About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2026 · Filed Aug 11, 2026

NRGV$3.24+15.7%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2026-03-31; filed 2026-05-19.

0001828536-26-000050

Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2026-06-30; filed 2026-08-11.

0001828536-26-000101

Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 222 previous paragraphs and 222 current paragraphs.

123 unchanged; 53 reworded; 44 added; 43 removed; 3 previous and 2 current paragraphs rearranged.

Tables are not compared: 15 previous and 13 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (44)

Current report

During the three months ended June 30, 2026, we entered into a securities purchase agreement to issue 2026 Debentures, which was subsequently amended to increase the maximum aggregate principal amount issuable thereunder to $150.0 million. In connection with the securities purchase agreement and related amendment, we issued 2026 Debentures with an outstanding principal amount of $80.0 million as of June 30, 2026. Refer to “Liquidity and Capital Resources—Sources of Liquidity—Convertible Debentures” below and Note 9 of the unaudited condensed consolidated financial statements elsewhere in this Quarterly Report for more information.

Current report

Japan Battery Energy Storage System (“BESS”) Portfolio Acquisition

Current report

During the three months ended June 30, 2026, we completed the acquisition of an 850 MW BESS development portfolio in Japan from BayWa, including certain project development rights. The acquired portfolio includes advanced-stage and early-stage projects and establishes our operating platform in Japan. See Note 7 of the unaudited condensed consolidated financial statements elsewhere in this Quarterly Report for more information.

Current report

Subsequent to June 30, 2026, we entered into agreements relating to the initial deployment of modular data center units at the Company’s site in Snyder, Texas. Under the agreements, the Company intends to purchase the units and lease them to a Crusoe affiliate under a long-term lease providing for fixed and variable rental payments.

Current report

On August 7, 2026, the Company announced that it had entered into a series of agreements with a customer to design, procure, and deliver BESS and related equipment and to provide commissioning support for data center power projects in Texas. The Company currently expects to recognize revenue in excess of $500 million under these agreements from the second half of 2026 through the end of 2027. A portion of the amounts expected to be recognized as revenue under these agreements was included in backlog as of June 30, 2026.

Current report

Interest expense consists primarily of contractual interest on debt, insurance premium financing obligations, and finance lease liabilities, as well as amortization of debt discounts and debt issuance costs.

Current report

Revenue from three customers accounted for 50%, 31%, and 10% of total revenue, respectively, for the three months ended June 30, 2025 and revenue from three customers accounted for 52%, 19%, and 15% of total revenue, respectively, for the six months ended June 30, 2025.

Current report

Cost of revenue for the three months ended June 30, 2026 was $12.0 million, an increase of $6.0 million from $6.0 million for the same period in 2025. Cost of revenue for the six months ended June 30, 2026 was $29.1 million, an increase of $19.4 million from $9.7 million for the same period in 2025.

Current report

Gross profit for the three months ended June 30, 2026 was $5.4 million, an increase of $2.9 million from $2.5 million for the same period in 2025. Gross profit for the six months ended June 30, 2026 was $10.2 million, an increase of $2.8 million from $7.4 million for the same period in 2025. The increases in gross profit for both periods in 2026 compared to 2025 were driven primarily by higher gross profit from sales of energy storage products and, to a lesser extent, from the Company’s owned energy storage systems.

Current report

Sales and marketing expenses for the three months ended June 30, 2026 were $2.9 million, a decrease of $0.3 million from $3.2 million for the same period in 2025. The decrease was driven primarily by lower headcount within sales and marketing, resulting in a $0.6 million decrease in personnel-related expenses. These cost savings were partially offset by a $0.4 million increase in consulting expenses.

Current report

Research and development expenses for the three months ended June 30, 2026 were $2.5 million, a decrease of $1.5 million from $4.1 million for the same period in 2025. The decrease was driven primarily by cost-control measures and lower headcount within research and development, resulting in decreases of $1.0 million in personnel-related expenses and $0.6 million in engineering and development costs.

Current report

Research and development expenses for the six months ended June 30, 2026 were $5.1 million, a decrease of $2.8 million from $7.9 million for the same period in 2025. The decrease was driven primarily by cost-control measures and lower headcount within research and development, resulting in decreases of $1.6 million in personnel-related expenses and $1.3 million in engineering and development costs.

Current report

General and administrative expenses for the six months ended June 30, 2026 were $43.9 million, an increase of $7.3 million from $36.6 million for the same period in 2025. The increase was driven primarily by increases of $4.9 million in legal and professional fees, $2.6 million in project development costs, $0.8 million in property tax and permitting fees, $0.6 million in travel expenses, $0.4 million in operating costs for the Snyder CDU, and $0.2 million in insurance costs. These increases were partially offset by a $2.8 million decrease in personnel-related expenses, primarily attributable to a $4.9 million decrease in stock-based compensation expense.

Current report

Provision for credit losses was $0.1 million for each of the three and six months ended June 30, 2026, compared with $3.8 million for each of the corresponding periods in 2025. The decrease was primarily due to allowances recorded in 2025 for a customer financing receivable and a convertible note receivable, with no comparable allowances recorded in 2026.

