Net Power Inc.

For the period ended Mar 31, 2025. Filed May 12, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 12, 2025

NPWR$0.81+5.8%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-12.

0001845437-24-000063

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-05-12.

0001845437-25-000027

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 89 previous paragraphs and 68 current paragraphs.

33 unchanged; 20 reworded; 15 added; 33 removed; 3 previous and 0 current paragraphs rearranged.

Tables are not compared: 4 previous and 3 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (15)

Current report

Over the next several years, Net Power plans to conduct additional research and equipment validation testing campaigns at its Demonstration Plant. Additionally, Net Power began purchasing initial long-lead materials for its first utility-scale power plant (“SN1”) in 2024 with the intention of locating SN1 in the Permian Basin of West Texas (“Project Permian”). However, after completing the front-end engineering and design (“FEED”) process in December 2024, the initial cost estimates were higher than originally anticipated. In response, during the first quarter of 2025, Net Power commenced a post-FEED optimization and value engineering process. In March 2025, the Company suspended further long-lead equipment releases but value engineering and certain development work remains in progress. Provided we are successful in our value engineering process, the project would come online no earlier than 2029. We are focused on delivering a project that will catalyze future adoption for utility-scale customers.

Current report

Project development expenses consist of labor expenses and fees paid to third parties developing commercial scale projects. Project development expenses increased by $4.2 million, or 1,286%, for the three months ended March 31, 2025, as compared to the same period in 2024. Beginning in March 2025, the Company began expensing costs associated with Project Permian as the Company suspended further long lead equipment releases for the project while it performs a value engineering process to evaluate the feasibility of the project. For the three months ended March 31, 2025, the Company expensed$3.8 million of costs related to Project Permian.

Current report

Goodwill impairment and other charges consists of $359.8 million related to goodwill impairmentand$56.1 million in construction-in-progress costs associated with Project Permian. The Company fully impaired goodwill during the three months ended March 31, 2025 dueto a change in the Company’s business plan and related sustained decrease in the Company’s market capitalization. Additionally, the Company expensed costs associated with the construction of Project Permian as management initiated a value engineering process to assess the project’s feasibility and optimize its design and temporarily paused further long lead equipment releases.

Current report

The change in Tax Receivable Agreement liability was $21.3 million, or 100.0%, for the three months ended March 31, 2025, as compared to the same period in 2024. During the three months ended March 31, 2025, the the TRA liability of $21.3 million was reduced to zero based on the determination that it was not more likely than not that its deferred tax assets subject to the TRA would be realized. Therefore, payments under the TRA are not considered probable as of March 31, 2025.

Current report

Income tax expense was$0.4 millionfor thethree months ended March 31, 2025, compared to an income tax benefit of $4.0 million for the same period in 2024. This change was due to an increase in the Company’s valuation allowance, partially offset by a favorable permanent difference related to the change in the value of the Warrant liability as compared to the same period in 2024.

Current report

Net loss attributable to non-controlling interest was 64.4% of net loss before income tax for the three months ended March 31, 2025, as compared to 66.2% of net loss for the three months ended March 31, 2024. The change in the non-controlling interests was due to exchanges by OpCo members of Class A OpCo units for Class A PubCo shares, partially offset by the additional issuance of Class A OpCo units under the BHES JDA.

Current report

During the three months ended March 31, 2025, net cash used in investing activities decreased $96.9 million ascompared to the same period in 2024. Our cash used in investing activities for thethree months ended March 31, 2024 primarily reflects the initial investments in available-for-sale securities during that period.

Current report

Our cash provided by financing activ ities was generally consistent for the three months ended March 31, 2025, as compared to the same period in 2024.

Current report

On March 7, 2025, the Company entered into a building lease agreement for a warehouse in La Porte, Texas with an initial term of 62 months commencing in April 2025. The lease contains a renewal option of five years. The future minimum lease payments associated with this lease are approximately $2.2 million.

