoin mined is subject to “halving” adjustments at predetermined intervals. At the outset, the reward for mining each block was set at 50 Bitcoins and this was cut in half to 25 Bitcoins on November 28, 2012 at block 210,000, cut in half to 12.5 Bitcoins on July 9, 2016 at block 420,000, cut in half to 6.25 Bitcoins on May 11, 2020 at block 630,000, and cut in half again to 3.125 Bitcoins on April 20, 2024 at block 840,000. The next two halving events for Bitcoin are expected to take place in 2028 at block 1,050,000 (when the reward will reduce to 1.5625 Bitcoins), and in 2032 at block 1,260,000 (when the reward will reduce to 0.78125 Bitcoins). As the rewards for each Bitcoin mined reduce, the Bitcoin we earn relative to our hashrate capacity decrease. As a result these adjustments have had, and will continue to have, material effects on our operating and financial results.
Current wording
Further, the rewards for each Bitcoin mined are subject to “halving” adjustments at predetermined intervals. At the outset, the reward for mining each block was set at 50 Bitcoins and this was cut in half to 25 Bitcoins on November 28, 2012 at block 210,000, cut in half to 12.5 Bitcoins on July 9, 2016 at block 420,000, cut in half to 6.25 Bitcoins on May 11, 2020 at block 630,000, and cut in half again to 3.125 Bitcoins on April 20, 2024 at block 840,000. The next two halving events for Bitcoin are expected to take place in 2028 at block 1,050,000 (when the reward will reduce to 1.5625 Bitcoins), and in 2032 at block 1,260,000 (when the reward will reduce to 0.78125 Bitcoins). As the rewards for each Bitcoin mined reduce, the Bitcoin we earn relative to our hashrate capacity decreases. As a result these adjustments have had, and will continue to have, material effects on our operating and financial results.
Previous wording
S21 miners and T21 miners. To remain cost competitive compared to other mining sector participants, in addition to targeting cost effective sources of energy and operating efficient data center infrastructure, we expect we will need to maintain an energy efficient mining fleet, which will require capital outlays to purchase new miners, so that we can make periodic upgrades to our existing mining fleet.
Current wording
As global mining capacity increases, we will need to correspondingly increase our total hashrate capacity in order to maintain our proportionate share relative to the overall global hashrate – all else being equal – to maintain the same amount of Bitcoin mining revenue. Our Bitcoin mining operations currently utilize the Bitmain S21 XP miners, S21 Pro miners, S21 miners and T21 miners. To remain cost competitive compared to other mining sector participants, in addition to targeting cost effective sources of energy and operating efficient data center infrastructure, we expect we will need to maintain an energy efficient mining fleet, which will require capital outlays to purchase new miners, so that we can make periodic upgrades to our existing mining fleet.
Previous wording
In certain periods, there may be disruption in global supply chain leading to shortage of advanced mining machines that meet our standard of quality and efficiency. To maintain our competitive edge over the long-term, we strive to maintain strong relationships with suppliers and vendors across the supply chain so that our fleet of miners is competitive.
Current wording
In certain periods, there may be disruption in the global supply chain leading to shortage of advanced mining machines that meet our standard of quality and efficiency. To maintain our competitive edge over the long-term, we strive to maintain strong relationships with suppliers and vendors across the supply chain so that our fleet of miners is competitive.
Previous wording
Ability to Secure Low-Cost Electricity, Particularly Renewable Power
Current wording
Ability to Secure Low-Cost Electricity and Timely Grid Connections, Particularly Renewable Power
Previous wording
Bitcoin mining and HPC and AI services consume extensive energy, including for both the mining and cooling aspects of our operations. In particular, we believe the increasing difficulty of the network, driven by more miners and higher global hashrate, and the periodic halving adjustments of Bitcoin reward rates, as well as the global demand for HPC and AI services for various programs, including AI Cloud Services, and the need for reliability in such industry, will drive the increasing importance of access to power and cost effectiveness in Bitcoin mining and HPC and AI services over the long-term.
Current wording
Bitcoin mining and HPC and AI services consume extensive energy, including for both the mining and cooling aspects of our operations. In particular, we believe that the global demand for HPC and AI services for various programs, including AI Cloud Services, and the need for reliability in such industry, as well as the increasing difficulty of the Bitcoin network, driven by more miners and higher global hashrate, and the periodic halving adjustments of Bitcoin reward rates, will drive the increasing importance of access to power and cost effectiveness in HPC and AI services and Bitcoin mining over the long-term.