Current report

Interest expense for the three months ended June 30, 2026 was $4.2 million, an increase of $1.7 million from $2.5 million for the same period in 2025. Interest expense for the six months ended June 30, 2026 was $7.7 million, an increase of $5.0 million from $2.6 million for the same period in 2025. The increases primarily reflect higher average debt balances in 2026 compared with the corresponding periods in 2025.

Current report

Change in fair value of financial instruments carried at fair value resulted in gains of $1.5 million and $1.4 million for the three and six months ended June 30, 2026, respectively, with no comparable amount recognized for the corresponding periods in 2025. The gains recognized in 2026 were primarily due to an decrease in the fair value of the Company’s warrant liabilities.

Current report

Other expense, net, for the three months ended June 30, 2026 was $2.2 million, a decrease of $0.3 million from $2.5 million for the same period in 2025. The decrease was primarily due to a $1.2 million decrease in loss on debt extinguishment, the absence of $0.9 million of commitment and transaction fees related to the Hudson Equity Purchase Agreement recognized in 2025, and a $0.3 million decrease in foreign exchange losses. These decreases were partially offset by a $2.0 million impairment of the Company’s investment in KORE equity securities recognized in 2026.

Current report

Other expense, net, for the six months ended June 30, 2026 was $7.4 million, an increase of $4.8 million from $2.6 million for the same period in 2025. The increase in other expense, net was primarily due to a $4.0 million increase in loss on debt extinguishment and a $2.0 million impairment of the Company’s investment in KORE equity securities, partially offset by the absence of $0.9 million of commitment and transaction fees related to the Hudson Equity Purchase Agreement recognized in 2025.

Current report

On June 26, 2026, CRC, the holders party thereto, and Wilmington Trust National Association, as collateral agent, entered into a Consent, Waiver, and Amendment No. 2 to the CRC Note Purchase Agreement (the “CRC Amendment”). Pursuant to the CRC Amendment, the holders, among other items, (i) consented to a voluntary principal prepayment of the CRC Senior Notes in an aggregate principal amount of approximately $4.1 million, (ii) waived the make-whole amount and related certificate delivery requirements otherwise payable in connection with such prepayment, (iii) consented to the release, withdrawal and transfer of excess reserve amounts for application to such prepayment, (iv) deferred the testing date for the debt service coverage ratio covenant to November 30, 2026, (v) consented to a revised amortization schedule, and (vi) consented to a reduction of the operating reserve requirement.

Current report

In connection with the CRC Amendment, the Company agreed to pay an amendment fee of $0.4 million to the holders of the CRC Senior Notes. The Company made the prepayment of principal and accrued interest, and the amendment fee in July 2026.

Current report

On June 29, 2026, Cross Trails entered into a Waiver, Consent and Amendment No. 1 to the Cross Trails Credit Agreement (the “Cross Trails Consent”) with the lenders. Pursuant to the Cross Trails Consent, the lenders waived any default or event of default under the Cross Trails Credit Agreement arising from Cross Trails’ failure to comply with the debt service coverage ratio requirements for the quarters ended March 31, 2026 and June 30, 2026, and consented to Cross Trails’ application of cash equity contributions from Energy Vault, Inc. in the aggregate amount of $1.2 million, together with a historical revenue credit related to insurance proceeds reasonably expected to be received, to cure the debt service coverage ratio noncompliance.

Current report

The amendment also added a prospective equity cure right under which Cross Trails may receive cash equity contributions from the project sponsor or its direct or indirect owners to cure future financial covenant noncompliance, subject to certain limitations. The cure right may be exercised up to four times during the term of the Cross Trails Credit Agreement and once in consecutive fiscal quarters; however, the cure of the March 31, 2026 and June 30, 2026 debt service coverage ratio noncompliance does not count toward the four permitted cure exercises. The amendment provides that the cure right may not be used for the quarter ending September 30, 2026.

Current report

As a result of the waiver, consent and amendment, the debt service coverage ratio noncompliance did not result in an event of default or acceleration of amounts outstanding under the Cross Trails Credit Agreement. As of June 30, 2026, the Company classified the outstanding balance under the Cross Trails Credit Agreement based on the contractual payment terms of the amended agreement.

Current report

Convertible Debentures (collectively, the 2025 and 2026 Debentures)

Current report

As of June 30, 2026, $3.0 million of principal remained outstanding under the 2025 Debentures, all of which was subject to conversion notices issued to the Investor that have not yet been exercised.

Current report

On May 18, 2026, the Company entered into a separate securities purchase agreement (“2026 Securities Purchase Agreement”) with the Investor, pursuant to which the Company issued a senior secured convertible debenture in the original principal amount of $42.0 million. The debenture was issued at 95% of principal, and the Company received net proceeds of $39.5 million after deductions for original issue discount and fees.

Current report

On June 29, 2026, the Company entered into an amendment to the 2026 Securities Purchase Agreement with the Investor. The amendment increased the maximum aggregate principal amount of convertible debentures issuable under the 2026 Securities Purchase Agreement from $75.0 million to $150.0 million and provided for the issuance of an amended and restated senior secured convertible debenture in the outstanding principal amount of $80.0 million (the “2026 Debentures”), consisting of the original $42.0 million principal amount issued on May 18, 2026 and an additional principal amount of $38.0 million issued on June 29, 2026.

