About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2026 · Filed May 6, 2026

SOC$1.93+6.0%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 155 previous paragraphs and 80 current paragraphs.

13 unchanged; 15 reworded; 52 added; 125 removed; 2 previous and 0 current paragraphs rearranged.

Tables are not compared: 3 previous and 2 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (52)

Current report

On March 13, 2026, the President of the United States, Donald J. Trump, signed an Executive Order to, among other things, delegate certain authorities under the Defense Production Act of 1950 (“DPA”) to the United States Secretary of Energy. Subsequently, on March 13, 2026, the United States Secretary of Energy, Chris Wright, issued an order to the Company invoking the DPA (the “DPA Order”) to immediately prioritize and allocate pipeline transportation services for hydrocarbons from the SYU through the SYPS in order to address the energy scarcity and supply disruption risks caused by California policies that have left the region and U.S. military forces dependent on foreign oil.

Current report

Resuming Petroleum Transportation through SYPS Segments 324 and 325

Current report

On March 14, 2026, the Company resumed the transportation of hydrocarbons (oil) produced at the SYU through the SYPS at the direction of the United States Secretary of Energy, Chris Wright, in compliance with the DPA Order. In doing so, the Company facilitates the supply of domestically produced crude oil through U.S. pipeline infrastructure to U.S. refineries, supporting domestic consumers and the U.S. military.

Current report

The resumption of oil transportation through Segments 324 and 325 of the SYPS was executed in compliance with all applicable safety standards through the Company’s comprehensive pipeline integrity management program. Sable is pleased with its operational performance across the SYU and the SYPS during this critical period. Sable is also proud to create new, well-paying jobs for the people of California and throughout America.

Current report

On March 29, 2026, the Company initiated oil sales upon filling the SYPS, resulting in total oil sales volumes of approximately 13,380 barrels for the period ended March 31, 2026.

Current report

The United States Department of Justice has moved to terminate or modify the Consent Decree in the United States District Court, Central District of California. Sable is not a party to this litigation, but is participating in briefing related to the Consent Decree termination or modification, which is set to be heard on June 1, 2026.

Current report

Following the resumption of oil transportation through Segments 324 and 325 of the SYPS, the OS&T Strategy is no longer the Company’s primary development pathway. Under the DPA Order, the Company has been directed to immediately prioritize and allocate pipeline transportation services for oil transportation from the SYU through the SYPS. Nonetheless, the Company continues to evaluate the OS&T Strategy as a longer-term option to diversify sales channels, expand access to domestic and international purchasers, and provide additional flexibility in navigating potential regulatory developments.

Current report

On February 2, 2026, the Company entered into a Sales Agreement (the “Agreement”) with TD Securities (USA) LLC and Jefferies LLC, as agents (the “Agents”), under which the Company may offer and sell, from time to time at its sole discretion, an aggregate gross sale price of up to $250.0 million of shares of its Common Stock through the Agents, pursuant to an effective shelf registration statement on Form S-3 (Registration No. 333-286675), which was declared effective by the SEC on May 1, 2025. The Company filed a prospectus supplement with the SEC on February 2, 2026 in connection with the offering. Under the terms of the Agreement, the Agents may sell the Company’s Common Stock by any method permitted by law deemed to be an “at the market offering” as defined in Rule 415 of the Securities Act of 1933, as amended.

Current report

During the three months ended March 31, 2026, the Company issued 5,359,790 shares of its Common Stock for aggregate gross proceeds of approximately $72.4 million. Associated marketing and legal fees of approximately $1.6 million were paid and recognized as an offset to the proceeds within Additional paid-in capital in the unaudited condensed consolidated balance sheet and statement of changes in stockholders’ equity as of March 31, 2026.

Current report

Commodity prices were volatile during the first quarter of 2026, and the Company expects continued volatility for the remainder of 2026 due to macroeconomic conditions, evolving regulatory frameworks, geopolitical developments, and potential changes in trade policies, including the imposition of domestic and foreign tariffs. The Company’s revenues, profitability, liquidity, and financial condition are expected to be impacted by market prices for crude oil and, to a lesser extent, NGLs and natural gas.

Current report

In July 2025, the One Big Beautiful Bill Act (“OBBBA”) was enacted, and the current U.S. administration has issued executive orders and indicated the potential for additional regulatory and trade policy changes that may affect the oil and gas industry. The OBBBA may favorably affect the Company’s future cash income tax obligations, including the potential deferral of certain federal income taxes; however, the extent and timing of such impacts remain uncertain. Changes in trade policy, including the potential imposition of tariffs, could result in reciprocal actions by foreign governments, which may affect demand for crude oil, increase costs for materials and services, and impact broader economic conditions, including interest rates.

Current report

The Company is subject to ongoing litigation and regulatory proceedings, including matters involving California state agencies, refer to Note 6 — Commitments and Contingencies for additional details. Continued regulatory scrutiny and legal proceedings contribute to an uncertain operating environment and may result in increased compliance costs, operational delays, or other constraints, which could adversely affect the Company’s business, results of operations, financial condition, and capital expenditures.

Current report

As of April 2026, approximately 40 wells at Platforms Harmony and Heritage are online, producing an average of approximately 750 gross barrels of oil per day per well. Upon bringing all 74 production wells on these platforms online, which is expected during the second quarter of 2026, the Company expects average production of approximately 700 gross barrels of oil per day per well. The Company expects Platform Hondo to commence production in June 2026.

Current report

The Company intends to pursue a refinancing of its Senior Secured Term Loan during the second quarter of 2026. In addition to engaging with its existing banking partners, the Company is evaluating potential federal credit support options. The Company also expects to implement a commodity hedging program designed to support cash flow stability while retaining exposure to favorable commodity price movements.

