DT Midstream, Inc.
For the period ended Dec 31, 2025. Filed Feb 19, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Feb 19, 2026
What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2024-12-31; filed 2025-02-26.
0001842022-25-000003
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2025-12-31; filed 2026-02-19.
0001842022-26-000003
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 131 previous paragraphs and 119 current paragraphs.
93 unchanged; 24 reworded; 2 added; 12 removed; 2 previous and 0 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (2)
Current report
Failure to successfully complete or realize the projected benefits of acquisitions, divestitures, and other strategic transactions may adversely affect our future results.
Current report
From time to time, the Company may undertake strategic transactions. The success of acquisitions and other transactions, depends in part on the Company’s ability to successfully complete and realize the anticipated benefits of such transactions. The Company’s ability to meet our objectives with respect to acquisitions, divestitures, and other strategic transactions may depend, as applicable, on our ability to identify suitable acquisition targets, buyers or counterparties; negotiate favorable financial and other contractual terms; obtain all necessary regulatory approvals on the terms expected; and complete those transactions. In addition, difficulties in integrating businesses and/or employees may result in the failure to realize anticipated results, benefits, and synergies in the expected timeframes, in operational challenges, and in the diversion of management’s attention from ongoing business concerns, as well as in unforeseen expenses associated with the transactions, which may have an adverse impact on our financial condition and results of operations.
Removed paragraphs (12)
Previous report
Failure to successfully combine our business with the assets acquired in the Midwest Pipeline Acquisition, or an inaccurate estimate by us of the benefits to be realized from the Midwest Pipeline Acquisition, may adversely affect our future results.
Previous report
On December 31, 2024, we closed our transaction with ONEOK pursuant to which DT Midstream acquired 100% of the equity interests of Guardian, Midwestern and Viking. The Midwest Pipeline Acquisition involves potential risks, including:
Previous report
•failure to attract and retain skilled professional and technical employees could adversely affect operations;
Previous report
•the failure to realize expected profitability, growth or accretion;
Previous report
•environmental or regulatory compliance matters or liabilities;
Previous report
•uncertainty associated with future rate-making proceedings with FERC;
Previous report
•the incurrence of substantial maintenance capital or other expenses;
Previous report
•the incurrence of significant charges, such as impairment of goodwill or other intangible assets, asset devaluation or restructuring charges; and
Previous report
•the incurrence of unanticipated liabilities and costs for which indemnification is unavailable or inadequate.
Previous report
The expected benefits from the Midwest Pipeline Acquisition may not be realized if our estimates of the potential revenues associated with the interests acquired by us in the Midwest Pipeline Acquisition are materially inaccurate or if we failed to identify operating problems or liabilities associated with the underlying pipeline systems prior to closing. The accuracy of our estimates of the potential cash flows generated by the acquired assets is inherently uncertain. Although we conducted due diligence in connection with the Midwest Pipeline Acquisition, DT Midstream cannot assure investors that this diligence surfaced all material issues that may arise as a result of the Midwest Pipeline Acquisition. Additionally, unexpected risks may arise, and previously known risks may materialize in a manner not consistent with our preliminary risk analysis. If problems are identified in the future, the purchase agreement for the Midwest Pipeline Acquisition provides for limited recourse against the seller. If any of these risks or unanticipated liabilities or costs were to materialize, any desired benefits of the Midwest Pipeline Acquisition may not be fully realized, if at all, and our future financial performance, results of operations and cash available for distribution could be negatively impacted.
Reworded paragraphs (24)
Previous wording
In addition, demand for our services is dependent on the demand for gas in the markets we serve. Alternative fuel sources such as electricity, coal, fuel oils, or nuclear energy, as well as technological advances and renewable sources of energy, could reduce demand for natural gas in our markets and have an adverse effect on our business. Government imposed constraints, such as changes in regulatory policy and permitting and environmental limitations, could also artificially limit new demand for natural gas, which could materially adversely affect our business, financial condition and results of operations.
Current wording
In addition, demand for our services is dependent on the demand for gas in the markets we serve. Alternative fuel sources such as coal, fuel oils, or nuclear energy, as well as technological advances and renewable sources of energy, could reduce demand for natural gas in our markets and have an adverse effect on our business. Government imposed constraints, such as changes in regulatory policy and permitting and environmental limitations, could also artificially limit new demand for natural gas, which could materially adversely affect our business, financial condition and results of operations.
Previous wording
Expand Energy accounted for approximately 56% of our operating revenues for the year ended December 31, 2024. Our operating revenues do not include revenues of unconsolidated joint ventures accounted for as equity method investments. The loss of all or even a portion of the contracted volumes of this or other customers, the failure to extend or replace customer contracts, or the extension or replacement of customer contracts on less favorable terms, as a result of competition, creditworthiness, reduced natural gas production or otherwise, could materially adversely affect our business, financial condition and results of operations.
Current wording
Expand Energy accounted for approximately 45% of our operating revenues for the year ended December 31, 2025. Our operating revenues do not include revenues of unconsolidated joint ventures accounted for as equity method investments. The loss of all or even a portion of the contracted volumes of this or other customers, the failure to extend or replace customer contracts, or the extension or replacement of customer contracts on less favorable terms, as a result of competition, creditworthiness, reduced natural gas production or otherwise, could materially adversely affect our business, financial condition and results of operations.
Previous wording
and Gulf Coast regions and a significant number of intrastate pipelines. Because we do not own these third-party pipelines or facilities, their continuing operation is not within our control. If these pipeline connections become unavailable for current or future volumes of natural gas due to testing, turnarounds, repairs, maintenance, damage, reduced operating pressure, lack of capacity, regulatory requirements or any other reason, our ability to operate efficiently and continue shipping natural gas to end markets could be restricted, thereby reducing our revenues. Any temporary or permanent interruption at any key pipeline interconnect or other downstream facility utilized to move our customers’ product to their end destination that causes a material reduction in volumes transported on our pipelines could materially adversely affect our business, financial condition and results of operations.
