Skip to main content

Nextpower Inc.

For the period ended Oct 2, 2026. Filed Nov 2, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Oct 2, 2026 · Filed Nov 2, 2026

NXT$104.89-0.0%Stored close · as of Nov 9, 2026

What changed in Risk Factors?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 317 previous paragraphs and 328 current paragraphs.

238 unchanged; 73 reworded; 15 added; 6 removed; 0 previous and 2 current paragraphs rearranged.

Tables are not compared: 0 previous and 1 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (15)

Current report

•Providing multiple interdependent products and services on the same project may increase our exposure to project performance and responsibility-allocation risks.

Current report

On July 28, 2026, the Federal Communications Commission (“FCC”) added foreign-produced power inverters to its Covered List based on a national security risk determination. On August 20, 2026, following a further determination by the Department of War, the FCC revised the definition of covered power inverters and excluded certain foreign-produced inverters eligible for the Section 45X advanced manufacturing production credit. The FCC stated that covered new inverter models generally may not receive the equipment authorization required for import, marketing or sale in the United States, while previously authorized models may continue to be imported, marketed and sold; the FCC also established a conditional-approval process. The FCC’s action also does not affect devices purchased before July 28, 2026. In October 2026, the FCC updated the Covered List to reflect conditional approvals for specified inverter models, subject to ongoing compliance with manufacturer-specific conditions. The scope and application of these actions, including the impact on the manufacturing build-out of our Apex inverter business, may continue to evolve.

Current report

On August 26, 2026, President Trump issued Executive Order 14421, “Declaring a National Emergency to Secure the United States Bulk-Power System.” The Executive Order authorizes the Secretary of Energy, after specified determinations, to prohibit certain acquisitions, imports, transfers or installations initiated after the date of the order that involve foreign-produced bulk-power system electric equipment and a foreign-country interest. The order expressly includes utility-scale and other grid-connected inverters and battery energy storage systems within its definition of bulk-power system electric equipment. It also authorizes the Secretary, subject to specified considerations, to impose conditions on the continued use of certain equipment acquired or installed before the order, including requirements to monitor, isolate, secure, disconnect, replace or remove equipment. The Executive Order directs the Secretary of Energy to publish implementing rules or regulations by December 24, 2026, as needed. The Department of Energy has solicited information to guide implementation, and the scope and application of future restrictions remain uncertain.

Current report

In August 2025, Commerce initiated AD/CVD investigations targeting CSPV cells and modules from India, Indonesia and Laos. On September 11, 2026, Commerce issued final affirmative AD/CVD determinations and calculated significant, exporter-specific rates. The U.S. International Trade Commission’s (the “ITC”) concurrent injury proceedings remain pending. If the ITC makes affirmative final determinations, resulting AD/CVD orders could adversely affect our costs, supply chain flexibility, project timing and results of operations.

Current report

In addition, our customer contracts may impose broader warranties, indemnities or liquidated damages than those available to us from our suppliers, contract manufacturers or other counterparties, which could leave us responsible for losses arising from components or systems supplied by third parties.

Current report

For example, the SEC’s climate-related disclosure rules adopted in 2024 were stayed pending litigation, and the SEC subsequently announced that it would no longer defend those rules. The SEC has since proposed rescinding the rules. Although the ultimate status and scope of future SEC climate-related disclosure requirements remain uncertain, future regulatory or legislative developments could require enhanced climate-related disclosures in our periodic reports and could require us to incur significant additional costs, including costs associated with implementing internal controls over climate-related information.

Current report

We may also be subject to climate- and sustainability-related disclosure requirements in other jurisdictions. For example, depending on applicable thresholds, rules and implementing requirements, we may be required to report under California’s climate disclosure laws, including SB 253 and SB 261. We may also be subject to the EU Corporate Sustainability Reporting Directive, as amended and implemented from time to time, and other EU or EU member -state requirements relating to sustainability, climate, supply chains and other ESG matters. These requirements vary across jurisdictions and may increase the complexity and cost of our compliance efforts, including the need to implement new systems, processes and controls.

Current report

Our warranty and performance obligations may extend for substantial periods, and estimating future failure rates, degradation, replacement costs, service costs and other liabilities may be difficult, including for newly introduced BESS and power-conversion products. Actual results may differ materially from our estimates, requiring increased reserves, charges or cash expenditures. Long-term service, availability, capacity, degradation and augmentation commitments may also require us to incur significant costs over the operating life of a project, including costs that exceed amounts recovered from customers or suppliers. A systemic defect in a component or product family could require a broad field inspection, retrofit, replacement or remediation program, resulting in substantial warranty expense, inventory write-offs, customer claims, litigation and disruption to our operations. Because certain products will be deployed in grid-connected storage, data-center and other critical-power applications, failures may also result in grid disruption, interruption of customer operations, loss of production, emergency response costs or claims for consequential damages. In addition, incidents involving lithium-ion batteries or other energy-storage systems operated by third parties, even if unrelated to our products, could result in negative public perceptions, increased insurance costs, additional safety requirements or reduced demand for BESS solutions generally.

Current report

Providing multiple interdependent products and services on the same project may increase our exposure to project performance and responsibility-allocation risks.

Current report

Where customers procure multiple products or services from us for the same project, the performance of one offering may depend on the design, operation, data, controls, installation or performance of another offering or related equipment. If those offerings do not operate together as intended, or if a plant does not meet requirements allocated to us, project completion or commercial operation could be delayed, plant output could be reduced, remediation could be required, or we could face claims. Determining the cause of a plant-level problem, or allocating responsibility among us, EPC contractors and other parties, may be difficult. Subject to the limitations of liability and other contractual protections in our agreements, we may incur costs or liabilities that are not fully recoverable from responsible parties or covered by our contracts or insurance.

Current report

Our joint venture subjects us to risks, including limitations on our decision-making authority and the risk of disputes, which could adversely affect us.

Current report

We have entered into a joint venture arrangement with Abunayyan Holding in Riyadh, Kingdom of Saudi Arabia, to accelerate the deployment of utility-scale solar power plants in the Middle East and North Africa and to build a manufacturing facility in Jeddah, Saudi Arabia. Our joint venture partner may have business interests, goals, priorities or concerns that differ from ours. We do not have sole authority to make certain decisions about the joint venture, and decisions requiring both parties’ agreement could be delayed or deadlocked. Disputes could disrupt the joint venture’s operations or result in litigation, arbitration or termination of the arrangement. The joint venture may also fail to obtain required approvals, secure necessary funding or resources, complete construction on time or within budget, or achieve its expected commercial objectives. If Abunayyan Holding cannot meet its funding or other commitments, we may need to provide additional funding or support, or the joint venture’s projects could be delayed or impaired. Any of these events could reduce the value of our investment and adversely affect our business, financial condition and results of operations.

Current report

The LLC’s ability to make scheduled payments of the principal of, to pay interest on or to refinance our indebtedness, depends on our future performance, which is subject to economic, financial, competitive and other factors beyond our control. Our business may not continue to generate cash flow from operations in the future sufficient to service our debt and make necessary capital expenditures. If we are unable to generate such cash flow, we may be required to adopt one or more alternatives, such as selling assets, restructuring debt or obtaining additional equity capital on terms that may be onerous or highly dilutive. Our ability to refinance our indebtedness will depend on the capital markets and our financial condition at such time. We may not be able to engage in any of these activities or engage in these activities on desirable terms, which could result in a default on our debt obligations.