Current report

The additional principal amount was issued at 95% of principal for a purchase price of $36.1 million. After deductions for a structuring fee and legal fee reimbursements, the Company received net proceeds of $34.6 million from the additional principal amount. The 2026 Debentures are secured by assets of the Company, Energy Vault, Inc. and certain of the Company’s subsidiaries.

Current report

The 2026 Debentures bear interest at 7.5% per annum, or 18.0% upon an uncured event of default, and mature on July 1, 2027. Under the amended and restated redemption schedule, interest-only installments are due in June and July 2026, and monthly principal installments begin on August 29, 2026.

Current report

The 2026 Debentures include certain amortization event provisions. An amortization event includes, among other things, (i) the Company’s common stock trading below the floor price for 5 of 7 consecutive trading days, (ii) issuance of more than 99% of the shares available under the exchange cap without stockholder approval, or (iii) from any time after the six-month anniversary of issuance, the Investor being unable to sell its shares pursuant to Rule 144. While an amortization event is in effect, the monthly installment must be paid in cash and the installment amount may increase to the greater of the scheduled amount and 20.0% of then-outstanding principal.

Current report

The 2026 Debentures also include mandatory redemption provisions based on the borrowing base. A mandatory redemption event occurs if the aggregate principal amount outstanding under the 2026 Debentures exceeds the applicable percentage of the borrowing base adjusted amount. Mandatory redemption amounts are required to be paid in cash.

Current report

Significant non-cash items consisted of $11.4 million of stock-based compensation expense, $6.8 million of depreciation, amortization, and accretion expense, a $5.4 million loss on debt extinguishment, a $1.4 million gain on the change in fair value of financial instruments carried at fair value, a $2.0 million impairment of equity securities, $1.9 million of non-cash debt and financing costs, and a $0.3 million increase in the deferred tax asset valuation allowance.

Showing the first 40 of 44 passages. Open the source sections for the rest.

Removed paragraphs (43)

Previous report

In December 2025, the Australian Energy Market Operator published the Draft 2026 Integrated System Plan, which describes development pathways for the National Electricity Market through 2050. The Draft 2026 Integrated System Plan indicates that material growth in dispatchable capacity and energy storage is expected to be required to support reliability and the integration of higher levels of renewable generation over time, reflecting ongoing expansion in the market for utility scale energy storage.

Previous report

Each of our owned installations and our customers’ installations must be designed, constructed, and operated in compliance with applicable federal, state, and local regulations, codes, standards, guidelines, and laws. To develop, install, and operate energy storage systems, we, our customers, or our partners, as applicable, are required to obtain permits and approvals from authorities having jurisdiction, including zoning and land use approvals, building and electrical permits, fire and life safety approvals, and environmental permits where applicable. Energy storage systems typically require interconnection studies and agreements with the applicable transmission provider or local utility, and interconnection timelines and requirements may be affected by evolving interconnection processes and reforms.

Previous report

In February 2026, our Australian development partner, Bridge Energy Pty Ltd, was awarded a 14-year Long-Term Energy Service Agreement by AusEnergy Services for the Ebor Battery Energy Storage System project in New South Wales, Australia. The 100 MW / 870 MWh project is expected to provide eight hours of dispatchable capacity and is expected to commence operations in 2028, subject to obtaining necessary contractual and regulatory approvals. We hold an exclusive option to acquire and construct the project, which will utilize our proprietary B-VAULT technology and energy management system, and will be owned and operated under our Asset Vault platform.

Previous report

On February 9, 2026, we announced that we executed a definitive supply agreement with Peak Energy securing 1.5 gigawatt-hours of Peak Energy's U.S. manufactured sodium-ion battery systems.

Previous report

On February 11, 2026, we announced a strategic framework agreement with Crusoe, Inc. ("Crusoe") for the phased deployment of Crusoe Spark modular data centers at Energy Vault’s technology center in Snyder, Texas. The initial program is scalable up to 25 MW of total load to be operated inside Crusoe’s proprietary Spark modular AI factory product, with planned deployments expected in 2026.

Previous report

On March 24, 2026, the Company acquired rights to the McMurtre Battery Energy Storage System (“BESS”), a 175 MW / 350 MWh BESS project to be located near Dallas, Texas. The Company paid $0.3 million for the rights to the project and will owe the seller an additional $5.6 million if the project reaches the notice to proceed milestone and $1.4 million if the project reaches commercial operation.

Previous report

On April 9, 2026, the Company announced that it had entered into a binding agreement, subject to certain closing conditions, to acquire an 850 MW BESS development portfolio in Japan from a domestic energy storage developer. The portfolio includes 350 MW of advanced stage projects and 500 MW of early stage projects. The Company expects this transaction, if completed, to expand its geographic presence and support the continued execution of its Own and Operate strategy.

Previous report

On May 18, 2026, we issued senior secured convertible debentures (the “Senior Secured Convertible Debentures”) in multiple tranches with an aggregate principal amount of up to $75.0 million. The initial tranche of $42.0 million will be funded at closing and net proceeds are expected to be $39.6 million after deductions for an original issue discount and origination fees. Refer to “Liquidity and Capital Resources—Sources of Liquidity— Senior Secured Convertible Debentures” below for more information.