Previous wording
Certain governments and regulators are increasingly focused on the energy and environmental impact of Bitcoin mining and HPC and AI services. This has led, and could lead, to new governmental measures regulating, restricting or prohibiting the use of electricity for Bitcoin mining and HPC and AI services, or Bitcoin mining or HPC and AI services generally or could result in increased power costs for these types of power consumers. See “Item 1A. Risk Factors—Any electricity outage, non-supply or limitation of electricity supply, including as a result of political pressures or regulations, may result in material impacts to our operations and financial performance” and “Item 1A. Risk Factors—Risks Related to Regulations and Regulatory Frameworks—Bitcoin mining and HPC and AI services are energy-intensive, which may restrict the geographic locations of miners and operations, in particular, to locations with renewable sources of power. Government regulators and utilities may potentially restrict the ability of electricity suppliers to provide electricity to Bitcoin miners or HPC and AI service providers, including us, or Bitcoin mining or HPC and AI services generally” in our Annual Report. For example, the British Columbia Court of Appeal has recently upheld the Government of British Columbia’s moratorium on new and early-stage BC Hydro connection requests from cryptocurrency mining projects and the State of Texas has introduced, and may introduce, new laws and regulations that impose new processes and requirements for relating to the interconnection of facilities of large electrical loads to the ERCOT grid which include, among other things, voltage ride-through and/or frequency ride-through requirements.
Current wording
Certain governments and regulators are increasingly focused on the energy and environmental impact of HPC and AI services and Bitcoin mining. This has led, and could lead, to new governmental measures regulating, restricting or prohibiting the use of electricity for HPC and AI services and Bitcoin mining, or HPC and AI services and Bitcoin mining generally or could result in increased power costs for these types of power consumers. See “Item 1A. Risk Factors—Any electricity outage, non-supply or limitation of electricity supply, including as a result of political pressures or regulations, may result in material impacts to our operations and financial performance,” “Part 1. Item 1.A. Risk Factors—Risks Related to Our Business—Our growth strategy may take significant time and expenditure to implement and our efforts may not be successful” and “Item 1A. Risk Factors—Risks Related to Regulations and Regulatory Frameworks—Bitcoin mining and HPC and AI services are energy-intensive, which may restrict the geographic locations of miners and operations, in particular, to locations with renewable sources of power. Government regulators and utilities may potentially restrict the ability of electricity suppliers to provide electricity to Bitcoin miners or HPC and AI service providers, including us, or Bitcoin mining or HPC and AI services generally” in our Annual Report. For example, the British Columbia Court of Appeal has recently upheld the Government of British Columbia’s moratorium on new and early-stage BC Hydro connection requests from cryptocurrency mining projects and the State of Texas has introduced, and may introduce, new laws and regulations that impose new processes and requirements relating to the interconnection of facilities of large electrical loads to the ERCOT grid which include, among other things, voltage ride-through and/or frequency ride-through requirements. In December 2025, ERCOT announced that it was amending the approval process for large load interconnection requests. ERCOT is in the process of designing and implementing a process that will batch multiple large load interconnection requests together to determine system impacts of multiple projects at once to establish transmission needs for load customers in that batch. Furthermore, increasing demand for energy is contributing to heightened complexity and additional constraints in energy markets including load ramp requirements by utilities or grid operators, which may not align with the Company’s planned data center development and commissioning timelines. Shorter ramp schedules could result in financial penalties or loss of available capacity if required load thresholds are not met, while longer ramp schedules could delay the energization of data centers and associated operations. Any such misalignment between required load ramps and operational timing could have adverse effects on the Company’s business, financial condition, and results of operations.
Previous wording
The price we pay for electricity depends on numerous factors including sources of generation, regulatory environment, electricity market structure, commodity prices, transmission cost allocation, instantaneous supply/demand balances, counterparty and procurement method. These factors may be subject to change over time and result in increased power costs. In regulated markets, such as in British Columbia, suppliers of renewable power rely on regulators to approve raises in rates, resulting in fluctuations subject to requests for rate increases and their approval thereof; in markets that are largely deregulated, such as in Texas, prices of renewable power in the competitive market within ERCOT will fluctuate within the wholesale market alongside sources of electricity from non-renewable resources, which is often driven by price fluctuations in commodities such as natural gas. In addition, developments in the United States, including actions taken by the new Trump Administration, such as a series of executive orders aimed at, among other things, pausing approvals of wind power projects, pausing funding of programs aimed at promoting renewable energy and increasing oil and gas production, as well the Department of Energy’s cancellation of certain grants for clean energy projects, signal a policy shift away from supporting renewable energy production. Likewise, the One Big Beautiful Bill Act decreases or eliminates certain tax credits available for new renewable generation projects, which could result in fewer such projects being constructed and lead to increases in electricity prices as demand increases. There have also been legislative proposals and other legal developments targeting renewable energy and large electrical loads in certain states, including Texas. While the impacts of these actions and any future developments cannot be fully predicted at this time, any reductions or modifications to, or the elimination of, laws, programs or incentives that provide electricity to Bitcoin miners or HPC and AI services operators or that support renewable energy, or the implementation of more arduous requirements for renewable energy projects, could potentially limit the availability of, and increase the costs we incur for, electricity, and including renewable energy, in the United States.