Current report

Sable is coordinating with the federal government in various legal matters to defend its vested rights to operate its assets and ensure compliance with certain federal mandates, including the Defense Production Act. Sable is also actively pursuing damages and taking proactive legal action to curb state and county regulatory overreach.

Current report

On March 29, 2026, the Company initiated oil sales after filling the SYPS with oil produced from Platform Harmony. In April 2026, the Company resumed oil production from Platform Heritage with such produced oil contributing to sales thereafter. The Company expects to resume oil production from Platform Hondo by the end of the second quarter of 2026. The Company’s revenue stems from the sale of the oil produced from the SYU, processed by LFC, and transported via the interstate SYPS to its ultimate sales point at Pentland Station.

Current report

The following review of operations for the three months ended March 31, 2026 and 2025 should be read in conjunction with the unaudited condensed consolidated financial statements of the Company and notes thereto included in this Quarterly Report on Form 10-Q.

Current report

Three Months Ended March 31, 2026 vs. Three Months Ended March 31, 2025

Current report

Revenue. The Company sold 13.4 Mboe, net, recognizing $1.3 million in net revenue for the three months ended March 31, 2026. No revenue was recognized during the three months ended March 31, 2025 as sales did not commence until March 2026.

Current report

Depletion, depreciation, amortization and accretion. Depletion, depreciation, amortization and accretion was $3.9 million for the three months ended March 31, 2026, an increase of $0.9 million, or 30%, compared to $3.0 million for the three months ended March 31, 2025. The increase was primarily attributable to the additional depreciation associated with the Company’s office assets and the initial depletion expense recognized following the Company’s commencement of oil sales during the period. For the three months ended March 31, 2025, depletion, depreciation, amortization and accretion primarily consisted of accretion expense related to asset retirement obligations. During the three months ended March 31, 2026, the Company recognized $4.0 million of depletion, depreciation and amortization associated with the SYU assets. However, as approximately 95% of the associated production was used to fill the SYPS or remained in storage tanks at LFC as of March 31, 2026, the related costs were capitalized to Inventory and linefill within Oil and gas properties on the unaudited condensed consolidated balance sheet (refer to Note 1 — Organization, Business Operations, and Going

Current report

Concern for additional details regarding linefill). Depletion, depreciation, amortization and accretion expense is expected to increase in future periods as production volumes and sales activity increase.

Current report

Total other expense, net. Total other expense, net was $78.3 million for the three months ended March 31, 2026, compared to total other expense, net of $38.9 million for the three months ended March 31, 2025, an increase of $39.4 million. The increase was primarily attributable to a $22.9 million change in the fair value of warrants, driven by a longer remaining term, an increase in the market price of the Company’s Common Stock, and changes in market volatility. Other income decreased by $2.9 million due to lower interest income, reflecting a reduced average cash balance during the period. Interest expense increased by $13.7 million, primarily due to a higher debt balance and an increase in the applicable interest rate from 10% per annum to 15% per annum for the three months ended March 31, 2026.

Current report

Income tax expense. Income tax expense for the three months ended March 31, 2026 was zero, compared to an income tax expense of $10.9 million for the three months ended March 31, 2025. The Company’s effective tax rate was zero percent for the three months ended March 31, 2026. No income tax benefit was recognized in the current period as the tax benefit associated with the year–to–date pretax loss exceeds the amount expected to be realized through anticipated ordinary income in subsequent interim periods within the current fiscal year that is more likely than not to be realized.

Current report

The Company’s effective tax rate was negative 11.0% for the three months ended March 31, 2025. Based on its ongoing assessment of the realizability of deferred tax assets, the Company concluded that it was more likely than not that a portion of such assets would not be realized. Accordingly, the Company recorded an additional valuation allowance in the prior-year period. This determination was primarily driven by limitations on the utilization of net operating losses, including the limitation to 80% of taxable income. As a result, the increase in the valuation allowance resulted in income tax expense in the prior-year period.

Current report

Overview. Prior to commencing sales of production volumes through the SYPS, the Company incurred significant capital expenditures in excess of operating cash flows to achieve first sales. Additional capital will be required to resume oil production from the remaining wells at SYU, as well as to activate certain LFC facilities that are not yet fully operational. Historically, the SYU’s primary source of liquidity has been operational cash flows. Based on the Company’s current financial plan, management expects these cash flows to be sufficient to fund operating expenses and service indebtedness; however, this expectation is subject to commodity price volatility, regulatory developments, and other factors that could impact future liquidity.

Current report

Planned Capital Expenditures. Capital expenditures across the Company’s SYU Assets are expected to total approximately $180.0 million for the remainder of 2026, or approximately $203.3 million for the full year 2026 (excluding non-cash linefill capital expenditures), as the Company continues to focus on facility upgrades, maintenance capital, and low-cost production optimization initiatives. As previously discussed, the OS&T Strategy is not expected to be pursued in the near term and, accordingly, no material capital expenditures related to the OS&T Strategy are planned for 2026.

Current report

Capital Raising Activities. Prior to commencing sales of production volumes through the SYPS, the Company’s capital requirements were primarily funded through proceeds from equity issuances of Common Stock and warrant exercises. During the first quarter of 2026, the Company entered into an at-the-market equity offering program (the “ATM Program”) to support its capital requirements and enhance liquidity, pursuant to which the Company may offer and sell, from time to time at its sole discretion, shares of its Common Stock having an aggregate gross sales price of up to $250.0 million.

Current report

Under the ATM Program, during the three months ended March 31, 2026, the Company issued 5,359,790 shares of its Common Stock for aggregate gross proceeds of approximately $72.4 million. Associated marketing and legal fees of approximately $1.6 million were paid and recognized as an offset to the proceeds within Additional paid-in capital in the unaudited condensed consolidated balance sheet and statement of changes in stockholders’ equity as of March 31, 2026.