Current report

Additionally, the Company leases two office trailers at the Demonstration Plant in La Porte, Texas, with an effective date of September 1, 2024. The lease has a term of 24 months and contains a purchase option whereby the Company may purchase the trailers at the end of the lease term; therefore, the Company classified the lease as a finance lease.
Removed paragraphs (33)

Previous report

On December 13, 2022, NET Power, LLC entered into the Business Combination Agreement with RONI, RONI OpCo, Buyer and Merger Sub. Pursuant to the Business Combination Agreement, Merger Sub merged with and into NET Power, LLC with NET Power, LLC surviving the merger as a wholly owned subsidiary of Buyer. Upon the consummation of the Business Combination on June 8, 2023, RONI was renamed NET Power Inc. (“Net Power” or the“Company”).

Previous report

As discussed in Note 1 to the condensed consolidated financial statements, the Company's financial statement presentation distinguishes NET Power, LLC as the “Predecessor” through June 7, 2023 (the“Predecessor Period”) and Net Power as the“Successor” for periods after the Closing Date (the “Successor Period”). Revenue and earnings after the date of the Business Combination are shown in the Successor Period on the condensed consolidated statements of operations and comprehensive loss. As a result of the application of the acquisition method of accounting in the Successor Period, the consolidated financial statements for the Successor Period are presented on a full step-up basis; therefore, Successor Period consolidated financial statements are not comparable to the consolidated financial statements of the Predecessor Period, which are not presented on the same full step-up basis.

Previous report

As a result of the Business Combination, Net Power became a publicly traded company with Class A Common Stock and Public Warrants trading on the NYSE, which has necessitated the hiring of additional personnel and the implementation of procedures and processes to address public company regulatory requirements and customary practices. We have incurred, and expect to continue to incur, material additional annual expenses as a public company for, among other things, directors’ and officers’ liability insurance, director fees, and additional internal and external accounting, legal, and administrative resources, including increased personnel costs, audit, and other professional service fees.

Previous report

Over the next several years, the Company plans to conduct additional research and testing campaigns at its Demonstration Plant and construct its first utility-scale plant. Net Power began purchasing and expects to make additional purchases of initial long-lead materials for the first utility-scale plant in 2024 and 2025 and targets initial power generation between the second half of 2027 and the first half of 2028. We expect that the plant will be a Net Power-led consortium project located at a site hosted by Occidental Petroleum in the Permian Basin of West Texas. We also continue to evaluate other sites in

Previous report

North America for Net Power plants. We expect that the project will fully integrate power production with transportation and underground storage of carbon dioxide. We are focused on delivering a project that will catalyze future adoption for utility-scale customers.

Previous report

We have not generated material revenue to date. We have generated revenue through various contracts with potential future license customers for access to testing results, other data and feasibility studies. We have also generated revenue for conducting syngas testing at our Demonstration Plant. Revenue increased by $12, or 100%, for the three months ended September 30, 2024 (Successor), as compared to three months ended September 30, 2023 (Successor).

Previous report

Project development expenses consist of labor expenses and fees paid to third parties developing commercial scale projects. Our project development expe nses were fairly consistent, for the three months ended September 30, 2024 (Successor), as compared to the three months ended September 30, 2023 (Successor).

Previous report

Our income tax benefit increased by $4,736 for the three months ended September 30, 2024 (Successor), as compared to the three months ended September 30, 2023 (Successor). This increase was due to a lower effective tax rate for the three months ended September 30, 2023 (Successor) due to permanent differences for expenses associated with the closing of the Business Combination.

Previous report

Comparison of the Nine Months Ended September 30, 2024 (Successor) to the Periods from January 1, 2023 Through June 7, 2023 (Predecessor) and June 8, 2023 Through September 30, 2023 (Successor)

Previous report

We have not generated material revenue to date. We have generated revenue through various contracts with potential future license customers for access to testing results, other data and feasibility studies. We have also generated revenue for conducting syngas testing at our Demonstration Plant. Revenue increased by $75, or 43%, for the nine months ended September 30, 2024 (Successor), as compared to amounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor).

