Sable Offshore Corp.

For the period ended Sep 30, 2025. Filed Nov 13, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2025 · Filed Nov 13, 2025

SOC$1.93+6.0%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-06-30; filed 2025-08-12.

0001831481-25-000064

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-09-30; filed 2025-11-13.

0001831481-25-000103

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 119 previous paragraphs and 155 current paragraphs.

67 unchanged; 42 reworded; 43 added; 6 removed; 4 previous and 3 current paragraphs rearranged.

Tables are not compared: 3 previous and 3 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (43)

Current report

On November 10, 2025, the Company entered into subscription agreements with certain investors (the “Third PIPE Investors”), pursuant to which, among other things, the Third PIPE Investors agreed to subscribe for and purchase from the Company, and the Company agreed to issue and sell to the Third PIPE Investors an aggregate of 45,454,546 newly issued shares of its Common Stock at a purchase price of $5.50 per share for an aggregate purchase price of approximately $250.0 million, on the terms and subject to the conditions set forth therein (the “Third PIPE Investment”). The issuance and sale of the Common Stock in the Third PIPE Investment was completed on November 12, 2025. The Company intends to use the proceeds from the Third PIPE Investment for general corporate purposes. The Third PIPE Investment is expected to satisfy the common equity contribution condition of the Senior Secured Term Loan amendment announced by the Company on November 3, 2025, as previously discussed in Note 6 — Debt.

Current report

On September 29, 2025, Sable announced that it is evaluating and pursuing an offshore storage and treating vessel (“OS&T”) strategy to provide access to domestic and global markets via shuttle tankers for federal crude oil produced from the SYU in the Pacific Outer Continental Shelf Area (the “OS&T Strategy”). Continued delays related to the Onshore Pipeline have prompted Sable to evaluate and pursue the OS&T Strategy. On October 9, 2025, Sable submitted a Development and Production Plan update for the SYU to the Bureau of Ocean Energy Management (“BOEM”). Prior to implementation of the OS&T strategy, regulatory authorizations are required, including clearance from BOEM.

Current report

Preparations for the OS&T Strategy include the acquisition of a suitable OS&T vessel, certain refitting and upgrades to the vessel and the SYU equipment, transportation of the vessel to SYU, and related installation. In connection with implementation of the OS&T Strategy, the Company expects to opportunistically acquire an existing OS&T in Q1 2026, with delivery of the vessel expected in Q3 2026. Following the acquisition of the vessel, and vessel and platform upgrades and installation, Sable would expect to begin sales from all SYU platforms in Q4 2026, with expected comprehensive oil production rates of over 50,000 barrels of oil per day, utilizing the OS&T within the SYU federal leases, provided the Company receives regulatory clearances. See Risk Factors—Risks Associated with Our Operations—In order to commence operations pursuant to an OS&T offtake strategy, we will require clearances and permitting, including from BOEM.”

Current report

On November 3, 2025, the Company and Exxon entered into an amendment (the “Second Debt Amendment”) to the Senior Secured Term Loan. The Second Debt Amendment will become effective upon the satisfaction of certain conditions, including the Company receiving equity contributions in an amount of no less than $225.0 million, net of underwriting fees and other transaction costs and expenses, and other customary closing conditions. The Second Debt Amendment, once effective, will extend the maturity date of the Senior Secured Term Loan to the earlier of (i) March 31, 2027 or (ii) 90 days after first sales of Hydrocarbons (as defined in the Senior Secured Term Loan). The Second Debt Amendment, once effective, will increase the interest rate from ten percent (10%) per annum to fifteen percent (15%) per annum, compounded annually, payable in arrears on January 1st of each year. At the Company’s election, accrued but unpaid interest may be deemed paid on each interest payment date by adding the amount of interest owed to the outstanding principal (paid-in-kind) amount under the Senior Secured Term Loan. The Second Debt Amendment will also include additional reporting covenants and a financial liquidity covenant that will require the Company to have not less than $25.0 million in unrestricted cash, measured at the end of each month. There is no guarantee that the Company will be able to satisfy the necessary conditions to effect the Second Debt Amendment.

Current report

Restart of Production and Resuming Petroleum Transportation through 324 and 325

Current report

On May 15, 2025, Sable initiated oil production from six wells on Platform Harmony at SYU and began flowing oil production to Las Flores Canyon (“LFC”) at an initial rate of approximately 6,000 barrels of oil per day.

Current report

On May 18, 2025, Sable completed anomaly repairs on Line 324 (formerly known as Line 901), which extends from the Las Flores Station on the California coast to the Gaviota Pump Station in Santa Barbara County, California, and Line 325 (formerly known as Line 903), which extends from the Gaviota Pump Station to Pentland Station in Kern County, California, the point of sale. With the completion of such repairs, Sable has now completed its anomaly repair program on the Onshore Pipeline as specified by a Consent Decree that Plains entered into with various governmental agencies in 2020 (the “Consent Decree”), the governing document for resuming petroleum transportation through the Onshore Pipeline.

Current report

The Consent Decree requires the approval from the California Department of Forestry and Fire Protection’s Office of State Fire Marshall (“OSFM”) regarding restart plans for each of the Pipelines (the “Restart Plans”) prior to resuming petroleum transportation through Lines 324 and 325 (the “Pipeline Restart”). The Consent Decree prescribes what must be submitted in the Restart Plans. On July 29, 2024, Pacific Pipeline Company (“PPC”) submitted the Restart Plans to OSFM for approval. As of May 27, 2025, Sable has conducted successful hydrotests on all segments of Line 324 and Line 325.

Current report

On October 22, 2025, OSFM sent a letter to Sable alleging deficiencies in the Company’s compliance with the State Waivers. Sable strongly disagrees with the allegations, which are inconsistent with the plain language and numerous discussions with OSFM experts confirming that Sable was in compliance with the State Waivers. Sable provided its initial response to the OSFM on October 23, 2025, setting forth the Company’s objections to OSFM’s new interpretation of the State Waiver conditions, and plans to supplement its initial response. Refer to the Company’s 8-K filed on October 24, 2025 for more information.

Current report

Pipeline Maintenance and Repair Work. Federal regulations require Sable to promptly “evaluate all anomalous [pipeline] conditions and remediate those that could reduce a pipeline’s integrity.” The Consent Decree requires Sable to comply with this and other federal regulatory requirements related to pipeline safety at heightened standards. In addition, Sable is required to comply with California Assembly Bill 864’s requirements to install certain safety valves along the Pipelines in Santa Barbara County (the “County”). Accordingly, Sable has undertaken and completed required pipeline repair activities for both Lines 324 and 325, and the installation of the sixteen safety valves required under the approved 2021 Coastal Best Available Technology Plan.

Current report

On April 10, 2025, the Coastal Commission approved Cease and Desist Order CCC-25-CD-01, Restoration Order CCC-25-RO-01, and Administrative Penalty Order CCC-25-AP3-01, whereby the Coastal Commission ordered the Company to cease and desist from all ongoing development in the Coastal Zone “as part of the effort to restart the Santa Ynez Unit oil production operations and bring the pipelines back into use,” apply for new Coastal Act authorization for all previously completed, ongoing, and future development in the Coastal Zone to the extent “part of the effort to restart the Santa Ynez Unit oil production operations and bring the pipelines back into use,” and imposed an administrative penalty of approximately $18.0 million on the Company. Sable is prepared to vigorously pursue all available legal remedies related to the orders, including the administrative penalty, imposed by the Coastal Commission.

Current report

On April 16, 2025 the Coastal Commission filed a request in the Santa Barbara County Superior Court for a temporary restraining order against the Company to restrain the Company from violating the Cease and Desist Order CCC-25-CD-01 and to halt repair and maintenance activities on the Pipelines within the Coastal Zone. The request was filed within the Company’s ongoing litigation against the Coastal Commission (Case No. 25CV00974). On April 17, 2025, the court denied the Coastal Commission’s request for a temporary restraining order and set the matter for further hearing on May 14, 2025, which date was later continued to May 28, 2025.

Current report

On May 28, 2025, the court granted the Coastal Commission’s application for issuance of a preliminary injunction, enjoining Sable from conducting any further “development” in violation of Cease and Desist Order CCC-25-CD-01. On July 9, 2025, the court denied Sable’s motion to stay the Cease and Desist Order CCC-25-CD-01. On July 16, 2025, Sable filed a notice of appeal of challenging the court’s issuance of preliminary injunction. On July 29, 2025, counsel for Sable filed a Petition for Writ of Mandate or Other Appropriate Relief with the Second Division California Court of Appeal, seeking a writ of mandate reversing the Santa Barbara County Superior Court’s denial of Sable’s motion to the stay Cease and Desist Order CCC-25-CD-01. On August 4, 2025, the Court of Appeal denied Sable’s Petition for Writ of Mandate. Sable’s opening brief, reporter transcript and appendix of actions are due to be submitted to the Court of Appeal by November 14, 2025. On October 6, 2025, Sable filed a motion to file an amended complaint which quantifies its monetary damages in excess of $347 million. On October 15, 2025, the Santa Barbara County Superior Court denied the Company’s request for the issuance of a writ of mandate on its first cause of action and set procedural motions related to Sable’s four additional causes of action for December 3, 2025. On November 5, 2025, Sable filed its opening brief in support of its appeal challenging the Superior Court’s issuance of the preliminary injunction. Sable also filed a Petition for Writ of Mandate or Other Appropriate Relief, seeking a writ of mandate reversing the Superior Court’s October 15, 2025, denial of Sable’s first cause of action.

Current report

On June 27, 2024, the Center for Biological Diversity and the Wishtoyo Foundation filed a complaint against Debra Haaland, Secretary of the U.S. Department of the Interior; the Bureau of Safety and Environmental Enforcement (“BSEE”); and Bruce Hesson, BSEE Pacific Regional Director in the U.S. District Court for the Central District of California (Case No. 2:24-cv-05459). Sable intervened and vigorously contests the plaintiffs’ allegations. In the plaintiffs’ amended complaint, they allege that BSEE: violated the National Environmental Policy Act (“NEPA”), the Outer Continental Shelf Lands Act (“OCSLA”), and the Administrative Procedure Act (“APA”) in November 2023 by approving an extension to resume operations associated with the16 oil and gas leases Sable holds in the SYU in federal waters offshore of California in the Santa Barbara Channel; and violated NEPA and the APA in September 2024 by approving applications for permits to modify for well reworking operations and by failing to conduct supplemental environmental analysis for oil and gas development and production in the SYU. The complaint asks for the court: to issue an order finding that BSEE violated NEPA, OCSLA and the APA; to vacate and remand the extension and the applications for permits to modify; to order BSEE to complete NEPA analysis by a date certain; to prohibit BSEE from authorizing further extensions, applications for permits to modify, or any other authorizations for resuming production until it complies with NEPA, OCSLA and the APA; and for an award of costs and attorneys’ fees. Sable believes that the government’s prior extensions to resume operations were both appropriate and authorized and independently that subsequent actions, including a May 28, 2025 Environmental Assessment relied on by BSEE and a May 29, 2025 decision by BSEE approving the extension, render plaintiffs’ claims moot. On September 24, 2025, the court denied cross-motions for summary judgment by all parties. On November 7, 2025, the court approved a new scheduling order that provides for an amended complaint, the filing by the federal government of an updated administrative record by December 19, 2025, and a hearing on disputes over completeness of or for leave to seek discovery related to the administrative record on March 13, 2026.