Current wording
We depend upon third-party pipelines and other facilities that provide receipt and delivery options to and from our assets. For example, our pipelines interconnect with multiple interstate pipelines in the Midwestern U.S., Canada, Northeastern U.S. and Gulf Coast regions and a significant number of intrastate pipelines. Because we do not own these third-party pipelines or facilities, their continuing operation is not within our control. If these pipeline connections become unavailable for current or future volumes of natural gas due to testing, turnarounds, repairs, maintenance, damage, reduced operating pressure, lack of capacity, regulatory requirements or any other reason, our ability to operate efficiently and continue shipping natural gas to end markets could be restricted, thereby reducing our revenues. Any temporary or permanent interruption at any key pipeline interconnect or other downstream facility utilized to move our customers’ product to their end destination that causes a material reduction in volumes transported on our pipelines could materially adversely affect our business, financial condition and results of operations.
Previous wording
Our operations, our customers’ operations and other interconnected pipelines and facilities are subject to many operational hazards, including (i) damage to pipelines, facilities, equipment, environmental controls and surrounding properties, including damage resulting from landslide and ground movement slippage; (ii) leaks, migrations or losses of natural gas and other hydrocarbons, water, brine, other fluids and hazardous chemicals that we handle in our treating and other operations; (iii) inadvertent damage from third parties, including from construction, farm and utility equipment; (iv) uncontrolled releases of natural gas and other hydrocarbons; (v) ruptures, fires and explosions; (vi) product and waste spills and unauthorized discharges of products, wastes and other pollutants; (vii) pipeline freeze-offs due to cold weather; (viii) operator error; (ix) aging infrastructure, mechanical or other performance problems; (x) damages to and loss of availability of interconnecting third-party pipelines, railroads and terminals; (xi) disruption or failure of information technology systems and network infrastructure; (xii) floods; (xiii) severe weather; (xiv) lightning and (xv) terrorism.
Current wording
Our operations, our customers’ operations and other interconnected pipelines and facilities are subject to many operational hazards, including (i) damage to pipelines, facilities, equipment, environmental controls and surrounding properties, including damage resulting from landslide and ground movement slippage; (ii) leaks, migrations or losses of natural gas and other hydrocarbons, water, brine, other fluids and hazardous chemicals that we handle in our treating and other operations; (iii) inadvertent damage from third parties, including from construction, farm and utility equipment; (iv) uncontrolled releases of natural gas and other hydrocarbons; (v) ruptures, fires and explosions; (vi) product and waste spills and unauthorized discharges of products, wastes and other pollutants; (vii) pipeline freeze-offs or production curtailments due to cold weather; (viii) operator error; (ix) aging infrastructure, mechanical or other performance problems; (x) damages to and loss of availability of interconnecting third-party pipelines, railroads and terminals; (xi) disruption or failure of information technology systems and network infrastructure; (xii) floods; (xiii) severe weather; (xiv) lightning and (xv) terrorism.
Previous wording
Expansion projects or acquisitions that are expected to be accretive, including our Midwest Pipeline Acquisition, may nevertheless reduce our cash from operations and could materially adversely affect our business, financial condition and results of operations.
Current wording
Expansion projects that are expected to be accretive, may nevertheless reduce our cash from operations and could materially adversely affect our business, financial condition and results of operations.
Previous wording
We regularly review our portfolio of businesses and pursue growth through expansions and acquisitions that we expect to be accretive, and we believe the Midwest Pipeline Acquisition will be accretive to our distributive cash flow, improve our business profile, and add to the backlog of future growth opportunities. However, even if we complete expansion projects or acquisitions that we believe will be accretive, these expansion projects or acquisitions may nevertheless reduce our cash from operations and could materially adversely affect our business, financial condition and results of operations. Any expansion project or acquisition involves potential risks, including, among other things: (i) service interruptions or increased downtime associated with our projects; (ii) a decrease in our liquidity; (iii) an inability to complete expansion projects or acquisitions on schedule or within the budgeted cost; (iv) the assumption of unknown liabilities when making acquisitions for which we are not indemnified or for which our indemnity is inadequate; (v) the diversion of our management’s attention from other business concerns; (vi) mistaken assumptions about the overall costs of equity or debt, demand for our services, supply volumes, reserves, revenues and costs, synergies and potential growth; (vii) an inability to secure adequate customer commitments to use the expanded or acquired systems or facilities; (viii) an inability to successfully integrate the businesses we build or acquire; (ix) an inability to receive cash flows from a newly built asset until it is operational; and (x) unforeseen difficulties operating in new service areas or new geographic areas.
Current wording
We regularly review our portfolio of businesses and pursue growth through expansion that we expect to be accretive to our distributive cash flow, improve our business profile, and add to the backlog of future growth opportunities. However, even if we complete expansion projects that we believe will be accretive, these expansion projects may nevertheless reduce our cash from operations and could materially adversely affect our business, financial condition and results of operations. Any expansion project involves potential risks, including, among other things: (i) service interruptions or increased downtime associated with our projects; (ii) a decrease in our liquidity; (iii) an inability to complete expansion projects on schedule or within the budgeted cost; (iv) the assumption of unknown liabilities when undertaking expansion projects for which we are not indemnified or for which our indemnity is inadequate; (v) the diversion of our management’s attention from other business concerns; (vi) mistaken assumptions about the overall costs of equity or debt, demand for our services, supply volumes, reserves, revenues and costs, synergies and potential growth; (vii) an inability to secure adequate customer commitments to use the expanded or acquired systems or facilities; (viii) an inability to successfully integrate the businesses we build; (ix) an inability to receive cash flows from a newly built asset until it is operational; and (x) unforeseen difficulties operating in new service areas or new geographic areas.