Previous report

General and administrative expenses decreased by $23,105, or 51%, for the nine months ended September 30, 2024 (Successor), as compared to amounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). This decrease was primarily due to$16,644 in costs related to the Business Combination and $1,958 in costs incurred in the Successor Period as a result of becoming a public company during the nine months ended September 30, 2023. This decrease was also due to decreased amounts paid for professional services, partially offset by an increase in corporate headcount.

Previous report

Our R&D expenses consist primarily of labor expenses and fees paid to third parties working on and testing specific aspects of our technology, including testing at our Demonstration Plant and development activities under the BHES JDA. R&D increased by $14,902, or 51%, for the nine months ended September 30, 2024 (Successor), as compared to amounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). This increase was primarily due to timing of development activities under the BHES JDA.

Previous report

Project development expenses consist of labor expenses and fees paid to third parties developing commercial scale projects. Project development expenses increased by $728, or 104%, for the nine months ended September 30, 2024 (Successor), as compared to amounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). This increase was due to the initiation of activities related to development of a utility-scale facility and costs related to future projects.

Previous report

Option settlement expense of $79,054 forthe period from June 8, 2023 through September 30, 2023 (Successor) was due to a one-time cost for settlement of an option agreement in connection with the close of the Business Combination.

Previous report

Our depreciation, amortization and accretion expenses consist primarily of depreciation on our Demonstration Plant and amortization of intangible assets. Depreciation, amortization and accretion expense increased by $29,542, or 96%, for the nine months ended September 30, 2024 (Successor), as compared to amounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). As a result of the Business Combination, we adjusted the value of acquired assets to fair value, which resulted in a significant increase in intangible assets for internally developed technology and the Demonstration Plant. These increases resulted in an increase in related amortization and depreciation expense in the Successor Period.

Previous report

Interest income (expense) increased by $13,942, or 129%, for the nine months ended September 30, 2024 (Successor), as compared to amounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). Interest income increased due to the deployment of cash into fixed income securities and interest-bearing short-term investments subsequent to the Business Combination.

Previous report

The change in Earnout Shares liability and Warrant liability was $90,336, for the nine months ended September 30, 2024 (Successor), as compared to amounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). This increase is primarily due to the change in the fair value of the Private Placement Warrants and Public Warrants which was driven by changes in our stock price.

Previous report

Our income tax benefit increased by $10,456 for the nine months ended September 30, 2024, as compared to amounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). The increase is due to favorable permanent items and a cumulative tax benefit of $1,647 related to finalizing deferred taxes as of the Closing Date of the Business Combination in the nine months ended September 30, 2024 (Successor) and a lower effective tax rate for the nine months ended September 30, 2024 (Successor) due to unfavorable permanent differences for expenses associated with the closing of the Business Combination.

Previous report

During the nine months ended September 30, 2024 (Successor), net cash used in investing activities increased 31.6% as compared to thecombined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). Our cash used in investing activities for the nine months ended September 30, 2024 (Successor) primarily reflects theinvestment of a portion of the proceeds received from the PIPE Financing in investment grade fixed income securities and capital expenditures related to our Demonstration Plant and long-lead items for our first utility scale plant.

Previous report

Our cash provided by financing activities decreased 100.0% for the nine months ended September 30, 2024 (Successor) compared to the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). This changewas driven by proceeds from the PIPE Financing, fewer transaction expenses, and a reduction in the number of shareholder redemptions duringthe period from June 8, 2023 through September 30, 2023 (Successor).
Reworded paragraphs (20)

Previous wording

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations (Dollars in thousands, except share and unit amounts, unless otherwise noted)

Current wording

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Previous wording

We are a clean energy technology company that has developed a unique power generation system (the “Net Power Cycle”) that can produce clean, reliable, and low-cost electricity from natural gas while capturing virtually all atmospheric emissions. The Net Power Cycle is designed to inherently capture CO 2 and eliminate air pollutants such as SOX, NOX, and particulates.