Current report

Regional Water Quality Control Board and Department of Fish and Wildlife Matters

Current report

On December 13, 2024, the California Central Coast Regional Water Quality Control Board (“Water Board”) issued three letters to the Company related to the Pipelines: (i) a Notice of Violation for an alleged unauthorized discharge of waste to waters of the state at an ephemeral stream in Santa Barbara County; (ii) a Directive to obtain regulatory coverage for an alleged unauthorized discharge of waste to waters of the state at the same ephemeral stream identified in item (i); and (iii) a First Notice of Non-Compliance for an alleged failure to obtain coverage under the Water Board’s General Permit for Construction Stormwater Discharges in Santa Barbara, San Luis Obispo, and Kern Counties.

Current report

On December 17, 2024, the California Department of Fish and Wildlife (“CDFW”) issued a Notice of Potential Violation to Sable for alleged violations of the California Fish and Game Code at four separate sites within Santa Barbara County and San Luis Obispo County in California for alleged placement or fill of waste to waters.

Current report

On January 10, 2025, Sable submitted a written response to the Water Board’s December 2024 letters. On January 13, 2025, Sable submitted a written response to CDFW’s December 2024 Notice of Potential Violation. On January 22, 2025, the Water Board issued two additional letters to Sable related to the Pipelines: (i) a Second and Final Notice of Non-Compliance for an alleged failure to obtain coverage under the Water Board’s General Permit for Construction Stormwater Discharges in Santa Barbara, San Luis Obispo, and Kern Counties; and (ii) an order requiring Sable to submit a technical report associated with the discharge of earthen material to waters of the state.

Current report

On January 31, 2025, Sable submitted an application to the Water Board for regulatory coverage for the alleged discharge of waste to waters of the state at the location identified in the Water Board’s December 13, 2024, Notice of Violation, and coverage was approved and issued by the Water Board on March 20, 2025. On February 18, 2025, Sable submitted an application to CDFW for the same site, that application was deemed complete in March 2025, and work at the site was approved to proceed in May 2025. On February 21, 2025, the Company submitted a written response to the Water Board’s Second and Final Notice of Non-Compliance. On March 7, 2025, Sable submitted its initial responses to the Water Board’s order requiring Sable to submit a technical report, and on April 15, 2025, the Company submitted a supplemental response, that Sable committed to provide in its March initial response.

Current report

Sable submitted after-the-fact permitting applications to the Water Board and CDFW with respect to potential discharges at the four sites identified in CDFW’s December 2024 notice during the first two weeks of March 2025. The Water Board provided responses and requests for additional information in April 2025, to which the Company provided supplemental information on April 25, 2025. These sites were fully permitted by the Water Board in June 2025 and by CDFW as of September 2025.

Current report

On April 15, 2025, the Water Board issued a second Notice of Violation to the Company for an alleged failure to provide a sufficient response to the Water Board’s request for a technical report and continued allegations of unauthorized discharges. On that same day, the Company submitted to the Water Board further responses and additional information in response to the Water Board’s request for a technical report, in which the Company identified additional sites that may require after-the-fact permitting. On April 17, 2025, the Water Board issued Resolution R3-2025-0024, which referred any assessment of civil liability, injunctive and declaratory relief against the Company for its alleged violations of the California Water Code to the California Attorney General via the California Superior Court. After the issuance of Resolution R3-2025-0024, the Company continued to work with the Water Board and CDFW to identify locations and submit additional after-the-fact permit applications. On July 24, 2025, the Water Board issued a third Notice of Violation, requiring the Company to provide additional information in order to satisfy the request for a technical report, to which the Company timely responded on August 13, 2025 with all requested information. As of November 11, 2025, the Water Board and CDFW have each has issued permits for five locations identified by the Water Board, CDFW, and the Company. Nine additional locations (for a total of 14) are awaiting final approvals from both the Water Board and CDFW. Based on the information provided by Sable in response to the Notices of Non-Compliance associated with the Water Board’s General Permit for Construction Stormwater Discharges, the Water Board is not further requiring Sable to obtain coverage under that permit for the work performed.

Current report

On September 16, 2025, the Santa Barbara County District Attorney’s office filed a criminal Complaint in Santa Barbara County Superior Court, with 21 Counts being pursued (sixteen (16) misdemeanors and five (5) felonies) for alleged violation of the California Fish & Game Code and Water Code. The Complaint references some of the 14 locations where the Company has already sought after-the-fact permitting from the Water Board and CDFW, but also includes other locations where neither the Water Board nor the CDFW are requiring any further action or permitting. The Company has retained counsel for defense. On October 3, 2025, the Water Board filed a civil action in Santa Barbara County Superior Court alleging that the Company failed to secure permits at the 14 locations prior to undertaking the work, though the Complaint also notes the Company’s after-the-fact permitting efforts. The Complaint also alleges failure to comply with the request for a technical report. The Water Board is seeking civil penalties and potentially limited injunctive relief.

Current report

In October 2024, the County of Santa Barbara’s Planning Commission approved the transfer of the Final Development Permits for the SYU, POPCO Facility and Pipelines from Exxon and certain of its subsidiaries to the Company and its subsidiaries, PPC and POPCO, pursuant to Santa Barbara County Code Chapter 25B. That approval was appealed by various environmental advocacy groups to the Board of Supervisors. On February 25, 2025, the Board of Supervisors heard the appeals but, despite a County staff recommendation to reject them, did not decide them, splitting 2-2 in a tie vote. As the appeals did not reverse the Planning Commission’s decision, the Company thereafter sought the permit transfers from the County, but was unsuccessful.

Current report

On May 8, 2025, the Company, its subsidiaries, PPC and POPCO, and Exxon and certain of its subsidiaries filed suit against the County of Santa Barbara and Board of Supervisors seeking a writ of mandamus directing Santa Barbara County to issue updated Final Development Permits reflecting the Sable plaintiffs as holders thereof, for declaratory relief finding that the County’s Chapter 25B ordinances violate the 5th and 14th amendments and Supremacy Clause of the Constitution and for damages. On September 12, 2025, after hearing, the court issued an order of mandate requiring that “within 60 days of service of the writ of mandate on the Board, hold a de novo public hearing to affirm, reverse, or modify the Planning Commission’s decision regarding Petitioners/Plaintiffs’ Final Development Permit applications in this action in compliance with Santa Barbara County Code Chapter 25B-8, 9, and 10.If the Board is unable to reach a vote that affirms, reverses, or modifies the Planning Commission’s decision, the Board shall hold another de novo public hearing within 45 days, and if unable again, every 45 days thereafter.” The County set a hearing in this matter pursuant to the writ of mandate for November 4, 2025, and at that hearing the Board voted to continue the hearing until December 16, and directed County Staff to prepare findings that would grant the appeals and deny the transfer of the permits to Sable for consideration at that hearing. The litigation has been stayed pending the final action at the Board of Supervisors’ re-hearing, after which the matter will return to federal court.

Current report

On July 28, 2025, shareholder Tracy Johnson filed a putative class action complaint against the Company in the U.S. District Court for the Central District of California, captioned Johnson v. Sable Offshore Corp., et al., Case No. 2:25-cv-06869 (C.D. Cal). The complaint alleged violations of Sections 10(b) and 20(a) of the Exchange Act of 1934 and Sections 11, 12(a)(2), and 15 of the Securities Act of 1933, on behalf of a putative class of investors who purchased or acquired Sable’s publicly traded securities between May 19, 2025 and June 3, 2025, when the Company engaged in a public offering, and/or pursuant and/or traceable to the offering. The complaint named as defendants the Company, certain of its officers, and the underwriters in the offering.

Current report

On October 27, 2025, the Court appointed a lead plaintiff. On November 10, 2025, the lead plaintiff filed an amended complaint purportedly on behalf of persons or entities who purchased or otherwise acquired publicly traded Sable securities between May 19, 2025 and November 4, 2025. The amended complaint drops the claims under the Securities Act of 1933 and drops the underwriters as defendants. The amended complaint alleges, among other things, that the Company and certain of its officers made false and misleading statements or failed to disclose certain information regarding the Company’s business activities at the Santa Ynez Unit. The plaintiffs seek damages, costs, expenses, expert and attorneys’ fees, and other unspecified relief. Motions to dismiss are due on November 24, 2025, and a hearing on any motions to dismiss will be held on January 5, 2026. The Company intends to vigorously defend against the claims in this lawsuit.

Current report

On August 21, 2025, shareholder Bryce Kelly filed a verified shareholder derivative complaint, purportedly on behalf of the Company, in the U.S. District Court for the Central District of California, captioned Kelly v. Flores, et al., Case No. 2:25-cv-07848 (C.D. Cal.). The complaint names as defendants the members of the Board of Directors of the Company, certain officers of the Company, and the underwriters of the Company’s May 2025 public offering. The complaint alleges claims for breach of fiduciary duty, aiding and abetting breach of fiduciary duty, unjust enrichment, waste of corporate assets, contribution under Section 10(b) and 21D of the Exchange Act of 1934, and contribution under Section 11(f) of the

Current report

Securities Act of 1933, based on similar factual allegations to those at issue in the Johnson case. The case is at a preliminary stage.

Current report

On May 9, 2025, the California Department of Conservation’s Geologic Energy Management Division (“CalGEM”) issued a letter to the Company asserting that that the Company must post a bond of approximately $31.9 million, submit certain oil spill contingency response and management plans for CalGEM’s review, and indicating that the failure to timely respond could result in civil penalties of up to $50,000 per day/per violation. Sable disputes that CalGEM possesses jurisdiction to impose those requirements.