Previous wording
Certain of our internal growth projects may require regulatory approval from U.S. federal and state authorities and Canadian authorities prior to construction. The approval process for storage and transportation projects located in the Northeast has become increasingly challenging, due in part to state and local concerns related to unregulated exploration and production and gathering activities in new production areas, including the Marcellus/Utica formations. In addition, FERC could modify its policy governing the issuance of interstate natural gas pipeline authorizations, in part to address concerns about climate change. It is not clear at this time whether FERC will modify its policy governing the issuance of certificates and, if so, what those modifications will be. Policy and regulatory changes relating to the implementation of NEPA may increase scrutiny of environmental impacts associated with our projects. Authorizations required for our projects under existing or future agency policies may not be granted or, if granted, such authorization may include burdensome or expensive conditions.
Current wording
Certain of our internal growth projects may require regulatory approval from U.S. federal and state authorities and Canadian authorities prior to construction. The approval process for storage and transportation projects located in the Northeast has become increasingly challenging, as such projects in this region tend to face heightened opposition and permitting scrutiny. In addition, FERC has periodically considered to, and could in the future revisit, its policy governing the issuance of interstate natural gas pipeline authorizations, in part to address concerns about climate change. It is not clear at this time whether FERC will modify its policy governing the issuance of certificates and, if so, what those modifications will be. Policy and regulatory changes relating to the implementation of NEPA may increase scrutiny of environmental impacts associated with our projects. Authorizations required for our projects under existing or future agency policies may not be granted or, if granted, such authorization may include burdensome or expensive conditions.
Previous wording
As of December 31, 2024, we had outstanding approximately $2.1 billion of senior notes, $1.25 billion of senior secured notes and $150 million of borrowings under our Revolving Credit Facility. Our existing and future level of debt could have important consequences to us, including the following: (i) our ability to obtain additional financing, if necessary, for working capital, capital expenditures, acquisitions or other purposes may be impaired, or such financing may not be available on favorable terms; (ii) the funds that we have available for operations and payment of dividends to shareholders will be reduced by that portion of our cash flow required to make principal and interest payments on outstanding debt; and (iii) our debt level could make us more vulnerable to competitive pressures than competitors with less debt or to a downturn in our business or the economy generally.
Current wording
As of December 31, 2025, we had outstanding approximately $3.35 billion of senior notes and no borrowings under our Revolving Credit Facility. Our existing and future level of debt could have important consequences to us, including the following: (i) our ability to obtain additional financing, if necessary, for working capital, capital expenditures, acquisitions or other purposes may be impaired, or such financing may not be available on favorable terms; (ii) the funds that we have available for operations and payment of dividends to shareholders will be reduced by that portion of our cash flow required to make principal and interest payments on outstanding debt; and (iii) our debt level could make us more vulnerable to competitive pressures than competitors with less debt or to a downturn in our business or the economy generally.
Previous wording
Borrowings under our Revolving Credit Facility have, and we may in the future enter into debt instruments with, variable interest rates. From early 2022 through late 2023, in response to growing signs of inflation, the Federal Reserve increased interest rates rapidly. Although the Federal Reserve reduced the federal funds rate in late 2024, we are unable to predict changes in interest rates which are affected by factors beyond our control. Increases in interest rates on variable rate debt would increase our interest expense unless we make arrangements to hedge the risk of rising interest rates. In addition, interest rates under our Revolving Credit Facility will, and interest rates under future debt instruments we enter into may, increase depending on our leverage ratio levels or, under certain circumstances, our public debt ratings. These increased costs could reduce our profitability, reduce our credit availability, limit our ability to pursue growth opportunities, impair our ability to meet our debt obligations, increase the cost of financing, place us at a competitive disadvantage and materially adversely affect our business, financial condition, cash flows and results of operations. An increase in interest rates also could limit our ability to refinance existing debt upon maturity or cause us to pay higher rates upon refinancing.
Current wording
Borrowings under our Revolving Credit Facility have, and we may in the future enter into debt instruments with, variable interest rates. We are unable to predict changes in interest rates which are affected by factors beyond our control. Increases in interest rates on variable rate debt would increase our interest expense unless we make arrangements to hedge the risk of rising interest rates. In addition, interest rates under our Revolving Credit Facility will, and interest rates under future debt instruments we enter into may, increase depending on our leverage ratio levels or, under certain circumstances, our public debt ratings. These increased costs could reduce our profitability, reduce our credit availability, limit our ability to pursue growth opportunities, impair our ability to meet our debt obligations, increase the cost of financing, place us at a competitive disadvantage and materially adversely affect our business, financial condition, cash flows and results of operations. An increase in interest rates also could limit our ability to refinance existing debt upon maturity or cause us to pay higher rates upon refinancing.
Previous wording
Our existing Revolving Credit Facility and the indenture governing our senior notes limit our ability to, and any future credit facility or indenture we may enter into might limit our ability to, among other things: (i) incur additional indebtedness or guarantee other indebtedness; (ii) grant liens or make certain negative pledges; (iii) make certain dividends or investments; (iv) engage in transactions with affiliates; (v) transfer, sell or otherwise dispose of all or substantially all of our assets; or (vi) enter into a merger, consolidate, liquidate, wind up or dissolve.
