A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2026 · Filed Aug 6, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2026-03-31; filed 2026-05-11.
0001868275-26-000067
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSExecutive OverviewSignificant Transactions and DevelopmentsOther Key Business DriversCritical Accounting Policies and EstimatesFinancial Results of OperationsCurrent report: 10-Q
Period ended 2026-06-30; filed 2026-08-06.
0001868275-26-000104
ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSExecutive OverviewSignificant Transactions and DevelopmentsOther Key Business DriversCritical Accounting Policies and EstimatesFinancial Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 39 previous paragraphs and 43 current paragraphs.
29 unchanged; 9 reworded; 5 added; 1 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 3 previous and 4 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (5)
Current report
We have signed an additional 920 MW of long-term PPAs for clean, reliable nuclear generation with a diverse set of investment grade customers to help them meet their evolving energy needs. These agreements are for 15-20 years in duration and are set to begin in 2029 through 2032. Among these PPAs, our 176 MW agreement with Walmart will enable a 30 MW capacity expansion at our Dresden Clean Energy Center in Illinois and facilitate additional investments to strengthen the local community by supporting jobs and enabling continued expansion of operations and workforce.
Current report
In December 2025, FERC issued an order finding the existing PJM Tariff to be unjust and unreasonable and directing PJM to take a number of actions. FERC ordered three new transmission services: an interim interruptible network integration transmission service (IT NITS), which will allow load to take service on an interruptible basis while waiting for the network upgrades required for traditional NITS, and two other services. The IT NITS service allows the load to elect to connect promptly and receive some service from the grid, while avoiding PJM purchases of capacity to serve it, as it will be interruptible. The other services include a firm and non-firm contract demand service for co-located load. FERC also directed several PJM compliance filings and a paper hearing.
Current report
In June 2026, FERC ruled on a number of issues presented in the co-location paper hearing and on several PJM compliance filings implementing directives from the December 2025 order. Importantly, FERC pressed PJM to implement changes to accommodate co-located load prior to PJM’s proposed June 2029 effective date.
Current report
FERC also issued a series of orders in the various RTOs in response to the Advance Notice of Proposed Rulemaking (ANOPR) published by DOE last fall. The orders direct filings by RTOs and their transmission owners that are designed to expedite service to large load (regardless of whether it is co-located) and avoid the expense and delay associated with network upgrades to provide service to these loads. Constellation’s Load Dependent Capacity at Existing Plants (LCEP) proposal, which would expedite connection of new generation when paired with a large load at an existing plant, was flagged in several RTO orders as a proposal to be considered.
Removed paragraphs (1)
Previous report
In December 2025, FERC issued a draft order finding PJM's tariff unjust and unreasonable as it relates to colocated load, citing lack of sufficient clarity and consistency regarding rates, terms, and conditions of service for interconnection customers serving co-located load. The draft order also found that behind-the-meter generation rules in PJM's current tariff are no longer appropriate. PJM's current tariff requires that all co-located load be served through the PJM transmission system and that any planned modifications to generating facilities would require reliability studies and be subject to PJM's approval. FERC is now directing PJM to revise its tariff to: a) detail the terms and conditions for interconnection customers serving co-located load, b) require transmission customers serving co-located load to choose from four specific service options, and c) revise behind-the-meter generation rules, including the development of a transition period and grandfather clause for certain existing contracts. Through the date of this filing, PJM had not filed its final compliance tariff revisions, and the ultimate form and timing of these changes remain subject to further stakeholder processes and FERC review.
Reworded paragraphs (9)
Previous wording
In March 2026, we entered into an agreement with LS Power Equity Advisors, LLC to sell five natural gas-fired generating facilities with approximately 4.4 GWs of capacity from Calpine's portfolio of generation assets located in PJM to satisfy regulatory commitments related to our acquisition of Calpine. The transaction is valued at $5.0 billion before closing adjustments and remains subject to customary closing conditions, including receipt of applicable regulatory approvals. Completion of this transaction, together with the planned divestiture of an additional ERCOT facility, is expected to satisfy the remaining regulatory commitments related to the merger.
Current wording
In March 2026, we entered into an agreement with LS Power Equity Advisors, LLC to sell five natural gas-fired generating facilities with approximately 4.4 GWs of capacity from Calpine's portfolio of generation assets located in PJM to satisfy regulatory commitments related to our acquisition of Calpine. The transaction is valued at $5.0 billion before closing adjustments. In August 2026, we entered into an agreement with LS Power to divest the Brazos Valley Energy Center (f/k/a Jack A. Fusco Energy Center), a 606 MW natural gas-fired plant in ERCOT for $860 million before closing adjustments. Completion of these transactions is subject to customary closing conditions and receipt of applicable regulatory approvals, and is expected to satisfy the remaining regulatory commitments related to the merger. We expect the transactions to close by the end of this year.