Current report

On September 13, 2025, the California Legislature passed Senate Bill 237 (“SB 237”). On September 19, 2025, Governor Gavin Newsom signed SB 237 into law. SB 237 added Section 51014.1 to the California Government Code, which requires that an “existing oil pipeline … that has been idle, inactive, or out of service for five years or more, shall not be restarted without passing a spike hydrostatic testing program.” SB 237 also amends Section 30262 of the California Coastal Act to provide that the “[r]epair, reactivation, [] maintenance,” or “[d]evelopment associated with the repair, reactivation or maintenance of an oil pipeline that has been idled, inactive or out of service for five years or more” must obtain a “new coastal development permit.”

Current report

On September 29, 2025, Sable filed a Complaint for Declaratory Relief against the State of California in Kern County Superior Court seeking a declaratory judgment that the Onshore Pipeline is not subject to SB 237 because the Onshore Pipeline is not “idle, inactive, or out of service,” and because the Legislature did not give SB 237 retroactive effect. Sable intends to vigorously prosecute the action.

Showing the first 40 of 43 passages. Open the source sections for the rest.

Removed paragraphs (6)

Previous report

On February 16, 2025, the Coastal Commission sent Sable a “Notice Prior to Issuance of Executive Director Cease and Desist Order” related to certain of Sable’s Pipeline repair and maintenance activities and safety valve installation work. On February 17, 2025, Sable replied to the Coastal Commission with a letter stating that the “Coastal Act does not authorize the issuance of an [Executive Director Cease and Desist Order] under the present circumstances” and that “Sable intends to proceed with the anomaly repair work authorized by the County in its February 12, 2025 letter.”

Previous report

On April 10, 2025 the Commission voted to issue a Cease-and-Desist Order, Restoration Order, and Administrative Penalty Order (“CDO”), which included the imposition of an approximately $18.0 million administrative penalty on the Company, in connection with the previously described alleged unpermitted development undertaken by the Company in the California coastal zone. The Company does not believe this penalty is lawful. The Company is committed to contesting the claims and intends to vigorously defend the Company's interest.

Previous report

date. Refer to Note 6 — Debt for additional disclosures regarding the Senior Secured Term Loan.
Reworded paragraphs (42)

Previous wording

On May 23, 2025 the upsized underwritten public offering of 10,000,000 shares of Common Stock at the public offering price of $29.50 per share closed. Upon the closing of the 2025 Offering, associated marketing fees and legal fees of approximately $12.4 million were incurred, and were recognized as an offset to the proceeds from the 2025 Offering within Additional paid-in capital in the unaudited condensed consolidated balance sheet and statement of stockholders' equity (deficit)/net parent investment as of June 30, 2025. The Company intends to use the approximately $282.6 million of net proceeds from the 2025 Offering for capital expenditures, working capital purposes and general corporate purposes.

Current wording

On May 23, 2025 the upsized underwritten public offering of 10,000,000 shares of Common Stock at the public offering price of $29.50 per share closed. Upon the closing of the 2025 Offering, associated marketing fees and legal fees of approximately $12.4 million were incurred, and were recognized as an offset to the proceeds from the 2025 Offering within Additional paid-in capital in the unaudited condensed consolidated balance sheet and statement of stockholders’ equity (deficit)/net parent investment as of September 30, 2025. The Company received approximately $282.6 million of net proceeds from the 2025 Offering to be used for capital expenditures, working capital purposes and general corporate purposes.

Previous wording

2015, an onshore pipeline operated by Plains All American Pipeline, L.P. (“Plains”) that transported produced oil from SYU experienced a leak. The SYU offshore platforms and facilities suspended production after the incident, the SYU Assets were shut in and the facilities were placed in a safe state. Prior to May 15, 2025, the offshore facilities had not produced oil and gas since May 2015; however, all equipment remained in place in an operation-ready state, requiring ongoing inspections, maintenance and surveillance. As part of these efforts, all equipment was drained, flushed and purged in 2016. All hydrocarbon pipelines within SYU were placed in a safe state and regularly monitored. In 2020, Plains entered into a Consent Decree, that provides a path for a potential restart of the Onshore Pipeline.

Current wording

Beginning in 1968 and over the course of 14 years, EM consolidated more than a dozen offshore federal oil leases and organized them into a streamlined production unit known as SYU. SYU consists of three offshore platforms and a wholly owned onshore processing facility located along the Gaviota Coast at Las Flores Canyon in Santa Barbara County, California. SYU’s onshore facilities and the three offshore platforms remained in continuous operation until 2015. In May 2015, an onshore pipeline operated by Plains All American Pipeline, L.P. (“Plains”) that transported produced oil from SYU experienced a leak. The SYU offshore platforms and facilities suspended production after the incident, the SYU Assets were shut in and the facilities were placed in a safe state. Prior to May 15, 2025, the offshore facilities had not produced oil and gas since May 2015; however, all equipment remained in place in an operation-ready state, requiring ongoing inspections, maintenance and surveillance. As part of these efforts, all equipment was drained, flushed and purged in 2016. All hydrocarbon pipelines within SYU were placed in a safe state and regularly monitored. In 2020, Plains entered into a Consent Decree, that provides a path for a potential restart of the Onshore Pipeline.

Previous wording

On December 17, 2024, the California Office of the State Fire Marshal (“OSFM”) issued two “Letters of Decision” approving Sable’s implementation of enhanced pipeline integrity standards for the Onshore Pipeline. In recognition of these robust measures, OSFM granted state waivers of certain regulatory requirements related to cathodic protection and seam weld corrosion for the Onshore Pipeline. The U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration (“PHMSA”), on February 11, 2025, delivered notices to OSFM that PHMSA does not object to OSFM’s December 17, 2024 Letters of Decision approving the implementation of enhanced integrity standards for the Onshore Pipeline or OSFM’s granting of state waivers of certain regulatory requirements related to cathodic protection and seam weld corrosion for the Onshore Pipeline.

Current wording

State Waivers. On December 17, 2024, OSFM approved Sable’s implementation of enhanced pipeline integrity standards for the Pipelines by granting state waivers of certain regulatory requirements (“State Waivers”) related to cathodic protection and seam weld corrosion for the Pipelines.

Previous wording

On June 3, 2025, the Santa Barbara County Superior Court Judge presiding over the OSFM Lawsuits issued an order preventing OSFM from issuing any further authorizations for the Las Flores Pipeline System and preventing Sable from restarting the Las Flores Pipeline System until a hearing could be held on an order for OSFM to show cause why a preliminary injunction should not be issued. A hearing was held on July 18, 2025, and on July 29, 2025, the court entered an order granting petitioners’ application for issuance of preliminary injunction in part, ruling that, absent further order of the court, Sable may restart the Las Flores Pipeline System ten (10) court days after Sable files notice that Sable has received all necessary approvals and permits for restart. The court clarified that Sable is not prevented from taking steps toward restarting the Las Flores Pipeline, and that the OSFM is not prevented from taking steps it finds appropriate in its regulatory capacity with respect to Sable’s restart plans as contemplated by the federal consent decree.

Current wording

Two lawsuits have been filed against OSFM (as Defendant) and Sable and PPC (as Real Parties in Interest) challenging OSFM’s issuance of the State Waivers. On April 15, 2025, the Center for Biological Diversity and the Wishtoyo Foundation filed a Verified Petition for Writ of Mandate and Complaint for Declaratory and Injunctive Relief alleging that OSFM violated federal and state pipeline safety laws and the California Environmental Quality Act (“CEQA”) in issuing the State Waivers (Case No. 25CV02244). The Environmental Defense Center, Get Oil Out!, Santa Barbara County Action Network, Sierra Club, and Santa Barbara Channelkeeper also filed a Verified Petition for Writ of Mandate and Complaint for Declaratory and Injunctive Relief against OSFM against OSFM (as Defendant) and Sable and PPC (as Real Parties in Interest) alleging similar claims (Case No. 25CV02247). Both groups of Petitioners seek a court order declaring the State Waivers void and directing OSFM to vacate and set aside the State Waivers until OSFM complies with its obligations under federal and state pipeline safety laws and CEQA. A hearing was held on July 18, 2025, and on July 29, 2025, the court entered an order granting petitioners’ application for issuance of preliminary injunction in part, ruling that, absent further order of the court, Sable may resume petroleum transportation through the Onshore Pipeline 10 court days after Sable files notice that Sable has received all necessary approvals and permits for such resumption. The court clarified that Sable is not prevented from taking steps toward restarting the Onshore Pipeline, and that OSFM is not prevented from taking steps it finds appropriate in its regulatory capacity with respect to Sable’s Restart Plans as contemplated by the federal Consent Decree.

Previous wording

On September 27, 2024, the Coastal Commission (“Commission”) issued Notice of Violation No. V-9-24-0152 to the Company, which asserted that certain maintenance and repair activities undertaken by the Company on the Pipelines in the Coastal Zone to address identified anomalies and install safety valves constituted unpermitted development activities under the California Coastal Act (Cal. Pub. Res. Code Section 30000, et seq. (the “Coastal Act”) and the County of Santa Barbara’s (“County”) Local Coastal Program (“LCP”). Sable undertook the subject repair and maintenance work, including the safety valve installation work, based on its understanding that no new coastal development permit or other Coastal Act authorization was required, consistent with the County’s practice of authorizing certain repair work on the Pipelines since they were first permitted and built over 30 years ago, as well as the County’s acknowledgement that it does not have permit authority or jurisdiction over the Company’s installation of the new safety valves in the County along the Pipelines. Following good faith negotiations with Commission staff, on November 12, 2024, the Coastal Commission issued Executive Director Cease and Desist Order No. ED-24-CD-02 to the Company requiring the Company to, among other requirements, prepare and submit an Interim Restoration Plan and submit an application either to the Commission or the County to obtain a coastal development permit for the valve installation and other maintenance and repair work. In compliance with the Order, Sable prepared, submitted, and implemented the Interim Restoration Plan as approved by Commission staff. Sable separately submitted certain applications to the County related to some of the maintenance and repair work that was subject to Notice of Violation No. V-9-24-0152. The Order expired on February 10, 2025.