Previous report

Interest expense consists of contractual interest expense and amortization of non-cash debt and financing costs related to short and long-term loans, insurance premium financings, and finance leases.

Previous report

Gross profit for the three months ended March 31, 2026 was $4.8 million, a decrease of $0.1 million from $4.9 million for the same period in 2025. The decrease in gross profit was driven primarily by the decrease in IP licensing revenue, which had no associated cost of revenue, partially offset by an increase in gross profit from the sale of energy storage products.

Previous report

Research and development expenses for the three months ended March 31, 2026 were $2.6 million, a decrease of $1.2 million from $3.8 million for the same period in 2025. The decrease was driven primarily by cost control measures and lower R&D headcount, which reduced engineering and development costs by $0.7 million and personnel-related expenses by $0.6 million.

Previous report

Provision for credit losses for the three months ended March 31, 2026 was $25 thousand, a change of $36 thousand from an $11 thousand benefit for the same period in 2025.

Previous report

Interest expense for the three months ended March 31, 2026 was $3.5 million, an increase of $3.4 million from $0.1 million for the same period in 2025. The increase primarily reflected higher interest costs associated with debt financings obtained during 2025 and the first quarter of 2026, whereas during the first quarter of 2025, the Company’s borrowings were limited to insurance premium financing arrangements with minimal interest costs.

Previous report

Change in fair value of financial instruments carried at fair value was a loss of $0.1 million for the three months ended March 31, 2026, with no comparable amount recognized for the same period in 2025.

Previous report

Other expense, net for the three months ended March 31, 2026 was $5.3 million, an increase of $5.1 million from $0.1 million for the same period in 2025. The increase in other expense, net was primarily due to a $5.2 million loss on partial debt extinguishment related to repayments of the Company’s Convertible Debentures during the three months ended March 31, 2026, with no comparable amount recognized for the same period in 2025.

Previous report

On April 4, 2025, CRC issued $27.8 million of senior notes (“CRC Senior Notes”), with Eagle Point Credit as lender and Jefferies serving as agent for the transaction.

Previous report

The obligations under the Cross Trails Senior Note are secured by a first priority security interest in substantially all of the assets of the Cross Trails Borrower, including the project assets, accounts, and related collateral, as well as the membership interests in the Cross Trails Borrower. The Cross Trails Senior Note contains customary affirmative and negative covenants for a project financing of this type, including limitations on additional indebtedness, liens, asset sales, investments, affiliate transactions, and distributions.

Previous report

Reflecting performance within the ERCOT market since operations commenced at the Cross Trails BESS Project on May 31, 2025, the Company has not satisfied the current minimum Cross Trails Senior Note debt service coverage ratio under the covenant calculation for the quarter ended March 31, 2026. Under the terms of the Cross Trails Senior Note, the applicable reporting period has not yet occurred; the delivery date for the financial statements for the quarter ended March 31, 2026 is June 29, 2026. Also, the lender has informed the Company that an event of default has not occurred as of the date of this Quarterly Report. The Company intends to work with the lender between now and the delivery date to remedy this issue through a series of options, including but not limited to the receipt of waivers, project equity investments, and/or partial or full repayment in the appropriate time frame. As of March 31, 2026, the Company has classified the outstanding balance under the Cross Trails Senior Note as current as a result of the noncompliance.

Previous report

$1.6 million was subject to a conversion notice delivered by the Investor that had not yet been converted into shares of the Company’s common stock as of March 31, 2026. Tranche 1 matures on March 22, 2027.

Previous report

On May 18, 2026, the Company entered into a Securities Purchase Agreement (the “Purchase Agreement”) with YA II PN, Ltd. (the “Investor”), pursuant to which the Company agreed to issue senior secured convertible debentures (the “Senior Secured Convertible Debentures”) in multiple tranches with an aggregate principal amount of up to $75.0 million.

Previous report

The initial tranche of $42.0 million will be funded at closing and net proceeds are expected to be $39.6 million after deductions for an original issue discount and origination fees. The Senior Secured Convertible Debentures are secured by assets of the Company, Energy Vault, Inc. and the Company’s Swiss and Australian subsidiaries.

Previous report

The Senior Secured Convertible Debentures were issued at 95% of par, bear interest at 7.5% per annum (18.0% upon an uncured event of default), and mature on May 17, 2027. Beginning on September 18, 2026 and monthly thereafter (each, a “Payment Date”), approximate scheduled installments of principal and accrued interest are due as follows (per $10.0 million of original principal): $1.2 million on the first Payment Date, $1.2 million on each of the next 3 Payment Dates, $1.1 million on each of the next 4 Payment Dates, and $1.1 million at maturity. For the initial tranche, the floor price is $1.19 per share.

Previous report

Subsequent to March 31, 2026, the Company made or committed to certain payments in connection with the Mesa Del Sol project, including funding $7.5 million of prepaid development costs to Public Service Company of New Mexico, paying a $10.0 million reservation fee under a production slots reservation agreement, and paying or agreeing to pay certain other nonrefundable fees related to project development and land acquisition rights. The underlying land purchase agreement includes an initial closing requirement for certain tracts by December 18, 2026; however, the Company’s obligation to close remains subject to specified conditions, and the Company may terminate the arrangement without liability in excess of the nonrefundable assignment fee. The production slots reservation agreement does not obligate the Company to purchase the underlying equipment unless the parties execute a separate sales contract.