Previous wording
In the first quarter of 2026, we signed a new 380 MW agreement with Dallas-based CyrusOne, a leading global data center developer and operator, to connect and serve a new data center adjacent to the Freestone Energy Center, in Freestone County, Texas. The agreement provides CyrusOne with access to power, grid connectivity and site infrastructure needed to support development of the new facility, while ensuring electricity continues to flow to the regional grid and ensuring reliability for all customers and communities. Calpine has also entered into an exclusive agreement to provide power, grid connectivity and site infrastructure for Phase 2, which will be an additional 380 MWs. These agreements are in addition to the 400 MW agreements announced in the second half of last year between Calpine and CyrusOne for the Thad Hill Energy Center in Bosque County, Texas.
Current wording
In the first quarter of 2026, we signed a new 380 MW agreement with Dallas-based CyrusOne, a leading global data center developer and operator, to connect and serve a new data center adjacent to the Freestone Energy Center, in Freestone County, Texas. The agreement provides CyrusOne with access to power, grid connectivity and site infrastructure needed to support development of the new facility, while ensuring electricity continues to flow to the regional grid and ensuring reliability for all customers and communities. We have also entered into an exclusive agreement to provide power, grid connectivity and site infrastructure for Phase 2, which will be an additional 380 MWs. These agreements are in addition to the 400 MW agreements announced in the second half of last year between Calpine and CyrusOne for the Thad Hill Energy Center in Bosque County, Texas.
Previous wording
In April 2026, we celebrated the commissioning of the 105 MW Pastoria Solar Project, the largest renewable energy project contracted by the California Department of Water Resources to date in its mission to fully decarbonize its operations by 2035. The Pastoria Solar Project connects to the grid through the interconnection facilities at our highly efficient 750 MW natural gas-fired combined-cycle generating facility. Also, co-located with the Pastoria Solar Project is the Pastoria Power Bank, a 80 MW/320 MWh Battery Energy Storage System, which will be coming online during the spring/summer of 2026. The Pastoria Power Bank is contracted and supported by a 15-year power purchase agreement with Pacific Gas and Electric Company.
Current wording
In April 2026, we celebrated the commissioning of the 105 MW Pastoria Solar Project, the largest renewable energy project contracted by the California Department of Water Resources to date in its mission to fully decarbonize its operations by 2035. The Pastoria Solar Project connects to the grid through the interconnection facilities at our highly efficient 750 MW natural gas-fired Pastoria facility. Also, co-located with the Pastoria Solar Project is the Pastoria Power Bank, a 80 MW/320 MWh Battery Energy Storage System, which came online in July 2026. The Pastoria Power Bank is contracted and supported by a 15-year power purchase agreement with Pacific Gas and Electric Company.
Previous wording
In April 2026, our Pin Oak Creek Energy Center achieved commercial operation. Pin Oak Creek is a 460-megawatt, state-of-the-art natural gas facility designed to provide reliable, dispatchable power to the ERCOT grid. As a peaking facility, it is built to operate when demand is highest and reliability matters most, while also maintaining the flexibility to run longer if system conditions require it. The project is a direct response to Texas’ continued growth and increasing electricity demand across homes, businesses, and industry. Pin Oak Creek will play a critical role in strengthening grid reliability and supporting the state’s economic momentum.
Current wording
In April 2026, our Pin Oak Creek Energy Center achieved commercial operation. Pin Oak Creek is a 460 MW, state-of-the-art natural gas facility designed to provide reliable, dispatchable power to the ERCOT grid. As a peaking facility, it is built to operate when demand is highest and reliability matters most, while also maintaining the flexibility to run longer if system conditions require it. The project is a direct response to Texas’ continued growth and increasing electricity demand across homes, businesses, and industry. Pin Oak Creek will play a critical role in strengthening grid reliability and supporting the state’s economic momentum.
Previous wording
In January 2026, the National Energy Dominance Council, with support from Governors within the PJM territory, urged PJM to file proposed tariff revisions at FERC to improve reliability and cost-effectiveness within its capacity auctions. During the first quarter of 2026, PJM began stakeholder discussions and preparatory work in response to this directive, including evaluation of a potential reliability backstop mechanism, enhancements to large load forecasting methodologies, and actions to accelerate generator interconnection studies. In February 2026, PJM filed tariff revisions proposing to extend the existing RPM capacity market price collar—consisting of a price cap of approximately $325/MW‑day and a price floor of approximately $175/MW‑day—for the 2028/2029 and 2029/2030 Base Residual Auctions. In an order issued by FERC in April 2026, FERC accepted PJM’s tariff revisions, allowing the continued application of the price collar for the specified delivery years. The Commission found the filing sufficiently justified to proceed, citing ongoing reliability concerns and extraordinary demand growth, including data center load expansion, and anticipated market reforms.