Current wording
Our existing Revolving Credit Facility and the indenture governing our senior notes limit our ability to, and any future credit facility or indenture we may enter into might limit our ability to, among other things: (i) incur additional indebtedness or guarantee other indebtedness; (ii) grant liens or make certain negative pledges; (iii) make certain dividends or investments; (iv) engage in transactions with affiliates; (v) transfer, sell or otherwise dispose of all or substantially all of our assets; or (vi) enter into a merger, consolidate, liquidate, wind up or dissolve. Upon the occurrence of the Investment Grade Event, certain negative covenants in our existing senior notes were terminated and the negative covenants in our Revolving Credit Facility were automatically amended to create additional flexibility for DT Midstream and its subsidiaries such that (i) the indebtedness negative covenant remains applicable solely to restrict DT Midstream’s restricted subsidiaries, (ii) the former restriction related to prepayments of junior indebtedness has fallen away, and (iii) the remaining negative covenants, including those related to liens, mergers, consolidations, liquidations or dissolutions, sales, transfers or other dispositions, investments, acquisitions, loans or advances, dividends and distributions or repurchases of capital stock, entering into agreements that limit the ability of the restricted subsidiaries to make distributions to DT Midstream, and transactions with affiliates, were amended automatically to provide for flexibility customary for investment grade companies.
Previous wording
Furthermore, our existing Revolving Credit Facility contains, or any future credit facility or indenture we may enter into may also contain, covenants requiring us to maintain certain financial ratios and tests. If we violate any of the restrictions, covenants, ratios or tests in the applicable credit facility or indentures, the lenders thereunder will be able to accelerate the maturity of all borrowings under the credit facility and demand repayment of amounts outstanding, and our lenders’ commitment to make further loans to us may terminate. We might not have, or be able to obtain, sufficient funds to make these accelerated payments. Additionally, we have recently entered into amendments to our Revolving Credit Facility that, among other things, permitted us to incur certain customary bridge loans, extended the maturity date and implemented customary "limited condition transactions provisions", enabling us to enter into future acquisitions and other transactions with the conditionality to the consummation thereof subject only to customary "SunGard" conditions, which provide additional financing certainty and reduce the number of conditions required. Any subsequent amendment to the terms of our Revolving Credit Facility, replacement of our Revolving Credit Facility or any new indebtedness could have similar or greater restrictions.
Current wording
Furthermore, our existing Revolving Credit Facility contains, or any future credit facility or indenture we may enter into may also contain, covenants requiring us to maintain certain financial ratios and tests. If we violate any of the restrictions, covenants, ratios or tests in the applicable credit facility or indentures, the lenders thereunder will be able to accelerate the maturity of all borrowings under the credit facility and demand repayment of amounts outstanding, and our lenders’ commitment to make further loans to us may terminate. We might not have, or be able to obtain, sufficient funds to make these accelerated payments. Any subsequent amendment to the terms of our Revolving Credit Facility, replacement of our Revolving Credit Facility or any new indebtedness could have similar or greater restrictions. For more information, see the section entitled "Management’s Discussion and Analysis of Financial Condition and Results of Operations—Capital Resources and Liquidity".
Previous wording
Inflationary pressure could adversely impact our profitability. Inflation in the United States has recently declined; however, we are unable to predict changes in inflation which is affected by factors beyond our control, including the recent imposition of tariffs by the U.S. and certain of its trading partners. Rising inflation in the future could have an adverse impact on our operating costs, which have historically increased with the market during inflationary periods and may continue to increase as a result of inflationary impacts on product costs, labor rates, and domestic transportation. We may not be able to fully offset these inflation increases by raising prices for our services, which could result in downward pressure on our results of operations.
Current wording
Inflationary pressure could adversely impact our profitability. Inflation in the United States has recently declined; however, we are unable to predict changes in inflation which is affected by factors beyond our control, including the recent imposition of tariffs by the U.S. and certain of its trading partners. Rising inflation in the future could have an adverse impact on our operating and capital costs, which have historically increased with the market during inflationary periods and may continue to increase as a result of inflationary impacts on product costs, labor rates, and domestic transportation. We may not be able to fully offset these inflation increases by raising prices for our services, which could materially adversely affect our business, financial condition and results of operations.
Previous wording
If our intangible assets or goodwill become impaired, we may be required to record a charge to earnings.
Current wording
If our intangible assets, goodwill, property, plant and/or equipment become impaired, we may be required to record a charge to earnings.
Previous wording
We annually review the carrying value of goodwill associated with business combinations we have made for impairment. Our intangible assets and goodwill are also reviewed whenever events or circumstances indicate that the carrying value of these assets may not be recoverable. Factors that may be considered for purposes of this analysis include a decline in stock price and market capitalization, slower industry growth rates, changes in cost of capital or material changes with customers or contracts that could negatively impact future cash flows. We cannot predict the timing, strength or duration of such changes or any subsequent recovery. If the carrying value of any of our intangible assets or goodwill is determined to be not recoverable, we may take a non-cash impairment charge, which could materially adversely affect our business, financial condition and results of operations.
Current wording
We annually review the carrying value of goodwill associated with business combinations we have made for impairment. Our intangible assets, goodwill, property, plant, and equipment are also reviewed whenever events or circumstances indicate that the carrying value of these assets may not be recoverable. Factors that may be considered for purposes of this analysis include a decline in stock price and market capitalization, slower industry growth rates, changes in cost of capital or material changes with customers or contracts that could negatively impact future cash flows. We cannot predict the timing, strength or duration of such changes or any subsequent recovery. If the carrying value of any of our intangible assets, goodwill, property, plant, and/or equipment is determined to be not recoverable, we may take a non-cash impairment charge, which could materially adversely affect our business, financial condition and results of operations.
