Item 2. Properties

The following table presents certain information concerning our principal properties included in the Pipeline segment:

Property Classification% OwnedOperatorApproximate Capacity (Bcf/d)Approximate Compression HorsepowerDescriptionLocation
Pipeline
FERC-Regulated Interstate Pipelines
Birdsboro100%Yes0.2—A 14-mile interstate pipeline transporting gas supply to a gas-fired power plant in PennsylvaniaPA
Guardian100%Yes1.3100,300A 263-mile interstate pipeline which connects to the Chicago Hub and serves key Upper Midwest demand centersIL and WI
Midwestern100%Yes1.582,900A 402-mile bi-directional interstate pipeline which connects Appalachia supply to the Midwest market region between Tennessee and the Chicago HubKY, IL, IN and TN
Millennium (a)52.5%No1.987,960A joint venture that owns a 266-mile interstate pipeline and compression facilities serving markets in the northeast and supply from the northeast Marcellus regionNY
NEXUS (a)50%No1.4104,000A joint venture that owns a 256-mile interstate pipeline and three compression facilities that transports Utica and Marcellus shale natural gas to Ohio, Michigan and Ontario market centers and GenerationOH and MI
Vector (a)40%No2.8120,000A joint venture that owns a 348-mile interstate pipeline and five compression facilities connecting Illinois, Indiana, Michigan and Ontario market centersCanada, IL, IN and MI
Viking100%Yes1.069,500A 674-mile bi-directional interstate pipeline which serves key utility customers in Minnesota, Wisconsin and North DakotaMN, ND and WI
Intrastate Pipelines
Generation50%No0.4—A 25-mile intrastate pipeline in northern Ohio and owned by NEXUSOH
Michigan System (b)100%Yes0.82,400A 335-mile pipeline system in northern MichiganMI
FERC-Regulated Storage System
Washington 10 Storage Complex (c)91%YesN/A26,200An interstate storage system with 94 Bcf of storage capacity and associated compression facilitiesMI
Gathering Lateral Pipelines
Bluestone100%Yes1.231,400A 65-mile gathering lateral pipeline, and two compression facilities, that gathers Marcellus shale natural gas to Millennium and the Tennessee PipelinePA and NY
LEAP100%Yes2.136,000A 221-mile gathering pipeline that gathers Haynesville shale natural gas to markets in the Gulf Coast regionLA
Stonewall85%Yes1.5—A 68-mile gathering lateral pipeline that gathers Marcellus and Utica shale natural gas to the Columbia PipelineWV

(a)We account for our ownership interest in these joint venture properties as equity method investments in accordance with GAAP. See Note 1, "Description of the Business and Basis of Presentation" to the Consolidated Financial Statements under Part II, Item 8 of this Form 10-K.

(b)The Michigan System is comprised of both intrastate pipeline and gathering lateral pipeline assets. In 2025, the majority of the capacity, mileage, and revenue generated by the Michigan System were related to providing intrastate transportation services.

(c)The Washington 10 Storage Complex includes 16 Bcf of leased capacity from the Washington 28 Storage Complex, which is held by a joint venture, South Romeo, in which DT Midstream owns a 50% interest.

Business Updates

During the year ended December 31, 2025, we completed key integration milestones for the DTM Interstate Transportation assets acquired in the Midwest Pipeline Acquisition, including opening a new regional office in Tulsa, Oklahoma, which will largely support these assets. A full year of operations of the DTM Interstate Transportation assets contributed to growth of our Pipeline segment.

During 2025, we reached a final investment decision on the Guardian G3 expansion project, which will increase Guardian capacity by 537 MMcf/d or approximately 40% from current capacity, and is expected to be fully placed into service in the fourth quarter of 2028. The Guardian G3 expansion is anchored by 20-year negotiated rate precedent agreements with investment-grade utility customers. In addition, we also initiated phase 1 of a multi-year modernization program for the acquired pipelines. The initial phase will be predominantly focused on improving system efficiency and reliability on Guardian and is expected to be placed into service in the second half of 2027.

On July 31, 2025, the FERC approved (subject to a filed appeal) the Bluestone Extended Supply Transportation ("BEST") agreement between Bluestone and Millennium which will enable Millennium to establish a new supply lateral utilizing Bluestone’s existing interconnects, creating a transportation path between Millennium and Tennessee Gas Pipeline. The firm transportation service began on January 1, 2026.

In September 2025, we placed the LEAP phase 4 expansion into service on budget, increasing the system capacity to approximately 2.1 Bcf/d. We continue to evaluate opportunities for additional LEAP expansions to serve growing Gulf Coast LNG and industrial corridor demand. Additionally, during the year ended December 31, 2025, we began construction of an interconnect between Stonewall and Mountain Valley Pipeline as well as a lateral connecting Midwestern to a power plant. The Stonewall and Mountain Valley Pipeline interconnect was placed into service on February 1, 2026, and the Midwestern lateral is expected to be placed into service during the first half of 2026. Capital expenditure investments for our ongoing expansion projects are contemplated in our forecasted capital expenditures discussed under Part II, Item 7 "Management’s Discussion and Analysis of Financial Condition and Results of Operations—Capital Investments" of this Form 10-K.

Gathering Segment

Description

Our Gathering segment includes gathering systems, related treatment plants, and compression and surface facilities. Our subsidiary companies own and operate these types of assets across multiple states.

Our natural gas gathering systems primarily consist of networks of pipelines that collect natural gas from points at or near our customers’ wells for delivery to plants for treating, to gathering pipelines for further gathering, or to pipelines for transportation. Natural gas is moved from the receipt points to the central delivery points on our gathering systems. We provide other ancillary services within our Gathering segment, including compression, dehydration, gas treatment, water impoundment, water transportation, water disposal, and sand mining. Our gathering systems provide a gathering function and are therefore not subject to FERC jurisdiction. Our gathering business has significant infrastructure within our customers' production acreage that is contractually dedicated to DT Midstream to provide gathering services.