Current report

Risks related to our common stock

Current report

(1)During the period from July 4, 2026 through October 2, 2026, all purchases were made pursuant to the share repurchase program. All purchases were made in accordance with Rule 10b-18 under the Securities Exchange Act of 1934.
Removed paragraphs (6)

Previous report

Changes to tax laws and regulations that are applied adversely to us or our customers could materially adversely affect our business, financial condition, results of operations and prospects, including our ability to optimize the changes brought about by the passage of the IRA.

Previous report

Effective February 24, 2026, President Trump imposed a 10% tariff on most goods under Section 122 of the Trade Act of 1974 (“Section 122 Tariffs”). The Section 122 Tariffs generally apply uniformly against most U.S. imports from most countries, but do not apply to imports of products that qualify for preferential treatment under the United States – Mexico – Canada Agreement (USMCA) or to imports of certain products that are ordinarily unrelated to solar energy projects.

Previous report

In August 2025, Commerce initiated AD/CVD investigations targeting CSPV cells and modules from India, Indonesia and Laos. On February 26, 2026, Commerce published affirmative preliminary CVD determinations in the investigations and imposed significant CVD cash deposit rates. On April 23, 2026, Commerce issued preliminary affirmative dumping determinations covering CSPV cells and modules from those countries and imposed significant AD cash deposit rates. Although we have taken steps to mitigate potential exposure through supply chain adjustments, these preliminary determinations, and the proceedings’ final determinations (expected in September 2026), could adversely affect our costs, supply chain flexibility, project timing and results of operations.

Previous report

Existing tariffs and duties, the possibility of additional or increased tariffs or duties in the future, and the potential detention by CBP of solar modules all have created uncertainty in the solar industry. If the price of solar systems increases, the use of solar systems could become less economically feasible and could reduce our gross margins or reduce the demand for solar systems, which in turn may decrease demand for our products.

Previous report

For example, rules adopted by the SEC in 2024 could require significantly expanded climate-related disclosures in our periodic reporting, which may require us to incur significant additional costs to comply, including the implementation of significant additional internal controls regarding matters that have not been subject to such controls in the past. Although the rule has been stayed by the SEC and the SEC recently announced that it has voted to end its legal defense of these enhanced climate-related disclosure rules, it is possible that these rules could be reinstated in the future.

Previous report

Provisions in our amended and restated certificate of incorporation and our amended and restated bylaws may discourage, delay or prevent a merger, acquisition or other change in control of us that stockholders may consider favorable, including transactions in which stockholders might otherwise receive a premium for their shares. These provisions could also limit the price that investors might be willing to pay in the future for shares of our Class A common stock, thereby depressing the market price of our Class A common stock. In addition, these provisions may frustrate or prevent any attempts by our stockholders to replace or remove our current management by making it more difficult for stockholders to replace members of our board of directors. Because our board of directors is responsible for appointing the members of our management team, these provisions could in turn affect any attempt by our stockholders to replace current members of our management team.
Reworded paragraphs (73)

Previous wording

•We face competition from conventional and other renewable energy sources that may offer products and solutions that are less expensive or otherwise perceived to be more advantageous than solar energy solutions.

Current wording

•We face competition from conventional and other renewable energy sources that may offer products and solutions that are less expensive or otherwise perceived to be more advantageous than our solutions.

Previous wording

•The reduction, elimination or expiration of government incentives for, or regulations mandating or restricting the use of, renewable energy and solar energy specifically could reduce demand for solar energy systems and harm our business.

Current wording

•The reduction, elimination or expiration of government incentives for, or regulations mandating or restricting the use of, renewable energy and solar energy specifically could reduce demand for solar energy and energy storage systems and harm our business.

Previous wording

•International regulation of and incentives for solar projects vary by jurisdiction and may change or be eliminated.

Current wording

•International regulation of and incentives for solar and energy storage projects vary by jurisdiction and may change or be eliminated.

Previous wording

•Third party technology system limitations or failures could harm our business.

Current wording

•Technology system limitations or failures, including those involving third parties, could harm our business.

Previous wording

An increase in interest rates, or a reduction in the availability of tax equity or project debt financing, could make it difficult for project developers and owners to finance the cost of a solar energy system and could reduce the demand for our products.

Current wording

•An increase in interest rates, or a reduction in the availability of tax equity or project debt financing, could make it difficult for project developers and owners to finance the cost of a solar energy or energy storage system and could reduce the demand for our products.

Previous wording

•Electric utility industry policies and regulations may present technical, regulatory and economic barriers to the purchase and use of solar energy systems that could significantly reduce demand for our products or harm our ability to compete.

Current wording

•Electric utility industry policies and regulations may present technical, regulatory and economic barriers to the purchase and use of solar energy and energy storage systems that could significantly reduce demand for our products or harm our ability to compete.

Previous wording

•Technological advances in the solar components industry or developments in alternative technologies could render our systems uncompetitive or obsolete.

Current wording

•Technological advances in the solar and energy storage components industry or developments in alternative technologies could render our systems uncompetitive or obsolete.

Previous wording

Investing in our Class A common stock involves a high degree of risk. If any of the following risks occur, it could have a material adverse effect on our business, financial condition, results of operations or prospects. Risks that are not presently known to us or that we do not currently consider material could also have a material adverse effect on our business, financial condition and results of operations. If any of these or the following risks occur, the trading price of our Class A common stock could decline, and you could lose part or all of your investment. Some statements in this Quarterly Report, including statements in the following risk factors, constitute forward-looking statements. See the section entitled “Special note regarding forward-looking statements.”

Current wording

Investing in our common stock involves a high degree of risk. If any of the following risks occur, it could have a material adverse effect on our business, financial condition, results of operations or prospects. Risks that are not presently known to us or that we do not currently consider material could also have a material adverse effect on our business, financial condition and results of operations. If any of these or the following risks occur, the trading price of our common stock could decline, and you could lose part or all of your investment. Some statements in this Quarterly Report on Form 10-Q, including statements in the following risk factors, constitute forward-looking statements. See the section entitled “Special note regarding forward-looking statements.”

Previous wording

•the cost and availability of raw materials and components necessary to produce solar energy, such as steel, polysilicon and semiconductor chips;

Current wording

•the cost and availability of raw materials and components necessary to produce solar energy, such as steel, polysilicon and semiconductor chips, including increased tariffs on the importation of such raw materials and components;

Previous wording

We face intense competition from a large number of solar tracker companies in nearly all of the markets in which we compete. The solar tracker industry is currently fragmented and competition may increase further as the industry evolves or consolidates. This may result in price competition, including downward pressure on pricing, which could adversely affect our revenue and margins. In addition, as we expand our product offerings and offer additional technologies and services, the size and number of competitors will continue to increase.