Previous wording
The U.S. Congress has from time to time considered the adoption of legislation to provide for U.S. federal regulation of hydraulic fracturing, while a growing number of states, including some of those in which we operate, have adopted, and other states are considering adopting, regulations that could impose more stringent disclosure and/or well construction requirements on hydraulic fracturing operations. Some states, such as Pennsylvania, have imposed fees on the drilling of new unconventional oil and gas wells. Also, certain local governments have adopted, and additional local governments may further adopt, ordinances within their jurisdictions regulating the time, place and manner of drilling activities in general or hydraulic fracturing activities in particular. Further, several U.S. federal governmental agencies, including the EPA and the U.S. Department of Energy, have conducted or are conducting reviews and studies on the environmental aspects of hydraulic fracturing. These completed, ongoing or proposed studies on the environmental aspects of hydraulic fracturing, depending on their degree of pursuit and any meaningful results obtained, could spur initiatives to further regulate hydraulic fracturing or other regulatory mechanisms.
Current wording
The U.S. Congress has from time to time considered the adoption of legislation to provide for U.S. federal regulation of hydraulic fracturing, while a growing number of states, including some of those in which we operate, have adopted, and other states are considering adopting, regulations that could impose more stringent disclosure and/or well construction requirements on hydraulic fracturing operations. Some states, such as Pennsylvania, have imposed fees on the drilling of new unconventional oil and gas wells. Also, certain local governments have adopted, and additional local governments may further adopt, ordinances within their jurisdictions regulating the time, place and manner of drilling activities in general or hydraulic fracturing activities in particular. Further, several U.S. federal governmental agencies, including the EPA and the U.S. Department of Energy, have conducted or are conducting reviews and studies on the environmental aspects of hydraulic fracturing. These completed, ongoing or proposed studies on the environmental aspects of hydraulic fracturing, depending on their degree of pursuit and any meaningful results obtained, could spur initiatives to further regulate hydraulic fracturing or other regulatory mechanisms aimed at imposing more stringent requirements on hydraulic fracturing.
Previous wording
Certain state and U.S. federal regulatory agencies are also focused on a possible connection between hydraulic fracturing-related activities and the increased occurrence of seismic activity. In a few instances, operators of injection disposal wells in the vicinity of seismic events have been ordered to reduce injection volumes or suspend operations. These developments could result in additional regulation and restrictions on the use of injection disposal wells and hydraulic fracturing. The adoption of new laws, regulations or ordinances at the U.S. federal, state or local levels imposing more stringent restrictions on hydraulic fracturing could make it more difficult for our customers to complete natural gas wells, increase customers’ costs of compliance and doing business, and otherwise adversely affect the hydraulic fracturing services they perform, which could negatively impact demand for our services.
Current wording
Certain state and U.S. federal regulatory agencies have focused on, or are focused on a possible connection between hydraulic fracturing-related activities and the increased occurrence of seismic activity. In a few instances, operators of injection disposal wells in the vicinity of seismic events have been ordered to reduce injection volumes or suspend operations. These developments could result in additional regulation and restrictions on the use of injection disposal wells and hydraulic fracturing. The adoption of new laws, regulations or ordinances at the U.S. federal, state or local levels imposing more stringent restrictions on hydraulic fracturing could make it more difficult for our customers to complete natural gas wells, increase customers’ costs of compliance and doing business, and otherwise adversely affect the hydraulic fracturing services they perform, which could negatively impact demand for our services.
Previous wording
Moreover, environmental laws, regulations and enforcement policies tend to become more stringent over time. New, modified or stricter environmental laws, regulations or enforcement policies, including climate change laws and regulations restricting emissions of GHGs, could be implemented that significantly increase our compliance costs, pollution mitigation costs, or the cost of any necessary remediation of environmental contamination. For example, in April 2020 the U.S. District Court for the District of Montana issued a broad order vacating NWP 12, a general permit issued by the U.S. Army Corps of Engineers relied upon by industry for expedited permitting of oil and gas pipelines, for alleged failure to comply with consultation requirements under the ESA. While the U.S. Supreme Court ultimately stayed the vacatur of NWP 12, the District Court’s action temporarily caused uncertainty and disruption in the industry. A challenge to the 2021 reissuance of NWP 12 (re-issued on a five-year schedule) is pending in the federal district court in Washington, D.C. after the case was transferred from federal court in Montana. The NWP 12 reissuance was among the agency actions listed for review in accordance with the January 20, 2021 Executive Order ("Protecting Public Health and the Environment and Restoring Science to Tackle the Climate Crisis"); and, in 2022 the U.S. Army Corps of Engineers sought public comment on the potential to revise NWP 12 in response to objections to the use of NWP 12 related, primarily, to environmental justice, public participation, and climate change. The prior presidential administration did not take final action to modify the current version of NWP 12 before its expiration and reissuance in March 2026. While a new version might be proposed in early 2025, the position of the new presidential administration is not yet clear. Any disruption in our ability to obtain coverage under NWP 12 or other general permits may result in increased costs and project delays if we are forced to seek individual permits from the U.S. Army Corps of Engineers. Our compliance with changing legal requirements could result in our incurring significant additional expenses and operating restrictions with respect to our operations, which may not be fully recoverable from customers and, thus, could materially adversely affect our business, financial condition and results of operations.