Current wording

Net Power is an energy technology company that has developed a novel power generation system (which we refer to as the “Net Power Cycle”) designed to produce reliable and affordable electricity from natural gas while capturing virtually all atmospheric emissions. The Net Power Cycle is designed to inherently capture CO 2 while producing virtually no air pollutants such as SOX, NOX, and other particulates.

Previous wording

We believe that our performance and future success depend on a number of factors that present significant opportunities for us but also pose risks and challenges, including, but not limited to, cost over-runs in the testing and operation of the Demonstration Plant, technical problems with the Net Power Cycle, potential supply chain issues, our ability to finance the construction of our first utility-scale plant, and development of competing clean-energy technology sooner or at a lesser cost than the Net Power Cycle. Supply chain issues related to the manufacturing and transportation of key equipment may lead to a delay in our commercialization efforts, which could impact our results of operations.

Current wording

We believe that our performance and future success depend on a number of factors that present significant opportunities for us but also pose risks and challenges, including, but not limited to, cost over-runs in the testing and operation of the Demonstration Plant and future utility-scale plants, technical problems with the Net Power Cycle, that could impact performance, potential supply chain issues, changes in tax policies and other incentives supporting carbon capture, our access to the capital needed to finance the development of utility and commercial-scale plants, and development of competing clean-energy technology sooner or at a lesser cost than the Net Power Cycle. Supply chain issues related to the manufacturing and transportation of key equipment, including as a result of tariffs imposed by the U.S. or other countries or other trade barriers, measures, or conflicts, may lead to a delay in our commercialization efforts, which could impact our results of operations, financial condition and prospects. Also, currency fluctuations, inflation, and tariffs and other trade barriers, measures or conflicts may significantly increase freight charges, raw material costs and other expenses associated with our business, and such increased costs could materially and adversely affect our results of operations, financial condition and prospects.

Previous wording

Major remaining development activities relating to completing construction of our first utility-scale plant are similar to the activities we previously undertook to design, build, and commission the Demonstration Plant. These activities include but are not limited to: finalizing a siting study, completion of permitting, conducting a front-end engineering design (“FEED”) study, originating all required supply and off-take contracts, structuring the project to attract any required third party equity and debt financing and achieving final investment decision, initiating the engineering, procurement and construction (“EPC”) process, and constructing and commissioning the facility.

Current wording

In addition to the value engineering process discussed above, major remaining development activities relating to completing construction of SN1 are similar to the activities we previously undertook to design, build, and commission the Demonstration Plant. These activities include: finalizing all permitting, supply and off-take contracts, obtaining the financing required to achieve a final investment decision, and constructing and commissioning the facility.

Previous wording

Comparison of the Three Months Ended September 30, 2024 (Successor) to the Three Months Ended September 30, 2023 (Successor)

Current wording

Comparison of the Three Months Ended March 31, 2025 to the Three Months Ended March 31, 2024

Previous wording

General and administrative expenses consist primarily of personnel-related expenses associated with our general and administrative organization and professional fees for legal, accounting, and other consulting services. Our general and administrative expenses increased by $59, or 1%, for the three months ended September 30, 2024 (Successor), as compared to the three months ended September 30, 2023 (Successor). This increase was due to increases in corporate headcount and information technology costs, partially offset by lower SEC filing fees and insurance costs.

Current wording

General and administrative expenses consist primarily of personnel-related expenses associated with our general and administrative organiz ation and professional fees for legal, accounting, and other consulting services. General and administrative expenses increased by$2.3 million, or 36%, for the three months ended March 31, 2025, as compared to the same period in 2024. This increase was due to increases in corporate headcount, higher professional fees for engineering and accounting services and franchise taxes.

Previous wording

Our sales and marketing expenses consist primarily of personnel-related costs, consultants and information technology costs directly associated with our sales and marketing activities, which include general publicity efforts for the Company. Sales and marketing expenses increased by $101, or 11%, for the three months ended September 30, 2024 (Successor), as compared tothe three months ended September 30, 2023 (Successor). This increase was primarily attributable to costs associated with growth in employee headcount, partially offset by lower information technology costs and conference fees.