Current wording
The price we pay for electricity depends on numerous factors including sources of generation, regulatory environment, electricity market structure, commodity prices, transmission cost allocation, instantaneous supply/demand balances, counterparty and procurement method. These factors may be subject to change over time and result in increased power costs. In regulated markets, such as in British Columbia, suppliers of renewable power rely on regulators to approve raises in rates, resulting in fluctuations subject to requests for rate increases and their approval thereof; in markets that are largely deregulated, such as in Texas, prices of renewable power in the competitive market within ERCOT will fluctuate within the wholesale market alongside sources of electricity from non-renewable resources, which is often driven by price fluctuations in commodities such as natural gas. In addition, developments in the United States, including actions taken by the new Trump Administration, such as a series of executive orders aimed at, among other things, pausing approvals of wind power projects, pausing funding of programs aimed at promoting renewable energy and increasing oil and gas production, as well as the Department of Energy’s cancellation of certain grants for clean energy projects, signal a policy shift away from supporting renewable energy production. Likewise, the One Big Beautiful Bill Act decreases or eliminates certain tax credits available for new renewable generation projects, which could result in fewer such projects being constructed and lead to increases in electricity prices as demand increases. There have also been legislative proposals and other legal developments targeting renewable energy and large electrical loads in certain states, including Texas. While the impacts of these actions and any future developments cannot be fully predicted at this time, any reductions or modifications to, or the elimination of, laws, programs or incentives that provide electricity to Bitcoin miners or HPC and AI services operators or that support renewable energy, or the implementation of more arduous requirements for renewable energy projects, could potentially limit the availability of, and increase the costs we incur for, electricity, including renewable energy, in the United States.
Previous wording
We compete with a variety of Bitcoin miners globally, including individual hobbyists, mining pools and public and private companies, as well as HPC and AI service providers including large and well-funded companies. We believe that, even if the price of Bitcoin decreases, the Bitcoin mining market will continue to draw new miners and increase the scale and sophistication of competition in the Bitcoin mining industry, while the HPC and AI services industry continues to draw companies with significant resources to dedicate to growing their HPC and AI services business as well as expertise in the industry. Increasing competition generally results in increase to the global hashrate, which in turn would generally lead to a reduction in the percentage share of the fixed Bitcoin network rewards that Bitcoin miners, including the Company, would earn, and may result in larger and more established HPC and AI services providers increasing their resource allocation and attention to the industry, which could make our ability to compete, including to attract and maintain customers, more difficult. In addition, the new Trump Administration in the United States has suggested it may introduce different regulatory treatment for digital assets, including Bitcoin, that are mined within the United States compared to those that are mined outside of the United States. As a result, we may face increased competition specifically within the United States for low-cost energy and mining hardware from those attempting to benefit from any potential favorable treatment from mining within the United States.
Current wording
We compete with a variety of Bitcoin miners globally, including individual hobbyists, mining pools and public and private companies, as well as HPC and AI service providers including large and well-funded companies. We believe that, even if the price of Bitcoin decreases, the Bitcoin mining market will continue to draw new miners and increase the scale and sophistication of competition in the Bitcoin mining industry, while the HPC and AI services industry continues to draw companies with significant resources to dedicate to growing their HPC and AI services business as well as expertise in the industry. Increasing competition generally results in an increase to the global hashrate, which in turn would generally lead to a reduction in the percentage share of the fixed Bitcoin network rewards that Bitcoin miners, including the Company, would earn, and may result in larger and more established HPC and AI services providers increasing their resource allocation and attention to the industry, which could make our ability to compete, including to attract and maintain customers, more difficult. In addition, the new Trump Administration in the United States has suggested it may introduce different regulatory treatment for digital assets, including Bitcoin, that are mined within the United States compared to those that are mined outside of the United States. As a result, we may face increased competition specifically within the United States for low-cost energy and mining hardware from those attempting to benefit from any potential favorable treatment from mining within the United States.
Previous wording
Global economic and geopolitical conditions have been increasingly volatile due to factors such as trade restrictions, inflation, rising interest rates and supply chain disruptions. The impacts of inflation have resulted in increased operating expenses as we grow and develop our managerial, operational and financial resources and systems, consistent with its impact on the general economy. If our costs, in particular labor, information system, technology, hardware and utilities costs, were to become subject to significant inflationary pressures, we might not be able to effectively mitigate such higher costs. In addition, inflation may impact our ability to obtain financing for future capital expenditures at a price that is acceptable. Our inability or failure to do so could adversely affect our business, financial condition, and results of operations.
