Skip to main content

Leonardo DRS, Inc.

For the period ended Dec 31, 2025. Filed Feb 27, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 27, 2026

DRS$36.41+7.0%Stored close · as of Nov 9, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-03-03.

0001628280-25-009248

Item 1A. Risk Factors

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-27.

0001833756-26-000013

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 299 previous paragraphs and 300 current paragraphs.

225 unchanged; 62 reworded; 7 added; 10 removed; 2 previous and 6 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (7)

Current report

•We are subject to the U.S. government’s requirements, including the DoW’s National Industrial Security Program Operating Manual, for our facility security clearances, which are prerequisites to our ability to perform on classified contracts for the U.S. government.

Current report

•We operate under an amended and restated proxy agreement with the DoW that regulates significant areas of our governance. If we fail to comply with the amended and restated proxy agreement our classified U.S. government contracts could be terminated, which could have a material adverse impact on our business, financial condition and results of operations.

Current report

Our results of operations and cash flows are substantially affected by our mix of fixed-price, cost-plus and T&M type contracts. In particular, fixed-price contracts subject us to the risk of loss in the event of cost overruns or higher than anticipated inflation.

Current report

We are subject to the U.S. government’s requirements, including the DoW’s National Industrial Security Program Operating Manual, for our facility security clearances, which are prerequisites to our ability to perform on classified contracts for the U.S. government.

Current report

Separately, the Executive Order issued on January 7, 2026, relating to executive salaries and incentive compensation metrics applicable for defense contractors could adversely impact our ability to attract or retain executive officers.

Current report

Risks Relating to Our Ownership and Status under the Amended and Restated Proxy Agreement

Current report

We operate under an amended and restated proxy agreement with the DoW that regulates significant areas of our governance. If we fail to comply with the amended and restated proxy agreement, our classified U.S. government contracts could be terminated, which could have a material adverse impact on our business, financial condition and results of operations.
Removed paragraphs (10)

Previous report

•We are subject to the U.S. government’s requirements, including the DoD’s National Industrial Security Program Operating Manual, for our facility security clearances, which are prerequisites to our ability to perform on classified contracts for the U.S. government.

Previous report

•Changes to financial accounting standards may affect our results of operations and cause us to change our business practices.

Previous report

We are subject to the U.S. government’s requirements, including the DoD’s National Industrial Security Program Operating Manual, for our facility security clearances, which are prerequisites to our ability to perform on classified contracts for the U.S. government.

Previous report

The requirements of being a public company may strain our resources and divert management’s attention, and the increases in legal, accounting and compliance expenses may be greater than we anticipate.

Previous report

In 2022, we became a public company, and as such, have incurred, and may continue to incur, legal, accounting and other expenses that we did not incur as a private company. We are subject to the reporting requirements of the Exchange Act and are required to comply with the applicable requirements of the Sarbanes-Oxley Act of 2002 (“Sarbanes-Oxley”) and the Dodd-Frank Wall Street Reform and Consumer Protection Act, as well as the rules and regulations subsequently implemented by the SEC and the listing standards of the Nasdaq Stock Exchange (the “Nasdaq”), including changes in corporate governance practices and the establishment and maintenance of effective disclosure and financial controls. Compliance with these rules and regulations can be burdensome. Our management and other personnel need to devote a substantial amount of time to these compliance initiatives.

Previous report

Moreover, these rules and regulations will increase our historical legal and financial compliance costs and will make some activities more time-consuming and costly. We may need to hire additional accounting and financial staff, and engage outside consultants, all with appropriate public company experience and technical accounting knowledge and maintain an internal audit function, which will increase our operating expenses. We are evaluating these rules and regulations and their impact on our business and cannot predict or estimate the amount of additional costs we may incur or the timing of such costs.

Previous report

Changes to financial accounting standards may affect our results of operations and cause us to change our business practices.

Previous report

We prepare our financial statements in accordance with U.S. GAAP. These accounting principles are subject to interpretation by the Financial Accounting Standards Board, the SEC and various bodies formed to interpret and create appropriate accounting policies. A change in these accounting standards or the questioning of current reporting practices may adversely affect our reported financial results or the way we conduct our business.

Previous report

Risks Relating to Our Ownership and Status under the Proxy Agreement

Previous report

We operate under a proxy agreement with the DoD that regulates significant areas of our governance. If we fail to comply with the proxy agreement our classified U.S. government contracts could be terminated, which could have a material adverse impact on our business, financial condition and results of operations.
Reworded paragraphs (62)

Previous wording

You should carefully consider the risks and uncertainties described below, as well as other information contained in this Annual Report, including our financial statementsand the section titled “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” when evaluating our business. The risks described below are not the only ones facing us, and are not necessarily presented in the order of importance. The list of summary risk factors below should be read in conjunction with the remainder of this “Risk Factors” section and should not be relied upon as an exhaustive summary of the material risks we face. The occurrence of any of the following risks or additional risks and uncertainties not presently known to us or that we currently believe to be immaterial could materially and adversely affect our business, financial condition and results of operations. In any such case, the trading price of our common stock could decline. This Annual Report also contains forward-looking statements and estimates that involve risks and uncertainties. Our actual results could differ materially from those anticipated in the forward-looking statements as a result of a number of factors, including the risks and uncertainties described below.

Current wording

You should carefully consider the risks and uncertainties described below, as well as other information contained in this Annual Report, including the notes to our consolidated financial statementsand the section titled “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” when evaluating our business. The risks described below are not the only ones facing us, and are not necessarily presented in the order of importance. The list of summary risk factors below should be read in conjunction with the remainder of this“Risk Factors” section and should not be relied upon as an exhaustive summary of the material risks we face. The occurrence of any of the following risks or additional risks and uncertainties not presently known to us or that we currently believe to be immaterial could materially and adversely affect our business, financial condition and results of operations. In any such case, the trading price of our common stock could decline. This Annual Report also contains forward-looking statements and estimates that involve risks and uncertainties. Our actual results could differ materially from those anticipated in the forward-looking statements as a result of a number of factors, including the risks and uncertainties described below.

Previous wording

We depend on U.S. defense spending for the vast majority of our revenues. Disruptions or deteriorations in our relationships with the relevant agencies of the U.S. government could have a material adverse impact on our business, financial condition and results of operations.

Current wording

•We depend on U.S. defense spending for the vast majority of our revenues. Disruptions, including from government shutdowns, or deteriorations in our relationships with the relevant agencies of the U.S.

Previous wording

•Significant delays or reductions in appropriations for our programs and changes in U.S. government priorities and spending levels more broadly may negatively impact our business and could have a material adverse impact on our business, financial condition and results of operations.

Current wording

•Significant delays, including from government shutdowns, or reductions in appropriations for our programs and changes in U.S. government priorities and spending levels more broadly may negatively impact our business and could have a material adverse impact on our business, financial condition and results of operations.

Previous wording

•Our results of operations and cash flows are substantially affected by our mix of fixed-price, cost-plus and time-and-materials type contracts. In particular, fixed-price contracts subject us to the risk of loss in the event of cost overruns or higher than anticipated inflation.

Current wording

•Our results of operations and cash flows are substantially affected by our mix of fixed-price, cost-plus and T&M type contracts. In particular, fixed-price contracts subject us to the risk of loss in the event of cost overruns or higher than anticipated inflation.

Previous wording

•We are susceptible to a security breach, through cyber-attack, cyber-intrusion, insider threats or otherwise, and to other significant disruptions of our IT networks and related systems, or those of our customers, suppliers, vendors, subcontractors, partners, or other third parties.

Current wording

•We may be susceptible to a security breach, through cyber-attack, cyber-intrusion, insider threats or otherwise, and to other significant disruptions of our IT networks and related systems, or those of our customers, suppliers, vendors, subcontractors, partners, or other third parties.

Previous wording

We have significant operations in locations that could be materially and adversely impacted in the event of a natural disaster or other significant disruption.

Current wording

•We have significant operations in locations that could be materially and adversely impacted in the event of a natural disaster, severe weather or other significant disruption.