Current wording

California Coastal Commission. On September 27, 2024, the California Coastal Commission (the “Coastal Commission”) issued Notice of Violation No. V-9-24-0152 to Sable, which asserted that Sable’s safety valve installation work and certain maintenance and repair activities undertaken by Sable on the Pipelines in the California coastal zone (the“Coastal Zone”) to address anomalies and install safety valves constituted unpermitted development activities under the California Coastal Act (Cal. Pub. Res. Code Section 30000, et seq.) (the “Coastal Act”) and the County’s Local Coastal Program (“LCP”). Sable undertook the subject repair and maintenance work, including the safety valve installation work, based on its understanding that no new coastal development permit or other Coastal Act authorization was required, consistent with the County’s practice of authorizing repair work on the Pipelines since they were first permitted and built over 30 years ago. Following good faith negotiations with Coastal Commission staff, on November 12, 2024, the Coastal Commission issued Executive Director Cease and Desist Order No. ED-24-CD-02 (the “Order”) requiring Sable to, among other requirements, prepare and submit an interim restoration plan and submit an application either to the Coastal Commission or the County to obtain a coastal development permit for the valve installation and other maintenance and repair work. In compliance with the Order, Sable prepared, submitted, and implemented the Interim Restoration Plan as approved by Coastal Commission staff. Sable separately submitted certain applications to the County related to some of the maintenance and repair work that was subject to Notice of Violation No. V-9-24-0152. The Order expired on February 10, 2025.

Previous wording

On February 12, 2025 the County Planning and Development Department delivered a letter to Sable confirming that certain pipeline repair work on the Pipelines was “authorized by the existing permits (Final Development Plan, Major Conditional Use Permit, and associated Coastal Development Permits) and was analyzed in the prior Environmental Impact Report/Environmental Impact Statement (EIR/EIS).” The letter states in part that “[t]he County previously exercised its authority under its Local Coastal Program and delegated Coastal Act authority in approving the permits and the requested anomaly repair work is within the scope of those approved permits.” Sable subsequently recommenced the repair and maintenance activities which were subject to Notice of Violation V-9-24-0152.

Current wording

On February 12, 2025, the County delivered a letter to Sable confirming that certain Pipeline anomaly maintenance and repair work referenced in the Coastal Commission’s Notice of Violation V-9-24-0152 was “authorized by the existing permits (Final Development Plan, Major Conditional Use Permit, and associated Coastal Development Permits) and was analyzed in the prior Environmental Impact Report/Environmental Impact Statement (EIR/EIS).” The letter states in part that “[t]he County previously exercised its authority under its Local Coastal Program and delegated Coastal Act authority in approving the permits and the requested anomaly repair work is within the scope of those approved permits.” Sable subsequently recommenced the repair and maintenance activities which were subject to Notice of Violation V-9-24-0152.

Previous wording

Also on February 12, 2025, the County, acting under its certified Local Coastal Program authority under the Coastal Act, delivered a letter to the Commission. In this letter, the County states that the anomaly repair work as described in the attachments is “authorized by the existing permits (Final Development Plan, Major Conditional Use Permit, and associated Coastal Development Permits) and was analyzed in the prior Environmental Impact Report/Environmental Impact Statement. Thus, no further application to or action by the County is required.”

Current wording

In addition, also on February 12, 2025, the County delivered a letter to the Coastal Commission. In this letter, the County responded to a request by the Coastal Commission to consent to a consolidated coastal development permit process for certain activities undertaken and planned by Sable on the Pipelines. The County’s letter also stated that certain maintenance and repair work on the Pipelines that was referenced in the Coastal Commission’s Notice of Violation V-9-24-0152 is “authorized by the existing permits (Final Development Plan, Major Conditional Use Permit, and associated Coastal Development Permits) and was analyzed in the prior Environmental Impact Report/Environmental Impact Statement. Thus, no further application to or action by the County is required.”

Previous wording

On February 18, 2025, Sable filed a complaint against the Commission in the Superior Court of the State of California for the County of Santa Barbara (Case No. 25CV00974). In the complaint, Sable challenges the Commission’s prior Notices of Violations and Executive Director Cease and Desist Order as procedurally improper and asserts that Commission lacks authority to prohibit work authorized by existing permits. Sable seeks a declaration that the Commission's actions are unlawful, an injunction prohibiting further enforcement actions by the Commission, damages for the alleged taking of property rights, and attorneys' fees and costs. The Commission proceeded to issue an Executive Director Cease and Desist Order to Sable on February 18, 2025. Sable’s pipeline repair operations continued.

Current wording

On February 18, 2025, Sable filed a complaint against the Coastal Commission in the Superior Court of the State of California for the County of Santa Barbara (Case No. 25CV00974). In the complaint, Sable challenges the Coastal Commission’s prior Notices of Violations and Executive Director Cease and Desist Order as procedurally improper and asserts that the Coastal Commission lacks authority to prohibit work authorized by existing permits. Sable seeks a declaration that the Coastal Commission’s actions are unlawful, an injunction prohibiting further enforcement actions by the Coastal Commission, damages for the alleged taking of property rights, and attorneys’ fees and costs. The Coastal Commission proceeded to issue an Executive Director Cease and Desist Order to Sable on February 18, 2025, related to certain of Sable’s pipeline repair and maintenance activities and safety valve installation work.

Previous wording

The Company filed a Verified Amended Petition for Writ of Mandamus and Complaint for Damages and Declaratory and Injunctive Relief on April 16, 2025. On April 16, 2025, counsel for the Commission filed a Cross Complaint for Declaratory and Injunctive Relief seeking a judicial declaration ordering the Company to comply with the CDO. An Ex Parte Application for Order to Show Cause and Temporary Restraining Order was also filed by counsel for the Commission (as Cross-Plaintiff) on April 16, 2025, seeking a Temporary Restraining Order (“TRO”) and further injunctive relief against the Company (as Cross-Defendants) restraining the Company from violating the CDO. The court denied the Commission’s Ex Parte Application at a hearing on April 17, 2025. The court further set the Commission’s Motion for Preliminary Injunction for hearing on May 14, 2025, which the court later moved to May 28, 2025. On April 22, 2025, counsel for the Commission filed a Petition for Stay, Writ of Supersedeas, or Other Appropriate Order, and Request for Temporary Stay with the Second Division California Court of Appeal, seeking a temporary stay of the Santa Barbara County Superior Court’s denial of the Commission’s request for a TRO and an order requiring Sable to comply with the CDO. On May 15, 2025, the Court of Appeal denied the Commission’s Petition. On May 28, 2025, the court granted the Commission’s application for issuance of a preliminary injunction and on July 9, 2025, the court denied Sable’s motion to stay the CDO. The matter is set for trial on October 16-17 and 20-21, 2025.

Current wording

On April 22, 2025, counsel for the Coastal Commission filed a Petition for Stay, Writ of Supersedeas, or Other Appropriate Order, and Request for Temporary Stay with the Second Division California Court of Appeal, seeking a temporary stay of the Santa Barbara County Superior Court’s denial of the Coastal Commission’s request for a TRO and an order requiring Sable to comply with the cease and desist order. Sable filed an Opposition to the Coastal Commission’s Petition with the Court of Appeal on April 28, 2025. On May 15, 2025, the Court of Appeal denied the Coastal Commission’s request for a temporary stay.

Previous wording

On April 2, 2025, the Center for Biological Diversity and the Wishtoyo Foundation filed a complaint against Doug Burgum, Secretary of the U.S. Department of the Interior; the Bureau of Ocean Energy Management (“BOEM”); and Douglas Boren, BOEM Pacific Regional Director in the U.S. District Court for the Central District of California (Case No. 2:25-cv-02840). On May 12, 2025, plaintiffs filed an amended complaint in which plaintiffs challenge BOEM’s April 2025 decision determining that Sable is not required to revise the development and production plan for Platform Harmony in the SYU. The amended complaint asks for the court: to issue an order finding that BOEM’s decision was not in accordance with OCSLA and violated the APA; order BOEM to require revision of the development and production plan for Platform Harmony; prohibit BOEM from authorizing new oil and gas drilling activity at the SYU unless and until revision of the development and production plan is complete; and for an award of costs and attorneys’ fees. Sable was not named as a party to the case, but on June 10, 2025, the court granted Sable’s motion to intervene as a defendant to become a party to the lawsuit, and Sable vigorously contests the plaintiffs’ allegations. On July 21, 2025, Sable filed a motion to dismiss this case.

Current wording

On April 2, 2025, the Center for Biological Diversity and the Wishtoyo Foundation filed a complaint against Doug Burgum, Secretary of the U.S. Department of the Interior; BOEM; and Douglas Boren, BOEM Pacific Regional Director, in the U.S. District Court for the Central District of California (Case No. 2:25-cv-02840). On May 12, 2025, plaintiffs filed an amended complaint in which plaintiffs challenge BOEM’s April 2025 decision determining that Sable is not required to revise the development and production plan for Platform Harmony in the SYU. The amended complaint asks for the court:

Previous wording

•Taxes other than income. Management anticipates future increases in ad valorem taxes, in line with the projected restart of production.

Current wording

•Taxes other than income. Management anticipates future increases in ad valorem taxes, in line with the projected restarting sales of production volumes.

Previous wording

The comparability of our operating results for the three and six months ended June 30, 2025 (Successor), the three months ended June 30, 2024 (Successor), the period February 14, 2024 through June 30, 2024 (Successor), and for the period January 1, 2024 through February 13, 2024 (Predecessor) was impacted by the Business Combination. In the discussion of our results of operations for these periods, we may quantitatively disclose the impacts of the Business Combination to the extent they remain ascertainable. The entirety of our activity since inception through the Closing Date were related to our formation, the preparation for our initial public offering, and since the closing of our initial public offering, the search for a target for our initial business combination (Refer to Note 1 — Organization, Business Operations, and Going Concern).

Current wording

The comparability of our operating results for the three and nine months ended September 30, 2025 (Successor), the three months ended September 30, 2024 (Successor), the period February 14, 2024 through September 30, 2024 (Successor), and for the period January 1, 2024 through February 13, 2024 (Predecessor) was impacted by the Business Combination. In the discussion of our results of operations for these periods, we may quantitatively disclose the impacts of the Business Combination to the extent they remain ascertainable. The entirety of our activity since inception through the Closing Date were related to our formation, the preparation for our initial public offering, and since the closing of our initial public offering, the search for a target for our initial business combination (Refer to Note 1 — Organization, Business Operations, and Going Concern).

Previous wording

Following the Closing Date, all of our operations have focused on restarting production sales from the SYU Assets. We lack the ability to generate any operating revenues until we receive the necessary regulatory and legal approvals to restart production sales. Our only source of non-operating income is generated in the form of interest income on cash and cash equivalents. We also expect to continue to incur additional expenses as a result of being an operating public company, including for legal, accounting and compliance expenses.