Current report

The Company is currently evaluating additional debt financing alternatives, which may include the issuance of public or private debt securities, bank financing, or a combination thereof. There can be no assurance that such financing will be available on commercially reasonable terms, or at all. Additionally, the Senior Secured Term Loan contains restrictive covenants which limit our ability to, among others, create or incur debt or liens (refer to Note 4 — Debt for additional details regarding the restrictive covenants under the Senior Secured Term Loan). As of March 31, 2026, the Company was in compliance with all covenants under its Senior Secured Term Loan.

Current report

Following the increase in production sales during 2026, the Company expects operating cash flows to increase, which may support the funding of future capital expenditures. However, if the Company is unable to generate sufficient cash flows from operations or obtain additional financing as needed, it may not be able to fund the capital expenditures necessary to sustain production levels.

Showing the first 40 of 52 passages. Open the source sections for the rest.

Removed paragraphs (125)

Previous report

Sable Offshore Corp. is an independent oil and gas company headquartered in Houston, Texas. We were incorporated in Delaware on October 16, 2020 and, until February 14, 2024, were a blank check company formed for the purpose of effecting a merger, capital stock exchange, asset acquisition, stock purchase, reorganization or similar business combination with one or more businesses. We are an emerging growth company and, as such, we are subject to all of the risks associated with emerging growth companies.

Previous report

On November 1, 2022 (as amended on June 13, 2023 and December 15, 2023), Sable Offshore Corp., a Texas corporation (“SOC”), entered into a purchase and sale agreement (the “Sable-EM Purchase Agreement”) with Exxon Mobil Corporation (“Exxon”) and Mobil Pacific Pipeline Company (“MPPC,” and together with Exxon, “EM”) pursuant to which SOC agreed to acquire from EM certain assets constituting the Santa Ynez field in Federal waters offshore California (“SYU”) and associated onshore processing and pipeline assets (such “Assets,” as defined in the Sable-EM Purchase Agreement, collectively the “SYU Assets”).

Previous report

On November 2, 2022, Flame entered into an agreement and plan of merger, dated as of November 2, 2022 (as amended, the “Merger Agreement”), with SOC and Sable Offshore Holdings, LLC, a Delaware limited liability company and the parent company of SOC (“Holdco” and, together with SOC, “Legacy Sable”), which provided for the following transactions at the closing: (i) Holdco would merge with and into Flame, with Flame surviving such merger (the “Holdco Merger”) and (ii) SOC would merge with and into Flame, with Flame surviving such merger (the “SOC Merger” and, together with the Holdco Merger, the “Mergers” and, along with the other transactions contemplated by the Merger Agreement, the “Business Combination”).

Previous report

On February 12, 2024, Flame held a special meeting of stockholders (the “Special Meeting”), at which the Flame stockholders considered and adopted, among other matters, a proposal to approve the Business Combination, including (a) adopting the Merger Agreement and (b) approving the other transactions contemplated by the Merger Agreement.

Previous report

Pursuant to the terms and subject to the conditions set forth in the Merger Agreement, following the Special Meeting, on February 14, 2024 (the “Closing Date”), the Business Combination was consummated (the “Closing”). In connection with the Business Combination, Flame changed its name to “Sable Offshore Corp.”.

Previous report

On February 14, 2024, in connection with the Business Combination, the Company issued 44,024,910 shares of Common Stock, at a price of $10.00 per share for aggregate gross proceeds of $440.2 million (the “First PIPE Investment”). The shares of Common Stock issued in the First PIPE Investment were offered in a private placement under the Securities Act of 1933, as amended (the “Securities Act”). Upon the closing of the Business Combination, an associated marketing fee and legal fees of approximately $22.9 million was paid in full, and was recognized as an offset to the proceeds from the First PIPE Investment.

Previous report

On September 26, 2024, the Company issued 7,500,000 shares of Common Stock of the Company, at a price of $20.00 per share for aggregate gross proceeds of approximately $150.0 million (the “Second PIPE Investment”). The shares of Common Stock issued in the Second PIPE Investment were offered in a private placement under the Securities Act. An associated marketing fee and legal fees of approximately $7.8 million was recognized as an offset to the proceeds from the Second PIPE Investment.

Previous report

As of November 4, 2024 (the “Redemption Date”), approximately 99.8% of the Company’s outstanding Public Warrants were exercised by the holders thereof to purchase fully paid and non-assessable shares of Common Stock at an exercise price of $11.50 per share. As a result, holders of the Public Warrants received an aggregate of 15,957,820 shares of the Company’s Common Stock in exchange for $183.5 million in cash proceeds to the Company. All unexercised and outstanding Public Warrants as of 5:00 p.m. New York City time on the Redemption Date were redeemed at a price of $0.01 per Public Warrant and, as a result, no Public Warrants currently remain outstanding and the Public Warrants have ceased trading on the New York Stock Exchange. The private placement warrants and working capital warrants to purchase Common Stock that were issued under the Warrant Agreement and that are still held by the initial holders thereof or their permitted transferees were not subject to this redemption and remain outstanding.

Previous report

On May 21, 2025, the Company entered into an Underwriting Agreement (the “Underwriting Agreement”) with J.P. Morgan Securities LLC, TD Securities (USA) LLC and Jefferies LLC, as representatives of the several underwriters (the “Underwriters”), relating to the underwritten offering of 8,695,654 shares of common stock, par value $0.0001 per share (the “Common Stock”), of the Company (the “2025 Offering”). Under the terms of the Underwriting Agreement, the Company granted the Underwriters a 30-day option to purchase up to 1,304,346 additional shares of Common Stock.