Current wording

We face intense competition from a large number of companies in the solar and energy space in nearly all of the markets in which we compete. In the solar tracker market, the solar tracker industry is currently fragmented and competition may increase further as the industry evolves or consolidates. This may result in price competition, including downward pressure on pricing, which could adversely affect our revenue and margins. As we expand our product offerings and offer additional technologies and services, such as battery energy storage systems (“BESS”), power-conversion, and electrical infrastructure, the size and number of competitors will continue to increase. As a result, we may also compete with established providers of integrated solar-plus-storage, power-electronics and structural solutions that have greater scale, installed bases, service capabilities or customer relationships.

Previous wording

We may also face adverse competitive effects from other participants in the solar industry. For example, the price for solar panels has experienced significant declines in several markets globally in recent periods. Substantial pricing declines for panels can make the returns on investment for tracker technology less competitive in comparison to fixed tilt racking systems. In addition, other risks include EPCs subjecting their subcontractors who compete for their business, such as us, to contractual clauses that carry higher contractual risk to us, such as “pay if paid” clauses that require an EPC to pay us only when the EPC’s end customer pays the EPC, higher liquidated damages amounts, increased contractual liabilities above 100% of the contract value and more limited force majeure clauses, among others, which could increase our risk exposure, reduce our margins or adversely affect our cash flows.

Current wording

We may also face adverse competitive effects from other participants in the solar industry. For example, the price for solar panels has experienced significant declines in several markets globally in recent periods. Substantial pricing declines for panels can make the returns on investment for our products, including our tracker technology less competitive in comparison to fixed tilt racking systems. In addition, other risks include EPCs subjecting their subcontractors who compete for their business, such as us, to contractual clauses that carry higher contractual risk to us, such as “pay if paid” clauses that require an EPC to pay us only when the EPC’s end customer pays the EPC, higher liquidated damages amounts, increased contractual liabilities above 100% of the contract value and more limited force majeure clauses, among others, which could increase our risk exposure, reduce our margins or adversely affect our cash flows.

Previous wording

We face competition from conventional and other renewable energy sources that may offer products and solutions that are less expensive or otherwise perceived to be more advantageous than solar energy solutions.

Current wording

We face competition from conventional and other renewable energy sources that may offer products and solutions that are less expensive or otherwise perceived to be more advantageous than our solutions.

Previous wording

We face significant competition from providers of conventional and other renewable energy alternatives such as coal, nuclear, natural gas and wind, as well as emerging technologies such as energy storage and hybrid generation solutions. We compete with conventional energy sources primarily based on price, predictability of price and energy availability, environmental considerations and the ease with which customers can use electricity generated by solar energy projects. If solar energy systems cannot offer a compelling value to customers based on these factors, then our business growth may be impaired.

Current wording

We face significant competition from providers of conventional and other renewable energy alternatives such as coal, nuclear, natural gas and wind, as well as emerging technologies such as energy storage and hybrid generation solutions. We compete with conventional energy sources primarily based on price, predictability of price and energy availability, environmental considerations and the ease with which customers can use electricity generated by solar energy projects. If our systems cannot offer a compelling value to customers based on these factors, then our business growth may be impaired.

Previous wording

The reduction, elimination or expiration of government incentives for, or regulations mandating or restricting the use of, renewable energy and solar energy specifically could reduce demand for solar energy systems and harm our business.

Current wording

The reduction, elimination or expiration of government incentives for, or regulations mandating or restricting the use of, renewable energy and solar energy specifically could reduce demand for solar energy and energy storage systems and harm our business.

Previous wording

Federal, state, local and foreign government bodies provide incentives to owners, end users, distributors and manufacturers of solar energy systems to promote solar electricity in the form of tax credits, rebates, subsidies and other financial incentives. The range and duration of these incentives varies widely by jurisdiction. Our customers typically use our systems for grid-connected applications wherein solar power is sold under a power purchase agreement or into an organized electric market. This segment of the solar industry has historically depended in large part on the availability and size of government incentives supporting the use of renewable energy. Consequently, the reduction, elimination or expiration of government incentives for grid-connected solar electricity may negatively affect the competitiveness of solar electricity relative to conventional and non-solar renewable sources of electricity, and could harm or halt the growth of the solar electricity industry and our business. These reductions, eliminations or expirations could occur without warning. Any changes to the existing framework of these incentives could cause fluctuations in our results of operations and create uncertainty in customer demand and project timing.

Current wording

Federal, state, local and foreign government bodies provide incentives to owners, end users, distributors and manufacturers of solar energy systems to promote renewable electricity in the form of tax credits, rebates, subsidies and other financial incentives. The range and duration of these incentives varies widely by jurisdiction. Our customers typically use our systems for grid-connected applications wherein solar power is sold under a power purchase agreement or into an organized electric market. This segment of the solar industry has historically depended in large part on the availability and size of government incentives supporting the use of renewable energy. Consequently, the reduction, elimination or expiration of government incentives for grid-connected solar electricity may negatively affect the competitiveness of solar electricity relative to conventional and non-solar renewable sources of electricity, and could harm or halt the growth of the solar electricity industry and our business. These reductions, eliminations or expirations could occur without warning. Any changes to the existing framework of these incentives could cause fluctuations in our results of operations and create uncertainty in customer demand and project timing.

Previous wording

In 2024, the U.S. Treasury Department and the IRS issued final Treasury regulations on the elective payment of applicable credits under Section 6417 of the IRC and the transfer of certain credits under Section 6418 of the IRC. These final Treasury regulations provide guidance to taxpayers related to selling applicable tax credits including the ITC and Section 45X Credit.

Current wording

In 2024, the U.S. Treasury Department and the IRS issued final Treasury regulations on the elective payment of applicable credits under Section 6417 of the IRC and the transfer of certain credits under Section 6418 of the IRC. These final Treasury regulations provide guidance to taxpayers related to selling applicable tax credits including the Section 48E and Section 45X Credit.

Previous wording

On October 28, 2024, the U.S. Treasury Department and the IRS published the 45X Treasury regulations regarding the Section 45X Credit, which became effective on December 27, 2024. The 45X Treasury regulations confirm that torque tubes and structural fasteners, including several used in our trackers, may qualify as eligible components.

Current wording

On October 28, 2024, the U.S. Treasury Department and the IRS published the 45X Treasury regulations regarding the Section 45X Credit, which became effective on December 27, 2024. The 45X Treasury regulations confirm that torque tubes and structural fasteners used in our trackers may qualify as eligible components.

Previous wording

The Section 45X Credit amount will be reduced each year by 25% starting in 2030 and end after 2032. Our eligible U.S. manufacturing suppliers avail themselves of the Section 45X Credits to varying degrees and we accounted for some of these economic benefits in our cost of acquiring torque tubes and structural fasteners. Beginning in calendar year 2025, in certain circumstances, we have directly obtained the benefit of the Section 45X Credit through the use of an election authorized in the Section 45X Treasury regulations.