Current wording

Following the Closing Date, all of our operations have focused on recommencing sales of production from the SYU Assets. We lack the ability to generate any operating revenues until we receive the necessary regulatory and legal approvals to recommence sales of production. Our primary source of non-operating income is generated in the form of interest income on cash and cash equivalents. We also expect to continue to incur additional expenses as a result of being an operating public company, including for legal, accounting and compliance expenses.

Previous wording

Operating and maintenance expenses. Operating and maintenance expenses were $50.4 million for the three months ended June 30, 2025 (Successor), representing an increase of $24.1 million, or 91.7%, compared to $26.3 million for the three months ended June 30, 2024 (Successor). The increase in operating and maintenance expenses is primarily attributable to additional maintenance expenses incurred in connection with restart efforts, which includes a 113% increase in operations employee headcount between reporting periods, and $6.6 million related to restart incentive compensation, partially offset by $3.9 million of operating expense capitalized as Inventory and other on the unaudited condensed consolidated balance sheet as of June 30, 2025. Operations and maintenance expenses are expected to remain elevated for the remainder of 2025.

Current wording

Operating and maintenance expenses. Operating and maintenance expenses were $79.4 million for the three months ended September 30, 2025 (Successor), representing an increase of $53.8 million, or 210%, compared to $25.6 million for the three months ended September 30, 2024 (Successor). The increase in operating and maintenance expenses is primarily attributable to additional maintenance expenses incurred in connection with restart efforts, which includes an 81% increase in operations employee headcount between reporting periods, and $16.0 million related to operator rights expenditures, partially offset by $1.6 million of operating expense capitalized as Inventory and other on the unaudited condensed consolidated balance sheet as of September 30, 2025. Operations and maintenance expenses are expected to remain elevated for the remainder of 2025.

Previous wording

Depletion, depreciation, amortization and accretion. Depletion, depreciation, amortization and accretion was $3.2 million for the three months ended June 30, 2025 (Successor), representing an increase of $0.4 million, or 16.4%, compared to $2.7 million for the three months ended June 30, 2024 (Successor). The increase in depletion, depreciation, amortization and accretion is primarily attributable to the compounding effect of ARO accretion. The depletion, depreciation, amortization and accretion expense recognized for the three months ended June 30, 2025 (Successor) primarily represents the recognition of ARO accretion for the period. Recognition of depletion expense will resume once the assets are placed in service and sales volumes are achieved. Depletion, depreciation and amortization of $1.8 million associated with the SYU assets was recognized during the three months ended June 30, 2025 (Successor); however, as the associated production remained in the Company's storage tanks as of June 30, 2025, the entire amount has been capitalized as Inventory and other on the unaudited condensed consolidated balance sheet. Depletion, depreciation, amortization and accretion expense is expected to increase over the next several quarters as sales of production are expected to commence.

Current wording

Depletion, depreciation, amortization and accretion. Depletion, depreciation, amortization and accretion was $3.3 million for the three months ended September 30, 2025 (Successor), representing an increase of $0.5 million, or 18%, compared to $2.8 million for the three months ended September 30, 2024 (Successor). The increase in depletion, depreciation, amortization and accretion is primarily attributable to the compounding effect of ARO accretion. The depletion, depreciation, amortization and accretion expense recognized for the three months ended September 30, 2025 (Successor) primarily represents the recognition of ARO accretion for the period. Recognition of depletion expense will resume once the assets are placed in service and sales volumes are achieved. Depletion, depreciation and amortization of $3.6 million associated with the SYU assets was recognized during the three months ended September 30, 2025 (Successor); however, as the associated production remained in the Company’s storage tanks as of September 30, 2025, the onshore volumes have been capitalized as Inventory and other on the unaudited condensed consolidated balance sheet. Depletion, depreciation, amortization and accretion expense is expected to increase following the commencement of sales of production.

Previous wording

General and administrative expenses. General and administrative expenses (“G&A expenses”) were $75.3 million for the three months ended June 30, 2025 (Successor), representing an increase of $42.1 million compared to $33.2 million for the three months ended June 30, 2024 (Successor). The increase in G&A expenses is primarily attributable to $35.7 million in higher compensation related to restart incentive compensation costs, and $7.8 million in higher legal costs for the three months ended June 30, 2025 (Successor).

Current wording

General and administrative expenses. G&A expenses were $36.7 million for the three months ended September 30, 2025 (Successor), representing an increase of $10.5 million, or 40%, compared to $26.2 million for the three months ended September 30, 2024 (Successor). The increase in G&A expenses is primarily attributable to $4.6 million in higher compensation related to an 11% increase in general and administrative employee headcount, and $5.8 million in higher legal costs for the three months ended September 30, 2025 (Successor) related to ongoing legal and regulatory matters.

Previous wording

Total other (income) expense, net. Total other (income) expense, net was $8.6 million in income for the three months ended June 30, 2025 (Successor), representing a change of $106.7 million compared to other expense of $98.1 million for the three months ended June 30, 2024 (Successor). The change in total other (income) expense, net was primarily attributable to the $108.3 million decrease in the fair value of warrants, which decreased due to the remaining term of the warrants, as well as a decrease in the market price of the Common Stock and the effects of market volatility, and an increase of $1.8 million in interest expense due to the higher debt balance for the three months ended June 30, 2025 (Successor).

Current wording

Total other (income) expense, net. Total other (income) expense, net was $15.6 million in other income for the three months ended September 30, 2025 (Successor), representing a change of $215.7 million compared to other expense of $200.1 million for the three months ended September 30, 2024 (Successor). The change in total other (income) expense, net was primarily attributable to a $213.0 million change in the fair value of warrants, which decreased due to the remaining term of the warrants, a decrease in the market price of the Common Stock, and the effects of market volatility. The $4.6 million change in other (income) expense, net is attributable to $5.0 million of other expense recognized during the three months ended September 30, 2024 (Successor) related to the First Amendment to the Senior Secured Term Loan (Refer to Note 6 — Debt for additional details regarding the First Amendment to the Senior Secured Term Loan) and a $1.8 million increase in interest expense due to the higher debt balance for the three months ended September 30, 2025 (Successor).

Previous wording

Income tax expense. Income tax expense for the three months ended June 30, 2025 (Successor) was $7.8 million, representing an increase of $2.7 million compared to $5.1 million for the three months ended June 30, 2024 (Successor). Utilizing provisions of ASC 740, the Company's effective tax rate was negative 6.5% and negative 3.2% for the three months ended June 30, 2025 (Successor) and the three months ended June 30, 2024 (Successor), respectively. The negative tax rates were due to our ongoing assessment of our ability to recover our deferred tax assets, which we concluded that it was more likely than not that our deferred tax assets in excess of deferred tax liabilities would not be realized. The income tax rate was slightly higher due to lower forecasted pre-tax book loss for the full year.

Current wording

Income tax expense. Income tax expense for the three months ended September 30, 2025 (Successor) was $6.6 million, representing an increase of $5.8 million compared to $0.9 million for the three months ended September 30, 2024 (Successor). Utilizing provisions of ASC 740, the Company’s effective tax rate was negative 6.4% and negative 0.3% for the three months ended September 30, 2025 (Successor) and the three months ended September 30, 2024 (Successor), respectively. The negative tax rates were due to our ongoing assessment of our ability to recover our deferred tax assets, in which we concluded that it was more likely than not that our deferred tax assets in excess of deferred tax liabilities would not be realized. The income tax rate was higher due to the cumulative effect of the annual tax rate decrease recognized during the three months ended September 30, 2024 (Successor).

Previous wording

Comparison of the Six Months Ended June 30, 2025 (Successor) to the periods from January 1, 2024 through February 13, 2024 (Predecessor) and February 14, 2024 through June 30, 2024 (Successor).

Current wording

Nine Months Ended September 30, 2025 (Successor) vs. the periods from January 1, 2024 through February 13, 2024 (Predecessor) and February 14, 2024 through June 30, 2024 (Successor).

Previous wording

Operating and maintenance expenses. Operating and maintenance expenses were $84.8 million for the six months ended June 30, 2025 (Successor), representing an increase of $43.9 million, or 107%, compared to $7.3 million for the period from January 1, 2024 through February 13, 2024 (Predecessor) and $33.6 million for the period February 14, 2024 through June 30, 2024 (Successor), respectively, or a combined $40.9 million. The increase in operating and maintenance expenses is primarily attributable to additional maintenance expenses incurred in connection with restart efforts, which includes a 140% increase in operations employee headcount since the Closing Date, and $6.6 million related to restart incentive compensation, partially offset by $3.9 million of operating expense capitalized as Inventory and other on the unaudited condensed consolidated balance sheet as of June 30, 2025. Operations and maintenance expenses are expected to remain elevated for the remainder of 2025.

Current wording

Operating and maintenance expenses. Operating and maintenance expenses were $164.2 million for the nine months ended September 30, 2025 (Successor), representing an increase of $97.7 million, or 147%, compared to $7.3 million for the period from January 1, 2024 through February 13, 2024 (Predecessor) and $59.2 million for the period February 14, 2024 through September 30, 2024 (Successor), respectively, or a combined $66.6 million. The increase in operating and maintenance expenses is primarily attributable to additional maintenance expenses incurred in connection with restart efforts, which includes a 152% increase in operations employee headcount since the Closing Date, $16.0 million related to operator rights expenditures, and $6.6 million related to restart incentive compensation, partially offset by $5.5 million of operating expense capitalized as Inventory and other on the unaudited condensed consolidated balance sheet as of September 30, 2025. Operations and maintenance expenses are expected to remain elevated for the remainder of 2025.

Previous wording

Depletion, depreciation, amortization and accretion. Depletion, depreciation, amortization and accretion was $6.2 million for the six months ended June 30, 2025 (Successor), representing a decrease of $0.5 million, or 8%, compared to $2.6 million for the period January 1, 2024 through February 13, 2024 (Predecessor) and $4.1 million for the period February 14, 2024 through June 30, 2024 (Successor), respectively, or a combined $6.7 million. The decrease in depletion, depreciation, amortization and accretion is primarily attributable to the Company not recognizing depreciation expense following the Business Combination, as the Company determined the assets were not in service since repairs are necessary prior to achieving production restart. Depletion, depreciation and amortization of $1.8 million associated with the SYU assets was recognized during the six months ended June 30, 2025 (Successor); however, as the associated production remained in the Company's storage tanks as of June 30, 2025, the entire amount has been capitalized as Inventory and other on the unaudited condensed consolidated balance sheet. The depletion, depreciation, amortization and accretion expense recognized for the six months ended June 30, 2025 (Successor) primarily represents the recognition of ARO accretion for the period, recognition of depletion expense will resume once the assets are placed in service and sales volumes are achieved. Depletion, depreciation, amortization and accretion expense is expected to increase over the next several quarters as sales of production are expected to commence.