Previous wording

We depend on revenues from contracts and subcontracts with the U.S. government, including defense-related programs with the DoD and a broad range of programs with all branches of the U.S. military. Revenues derived directly or indirectly from contracts with the U.S. government represented approximately 79%, 80% and 84% of our total revenues for the years ended December 31, 2024, 2023, and 2022, respectively, with revenues principally derived directly or indirectly from contracts with the U.S. Navy and U.S. Army, which represented 37% and 32%, respectively, of our total revenues for the year ended December 31, 2024. Because our customer base is concentrated within the U.S. defense industry, any disruption or deterioration in our relationship with the U.S. government and its prime contractors, or any change in the U.S. government’s willingness to commit substantial resources to the continued purchase of our products, could significantly reduce our revenues and have a material adverse impact on our business, financial condition and results of operations.

Current wording

We depend on revenues from contracts and subcontracts with the U.S. government, including defense-related programs with the DoW and a broad range of programs with all branches of the U.S. military. Revenues derived directly or indirectly from contracts with the U.S. government represented approximately 80%, 79% and 80% of our total revenues for the years ended December 31, 2025, 2024, and 2023, respectively, with revenues principally derived directly or indirectly from contracts with the U.S. Navy and U.S. Army, which represented 36% and 36%, respectively, of our total revenues for the year ended December 31, 2025. Because our customer base is concentrated within the U.S. defense industry, any disruption or deterioration in our relationship with the U.S. government and its prime contractors, or any change in the U.S. government’s willingness to commit substantial resources to the continued purchase of our products, could significantly reduce our revenues and have a material adverse impact on our business, financial condition and results of operations.

Previous wording

Significant delays or reductions in appropriations for our programs and changes in U.S. government priorities and spending levels more broadly may negatively impact our business and could have a material adverse impact on our business, financial condition and results of operations.

Current wording

Significant delays, including from government shutdowns, or reductions in appropriations for our programs and changes in U.S. government priorities and spending levels more broadly may negatively impact our business and could have a material adverse impact on our business, financial condition and results of operations.

Previous wording

The availability of U.S. government funding for significant programs in which we participate may be impacted by a number of factors beyond our control including the overall federal budget, changes in spending priorities and defense spending levels, sequestration, the appropriations process, use of continuing resolutions (with restrictions, e.g., on starting new programs) and the permissible level of federal debt. These factors may also delay or adversely impact purchasing or payment decisions by our customers. In the event government funding for significant programs in which we participate becomes unavailable, or is reduced or delayed, our contract or subcontract under such programs may be terminated or adjusted by the U.S. government or the prime contractor. U.S. government priorities and spending levels have fluctuated and may continue to fluctuate over time. We cannot predict the impact on existing, follow-on, replacement or future programs from potential changes in priorities whether due to changes in defense spending levels, the threat environment, procurement strategy, military strategy and planning and/or changes in social, economic or political priorities. As the DoD budget represents the largest part of the federal discretionary budget, it is possible that the various legislative actions might exert downward pressure on defense spending, as well as other non-defense discretionary outlays. The U.S. government may also delay, modify or cancel ongoing competitive bidding processes, procurements and programs, as well as change its acquisition strategy. A significant shift in government priorities, programs or acquisition strategies could have a material adverse impact on our business, financial condition and results of operations.

Current wording

The availability of U.S. government funding for significant programs in which we participate may be impacted by a number of factors beyond our control including full or partial government shutdowns, the overall federal budget, changes in spending priorities and defense spending levels, sequestration, the appropriations process, use of continuing resolutions (with restrictions, e.g., on starting new programs) and the permissible level of federal debt. These factors may also delay or adversely impact purchasing or payment decisions by our customers. In the event government funding for significant programs in which we participate becomes unavailable, or is reduced or delayed, our contract or subcontract under such programs may be terminated or adjusted by the U.S. government or the prime contractor. U.S. government priorities and spending levels have fluctuated and may continue to fluctuate over time. We cannot predict the impact on existing, follow-on, replacement or future programs from potential changes in priorities whether due to changes in defense spending levels, the threat environment, procurement strategy, the evolution of warfare, military strategy and planning and/or changes in social, economic or political priorities. As the DoW budget represents the largest part of the federal discretionary budget, it is possible that the various legislative actions might exert downward pressure on defense spending, as well as other non-defense discretionary outlays. The U.S. government may also delay, modify or cancel ongoing competitive bidding processes, procurements and programs, as well as change its acquisition strategy. A significant shift in government priorities, programs or acquisition strategies could have a material adverse impact on our business, financial condition and results of operations.

Previous wording

Considerable uncertainty exists regarding future budget and program decisions, including U.S. defense spending priorities, what challenges budget reductions will present for the defense industry, whether annual appropriations bills for all agencies will be enacted for U.S. government fiscal year 2025 and thereafter, and how the current administration will approach those decisions through the budgeting process. Additionally, the current U.S. administration has discussed various changes to defense spending levels ranging from across-the-board percentage cuts, to a change in spending allocations in favor of new priorities, and potential increases in the top-line spending profile. It remains unclear whether and to what extent the DoD’s budget may change and, if it does, to what extent our business, financial condition and results of operations may be affected. Additionally, the U.S. government’s budget deficit and the national debt could also significantly affect government budgeting priorities and could have an adverse impact on our business, financial condition and results of operations in a number of ways, including the following:

Current wording

Considerable uncertainty exists regarding future budget and program decisions, including U.S. defense spending priorities, what challenges budget reductions will present for the defense industry, whether annual appropriations bills for all agencies will be enacted for U.S. government FY2027 and thereafter, and how the current administration will approach those decisions through the budgeting process. While the FY2026 DoW budget was approved, there remains uncertainty with regard to the U.S.

Previous wording

We generate revenue through various fixed-price, cost-plus and time-and-materials contracts. For a general description of our U.S. government contracts and subcontracts, including a discussion of revenue generated thereunder and of cost-reimbursable versus fixed-price contracts, see Part II, Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in this Annual Report.

Current wording

We generate revenue through various fixed-price, cost-plus and T&M type contracts. For a general description of our U.S. government contracts and subcontracts, including a discussion of revenue generated thereunder and of cost-reimbursable versus fixed-price contracts, see Part II, Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in this Annual Report.

Previous wording

For the years ended December 31, 2024, 2023, and 2022, approximately 84%, 84% and 87%, respectively, of our revenue was derived from fixed-price contracts. We assume financial risk on fixed-price contracts due to the risk of potential cost overruns, particularly for firm-fixed price contracts in which we assume all of the cost burden. Our failure to anticipate or address risks or technical problems, estimate costs accurately or control costs during performance will reduce our profit or cause a loss on these contracts. U.S. government contracts can expose us to potentially large losses because the U.S. government can hold us responsible for completing a project or, in certain circumstances, paying the entire cost of its replacement by another provider regardless of the size or foreseeability of any cost overruns that occur over the life of the contract. Because many of these contracts involve new technologies and applications and can last for years, unforeseen events, such as technological difficulties, engineering or development challenges, fluctuations in raw materials prices, higher than expected inflation, increased labor costs, problems with our suppliers and cost overruns, can result in the contractual price becoming less favorable or even unprofitable to us over time. Furthermore, if we do not meet contract deadlines or specifications, we may need to renegotiate contracts on less favorable terms, be forced to pay actual or liquidated damages or suffer significant losses if the customer terminates our contract. In addition, some of our contracts have provisions relating to cost controls and audit rights, and if we fail to meet the terms specified in those contracts, we may not realize their full benefits. For further information, see “—Risks Relating to Our Business—We operate in a highly regulated environment and are routinely audited and reviewed by the U.S. government and its agencies.” Our results of operations depend on our ability to maximize our earnings from our contracts. Cost overruns could have a material adverse impact on our business, financial condition and results of operations.

Current wording

For the years ended December 31, 2025, 2024, and 2023, approximately 88%, 84% and 84%, respectively, of our revenue was derived from fixed-price contracts. We assume financial risk on fixed-price contracts due to the risk of potential cost overruns, particularly for firm-fixed price contracts in which we assume all of the cost burden. Our failure to anticipate or address risks or technical problems, estimate costs accurately or control costs during performance will reduce our profit or cause a loss on these contracts. U.S. government contracts can expose us to potentially large losses because the U.S. government can hold us responsible for completing a project or, in certain circumstances, paying the entire cost of its replacement by another provider regardless of the size or foreseeability of any cost overruns that occur over the life of the contract. Because many of these contracts involve new technologies and applications and can last for years, unforeseen events, such as technological difficulties, engineering or development challenges, fluctuations in raw materials prices, higher than expected inflation, increased labor costs, problems with our suppliers and cost overruns, can result in the contractual price becoming less favorable or even unprofitable to us over time. Furthermore, if we do not meet contract deadlines or specifications, we may need to renegotiate contracts on less favorable terms, be forced to pay actual or liquidated damages or suffer significant losses if the customer terminates our contract. In addition, some of our contracts have provisions relating to cost controls and audit rights, and if we fail to meet the terms specified in those contracts, we may not realize their full benefits. For further information, see “—Risks Relating to Our Business—We operate in a highly regulated environment and are routinely audited and reviewed by the U.S. government and its agencies.” Our results of operations depend on our ability to maximize our earnings from our contracts. Cost overruns could have a material adverse impact on our business, financial condition and results of operations.