Current wording
Global economic and geopolitical conditions have been increasingly volatile due to factors such as trade restrictions, inflation, rising interest rates and supply chain disruptions. The impacts of inflation have resulted in increased operating expenses as we grow and develop our managerial, operational and financial resources and systems, consistent with its impact on the general economy. If our costs, in particular labor, information systems, technology, hardware and utilities costs, were to become subject to significant inflationary pressures, we might not be able to effectively mitigate such higher costs. In addition, inflation may impact our ability to obtain financing for future capital expenditures at a price that is acceptable. Our inability or failure to do so could adversely affect our business, financial condition, and results of operations.
Previous wording
During the 2025 calendar year, the United States announced the intention to impose tariffs on various countries, including an across-the-board 10% tariff on all countries and individualized higher tariffs on certain countries, including countries from which we have historically sourced miners (including Malaysia, Indonesia, and Thailand) and other hardware and equipment. Several of such tariffs have come into effect as of the date of this report, which could result in higher prices in order to obtain miners and other hardware and equipment, as well as limit the availability of miners and other hardware and equipment and could impact our timelines for installation, energization and expected revenue. In addition to those tariffs which have already come into effect, additional tariffs and trade restrictions have been suggested and others may be suggested in the future, which, if they were enacted, could further impact our business. For example, on August 7, 2025, the United States proposed a 100% tariff on semiconductors imported to the United States. Uncertainty around geopolitical conditions and international trade policies may continue to affect the movement and costs of goods, materials, services and capital. Further, we have received notices disputing the origin of Bitcoin miners imported during 2024 and 2025 from Indonesia, Thailand and Malaysia, claiming the origin of such miners is China and that an additional 25% tariff is applicable to certain shipments imported during such period. While we believe these disputes are without merit, including based on representations from the seller, and we have challenged them, if we are unsuccessful we would owe additional tariffs with respect to the import of such miners which could be material and could materially impact our business, prospects, operations and financial performance. See “Item 1A. Risk Factors—Changing political and geopolitical conditions, including changing international trade policies and the implementation of wide-ranging, reciprocal and retaliatory tariffs and trade restrictions, could adversely impact our business, prospects, operations and financial performance” in our Annual Report.
Current wording
During the 2025 calendar year, the United States announced the intention to impose tariffs on various countries, including an across-the-board 10% tariff on all countries and individualized higher tariffs on certain countries, including countries from which we have historically sourced miners (including Malaysia, Indonesia, and Thailand) and other hardware and equipment. Several of such tariffs have come into effect as of the date of this report, which could result in higher prices in order to obtain GPUs and other hardware and equipment, as well as limit the availability of GPUs and other hardware and equipment and could impact our timelines for installation, energization and expected revenue. In addition to those tariffs which have already come into effect, additional tariffs and trade restrictions have been suggested and others may be suggested in the future, which, if they were enacted, could further impact our business. For example, on August 7, 2025, the United States proposed a 100% tariff on semiconductors imported to the United States. Uncertainty around geopolitical conditions and international trade policies may continue to affect the movement and costs of goods, materials, services and capital. Further, we have received notices disputing the origin of Bitcoin miners imported during 2024 and 2025 from Indonesia, Thailand and Malaysia, claiming the origin of such miners is China and that an additional 25% tariff is applicable to certain shipments imported during such period. While we believe these disputes are without merit, including based on representations from the seller, and we have challenged them, if we are unsuccessful we would owe additional tariffs with respect to the import of such miners which could be material and could materially impact our business, prospects, operations and financial performance. See “Item 1A. Risk Factors—Changing political and geopolitical conditions, including changing international trade policies and the implementation of wide-ranging, reciprocal and retaliatory tariffs and trade restrictions, could adversely impact our business, prospects, operations and financial performance” in our Annual Report.