Current wording

The Section 45X Credit amount will be reduced each year by 25% starting in 2030 and end after 2032. Our eligible U.S. manufacturing suppliers avail themselves of the Section 45X Credits to varying degrees and we accounted for some of these economic benefits in our cost of acquiring torque tubes and structural fasteners. Beginning in calendar year 2025, in certain circumstances, we have directly obtained the benefit of the Section 45X Credit through the use of an election authorized in the Section 45X Treasury regulations. If our or our eligible U.S. manufacturing suppliers’ ability to claim Section 45X Credits is impaired, if credits claimed by us or them are disallowed or otherwise not realized, or if Treasury regulations adversely affect the amount or value of credits available to us or them, our cost of goods sold could increase, which could reduce our profitability and competitiveness.

Previous wording

On July 4, 2025, a U.S. federal budget reconciliation bill known as the One Big Beautiful Bill Act (“OBBBA”) was enacted. The OBBBA, among other things, materially changed most of the federal renewable energy incentives, including those described in Sections 45X, 48E, and 45Y. In particular, the OBBBA significantly altered the availability of the Section 48E and 45Y tax credits our customers rely upon for qualified solar facilities. For example, whereas under the IRA, Section 48E and 45Y credits were available through 2032 or such later period until the U.S. power sector emitted 75% less carbon emissions than 2022 levels, the OBBBA substantially reduced this timeframe to require that projects begin construction by July 4, 2026 to utilize a continuity safe harbor that permits solar projects to be placed in service within four calendar years following the calendar year in which the project began construction for tax credit eligibility. Alternatively, solar projects that begin construction after July 4, 2026 must be placed in service by December 31, 2027 to qualify for the Section 48E and 45Y credits. Such acceleration in the expiration of these tax credits will reduce the number of projects in future years that would have otherwise qualified for such credits, likely reducing the overall project volume over time.

Current wording

On July 4, 2025, a U.S. federal budget reconciliation bill known as the One Big Beautiful Bill Act (“OBBBA”) was enacted. The OBBBA, among other things, materially changed most of the federal renewable energy incentives, including those described in Sections 45X, 48E, and 45Y. In particular, the OBBBA significantly altered the availability of the Section 48E and 45Y tax credits our customers rely upon for qualified solar facilities. For example, whereas under the IRA, Section 48E and 45Y credits were available through 2032 or such later period until the U.S. power sector emitted 75% less carbon emissions than 2022 levels, the OBBBA substantially reduced this timeframe to require that projects begin construction by July 4, 2026 to utilize a continuity safe harbor that permits solar projects to be placed in service within four calendar years following the calendar year in which the project began construction for tax credit eligibility. Alternatively, solar projects that begin construction after July 4, 2026 must be placed in service by December 31, 2027 to qualify for the Section 48E and 45Y credits. Such acceleration in the expiration of these tax credits will reduce the number of projects in future years that would have otherwise qualified for such credits, likely reducing the overall project volume over time. The July 4, 2026 construction-start deadline has now passed.

Previous wording

In addition, the OBBBA introduced certain “foreign entity of concern” (“FEOC”) restrictions relating to prohibited foreign entities on owners of qualified facilities claiming such Section 48E and 45Y tax credits, as well as on manufacturers of components that otherwise qualify for the Section 45X credit. Under these rules, a “prohibited foreign entity” includes a “specified foreign entity” or “foreign influenced entity”, and in general means that certain entities (governments or companies) that are under the ownership, control, or influence of deemed foreign adversaries, such as China, are ineligible for such tax credits. Under the OBBBA a taxpayer must comply with the FEOC rules applicable to a tax credit in order to qualify for such tax credit. The FEOC restrictions apply to Sections 45X, 48E and 45Y in somewhat different ways. However, these rules generally require that Nextpower evaluate its ownership, the ownership of certain members of its supply chain partners, any rights regarding the ability to appoint board members and executives of Nextpower and its supply chain partners, certain payments made by Nextpower and its supply chain partners, and certain contractual arrangements entered into by Nextpower and its supply chain partners with other parties. On February 12, 2026, the U.S. Treasury Department issued interim guidance under Notice 2026-15 regarding material assistance tests related to prohibited foreign entities, and requested public comment. Additional Treasury guidance and/or regulations implementing the FEOC provisions of the OBBBA are pending and may alter current interpretations of the restrictions.

Current wording

that are under the ownership, control, or influence of deemed foreign adversaries, such as China, are ineligible for such tax credits. Under the OBBBA a taxpayer must comply with the FEOC rules applicable to a tax credit in order to qualify for such tax credit. The FEOC restrictions apply to Sections 45X, 48E and 45Y in somewhat different ways. However, these rules generally require that Nextpower evaluate its ownership, the ownership of certain members of its supply chain partners, any rights regarding the ability to appoint board members and executives of Nextpower and its supply chain partners, certain payments made by Nextpower and its supply chain partners, and certain contractual arrangements entered into by Nextpower and its supply chain partners with other parties. On February 12, 2026, the U.S. Treasury Department issued interim guidance under Notice 2026-15 regarding material assistance tests related to prohibited foreign entities, and requested public comment. Additional Treasury guidance and/or regulations implementing the FEOC provisions of the OBBBA are pending and may alter current interpretations of the restrictions.

Previous wording

Nextpower is currently evaluating itself and its supply chain partners who provide components for U.S. qualified facilities and will continue to do so as the Treasury Department issues clarifying guidance or regulations. To the extent that our suppliers are disqualified from 45X eligibility as a result of FEOC restrictions, our cost of goods sold may increase and we may become less profitable and/or competitive. In addition, to the extent our tracker components are produced by suppliers which impair our customers’ ability to qualify their projects for Section 48E or 45Y credits (or related domestic content bonus credits), we may become less competitive and our business and results of operations could be materially harmed.

Current wording

Nextpower is currently evaluating itself and its supply chain partners who provide components for U.S. qualified facilities and will continue to do so as the Treasury Department issues clarifying guidance or regulations. To the extent that our suppliers are disqualified from 45X eligibility as a result of FEOC restrictions, our cost of goods sold may increase and we may become less profitable and/or competitive. In addition, to the extent our components and products are produced by suppliers which impair our customers’ ability to qualify their projects for Section 48E or 45Y credits (or related domestic content bonus credits), we may become less competitive and our business and results of operations could be materially harmed.

Previous wording

Although we continue to expand our international presence, the impact of the OBBBA, Executive Orders, Treasury Department guidance, and other regulatory actions on the U.S. solar market may adversely impact our business. The substantially reduced timelines for our customers to qualify for the Section 48E or 45Y tax credits may reduce the number of solar projects that our customers build in the United States and therefore reduce the demand for our trackers in the U.S. market. In addition, we may not have an adequate supply of tracker products that satisfy the FEOC or domestic content requirements to remain competitive and meet customer demand. Compliance with FEOC and domestic content requirements also may increase our record-keeping, accounting and production costs.

Current wording

Although we continue to expand our international presence, the impact of the OBBBA, Executive Orders, Treasury Department guidance, and other regulatory actions on the U.S. solar market may adversely impact our business. The substantially reduced timelines for our customers to qualify for the Section 48E or 45Y tax credits may reduce the number of solar projects that our customers build in the United States and therefore reduce the demand for our trackers in the U.S. market. In addition, we may not have an adequate supply of our components and products that satisfy the FEOC or domestic content requirements to remain competitive and meet customer demand. Compliance with FEOC and domestic content requirements also may increase our record-keeping, accounting and production costs.