Previous wording

We require a facility security clearance to perform on classified contracts for the DoD and certain other agencies of the U.S. government. Security clearances are subject to regulations and requirements including, among others, the National Industrial Security Program Operating Manual (the “NISPOM”), which specifies the requirements for the protection of classified information released or disclosed in connection with classified U.S. government contracts. The Defense Counterintelligence and Security Agency (the “DCSA”) manages the facility clearance process under the NISPOM and conducts various facility audits and inspections throughout the lifecycle of a respective facility clearance.

Current wording

We require a facility security clearance to perform on classified contracts for the DoW and certain other agencies of the U.S. government. Security clearances are subject to regulations and requirements including, among others, the National Industrial Security Program Operating Manual (the “NISPOM”), which specifies the requirements for the protection of classified information released or disclosed in connection with classified U.S. government contracts. The Defense Counterintelligence and Security Agency (the “DCSA”) manages the facility clearance process under the NISPOM and conducts various facility audits and inspections throughout the lifecycle of a respective facility clearance.

Previous wording

Leonardo S.p.A., an Italian company listed on the Milan Stock Exchange, owns the entire share capital of US Holding which, in turn, owns approximately 72% of the voting power of our outstanding common stock. As a result, we are deemed to be under FOCI. Furthermore, the Italian state beneficially owns approximately 30.2% of Leonardo S.p.A.’s voting power (through its ownership of approximately 30.2% of the outstanding ordinary shares of Leonardo S.p.A.). In order to be permitted to maintain our security clearances and our access to classified data and to perform or bid on classified programs, we are required to mitigate FOCI through a proxy agreement, which we have done by entering into an interim proxy agreement, with the DoD. We are currently operating under an interim proxy agreement while we seek to enter into a new proxy agreement with the DoD. The terms of any new proxy agreement or other mitigation agreements could impose heightened or new restrictions, which could further impact our business operations. Proxy agreements, including ours, typically have limited duration and need to be renewed on a regular basis. For additional information on the terms and requirements of the proxy agreement, see “—Risks Relating to Our Ownership and Status under the Proxy Agreement—We operate under a proxy agreement with the DoD that regulates significant areas of our governance. If we fail to comply with the proxy agreement our classified U.S. government contracts could be terminated, which could have a material adverse impact on our business, financial condition and results of operations.”

Current wording

Leonardo S.p.A., an Italian company listed on the Milan Stock Exchange, owns the entire share capital of US Holding which, in turn, owns approximately 71% of the voting power of our outstanding common stock. As a result, we are deemed to be under FOCI. Furthermore, the Italian state beneficially owns approximately 30.2% of Leonardo S.p.A.’s voting power (through its ownership of approximately 30.2% of the outstanding ordinary shares of Leonardo S.p.A.). In order to be permitted to maintain our security clearances and our access to classified data and to perform or bid on classified programs, we are required to mitigate FOCI through a proxy agreement, which we have done by entering into an amended and restated proxy agreement, with the DoW. The terms of any new proxy agreement or other mitigation agreements could impose heightened or new restrictions, which could further impact our business operations. Proxy agreements, including ours, typically have limited duration and need to be renewed on a regular basis. For additional information on the terms and requirements of the amended and restated proxy agreement, see “—Risks Relating to Our Ownership and Status under the Amended and Restated Proxy Agreement—We operate under an amended and restated proxy agreement with the DoW that regulates significant areas of our governance. If we fail to comply with the amended and restated proxy agreement, our classified U.S. government contracts could be terminated, which could have a material adverse impact on our business, financial condition and results of operations.”

Previous wording

While we currently mitigate FOCI under the interim proxy agreement, the DoD reserves the right to terminate the proxy agreement or impose such additional security safeguards as it believes necessary in order to prevent unauthorized access to classified and controlled unclassified information and any U.S. government agency may deny or revoke our access to classified and controlled unclassified information under its jurisdiction if it considers it necessary to protect national security. Failure to maintain an agreement with the DoD regarding the appropriate FOCI mitigation arrangement could result in invalidation or termination of our facility security clearances, which in turn would mean that we would not be able to perform under current or enter into future contracts with the U.S. government requiring facility security clearances.

Current wording

While we currently mitigate FOCI under the amended and restated proxy agreement, the DoW reserves the right to terminate such proxy agreement or impose such additional security safeguards as it believes necessary in order to prevent unauthorized access to classified and controlled unclassified information and any U.S. government agency may deny or revoke our access to classified and controlled unclassified information under its jurisdiction if it considers it necessary to protect national security. Failure to maintain an agreement with the DoW regarding the appropriate FOCI mitigation arrangement could result in invalidation or termination of our facility security clearances, which in turn would mean that we would not be able to perform under current or enter into future contracts with the U.S. government requiring facility security clearances.

Previous wording

We depend on revenues from contracts and subcontracts with the U.S. government, including defense-related programs with the DoD and a broad range of programs with each of the service branches. Revenues derived directly or indirectly from contracts with the U.S. government were approximately 79%, 80% and 84% for the years ended December 31, 2024, 2023, and 2022, respectively. If we fail to maintain an agreement with the DoD regarding the appropriate FOCI mitigation arrangement or otherwise fail to comply with the NISPOM, this could have a material adverse impact on our business, financial condition and results of operations. For further information, see “—Risks Relating to Our Business—We depend on U.S. defense spending for the vast majority of our revenues. Disruptions or deteriorations in our relationships with the relevant agencies of the U.S. government could have a material adverse impact on our business, financial condition and results of operations.”

Current wording

We depend on revenues from contracts and subcontracts with the U.S. government, including defense-related programs with the DoW and a broad range of programs with each of the service branches. Revenues derived directly or indirectly from contracts with the U.S. government were approximately 80%, 79% and 80% for the years ended December 31, 2025, 2024, and 2023, respectively. If we fail to maintain an agreement with the DoW regarding the appropriate FOCI mitigation arrangement or otherwise fail to comply with the NISPOM, this could have a material adverse impact on our business, financial condition and results of operations. For further information, see “—Risks Relating to Our Business—We depend on U.S. defense spending for the vast majority of our revenues. Disruptions or deteriorations in our relationships with the relevant agencies of the U.S. government could have a material adverse impact on our business, financial condition and results of operations.”

Previous wording

Furthermore, President Trump issued an Executive Order in January 2025, which requires, in relevant part, that every Federal contract or grant award include a clause that requires the contractor or grant recipient to (1) agree that its compliance with all applicable federal anti-discrimination laws is material to the government’s payment decisions on such contract or grant for purposes of the False Claims Act, and (2) certify that it does not operate any programs promoting diversity, equity and inclusion that violate any applicable federal anti-discrimination laws. The Executive Order increases our compliance risk through an increased risk of civil False Claims Act liability if our current practices are deemed to violate the federal anti-discrimination laws.

Current wording

Furthermore, the President issued an Executive Order in January 2025, which requires, in relevant part, that every Federal contract or grant award include a clause that requires the contractor or grant recipient to (1) agree that its compliance with all applicable federal anti-discrimination laws is material to the government’s payment decisions on such contract or grant for purposes of the False Claims Act, and (2) certify that it does not operate any programs promoting diversity, equity and inclusion that violate any applicable federal anti-discrimination laws. The Executive Order increases our compliance risk through an increased risk of civil False Claims Act liability, if our current practices are deemed to violate the federal anti-discrimination laws.