Current wording
Moreover, environmental laws, regulations and enforcement policies tend to become more stringent over time. New, modified or stricter environmental laws, regulations or enforcement policies, including climate change laws and regulations restricting emissions of GHGs, could be implemented that significantly increase our compliance costs, pollution mitigation costs, or the cost of any necessary remediation of environmental contamination. For example, in April 2020 the U.S. District Court for the District of Montana issued a broad order vacating NWP 12, a general permit issued by the U.S. Army Corps of Engineers relied upon by industry for expedited permitting of oil and gas pipelines, for alleged failure to comply with consultation requirements under the ESA. While the U.S. Supreme Court ultimately stayed the vacatur of NWP 12, the District Court’s action temporarily caused uncertainty and disruption in the industry. A challenge to the 2021 reissuance of NWP 12 (re-issued on a five-year schedule) is pending in the federal district court in Washington, D.C. after the case was transferred from federal court in Montana. The NWP 12 reissuance was among the agency actions listed for review in accordance with the January 20, 2021 Executive Order ("Protecting Public Health and the Environment and Restoring Science to Tackle the Climate Crisis"); and, in 2022 the U.S. Army Corps of Engineers sought public comment on the potential to revise NWP 12 in response to objections to the use of NWP 12 related, primarily, to environmental justice, public participation, and climate change. The prior presidential administration did not take final action to modify the current version of NWP 12 before its expiration and reissuance in March 2026. On June 18, 2025, the U.S. Army Corps of Engineers published a proposal to reissue multiple nationwide permits, including NWP 12, but a final rule reissuing NWP 12 has not yet been published. Any disruption in our ability to obtain coverage under NWP 12 or other general permits may result in increased costs and project delays if we are forced to seek individual permits from the U.S. Army Corps of Engineers. Our compliance with changing legal requirements could result in our incurring significant additional expenses and operating restrictions with respect to our operations, which may not be fully recoverable from customers and, thus, could materially adversely affect our business, financial condition and results of operations.
Previous wording
Our customers may similarly incur increased costs or restrictions that may limit or decrease those customers’ operations and have an indirect material adverse effect on our business, financial condition and results of operations. For example, an Executive Order was issued on January 27, 2021 ("Tackling the Climate Crisis at Home and Abroad") that included provisions directing the Secretary of the Interior to pause approval of new oil and natural gas leases on public lands pending completion of a comprehensive review and reconsideration of U.S. federal oil and gas permitting and leasing practices and directing the heads of U.S. federal agencies to take steps to ensure that, to the extent consistent with applicable law, federal funding is not directly subsidizing fossil fuels. During the course of the prior presidential administration, litigation over the “pause” ensued. While lease sales ultimately continued, they have been scaled back and are subject to challenge by environmental groups. Over the past four years, the Department of the Interior has issued various regulations, with portions implementing the provisions of the Inflation Reduction Act pertaining to oil and gas leasing. These regulations include the so-called Waste Prevention Rule, which would strictly limit releases of methane from oil and gas drilling on public lands. This could lead to increased costs for producers and increased need for pipeline capacity as operators would be required to have a plan to reduce venting and flaring as a predicate to approval of production of federal minerals. The new presidential administration may return to a robust oil and gas leasing program and re-visit the Waste Prevention Rule as well as a number of other rules that may impact our customers. While the prior presidential administration had placed a temporary pause on the authorization of new LNG terminals, impacting LNG projects in various stages of planning and review, the new presidential administration has lifted this pause and the Department of Energy has been directed to review LNG export applications as expeditiously as possible. Moreover, a number of state and regional legal initiatives, including climate change laws, have emerged in recent years that seek to reduce GHGs emissions and the EPA, based on its findings that emissions of GHGs present a danger to public health and the environment, has adopted regulations under existing provisions of the U.S. federal Clean Air Act that, among other things, restrict emissions of GHGs and require the monitoring and reporting of GHG emissions from specified onshore and offshore production sources and onshore treating sources in the U.S. on an annual basis. In addition, some communities and cities have banned new natural gas hook-ups or are expected to enact similar electrification measures in response to climate change concerns. Any new U.S. federal laws restricting emissions of GHGs, such as a carbon tax, from customer operations, or that limit the…
Excerpt shortened here; the source contains the full paragraph.
Current wording
Our customers may similarly incur increased costs or restrictions that may limit or decrease those customers’ operations and have an indirect material adverse effect on our business, financial condition and results of operations. During the course of the prior presidential administration, litigation over the “pause” ensued. While lease sales ultimately continued, they have been scaled back and are subject to challenge by environmental groups. If key provisions of the Waste Prevention Rule or similar restrictions become effective, they could lead to increased costs for producers and increased need for pipeline capacity as operators would be required to have a plan to reduce venting and flaring as a predicate to approval of production of federal minerals. While the prior presidential administration had placed a temporary pause on the authorization of new LNG terminals, impacting LNG projects in various stages of planning and review, the current presidential administration has lifted this pause and the Department of Energy has been directed to review LNG export applications as expeditiously as possible. Moreover, a number of state and regional legal initiatives, including climate change laws, have emerged in recent years that seek to reduce GHGs emissions and the EPA, based on its findings that emissions of GHGs cause, or contribute to, air pollution which may reasonably be anticipated to endanger public health or welfare, has adopted regulations under existing provisions of the U.S. federal Clean Air Act that, among other things, restrict emissions of GHGs and require the monitoring and reporting of GHG emissions from specified onshore and offshore production sources and onshore treating sources in the U.S. on an annual basis. In addition, some communities and cities have banned new natural gas hook-ups or are expected to enact similar electrification measures in response to climate change concerns. Any new U.S. federal laws restricting emissions of GHGs, such as a carbon tax, from customer operations, or that limit the growth of pipelines and LNG exports from the U.S., could delay or curtail their activities and, in turn, adversely affect our business, financial condition and results of operations.