Previous wording

In RENEW Northeast et al. v. U.S. Department of Interior et al., renewable energy industry groups filed an action in December 2025 alleging that several federal agency actions targeted wind and solar development, slowing or blocking renewable energy permitting in violation of the Administrative Procedure Act. In April 2026, the District Court of Massachusetts found irreparable harm as plaintiffs showed imminent economic injuries, including permitting delays, increased compliance costs, disruption to existing investments, and project-related harms. The court held that the balance of equities and public interest favored relief, due to the asserted harms to renewable energy development, the grid, and the environment outweighed the agencies’ interest in continuing policies the court found likely unlawful. The injunction may reduce some immediate permitting barriers for covered entities, but it does not eliminate regulatory uncertainty as the case remains pending, the ruling is subject to appeal, and the agencies may pursue alternative actions.

Current wording

In RENEW Northeast et al. v. U.S. Department of Interior et al., renewable energy industry groups filed an action in December 2025 alleging that several federal agency actions targeted wind and solar development, slowing or blocking renewable energy permitting in violation of the Administrative Procedure Act. In April 2026, the District Court of Massachusetts found irreparable harm as plaintiffs showed imminent economic injuries, including permitting delays, increased compliance costs, disruption to existing investments, and project-related harms. The court found that the balance of equities and public interest favored relief, citing the plaintiffs’ asserted harms to renewable energy development, the grid, and the environment. The injunction may reduce some immediate permitting barriers for covered entities, but it does not eliminate regulatory uncertainty. The agencies have appealed and such appeal remains pending. The agencies may also pursue alternative actions.

Previous wording

International regulation of and incentives for solar projects vary by jurisdiction and may change or be eliminated.

Current wording

International regulation of and incentives for solar and energy storage projects vary by jurisdiction and may change or be eliminated.

Previous wording

The international markets in which we operate or may operate in the future may have or may put in place policies to promote renewable energy, including solar. These incentives and mechanisms vary from country to country. In seeking to achieve growth internationally, we may make investments that, to some extent, rely on governmental incentives and support in a new market.

Current wording

The international markets in which we operate or may operate in the future may have or may put in place policies to promote renewable energy, including solar and energy storage. These incentives and mechanisms vary from country to country. In seeking to achieve growth internationally, we may make investments that, to some extent, rely on governmental incentives and support in a new market.

Previous wording

There is no assurance that foreign governments will provide or continue to provide sufficient incentives and support to the solar industry or that the industry in any particular country will not suffer significant downturns in the future as the result of changes in public policies or government interest in renewable energy, any of which would adversely affect demand for our solar products.

Current wording

There is no assurance that foreign governments will provide or continue to provide sufficient incentives and support to the solar industry or that the industry in any particular country will not suffer significant downturns in the future as the result of changes in public policies or government interest in renewable energy, any of which would adversely affect demand for our solar and energy storage products.

Previous wording

In recent years, imposition and withdrawal of import tariffs have been erratic and unpredictable. On February 20, 2026, the U.S. Supreme Court ruled that import tariffs imposed by President Trump purportedly under the International Emergency Economic Powers Act (“IEEPA”) were unlawful. As a result, it is expected that the U.S. government will refund with interest at least a sizable portion of the IEEPA tariffs, although the timing and precise coverage of those tariff refunds remain uncertain.

Current wording

In recent years, imposition and withdrawal of import tariffs have been erratic and unpredictable. On February 20, 2026, the U.S. Supreme Court ruled that import tariffs imposed by President Trump purportedly under the International Emergency Economic Powers Act (“IEEPA”) were unlawful. The Administration subsequently ended the IEEPA ad valorem tariffs at issue. The availability, scope and timing of any refunds remain uncertain. A 10% temporary import surcharge under Section 122 of the Trade Act of 1974 took effect on February 24, 2026, and expired on July 24, 2026. It generally applied to most imports, subject to specified exceptions.

Previous wording

There currently are tariffs on imports of steel, aluminum and copper products, including certain derivative products containing steel, aluminum and/or copper, imposed under Section 232 of the Trade Expansion Act of 1962 (“Section 232 Tariffs”). Effective April 6, 2026, the Administration revised the Section 232 Tariff framework, including by generally applying a 50% tariff to the full customs value of covered steel, aluminum and copper products, applying a lower 25% tariff to certain products and applying a 10% tariff to covered derivative products made from aluminum or copper smelted and cast in the United States, or from steel melted and poured in the United States . Certain products also qualify for Section 232 tariff exemptions. Section 232 tariffs are not additive to the Section 122 Tariffs. Although the April 6, 2026 Section 232 Tariff revisions reduced our tariff exposure for certain imported components, Section 232 Tariffs continue to affect our costs and gross margins and could result in interruptions in our product supply chains.

Current wording

There currently are tariffs on imports of steel, aluminum and copper products, including certain derivative products containing steel, aluminum and/or copper, imposed under Section 232 of the Trade Expansion Act of 1962 (“Section 232 Tariffs”). Effective April 6, 2026, the Administration revised the Section 232 Tariff framework, including by generally applying a 50% tariff to the full customs value of covered steel, aluminum and copper products, applying a lower 25% tariff to certain products and applying a 10% tariff to covered derivative products made from aluminum or copper smelted and cast in the United States, or from steel melted and poured in the United States. Certain products also qualify for Section 232 tariff exemptions. The Administration further revised the Section 232 tariff framework in June and July 2026. Although the April 6, 2026 Section 232 Tariff revisions reduced our tariff exposure for certain imported components, Section 232 Tariffs continue to affect our costs and gross margins and could result in interruptions in our product supply chains.

Previous wording

There are also tariffs on various items of solar equipment, including solar cells and modules, inverters and power optimizers, imported from China under Section 301 of the Trade Act of 1974 (“Section 301 Tariffs”). At present, Section 301 Tariffs are 50% on Chinese crystalline solar photovoltaic (“CSPV”) cells and modules, 25% on Chinese steel products, 25% on Chinese parts of lead-acid storage batteries (including separators thereof) and 25% on Chinese lithium-ion non-EV batteries. These Section 301 Tariffs are additive to Section 122 Tariffs.

Current wording

There are also tariffs on various items of solar equipment, including solar cells and modules, inverters and power optimizers, imported from China under Section 301 of the Trade Act of 1974 (“Section 301 Tariffs”). At present, Section 301 Tariffs are 50% on Chinese crystalline solar photovoltaic (“CSPV”) cells and modules, 25% on Chinese steel products, 25% on Chinese parts of lead-acid storage batteries (including separators thereof) and 25% on Chinese lithium-ion non-EV batteries. In July 2026, the Administration announced Section 301 tariffs of 10% or 12.5% on goods from 60 economies in connection with forced-labor import restrictions, subject to exemptions and country-specific terms.

Previous wording

In addition, the Trump Administration has indicated that new Section 301 Tariffs may be implemented in the near future following investigations covering a broad range of countries, including major sourcing markets. The timing, rates, country coverage, product coverage and interaction with other tariffs remain uncertain. If implemented, these additional Section 301 tariffs could increase our costs, reduce our gross margins, adversely affect sourcing and pricing decisions, and otherwise adversely affect our business, financial condition, results of operations and cash flows.