Previous wording

We depend on U.S. government contracts, which are heavily regulated and subject to audit by the U.S. government and its agencies, such as the Defense Contract Audit Agency (“DCAA”), Defense Contract Management Agency, the DoD Inspector General, and others. These agencies review performance on government contracts, direct and indirect rates and pricing practices, and compliance with applicable contracting and procurement laws, regulations and standards. They also review compliance with government standards for our business systems and the adequacy of our internal control systems and policies. Negative findings related to our business and accounting systems and financial controls and capability could result in our ineligibility for future cost-plus contracts. Costs ultimately disallowed or found to be improperly allocated to a specific contract will not be reimbursed or must be refunded if already reimbursed. We record contract revenue based on costs on which we expect to be paid after any final audit. However, we do not know the outcome of any future audits and adjustments in advance, and we may be required to reduce our revenue or profits materially upon completion and final negotiation of audits. As a result of certain cost reduction initiatives across our industry, we have experienced and may continue to experience an increased number of audits and/or a lengthened period of time required to close open audits. For example, the thresholds for certain allowable costs in the U.S., including compensation costs, have been significantly reduced and the allowability of other types of costs are being challenged, debated and, in certain cases, modified, all with potentially significant financial costs to the Company.

Current wording

We depend on U.S. government contracts, which are heavily regulated and subject to audit by the U.S. government and its agencies, such as the Defense Contract Audit Agency (“DCAA”), Defense Contract Management Agency, the DoW Inspector General, and others. These agencies review performance on government contracts, direct and indirect rates and pricing practices, and compliance with applicable contracting and procurement laws, regulations and standards. They also review compliance with government standards for our business systems and the adequacy of our internal control systems and policies. Negative findings related to our business and accounting systems and financial controls and capability could result in our ineligibility for future cost-plus contracts. Costs ultimately disallowed or found to be improperly allocated to a specific contract will not be reimbursed or must be refunded if already reimbursed. We record contract revenue based on costs on which we expect to be paid after any final audit. However, we do not know the outcome of any future audits and adjustments in advance, and we may be required to reduce our revenue or profits materially upon completion and final negotiation of audits. As a result of certain cost reduction initiatives across our industry, we have experienced and may continue to experience an increased number of audits and/or a lengthened period of time required to close open audits. For example, the thresholds for certain allowable costs in the U.S., including compensation costs, have been significantly reduced and the allowability of other types of costs are being challenged, debated and, in certain cases, modified, all with potentially significant financial costs to the Company.

Previous wording

We (including our subcontractors and others with whom we do business) are also subject to, and expected to perform in compliance with, a vast array of federal, state, local and international laws, regulations and requirements related to our industry, our products and the businesses we operate. These laws and regulations include, but are not limited to, the Anti-Kickback Act, the Arms Export Control Act, including the ITAR, the Communications Act, the Defense Federal Acquisition Regulations, the EAR (which includes anti-boycott provisions), the False Claims Act, the Federal Acquisition Regulation, the FCPA, the Lobbying Disclosure Act, the Procurement Integrity Act, the Truthful Cost or Pricing Data Act, the Foreign Trade Regulations, the Foreign Investment Risk Review Modernization Act, the International Emergency Economic Powers Act, the Trading with the Enemy Act, and Executive Orders and regulations, administered by the U.S. Department of the Treasury, Office of Foreign Assets Control, as well as rules and regulations administered by the U.S. Customs and Border Protection and the Bureau of Alcohol, Tobacco, Firearms and Explosives. While we have implemented compliance programs that are intended to avoid violations of these laws, regulations and requirements, given the nature of our operations and the constant evolution of applicable laws, regulations and requirements, we may not be able to prevent future violations. If we are found to have violated such laws, regulations or requirements, we may be subject to: reductions of the value of contracts; contract modifications or termination; the withholding of payments from our customer; the loss of export privileges; administrative or civil judgments and liabilities; criminal judgments or convictions, liabilities and consent or other voluntary decrees or agreements; other sanctions; the assessment of penalties, fines, or compensatory, treble or other damages or non-monetary relief or actions; or suspension or debarment.

Current wording

We (including our subcontractors and others with whom we do business) are also subject to, and expected to perform in compliance with, a vast array of federal, state, local and international laws, regulations and requirements related to our industry, our products and the businesses we operate. These laws and regulations include, but are not limited to, the Anti-Kickback Act, the Arms Export Control Act, including the ITAR, the Communications Act, the Defense Federal Acquisition Regulations, the EAR (which includes anti-boycott provisions), the False Claims Act, the Federal Acquisition Regulation, the FCPA, the Lobbying Disclosure Act, the Procurement Integrity Act, the Truthful Cost or Pricing Data Act, the Foreign Trade Regulations, the Foreign Investment Risk Review Modernization Act, the International Emergency Economic Powers Act, the Trading with the Enemy Act, and Executive Orders and regulations, administered by the U.S. Department of the Treasury, DoW, Office of Foreign Assets Control, as well as rules and regulations administered by the U.S. Customs and Border Protection and the Bureau of Alcohol, Tobacco, Firearms and Explosives. While we have implemented compliance programs that are intended to avoid violations of these laws, regulations and requirements, given the nature of our operations and the constant evolution of applicable laws, regulations and requirements, we may not be able to prevent future violations. If we are found to have violated such laws, regulations or requirements, we may be subject to: reductions of the value of contracts; contract modifications or termination; the withholding of payments from our customer; the loss of export privileges; administrative or civil judgments and liabilities; criminal judgments or convictions, liabilities and consent or other voluntary decrees or agreements; other sanctions; the assessment of penalties, fines, or compensatory, treble or other damages or non-monetary relief or actions; or suspension or debarment.

Previous wording

Considerable uncertainty exists regarding future legislation and regulations as the current administration has issued changing guidance on a wide array of topics including the Executive Order issued in January 2025, which requires, in relevant part, that every Federal contract or grant award include a clause that requires the contractor or grant recipient to (1) agree that its compliance with all applicable federal anti-discrimination laws is material to the government’s payment decisions on such contract or grant for purposes of the False Claims Act, and (2) certify that it does not operate any programs promoting diversity, equity and inclusion that violate any applicable federal anti-discrimination laws. Future legislation and regulations may increase the restrictions in current organizational conflicts of interest regulations and rules. To the extent that organizational conflicts of interest laws, regulations and rules limit our ability to successfully compete for new contracts or task orders with the U.S. government and/or commercial entities, or require us to exit certain existing contracts or wind down certain existing contracts, either because of organizational conflicts of interest issues arising from our business or because companies with which we are affiliated, including Leonardo S.p.A. and its subsidiaries (including US Holding), or with which we otherwise conduct business create organizational conflicts of interest issues for us, our business, financial condition, results of operations and prospects could be materially and adversely affected.

Current wording

Considerable uncertainty exists regarding future legislation and regulations as the current administration has issued changing guidance on a wide array of topics. Future legislation and regulations may increase the restrictions in current organizational conflicts of interest regulations and rules. To the extent that organizational conflicts of interest laws, regulations and rules limit our ability to successfully compete for new contracts or task orders with the U.S. government and/or commercial entities, or require us to exit certain existing contracts or wind down certain existing contracts, either because of organizational conflicts of interest issues arising from our business or because companies with which we are affiliated, including Leonardo S.p.A. and its subsidiaries (including US Holding), or with which we otherwise conduct business create organizational conflicts of interest issues for us, our business, financial condition, results of operations and prospects could be materially and adversely affected.

Previous wording

Our industry has experienced, and we expect will continue to experience, significant changes to business practices globally as a result of an increased focus on affordability, efficiencies, business systems, recovery of costs and a reprioritization of available defense funds to key areas for future defense spending. For example, the current administration implemented an Executive Order in January 2025 creating the Department of Government Efficiency which has the stated purpose of modernizing Federal technology and software to maximize governmental efficiency and productivity. These initiatives and changes to procurement practices may change the way U.S. government contracts are solicited, negotiated and managed, which may affect whether and how we pursue opportunities to provide our products and services to the U.S. government, including the terms and conditions under which we do so. For example, in connection with these cost reduction initiatives the U.S. government is pursuing alternatives to shift additional responsibility and performance risks to the contractor. Changes in procurement practices favoring incentive-based fee arrangements, different award criteria, non-traditional contract provisions and government contract negotiation offers also may affect our results of operations and predictability. The U.S. government has been pursuing and may continue to pursue these and other policies that could negatively impact our profitability and adversely impact our business, financial condition and results of operations.