Current wording
In January 2026, the National Energy Dominance Council, with support from Governors within the PJM territory, urged PJM to file proposed tariff revisions at FERC to improve reliability and cost-effectiveness within its capacity auctions. During the first quarter of 2026, PJM began stakeholder discussions and preparatory work in response to this directive, including evaluation of a potential reliability backstop mechanism, enhancements to large load forecasting methodologies, and actions to accelerate generator interconnection studies. In February 2026, PJM filed tariff revisions proposing to extend the existing RPM capacity market price collar—consisting of a price cap of approximately $325/MW‑day and a price floor of approximately $175/MW‑day—for the 2028/2029 and 2029/2030 Base Residual Auctions. In an order issued by FERC in April 2026, FERC accepted PJM’s tariff revisions, allowing the continued application of the price collar for the specified delivery years. FERC found the filing sufficiently justified to proceed, citing ongoing reliability concerns and extraordinary demand growth, including data center load expansion, and anticipated market reforms. In July 2026, PJM released the results of the 2028/2029 Base Residual Auction and the entire RTO, including all submitted CEG units, cleared at the price cap of $325/MW-day
Previous wording
In September 2021, Illinois Governor JB Pritzker signed into law the Climate and Equitable Jobs Act, which, among other things, establishes a schedule for eliminating CO2 emissions by EGUs. Under that schedule, privately owned natural gas units that exceed an established level of NOx or SO 2 emissions and are located within three miles of an environmental justice community, or an equity investment-eligible community must permanently eliminate CO2 and co-pollutant emissions by January 1, 2030, subject to certain reliability exceptions. Unless relief from the requirements is provided this could require our natural gas generation facility Zion Energy Center, acquired as part of Calpine, to shut down by January 2030.
Current wording
In September 2021, Illinois Governor JB Pritzker signed into law the Climate and Equitable Jobs Act, which, among other things, establishes a schedule for eliminating CO2 emissions by EGUs. Under that schedule, privately owned natural gas units that exceed an established level of NOx or SO 2 emissions and are located within three miles of an environmental justice community, or an equity investment-eligible community must permanently eliminate CO2 and co-pollutant emissions by January 1, 2030, subject to certain reliability exceptions, such as a determination by PJM that the unit is needed for reliability. PJM made such a finding with respect to our natural gas generation facility Zion Energy Center, acquired as part of Calpine, and accordingly Zion plans to operate past January 2030.
Previous wording
GAAP Results of Operations. The following table sets forth our consolidated GAAP Net Income (Loss) Attributable to Common Shareholders for the three months ended March 31, 2026 compared to the same period in 2025. For additional information regarding the financial results for the three months ended March 31, 2026 and 2025, see the discussions of Results of Operations below.
Current wording
GAAP Results of Operations. The following table sets forth our consolidated GAAP Net Income (Loss) Attributable to Common Shareholders for the three and six months ended June 30, 2026 compared to the same period in 2025. For additional information regarding the financial results for the three and six months ended June 30, 2026 and 2025, see the discussions of Results of Operations below.
Previous wording
Unless otherwise noted, the income tax impact of each reconciling adjustment between GAAP Net Income (Loss) Attributable to Common Shareholders and Adjusted (non-GAAP) Operating Earnings is based on the marginal statutory federal and state income tax rates, taking into account whether the income or expense item is taxable or deductible, respectively, in whole or in part, which may result in an effective tax rate that differs from the marginal rate. The marginal statutory income tax rate was 25.5% for the three months ended March 31, 2026 and 2025. The following table provides a reconciliation between GAAP Net Income (Loss) Attributable to Common Shareholders and Adjusted (non-GAAP) Operating Earnings for the three months ended March 31, 2026 compared to the same period in 2025.
Current wording
Unless otherwise noted, the income tax impact of each reconciling adjustment between GAAP Net Income (Loss) Attributable to Common Shareholders and Adjusted (non-GAAP) Operating Earnings is based on the marginal statutory federal and state income tax rates, taking into account whether the income or expense item is taxable or deductible, respectively, in whole or in part, which may result in an effective tax rate that differs from the marginal rate. The marginal statutory income tax rate was 25.5% for the three and six months ended June 30, 2026 and 2025. The following table provides a reconciliation between GAAP Net Income (Loss) Attributable to Common Shareholders and Adjusted (non-GAAP) Operating Earnings for the three and six months ended June 30, 2026 compared to the same period in 2025.
Previous wording
(a)Amounts may not sum due to rounding. Earnings per share amount is based on average diluted common shares outstanding of 354 million and 314 million for the three months ended March 31, 2026 and 2025, respectively.
Current wording
(a)Amounts may not sum due to rounding. Earnings per share amount is based on average diluted common shares outstanding of 360 million and 314 million for the three months ended June 30, 2026 and 2025, respectively, and 357 million and 314 million for the six months ended June 30, 2026 and 2025, respectively.