Current wording

Sales and marketing expenses consist primarily of personnel-related costs, consultants and information technology costs directly associated with our sales and marketing activities, which include general publicity efforts for the Company. Sales and marketing expenses increased by$0.4 million, or 58%, for the three months ended March 31, 2025, as compared to the same period in 2024. This increase was primarily attributable to costs associated with growth in employee headcount.

Previous wording

Our research and development (“R&D”) expenses consist primarily of labor expenses and fees paid to third parties working on and testing specific aspects of our technology, including testing at our Demonstration Plant and development activities under the BHES JDA. R&D expenses increased by $8,301, or 92%, for the three months ended September 30, 2024(Successor), as compared to the three months ended September 30, 2023 (Successor). This increase was primarily due to activities under the BHES JDA and increased activity at the Demonstration Plant in preparation for testing which is scheduled to commence in the fourth quarter of 2024.

Current wording

Research and development (“R&D”) expenses consist primarily of labor expenses and fees paid to third parties working on and testing specific aspects of our technology, including testing at our Demonstration Plant and development activities under the BHES JDA. R&D expenses increased by$11.4 million, or 101%, for the three months ended March 31, 2025, as compared to the same period in 2024. This increase was primarily due to more activity under the BHES JDA and related increased activity at the Demonstration Plant due to the ongoing testing campaign that commenced in the fourth quarter of 2024 and is expected to continue over the next several years. Additionally, thethree months ended March 31, 2025 includes a $2.5 million accrual forthe BHES JDA Make-Whole Payment. There was no such payment due for the same period in 2024.

Previous wording

Our depreciation, amortization and accretion expenses consist primarily of depreciation on our Demonstration Plant and amortization of intangible assets. Depreciation, amortization and accretion expense increased by $183, or 1%, for the three months ended September 30, 2024 (Successor), as compared to the three months ended September 30, 2023 (Successor).

Current wording

Depreciation, amortization and accretion expenses consist primarily of depreciation on our Demonstration Plant and amortization of intangible assets. Depreciation, amortization and accretion expense increased by$1.6 million, or 8%, for the three months ended March 31, 2025, as compared to the same period in 2024, primarily due to new additions to the Demonstration Plant throughout 2024.

Previous wording

Our interest income (expense) decreased by $683, or 8%, for the three months ended September 30, 2024 (Successor), as compared to the three months ended September 30, 2023 (Successor). Interest income decreased due to decreased investments, partially offset by investment accretion.

Current wording

Interest income (expense) decreased by$1.8 million, or 24%, for the three months ended March 31, 2025, as compared to the same period in 2024. Interest income decreased due to lower cash balances and interest rates, partially offset by investment accretion.

Previous wording

The change in Earnout Shares liability and Warrant liability was $89,674, or 145%, for the three months ended September 30, 2024 (Successor), as compared to the three months ended September 30, 2023 (Successor). The change was due to the changes in the market price of our Class A Common Stock, which correlates to the change in value of our Warrants.

Current wording

The change in Earnout Shares liability and Warrant liability was$88.7 million, or 609%, for the three months ended March 31, 2025, as compared to the same period in 2024. The change was primarily due to the changes in the market price of our Class A Common Stock, which correlates to the change in value of our Warrants. The Company’s stock price decreased $7.96 per share during the three months ended March 31, 2025 compared to an increase of $1.29 per share for thethree months ended March 31, 2024.

Previous wording

Our principal sources of liquidity are cash, short-term investments and investments in highly liquid available-for-sale securities. Historically, our sources of liquidity have also included raising capital through the sale of equity. We may issue additional equity securities in the future. We measure liquidity in terms of our ability to fund the cash requirements of our R&D activities and our near-term business operations, including our contractual obligations and other commitments. Our current liquidity needs primarily involve R&D activities for the ongoing development of our technology, general and administrative costs, and expenditures to purchase long-lead items related to our first commercial scale facility.