Current wording

Our industry has experienced, and we expect will continue to experience, significant changes to business practices globally as a result of an increased focus on affordability, efficiencies, business systems, recovery of costs and a reprioritization of available defense funds to key areas for future defense spending. Any initiatives and changes to procurement practices may change the way U.S. government contracts are solicited, negotiated and managed, which may affect whether and how we pursue opportunities to provide our products and services to the U.S. government, including the terms and conditions under which we do so. For example, in connection with these cost reduction initiatives the U.S. government is pursuing alternatives to shift additional responsibility and performance risks to the contractor. Changes in procurement practices favoring incentive-based fee arrangements, different award criteria, non-traditional contract provisions and government contract negotiation offers also may affect our results of operations and predictability. The U.S. government has been pursuing and may continue to pursue these and other policies that could negatively impact our profitability and adversely impact our business, financial condition and results of operations.

Previous wording

Our total backlog consists of funded and unfunded amounts. Funded backlog represents the revenue value of orders for services under existing contracts for which funding is appropriated or otherwise authorized less revenue previously recognized on these contracts. Unfunded backlog represents the revenue value of firm orders for products and services under existing contracts for which funding has not yet been appropriated less funding previously recognized on these contracts. We evaluate bookings which we define as the total value of contract awards received from the U.S. government for which it has appropriated funds and legally obligated such funds to the Company through a contract or purchase order, plus the value of contract awards and orders received from customers other than the U.S. government. As of December 31, 2024, our total remaining contract value was approximately $8,509 million with bookings of $4,077 million. We historically have not realized all of the revenue included in our total contract value or bookings, and we may not realize all of the revenue included in our total contract value or bookings in the future. There is a higher degree of risk in this regard with respect to unfunded backlog. In addition, there can be no assurance that our total bookings will result in actual revenue in any particular period. This is because the actual receipt, timing, and amount of revenue under contracts included in total contract value and bookings are subject to various contingencies, including Congressional appropriations, many of which are beyond our control. The actual receipt of revenue from contracts included in total estimated contract value and bookings may never occur or may be delayed because: a program schedule could change or the program could be canceled; a contract’s funding or scope could be reduced, modified, delayed, de-obligated or terminated early, including as a result of a lack of appropriated funds or cost cutting initiatives and other efforts to reduce U.S. government spending and/or the automatic federal defense spending cuts required by sequestration; in the case of funded backlog, the period of performance for the contract has expired or the U.S. government has exercised its unilateral right to cancel multi-year contracts and related orders or terminate existing contracts for convenience or default; in the case of unfunded backlog, funding may not be available. Our failure to replace canceled or reduced bookings could have a material adverse impact on our business, financial condition and results of operations.

Current wording

Our total backlog consists of funded and unfunded amounts. Funded backlog represents the revenue value of orders for products and services under existing contracts for which funding is appropriated or otherwise authorized less revenue previously recognized on these contracts. Unfunded backlog represents the revenue value of firm orders for products and services under existing contracts for which funding has not yet been appropriated less funding previously recognized on these contracts. We evaluate bookings which we define as the total value of contract awards received from the U.S. government for which it has appropriated funds and legally obligated such funds to the Company through a contract or purchase order, plus the funded value of contract awards and orders received from customers other than the U.S. government. As of December 31, 2025, our total remaining contract value was approximately $8,448 million with bookings for the year of $4,245 million. We historically have not realized all of the revenue included in our total contract value or bookings, and we may not realize all of the revenue included in our total contract value or bookings in the future. There is a higher degree of risk in this regard with respect to unfunded backlog. In addition, there can be no assurance that our total bookings will result in actual revenue in any particular period. This is because the actual receipt, timing, and amount of revenue under contracts included in total contract value and bookings are subject to various contingencies, including Congressional appropriations, many of which are beyond our control. The actual receipt of revenue from contracts included in total estimated contract value and bookings may never occur or may be delayed because: a program schedule could change or the program could be canceled; a contract’s funding or scope could be reduced, modified, delayed, de-obligated or terminated early, including as a result of a lack of appropriated funds or cost cutting initiatives and other efforts to reduce U.S. government spending and/or the automatic federal defense spending cuts required by sequestration; in the case of funded backlog, the period of performance for the contract has expired or the U.S. government has exercised its unilateral right to cancel multi-year contracts and related orders or terminate existing contracts for convenience or default; in the case of unfunded backlog, funding may not be available. Our failure to replace canceled or reduced bookings could have a material adverse impact on our business, financial condition and results of operations.

Previous wording

We cannot predict future capital needs, the sufficiency of our current financing or our ability to obtain additional financing if we need it.

Current wording

We cannot predict future capital needs, the sufficiency of our current financing or our ability to obtain additional financing if needed, on terms acceptable to us, if at all.

Previous wording

Our operations are capital intensive, and we rely heavily on financing, including working capital financing, such as factoring and supply chain financing. We may also enter into other types of financings in the future, including bank and bond financing. Although we believe that our available cash resources, together with our access to credit facilities as described in Note 13: Debt and future cash that we expect to generate from our operations, are sufficient to meet our presently anticipated liquidity needs and capital expenditure requirements, we might in the future need to raise additional funds to, among other things:

Current wording

Our operations are capital intensive, and we rely heavily on financing, including working capital financing, such as factoring and supply chain financing. We may also enter into other types of financings in the future, including bank and bond financing. Although we believe that our available cash resources, together with our access to credit facilities, as described in Note 12: Debt to the Consolidated Financial Statements, and future cash that we expect to generate from our operations, are sufficient to meet our presently anticipated liquidity needs and capital expenditure requirements, we might in the future need to raise additional funds to, among other things:

Previous wording

We cannot guarantee that we will continue to be able to extend existing working capital financing on commercially reasonable terms or at all and we might be unable to obtain additional financing, if needed, on terms acceptable to us, if at all. If sufficient funds are not available or are not available on terms acceptable to us, our ability to fund our current operations, fund expansion, take advantage of acquisition opportunities, develop or enhance services or products, or otherwise respond to competitive pressures would be significantly limited. We may be required to obtain the consent of US Holding in order to obtain financing and there is no guarantee that their consent will be granted. See “—Risks Relating to Our Ownership and Status under the Proxy Agreement—Our indirect majority stockholder, Leonardo S.p.A., may have interests that are different from, or conflict with, those of our other stockholders, and their majority ownership in us may discourage change of control transactions.” The existing debt obligations of Leonardo S.p.A., which contain restrictions applicable to subsidiaries of Leonardo S.p.A., including us, may also negatively impact our ability to obtain additional financing on terms acceptable to us, if at all. In addition, any decline in the ratings of our corporate credit or any indications from the rating agencies that their ratings on our corporate credit are under surveillance or review with possible negative implications could adversely impact our ability to access capital. These limitations could have a material adverse impact on our business, financial condition and results of operations.

Current wording

We cannot guarantee that we will continue to be able to extend existing working capital financing on commercially reasonable terms or at all and we might be unable to obtain additional financing, if needed, on terms acceptable to us, if at all. If sufficient funds are not available or are not available on terms acceptable to us, our ability to fund our current operations, fund expansion, take advantage of acquisition opportunities, develop or enhance services or products, or otherwise respond to competitive pressures would be significantly limited. We may be required to obtain the consent of US Holding in order to obtain financing and there is no guarantee that their consent will be granted. See “—Risks Relating to Our Ownership and Status under the Amended and Restated Proxy Agreement—Our indirect majority stockholder, Leonardo S.p.A., may have interests that are different from, or conflict with, those of our other stockholders, and their majority ownership in us may discourage change of control transactions.” The existing debt obligations of Leonardo S.p.A., which contain restrictions applicable to subsidiaries of Leonardo S.p.A., including us, may also negatively impact our ability to obtain additional financing on terms acceptable to us, if at all. In addition, any decline in the ratings of our corporate credit or any indications from the rating agencies that their ratings on our corporate credit are under surveillance or review with possible negative implications could adversely impact our ability to access capital. These limitations could have a material adverse impact on our business, financial condition and results of operations.