Current wording

In March 2026, the Administration initiated additional Section 301 investigations into structural excess capacity and production in multiple economies, including major sourcing markets and solar modules. The timing, rates, country and product coverage, and interaction of any resulting measures with existing tariffs remain uncertain. If implemented, additional tariffs could increase our costs, reduce our gross margins, adversely affect sourcing and pricing decisions, and otherwise adversely affect our business, financial condition, results of operations and cash flows.

Previous wording

As a result of a Presidential Proclamation 10414 issued by President Biden on June 6, 2022, entries of CSPV cells and models covered by the Solar Circumvention Determination that entered the United States prior to June 6, 2024 generally did not face the collection of AD/CVD amounts if the importers of such cells and modules submitted required certifications to U.S. Customs and Border Protection (“CBP”). Nextpower imported proprietary, low-power CSPV smart modules from Malaysia and Thailand covered by the Solar Circumvention Determination between April 1, 2022 and November 30, 2022, While Nextpower submitted certifications for the low-power CSPV smart modules it imported during this period, Nextpower did not strictly follow all the certification procedures for a number of the entries. In addition, the AD/CVD exemption put in place by Presidential Proclamation 10414 is subject to a pending court challenge.

Current wording

As a result of a Presidential Proclamation 10414 issued by President Biden on June 6, 2022, entries of CSPV cells and modules covered by the Solar Circumvention Determination that entered the United States prior to June 6, 2024 generally did not face the collection of AD/CVD amounts if the importers of such cells and modules submitted required certifications to U.S. Customs and Border Protection (“CBP”). Nextpower imported proprietary, low-power CSPV smart modules from Malaysia and Thailand covered by the Solar Circumvention Determination between April 1, 2022 and November 30, 2022, While Nextpower submitted certifications for the low-power CSPV smart modules it imported during this period, Nextpower did not strictly follow all the certification procedures for a number of the entries. In addition, the AD/CVD exemption put in place by Presidential Proclamation 10414 is subject to a pending court challenge.

Previous wording

On July 1, 2025, Commerce initiated a Section 232 investigation to determine the effects on U.S. national security of imports of polysilicon and its derivatives. Once completed, the investigation may result in President Trump imposing tariffs on imports into the United States of polysilicon and its derivatives. It is possible that such Section 232 tariffs could apply to CSPV cells and modules, which would negatively impact our business.

Current wording

On July 1, 2025, Commerce initiated a Section 232 investigation to determine the effects on U.S. national security of imports of polysilicon and its derivatives. On August 6, 2026, the Administration imposed tariffs on imports of polysilicon and polysilicon derivatives under Section 232. These tariffs, and any related exclusions, quotas, country-specific treatment or subsequent modifications, may increase the cost of solar modules and other components used in solar projects, adversely affect our suppliers and customers, and negatively impact our costs, margins, supply chain and demand.

Previous wording

As part of our business strategy, we have, and in the future expect to continue to make, investments in and/or acquire complementary companies, services or technologies, such as our acquisitions of Ojjo, the foundations business of SPI, Bentek, OnSight, Origami, Prevalon and other recent acquisitions. We have also entered into, and may in the future enter into, joint ventures or similar strategic arrangements, such as our Nextpower Arabia joint venture. Our ability as an organization to acquire and integrate other companies, services or technologies, and to structure, negotiate and manage joint ventures and other strategic arrangements, in a successful manner in the future is not guaranteed. We may not be able to find suitable acquisition candidates or joint venture partners, and we may not be able to complete such acquisitions or joint ventures on favorable terms, if at all. When we complete acquisitions or enter into joint ventures, we may not ultimately strengthen our competitive position or ability to achieve our business objectives, and any acquisitions or joint ventures we complete could be viewed negatively by our end-customers or investors. In addition, our due diligence may fail to identify all of the problems, liabilities or other shortcomings or challenges of an acquired business, joint venture partner, product or technology, including issues related to intellectual property, product quality or product architecture, regulatory compliance practices, revenue recognition or other accounting practices or issues with employees or customers. Joint ventures involve unique risks, including our potential inability to control the operations, strategies or financial decisions of our joint venture partners, the potential for our partners to have economic or business interests inconsistent with our own, the possibility that we may be responsible to joint venture partners for indemnifiable losses and the risk that our partners may be unable or unwilling to fulfill their obligations under the relevant joint venture agreements. If we are unsuccessful at integrating such acquisitions, or the technologies associated with such acquisitions, into our company, or at managing our joint ventures effectively, the revenue and results of operations of the combined company could be adversely affected. Any integration process may require significant time and resources, and we may not be able to manage the process successfully. We may not successfully evaluate or utilize the acquired technology or personnel, or the capabilities of joint venture partner, or accurately forecast the financial impact of an acquisition or joint venture transaction, causing unanticipated write-offs or accounting charges. We may have to pay cash, incur debt or issue equity securities to pay for any such acquisition, or to fund our obligations under any joint venture arrangements each of which could adversely affect our business, financial condition and the market price of our Class A com…

Excerpt shortened here; the source contains the full paragraph.

Current wording

As part of our business strategy, we have, and in the future expect to continue to make, investments in and/or acquire complementary companies, services or technologies, such as our acquisitions of Ojjo, the foundations business of SPI, Bentek, OnSight, Origami, Prevalon, Zigor/Apex, Zimmermann and other recent acquisitions. We have also entered into, and may in the future enter into, joint ventures or similar strategic arrangements, such as our Nextpower Arabia joint venture. Our ability as an organization to acquire and integrate other companies, services or technologies, and to structure, negotiate and manage joint ventures and other strategic arrangements, in a successful manner in the future is not guaranteed. We may not be able to find suitable acquisition candidates or joint venture partners, and we may not be able to complete such acquisitions or joint ventures on favorable terms, if at all. When we complete acquisitions or enter into joint ventures, we may not ultimately strengthen our competitive position or ability to achieve our business objectives, and any acquisitions or joint ventures we complete could be viewed negatively by our end-customers or investors. In addition, our due diligence may fail to identify all of the problems, liabilities or other shortcomings or challenges of an acquired business, joint venture partner, product or technology, including issues related to intellectual property, product quality or product architecture, regulatory compliance practices, revenue recognition or other accounting practices or issues with employees or customers. Joint ventures involve unique risks, including our potential inability to control the operations, strategies or financial decisions of our joint venture partners, the potential for our partners to have economic or business interests inconsistent with our own, the possibility that we may be responsible to joint venture partners for indemnifiable losses and the risk that our partners may be unable or unwilling to fulfill their obligations under the relevant joint venture agreements. If we are unsuccessful at integrating such acquisitions, or the technologies associated with such acquisitions, into our company, or at managing our joint ventures effectively, the revenue and results of operations of the combined company could be adversely affected. Any integration process may require significant time and resources, and we may not be able to manage the process successfully. We may not successfully evaluate or utilize the acquired technology or personnel, or the capabilities of joint venture partner, or accurately forecast the financial impact of an acquisition or joint venture transaction, causing unanticipated write-offs or accounting charges. We may have to pay cash, incur debt or issue equity securities to pay for any such acquisition, or to fund our obligations under any joint venture arrangements each of which could adversely affect our business, financial condition and the market …

Excerpt shortened here; the source contains the full paragraph.