Previous wording
Key operating and financial metrics that we use, in addition to our GAAP unaudited condensed consolidated financial statements, to assess the performance of our business are set forth below for the three months ended September 30, 2025 and 2024, include:
Current wording
Key operating and financial metrics that we use, in addition to our GAAP unaudited condensed consolidated financial statements, to assess the performance of our business are set forth below for the three and six months ended December 31, 2025 and 2024, include:
Previous wording
EBITDA is defined as net income (loss), excluding income tax (expense) benefit, finance expense, interest income, and depreciation and amortization, which are important components of our net income (loss). EBITDA Margin is defined as EBITDA divided by revenue. As a capital-intensive business, EBITDA excludes the impact of the cost of depreciation of computer hardware equipment and other fixed assets, which allows us to measure the liquidity of our business on a current basis, which we believe provides a useful tool for comparison to our competitors in a similar industry. We believe
Current wording
EBITDA is defined as net income (loss), excluding income tax (expense) benefit, finance expense, interest income, and depreciation and amortization, which are important components of our net income (loss). EBITDA Margin is defined as EBITDA divided by revenue. As a capital-intensive business, EBITDA excludes the impact of the cost of depreciation of computer hardware equipment and other fixed assets, which allows us to measure the liquidity of our business on a current basis, which we believe provides a useful tool for comparison to our competitors in a similar industry. We believe EBITDA is a useful metric for assessing operating performance before the impact of non-cash and other items. Our presentation of EBITDA should not be construed as an inference that our future results will be unaffected by these items.
Previous wording
Adjusted EBITDA is defined as EBITDA, further adjusted to exclude stock-based compensation, foreign exchange gain (loss), impairment of assets, certain other non-recurring income, gain (loss) on disposal of property, plant and equipment, unrealized fair value gain (loss) on financial instruments, gain (loss) on partial extinguishment of financial liabilities, increase (decrease) in fair value of assets held for sale and certain other expense items. Adjusted EBITDA Margin is defined as Adjusted EBITDA divided by revenue. We believe Adjusted EBITDA is a useful metric because it allows us to monitor the profitability of our business on a current basis and removes expenses which do not impact our ongoing profitability and which can vary significantly in comparison to other companies. Our presentation of Adjusted EBITDA should not be construed as an inference that our future results will be unaffected by these items.
Current wording
Adjusted EBITDA is defined as EBITDA, further adjusted to exclude stock-based compensation, foreign exchange gain (loss), impairment of assets, certain other non-recurring income, gain (loss) on disposal of property, plant and equipment, unrealized fair value gain (loss) on financial instruments, debt conversion inducement expense, gain (loss) on partial extinguishment of financial liabilities, increase (decrease) in fair value of assets held for sale and certain other expense items. Adjusted EBITDA Margin is defined as Adjusted EBITDA divided by revenue. Beginning in the fiscal year ended June 30, 2026, the Company has changed its definition of Adjusted EBITDA to exclude debt conversion inducement expense. This is a change from the presentation of Adjusted EBITDA in prior periods, and these adjustments did not have any impact on the calculation of Adjusted EBITDA in prior periods. We believe Adjusted EBITDA is a useful metric because it allows us to monitor the profitability of our business on a current basis and removes expenses which do not impact our ongoing profitability and which can vary significantly in comparison to other companies. Our presentation of Adjusted EBITDA should not be construed as an inference that our future results will be unaffected by these items.
Previous wording
(3)(Increase) decrease in fair value of assets held for sale for the three months ended September 30, 2025 and 2024 was nil and $2.6 million, respectively. See “Results of Operations—Comparison of the three months ended September 30, 2025 and 2024 —Increase (decrease) in fair value of assets held for sale ” for further information.
Current wording
(4)(Increase) decrease in fair value of assets held for sale for the three months ended December 31, 2025 and 2024 was $6.4 million and $(0.5) million, respectively, and $6.4 million and $2.1 million for the six months ended December 31, 2025 and 2024, respectively. See “Results of Operations—Comparison of the three months ended December 31, 2025 and 2024 —Increase (decrease) in fair value of assets held for sale ” and “Results of Operations—Comparison of the six months ended December 31, 2025 and 2024 —Increase (decrease) in fair value of assets held for sale ”for further information.
Previous wording
(4)Impairment of assets for the three months ended September 30, 2025 and 2024, was $16.3 million and $6.9 million, respectively. See “Results of Operations—Comparison of the three months ended September 30, 2025 and 2024 —Impairment of assets” for further information.
Current wording
(5)Impairment of assets for the three months ended December 31, 2025 and 2024, was $31.8 million and $— million, respectively, and $48.0 million and $6.9 million for the six months ended December 31, 2025 and 2024, respectively. See “Results of Operations—Comparison of the three months ended December 31, 2025 and 2024 —Impairment of assets” and “Results of Operations—Comparison of the six months ended December 31, 2025 and 2024 —Impairment of assets” for further information.
Previous wording
(5)Other one-off expenses for the three months ended September 30, 2024, includes a one-time liquidation payment incurred in August 2024 resulting from the transition to spot pricing at the Group’s site at Childress, the reversal of the unrealized loss recorded on fixed price contracted amounts outstanding at June 30, 2024, loss on mining hardware in transit and one-off professional fees incurred in relation to litigation matters.