Previous wording
Any changes to the policies of FERC or state regulatory authorities regarding the natural gas industry may have an impact on us, including FERC’s approach as it considers policies affecting the establishment and modification of interstate pipeline rates and terms and conditions of service, policies that may affect rights of access to natural gas transmission capacity and policies that govern FERC's authorization of new or expanded pipeline and storage infrastructure. FERC is currently considering modifications to its long-standing Certificate Policy Statement that currently governs its granting of certificate authority for the construction of proposed interstate natural gas infrastructure, whether new or expanded. In addition, future U.S. federal, state or local legislation or regulations under which we will operate our assets could materially adversely affect our business, financial condition and results of operations. Guardian, Midwestern and Viking are subject to rate regulation and accounting requirements of the FERC. The regulated operations of each of these subsidiaries have rates that are (i) established by independent, third-party regulators, (ii) set at levels that will recover our costs when considering the demand and competition for our services and (iii) collectible from our customers. Accordingly, we follow the accounting for regulated operations as defined in ASC 980, Regulated Operations for these pipelines, which results in differences in the application of GAAP between our regulated and non-regulated businesses. Under ASC 980, our regulated operations are required to record regulatory assets and liabilities for certain transactions that would have been treated as revenue or expense in non-regulated businesses. Future regulatory changes could result in changes in the amounts of regulatory assets and liabilities or the discontinuance of this accounting treatment for regulatory assets and liabilities and may require the write-off of the portion of any regulatory asset or liability that is no longer probable of recovery through regulated rates. Actions by regulatory authorities could also have an effect on the amounts we charge to and collect from our customers. Any changes to ASC 980 or on the determination of whether Guardian, Midwestern or Viking will continue to meet the criteria of ASC 980 could materially adversely affect our business, financial condition and results of operations.
Current wording
Any changes to the policies of FERC or state regulatory authorities regarding the natural gas industry may have an impact on us, including FERC’s approach as it considers policies affecting the establishment and modification of interstate pipeline rates and terms and conditions of service, policies that may affect rights of access to natural gas transmission capacity and policies that govern FERC's authorization of new or expanded pipeline and storage infrastructure. In addition, future U.S. federal, state or local legislation or regulations under which we will operate our assets could materially adversely affect our business, financial condition and results of operations. Guardian, Midwestern and Viking are subject to rate regulation and accounting requirements of FERC. The regulated operations of each of these subsidiaries have rates that are (i) established by independent, third-party regulators, (ii) set at levels that will recover our costs when considering the demand and competition for our services and (iii) charged to and collectible from our customers. Accordingly, we follow the accounting for regulated operations as defined in ASC 980 for these pipelines, which results in differences in the application of GAAP between our regulated and non-regulated businesses. Under ASC 980, our regulated operations are required to record regulatory assets and liabilities for certain transactions that would have been treated as revenue or expense in non-regulated businesses. Future regulatory changes could result in changes in the amounts of regulatory assets and liabilities or the discontinuance of this accounting treatment for regulatory assets and liabilities and may require the write-off of the portion of any regulatory asset or liability that is no longer probable of recovery through regulated rates. Actions by regulatory authorities could also have an effect on the amounts we charge to and collect from our customers. Any changes to ASC 980 or on the determination of whether Guardian, Midwestern or Viking will continue to meet the criteria of ASC 980 could materially adversely affect our business, financial condition and results of operations.
Previous wording
The U.S. Department of Transportation, through PHMSA, has adopted regulations requiring pipeline operators to comply with a number of operational and maintenance requirements, including to continuously survey their assets, conduct leakage surveys, and repair certain conditions. Additionally, these requirements require operators to develop integrity management programs for transportation pipelines located where a leak or rupture could do the most harm in a high consequence area, referred to as an HCA. The regulations require operators to: (i) perform ongoing assessments of pipeline integrity; (ii) identify and characterize applicable threats to pipeline segments that could impact an HCA; (iii) improve data collection, integration and analysis; (iv) repair and remediate the pipeline as necessary; and (v) implement preventive and mitigating actions. PHMSA regulations also require assessment and repairs outside of HCAs in what are referred to as moderate consequence areas or MCAs.
Current wording
The U.S. Department of Transportation, through PHMSA, has adopted regulations requiring pipeline operators to comply with a number of operational and maintenance requirements, including to continuously survey pipeline assets, conduct leakage surveys, and repair certain conditions. Additionally, these requirements require operators to develop integrity management programs for transportation pipelines located where a leak or rupture could do the most harm in an HCA. The regulations require operators to: (i) perform ongoing assessments of pipeline integrity; (ii) identify and characterize applicable threats to pipeline segments that could impact an HCA; (iii) improve data collection, integration and analysis; (iv) repair and remediate the pipeline as necessary; and (v) implement preventive and mitigating actions. PHMSA regulations also require assessment and repairs outside of HCAs in MCAs.
Previous wording
Certain portions of our systems, particularly our Northern Michigan assets and our storage assets, have been in operation for many years, with some portions being more than 50 years old. In some cases, certain portions may have been in service for many years prior to our purchase of the relevant systems or have been operated by third parties not under our control and consequently, there may be historical occurrences or latent issues regarding our pipeline systems that management may be unaware of and that could materially adversely affect our business, financial condition and results of operations. Certain portions of our pipeline systems are located in or near areas determined to be HCAs, which are areas where a leak or rupture could have the most significant adverse consequences. The age and condition of these systems could result in increased maintenance or repair expenditures, and any downtime associated with increased maintenance and repair activities could materially reduce our revenue. If, due to their age, certain pipeline sections were to become unexpectedly unavailable for current or future volumes of natural gas because of repairs, maintenance, damage, spills or leaks, or any other reason, it could materially adversely affect our business, financial condition and results of operation.
Current wording
Certain portions of our systems, particularly our DTM Interstate Transportation, Northern Michigan, and storage assets, have been in operation for many years, with some portions being more than 50 years old. In some cases, certain portions may have been in service for many years prior to our purchase of the relevant systems or have been operated by third parties not under our control and consequently, there may be historical occurrences or latent issues regarding our pipeline systems that management may be unaware of and that could materially adversely affect our business, financial condition and results of operations. Certain portions of our pipeline systems are located in or near areas determined to be HCAs, which are areas where a leak or rupture could have the most significant adverse consequences. The age and condition of these systems could result in increased maintenance or repair expenditures, and any downtime associated with increased maintenance and repair activities could materially reduce our revenue. If, due to their age, certain pipeline sections were to become unexpectedly unavailable for current or future volumes of natural gas because of repairs, maintenance, damage, spills or leaks, or any other reason, it could materially adversely affect our business, financial condition and results of operation.