Previous report

(1)The table reflects contractual principal maturities and does not reflect the balance sheet classification of the Cross Trails Senior Note as current as of March 31, 2026, as described above.

Previous report

Significant non-cash items include $7.1 million in stock-based compensation expense, $5.2 million in loss on debt extinguishment, and $3.5 million in depreciation, amortization, and accretion expense.

Previous report

The decrease in operating liabilities was driven by a $67.7 million decrease in accounts payable and accrued expenses, partially offset by an $8.6 million increase in contract liabilities. The decrease in operating assets was driven by a $21.0 million decrease in accounts receivable, a $2.9 million decrease in contract assets, and a $2.7 million decrease in advances to suppliers, partially offset by a $3.0 million increase in prepaid expenses and other current assets and a $2.6 million increase in other assets.

Previous report

Net cash used in operating activities for the three months ended March 31, 2026 increased compared with the same period in 2025, primarily reflecting higher payments to vendors, including payments that reduced accounts payable and accrued expenses during the period.

Previous report

The change from net cash used in investing activities in the prior year period to net cash provided by investing activities in the current year period was driven primarily by the $11.8 million in proceeds from the transfer of the Cross Trails ITC, partially offset by property and equipment expenditures during the period.

Showing the first 40 of 43 passages. Open the source sections for the rest.

Reworded paragraphs (53)

Previous wording

Energy Vault is an integrated power infrastructure platform that builds, owns and operates flexible, reliable energy systems designed to accelerate time-to-power for utilities, independent power producers, industrial customers and the artificial intelligence and data center market. At the core of our platform is a technology-agnostic, software-enabled architecture that is designed to accelerate project delivery, optimize performance and drive faster time-to-revenue. Energy Vault’s integrated solutions combine energy storage, generation, and advanced energy management to deliver scalable infrastructure tailored to customer needs. Our portfolio spans short-, long-, and multi-day duration storage, engineered to enable reliability, flexibility and cost efficiency across applications.

Current wording

Energy Vault Holdings, Inc., which together with its subsidiaries is referred to herein as “Energy Vault” or the “Company,” is an integrated global energy infrastructure platform that builds, owns and operates flexible, reliable energy systems designed to accelerate time-to-power for utilities, independent power producers, industrial customers and the artificial intelligence and data center market. At the core of our platform is a technology-agnostic, software-enabled architecture that is designed to accelerate project delivery, optimize performance and drive faster time-to-revenue. Energy Vault’s integrated solutions combine energy storage, generation, and advanced energy management to deliver scalable infrastructure tailored to customer needs. Our portfolio spans short-, long-, and multi-day duration storage, engineered to enable reliability, flexibility and cost efficiency across applications.

Previous wording

We believe that our performance and future success depend upon several factors that present significant opportunities for us, but also pose risks and challenges including those discussed below and in Part I, Item 1A. “Risk Factors” of our 2025 Annual Report on Form 10-K filed with the SEC on March 18, 2026.

Current wording

We believe that our performance and future success depend upon several factors that present significant opportunities for us, but also pose risks and challenges including those discussed below and in Part I, Item 1A. “Risk Factors” of our 2025 Annual Report on Form 10-K filed with the SEC on March 18, 2026 and Part II, Item 1A. “Risk Factors” of our Form 10-Q for the quarter ended March 31, 2026 filed with the SEC on May 19, 2026.

Previous wording

U.S. trade policy and tariff actions have affected the cost and availability of certain inputs used in our B-VAULT products and related project delivery. Beginning February 4, 2025, the United States imposed additional duties on imports from China and Hong Kong under the International Emergency Economic Powers Act (“IEEPA”), which were increased effective March 4, 2025. In parallel, the United States imposed additional IEEPA based reciprocal duties on China origin goods in April 2025, which escalated to significantly higher levels by April 10, 2025. The United States and China subsequently announced tariff reductions and pauses beginning in mid-May 2025, and in November 2025 the United States implemented additional executive actions that (i) reduced the IEEPA fentanyl related additional duty rate on China origin imports and (ii) extended the reduced reciprocal duty framework through November 10, 2026, subject to the terms and conditions of the arrangement.

Current wording

U.S. trade policy and tariff actions have affected the cost and availability of certain inputs used in our products and related project delivery. Beginning February 4, 2025, the United States imposed additional duties on imports from China and Hong Kong under the International Emergency Economic Powers Act (“IEEPA”), which such duties fluctuated drastically throughout the course of the year.

Previous wording

These tariff actions and related uncertainty materially affected our operations. Several third party sales projects within our backlog and developed pipeline experienced delays or cancellations due to the anticipated increase in costs associated with importing B-VAULT products from China. In addition, separate from IEEPA based duties, tariff rates under Section 301 of the Trade Act of 1974 (“Section 301 tariffs”) applicable to certain China origin products continued to evolve. For example, pursuant to U.S. Trade Representative actions finalized in 2024, the Section 301 duty rate applicable to lithium ion non electric vehicle batteries increased to 25% effective January 1, 2026. Depending on product classification and the interaction of applicable tariff programs, cumulative duty burdens can be significant and can materially affect project pricing and competitiveness.