Previous wording

In connection with our acquisitions and strategic investments, we have recorded, and expect to continue to record, significant amounts of goodwill and other intangible assets on our unaudited condensed consolidated balance sheet. We are required to test goodwill for impairment at least annually, generally at the beginning of our fourth fiscal quarter, and to test our finite-lived intangible assets and other long-lived assets for impairment whenever events or changes in circumstances indicate that their carrying value may not be recoverable. Triggering events that could require an interim or annual impairment assessment include declines in our historical or projected revenue, operating income or cash flows, a sustained decline in the price or market capitalization of our Class A common stock, deterioration in general macroeconomic, industry or market conditions, reductions in demand or project volumes, the loss of one or more significant customers, adverse changes in the regulatory or incentive environment, or the failure of an acquired business to perform as we expected at the time of acquisition. If the carrying value of a reporting unit or asset exceeds its estimated fair value, we may be required to recognize a non-cash impairment charge, which could be significant. Any such charge could have a material adverse effect on our results of operations and financial condition in the period in which it is recognized.

Current wording

In connection with our acquisitions, joint ventures and strategic investments, we have recorded, and expect to continue to record, significant amounts of goodwill and other intangible assets on our unaudited condensed consolidated balance sheet. We are required to test goodwill for impairment at least annually, generally at the beginning of our fourth fiscal quarter, and to test our finite-lived intangible assets and other long-lived assets for impairment whenever events or changes in circumstances indicate that their carrying value may not be recoverable. Triggering events that could require an interim or annual impairment assessment include declines in our historical or projected revenue, operating income or cash flows, a sustained decline in the price or market capitalization of our common stock, deterioration in general macroeconomic, industry or market conditions, reductions in demand or project volumes, the loss of one or more significant customers, adverse changes in the regulatory or incentive environment, or the failure of an acquired business to perform as we expected at the time of acquisition. If the carrying value of a reporting unit or asset exceeds its estimated fair value, we may be required to recognize a non-cash impairment charge, which could be significant. Any such charge could have a material adverse effect on our results of operations and financial condition in the period in which it is recognized.

Previous wording

We purchase our components through arrangements with various suppliers located across the globe. We depend on our suppliers to source materials and manufacture critical components for our products. Our reliance on these suppliers, in certain cases on an exclusive or sole-source basis, makes us vulnerable to possible capacity constraints and reduced control over component availability, delivery schedules and costs which could disrupt our ability to procure these components in a timely and cost-efficient manner. As we expand our product offerings, the complexity of our supply chain could increase, exposing us to additional problems or disruptions. Any shortages of components or raw materials for these products could affect our ability to timely deliver our products to our customers, which may result in liquidated damages or contractual disputes with our customers, harm our reputation and lead to a decrease in demand for our products.

Current wording

We purchase our components through arrangements with various suppliers located across the globe. We depend on our suppliers to source materials and manufacture critical components for our products. Our reliance on these suppliers, in certain cases on an exclusive or sole-source basis, makes us vulnerable to possible capacity constraints and reduced control over component availability, delivery schedules and costs which could disrupt our ability to procure these components in a timely and cost-efficient manner. As we expand our product offerings, the complexity of our supply chain could increase, exposing us to additional problems or disruptions. The addition of BESS and power-conversion products also increases our exposure to battery cells, power semiconductors, transformers and other specialized components, for which there may be limited qualified suppliers or substitutes and longer qualification cycles. Any shortages of components or raw materials for these products could affect our ability to timely deliver our products to our customers, which may result in liquidated damages or contractual disputes with our customers, harm our reputation and lead to a decrease in demand for our products.

Previous wording

For example, our products are manufactured from steel and, as a result, our business is significantly affected by the price of steel. When steel prices are higher, the prices that we charge customers for our products may increase, which may decrease demand for our products. Conversely, if steel prices decline, customers may demand lower prices and our competitors’ responses to those demands could result in lower sale prices or lower sales volume and, consequently, negatively affect our profitability. A significant portion of the steel used to produce our products is derived directly or indirectly from steel mills located in China. At times, pricing and availability of steel can be volatile due to numerous factors beyond our control, including domestic and international economic conditions, global steel capacity, import levels, fluctuations in the costs of raw materials necessary to produce steel, sales levels, competition, consolidation of steel producers, labor costs, transportation costs, import duties, tariffs and foreign currency exchange rates. The volatility in the availability and cost of steel may impact our business. Imports of China-origin steel currently are subject to significant tariffs and trade restrictions, including reciprocal tariffs and Section 301 Tariffs, which materially increase the cost of such imports. Imports of steel and many steel derivative products from other countries are subject to tariffs and other trade measures (with limited exceptions for certain countries). Accordingly, ongoing trade disputes, unpredictable tariff policies and uncertainty with respect to the potential for such policy changes may increase procurement costs or restrict access to necessary materials for our products, like steel, potentially leading to disruptions with our suppliers or in our supply chain. We continue to evaluate the potential impact of the imposition of such tariffs and trade restrictions to our business and financial condition, but we expect that these tariffs will significantly increase our costs.

Current wording

For example, many of our products are manufactured from steel and, as a result, our business is significantly affected by the price of steel. When steel prices are higher, as they have been in recent months, the prices that we charge customers for our products may increase, which may decrease demand for our products. Conversely, if steel prices decline, customers may demand lower prices and our competitors’ responses to those demands could result in lower sale prices or lower sales volume and, consequently, negatively affect our profitability. A significant portion of the steel used to produce our products is derived directly or indirectly from steel mills located in China. At times, pricing and availability of steel can be volatile due to numerous factors beyond our control, including domestic and international economic conditions, global steel capacity, import levels, fluctuations in the costs of raw materials necessary to produce steel, sales levels, competition, consolidation of steel producers, labor costs, transportation costs, import duties, tariffs and foreign currency exchange rates. The volatility in the availability and cost of steel may impact our business. Imports of China-origin steel currently are subject to significant tariffs and trade restrictions, including reciprocal tariffs and Section 301 Tariffs, which materially increase the cost of such imports. Imports of steel and many steel derivative products from other countries are subject to tariffs and other trade measures (with limited exceptions for certain countries). Accordingly, ongoing trade disputes, unpredictable tariff policies and uncertainty with respect to the potential for such policy changes may increase procurement costs or restrict access to necessary materials for our products, like steel, potentially leading to disruptions with our suppliers or in our supply chain. We continue to evaluate the potential impact of the imposition of such tariffs and trade restrictions to our business and financial condition, but we expect that these tariffs will significantly increase our costs.