Previous wording
We published our third annual Corporate Sustainability Report in 2024, which detailed how we seek to manage our operations responsibly and ethically, as well as strategies and goals associated with reducing our environmental impact. The Corporate Sustainability Report included our policies and practices on a variety of social and ethical matters, including, but not limited to, corporate governance, environmental compliance, employee health and safety practices, human capital management and workforce inclusion and diversity. We believe providing more expansive disclosure on these topics in our Corporate Sustainability Report increases our transparency to our stakeholders and complements the disclosures regarding our contributions to sustainable development in this Form 10-K. It is possible that stakeholders may not be satisfied with our ESG practices or the speed of their adoption. We could also incur additional costs and require additional resources to monitor, report and comply with various ESG practices. Also, our failure, or perceived failure, to meet the standards set forth in the Corporate Sustainability Report could negatively impact our reputation, employee retention, and the willingness of our customers and suppliers to do business with us. Any of these consequences could materially adversely affect our business, financial condition and results of operations.
Current wording
We published our fourth annual Corporate Sustainability Report in 2025, which detailed how we seek to manage our operations responsibly and ethically, as well as strategies and goals associated with reducing our environmental impact. The Corporate Sustainability Report included our policies and practices on a variety of social and ethical matters, including, but not limited to, corporate governance, environmental compliance, employee health and safety practices, human capital management and workforce inclusion and diversity. We believe providing disclosure on these topics in our Corporate Sustainability Report increases our transparency to our stakeholders and complements the disclosures regarding our contributions to sustainable development in this Form 10-K. It is possible that stakeholders may not be satisfied with our ESG practices or the speed of their adoption. We could also incur additional costs and require additional resources to monitor, report and comply with various ESG practices. Also, our failure, or perceived failure, to meet the standards set forth in the Corporate Sustainability Report could negatively impact our reputation, employee retention, and the willingness of our customers and suppliers to do business with us. Any of these consequences could materially adversely affect our business, financial condition and results of operations.
Previous wording
Our business involves collection, uses and other processing of personal data of our employees, contractors, suppliers and service providers. Governmental standards and commonly accepted frameworks for the protection of computer-based systems and technology from cyber threats and attacks have been adopted. On November 7, 2024, the DHS's Transportation Security Administration issued a notice of proposed rulemaking seeking to imposes cybersecurity requirements on certain pipeline facilities entitled "Enhancing Surface Cyber Risk Management." New data privacy and cybersecurity laws add additional complexity, requirements, restrictions and potential legal risk, and compliance programs may require additional investment in resources, and could impact strategies and availability of previously useful data. Any failure by us or one of our technology service providers to comply with such laws and regulations could result in reputational harm, penalties, regulatory scrutiny, liabilities, legal claims, and/or mandated changes in our business practices.
Current wording
Our business involves collection, uses and other processing of personal data of our employees, contractors, suppliers and service providers. Governmental standards and commonly accepted frameworks for the protection of computer-based systems and technology from cyber threats and attacks have been adopted. On November 7, 2024, the DHS's Transportation Security Administration issued a notice of proposed rulemaking seeking to impose cybersecurity requirements on certain pipeline facilities entitled "Enhancing Surface Cyber Risk Management." The Transportation Security Administration has not provided a timeframe for issuance of a final rule and the rulemaking has been classified as a long-term action in DHS’s regulatory agenda. New data privacy and cybersecurity laws add additional complexity, requirements, restrictions and potential legal risk, and compliance programs may require additional investment in resources, and could impact strategies and availability of previously useful data. Any failure by us or one of our technology service providers to comply with such laws and regulations could result in reputational harm, penalties, regulatory scrutiny, liabilities, legal claims, and/or mandated changes in our business practices.
Previous wording
Our increasing reliance on digital technologies puts us at risk for system failures, disruptions, incidents, data breaches and cyberattacks, which could significantly impair our ability to conduct our business. Cyberattacks are becoming more sophisticated and include, but are not limited to, ransomware, credential stuffing, spear phishing, social engineering and other attempts to gain unauthorized access to data for purposes of extortion or malfeasance. The methodologies used by attackers change frequently and may not be recognized until such attack is underway. In April 2022, the cybersecurity authorities of the United States, Australia, Canada, New Zealand, and the United Kingdom issued a joint cybersecurity advisory warning of the increased risks of Russian state-sponsored cyberattacks following the international response to Russia’s invasion of Ukraine. We expect to continue to be targeted by cyberattacks as a critical infrastructure company.
Current wording
Our increasing reliance on digital technologies puts us at risk for system failures, disruptions, incidents, data breaches and cyberattacks, which could significantly impair our ability to conduct our business. Cyberattacks are becoming more sophisticated and include, but are not limited to, ransomware, credential stuffing, spear phishing, social engineering, AI-powered attacks, and other attempts to gain unauthorized access to data for purposes of extortion or malfeasance. The methodologies used by attackers change frequently and may not be recognized until such attack is underway. In April 2022, the cybersecurity authorities of the United States, Australia, Canada, New Zealand, and the United Kingdom issued a joint cybersecurity advisory warning of the increased risks of Russian state-sponsored cyberattacks following the international response to Russia’s invasion of Ukraine. We expect to continue to be targeted by cyberattacks as a critical infrastructure company.
Rearranged previous paragraphs (2)
Previous report — wording carried elsewhere
We depend upon third-party pipelines and other facilities that provide receipt and delivery options to and from our assets. For example, our pipelines interconnect with multiple interstate pipelines in the Midwestern U.S., Canada, Northeastern U.S.
Previous report — wording carried elsewhere
For more information, see the section entitled "Management’s Discussion and Analysis of Financial Condition and Results of Operations—Capital Resources and Liquidity".