Current wording
(7)Other expenses include a one-time liquidation payment incurred in August 2024 resulting from the transition to spot pricing at the Group’s site at Childress, the reversal of the unrealized loss recorded on fixed price contracted amounts outstanding at June 30, 2024, a litigation related settlement provision, loss on theft of mining hardware in transit, one-off professional fees incurred in relation to litigation matters, and transaction costs incurred on entering the capped call transactions in conjunction with the issuance of the convertible notes.
Previous wording
(6)Adjusted EBITDA margin is calculated as Adjusted EBITDA divided by Revenue.
Current wording
(8)Adjusted EBITDA margin is calculated as Adjusted EBITDA divided by Revenue.
Previous wording
The following table summarizes our results of operation, disclosed in the Unaudited Condensed Consolidated Statements of Operations and Comprehensive Income (Loss) for the three months ended September 30, 2025 and 2024.
Current wording
The following table summarizes our results of operation, disclosed in the Unaudited Condensed Consolidated Statements of Operations and Comprehensive Income (Loss) for the three and six months ended December 31, 2025 and 2024.
Previous wording
Our Bitcoin mining revenue for the three months ended September 30, 2025 and 2024, was $232.9 million and $49.6 million, respectively. This revenue was generated from the mining and sale of 2,039 and 813 Bitcoin during the three months ended September 30, 2025 and 2024, respectively. The increase in revenue is primarily due to a $43.3 million increase attributable to the increase in the average Bitcoin price and $140.0 million increase attributable to the increase in average operating hashrate during the three months ended September 30, 2025 as compared to the three months ended September 30, 2024, which was partially offset by the increase in the difficulty implied global hashrate during the same period. Average operating hashrate increased to 45.3 EH/s for the three months ended September 30, 2025 as compared to 12.1 EH/s for the three months ended September 30, 2024.
Current wording
Our Bitcoin Mining revenue for the three months ended December 31, 2025 and 2024, was $167.4 million and $113.5 million, respectively. This revenue was generated from the mining and sale of 1,664 and 1,347 Bitcoin during the three months ended December 31, 2025 and 2024, respectively. The increase in revenue is primarily due to a $23.0 million increase attributable to the increase in the average Bitcoin price and $30.9 million increase attributable to the increase in Bitcoin mined during the three months ended December 31, 2025, reflecting the increase in average operating hashrate, which was partially offset by the increase in the implied global hashrate during the same period. Average operating hashrate increased to 43.0 EH/s for the three months ended December 31, 2025 as compared to 22.7 EH/s for the three months ended December 31, 2024.
Previous wording
Our AI Cloud Services revenue for the three months ended September 30, 2025 and 2024, was $7.3 million and $3.2 million, respectively. This increase was primarily due to an increase in AI Cloud Services customers and contracts, as a result of continued capacity expansion.
Current wording
Our AI Cloud Services revenue for the three months ended December 31, 2025 and 2024, was $17.3 million and $2.7 million, respectively. This increase was primarily due to an increase in AI Cloud Services customers and contracts, as a result of continued capacity expansion.
Previous wording
Cost of revenue - Bitcoin Mining consist of electricity charges, employee benefits, and other direct expenses incurred in generating Bitcoin mining revenue. Cost of revenue - Bitcoin Mining for the three months ended September 30, 2025 and 2024 was $79.9 million and $31.6 million, respectively. This increase was primarily due to a $46.0 million increase in electricity costs, in line with the increase in Bitcoin mined during the same period and a $1.6 million increase in employee benefits as a result of increased site headcount.
Current wording
Cost of revenue - Bitcoin Mining consist of electricity charges, employee benefits, and other direct expenses incurred in generating Bitcoin mining revenue. Cost of revenue - Bitcoin Mining for the three months ended December 31, 2025 and 2024 was $63.4 million and $32.0 million, respectively. This increase was primarily due to a $28.8 million increase in electricity costs, in line with the increase in average operating hashrate during the three months ended December 31, 2025 and a $2.0 million increase in employee benefits as a result of increased site headcount.
Previous wording
Cost of revenue - AI Cloud Services consist of electricity charges, employee benefits, and other direct expenses incurred in generating AI Cloud Services. Cost of revenue - AI Cloud Services for the three months ended September 30, 2025 and 2024 was $0.7 million and $0.2 million, respectively. This increase was primarily due to an increase in employee benefits as a result of increased headcount, as well as continued capacity expansion.