Current wording

Depletion, depreciation, amortization and accretion. Depletion, depreciation, amortization and accretion was $9.5 million for the nine months ended September 30, 2025 (Successor), representing an increase of less than $0.1 million, or less than 1%, compared to $2.6 million for the period January 1, 2024 through February 13, 2024 (Predecessor) and $6.9 million for the period February 14, 2024 through September 30, 2024 (Successor), respectively, or a combined $9.5 million. The consistent depletion, depreciation, amortization and accretion is attributable to the Company not recognizing depreciation expense following the Business Combination, as the Company determined the assets were not in service since repairs are necessary prior to achieving production restart, offset by the compounding effect of ARO accretion. Depletion, depreciation and amortization of $5.4 million associated with the SYU assets was recognized during the nine months ended September 30, 2025 (Successor); however, as the associated production remained in the Company’s storage tanks as of September 30, 2025, the entire amount has been capitalized as Inventory and other on the unaudited condensed consolidated balance sheet. The depletion, depreciation, amortization and accretion expense recognized for the nine months ended September 30, 2025 (Successor) primarily represents the recognition of ARO accretion for the period. Recognition of depletion expense will resume once the assets are placed in service and sales volumes are achieved. Depletion, depreciation, amortization and accretion expense is expected to increase prior to our commencement of sales of production.

Previous wording

General and administrative expenses. General and administrative expenses (“G&A expenses”) were $97.7 million for the six months ended June 30, 2025 (Successor), representing a decrease of $87.7 million compared to $1.7 million for the period January 1, 2024 through February 13, 2024 (Predecessor) and $183.7 million for the period February 14, 2024 through June 30, 2024 (Successor), respectively, or a combined $185.4 million. The decrease in G&A expenses is primarily attributable to the $70.0 million accrued settlement of the Grey Fox Matter (Refer to Note 8 — Commitments and Contingencies) and $16.8 million in legal expenses and professional fees related to the Business Combination that were recognized for the period February 14, 2024 through June 30, 2024 (Successor). The remaining decrease in G&A expenses is attributable to a $54.0 million decrease in share-based compensation expense between reporting periods, partially offset by $35.7 million in higher compensation related to restart incentive compensation costs and the recognition of salaries and wages for the full six months ended June 30, 2025 (Successor), opposed to the Successor period February 14, 2024 through June 30, 2024. Predecessor G&A expenses were allocated to SYU as a portion of certain other operating costs based on aggregated historical benchmarking data as previously noted (Refer to Note 2 — Significant Accounting Policies).

Current wording

General and administrative expenses. G&A expenses were $134.4 million for the nine months ended September 30, 2025 (Successor), representing a decrease of $77.2 million compared to $1.7 million for the period January 1, 2024 through February 13, 2024 (Predecessor) and $209.9 million for the period February 14, 2024 through September 30, 2024 (Successor), respectively, or a combined $211.6 million. The decrease in G&A expenses is primarily attributable to the $70.0 million accrued settlement of the Grey Fox Matter (Refer to Note 8 — Commitments and Contingencies), $16.8 million in legal expenses and professional fees related to the Business Combination that were recognized for the period February 14, 2024 through September 30, 2024 (Successor) and a $56.8 million decrease in share-based compensation expense between reporting periods. Such decreases were partially offset by $35.7 million in higher compensation related to restart incentive compensation costs and the recognition of salaries and wages for the full nine months ended September 30, 2025 (Successor), compared to the Successor period February 14, 2024 through September 30, 2024. Predecessor G&A expenses were allocated to SYU as a portion of certain other operating costs based on aggregated historical benchmarking data as previously noted (Refer to Note 2 — Significant Accounting Policies).

Previous wording

Total other expense, net. Total other expense, net was $30.2 million for the six months ended June 30, 2025 (Successor), representing a decrease of $75.5 million compared to other expense of $0.1 million for the period January 1, 2024 through February 13, 2024 (Predecessor) and other expense of $105.6 million for the period February 14, 2024 through June 30, 2024 (Successor), respectively, or a combined expense of $105.7 million. The decrease in total other expense, net was primarily attributable to a decrease of $85.3 million in the fair value of the warrants, due to fewer warrants outstanding for the six months ended June 30, 2025 (Successor) after all public warrants were redeemed during the three months ended December 31, 2024, and due to an increase in the market price of the Common Stock in prior year compared to flat market price of the Common Stock in the current period, partially offset by $13.0 million in higher interest expense for the six months ended June 30, 2025 (Successor) due to higher debt balance over the comparative periods. The Predecessor did not have any debt or associated interest expense, warrants, or interest income.

Current wording

Total other expense, net. Total other expense, net was $14.6 million for the nine months ended September 30, 2025 (Successor), representing a decrease of $291.2 million compared to other expense of $0.1 million for the period January 1, 2024 through February 13, 2024 (Predecessor) and other expense of $305.7 million for the period February 14, 2024 through September 30, 2024 (Successor), respectively, or a combined expense of $305.8 million. The decrease in total other expense, net was primarily attributable to a decrease of $298.3 million in the fair value of the warrants, due to fewer warrants outstanding for the nine months ended September 30, 2025 (Successor) after all public warrants were redeemed during the year ended December 31, 2024, and due to an increase in the market price of the Common Stock in the prior year compared to a decrease in the market price of the Common Stock in the current period, and a $7.8 million decrease in Other (income) expense attributable to $5.0 million of other expense recognized during the period February 14, 2024 through September 30, 2024 (Successor) related to the First Amendment to the Senior Secured Term Loan (Refer to Note 6 — Debt for additional details regarding the First Amendment to the Senior Secured Term Loan), paired with a decrease in interest income due to the lower cash balance over the comparative periods, partially offset by $14.9 million in higher interest expense for the nine months ended September 30, 2025 (Successor) due to higher debt balance over the comparative periods. The Predecessor did not have any debt or associated interest expense, warrants, or interest income.

Previous wording

Income tax expense. Income tax expense for the six months ended June 30, 2025 (Successor) was $18.7 million, representing an increase of $0.1 million compared to zero for the period January 1, 2024 through February 13, 2024 (Predecessor) and $18.6 million for the period February 14, 2024 through June 30, 2024 (Successor), respectively, or a combined $18.6 million. Utilizing provisions of ASC 740, the Company's effective tax rate was negative 8.5%, and negative 5.7% for the six months ended June 30, 2025 (Successor) and the period February 14, 2024 through June 30, 2024 (Successor) respectively. The negative tax rates were due to our ongoing assessment of our ability to recover our deferred tax assets, which we concluded that it was more likely than not that our deferred tax assets in excess of deferred tax liabilities would not be realized. The income tax rate was slightly higher due to lower forecasted pre-tax book loss for the full year. The higher tax rate was offset by a lower pre-tax book loss for the Successor period.

Current wording

Income tax expense. Income tax expense for the nine months ended September 30, 2025 (Successor) was $25.3 million, representing an increase of $5.9 million compared to zero for the period January 1, 2024 through February 13, 2024 (Predecessor) and $19.4 million for the period February 14, 2024 through September 30, 2024 (Successor), respectively, or a combined $19.4 million. Utilizing provisions of ASC 740, the Company’s effective tax rate was negative 7.9%, and negative 3.3% for the nine months ended September 30, 2025 (Successor) and the period February 14, 2024 through September 30, 2024 (Successor) respectively. The negative tax rates were due to our ongoing assessment of our ability to recover our deferred tax assets, in which we concluded that it was more likely than not that our deferred tax assets in excess of deferred tax liabilities would not be realized. The negative income tax rate was greater due to lower forecasted pre-tax book loss for the full year.

Previous wording

Overview. Our plans for restarting sales of production volumes, including restarting the remainder of the existing wells and facilities that have not been restarted and recommencing oil transportation through the Pipelines, will require significant capital expenditures in excess of current operational cash flow. Historically, SYU’s primary source of liquidity has been its operational cash flow and, since the shut-in, capital contributions from its parent. While production has restarted, prior to generating sales and positive cash flow from production, capital expenditure needs will be substantial and are expected to come from cash on hand. Additionally, the achievement of first production triggered the acceleration of the Senior Secured Term Loan maturity date to 240 days after the production restart date, or January 10, 2026. Accordingly, the Senior Secured Term Loan must be refinanced or otherwise paid in full by or prior to the maturity date.

Current wording

Overview. Our plans for recommencing sales of production volumes, including restarting the remainder of the existing wells and facilities that have not been restarted and recommencing oil transportation via OS&T or through the Onshore Pipelines, will require significant capital expenditures in excess of current operational cash flow. Historically, SYU’s primary source of liquidity has been its operational cash flow and, since the shut-in, capital contributions from its parent. While production has restarted, prior to generating sales and positive cash flow from production, our capital expenditure needs will be substantial.

Previous wording

Prior to the Business Combination, Flame had approximately $62.2 million in its trust account, which consisted of proceeds from the public stockholders and the private placement investors in connection with the Company’s initial public offering, less redemptions. Sable raised $440.2 million in gross proceeds from the First PIPE Investment in connection with the Business Combination, $150.0 million in gross proceeds from the Second PIPE Investment, and approximately $183.5 million from the exercise of 15,957,820 warrants for 15,957,820 shares of Common Stock. Additionally, more than $600 million of the Purchase Price was seller-financed through a secured Senior Secured Term Loan with EM (the “Senior Secured Term Loan”). In May 2025, Sable raised an additional $295.0 million in gross proceeds from the sale of 10,000,000 shares of Common Stock in the 2025 Offering. Based on its current financial plan, Sable management expects sales production to commence in the third quarter 2025, after which its operating cash flows are expected to be sufficient to service Sable’s operating expenses and indebtedness.

Current wording

Prior to the Business Combination, Flame had approximately $62.2 million in its trust account, which consisted of proceeds from the public stockholders and the private placement investors in connection with the Company’s initial public offering, less redemptions. Sable raised $440.2 million in gross proceeds from the First PIPE Investment in connection with the Business Combination, $150.0 million in gross proceeds from the Second PIPE Investment, and approximately $183.5 million from the exercise of 15,957,820 warrants for 15,957,820 shares of Common Stock. Additionally, more than $600 million of the Purchase Price was seller-financed through a secured Senior Secured Term Loan with EM. In May 2025, the Company raised an additional $295.0 million in gross proceeds from the sale of 10,000,000 shares of Common Stock in the 2025 Offering. In November 2025, the Company raised an additional $250.0 million in gross proceeds from the sale of 45,454,546 shares of Common Stock in the Third PIPE Investment. Based on its current financial plan, Sable management expects sales production to commence in the fourth quarter 2026, after which its operating cash flows are expected to be sufficient to service Sable’s operating expenses and indebtedness. However, such expectation is dependent on the results of the remaining regulatory and legal approvals required to recommence sales of production via the Onshore Pipeline or the OS&T.