Revenues

Our Gathering segment typically has firm revenue contracts that are long-term and structured using fixed demand charges or MVCs with fixed deficiency fee rates. This provides for fixed revenue commitments regardless of actual volumes of natural gas that flow, which leads to more stable operating performance, revenues and cash flows and limits our exposure to natural gas price fluctuations. Additional revenues are generated from proved developed producing reserves connected to our assets, which we refer to as "flowing gas." For the year ended December 31, 2025, approximately 57% and 36% of our Gathering segment revenue was generated under firm revenue contracts and flowing gas, respectively.

For the years ended December 31, 2025 and 2024, average throughput from the Gathering segment was 3.1 Bcf/d and 2.9 Bcf/d, respectively. For the year ended December 31, 2025, revenue from the Gathering segment accounted for approximately 45% of our consolidated revenue.

Competition

Our Gathering operations compete for customers based on geographic location, reputation, operating reliability and flexibility, price and service offerings, including interconnectivity to producer-desired takeaway options (i.e., processing facilities and pipelines). We mitigate the risk of competition by signing acreage dedications, entering firm revenue contracts, expanding treating capacity and expanding our systems to desirable production basins. Competition customarily is impacted by the level of drilling activity in a particular geographic region. Our primary competitors include other independent midstream companies with gathering operations and producer owned systems.

The following table presents certain information concerning our principal properties included in the Gathering segment:

Property Classification% OwnedOperatorApproximate Capacity (Bcf/d)Approximate Compression HorsepowerDescriptionLocation
Gathering
Appalachia Gathering100%Yes1.192,300A 154-mile gathering system that gathers Marcellus shale natural gas to the Texas Eastern Pipeline and StonewallPA and WV
Blue Union Gathering100%Yes2.681,600A 443-mile gathering system that gathers shale natural gas from the Haynesville formation of Louisiana and Texas and delivers to markets in the Gulf Coast region; ancillary services are also providedLA and TX
Clean Fuels Gathering100%Yes0.09,400A 93-mile gathering system that gathers and treats coal mine methane into pipeline quality natural gasIL
Ohio Utica Gathering100%Yes0.112,500A 26-mile gathering system, including compression and dehydration facilities, that gathers Utica shale natural gas from producer wells to a nearby processing plantOH
Susquehanna Gathering100%Yes1.278,000A 198-mile gathering system that gathers Marcellus shale natural gas to BluestonePA
Tioga Gathering100%Yes0.1—A 3-mile gathering system that gathers shale natural gas to the Eastern Gas Transmission systemPA

Business Updates

During the year ended December 31, 2025, we gathered record high volumes on our Haynesville System, where we also placed into service an expansion on Blue Union Gathering. In addition, our Tioga Gathering expansion and Clean Fuels Gathering projects were placed into service. Our Class VI permit application for the Louisiana carbon capture and sequestration project advanced to formal technical review with the Louisiana Department of Conservation and Energy in July 2025, and the Company is awaiting the completion of that review.

Capital expenditure investments for our ongoing expansion projects are contemplated in our forecasted capital expenditures discussed under Part II, Item 7 "Management’s Discussion and Analysis of Financial Condition and Results of Operations—Capital Investments" of this Form 10-K.

Pipeline and Gathering Rights-of-Way

We obtain satisfactory title to the properties we own and use in our businesses, subject to liens for current taxes, liens incident to minor encumbrances, and easements and restrictions, which do not materially detract from the value of such property, the interests in those properties or the use of such properties in our businesses. Our storage facilities, treating and processing plants, compressor stations, offices and related facilities are located on real property owned or leased by us. In some cases, the real property we lease is on federal, state or local government land.

We typically obtain and maintain rights to construct and operate the pipelines on other people’s land under agreements that are perpetual or provide for renewal rights. Our pipelines are constructed on rights-of-way granted by the current record owners of such property. In many instances, lands over which rights-of-way have been obtained are subject to prior liens that have not been subordinated to the rights-of-way grants. All record owners have joined in the rights-of-way grants and signatures have been obtained, except in unusual cases where title is unclear and requires additional investigation.

Human Capital Resources

DT Midstream recognizes that being innovative is necessary for our continued growth. We currently employ 588 employees, all of whom are employed full-time, exclusive of our student intern program. All of our employees are in the U.S., with our headquarters in Detroit, Michigan. None of our employees are covered by collective bargaining agreements. We believe that our employee relations are good.

Know, Support and Respect Culture

Our human capital resources objectives continue to center around employee engagement, strengthening our culture, and leadership development. We accomplish this through our annual engagement survey and training focused on our Know, Support and Respect priorities discussed below. We maintain and grow our team through practices that help us identify and hire new talent, as well as incentivize and retain our existing employees. Our employees have access to online learning resources, tuition reimbursement programs, and formal leadership development for emerging leaders identified at various levels within our corporate structure. Our executive leadership team meets annually with our Board of Directors' Organization and Compensation Committee to discuss executive leadership succession planning, including successor candidates and emerging leaders for senior management positions within the Company.

DT Midstream is committed to building an empowered, and engaged team that delivers safe and reliable service to our customers. We integrate these practices into our overall operating model and focus on the outcomes of Knowing, Supporting, and Respecting one another. We regularly review our geographical availability, representation demographics, and engagement scores, and we evaluate our success based on our ability to advance our Know, Support and Respect Culture priorities:

Know — Deliberately understanding the demographics and cultural norms of the communities where we live and operate;

Support — Honestly understanding and listening to the perspectives and needs of all employees, regardless of location, position, or tenure, and developing strategic action plans based on annual engagement survey feedback; and

Respect — Respect is required so that every employee feels comfortable being themselves at work.

Health and Safety

The health and safety of people, including our employees, contractors, customers, and the communities we serve is our top priority. Our safety culture is maintained and strengthened by our safety team, which monitors events, compliance, and training activities.

We monitor our safety performance with leading and lagging indicators, such as safety observations, near-misses and the OSHA recordable injury metrics.