Current wording

Our principal sources of liquidity are cash, short-term investments and investments in highly liquid available-for-sale securities. Historically, our sources of liquidity have also included raising capital through the sale of equity. We may issue additional equity securities in the future. We measure liquidity in terms of our ability to fund the cash requirements of our R&D activities and our near-term business operations, including our contractual obligations and other commitments. Our current liquidity needs primarily involve R&D activities for the ongoing development of our technology, general and administrative costs, and progress certain development activities related to SN1.

Previous wording

As of September 30, 2024, we had short-term investments totaling $100,000, which was comprised of a single six-month certificate of deposit custodied by a domestic banking institution and available-for-sale securities comprised of investment grade, fixed income securities totaling $91,279. Additionally, our current liabilities were $26,915 at September 30, 2024 (Successor).

Current wording

The short-term investments are comprised of a single six-month certificate of deposit custodied by a domestic banking institution, and the available-for-sale securities are comprised of investment grade, fixed income securities. Additionally, our current liabilities were$21.4 million at March 31, 2025.

Previous wording

We believe we have the ability to manage our operating costs, including R&D expenditures, such that our existing liquidity will be sufficient to fund our obligations for the next 12 months following the filing of this Report. We believe that our current sources of liquidity on hand should be sufficient to fund our general corporate operating expenses as we work to commercialize our technology, but certain costs are not reasonably estimable at this time and we may require additional funding. More specifically, we will require additional funding in order to successfully construct our first utility-scale plant and to originate additional Net Power plant opportunities.

Current wording

We believe we have the ability to manage our operating costs, including R&D expenditures, such that our existing liquidity will be sufficient to fund our obligations for the next 12 months following the filing of this Report. We believe that our current sources of liquidity on hand should be sufficient to fund our general corporate operating expenses as we work to commercialize our technology, but certain costs are not reasonably estimable at this time and we may require additional funding. Specifically, we will require additional funding in order to successfully construct our first utility-scale plant and to originate additional Net Power plant opportunities.

Previous wording

Cash used in operating activities decreased 59.4% for the nine months ended September 30, 2024 as compared to thecombined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). Our net cash used in operating activities to date have been primarily comprised of payroll, material and supplies, facilities expense, and professional services related to R&D, including the BHES JDA, and general and administrative activities. This change was primarily due to costs associated with the completion of the Business Combination and our corresponding transition to operating as a public company during the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). As we continue to increase hiring and build out the Company, we expect our cash used in operating activities to increase significantly before we start to generate any material cash inflows from our operations.

Current wording

Cash used in operating activities increased $17.7 million for the three months ended March 31, 2025, as compared to the same period in 2024. Our net cash used in operating activities to date have been primarily comprised of payroll, material and supplies, facilities expense, and professional services related to R&D, including the BHES JDA, and general and administrative activities. This change was primarily due to higher R&D costs, including costs incurred under the BHES JDA, as we commenced the testing campaign at our Demonstration Plant during the fourth quarter of 2024, project development costs and the build out of the Company during 2024. We expect our cash used in operating activities to increase significantly before we start to generate any material cash inflows from our operations as costs related to Project Permian are being expensed pending the results of the value engineering process initiated during the three months ended March 31, 2025.

Previous wording

We hold a lease for approximately 218,900 square feet of land under the Demonstration Plant. In addition, we have an oxygen supply agreement with the lessor to supply oxygen to the Demonstration Plant. The lease expires on the earlier of (i) January 1, 2031 and (ii) the termination of our oxygen supply agreement with the lessor. The term of the oxygen supply agreement expires on January 1, 2030 with automatic 12-month renewal terms. The oxygen supply agreement may be terminated by us or by the lessor upon 24 months’ written notice prior to the expiration date of its current term. The underlying lease requires the removal of all equipment and the obligation to restore the land to post-clearing grade level, which has resulted in the recognition of an asset retirement obligation liability of $2,191 and $2,060 as of September 30, 2024 and December 31, 2023, respectively.