Previous wording

Capital Requirements. Sable currently estimates remaining start-up expenses of approximately $66.6 million in order to commence sales of production in the third quarter 2025. Management evaluates its cost estimates on an ongoing basis. The expenditures will primarily be directed toward obtaining the necessary regulatory and legal approvals and bringing additional shut-in wells back online in the third quarter 2025. After sales of production commences, Sable management expects a rapid increase in operating cash flows that should allow Sable to fund further capital expenditures. If Sable is unable to obtain funds or provide funds as needed for the planned capital expenditure program, Sable may not be able to finance the capital expenditures necessary to restart production sales or sustain production thereafter.

Current wording

Management evaluates its cost estimates on an ongoing basis. The expenditures will primarily be directed toward obtaining the necessary regulatory and legal approvals and configuring the OS&T to meet our operational needs. After sales of production commences, Sable management expects a rapid increase in operating cash flows that should allow Sable to fund further capital expenditures. If Sable is unable to obtain funds or provide funds as needed for the planned capital expenditure program, Sable may not be able to finance the capital expenditures necessary to restart production sales or sustain production thereafter.

Previous wording

Prior to the Business Combination, EM funded the Predecessor SYU operational expenses. Since the consummation of the Business Combination, Sable has addressed near-term capital funding needs with the First PIPE Investment, the Second PIPE Investment, proceeds from the exercise of Warrants (refer to Note 7 — Warrantsfor additional details regarding the warrant exercises) and net proceeds from the 2025 Offering, and believes the Company has sufficient capital to maintain operations and restart sales of production volumes. However, the Company’s plans for restart of production sales are contingent upon approvals from federal, state and local regulators.

Current wording

Prior to the Business Combination, EM funded the Predecessor SYU operational expenses. Since the consummation of the Business Combination, Sable has addressed near-term capital funding needs with the First PIPE Investment, the Second PIPE Investment, proceeds from the exercise of Warrants (refer to Note 7 — Warrantsfor additional details regarding the warrant exercises), net proceeds from the 2025 Offering, and the Third PIPE Investment. However, the Company’s plans for recommencement of sales of production are contingent upon approvals from federal, state and local regulators.

Previous wording

The achievement of first production triggered the acceleration of the Senior Secured Term Loan maturity date to 240 days after the production restart date, or January 10, 2026. Accordingly, the Senior Secured Term Loan must be refinanced or otherwise paid in full by or prior to the maturity date. Additionally, if the Company’s estimates of the costs to reach first sales are less than the actual amounts necessary to do so, the Company may have insufficient funds available to operate its business prior to first sales and will need to raise additional capital. If the Company is unable to raise additional capital, it may be required to take additional measures to conserve liquidity, which could include, among other things, reducing overhead expenses.

Current wording

Additionally, if the Company’s estimates of the costs to reach first sales are less than the actual amounts necessary to do so, the Company may have insufficient funds available to operate its business prior to first sales and will need to raise additional capital. If the Company is unable to raise additional capital, it may be required to take additional measures to conserve liquidity, which could include, among other things, reducing overhead expenses.

Previous wording

Due to the remaining regulatory and legal approvals necessary to resume pipeline operations and enable sales of production volumes, and lack of assurance that new financing, or refinancing of the Senior Secured Term Loan, will be available to the Company on commercially acceptable terms, if at all, substantial doubt exists about the Company’s ability to continue as a going concern. The financial statements included in this quarterly report do not include any adjustments relating to the recovery of the recorded assets or the classification of the liabilities that could be necessary if the Company is unable to continue as a going concern.

Current wording

Company’s ability to continue as a going concern. The financial statements included in this quarterly report do not include any adjustments relating to the recovery of the recorded assets or the classification of the liabilities that could be necessary if the Company is unable to continue as a going concern.

Previous wording

Cash Flows from Operating Activities. Since the regulatory and legal approvals required to restart Lines 324 and 325 have not been received, no revenues have been recognized for the comparative periods. The net cash used in operating activities for the Company was $142.9 million for the six months ended June 30, 2025 (Successor), representing an increase in cash used in operating activities of $26.6 million, or 22.9%, compared to net cash used in operating activities of $22.5 million for the period January 1, 2024 through February 13, 2024 (Predecessor) and $93.9 million net cash used in operating activities from February 14, 2024 through June 30, 2024 (Successor), respectively, or a combined $116.3 million. The primary use of cash can be attributed to maintenance and operational readiness activities in the Predecessor and Successor periods, with additional general and administrative costs incurred post the Business Combination in the Successor period.

Current wording

Cash Flows from Operating Activities. Since the regulatory and legal approvals required to restart Lines 324 and 325 have not been received, no operating revenues have been recognized for the comparative periods. The net cash used in operating activities for the Company was $253.6 million for the nine months ended September 30, 2025 (Successor), representing an increase in cash used in operating activities of $105.6 million, or 71%, compared to net cash used in operating activities of $22.5 million for the period January 1, 2024 through February 13, 2024 (Predecessor) and $125.5 million net cash used in operating activities from February 14, 2024 through September 30, 2024 (Successor), respectively, or a combined $148.0 million. The primary use of cash can be attributed to maintenance and operational readiness activities in the Predecessor and Successor periods, with additional general and administrative costs incurred post the Business Combination in the Successor period.

Previous wording

2024 through June 30, 2024 (Successor) the Company incurred a net loss of $345.5 million, respectively, or a combined $357.3 million. Our combined net loss was partially offset by a non-cash change in the fair value of our warrant liabilities of $79.4 million, non-cash stock based compensation of $69.3 million, non-cash paid-in-kind interest $28.5 million, changes in accounts payable of $45.2 million and non-cash deferred tax expense of $18.6 million. Changes in accounts payable is primarily attributable to the Grey Fox Matter settlement, with $35.0 million in accounts payable and accrued liabilities as of June 30, 2024 (Refer to Note 2 — Significant Accounting Policies). Future cash flow from operations will depend on our ability to bring the associated oil and gas production of the assets back online, as well as the prices of oil, natural gas and NGLs.

Current wording

For the nine months ended September 30, 2025 (Successor), we had a net loss of $348.0 million, which consists of a non-cash decrease of $40.7 million in fair value of the warrants, non-cash stock-based compensation of $30.0 million, non-cash paid-in-kind interest of $62.6 million, non-cash depreciation, depletion, amortization and accretion of $9.5 million, and non-cash tax expense of $25.3 million. Changes in accounts payable for the period of $20.7 million is primarily attributable to the increase in vendor payables associated with the restart efforts. For the period January 1, 2024 through February 13, 2024 (Predecessor), SYU incurred a net loss of $11.8 million and for the period February 14, 2024 through September 30, 2024 (Successor) the Company incurred a net loss of $601.1 million, respectively, or a combined $612.9 million. Our combined net loss was partially offset by a non-cash change in the fair value of our warrant liabilities of $257.6 million, non-cash stock based compensation of $86.0 million, non-cash paid-in-kind interest $47.3 million, and non-cash deferred tax expense of $19.4 million. Changes in accounts payable of $46.6 million is primarily attributable to the Grey Fox Matter settlement, with $35.0 million in accounts payable and accrued liabilities as of September 30, 2024 (Refer to Note 2 — Significant Accounting Policies). Future cash flow from operations will depend on our ability to recognize sales of production volumes, as well as the prices of oil, natural gas and NGLs.

Previous wording

Cash Flows from Investing Activities. The net cash used in investing activities for the Company was $193.0 million for the six months ended June 30, 2025 (Successor), representing a decrease in cash used in investing activities of $15.3 million, or 7.3%, compared to the net cash used investing activities of zero for the period January 1, 2024 through February 13, 2024 (Predecessor) and $208.3 million for the period February 14, 2024 through June 30, 2024 (Successor), or a combined $208.3 million. The Successor investing cash flow for the six months ended June 30, 2025 (Successor) consists of cash paid for capital expenditures associated with restart efforts and for the period February 14, 2024 through June 30, 2024 (Successor) is almost entirely comprised of $204.2 million paid to EM at Closing per settlement statement. The net cash used in investing activities for the Predecessor period was zero since the SYU Assets had been shut in since 2015, without investing activities.

Current wording

Cash Flows from Investing Activities. Net cash used in investing activities was $323.1 million for the nine months ended September 30, 2025 (Successor), representing an increase in cash used in investing activities of $100.4 million, or 45%, compared to the net cash used investing activities of zero for the period January 1, 2024 through February 13, 2024 (Predecessor) and $222.7 million for the period February 14, 2024 through September 30, 2024 (Successor), or a combined $222.7 million. Investing cash flow for the nine months ended September 30, 2025 (Successor) consists of cash paid for capital expenditures associated with restart efforts and for the period February 14, 2024 through September 30, 2024 (Successor) is almost entirely comprised of $204.2 million paid to EM at Closing per settlement statement. There was no net cash used in investing activities for the Predecessor period since the SYU Assets had been shut in since 2015 and had no investing activities.

Previous wording

Cash Flows from Financing Activities. The net cash provided by financing activities for the Company was $282.9 million for the six months ended June 30, 2025 (Successor), consisting of $295.0 million of gross proceeds from the 2025 Offering and related paid fees of $12.1 million. The net cash provided by financing activities for the period January 1, 2024 through February 13, 2024 (Predecessor) was $22.5 million and net cash provided by financing activities for the period February 14, 2024 through June 30, 2024 (Successor) was $396.0 million, respectively, or a combined $418.5 million.

Current wording

Cash Flows from Financing Activities. Net cash provided by financing activities was $282.5 million for the nine months ended September 30, 2025 (Successor), consisting of $295.0 million of gross proceeds from the 2025 Offering and related paid fees of $12.5 million. Net cash provided by financing activities for the period January 1, 2024 through February 13, 2024 (Predecessor) was $22.5 million and net cash provided by financing activities for the period February 14, 2024 through September 30, 2024 (Successor) was $618.4 million, respectively, or a combined $640.9 million.