Compensation and Benefits Description

Our human capital resources objectives include recruiting, incentivizing, fostering belonging, and retaining top talent. To achieve this, we offer all employees competitive compensation packages, annual and long-term incentive programs, defined contribution retirement savings plans and an employer contribution match, as well as paid time off, medical, dental, vision and other employee benefits. We review our compensation practices annually to ensure that pay is fair and internally equitable. For additional information on the metrics used in our incentive plans, see Part III, Item 11 "Executive Compensation" of this Form 10-K.

For additional information on our approach to managing our human capital resources, see our 2025 Corporate Sustainability Report on our website. The information in our Corporate Sustainability Report is not incorporated by reference into this Form 10-K.

Regulatory Environment

Our operations and investments are subject to extensive regulation by United States federal, state and local authorities. In addition, NEXUS and Vector are subject to applicable laws, rules, and regulations in Canada. Failure to comply with federal, state or local regulations may result in the imposition of administrative, civil and/or criminal remedies. We cannot predict whether a regulatory complaint or proceeding will be filed against us in the future or how a regulator may rule on any such complaint. We are not aware of any pending proceedings or complaints at this time.

Additional rules and legislation pertaining to these matters are considered and adopted from time to time. In certain instances, existing rules and legislation may be repealed or substantially modified in a way that reduces our regulatory compliance obligations. We cannot predict whether any such additional rules or legislation will be promulgated or enacted, whether any existing rules or legislation will be repealed or substantially modified, or what effect, if any, such changes might have on our operations, or existing regulatory requirements. To the extent that any new rules or legislation increase our regulatory compliance obligations, the industry could be required to incur additional capital expenditures and increased costs depending on future legislative and regulatory changes.

Federal Interstate Transportation & Storage Regulation

Many of our business operations are subject to extensive regulation by FERC under the NGA, the NGPA and regulations, rules and policies promulgated under those and other statutes. Specifically, Birdsboro, Guardian, Midwestern, Millennium, NEXUS, Vector, Viking and the Washington 10 Storage Complex are subject to FERC's NGA authority and provide interstate natural gas transportation or storage services in accordance with their FERC-approved tariffs. Notwithstanding the regulatory discussion below, we believe the regulatory burden does not currently affect our competitive condition.

Generally, FERC’s authority with respect to natural gas extends to:

rates and charges for interstate pipelines and storage facilities as well as intrastate pipelines and storage facilities providing service in interstate commerce;

terms and conditions of services and service contracts with customers;

certification and construction of new interstate pipelines and storage services and facilities and expansion of such facilities;

abandonment of interstate pipelines and storage services and facilities;

maintenance of accounts and records;

relationships between pipelines and certain affiliates;

depreciation and amortization rates and policies;

facility replacements and upgrades; and

acquisitions and dispositions of interstate pipelines and storage facilities.

Under the NGA, rates charged by interstate pipelines must be just, reasonable, and not unduly discriminatory or preferential. For interstate pipeline transportation services subject to cost‑of‑service regulation, the recourse rate is the maximum rate an interstate pipeline may charge for its services under its tariff. It is established through FERC’s cost-of-service ratemaking process. Key determinants in the ratemaking process include the costs of providing service, the volumes of gas being transported, the rate design, the allocation of costs between services, the capital structure, the depreciation rate and the rate of return a natural gas company is permitted to earn. The maximum applicable recourse rates and terms and conditions for service on an interstate natural gas pipeline are set forth in the pipeline’s FERC-approved tariff unless market-based rates have been approved by FERC. Rate design and the allocation of costs also can affect a pipeline’s profitability. While the ratemaking process establishes the recourse rate, interstate pipelines such as some of our pipelines and storage systems that provide cost‑of‑service‑based services are permitted to charge discounted rates, which are lower than the recourse rates, without further FERC authorization down to the minimum rate set forth in the tariff for the applicable service. If a pipeline company desires to change its recourse rates or terms and conditions of service, including pro forma contracts, then it must propose such changes to FERC in a filing made pursuant to Section 4 of the NGA. Such changes may be challenged by intervening parties, including customers and state agencies, and such proposed changes may ultimately be rejected by FERC. By contrast, our natural gas storage facility operates pursuant to FERC‑approved market‑based rate authority, and the rates charged for storage services are not established through FERC’s cost‑of‑service ratemaking process.

Existing rates or terms and conditions of service and contracts also may be challenged by a complaint filed by interested persons, including customers, state agencies or FERC, under Section 5 of the NGA. Rate increases proposed by a pipeline may be allowed to become effective subject to refund and/or a period of suspension, while rates or terms and conditions of service that are the subject of a complaint under Section 5 of the NGA are subject only to prospective change by FERC. Any successful challenge against existing or proposed rates charged for our pipelines and storage services could materially adversely affect our business, financial condition and results of operations.

In addition, our interstate pipelines may also charge negotiated rates that may be above or below the recourse rate or that are subject to a different rate design than the rates specified in our interstate pipeline tariffs, provided that the pipeline has appropriate language in its tariff permitting negotiated rates, that affected customers are willing to agree to such rates rather than recourse rates, and that FERC has approved the negotiated rate agreement. A prerequisite for allowing the negotiated rates is that negotiated rate customers must have had the option to take service under the pipeline’s recourse rates. Some negotiated rate transactions are designed to fix the negotiated rate for the term of the firm transportation agreement and the fixed rate is generally not subject to adjustment for increased or decreased costs occurring during the contract term or for changes in the recourse rate during the contract term.

Interstate transportation and storage service agreements are required to conform, in all material respects, with the form of service agreements set forth in the pipeline’s FERC-approved tariff. Non-conforming agreements must be filed with, and accepted by, FERC. If FERC finds that an agreement is materially non-conforming, in whole or in part, it could reject, or require us to seek modification of, the agreement, or alternatively require us to modify our tariff so that the non-conforming provisions are generally available to all customers or class of customers.

Failure of an interstate pipeline to comply with its obligations under the NGA could result in the imposition of civil and criminal penalties. The EPAct 2005 amended the NGA to give FERC authority to impose civil penalties for violations of the NGA up to $1,584,648 per violation per day (as adjusted for inflation for 2025), and violators may be subject to criminal penalties of up to $1 million per violation per day and five years in prison.