Previous wording

As a public reporting company, we are required to establish and maintain effective internal control over financial reporting. Failure to establish such internal control, or any failure of such internal control once established, could adversely impact our public disclosures regarding our business, financial condition or results of operations. Any failure of our internal control over financial reporting could also prevent us from maintaining accurate accounting records and discovering accounting errors and financial frauds. Rules adopted by the SEC pursuant to Section 404 of the Sarbanes-Oxley Act require annual assessment of our internal control over financial reporting. The standards that must be met for management to assess the internal control over financial reporting as effective are complex, and require significant documentation, testing and possible remediation to meet the detailed standards. Any assessment by management that there are weaknesses in our internal control over financial reporting may raise concerns for investors. Any actual or perceived weaknesses and conditions that need to be addressed in the internal controls over financial reporting (including those weaknesses identified in periodic reports), or disclosure of management’s assessment of the internal controls over financial reporting may have an adverse impact on the price of our common stock.

Current wording

As a public reporting company, we are required to maintain an effective system of internal control over financial reporting. Failure to maintain an effective system of internal control over financial reporting could adversely impact our public disclosures regarding our business, financial condition or results of operations. Any such failure could also prevent us from maintaining accurate accounting records and discovering accounting errors and financial frauds. Rules adopted by the SEC pursuant to Section 404 of the Sarbanes-Oxley Act require annual assessment of our internal control over financial reporting. The standards that must be met for management to assess the internal control over financial reporting as effective are complex, and require significant documentation, testing and possible remediation to meet the detailed standards. Any assessment by management that there are weaknesses in our internal control over financial reporting may raise concerns for investors. Any actual or perceived weaknesses and conditions that need to be addressed in the internal controls over financial reporting (including those weaknesses identified in periodic reports), or disclosure of management’s assessment of the internal controls over financial reporting may have an adverse impact on the price of our common stock.

Previous wording

Our financing arrangements contain restrictions, covenants and events of default that, among other things, require us to satisfy certain financial tests and maintain certain financial ratios and restrict our ability to incur additional indebtedness and to refinance our existing indebtedness.

Current wording

Our financing arrangements, including our senior unsecured credit agreement, contain restrictions, covenants and events of default that, among other things, require us to satisfy certain financial tests and maintain certain financial ratios and restrict our ability to incur additional indebtedness and to refinance our existing indebtedness.

Previous wording

Our customers’ requirements change and evolve regularly. Accordingly, our future performance depends, in part, on our ability to adapt to changing customer needs rapidly, identify emerging technological trends, develop and manufacture innovative products and services efficiently and bring those offerings to market quickly at cost-effective prices. This includes efforts to provide solutions that integrate capabilities and resources. Artificial Intelligence technologies have rapidly developed, and our business may be adversely affected if we cannot successfully integrate the technology into our internal business processes and product and service offerings in a timely, cost-effective, compliant and responsible manner.

Current wording

Our customers’ requirements change and evolve regularly. Accordingly, our future performance depends, in part, on our ability to adapt to changing customer needs rapidly, identify emerging technological trends, develop and manufacture innovative products and services efficiently and bring those offerings to market quickly at cost-effective prices. This includes efforts to provide solutions that integrate capabilities and resources. AI technologies have rapidly developed, and our business may be adversely affected if we cannot successfully integrate the technology into our internal business processes and product and service offerings in a timely, cost-effective, compliant and responsible manner.

Previous wording

Many of our larger competitors have significantly greater financial resources than we do and have more extensive or more specialized engineering, manufacturing and marketing capabilities than we do in some areas, including as a result of substantial industry consolidation, which increased the market share of certain of our competitors and enabled them to take advantage of economies of scale and develop new technologies. These larger competitors may also benefit from supply chain leverage and pricing flexibility, including, in some cases, the ability to price contracts at a loss, due to their size. Larger competitors, for example, may decide to pursue contracts typically won by mid-tier contractors, such as us. A number of these competitors are also our suppliers and customers. Additionally, some customers, including the DoD, are increasingly purchasing “off the shelf” components from commercial suppliers in lieu of using traditional defense contractors to design and manufacture such items.

Current wording

Many of our larger competitors have significantly greater financial resources than we do and have more extensive or more specialized engineering, manufacturing and marketing capabilities than we do in some areas, including as a result of substantial industry consolidation, which increased the market share of certain of our competitors and enabled them to take advantage of economies of scale and develop new technologies. These larger competitors may also benefit from supply chain leverage and pricing flexibility, including, in some cases, the ability to price contracts at a loss, due to their size. Larger competitors, for example, may decide to pursue contracts typically won by mid-tier contractors, such as us. A number of these competitors are also our suppliers and customers. Additionally, some customers, including the DoW, are increasingly purchasing “off the shelf” components from commercial suppliers in lieu of using traditional defense contractors to design and manufacture such items.

Previous wording

Preferences or set-asides for minority-owned, small and small disadvantaged businesses could impact our ability to be a prime contractor and limit our opportunity to work as a subcontractor on certain governmental procurements.

Current wording

Preferences or set-asides for small or small disadvantaged businesses could impact our ability to be a prime contractor and limit our opportunity to work as a subcontractor on certain governmental procurements.

Previous wording

As a result of the Small Business Administration (“SBA”) set-aside program, the federal government may decide to restrict certain procurements only to bidders that qualify as minority-owned, small, or small disadvantaged businesses. We would not be eligible to perform as a prime contractor on those programs and in general would be restricted to no more than 49% of the work as a subcontractor on those programs. An increase in the amount of procurements under the SBA set-aside program may impact our ability to bid on new procurements as a prime contractor, limit our opportunity to work as a subcontractor or restrict our ability to compete on incumbent work that is placed in the set-aside program.

Current wording

As a result of the Small Business Administration (“SBA”) set-aside program, the federal government may decide to restrict certain procurements only to bidders that qualify as small or small disadvantaged businesses. We would not be eligible to perform as a prime contractor on those programs and in general would be restricted to no more than 49% of the work as a subcontractor on those programs. An increase in the amount of procurements under the SBA set-aside program may impact our ability to bid on new procurements as a prime contractor, limit our opportunity to work as a subcontractor or restrict our ability to compete on incumbent work that is placed in the set-aside program.

Previous wording

We are susceptible to a security breach, through cyber-attack, cyber-intrusion, insider threats or otherwise, and to other significant disruptions of our IT networks and related systems, or those of our customers, suppliers, vendors, subcontractors, partners, or other third parties.

Current wording

We may be susceptible to a security breach, through cyber-attack, cyber-intrusion, insider threats or otherwise, and to other significant disruptions of our IT networks and related systems, or those of our customers, suppliers, vendors, subcontractors, partners, or other third parties.

Previous wording

We store sensitive data, including information relating to national security and other sensitive government functions, intellectual property and technology, proprietary business information, and confidential employee information such as personally identifiable or protected health information on our servers and databases. We are subject to laws and rules issued by U.S. and non-U.S. governments and agencies concerning safeguarding and maintaining information confidentiality including extensive and evolving cyber requirements of the DoD. We face the risk of a security breach with respect to that data, whether through cyber-attack, cyber-intrusion or insider threat via the Internet, malware, e-mail attachments, persons inside our organization or with access to systems inside our organization, threats to the physical security of our facilities and employees or other significant disruption of our IT networks and related systems or those of our suppliers or subcontractors. As an advanced technology-based solutions provider, and particularly as a government contractor with access to national security and other sensitive government information, we face a heightened risk of a security breach or disruption from threats to gain unauthorized access to our and our customers’ proprietary or classified information on our IT networks and related systems and to the IT networks and related systems that we operate and maintain for certain of our customers. These types of information and IT networks and related systems are critical to the operation of our business and essential to our ability to perform day-to-day operations, and, in some cases, are critical to the operations of certain of our customers. We make significant efforts to maintain the security and integrity of these types of information and IT networks and related systems and have implemented various measures to manage the risk of a security breach or disruption. As is the case with many other companies, we have experienced cybersecurity incidents in the past, including denial-of-service attacks, ransomware, and attacks from suspected nation state actors. Our efforts and measures have not been effective in the case of every incident, but no incident has had a material negative impact on us to date. Sensitive data saved on networks, systems and facilities therefore remain vulnerable because of the risk that cybersecurity incidents, including, but not limited to, attempts to gain unauthorized access to data; potential security breaches, particularly cyber-attacks and cyber-intrusions; or disruptions, will occur in the future, and because the techniques used in such attempts are constantly evolving and generally are not recognized until launched against a target. In some cases these attempts are designed not to be detected and, in fact, may not be detected. In some cases, the resources of foreign governments may be behind such attacks due to the nature of our business and the industries in which we operate.…

Excerpt shortened here; the source contains the full paragraph.