Previous report

On May 23, 2025 the upsized underwritten public offering of 10,000,000 shares of Common Stock at the public offering price of $29.50 per share closed. Upon the closing of the 2025 Offering, associated marketing fees and legal fees of approximately $12.4 million were incurred, and were recognized as an offset to the proceeds from the 2025 Offering within Additional paid-in capital in the unaudited condensed consolidated balance sheet and statement of stockholders’ equity (deficit)/net parent investment as of September 30, 2025. The Company received approximately $282.6 million of net proceeds from the 2025 Offering to be used for capital expenditures, working capital purposes and general corporate purposes.

Previous report

On November 10, 2025, the Company entered into subscription agreements with certain investors (the “Third PIPE Investors”), pursuant to which, among other things, the Third PIPE Investors agreed to subscribe for and purchase from the Company, and the Company agreed to issue and sell to the Third PIPE Investors an aggregate of 45,454,546 newly issued shares of its Common Stock at a purchase price of $5.50 per share for an aggregate purchase price of approximately $250.0 million, on the terms and subject to the conditions set forth therein (the “Third PIPE Investment”). The issuance and sale of the Common Stock in the Third PIPE Investment was completed on November 12, 2025. The Company intends to use the proceeds from the Third PIPE Investment for general corporate purposes. The Third PIPE Investment is expected to satisfy the common equity contribution condition of the Senior Secured Term Loan amendment announced by the Company on November 3, 2025, as previously discussed in Note 6 — Debt.

Previous report

Beginning in 1968 and over the course of 14 years, EM consolidated more than a dozen offshore federal oil leases and organized them into a streamlined production unit known as SYU. SYU consists of three offshore platforms and a wholly owned onshore processing facility located along the Gaviota Coast at Las Flores Canyon in Santa Barbara County, California. SYU’s onshore facilities and the three offshore platforms remained in continuous operation until 2015. In May 2015, an onshore pipeline operated by Plains All American Pipeline, L.P. (“Plains”) that transported produced oil from SYU experienced a leak. The SYU offshore platforms and facilities suspended production after the incident, the SYU Assets were shut in and the facilities were placed in a safe state. Prior to May 15, 2025, the offshore facilities had not produced oil and gas since May 2015; however, all equipment remained in place in an operation-ready state, requiring ongoing inspections, maintenance and surveillance. As part of these efforts, all equipment was drained, flushed and purged in 2016. All hydrocarbon pipelines within SYU were placed in a safe state and regularly monitored. In 2020, Plains entered into a Consent Decree, that provides a path for a potential restart of the Onshore Pipeline.

Previous report

The discussion of the results of operations for the Predecessor periods below do not include the results from the Pipelines and the Pipelines are not included in the combined financial statements of the Predecessor included in the financial statements and related notes thereto included elsewhere in this Quarterly Report. Financial statements of the Pipelines have not been included because SEC guidance provides that the financial statements of recently acquired businesses such as the Pipelines need not be filed unless their omission would render Predecessors combined financial statements misleading or substantially incomplete. Based upon our quantitative and qualitative analysis, we do not believe omitting the financial statements of the Pipelines renders the Predecessor combined financial statements misleading or substantially incomplete. The Successor financial statements include the results from the Pipelines and the Pipelines are included in the unaudited condensed consolidated financial statements.

Previous report

For the purposes of the unaudited condensed consolidated financial statements, periods on or before February 13, 2024 reflect the financial position, results of operations and cash flows of SYU prior to the Business Combination, referred to herein as the “Predecessor,” and periods beginning on or after February 14, 2024 reflect the financial position, results of operations and cash flows of the Company as a result of the Business Combination, referred to herein as the “Successor.”

Previous report

Preparations for the OS&T Strategy include the acquisition of a suitable OS&T vessel, certain refitting and upgrades to the vessel and the SYU equipment, transportation of the vessel to SYU, and related installation. In connection with implementation of the OS&T Strategy, the Company expects to opportunistically acquire an existing OS&T in Q1 2026, with delivery of the vessel expected in Q3 2026. Following the acquisition of the vessel, and vessel and platform upgrades and installation, Sable would expect to begin sales from all SYU platforms in Q4 2026, with expected comprehensive oil production rates of over 50,000 barrels of oil per day, utilizing the OS&T within the SYU federal leases, provided the Company receives regulatory clearances. See Risk Factors—Risks Associated with Our Operations—In order to commence operations pursuant to an OS&T offtake strategy, we will require clearances and permitting, including from BOEM.”

Previous report

On November 3, 2025, the Company and Exxon entered into an amendment (the “Second Debt Amendment”) to the Senior Secured Term Loan. The Second Debt Amendment will become effective upon the satisfaction of certain conditions, including the Company receiving equity contributions in an amount of no less than $225.0 million, net of underwriting fees and other transaction costs and expenses, and other customary closing conditions. The Second Debt Amendment, once effective, will extend the maturity date of the Senior Secured Term Loan to the earlier of (i) March 31, 2027 or (ii) 90 days after first sales of Hydrocarbons (as defined in the Senior Secured Term Loan). The Second Debt Amendment, once effective, will increase the interest rate from ten percent (10%) per annum to fifteen percent (15%) per annum, compounded annually, payable in arrears on January 1st of each year. At the Company’s election, accrued but unpaid interest may be deemed paid on each interest payment date by adding the amount of interest owed to the outstanding principal (paid-in-kind) amount under the Senior Secured Term Loan. The Second Debt Amendment will also include additional reporting covenants and a financial liquidity covenant that will require the Company to have not less than $25.0 million in unrestricted cash, measured at the end of each month. There is no guarantee that the Company will be able to satisfy the necessary conditions to effect the Second Debt Amendment.

Previous report

Restart of Production and Resuming Petroleum Transportation through 324 and 325

Previous report

On May 15, 2025, Sable initiated oil production from six wells on Platform Harmony at SYU and began flowing oil production to Las Flores Canyon (“LFC”) at an initial rate of approximately 6,000 barrels of oil per day.