State Intrastate Transportation Regulation

Many state agencies possess the authority to review and authorize natural gas transportation transactions and the construction, acquisition, abandonment and interconnection of physical facilities for intrastate pipelines. State agencies also may regulate transportation rates, service terms, and conditions and contract pricing. Other state regulations may not directly apply to our business but may nonetheless affect the availability of natural gas for purchase, compression and sale. Regulations within a particular state generally will affect all intrastate pipeline operators within the state on a comparable basis; thus, we believe that the regulation of intrastate transportation in any state in which we operate will not disproportionately affect our operations.

Gathering Pipeline Regulation

Section 1(b) of the NGA exempts natural gas gathering facilities from regulation by FERC. We believe that our gathering systems meet the traditional tests FERC has used to establish a pipeline’s status as an exempt gatherer not subject to regulation as a FERC-jurisdictional natural gas company. If FERC were to consider the status of an individual facility and determine that the facility is not a gathering pipeline and the pipeline provides interstate transmission service, the rates for, and terms and conditions of, services provided by such facility would become subject to regulation by FERC under the NGA or the NGPA. Such regulation could decrease revenue, increase operating costs and, depending upon the facility in question, adversely affect our business, financial condition and results of operations. In addition, if any of our facilities were found to have provided services or otherwise operated in violation of the NGA or NGPA, this could result in the imposition of civil penalties as well as a requirement to disgorge charges collected for such service in excess of the rate established by FERC.

Our gathering assets may be subject to the rules and regulations of various state utility commissions. State regulation of gathering facilities generally includes various safety, environmental and, in some circumstances, nondiscriminatory take requirements and complaint-based rate regulation. States in which we operate may adopt ratable take and common purchaser statutes, which would require our gathering pipelines to take natural gas without undue discrimination in favor of one producer over another producer or one supply source over another similarly situated supply source. The regulations under these statutes may impose some restrictions on our ability as an owner of gathering facilities to decide with whom we contract to gather natural gas. States in which we operate may also adopt a complaint-based regulation of natural gas gathering activities, which allows natural gas producers and shippers to file complaints with state regulators in an effort to resolve grievances relating to gathering access and rate discrimination.

Our gathering operations could be adversely affected should they be subject in the future to different application of state regulation of rates and services. Our gathering operations also may be, or become, subject to additional safety and operational regulations relating to the design, installation, testing, construction, operation, replacement, and management of gathering facilities.

FERC and CFTC Enforcement

The EPAct 2005 amended the NGA and NGPA to prohibit fraud and manipulation in natural gas markets, and FERC issued a final rule making it unlawful for any entity, in connection with the purchase or sale of natural gas or transportation service subject to FERC’s jurisdiction, to defraud, make an untrue statement or omit a material fact, or engage in any practice, act or course of business that operates or would operate as a fraud. FERC’s anti-manipulation rules apply to interstate gas pipeline and storage companies and intrastate gas pipeline and storage companies that provide interstate services, such as Section 311 service, as well as otherwise non-jurisdictional entities to the extent the activities are conducted "in connection with" gas sales, purchases or transportation subject to FERC jurisdiction. The anti-manipulation rules apply to intrastate sales and gathering activities only to the extent that there is a "nexus" to FERC-jurisdictional transactions. The EPAct 2005 also provided FERC with the authority to impose civil penalties, which, as adjusted for inflation for 2025, is currently up to a maximum of $1,584,648 per violation per day.

In addition, the CFTC is directed under the Commodity Exchange Act to prevent price manipulations in the commodity and futures markets, including the energy futures markets. Pursuant to the Dodd-Frank Act and other authority, the CFTC has adopted anti-market manipulation regulations that prohibit fraud and price manipulation in the commodity and futures markets. The CFTC also has statutory authority to seek civil penalties of up to the greater of approximately $1.5 million (as adjusted for inflation for 2025) per violation or triple the monetary gain to the violator for violations of the anti-market manipulation provisions of the Commodity Exchange Act.

Pipeline Safety and Maintenance Regulation

Our natural gas pipeline assets are subject to the pipeline safety regulations implemented by PHMSA. PHMSA establishes and implements minimum federal safety standards and reporting requirements applicable to gas pipeline facilities, including associated underground natural gas storage. These standards include requirements that apply to the design, installation, testing, construction, operation and maintenance, and operator qualification as well as requirements for integrity management on certain pipelines. The integrity management requirements apply to gas transmission line segments located in HCAs and require operators to perform periodic risk-based assessments in addition to the minimum required inspections and other preventative and mitigation measures. Notwithstanding the investigatory and preventative maintenance costs incurred in our performance of customary pipeline management activities, we may incur significant additional expenses if anomalous pipeline conditions are discovered or additional preventative and mitigation measures need to be implemented.

PHMSA often issues new or amended safety standards and reporting requirements for gas pipeline facilities. For example, the "Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments" rule, which became effective July 1, 2020, requires operators of certain gas transmission pipelines to reconfirm the maximum allowable operating pressure for certain portions of their systems and imposes periodic assessment requirements for certain areas outside of HCAs, including newly-defined MCAs. The rule also incorporates industry standards and guidelines as well as new requirements for integrity management programs. In August 2022, PHMSA published the "Safety of Gas Transmission Pipelines: Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments" rule, effective May 24, 2023, which increases gas integrity management and corrosion control requirements and establishes repair criteria for pipelines outside of HCAs, among other things. We have revised our operating and inspection procedures to address these requirements and have implemented these changes as required by the rules. We may incur additional expenses related to compliance activities associated with this rule but do not expect these expenses to be material.

In November 2021, PHMSA issued another final rule, entitled "Safety of Gas Gathering Pipelines: Extension of Reporting Requirements, Regulation of Large, High-Pressure Lines, and Other Related Amendments," effective May 16, 2022, that established new safety standards and reporting requirements for certain historically unregulated onshore gas gathering lines. The final rule created a new Type C category of regulated onshore gas gathering lines in Class 1 locations that are subject to PHMSA’s safety standards and reporting requirements and required operators to comply with certain regulatory requirements applicable to newly designated Type C gas gathering lines by May 16, 2023. The final rule also created a new Type R category of reporting-only onshore gas gathering pipelines that are subject to PHMSA’s incident and annual reporting requirements. We have revised our operating and maintenance procedures to address these requirements and have implemented these changes. We may incur additional expenses related to compliance activities but do not expect these expenses to be material.