Current wording

These tariff actions and related uncertainty materially affected our operations. Several third party sales projects within our backlog and developed pipeline experienced delays or cancellations due to the anticipated increase in costs associated with importing B-VAULT products from China. In addition, separate from IEEPA based duties, tariff rates under Section 301 of the Trade Act of 1974 (“Section 301 tariffs”) applicable to certain Chinese-origin products continued to evolve. For example, pursuant to U.S. Trade Representative actions finalized in 2024, the Section 301 duty rate applicable to lithium ion non-electric vehicle batteries increased to 25% effective January 1, 2026. Depending on product classification and the interaction of applicable tariff programs, cumulative duty burdens can be significant and can materially affect project pricing and competitiveness.

Previous wording

Trade Expansion Act of 1962. The Supreme Court decision did not address the process for obtaining refunds of IEEPA based duties previously paid, and the timing and availability of any potential duty relief remain uncertain. In response, President Trump promptly implemented a wide sweeping 10% import surcharge on goods under Section 122 of the Trade Act of 1974, which is scheduled to expire in July 2026 unless otherwise extended. These new tariffs target various categories of imports, including several raw materials used in our operations, such as core metals used in our grid-scale infrastructure. While the full scope, duration, and economic impact of these new tariffs remain uncertain, they could result in higher input costs, supply chain disruptions, and potential retaliatory measures from affected trading partners. We continue to monitor these developments closely and evaluate their potential effects on our cost structure and customer demand.

Current wording

On February 20, 2026, the U.S. Supreme Court held that IEEPA does not authorize the President to impose tariffs, and IEEPA based tariffs were invalidated. The decision does not affect Section 301 tariffs or tariffs under Section 232 of the Trade Expansion Act of 1962. After the U.S. Supreme Court decision, the U.S. Court of International Trade also ruled that all importers who paid IEEPA tariffs were entitled to a refund. Although U.S. Customs and Border Protection has established a process for importers to obtain refunds for certain entries, the process, timing, and availability of refunds for other entries remains uncertain. In response to the U.S. Supreme Court Decision, President Trump promptly implemented a sweeping 10% import surcharge on goods under Section 122 of the Trade Act of 1974, which expired on July 24, 2026. These tariffs targeted various categories of imports, including several raw materials used in our operations, such as core metals used in our grid-scale infrastructure. Immediately upon expiration of the 122 tariffs, the U.S. government imposed Section 301 tariffs on 60 countries related to the U.S. Trade Representative’s forced labor findings. Under these new Section 301 tariffs, unless exempted, all products of China and Hong Kong are subject to an additional 12.5% tariff upon entry into the United States. While the duration and economic impact of these new tariffs remain uncertain, they could result in higher input costs, supply chain disruptions, and potential retaliatory measures from affected trading partners. We continue to monitor these developments closely and evaluate their potential effects on our cost structure and customer demand.

Previous wording

If the current tariff relief, exclusions or suspension periods expire, are not extended or are replaced with less favorable measures, or if additional tariffs, trade restrictions, export controls or retaliatory measures are implemented or reinstated, our ability to source B-VAULT products or sell them at competitive prices could be adversely affected, which could have a material adverse impact on our business, results of operations, and cash flows.

Current wording

If the current tariff relief, exclusions or suspension periods expire, are not extended or are replaced with less favorable measures, or if additional tariffs, trade restrictions, export controls or retaliatory measures are implemented or reinstated, our ability to source B-VAULT products and other equipment, or sell them at competitive prices could be adversely affected, which could have a material adverse impact on our business, results of operations, and cash flows.

Previous wording

Recent reliability sector publications, including the North American Electric Reliability Corporation 2025 Long Term Reliability Assessment published in January 2026, indicate that load growth expectations have increased meaningfully, with data centers, electrification, and new large industrial and manufacturing facilities among the most cited drivers of incremental demand.

Current wording

Data centers, electrification, and new large industrial and manufacturing facilities are among the most cited drivers of incremental demand.

Previous wording

Over the past decade, deployment of renewable energy resources has accelerated and there has been an industry wide push for decarbonization, which is increasing the demand for grid scale energy storage. A major obstacle to transitioning to renewable sources of energy such as wind and solar is the intermittent availability of these types of energy sources. Energy storage solutions are needed to balance the production intermittency of variable renewable energy to support a clean energy future and a balanced electrical grid infrastructure. Both government mandates and companies focused on reducing energy use, cost, and emissions are expected to propel the shift to renewable sources of power.

Current wording

Over the past decade, deployment of renewable energy resources has accelerated and there has been a push for decarbonization, which is increasing the demand for grid scale energy storage. A major obstacle to transitioning to renewable sources of energy such as wind and solar is the intermittent availability of these types of energy sources. Energy storage solutions are needed to balance the production intermittency of variable renewable energy to support a clean energy future and a balanced electrical grid infrastructure. Both government mandates and companies focused on reducing energy use, cost, and emissions are expected to propel the shift to renewable sources of power.