Previous report

On May 18, 2025, Sable completed anomaly repairs on Line 324 (formerly known as Line 901), which extends from the Las Flores Station on the California coast to the Gaviota Pump Station in Santa Barbara County, California, and Line 325 (formerly known as Line 903), which extends from the Gaviota Pump Station to Pentland Station in Kern County, California, the point of sale. With the completion of such repairs, Sable has now completed its anomaly repair program on the Onshore Pipeline as specified by a Consent Decree that Plains entered into with various governmental agencies in 2020 (the “Consent Decree”), the governing document for resuming petroleum transportation through the Onshore Pipeline.

Previous report

The Consent Decree requires the approval from the California Department of Forestry and Fire Protection’s Office of State Fire Marshall (“OSFM”) regarding restart plans for each of the Pipelines (the “Restart Plans”) prior to resuming petroleum transportation through Lines 324 and 325 (the “Pipeline Restart”). The Consent Decree prescribes what must be submitted in the Restart Plans. On July 29, 2024, Pacific Pipeline Company (“PPC”) submitted the Restart Plans to OSFM for approval. As of May 27, 2025, Sable has conducted successful hydrotests on all segments of Line 324 and Line 325.

Previous report

State Waivers. On December 17, 2024, OSFM approved Sable’s implementation of enhanced pipeline integrity standards for the Pipelines by granting state waivers of certain regulatory requirements (“State Waivers”) related to cathodic protection and seam weld corrosion for the Pipelines.

Previous report

On February 11, 2025, Pipeline and Hazardous Materials Safety Administration (“PHMSA”) notified the OSFM that PHMSA does not object to OSFM’s granting of the State Waivers.

Previous report

Two lawsuits have been filed against OSFM (as Defendant) and Sable and PPC (as Real Parties in Interest) challenging OSFM’s issuance of the State Waivers. On April 15, 2025, the Center for Biological Diversity and the Wishtoyo Foundation filed a Verified Petition for Writ of Mandate and Complaint for Declaratory and Injunctive Relief alleging that OSFM violated federal and state pipeline safety laws and the California Environmental Quality Act (“CEQA”) in issuing the State Waivers (Case No. 25CV02244). The Environmental Defense Center, Get Oil Out!, Santa Barbara County Action Network, Sierra Club, and Santa Barbara Channelkeeper also filed a Verified Petition for Writ of Mandate and Complaint for Declaratory and Injunctive Relief against OSFM against OSFM (as Defendant) and Sable and PPC (as Real Parties in Interest) alleging similar claims (Case No. 25CV02247). Both groups of Petitioners seek a court order declaring the State Waivers void and directing OSFM to vacate and set aside the State Waivers until OSFM complies with its obligations under federal and state pipeline safety laws and CEQA. A hearing was held on July 18, 2025, and on July 29, 2025, the court entered an order granting petitioners’ application for issuance of preliminary injunction in part, ruling that, absent further order of the court, Sable may resume petroleum transportation through the Onshore Pipeline 10 court days after Sable files notice that Sable has received all necessary approvals and permits for such resumption. The court clarified that Sable is not prevented from taking steps toward restarting the Onshore Pipeline, and that OSFM is not prevented from taking steps it finds appropriate in its regulatory capacity with respect to Sable’s Restart Plans as contemplated by the federal Consent Decree.

Previous report

On October 22, 2025, OSFM sent a letter to Sable alleging deficiencies in the Company’s compliance with the State Waivers. Sable strongly disagrees with the allegations, which are inconsistent with the plain language and numerous discussions with OSFM experts confirming that Sable was in compliance with the State Waivers. Sable provided its initial response to the OSFM on October 23, 2025, setting forth the Company’s objections to OSFM’s new interpretation of the State Waiver conditions, and plans to supplement its initial response. Refer to the Company’s 8-K filed on October 24, 2025 for more information.

Previous report

Pipeline Maintenance and Repair Work. Federal regulations require Sable to promptly “evaluate all anomalous [pipeline] conditions and remediate those that could reduce a pipeline’s integrity.” The Consent Decree requires Sable to comply with this and other federal regulatory requirements related to pipeline safety at heightened standards. In addition, Sable is required to comply with California Assembly Bill 864’s requirements to install certain safety valves along the Pipelines in Santa Barbara County (the “County”). Accordingly, Sable has undertaken and completed required pipeline repair activities for both Lines 324 and 325, and the installation of the sixteen safety valves required under the approved 2021 Coastal Best Available Technology Plan.

Previous report

California Coastal Commission. On September 27, 2024, the California Coastal Commission (the “Coastal Commission”) issued Notice of Violation No. V-9-24-0152 to Sable, which asserted that Sable’s safety valve installation work and certain maintenance and repair activities undertaken by Sable on the Pipelines in the California coastal zone (the“Coastal Zone”) to address anomalies and install safety valves constituted unpermitted development activities under the California Coastal Act (Cal. Pub. Res. Code Section 30000, et seq.) (the “Coastal Act”) and the County’s Local Coastal Program (“LCP”). Sable undertook the subject repair and maintenance work, including the safety valve installation work, based on its understanding that no new coastal development permit or other Coastal Act authorization was required, consistent with the County’s practice of authorizing repair work on the Pipelines since they were first permitted and built over 30 years ago. Following good faith negotiations with Coastal Commission staff, on November 12, 2024, the Coastal Commission issued Executive Director Cease and Desist Order No. ED-24-CD-02 (the “Order”) requiring Sable to, among other requirements, prepare and submit an interim restoration plan and submit an application either to the Coastal Commission or the County to obtain a coastal development permit for the valve installation and other maintenance and repair work. In compliance with the Order, Sable prepared, submitted, and implemented the Interim Restoration Plan as approved by Coastal Commission staff. Sable separately submitted certain applications to the County related to some of the maintenance and repair work that was subject to Notice of Violation No. V-9-24-0152. The Order expired on February 10, 2025.