In April 2022, PHMSA published the "Pipeline Safety: Requirement of Valve Installation and Minimum Rupture Detection Standard" rule, effective October 5, 2022, which required installation of remote control or automatic shut-off valves (or alternative equivalent technology) on certain newly constructed or replaced gas transmission pipelines. The final rule also imposed minimum performance standards for operation of those valves. We may incur additional expenses related to the requirements imposed by this rule, but do not expect these expenses to be material.

In May 2023, PHMSA issued a Notice of Proposed Rulemaking, entitled "Gas Pipeline Leak Detection and Repair," that proposes amendments to implement a congressional mandate in the 2020 PIPES Act and impose leak detection and repair criteria applicable to gas pipelines and underground natural gas storage facilities. The final rule was submitted for publication in the Federal Register in January 2025 but was withdrawn for further review by PHMSA with no timeframe for a final rule. The rulemaking has been classified as a long-term action in the Department of Transportation's regulatory agenda. PHMSA is also in the process of revising regulations applicable to requirements for operators in response to certain class location changes, developing a proposed rule to establish inspection and maintenance requirements for idled pipelines, and revising repair criteria for gas transmission pipelines. Congress is also required to periodically reauthorize the Pipeline Safety Act and is expected to do so in 2026. Through reauthorization of the Pipeline Safety Act, Congress may pass a bill that mandates other statutory changes or directs PHMSA to develop additional rulemaking.

It is unclear how the adoption of these new PHMSA rules could impact our pipeline assets and operations, including our operational costs. While some revised regulations require the installation of new or modified safety controls and the implementation of new capital projects or accelerated maintenance programs, which may increase our operational costs, other rulemaking initiatives are intended to be deregulatory in nature. We may also be affected by lost cash flows resulting from shutting down our pipelines during the pendency of any repairs and any testing, maintenance, and repair of pipeline facilities downstream from our own facilities.

Every state in which we operate is certified by PHMSA to regulate the safety of intrastate gas pipeline facilities consistent with the federal safety standards, and some of these states apply additional or more stringent safety standards or reporting requirements to intrastate gas pipeline facilities in their respective jurisdictions. We may incur significant costs and liabilities associated with repair, remediation, preventive or mitigation measures associated with complying with these additional or more stringent state requirements, including for certain gas gathering lines or other pipeline facilities that are not currently subject to PHMSA’s regulations. The costs, if any, for repair, remediation, preventive or mitigating actions that may be determined to be necessary, as well as lost cash flows resulting from shutting down our pipelines during the pendency of such actions, could be material.

We incur significant costs in complying with U.S. federal and state pipeline safety laws and regulations and otherwise administering our pipeline safety program, but we do not believe such costs of compliance will materially adversely affect our business, financial condition and results of operations. While we cannot predict the outcome of pending or future legislative or regulatory initiatives, we anticipate that pipeline safety requirements will continue to become more stringent over time. As a result, we may incur significant additional costs to comply with the new pipeline safety regulations, the pending pipeline safety regulations, and any new pipeline safety laws and regulations associated with our pipeline facilities, which could materially adversely affect our business, financial condition and results of operations.

Should we fail to comply with PHMSA or state regulations, where applicable, we could be subject to penalties and fines. PHMSA has the statutory authority to impose civil penalties for pipeline safety violations up to a maximum of approximately $272,926 per day for each violation and approximately $2.73 million for a related series of violations (as adjusted for inflation as prescribed in 2025). This maximum penalty authority established by statute will continue to be adjusted periodically to account for inflation, including in 2026.

Our operations are in substantial compliance with all existing U.S. federal, state and local pipeline safety laws and regulations. However, the adoption of new laws and regulations, such as those proposed by PHMSA, could result in significant added costs or delays in service or the termination of projects, which could have a material adverse effect on us in the future.

In the course of operating our pipeline facilities, we may experience a leak or a rupture on our system. These leaks and ruptures may cause explosions, fire, damage to the environment, damage to property, personal injury and/or death. Depending on the circumstances of the leak or rupture, PHMSA or the state agent may require that certain pipeline assets remain out of service and/or operate at a significantly reduced operating pressure until certain corrective measures are performed and a return to normal operation is approved by PHMSA or the state agent. In addition to any regulatory fines or corrective measures, we may be sued for any damages. Depending upon the facts and circumstances of a particular incident, state and federal regulatory authorities may also seek civil and/or criminal fines and penalties.

Natural Gas Storage Regulation

We operate natural gas storage facilities in Michigan as interstate facilities regulated by PHMSA and provide interstate storage and related services pursuant to a FERC-approved tariff. As such, our natural gas storage facilities are required to meet the federal safety standards as required by 49 C.F.R. §192.12, Underground natural gas storage facilities. New regulations that may expand requirements for underground natural gas storage facilities were under development by PHMSA based on the May 2023 PHMSA Notice of Proposed Rulemaking entitled "Gas Pipeline Leak Detection and Repair." PHMSA submitted a final rule for publication in the Federal Register in January 2025, which was subsequently withdrawn for further review by PHMSA with no projected timeframe for finalizing the regulations and the rulemaking has been classified as a long-term action in the Department of Transportation's regulatory agenda.

Our operations are in substantial compliance with 49 C.F.R. §192.12, Underground natural gas storage facilities. However, the adoption of new laws and regulations could result in significant added costs or delays in service or the termination of projects, which could have a material adverse effect on us in the future.