Current wording
Cost of revenue - AI Cloud Services consist of electricity charges, employee benefits, and other direct expenses incurred in generating AI Cloud Services. Cost of revenue - AI Cloud Services for the three months ended December 31, 2025 and 2024 was $2.4 million and $0.3 million, respectively. This increase was primarily due to an increase in employee benefits as a result of increased headcount, as well as continued capacity expansion.
Previous wording
Depreciation and amortization consist primarily of the depreciation of Bitcoin mining hardware, HPC hardware and data centers. Depreciation expense for the three months ended September 30, 2025 and 2024 was $85.2 million and $33.9 million respectively. This increase was primarily due continued expansion at Childress and additional hardware miners and GPUs placed into service during the fiscal year 2025, including three months ended September 30, 2025.
Current wording
Depreciation and amortization consist primarily of the depreciation of Bitcoin mining hardware, GPU hardware and data centers. Depreciation expense for the three months ended December 31, 2025 and 2024 was $99.2 million and $36.1 million respectively. This increase was primarily due to higher operating capacity at Childress compared to the three months ended December 31, 2024, and additional GPUs placed into service during the three months ended December 31, 2025.
Previous wording
The net gain (loss) on disposal of property and equipment for the three months ended September 30, 2025 and 2024 was $0.0 million and $0.8 million, respectively. The net gain in three months ended September 30, 2024 relates to the exchange of Bitmain T21 mining hardware for miners of the same model and specification under the Bitmain S21XP exchange agreement.
Current wording
The net gain (loss) on disposal of property and equipment for the three months ended December 31, 2025 and 2024 was nil and $(0.7) million, respectively. The net loss during the three months ended December 31, 2024 primarily relates to the loss recorded on the derecognition of Bitcoin mining hardware.
Previous wording
Other operating income for the three months ended September 30, 2025 and 2024 was $3.8 million and $1.6 million, respectively. This increase is primarily due to a $2.2 million increase in demand response program income at the Group’s site at Childress.
Current wording
Other operating income for the three months ended December 31, 2025 and 2024 was $1.8 million and $3.1 million, respectively. This decrease is primarily due to $1.7 million insurance income received during the three months ended December 31, 2024, in relation to theft of mining hardware in transit, offset by a $0.4 million increase in demand response program income at the Group’s site at Childress during the three months ended December 31, 2025.
Showing the first 40 of 66 pairs. Open the source sections for the rest.
Rearranged current paragraphs (17)
Current report — wording carried from elsewhere
Our 50MW Prince George site has been operating since September 2022 and, as of December 31, 2025, had approximately 50MW of data center capacity. All of the hashrate capacity at Prince George has been displaced to accommodate GPUs at the site.
Current report — wording carried from elsewhere
The GPUs that will be used to provide the GPU services will be installed across “Horizon 1,” “Horizon 2,” “Horizon 3” and “Horizon 4”, representing a combined IT load of approximately 200MW. Cash flows from the Microsoft Agreement will be used to finance part of the approximately $5.8 billion of GPU related capital expenditure anticipated to be required in connection with the Microsoft Agreement.
Current report — wording carried from elsewhere
Selling, general and administrative expenses consist of employee benefits expense, RECs, site expenses (including property taxes), repairs and maintenance, stock-based compensation and professional fees, among other expenses. Selling, general and administrative expenses for the three months ended December 31, 2025 and 2024 was $100.8 million and $28.9 million, respectively. This increase includes a $6.4 million increase in accrued payroll tax expense relating to stock-based compensation awards, a $3.7 million increase in employee benefits expense related to a rise in the employee headcount as a result of expansion of business operations, a $1.3 million increase in the consumption of RECs as a result of higher operating capacity at the Childress site and a $50.3 million increase in stock-based compensation expense. The increase in stock-based compensation expense is primarily related to the October 2025 vesting of certain market-based RSUs and stock options and the resulting accelerated recognition of the remaining unrecognized compensation cost, the amortization of certain stock-based payment awards modified and awarded in the fourth quarter of the fiscal year 2025, and the amortization of RSUs issued to employees and directors during the first quarter of the fiscal year 2026. The increase in selling, general and administrative expenses also included a $5.7 million increase in professional fees, a $1.1 million increase in sponsorships and marketing, and a $1.7 million increase in property taxes as a result of the expansion of our business operations and ongoing expenses as a publicly listed company.
Current report — wording carried from elsewhere
Realized gain (loss) recorded on financial instruments for the three months ended December 31, 2025 and 2024 was $(2.9) million and nil, respectively. Realized gain (loss) on financial instruments for the three months ended December 31, 2025 represents the loss on expired Bitcoin purchase options during the three months ended December 31, 2025. Refer to Note 10 of the unaudited condensed consolidated financial statements included in this Quarterly Report for further information.