Current wording

We store sensitive data, including information relating to national security and other sensitive government functions, intellectual property and technology, proprietary business information, and confidential employee information such as personally identifiable or protected health information on our servers and databases. We are subject to laws and rules issued by U.S. and non-U.S. governments and agencies concerning safeguarding and maintaining information confidentiality including extensive and evolving cyber requirements of the DoW. We face the risk of a security breach with respect to that data, whether through cyber-attack, cyber-intrusion or insider threat via the Internet, malware, e-mail attachments, persons inside our organization or with access to systems inside our organization, threats to the physical security of our facilities and employees or other significant disruption of our IT networks and related systems or those of our suppliers or subcontractors. As an advanced technology-based solutions provider, and particularly as a government contractor with access to national security and other sensitive government information, we face a heightened risk of a security breach or disruption from threats to gain unauthorized access to our and our customers’ proprietary or classified information on our IT networks and related systems and to the IT networks and related systems that we operate and maintain for certain of our customers. These types of information and IT networks and related systems are critical to the operation of our business and essential to our ability to perform day-to-day operations, and, in some cases, are critical to the operations of certain of our customers. We make significant efforts to maintain the security and integrity of these types of information and IT networks and related systems and have implemented various measures to manage the risk of a security breach or disruption. As is the case with many other companies, we have experienced cybersecurity incidents in the past, including denial-of-service attacks, ransomware, and attacks from suspected nation state actors. Our efforts and measures have not been effective in the case of every incident, but no incident has had a material negative impact on us to date. In addition, the rapid evolution and increased adoption of AI or machine learning technologies may intensify our cybersecurity risks. Sensitive data saved on networks, systems and facilities therefore remain vulnerable because of the risk that cybersecurity incidents, including, but not limited to, attempts to gain unauthorized access to data; potential security breaches, particularly cyber-attacks and cyber-intrusions; or disruptions, will occur in the future, and because the techniques used in such attempts are constantly evolving and generally are not recognized until launched against a target. In some cases these attempts are designed not to be detected and, in fact, may not be detected. In some cases, the…

Excerpt shortened here; the source contains the full paragraph.

Previous wording

Additionally, a failure to comply with the National Institute of Standards and Technology Special Publication 800-171 or other DoD cybersecurity requirements including the Cybersecurity Material Model Certificate (“CMMC”), whether or not resulting in a security breach or disruption, could restrict our ability to bid for, be awarded and perform on DoD contracts. DoD requirements to comply with the CMMC now and in the future, and any obligations that may be imposed on us under the CMMC that may be different from or in addition to those otherwise required by applicable laws and regulations, may cause additional expense for compliance.

Current wording

Additionally, a failure to comply with the National Institute of Standards and Technology Special Publication 800-171 or other DoW cybersecurity requirements including the Cybersecurity Material Model Certificate (“CMMC”), whether or not resulting in a security breach or disruption, could restrict our ability to bid for, be awarded and perform on DoW contracts. DoW requirements to comply with the CMMC now and in the future, and any obligations that may be imposed on us under the CMMC that may be different from or in addition to those otherwise required by applicable laws and regulations, may cause additional expense for compliance.

Previous wording

As a defense contractor, we may be more likely than other companies to be a direct target of, or indirectly damaged by, physical attacks including by active shooters, terrorists or terrorist organizations. It is impossible to predict accurately the likelihood or impact of any attack on our industry generally or on our business. While we have implemented significant physical security protection measures, business continuity plans and established backup sites, in the event of an attack or a threat of an attack, these security measures and contingency plans may be inadequate to prevent significant disruptions in our business, technology or access to the infrastructure necessary to maintain our business. Such attack may harm our personnel, close our facilities or render our backup data and recovery systems inoperable. Damage to our facilities due to attacks may be significantly in excess of any amount of insurance recovery, and we may not be able to insure against such damage at a reasonable price or at all. The threat of attacks may also negatively affect our ability to attract and retain employees. Any of these events could have a material adverse effect on our business, financial condition and results of operations.

Current wording

As a defense contractor, we may be more likely than other companies to be a direct target of, or indirectly damaged by, physical attacks including by active shooters, terrorists or terrorist organizations. It is impossible to predict accurately the likelihood or impact of any attack on our industry generally or on our business. While we have implemented significant physical security protection measures, business continuity plans and established backup sites, in the event of an attack or a threat of an attack, these security measures and contingency plans may be inadequate to prevent significant disruptions in our business, technology or access to the infrastructure necessary to maintain our business. Such attack may harm our personnel, close our facilities or render our backup data and recovery systems inoperable.

Previous wording

The markets in which we compete are characterized by rapid technological developments and frequent new product introductions, enhancements and modifications. This includes efforts to provide solutions that integrate Artificial Intelligence technologies that have rapidly developed, and our business may be adversely affected if we cannot successfully integrate the technology into our internal business processes and product and service offerings in a timely, cost-effective, compliant and responsible manner. Additionally, our ability to develop other new products and technologies that anticipate changing customer requirements, reduce costs and otherwise retain or enhance our competitive position in existing and new markets will be an important factor in our future results of operations. We will continue to make substantial capital expenditures and incur significant R&D costs aimed at improving our manufacturing capability, reducing costs, and developing and introducing new products and enhancements. If we fail to develop and introduce new products and technologies in a timely manner it could have a material adverse effect on our business, financial condition and results of operations. In addition, we cannot be certain that our new products and technologies will be successful or that customers will accept any of our new products.

Current wording

The markets in which we compete are characterized by rapid technological developments and frequent new product introductions, enhancements and modifications. This includes efforts to provide solutions that integrate AI technologies, including AI-optimized open architecture software that have rapidly developed and are continuously evolving, and our business may be adversely affected if we cannot successfully integrate the technology into our internal business processes and product and service offerings in a timely, cost-effective, compliant and responsible manner. Additionally, our ability to develop other new products and technologies that anticipate changing customer requirements, reduce costs and otherwise retain or enhance our competitive position in existing and new markets will be an important factor in our future results of operations. We will continue to make substantial capital expenditures and incur significant R&D costs aimed at improving our manufacturing capability, reducing costs, and developing and introducing new products and enhancements. If we fail to develop and introduce new products and technologies in a timely manner it could have a material adverse effect on our business, financial condition and results of operations. In addition, we cannot be certain that our new products and technologies will be successful or that customers will accept any of our new products.

Previous wording

Claims of intellectual property infringement might also require us to enter into costly royalty or license agreements. There can be no assurance that any of our patents and other intellectual property will not be challenged, invalidated, misappropriated or circumvented by third parties. Moreover, we may not be able to obtain royalty or license agreements on terms acceptable to us, or at all. We also may be subject to significant damages or injunctions against development and sale of certain of our products, services and solutions. Our success depends in large part on our proprietary technology. We rely on a combination of patents, copyrights, trademarks, trade secrets, know-how, confidentiality provisions and licensing arrangements to establish and protect our intellectual property rights. Our efforts, however, to protect our intellectual property and proprietary rights may not be sufficient. In addition, the laws concerning intellectual property vary among nations and the protection provided to our intellectual property by the laws and courts of foreign nations may differ from and be more limited than the protection provided in the U.S. If we fail to successfully protect and enforce these rights, our competitive position could suffer. Our pending patent and trademark registration applications may not be issued, and/or competitors may challenge the validity or scope of our patents or trademark registrations. In addition, our patents may not provide us a significant competitive advantage. We may be required to spend significant resources to monitor and enforce our intellectual property rights. Litigation to determine the scope of intellectual property rights, even if ultimately successful, could be costly and could divert management’s attention away from other aspects of our business. Further, in some cases the US government is unilaterally empowered to use, or allow our competitors to use, patented technology, subject only to the obligation to pay reasonable compensation.