Environmental and Occupational Health and Safety Regulations

General. Our operations are subject to U.S. federal, state and local environmental laws and regulations relating to air quality, water quality, waste management, wildlife conservation, natural resources and worker health and safety. These laws and regulations require the acquisition of and compliance with permits and the installation of pollution control equipment or replacement of aging pipelines and other facilities; limit or prohibit construction activities in sensitive areas such as wetlands, wilderness or areas that provide habitat for endangered or threatened species; require investigatory and remedial actions to mitigate or eliminate pollution conditions caused by our operations or attributable to former operations; and apply health and safety criteria addressing worker protections.

In addition, our operations and construction activities are subject to county and local ordinances that restrict the time, place or manner in which those activities may be conducted to reduce or mitigate nuisance-type conditions, such as, for example, excessive levels of dust or noise or increased traffic congestion.

Failure to comply with these laws and regulations may result in the assessment of administrative, civil and criminal penalties; the occurrence of delays or cancellations in the permitting or performance or expansion of projects; the denial or termination of project authorizations; the imposition of restrictions or limitations on project authorizations; the addition or removal of conditions or terms in project authorizations; the issuance of injunctions limiting or preventing some or all of our operations in a particular area; and, under certain environmental laws, citizen suits, in which individuals and environmental organizations act in the place of the government and sue operators for alleged violations of environmental law.

We have implemented programs and policies designed to keep our pipelines and other facilities in compliance with existing environmental laws and regulations, and we incur significant costs in connection with compliance. We also incur, and expect to continue to incur, additional costs with respect to construction as existing environmental laws and regulations impact the cost of planning, design, permitting, installation and start-up, and with respect to capital expenditures for pollution control equipment that is necessary to achieve emission and discharge standards included in our permits.

Moreover, we incur, and expect to continue to incur, additional costs in connection with spill response. Spills can result in significant costs associated with the investigation and remediation of contaminated facilities, and with injury and damage claims arising from releases and related contamination.

The timing and complete extent of future expenditures related to environmental matters is difficult to estimate accurately because, among other things, interpretation and enforcement of environmental laws and regulations are constantly changing, our pollution control and clean-up cost estimates may change, especially when our current estimates are based on preliminary site investigations or agreements, and new contaminated facilities and sites may be found, or what we know about existing sites and facilities could change.

We do not believe that our compliance with environmental legal requirements will materially adversely affect our business, financial condition and results of operations. Nonetheless, the trend in environmental regulation is to place more restrictions and limitations on activities that may affect human health or the environment. Thus, there can be no assurance as to the amount or timing of future expenditures for environmental compliance or remediation, and actual future expenditures may be significantly in excess of the amounts we currently anticipate. For example, we try to anticipate future regulatory requirements that might be imposed and plan accordingly to remain in compliance with changing environmental laws and regulations and to minimize the costs of such compliance. While we are in substantial compliance with existing environmental laws and regulations, additional, unplanned measures and expenditures may be required to maintain compliance in the future.

The following is a discussion of several of the principal environmental laws and regulations, as amended from time to time, which relate to our business.

Hazardous Substances and Waste. CERCLA and comparable state laws impose liability, without regard to fault or the legality of the original conduct, on current and prior owners or operators of the sites where a release of hazardous substances occurred or extends and companies that transported, disposed or arranged for the transportation or disposal of the hazardous substances released. Under CERCLA, these "responsible parties" may be subject to strict and joint and several liability for the costs of cleaning up the hazardous substances that have been released into the environment, for damages to natural resources, and for the costs of certain health studies. CERCLA also authorizes the EPA and, in some instances, third parties to act in response to threats to the public health or the environment and to seek to recover from the responsible parties the costs they incur. It is not uncommon for neighboring landowners and other third parties to file claims for personal injury and property damage allegedly caused by hazardous substances or other pollutants released into the environment. We generate materials in the course of our ordinary operations that are regulated as "hazardous substances" under CERCLA or similar state laws and, as a result, may be jointly and severally liable under CERCLA, or such laws, for all or part of the costs required to clean up sites at which these hazardous substances have been released into the environment.

In the ordinary course of our operations, we generate solid wastes and in some instances hazardous wastes, which are subject to the requirements of RCRA and comparable state statutes. While RCRA regulates both solid and hazardous wastes, it imposes strict requirements on the generation, storage, treatment, transportation and disposal of hazardous wastes. While certain petroleum production wastes are excluded from RCRA’s hazardous waste regulations, it is possible that these wastes will in the future be designated as "hazardous wastes" and be subject to more rigorous and costly disposal requirements, which could have a material adverse effect on our maintenance capital expenditures and operating expenses.

We own, lease or operate properties where hydrocarbons are being or have been handled for many years, by us and by former owners or operators, and we send hydrocarbons and wastes to third-party sites for treatment or disposal. Under CERCLA, RCRA and analogous state laws, we could be required to remove or remediate previously disposed or released wastes (including wastes disposed of or released by prior owners or operators), to clean up contaminated property (including contaminated groundwater) or to perform remedial operations to prevent future contamination, as well as to reimburse for or contribute to the remediation of third-party disposal and treatment sites. We are not currently aware of any facts, events or conditions relating to the application of such requirements that could reasonably materially adversely affect our business, financial condition and results of operations.

Air Emissions. The U.S. federal Clean Air Act and comparable state laws and regulations restrict the emission of air pollutants from various industrial sources, including our compressor stations, and also impose various pre-construction, operational, monitoring and reporting requirements. Such laws and regulations may require that we obtain pre-approval for the construction or modification of certain projects or facilities, obtain and strictly comply with air permits containing various emissions and operational limitations, and utilize specific emission control technologies to limit emissions. Our failure to comply with these requirements could subject us to monetary penalties, injunctions, conditions or restrictions on operations and, potentially, criminal enforcement actions. We may be required to incur certain capital expenditures in the future for air pollution control equipment in connection with obtaining and maintaining permits and approvals for air emissions. Compliance with these requirements may require modifications to certain of our operations, including the installation of new equipment to control emissions from our compressors that could result in significant costs, increased capital expenditures and operating costs, and could adversely affect our business. Further, the permitting, regulatory compliance and reporting programs, taken as a whole, increase the costs and complexity of oil and gas operations with potential to adversely affect the cost of doing business for our customers resulting in reduced demand for our gas processing and transportation services. Although we can give no assurances, we believe such requirements will not materially adversely affect our business, financial condition and results of operations, and the requirements are not expected to be more burdensome to us than to any similarly situated midstream company.

