Skip to main content

Centerra Gold Inc.

For the period ended Dec 31, 2023. Filed Mar 28, 2024.

View on SEC.gov

About this filing

The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.

FY2023 · Filed Mar 28, 2024

Use the contents to explore the available documents and sections.

CGAU$21.78+2.3%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.1 · Sampling, Analysis, and Data Verification

Sampling, Analysis, and Data Verification

All Mount Milligan Mine Assay Laboratory procedures are accompanied by appropriate, industry standard instrument calibration and quality assurance/quality control (“QAQC”) measures, including quarterly third-party analysis checks. The ore and acid-base accounting analyses Standard Operating Procedure includes steps to confirm on-site laboratory method accuracy, precision, contamination control, sample tracking, and recordkeeping. The assay laboratory also receives blind duplicate samples from the Ore Control Geologist/Technician which are compared against daily sample analyses. This workflow is managed as part of the Mount Milligan Assay Laboratory Quality Management System.

Most samples analyzed for the Mount Milligan Mine deposits have been collected from NQ-sized core. Cores were either split (early programs) or sawn along the long axis with one-half sampled and assayed and the other half retained in core boxes and the core library.

A formal QAQC program, including the insertion of standard, blank and duplicate samples for assay, was introduced after 1992. Prior to that date, external check assays were commissioned from independent laboratories.

Validation of the mapping co-ordinates, elevations, assay quality control/quality assurance program and the DDH database has been completed by Centerra and predecessor owners of Mount Milligan Mine.

All exploration data is captured as per standard geological data management procedures and is stored in an acQuire Geological Information Management System. Throughout 2023, routine validations and verifications of the database were conducted, including QAQC of all assay data received from external laboratories and verifications of raw data imported into the database, e.g., assay certificates, downhole surveys, geochemical data, and geotechnical data.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.