Previous wording

Our expansion of revenue depends on the ongoing adoption of energy storage solutions by our customers and our ability to source, execute, and operate energy storage projects with attractive economics. The growth of the energy storage market that we address is primarily driven by the decreasing cost of energy storage technologies, government mandates, financial incentives to reduce greenhouse gas emissions, industry-wide decarbonization objectives, and efforts to enhance grid stability and efficiency. These dynamics are driving demand for increased energy storage capacity and duration.

Current wording

Our expansion of energy storage revenue depends on the ongoing adoption of energy storage solutions by our customers and our ability to source, execute, and operate energy storage projects with attractive economics. The growth of the energy storage market is primarily driven by the decreasing cost of energy storage technologies, government mandates, financial incentives to reduce greenhouse gas emissions, industry-wide decarbonization objectives, and efforts to enhance grid stability and efficiency. These dynamics are driving demand for increased energy storage capacity and duration.

Previous wording

Federal, state, and local statutes and regulations concerning electricity materially influence the market for our products and services. These requirements directly affect our owned asset business and indirectly affect our third party sales business, particularly with respect to permitting, siting, and interconnection of energy storage systems, as well as compliance with applicable codes and safety standards. Regulatory frameworks also affect how energy storage participates in wholesale markets, including market rules administered by regional transmission organizations and independent system operators and related Federal Energy Regulatory Commission oversight, which can influence dispatch, revenues, and operational requirements for storage resources.

Current wording

Federal, state, and local statutes and regulations concerning electricity materially influence the market for our products and services. These requirements directly affect our owned asset business and indirectly affect our third-party sales business, particularly with respect to permitting, siting, and interconnection of energy storage systems, as well as compliance with applicable codes and safety standards. Regulatory frameworks also affect how energy storage interconnects to electric systems and participates in wholesale markets, including market rules administered by regional transmission organizations and independent system operators and related Federal Energy Regulatory Commission oversight, which can influence dispatch, revenues, and operational requirements for storage resources.

Previous wording

We cannot guarantee that our bookings, backlog, or developed pipeline will result in actual revenue in the originally anticipated period, or at all. Our customers may experience project delays or cancel orders as a result of external market factors and economic or other factors beyond our control. Many of our projects require government approvals, third-party financing, and other contingencies, many of which are beyond our control. If our bookings, backlog, or developed pipeline fail to result in revenue as anticipated or in a timely manner, we could experience a reduction in revenue, profitability, and liquidity. See “Risk Factors - Our total backlog, bookings, and developed pipeline may not be indicative of our future revenue, which could have a material impact on our business, financial condition, and results of operations” in the Annual Report for the year ended December 31, 2025 filed by us with the SEC on March 18, 2026.

Current wording

We cannot guarantee that our bookings, backlog, or developed pipeline will result in actual revenue in the originally anticipated period, or at all. Our customers may experience project delays or cancel orders as a result of external market factors and economic or other factors beyond our control. Many of our projects require government approvals, third-party financing, and other contingencies, many of which are beyond our control. If our bookings, backlog, or developed pipeline fail to result in revenue as anticipated or in a timely manner, we could experience a reduction in revenue, profitability, and liquidity. See Part I, Item 1A. Risk Factors, “Risks Related to Our Financial Condition and Liquidity - Risk Factors - Our total backlog, bookings, and developed pipeline may not be indicative of our future revenue, which could have a material impact on our business, financial condition, and results of operations” in the Annual Report for the year ended December 31, 2025 filed by us with the SEC on March 18, 2026.

Previous wording

The Company generates revenue from the sale of our energy storage products, tolling arrangements related to owned projects, the licensing of the Company’s software solutions and IP, and from long-term service agreements to operate and maintain customer owned energy systems. To date, the Company has generated revenue primarily from the sale of our BESSs and from licensing our IP.

Current wording

The Company generates revenue from the sale of our energy storage products, tolling arrangements related to owned projects, the licensing of the Company’s software solutions and IP, and long-term service agreements to operate and maintain customer owned energy systems. To date, the Company has generated revenue primarily from the sale of our BESSs and from licensing our IP.

Previous wording

Our revenue is affected by changes in the price, volume, and mix of products and services purchased by our customers, which is driven by the demand of our products, geographic mix of our customers, strength of competitor’s product offerings, and the availability of government incentives to the end-users of our products.

Current wording

Our revenue is affected by changes in the price, volume, and mix of products and services purchased by our customers, which is driven by the demand for our products, geographic mix of our customers, strength of competitors’ product offerings, and the availability of government incentives to the end-users of our products.

Previous wording

R&D expenses consist primarily of internal and external expenses incurred in connection with our research activities and development programs that include material costs directly related to product development, testing and evaluation costs, construction costs including labor and transportation of material, overhead related costs and other direct expenses consisting of personnel-related expenses and consulting expenses relating to study of product safety, reliability and development. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense.

Current wording

R&D expenses consist primarily of internal and external expenses incurred in connection with our research activities and development programs that include material costs directly related to product development, testing and evaluation costs, construction costs including labor and transportation of material, overhead related costs and other direct expenses consisting of personnel-related expenses and consulting expenses relating to studies of product safety, reliability and development. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense.

Previous wording

G&A expenses consist of information technology expenses, legal and professional fees, travel costs, and personnel-related expenses for our corporate, executive, finance, and other administrative functions, including expenses for professional and contract services. Personnel-related expenses consist of salaries, benefits, and stock-based compensation expense. To a lesser extent, general and administrative expenses include investor relations costs, insurance costs, rent, office expenses, and maintenance costs.