Current wording

Claims of intellectual property infringement might also require us to enter into costly royalty or license agreements. There can be no assurance that any of our patents and other intellectual property will not be challenged, invalidated, misappropriated or circumvented by third parties. Moreover, we may not be able to obtain royalty or license agreements on terms acceptable to us, or at all. We also may be subject to significant damages or injunctions against development and sale of certain of our products, services and solutions. Our success depends in large part on our proprietary technology. We rely on a combination of patents, copyrights, trademarks, trade secrets, know-how, confidentiality provisions and licensing arrangements to establish and protect our intellectual property rights. Our efforts, however, to protect our intellectual property and proprietary rights may not be sufficient. In addition, the laws concerning intellectual property vary among nations and the protection provided to our intellectual property by the laws and courts of foreign nations may differ from and be more limited than the protection provided in the U.S. If we fail to successfully protect and enforce these rights, our competitive position could suffer. Our pending patent and trademark registration applications may not be issued, and/or competitors may challenge the validity or scope of our patents or trademark registrations. In addition, our patents may not provide us a significant competitive advantage. We may be required to spend significant resources to monitor and enforce our intellectual property rights. Litigation to determine the scope of intellectual property rights, even if ultimately successful, could be costly and could divert management’s attention away from other aspects of our business. Further, in some cases the U.S. government is unilaterally empowered to use, or allow our competitors to use, patented technology, subject only to the obligation to pay reasonable compensation.

Previous wording

The size, nature and complexity of our business make us susceptible to investigations, claims, disputes, agency audits, enforcement actions, subpoenas, litigation and other legal proceedings, particularly those involving government authorities. From time to time, we are and may become subject to investigations, claims, disputes, enforcement actions and administrative, civil or criminal litigation, arbitration or other legal proceedings globally and across a broad array of matters, including, but not limited to, government contracts, commercial transactions, false claims, false statements, mischarging, contract performance, fraud, procurement integrity, products liability, warranty liability, the use of hazardous materials, personal injury claims, environmental matters, shareholder-derivative actions, prior acquisitions and divestitures, intellectual property, tax, employees, export/import, anti-corruption, labor, health and safety, accidents, employee benefits and plans, including plan administration, and improper payments, as well as matters relating to our acquisition of assets or companies and other matters. These actions may divert financial and management resources that would otherwise be used to benefit our operations. No assurances can be given that the results of these or any other matters will be favorable to us. Although we maintain insurance policies, these policies may not be adequate to protect us from all material judgments and expenses related to current or future claims and may not cover the conduct that is the subject of the litigation or arbitration. Desired levels of insurance may not be available in the future at economical prices or at all. Although we believe that we have meritorious defenses to the claims made in the litigation matters in which we have been named a party and intend to contest each lawsuit vigorously, no assurances can be given that the results of these matters will be favorable to us. An adverse resolution or outcome of any of these investigations, claims, disputes, enforcement actions, litigation and other legal proceedings could have an adverse impact on our business, financial condition and results of operations. From time to time, the Company may deem it appropriate to take legal action (or threaten to take such action) against a customer, supplier, former employee, subcontractor or other industry participant to protect its contractual and other legal rights. The outcome of such litigation is inherently uncertain, often costly and could adversely impact the Company’s commercial relationships and reputation.

Current wording

The size, nature and complexity of our business make us susceptible to investigations, claims, disputes, agency audits, enforcement actions, subpoenas, litigation and other legal proceedings, particularly those involving government authorities. From time to time, we are and may become subject to investigations, claims, disputes, enforcement actions and administrative, civil or criminal litigation, arbitration or other legal proceedings globally and across a broad array of matters, including, but not limited to, government contracts, commercial transactions, false claims, false statements, mischarging, contract performance, fraud, procurement integrity, products liability, warranty liability, the use of hazardous materials, personal injury claims, environmental matters, stockholder-derivative actions, prior acquisitions and divestitures, intellectual property, tax, employees, export/import, anti-corruption, labor, health and safety, accidents, employee benefits and plans, including plan administration, and improper payments, as well as matters relating to our acquisition of assets or companies and other matters. These actions may divert financial and management resources that would otherwise be used to benefit our operations. No assurances can be given that the results of these or any other matters will be favorable to us. Although we maintain insurance policies, these policies may not be adequate to protect us from all material judgments and expenses related to current or future claims and may not cover the conduct that is the subject of the litigation or arbitration. Desired levels of insurance may not be available in the future at economical prices or at all. Although we believe that we have meritorious defenses to the claims made in the litigation matters in which we have been named a party and intend to contest each lawsuit vigorously, no assurances can be given that the results of these matters will be favorable to us. An adverse resolution or outcome of any of these investigations, claims, disputes, enforcement actions, litigation and other legal proceedings could have an adverse impact on our business, financial condition and results of operations. From time to time, the Company may deem it appropriate to take legal action (or threaten to take such action) against a customer, supplier, former employee, subcontractor or other industry participant to protect its contractual and other legal rights. The outcome of such litigation is inherently uncertain, often costly and could adversely impact the Company’s commercial relationships and reputation.

Previous wording

For the years ended December 31, 2024, 2023, and 2022, approximately 13%, 10% and 7%, respectively, of our revenue was derived from sales to customers located in foreign countries and foreign governments. We cannot assure you that we will maintain significant operations internationally or that any such operations will be successful. International business (including our participation in joint ventures and other joint business arrangements) is subject to numerous political and economic factors, legal requirements, cross-cultural considerations and other risks associated with doing business globally. These risks differ in some respects from those associated with our U.S. business and our exposure to such risks may increase if our international business continues to grow.

Current wording

For the years ended December 31, 2025, 2024, and 2023, approximately 8%, 13% and 10%, respectively, of our revenue was derived from sales to customers located in foreign countries and foreign governments. We cannot assure you that we will maintain significant operations internationally or that any such operations will be successful. International business (including our participation in joint ventures and other joint business arrangements) is subject to numerous political and economic factors, legal requirements, cross-cultural considerations and other risks associated with doing business globally.

Previous wording

As of December 31, 2024, approximately 520 (or 7%) of our employees were covered by collective bargaining agreements. We generally have been able to renegotiate renewals to expiring agreements without significant disruption of operating activities. If we experience difficulties with renewals and negotiations of existing collective agreements or if our employees pursue new collective representation, we could incur additional expenses and may be subject to work stoppages, slow-downs or other labor-related disruptions. Any such expenses or delays could adversely affect our programs served by employees who are covered by such agreements or representation.

Current wording

As of December 31, 2025, approximately 500 (or 7%) of our employees were covered by collective bargaining agreements. We generally have been able to renegotiate renewals to expiring agreements without significant disruption of operating activities. If we experience difficulties with renewals and negotiations of existing collective agreements or if our employees pursue new collective representation, we could incur additional expenses and may be subject to work stoppages, slow-downs or other labor-related disruptions. Any such expenses or delays could adversely affect our programs served by employees who are covered by such agreements or representation.

Showing the first 40 of 62 pairs. Open the source sections for the rest.

Rearranged current paragraphs (6)

Current report — wording carried from elsewhere

government could have a material adverse impact on our business, financial condition and results of operations.

Current report — wording carried from elsewhere

•There can be no assurance that we will continue to pay or increase our dividend or to repurchase shares of our common stock. Additionally, there can be no assurance that we will not accelerate our dividend or repurchases of our common stock.

Current report — wording carried from elsewhere

government’s spending priorities, including whether and to what extent the DoW’s budget may change, and, if it does, to what extent our business, financial condition and results of operations may be affected. Additionally, the U.S. government’s budget deficit and the national debt could also significantly affect government budgeting priorities and could have an adverse impact on our business, financial condition and results of operations in a number of ways, including the following:

Current report — wording carried from elsewhere

Damage to our facilities due to attacks may be significantly in excess of any amount of insurance recovery, and we may not be able to insure against such damage at a reasonable price or at all. The threat of attacks may also negatively affect our ability to attract and retain employees. Any of these events could have a material adverse effect on our business, financial condition and results of operations.

Current report — wording carried from elsewhere

These risks differ in some respects from those associated with our U.S. business and our exposure to such risks may increase if our international business continues to grow.

Current report — wording carried from elsewhere

There can be no assurance that we will continue to pay or increase our dividend or to repurchase shares of our common stock. Additionally, there can be no assurance that we will not accelerate our dividend or repurchases of our common stock.
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

Our results of operations and cash flows are substantially affected by our mix of fixed-price, cost-plus and time-and-materials type contracts. In particular, fixed-price contracts subject us to the risk of loss in the event of cost overruns or higher than anticipated inflation.

Previous report — wording carried elsewhere

The extent to which a pandemic or epidemic will impact us in the future will depend on numerous evolving factors and developments that we are unable to predict, including: the severity and transmission rate of the virus(es); the duration of the outbreak, including the risk of a resurgence of the virus in areas in which it appears to have been contained; the extent and effectiveness of containment actions;