Climate Change. Legislative and regulatory measures to address climate change and GHG emissions are in various phases of discussion or implementation. The EPA regulates GHG emissions from new and modified facilities that are potential major sources of criteria pollutants under the Clean Air Act’s Prevention of Significant Deterioration and Title V programs and has adopted regulations that require, among other things, preconstruction and operating permits for certain large stationary sources and the monitoring and annual reporting of GHGs from certain onshore oil and natural gas production sources. On December 2, 2023, the EPA released a final rule to regulate GHG emissions (in the form of methane limitations, as well as design, equipment, work practice, and operational standards) and volatile organic compound emissions from crude oil and natural gas production, processing, transmission, and storage. The final rule includes standards of performance for new, modified, and reconstructed sources and emission guidelines for existing sources. On December 3, 2025, the EPA published a final rule extending the compliance deadlines for certain requirements set forth in the rule released on December 2, 2023. Additionally, the U.S. Congress, along with U.S. federal and state agencies, has considered measures to reduce the emissions of GHGs. On August 16, 2022, the U.S. Congress enacted the Inflation Reduction Act, pursuant to which EPA issued regulations (announced November 12, 2024) that impose a charge on methane emissions that exceed certain thresholds from offshore and onshore petroleum and natural gas production, onshore natural gas processing, onshore natural gas transmission compression, certain kinds of natural gas and LNG storage, and onshore petroleum and natural gas gathering and boosting. On March 14, 2025, the President signed into law a joint resolution disapproving these regulations and rendering them without legal force of effect by operation of the Congressional Review Act. On July 4, 2025, the President signed the OBBBA, which amended the Clean Air Act to postpone the applicability of the waste emission charges set forth in the Inflation Reduction Act until calendar year 2034. Legislation or regulation that levies a charge related to our GHG emissions or that restricts GHG emissions could increase our cost of environmental compliance by requiring us to install new equipment to reduce emissions from larger facilities; purchase emission allowances; administer and manage a GHG emissions program; and otherwise increase the costs of our operations, including costs to operate and maintain our facilities.

FERC does not directly regulate GHG emissions. However, on February 17, 2022, FERC issued two policy statements providing guidance on its consideration of GHG emissions and other factors when reviewing proposed projects under the NGA. These policy statements have been the subject of public comments. On January 24, 2025, FERC issued an order terminating the Consideration of Greenhouse Gas Emissions in Natural Gas Infrastructure Project Reviews proceeding. FERC instead said it will address GHG emissions issues on a case-by-case basis.

PHMSA was working on a Congressionally-mandated rulemaking to impose leak detection and repair criteria to reduce GHG emissions associated with PHMSA-regulated gas pipeline facilities and underground natural gas storage facilities. PHMSA submitted a final rule for publication in the Federal Register in January 2025, which has since been withdrawn for further review by PHMSA with no timeframe for finalizing the regulations and the rulemaking has been classified as a long-term action in the Department of Transportation's regulatory agenda. If this rulemaking is finalized, we may incur additional expenses related to the requirements imposed by this rule, but do not expect these expenses to be material.

The effect of climate change legislation or regulation on our business is currently uncertain. If we incur additional costs to comply with such legislation or regulations, we may not be able to pass on the higher costs to our customers or recover all the costs related to complying with such requirements, and any such recovery may depend on events beyond our control, including the outcome of future rate proceedings before FERC or state regulatory agencies and the provisions of any final legislation or implementing regulations. Our future business, financial condition and results of operations could be adversely affected if such costs are not recovered through regulated rates or otherwise passed on to our customers. Additionally, our customers or suppliers may also be affected by legislation or regulation, which may adversely impact their demand for our services.

Climate change and GHG legislation or regulation could also delay or otherwise negatively affect efforts to obtain permits and other regulatory approvals with regard to existing and new facilities or impose additional monitoring and reporting requirements. The effect of any new legislative or regulatory measures on us will depend on the particular provisions that are ultimately adopted.

Water Discharges. The U.S. federal Clean Water Act and analogous state laws impose restrictions and strict controls regarding the discharge of pollutants or dredged and fill material into state waters as well as WOTUS, including adjacent wetlands. The discharge of pollutants into regulated waters is prohibited, except in accordance with the terms of permits issued by the EPA, the U.S. Army Corps of Engineers, and/or an analogous state agency. The definition of WOTUS has been the subject of multiple regulatory interpretations and judicial decisions in recent years. In May 2023, the U.S. Supreme Court issued its decision in Sackett v. Environmental Protection Agency, which adopted a narrower test for wetlands covered under the Clean Water Act; and, in August 2023, the EPA and the U.S. Army Corps of Engineers promulgated final rule amendments for a new WOTUS definition that conformed to the Supreme Court's Sackett decision. The definition remains subject to litigation, with opponents arguing it is not sufficiently narrow. In November of 2025, the EPA and the U.S. Army Corps of Engineers proposed a narrower regulatory definition of WOTUS, but the definition has not yet been finalized. While recent and future changes to the definition may ease permitting in certain circumstances, continued controversy over the WOTUS definition may result in uncertainty, costs and delays with respect to obtaining permits for activities in jurisdictional waters, including wetlands.

Spill prevention, control and countermeasure requirements of U.S. federal laws require appropriate containment berms and similar structures to help prevent the contamination of regulated waters in the event of a hydrocarbon spill, rupture or leak. In addition, the Clean Water Act and analogous state laws require individual permits or coverage under general permits for discharges of storm water runoff from certain types of facilities. These permits may require us to monitor and sample the storm water runoff from some of our facilities. The Clean Water Act and regulations implemented thereunder also prohibit discharges of dredged and fill material in wetlands and other waters of the U.S. unless authorized by an appropriately issued permit. Some states also maintain groundwater protection programs that require permits for discharges or operations that may impact groundwater conditions. U.S. federal and state regulatory agencies can impose administrative, civil and criminal penalties for non-compliance with discharge permits or other requirements of the Clean Water Act and analogous state laws. We believe that compliance with existing permits and foreseeable new permit requirements will not materially adversely affect our business, financial condition and results of operations.