Previous wording

Further, if any of our suppliers were unable or unwilling to manufacture the components that we require for our products in sufficient volumes or at sufficiently high-quality levels or to renew existing terms under supply agreements, we would need to identify, qualify and select acceptable alternative suppliers. An alternative supplier may not be available to us when needed or may not be in a position to satisfy our quality or production requirements on commercially reasonable terms, including price. In certain cases, identifying, qualifying and transitioning to alternative suppliers may require engineering validation, testing or customer approval, which can take time and may not be feasible within project schedules. In addition, we may enter into exclusive arrangements which prohibit or limit our ability to use alternative suppliers. In some cases, we may rely on a limited number of suppliers, or single-source suppliers, for certain components, which may increase our exposure to supply disruptions. Any significant disruption to our ability to procure our components, and our suppliers’ ability to procure materials to manufacture components for our products could increase the production cost of our products or reduce or delay our ability to perform under our contracts and could thereby adversely affect our business, financial condition and results of operations.

Current wording

Further, if any of our suppliers were unable or unwilling to manufacture the components that we require for our products in sufficient volumes or at sufficiently high-quality levels or were to experience financial distress, insolvency or bankruptcy or to renew existing terms under supply agreements, we would need to identify, qualify and select acceptable alternative suppliers. An alternative supplier may not be available to us when needed or may not be in a position to satisfy our quality or production requirements on commercially reasonable terms, including price. In certain cases, identifying, qualifying and transitioning to alternative suppliers may require engineering validation, testing or customer approval, which can take time and may not be feasible within project schedules. In addition, we may enter into exclusive arrangements which prohibit or limit our ability to use alternative suppliers. In some cases, we may rely on a limited number of suppliers, or single-source suppliers, for certain components, which may increase our exposure to supply disruptions. Any significant disruption to our ability to procure our components, and our suppliers’ ability to procure materials to manufacture components for our products could increase the production cost of our products or reduce or delay our ability to perform under our contracts and could thereby adversely affect our business, financial condition and results of operations.

Previous wording

In addition, as noted above, the federal law provides incremental tax credits for U.S. solar projects satisfying domestic content requirements. While the impact of these requirements on us remains fluid and uncertain pending customer response and any future implementing regulations, if we are unable to provide our tracker products in a manner that satisfies applicable domestic content requirements, we might experience a decline in sales for U.S. projects, especially if our competitors are able to satisfy such domestic content requirements. In addition, compliance with these requirements may increase our production costs. In light of the foregoing, our U.S. sales, profitability and results of operations in the United States may be adversely affected by applicable domestic content requirements which must be satisfied in order for solar projects to be eligible for these incremental credits. Further, the sourcing of compliant materials under domestic content rules may become more complex due to evolving guidance, limited supplier availability, or capacity constraints.

Current wording

In addition, as noted above, the federal law provides incremental tax credits for U.S. solar and renewable energy projects satisfying domestic content requirements. While the impact of these requirements on us remains fluid and uncertain pending customer response and any future implementing regulations, if we are unable to provide our products in a manner that satisfies applicable domestic content requirements, we might experience a decline in sales for U.S. projects, especially if our competitors are able to satisfy such domestic content requirements. In addition, compliance with these requirements may increase our production costs. In light of the foregoing, our U.S. sales, profitability and results of operations in the United States may be adversely affected by applicable domestic content requirements which must be satisfied in order for solar projects to be eligible for these incremental credits. Further, the sourcing of compliant materials under domestic content rules may become more complex due to evolving guidance, limited supplier availability, or capacity constraints.

Previous wording

Further, disruption in our supply chain and transportation channels, including changes by carriers and transportation companies relating to delivery schedules, shortages in available cargo capacity or labor availability, payment terms and frequency of service and pricing as well as cargo ship incidents, shipping channel disruptions or work stoppages or strikes could impact our ability to timely deliver our products to our customers or increase delivery costs. For example, in the recent past we have seen many shipping companies pause or reroute shipments through the Suez Canal and the Red Sea as a result of attacks against commercial vessels in the area, causing rerouting of commercial vessels. Similarly, the U.S.-Iran war has resulted in a cessation or substantial curtailment of shipments through the Strait of Hormuz. As a result, we have and may continue to experience increased costs and delivery delays. Geopolitical tensions, armed conflicts, trade restrictions or other global events may further exacerbate these risks.

Current wording

Further, disruption in our supply chain and transportation channels, including changes by carriers and transportation companies relating to delivery schedules, shortages in available cargo capacity or labor availability, payment terms and frequency of service and pricing as well as cargo ship incidents, shipping channel disruptions, natural disasters, extreme weather and other climate-related events affecting supplier facilities, ports or shipping routes, or work stoppages or strikes could impact our ability to timely deliver our products to our customers or increase delivery costs. For example, in the recent past we have seen many shipping companies pause or reroute shipments through the Suez Canal and the Red Sea as a result of attacks against commercial vessels in the area, causing rerouting of commercial vessels. Similarly, the U.S.-Iran war and regional conflict has resulted in a cessation or substantial curtailment of shipments through the Strait of Hormuz. As a result, we have and may continue to experience increased costs and delivery delays. Geopolitical tensions, armed conflicts, trade restrictions or other global events may further exacerbate these risks.

Previous wording

Many governments, customers, investors and employees have enhanced their focus on ESG practices and disclosures, and expectations in this area are rapidly evolving and in some cases may be inconsistent or conflicting. Failure to adequately maintain ESG practices that meet diverse stakeholder expectations may result in an inability to attract customers, loss of business, diluted market valuation, and an inability to attract and retain top talent. In addition, standards, processes and governmental requirements for disclosing sustainability metrics have frequently changed in recent years, resulting in changes in the data that we must collect or disclose about our ESG practices, and could result in significant revisions to our sustainability commitments or our ability to achieve them. As governments impose greenhouse gas emission reporting requirements and other ESG-related laws, we are subject to at least some of these rules and concomitant regulatory risk exposure. ESG compliance and reporting could be costly, and we could be at a disadvantage compared to companies that do not have similar reporting requirements.

Current wording

Many governments, customers, investors and employees have increased their focus on ESG practices and disclosures, and expectations in this area continue to evolve and may be inconsistent or conflicting. Failure to adequately maintain ESG practices that meet diverse stakeholder expectations could result in an inability to attract customers, loss of business, a decline in our market valuation, and an inability to attract and retain employees. In addition, standards, processes and governmental requirements for disclosing sustainability metrics have changed frequently and may continue to change. These developments may require us to collect, verify and disclose additional information or revise our sustainability commitments. We may also be subject to penalties, regulatory scrutiny, litigation or reputational harm if we fail to comply with applicable requirements or if our disclosures are perceived to be inaccurate, incomplete, misleading or inconsistent with applicable standards or stakeholder expectations.

Showing the first 40 of 73 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

In addition, the OBBBA introduced certain “foreign entity of concern” (“FEOC”) restrictions relating to prohibited foreign entities on owners of qualified facilities claiming such Section 48E and 45Y tax credits, as well as on manufacturers of components that otherwise qualify for the Section 45X credit. Under these rules, a “prohibited foreign entity” includes a “specified foreign entity” or “foreign influenced entity”, and in general means that certain entities (governments or companies)

Current report — wording carried from elsewhere

As of October 2, 2026, approximately $337.5 million remained available for future share repurchases under the program.