Previous report

On February 12, 2025, the County delivered a letter to Sable confirming that certain Pipeline anomaly maintenance and repair work referenced in the Coastal Commission’s Notice of Violation V-9-24-0152 was “authorized by the existing permits (Final Development Plan, Major Conditional Use Permit, and associated Coastal Development Permits) and was analyzed in the prior Environmental Impact Report/Environmental Impact Statement (EIR/EIS).” The letter states in part that “[t]he County previously exercised its authority under its Local Coastal Program and delegated Coastal Act authority in approving the permits and the requested anomaly repair work is within the scope of those approved permits.” Sable subsequently recommenced the repair and maintenance activities which were subject to Notice of Violation V-9-24-0152.

Previous report

In addition, also on February 12, 2025, the County delivered a letter to the Coastal Commission. In this letter, the County responded to a request by the Coastal Commission to consent to a consolidated coastal development permit process for certain activities undertaken and planned by Sable on the Pipelines. The County’s letter also stated that certain maintenance and repair work on the Pipelines that was referenced in the Coastal Commission’s Notice of Violation V-9-24-0152 is “authorized by the existing permits (Final Development Plan, Major Conditional Use Permit, and associated Coastal Development Permits) and was analyzed in the prior Environmental Impact Report/Environmental Impact Statement. Thus, no further application to or action by the County is required.”

Previous report

On February 14, 2025, Sable submitted a written response to the Coastal Commission’s Notice of Violation V-9-24-0152 detailing that, consistent with the County’s letters, certain of the alleged unpermitted development subject to the Notice of Violation was previously approved and that no further coastal development permit is required.

Showing the first 40 of 125 passages. Open the source sections for the rest.

Reworded paragraphs (15)

Previous wording

Unless otherwise indicated, references to “we”, “us”, “our”, “Sable” or the “Company” in this Item 2 are to Sable Offshore Corp. (f/k/a Flame Acquisition Corp.) and its consolidated subsidiaries, following the Business Combination. References to “Flame” are to Flame Acquisition Corp. before the consummation of the Business Combination. References to the “Pipelines” are to Pipeline Segments 324/325 (formerly known as Pipeline Segments 901/903) and the other “324/325 Assets” (formally known as “901/903 Assets” and as defined in the Sable-EM Purchase Agreement). As a result of the closing of the Business Combination, which was accounted for as a forward merger in accordance with GAAP, the financial statements of Successor (as defined below) are now the financial statements of the Company. The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our financial statements and related notes thereto included elsewhere in this Quarterly Report. Certain information contained in the discussion and analysis set forth below includes forward-looking statements that involve risks and uncertainties.

Current wording

Unless otherwise noted or the context otherwise requires, references to (i) the “Company”, “Sable”, “we”, “us”, or “our” in this Item 2 are to Sable Offshore Corp, a Delaware corporation, and its consolidated subsidiaries, following the Business Combination, (ii) “Flame” are to Flame Acquisition Corp. prior to the Business Combination, (iii) the “Santa Ynez Unit” or “SYU” are to the 16 federal leases, three offshore platforms (Hondo, Harmony and Heritage), and associated ancillary facilities located in federal water offshore California, and (iv) the “Santa Ynez Pipeline System” (or “SYPS”) are to the interstate pipeline connecting the SYU to the Pentland Station terminal, inclusive of “Pipeline Segment 324” and “Pipeline Segment 325”, or collectively referred to as “Pipeline Segments 324 and 325” (formerly known as “901/903 Assets” and as defined in the Sable-EM Purchase Agreement), the Las Flores Canyon (“LFC”) onshore processing. storage, and related pipeline assets, and the offshore pipeline connecting the SYU to LFC. The SYU Assets include the SYU and the SYPS. The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our financial statements and related notes thereto included elsewhere in this Quarterly Report. Certain information contained in the discussion and analysis set forth below includes forward-looking statements that involve risks and uncertainties.

Previous wording

The unaudited condensed consolidated financial statements include forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). We have based these forward-looking statements on our current expectations and projections about future events. These forward-looking statements are subject to known and unknown risks, uncertainties and assumptions about us that may cause our actual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by such forward-looking statements. In some cases, you can identify forward-looking statements by terminology such as “may,” “should,” “could,” “would,” “expect,” “plan,” “anticipate,” “believe,” “estimate,” “continue,” or the negative of such terms or other similar expressions. A number of factors could cause actual events, performance or results to differ materially from the events, performance and results discussed in the forward-looking statements. For information identifying important factors that could cause actual results to differ materially from those anticipated in the forward-looking statements, please refer to the risk factors described in Part I, Item 1A “Risk Factors” included in our Annual Report on Form 10-K for the year ended December 31, 2024, and those described in our other SEC filings. The Company’s securities filings can be accessed on the EDGAR section of the SEC’s website at www.sec.gov. Except as expressly required by applicable securities law, the Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

Current wording

The unaudited condensed consolidated financial statements include forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). We have based these forward-looking statements on our current expectations and projections about future events. These forward-looking statements are subject to known and unknown risks, uncertainties and assumptions about us that may cause our actual results, levels of activity, performance or achievements to be materially different from any future results, levels of activity, performance or achievements expressed or implied by such forward-looking statements. In some cases, you can identify forward-looking statements by terminology such as “may,” “should,” “could,” “would,” “expect,” “plan,” “anticipate,” “believe,” “estimate,” “continue,” or the negative of such terms or other similar expressions. A number of factors could cause actual events, performance or results to differ materially from the events, performance and results discussed in the forward-looking statements. For information identifying important factors that could cause actual results to differ materially from those anticipated in the forward-looking statements, please refer to the risk factors described in Part I, Item 1A “Risk Factors” included in our Annual Report on Form 10-K for the year ended December 31, 2025, and those described in our other SEC filings. The Company’s securities filings can be accessed on the EDGAR section of the Securities and Exchange Commission (“SEC”) website at www.sec.gov. Except as expressly required by applicable securities law, the Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