National Environmental Policy Act. The construction of interstate natural gas transportation pipelines pursuant to the NGA requires authorization from FERC. Certain FERC actions relating to such pipelines are subject to NEPA, which requires U.S. federal agencies, such as FERC, to evaluate major U.S. federal actions having the potential to significantly affect the environment. During such evaluations, an agency will prepare a detailed Environmental Impact Statement unless it has found on the basis of an environmental assessment that no significant effect is likely. Such NEPA analyses have the potential to significantly delay or limit, and significantly increase the cost of, development of midstream infrastructure. Under the prior presidential administration, the White House Council on Environmental Quality implemented actions that generally require agencies to undertake more searching inquiries during their NEPA reviews of new projects that require federal permits. However, on November 12, 2024, the U.S. Court of Appeals for the D.C. Circuit Court issued an opinion in Marin Audubon Society v. Federal Aviation Administration finding that the Council’s regulations exceed the Council’s authority and do not bind the federal agencies. On February 25, 2025, the Council published an interim final rule removing the Council's regulations implementing NEPA. On May 29, 2025, the U.S. Supreme Court issued its decision in Seven County Infrastructure Coalition v. Eagle County, Colorado, holding that NEPA reviews need not address the effects of separate projects, including downstream projects. Following these events and in compliance with various Executive Orders, federal agencies rescinded or substantially revised their own NEPA regulations and issued NEPA procedures in line with Seven County Infrastructure Coalition v. Eagle County, Colorado, and with the presidential administration's policies regarding streamlining reviews.

Hydraulic Fracturing. We do not operate any assets that conduct hydraulic fracturing. However, our customers’ natural gas production is developed from unconventional sources that require hydraulic fracturing as part of the completion process. Hydraulic fracturing involves the injection of water, sand and chemicals under pressure into the formation to fracture the surrounding rock and stimulate crude oil and natural gas production. The process is regulated by state agencies, typically the state’s commission that regulates oil and gas production. A number of U.S. federal agencies, including the EPA and the U.S. Department of Energy, have analyzed, or have been requested to review, a variety of environmental issues associated with hydraulic fracturing. In addition, some states have adopted, and other states are considering adopting, regulations that could impose more stringent disclosure and/or well construction requirements on hydraulic fracturing operations.

Certain state and U.S. federal regulatory agencies are also focused on a possible connection between hydraulic fracturing-related activities, including wastewater disposal, and the increased occurrence of seismic activity. When caused by human activity, such events are called induced seismicity. In a few instances, operators of injection disposal wells in the vicinity of seismic events have been ordered by regulatory agencies to reduce injection volumes or suspend operations. Additionally, some state regulatory agencies have modified their regulations or issued orders to restrict disposal wells or enhance well construction and monitoring requirements.

These developments could result in additional regulation and restrictions on the use of injection disposal wells and hydraulic fracturing. The adoption of new laws, regulations or ordinances at the U.S. federal, state or local levels imposing more stringent restrictions on hydraulic fracturing or wastewater disposal could make it more difficult for our customers to complete natural gas wells, increase customers’ costs of compliance and doing business, and otherwise adversely affect the hydraulic fracturing services they perform, which could negatively impact demand for our services.

Endangered Species Act. The ESA restricts activities that may adversely affect endangered and threatened species or their habitats and it makes illegal the "take" of any protected species. U.S. federal agencies are required to ensure that any action authorized, funded or carried out by them is not likely to jeopardize the continued existence of listed species or modify their critical habitat. While some of our facilities are located in areas that are designated as habitats for endangered or threatened species, we have not incurred any material costs to comply or restrictions on our operations and we believe that we are in substantial compliance with the ESA. The designation of previously unprotected species as being endangered or threatened, or the designation of previously unprotected areas as a critical habitat for such species, could cause us to incur additional costs, result in delays in construction of pipelines and facilities, cause us to become subject to operating restrictions in areas where the species are known to exist or could result in limitations on our customers’ exploration and production activities that could have an adverse impact on demand for our services. For example, the U.S. Fish and Wildlife Service has received hundreds of petitions to consider listing additional species as endangered or threatened and is being regularly sued or threatened with lawsuits to address these petitions. Compliance with all applicable laws providing special protection for designated species has not posed a material cost on our business and operations to date.

Employee Health and Safety. We are subject to a number of U.S. federal and state laws and regulations, including OSHA, and comparable state statutes, whose purpose is to protect the health and safety of workers. In addition, the OSHA hazard communication standard, the EPA community "right-to-know" regulations, and comparable state laws and regulations require that information be maintained concerning hazardous materials used or produced in our operations and that this information be provided to employees, state and local government authorities and citizens. We are also subject to OSHA Process Safety Management regulations, which are designed to prevent or minimize the consequences of catastrophic releases of toxic, reactive, flammable or explosive chemicals. We are also subject to the EPA Risk Management Program, which addresses the prevention of chemical accidents and preparedness for emergencies. In February 2024, the EPA issued a final rule amending the Risk Management Program’s implementing regulations. The amended regulations impose numerous new or heightened requirements concerning incident investigations, third-party compliance auditing, consideration of alternative chemicals and technologies, and evaluation of risks from natural hazards and climate change, among other issues. The U.S. Court of Appeals for the D.C. Circuit has granted an EPA motion to hold a challenge of the final rule in abeyance to allow time for EPA to review the rule in relation to the administration’s policies.

We are in substantial compliance with all applicable laws and regulations relating to worker health and safety. Historically, worker safety and health compliance costs have not materially adversely affected our business, financial condition and results of operations; however, there can be no assurance that such costs will not be material in the future or that such future compliance will not materially adversely affect our business, financial condition and results of operations. While we may increase future expenditures to comply with higher industry and regulatory safety standards, such increases in costs of compliance, and the extent to which they might be recoverable through our rates, cannot be estimated at this time.