Previous wording

The Predecessor financing activities for the period January 1, 2024 through February 13, 2024 (Predecessor) consists of EM capital contributions financing the maintenance and operational readiness activities. The Successor financing activities for the period February 14, 2024 through June 30, 2024 (Successor) are comprised of the aggregate $440.2 million, net of $22.9 million of capitalized Business Combination transaction expenses, or $417.3 million net, less deposit paid to EM for the Term Loan of $18.8 million, payment of debt issuance costs of $1.5 million, and repayment of Flame non-convertible promissory notes - related parties for $1.1 million.

Current wording

Financing activities for the period January 1, 2024 through February 13, 2024 (Predecessor) consists of EM capital contributions financing the maintenance and operational readiness activities. Financing activities for the period February 14, 2024 through September 30, 2024 (Successor) are comprised of $440.2 million of gross proceeds from the First Pipe Investment, $150.0 million of gross proceeds from the Second PIPE Investment, or $590.2 million in aggregate gross private offering proceeds, net of $22.9 million of capitalized transaction expenses, or $567.4 million net, plus $72.5 million net cash received from warrant exercises, less deposit paid to EM for the Term Loan of $18.8 million, payment of debt issuance costs of $1.5 million, and repayment of Flame non-convertible promissory notes — related parties for $1.1 million.

Previous wording

Pursuant to the Senior Secured Term Loan, which financed most of the Purchase Price (as defined in the Senior Secured Term Loan), Sable will pay interest at ten percent (10%) per annum compounded annually, payable in arrears on January 1st of each year. At Sable’s election, accrued but unpaid interest may be deemed paid on each interest payment date by adding the amount of interest owed to the outstanding principal (paid-in-kind) amount under the Senior Secured Term Loan. On December 13, 2024, the Company entered into the Fourth Amendment to the Sable-EM Purchase Agreement, pursuant to which the following definitions were amended. “Restart Production” was redefined as 150 days after first production, extending the maturity date of the EM Term Loan by 60 days. “Restart Failure Date” was extended an additional 60 days to March 1, 2026. In the absence of further negotiations, Restart Production must take place prior to March 1, 2026, and the Senior Secured Term Loan must be refinanced within 240 days following such first production

Current wording

Pursuant to the Senior Secured Term Loan, which financed most of the Purchase Price (as defined in the Senior Secured Term Loan), Sable will pay interest at ten percent (10%) per annum compounded annually, payable in arrears on January 1st of each year. At Sable’s election, accrued but unpaid interest may be deemed paid on each interest payment date by adding the amount of interest owed to the outstanding principal (paid-in-kind) amount under the Senior Secured Term Loan. On December 13, 2024, the Company entered into the Fourth Amendment to the Sable-EM Purchase Agreement, pursuant to which the following definitions were amended. “Restart Production” was redefined as 150 days after first production, extending the maturity date of the EM Term Loan by 60 days. “Restart Failure Date” was extended an additional 60 days to March 1, 2026.

Previous wording

On May 19, 2025, the Company announced that as of May 15, 2025, it had restarted production at SYU and begun flowing oil production from six wells at SYU’s Platform Harmony to LFC. Additionally, with the completion of the Gaviota State Park anomaly repairs on the Onshore Pipeline on May 18, 2025, the Company completed its anomaly repair program on the Onshore Pipeline as specified by the Consent Decree, the governing document for the restart and operations of the Onshore Pipeline. As a result of Restart Production the Senior Secured Term Loan must be refinanced within 240 days following such first production date, or January 10, 2026. Accordingly, the Senior Secured Term Loan must be refinanced or otherwise paid in full by or prior to the maturity date.

Current wording

On May 19, 2025, the Company announced that as of May 15, 2025, it had restarted production at SYU and begun flowing oil production from six wells at SYU’s Platform Harmony to LFC. Additionally, with the completion of the Gaviota State Park anomaly repairs on the Onshore Pipeline on May 18, 2025, the Company completed its anomaly repair program on the Onshore Pipeline as specified by the Consent Decree, the governing document for the restart and operations of the Onshore Pipeline. As a result of Restart Production the Senior Secured Term Loan must be refinanced or otherwise paid in full within 240 days following such first production date, or January 9, 2026, but is expected to be extended to the earlier of (i) March 31, 2027 or (ii) the date falling 90 days after first sales of Hydrocarbons (as defined in the Senior Secured Term Loan) upon effectiveness of the Second Debt Amendment (refer to Note 6 — Debt for additional details regarding the Second Debt Amendment).

Previous wording

Other Property and Equipment. Other property and equipment primarily consist of onshore midstream facilities and transportation assets. Due to the natural of such assets, the onshore midstream facilities are presented within oil and gas properties, while the transportation assets are presented within other assets on the unaudited condensed consolidated balance sheets.

Current wording

Other Property and Equipment. Other property and equipment primarily consist of onshore midstream facilities, transportation assets and assets related to the Company’s corporate office (the “Office Assets”). Due to the nature of such assets, the onshore midstream facilities are presented within oil and gas properties, while the transportation assets and the Office Assets are presented within other assets on the unaudited condensed consolidated balance sheets.

Previous wording

The SYU Assets had previously been shut in since 2015 due to a pipeline incident but had been maintained by EM to preserve it in an operation-ready state and thus no depletion had been recognized prior to achieving first production on May 15, 2025. Depletion, depreciation and amortization of $1.8 million associated with the SYU assets was recognized during the three months ended June 30, 2025; however, as the associated production remained in the Company's storage tanks as of June 30, 2025, the entire amount has been capitalized as Inventory and other on the unaudited condensed consolidated balance sheet. The recognition of depletion expense on the unaudited condensed consolidated statement of operations will commence upon restart and related production.

Current wording

The SYU Assets had previously been shut in since 2015 due to a pipeline incident but had been maintained by EM to preserve it in an operation-ready state and thus no depletion had been recognized prior to achieving first production on May 15, 2025. Depletion, depreciation and amortization of $3.6 million and $5.4 million associated with the SYU assets was recognized during the three and nine months ended September 30, 2025, respectfully; however, as the associated production remained in the Company’s storage tanks as of September 30, 2025, the entire amount has been capitalized as Inventory and other on the unaudited condensed consolidated balance sheet. The recognition of depletion expense on the unaudited condensed consolidated statement of operations will commence upon the commencement of sales of production.

Previous wording

Oil Inventory. Production volumes for the period May 16, 2025 through June 30, 2025 were retained within the Company's storage tanks and recognized as short term oil inventory, and the associated depletion expense was capitalized, as noted above. FASB ASC Topic 330—Inventory (“ASC 330”) dictates that inventory shall initially be valued at the price paid or consideration given to acquire an asset. By analogy, the Company capitalized the costs incurred that were directly attributable to producing and transporting the production to the onshore storage tanks, including associated depreciation, depletion, and amortization. Oil inventory is presented as a component of Inventory and other on the unaudited condensed consolidated balance sheet.

Current wording

Oil Inventory. Production volumes for the period May 16, 2025 through September 30, 2025 were retained within the Company’s storage tanks and recognized as short term oil inventory, and the associated depletion expense was capitalized, as noted above. ASC 330 dictates that inventory shall initially be valued at the price paid or consideration given to acquire an asset. By analogy, the Company capitalized the costs incurred that were directly attributable to producing and transporting the production to the onshore storage tanks, including associated depreciation, depletion, and amortization. Oil inventory is presented as a component of Inventory and other on the unaudited condensed consolidated balance sheet.

Showing the first 40 of 42 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

On February 11, 2025, Pipeline and Hazardous Materials Safety Administration (“PHMSA”) notified the OSFM that PHMSA does not object to OSFM’s granting of the State Waivers.

Current report — wording carried from elsewhere

to issue an order finding that BOEM’s decision was not in accordance with OCSLA and violated the APA; order BOEM to require revision of the development and production plan for Platform Harmony; prohibit BOEM from authorizing new oil and gas drilling activity at the SYU unless and until revision of the development and production plan is complete; and for an award of costs and attorneys’ fees. Sable intervened and vigorously contests the plaintiffs’ allegations. On September 10, 2025, the court denied Sable’s motion to dismiss based on plaintiffs’ failure to provide notice under OCSLA’s citizen suit provision. The court approved a scheduling order that provides for a hearing on cross-motions for summary judgment on May 15, 2026.

Current report — wording carried from elsewhere

Due to the remaining regulatory and legal approvals necessary to implement either the Pipeline Strategy or OS&T Strategy, and resume sales of production volumes, and lack of assurance that new financing, or refinancing of the Senior Secured Term Loan, will be available to the Company on commercially acceptable terms, if at all, substantial doubt exists about the
Rearranged previous paragraphs (4)

Previous report — wording carried elsewhere

Beginning in 1968 and over the course of 14 years, EM consolidated more than a dozen offshore federal oil leases and organized them into a streamlined production unit known as SYU. SYU consists of three offshore platforms and a wholly owned onshore processing facility located along the Gaviota Coast at Las Flores Canyon in Santa Barbara County, California. SYU’s onshore facilities and the three offshore platforms remained in continuous operation until 2015. In May

Previous report — wording carried elsewhere

On May 19, 2025, the Company announced that as of May 15, 2025, it had restarted production at SYU and begun flowing oil production from six wells at SYU's Platform Harmony to the Company's Las Flores Canyon (“LFC”). Additionally, on May 19, 2025 the Company also announced that with the completion of the Gaviota State Park anomaly repairs on the Las Flores Pipeline System (the “Onshore Pipeline”) on May 18, 2025, the Company completed its anomaly repair program on the Onshore Pipeline as specified by the Consent Decree, the governing document for the restart and operations of the Onshore Pipeline.

Previous report — wording carried elsewhere

For the six months ended June 30, 2025 (Successor), we had a net loss of $237.6 million, which consists of a non-cash increase of $5.9 million in fair value of the warrants, non-cash stock-based compensation of $16.5 million, non-cash paid-in-kind interest of $41.7 million, changes in accounts payable of $22.4 million, non-cash depreciation, depletion, amortization and accretion of $6.2 million, and non-cash tax expense of $18.7 million. Changes in accounts payable for the period is primarily attributable to the increase in vendor payables associated with the restart efforts. For the period January 1, 2024 through February 13, 2024 (Predecessor), SYU incurred a net loss of $11.8 million and for the period February 14,

Previous report — wording carried elsewhere

All of our outstanding warrants are recognized as derivative liabilities in accordance with ASC 815-40. Accordingly, we recognize the warrant instruments as liabilities at fair value and adjust the instruments to fair value at each reporting period.