Previous wording

On September 29, 2025, Sable announced that it is evaluating and pursuing an offshore storage and treating vessel (“OS&T”) strategy to provide access to domestic and global markets via shuttle tankers for federal crude oil produced from the SYU in the Pacific Outer Continental Shelf Area (the “OS&T Strategy”). Continued delays related to the Onshore Pipeline have prompted Sable to evaluate and pursue the OS&T Strategy. On October 9, 2025, Sable submitted a Development and Production Plan update for the SYU to the Bureau of Ocean Energy Management (“BOEM”). Prior to implementation of the OS&T strategy, regulatory authorizations are required, including clearance from BOEM.

Current wording

On September 29, 2025, Sable announced that it is evaluating and pursuing an offshore storage and treating vessel (“OS&T”) strategy to provide access to domestic and global markets via shuttle tankers for federal crude oil produced from the SYU in the Pacific Outer Continental Shelf Area (the “OS&T Strategy”). On October 9, 2025, Sable submitted a Development and Production Plan update for the SYU to the Bureau of Ocean Energy Management (“BOEM”). Prior to implementation of the OS&T strategy, regulatory authorizations are required, including clearance from BOEM.

Previous wording

•Depreciation, depletion, amortization, and accretion. Depreciation, depletion and amortization are primarily determined under either the unit-of-production method or the straight-line method, which is based on estimated asset service life taking obsolescence into consideration. Since being shut in, no depletion or amortization has been recorded for the Successor periods presented. An immaterial amount of depreciation was reflected for idle plants in the historical Predecessor financial statements. Also included in the Successor and Predecessor financial statements is the accretion associated with the Company’s estimated asset retirement obligations (“ARO”). The ARO liabilities are initially recorded at their fair value and then are accreted using the Company’s applicable discount rate over the period for the change in their present value until the estimated retirement of the asset.

Current wording

•Depreciation, depletion, amortization, and accretion. Depreciation, depletion and amortization are primarily determined under either the unit-of-production method or the straight-line method, which is based on estimated asset service life taking obsolescence into consideration. Also included in the financial statements is the accretion associated with the Company’s estimated asset retirement obligations (“ARO”). The ARO liabilities are initially recorded at their fair value and then are accreted using the Company’s applicable discount rate over the period for the change in their present value until the estimated retirement of the asset.

Previous wording

•General and administrative. General and administrative (“G&A”) costs are comprised of overhead expenditures directly and indirectly associated with operating the assets. These support services include information technology, risk management, corporate planning, accounting, cash management, human resources, and other general corporate services. For the Predecessor period, any general and administrative expenses that were not specifically identifiable to SYU were allocated to SYU for the period from January 1, 2024 to February 13, 2024. To calculate a reasonable allocation, aggregated historical benchmarking data from comparable companies with similar operated upstream assets was used to identify general and administrative expenses as a proportion of operating expenses. Increased general and administrative services may be required in the future, commensurate with planned operations activity levels.

Current wording

•General and administrative. General and administrative (“G&A”) costs are comprised of overhead expenditures directly and indirectly associated with operating the assets. These support services include information technology, risk management, corporate planning, accounting, cash management, human resources, and other general corporate services. Increased general and administrative services may be required in the future, commensurate with planned operations activity levels.

Previous wording

•Taxes other than income. Management anticipates future increases in ad valorem taxes, in line with the projected restarting sales of production volumes.

Current wording

•Taxes other than income. Management anticipates future increases in ad valorem taxes, in line with the restarting sales of production volumes.

Previous wording

The following table presents selected unaudited condensed consolidated financial results of operations for the Successor and Predecessor periods presented.

Current wording

The following table presents selected unaudited condensed consolidated financial results of operations for the three months ended March 31, 2026 and 2025.

Previous wording

Operating and maintenance expenses. Operating and maintenance expenses were $79.4 million for the three months ended September 30, 2025 (Successor), representing an increase of $53.8 million, or 210%, compared to $25.6 million for the three months ended September 30, 2024 (Successor). The increase in operating and maintenance expenses is primarily attributable to additional maintenance expenses incurred in connection with restart efforts, which includes an 81% increase in operations employee headcount between reporting periods, and $16.0 million related to operator rights expenditures, partially offset by $1.6 million of operating expense capitalized as Inventory and other on the unaudited condensed consolidated balance sheet as of September 30, 2025. Operations and maintenance expenses are expected to remain elevated for the remainder of 2025.

Current wording

Operating and maintenance expenses. Operating and maintenance expenses were $68.0 million for the three months ended March 31, 2026, representing an increase of $33.6 million, or 98%, compared to $34.4 million for the three months ended March 31, 2025. The increase was primarily attributable to additional maintenance and restart–related activities including higher personnel costs driven by a 31% increase in operations headcount, as well as $12.0 million related to operator rights expenditures. This increases were partially offset by $3.8 million of operating expense capitalized to Inventory and linefill within Oil and gas properties on the unaudited condensed consolidated balance sheet as of March 31, 2026. Operations and maintenance expenses are expected to remain elevated for the remainder of 2026, as compared to the prior periods.

Previous wording

General and administrative expenses. G&A expenses were $36.7 million for the three months ended September 30, 2025 (Successor), representing an increase of $10.5 million, or 40%, compared to $26.2 million for the three months ended September 30, 2024 (Successor). The increase in G&A expenses is primarily attributable to $4.6 million in higher compensation related to an 11% increase in general and administrative employee headcount, and $5.8 million in higher legal costs for the three months ended September 30, 2025 (Successor) related to ongoing legal and regulatory matters.