Current report — wording carried from elsewhere
Our AI Cloud Services revenue for the six months ended December 31, 2025 and 2024, was $24.6 million and $5.8 million, respectively. This increase was primarily due to an increase in AI Cloud Services customers and contracts, as a result of continued capacity expansion.
Current report — wording carried from elsewhere
Cost of revenue - Bitcoin Mining (exclusive of depreciation and amortization)
Current report — wording carried from elsewhere
Cost of revenue - Bitcoin Mining consist of electricity charges, employee benefits, and other direct expenses incurred in generating Bitcoin mining revenue. Cost of revenue - Bitcoin Mining for the six months ended December 31, 2025 and
Current report — wording carried from elsewhere
2024 was $143.3 million and $63.6 million, respectively. This increase was primarily due to a $74.8 million increase in electricity costs, in line with the increase in average operating hashrate during the same period and a $3.6 million increase in employee benefits as a result of increased site headcount.
Current report — wording carried from elsewhere
Cost of revenue - AI Cloud Services (exclusive of depreciation and amortization)
Current report — wording carried from elsewhere
Cost of revenue - AI Cloud Services consist of electricity charges, employee benefits, and other direct expenses incurred in generating AI Cloud Services. Cost of revenue - AI Cloud Services for the six months ended December 31, 2025 and 2024 was $3.1 million and $0.5 million, respectively. This increase was primarily due to an increase in employee benefits as a result of increased headcount, as well as continued capacity expansion.
Current report — wording carried from elsewhere
Gain (loss) on disposal of property, plant and equipment
Current report — wording carried from elsewhere
Increase (decrease) in fair value of assets held for sale
Current report — wording carried from elsewhere
Realized gain (loss) on financial instruments
Current report — wording carried from elsewhere
Unrealized gain (loss) on financial instruments
Current report — wording carried from elsewhere
Foreign exchange gain (loss) for the six months ended December 31, 2025 and 2024 was $(3.5) million and $(3.4) million, respectively. The increase in the loss was primarily related to foreign exchange movements in the translation of monetary assets and liabilities held in currencies other than the functional currency of the company holding the monetary asset or liability.
Current report — wording carried from elsewhere
On December 8, 2025, we issued $1.15 billion aggregate principal amount of the 2032 Convertible Notes and $1.15 billion aggregate principal amount of the 2033 Convertible Notes. The 2032 Convertible Notes will mature on June 1, 2032, unless earlier converted or redeemed or repurchased by us, and the 2033 Convertible Notes will mature on June 1, 2033, unless earlier converted or redeemed or repurchased by us. On or after March 1, 2032 (in the case of the 2032 Convertible Notes) or March 1, 2033 (in the case of the 2033 Convertible Notes) until the close of business on the second scheduled trading day immediately before the maturity date, noteholders may convert their 2032 Convertible Notes and their 2033 Convertible Notes at any time at their election. We will generally have the right to elect to settle conversions by paying or delivering, as applicable, cash, Ordinary shares or a combination of cash and Ordinary shares. The initial conversion rate of the 2032 Convertible Notes is 19.4553 Ordinary shares per $1,000 principal amount of 2032 Convertible Notes, which represents an initial conversion price of approximately $51.40 per Ordinary share. The initial conversion rate of the 2033 Convertible Notes is 19.4553 Ordinary shares per $1,000 principal amount of 2033 Convertible Notes, which represents an initial conversion price of approximately $51.40 per Ordinary share. The conversion rate and conversion price for the 2032 Convertible Notes and the 2033 Convertible Notes, respectively, will be subject to customary adjustments upon the occurrence of certain events. In addition, if certain corporate events that constitute a “Make-Whole Fundamental Change” (as defined in the indentures governing the 2032 Convertible Notes and the 2033 Convertible Notes, respectively) occur, then the conversion rate of the 2032 Convertible Notes and the 2033 Convertible Notes, respectively, will, in certain circumstances, be increased for a specified period of time.
Current report — wording carried from elsewhere
We are also pursuing a strategy of expanding and diversifying our revenue sources into other HPC and AI services beyond AI Cloud Services, including through the development of purpose-built AI data centers for colocation.
Rearranged previous paragraphs (2)
Previous report — wording carried elsewhere
As global mining capacity increases, we will need to correspondingly increase our total hashrate capacity in order to maintain our proportionate share relative to the overall global hashrate – all else being equal – to maintain the same amount of Bitcoin mining revenue. Our Bitcoin mining operations currently utilize the Bitmain S21 XP miners, S21 Pro miners,
Previous report — wording carried elsewhere
EBITDA is a useful metric for assessing operating performance before the impact of non-cash and other items. Our presentation of EBITDA should not be construed as an inference that our future results will be unaffected by these items.