Current wording

We hold a lease for approximately 218,900 square feet of land under the Demonstration Plant. In addition, we have an oxygen supply agreement with the lessor to supply oxygen to the Demonstration Plant. The lease expires on the earlier of (i) January 1, 2031 and (ii) the termination of our oxygen supply agreement with the lessor. The term of the oxygen supply agreement expires on January 1, 2030 with automatic 12-month renewal terms. The oxygen supply agreement may be terminated by us or by the lessor upon 24 months’ written notice prior to the expiration date of its current term. The underlying lease requires the removal of all equipment and the obligation to restore the land to post-clearing grade level, which has resulted in the recognition of an asset retirement obligation liability of $3.3 million and $3.3 millionas of March 31, 2025 and December 31, 2024, respectively.

Previous wording

As of September 30, 2024, future minimum lease payments attributable to the Company's operating and finance lease arrangements are appr oximately $3,447 and $382, respectively.

Current wording

As of March 31, 2025, future minimum lease payments attributable to the Company’s operating and finance lease arrangements are appr oximately $3.0 million and $0.3 million, respectively.

Previous wording

The Company leases corporate office space in Durham, North Carolina, and Houston, Texas. The lease for the Company's corporate office space in Houston, Texas, commenced July 11, 2024. The Company also entered into a land lease agreement with a subsidiary of Occidental Petroleum, a related party, on March 8, 2024, for land in West Texas with commencement of the lease to occur no later than December 31, 2024. The term of the Company's land lease has not yet commenced.

Current wording

The Company leases corporate office space in Durham, North Carolina, and Houston, Texas. The lease for the Company’s corporate office space in Houston, Texas, commenced July 11, 2024. The Company also entered into a land lease agreement with a subsidiary of Occidental Petroleum, a related party, on March 8, 2024, for land in West Texas with commencement on December 1, 2024.

Previous wording

As of September 30, 2024 and December 31, 2023, we have committed to funding a portion of the remaining development costs incurred under the BHES JDA through a combination of cash and equity. The BHES JDA's total value is $140,000. As of September 30, 2024, we recognized approximately $25,733 of inception-to-date cash expenses and approximately $25,932 of inception-to-date share-based expenses related to the BHES JDA. The share-based expense excludes $6,442 of realized loss on share issuance.

Current wording

As of March 31, 2025 and December 31, 2024, we have committed to funding a portion of the remaining development costs incurred under the BHES JDA through a combination of cash and equity. The BHES JDA’s total value is $140 million, which assumes a fixed price per share. As of March 31, 2025, we recognized approximately $38.5 million of inception-to-date cash expenses and approximately $38.5 million of inception-to-date share-based expenses related to the BHES JDA. In addition, the Company may be required to make additional cash payments to BHES during periods when the volume-weighted average price of our Class A Common Stock is less than $4.00 per share in the 10 trading days preceding applicable quarterly share issuances under the terms of the BHES JDA (the “JDA Make-Whole Payment”). As of March 31, 2025, we recognized a liability of $2.5 million related to the JDA Make-Whole Payment.

Previous wording

As of September 30, 2024, we have committed to purchase certain components of industrial machinery for use at our Demonstration Plant and at our first utility-scale plant. The total gross commitments, which were initially unrecognized on our balance sheet, totaled$133,780. As of September 30, 2024, there was $106,831 remai ning related to these commitments.

Current wording

As of March 31, 2025, we have committed to purchase certain components of industrial machinery for use at our Demonstration Plant and at SN1. The total gross commitments totaled$146.4 million. As of March 31, 2025, there was $95.0 million remaining related to these commitments.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

The following table sets forth our condensed results of operations data for the periods presented:

Previous report — wording carried elsewhere

Our sales and marketing expenses consist primarily of personnel-related costs, consultants and information technology costs directly associated with our sales and marketing activities, which include general publicity efforts for the Company. Sales and marketing expenses increased by $704, or 36%, for the nine months ended September 30, 2024 (Successor), as compared toamounts for the combined periods from January 1, 2023 through June 7, 2023 (Predecessor) and June 8, 2023 through September 30, 2023 (Successor). This increase was primarily attributable to increased headcount and engagement of external consultants to support increased marketing activities.

Previous report — wording carried elsewhere

Change in Earnout Shares liability and Warrant liability