Current wording

General and administrative expenses. G&A expenses were $48.1 million for the three months ended March 31, 2026, an increase of $25.7 million, or 115%, compared to $22.3 million for the three months ended March 31, 2025. The increase was primarily attributable to $12.9 million of higher compensation expense, driven by an 8% increase in general and administrative headcount, and $12.6 million in higher legal expenses related to ongoing legal and regulatory matters.

Previous wording

Following the Closing Date and through September 30, 2025, the Successor reported unrestricted cash of $41.6 million, total debt of $896.6 million, and an accumulated deficit of $1.0 billion. Additionally, the achievement of first production triggered the acceleration of the Senior Secured Term Loan maturity date to 240 days after the production restart date, or January 9, 2026, but is expected to be extended to the earlier of (i) March 31, 2027 or (ii) the date falling 90 days after first sales of Hydrocarbons (as defined in the Senior Secured Term Loan) upon effectiveness of the Second Debt Amendment (refer to Note 6 — Debt for additional details regarding the Second Debt Amendment).

Current wording

As of March 31, 2026, the Company reported unrestricted cash of $52.2 million, total debt of $956.3 million, and an accumulated deficit of $1.3 billion. On March 29, 2026, the maturity date of the Senior Secured Term Loan was accelerated to 90 days after the first sales of Hydrocarbons (as defined in the Senior Secured Term Loan), or June 26, 2026 (refer to Note 4 — Debt for additional details regarding the acceleration of the maturity date).

Previous wording

Cash Flows from Financing Activities. Net cash provided by financing activities was $282.5 million for the nine months ended September 30, 2025 (Successor), consisting of $295.0 million of gross proceeds from the 2025 Offering and related paid fees of $12.5 million. Net cash provided by financing activities for the period January 1, 2024 through February 13, 2024 (Predecessor) was $22.5 million and net cash provided by financing activities for the period February 14, 2024 through September 30, 2024 (Successor) was $618.4 million, respectively, or a combined $640.9 million.

Current wording

Cash Flows from Financing Activities. Net cash provided by financing activities was $57.8 million for the three months ended March 31, 2026, primarily consisting of $72.4 million of gross proceeds from ATM Program, net of $14.4 million of offering costs related to the ATM Offering and the 2025 equity offerings. Net cash used in financing activities for the three months ended March 31, 2025 was less than $0.1 million.

Previous wording

Pursuant to the Senior Secured Term Loan, which financed most of the Purchase Price (as defined in the Senior Secured Term Loan), Sable will pay interest at ten percent (10%) per annum compounded annually, payable in arrears on January 1st of each year. At Sable’s election, accrued but unpaid interest may be deemed paid on each interest payment date by adding the amount of interest owed to the outstanding principal (paid-in-kind) amount under the Senior Secured Term Loan. On December 13, 2024, the Company entered into the Fourth Amendment to the Sable-EM Purchase Agreement, pursuant to which the following definitions were amended. “Restart Production” was redefined as 150 days after first production, extending the maturity date of the EM Term Loan by 60 days. “Restart Failure Date” was extended an additional 60 days to March 1, 2026.

Current wording

Pursuant to the Senior Secured Term Loan, which financed most of the Purchase Price (as defined in the Senior Secured Term Loan), Sable incurred interest for the period prior to the effectiveness of the Second Debt Amendment of ten percent (10%) per annum, and fifteen percent (15%) per annum subsequent to the Second Debt Amendment, compounded annually (refer to Note 4 — Debt for additional details regarding the Second Debt Amendment). Interest on the Senior Secured Term Loan is payable in arrears on January 1st of each year but, at Sable’s election, accrued but unpaid interest may be deemed paid on each interest payment date by adding the amount of interest owed to the outstanding principal (paid-in-kind) amount. The maturity date of the Senior Secured Term Loan is June 26, 2026.

Previous wording

Additional obligations include the performance of ARO as referenced under “Critical Accounting Policies and Estimates—Asset Retirement Obligations” below.

Current wording

Additional obligations include the performance of ARO as referenced under “Critical Accounting Policies and Estimates—Asset Retirement Obligations” included in our Annual Report on Form 10-K for the fiscal year ended December 31, 2025.

Previous wording

We are an “emerging growth company,” or EGC, as defined in Section 2(a) of the Securities Act, as modified by the JOBS Act, and it has elected to comply with certain reduced public company reporting requirements. Sable could remain an emerging growth company until the last day of the fiscal year following the fifth anniversary of the completion of the Company IPO. However, if (a) Sable’s total annual gross revenue exceed $1.235 billion, (b) Sable is deemed to be a large accelerated filer, which means the market value of Common Stock that is held by non-affiliates exceeds $700.0 million as of the end of the prior fiscal year’s second fiscal quarter, or (c) Sable’s non-convertible debt issued within a three-year period exceeds $1.0 billion, Sable would cease to be an emerging growth company as of the following fiscal year.

Current wording

We are an “emerging growth company,” or EGC, as defined in Section 2(a) of the Securities Act, as modified by the JOBS Act, and it has elected to comply with certain reduced public company reporting requirements.

Previous wording

We will no longer be an EGC or SRC as of December 31, 2025, after which we will not be able to take advantage of the reduced reporting and disclosure requirements discussed above.

Current wording

We will no longer be an EGC as of December 31, 2026, after which we will not be able to take advantage of such reduced reporting and disclosure requirements.
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

The following table presents selected unaudited condensed consolidated financial results of operations for the Successor periods presented.

Previous report — wording carried elsewhere

Depreciation, Depletion and Amortization. Depreciation, depletion and amortization are primarily determined under the unit-of-production method, which is based on estimated asset service life taking obsolescence into consideration.