Current wording

General and administrative expenses consist primarily of personnel-related expenses for our corporate, executive, finance and other administrative functions; information technology expenses; legal and professional fees; costs related to preliminary project development activities, including feasibility studies, site evaluation, permitting and preliminary engineering; and travel costs. Personnel-related expenses consist of salaries, benefits and stock-based compensation expense. To a lesser extent, general and administrative expenses include investor relations, insurance, rent, office and maintenance costs.

Previous wording

Other income (expense) includes foreign currency gains and losses and non-recurring non-operating gains and losses.

Current wording

Other expense, net includes foreign currency gains and losses and non-recurring non-operating gains and losses.

Previous wording

Consolidated Comparison of Three Months Ended March 31, 2026 to March 31, 2025

Current wording

Consolidated Comparison of Three and Six Months Ended June 30, 2026 to June 30, 2025

Previous wording

The Company recognized revenue for the product and service categories as follows for the three months ended March 31, 2026 and 2025 (amounts in thousands):

Current wording

The Company recognized revenue for the product and service categories as follows for the six months ended June 30, 2026 and 2025 (amounts in thousands):

Previous wording

Revenue for the three months ended March 31, 2026 was $21.9 million, an increase of $13.3 million from $8.5 million in the same period in 2025. The increase was primarily due to a $14.8 million increase in energy storage product sales and a $1.5 million increase in tolling and PPA revenue, partially offset by a $3.2 million decrease in IP licensing revenue. The increase in sales of energy storage products primarily related to progress on the Company’s Australian EPC projects. The increase in tolling and PPA revenue primarily related to the Company’s owned energy storage systems placed in service during the second and third quarters of 2025. The decrease in IP licensing revenue primarily reflected revenue recognized in the prior year period that did not recur in the current year period.

Current wording

Revenue for the six months ended June 30, 2026 was $39.2 million, an increase of $22.2 million from $17.0 million for the same period in 2025. The increase was primarily due to a $21.8 million increase in energy storage product sales and a $3.2 million increase in tolling and PPA revenue, partially offset by a $3.2 million decrease in IP licensing revenue. The increase in sales of energy storage products primarily related to progress on the Company’s Australian EPC projects. The increase in tolling and PPA revenue primarily related to the Company’s owned energy storage systems placed in service during the second and third quarters of 2025. The decrease in IP licensing revenue primarily reflected revenue recognized in the prior year period that did not recur in the current year period.

Previous wording

Revenue from one customer accounted for 81% of total revenue for the three months ended March 31, 2026, and revenue from two customers accounted for 55% and 38% of total revenue, respectively, for the three months ended March 31, 2025.

Current wording

Revenue from three customers accounted for 41%, 21%, and 21% of total revenue, respectively, for the three months ended June 30, 2026 and revenue from three customers accounted for 54%, 22%, and 10% of total revenue, respectively, for the six months ended June 30, 2026.

Previous wording

Cost of revenue for the three months ended March 31, 2026 was $17.1 million, an increase of $13.4 million from $3.7 million for the same period in 2025. The increase was driven by higher EPC project costs, primarily reflecting increased activity on the Company’s Australian EPC projects during the first quarter of 2026 as compared to the same period in 2025.

Current wording

The increases in cost of revenue for the three and six months ended June 30, 2026 compared to the same periods in 2025 were driven by higher EPC project costs, primarily reflecting increased activity on the Company’s Australian EPC projects. Also contributing to the increases was depreciation expense associated with the Company’s owned energy storage systems, which were placed in service during the second and third quarters of 2025.

Previous wording

Gross profit margin decreased to 21.9% for the three months ended March 31, 2026 from 57.1% in the same period in 2025, primarily due to lower IP licensing revenue in 2026, compared to the prior year period.

Current wording

Gross profit margin increased to 31.0% for the three months ended June 30, 2026 from 29.6% for the same period in 2025, primarily due to higher gross profit margins on sales of energy storage products. Gross profit margin decreased to 25.9% for the six months ended June 30, 2026 from 43.4% for the same period in 2025, primarily due to lower IP licensing revenue in 2026 than in the prior-year period.

Previous wording

Sales and marketing expenses for the three months ended March 31, 2026 were $2.9 million, a decrease of $1.2 million from $4.1 million for the same period in 2025. The decrease was driven primarily by cost control measures and lower S&M headcount, which together reduced personnel-related expenses by $0.6 million, consulting fees by $0.4 million, and external marketing and public relations costs by $0.2 million.

Current wording

Sales and marketing expenses for the six months ended June 30, 2026 were $5.8 million, a decrease of $1.5 million from $7.3 million for the same period in 2025. The decrease was driven primarily by cost-control measures and lower headcount within sales and marketing, resulting in a $1.2 million decrease in personnel-related expenses and a $0.2 million decrease in external marketing and public relations costs.

Previous wording

General and administrative expenses for the three months ended March 31, 2026 were $21.2 million, an increase of $3.7 million from $17.5 million for the same period in 2025. The increase was driven primarily by a $1.8 million increase in legal and professional fees, a $0.7 million increase in project development costs, a $0.4 million increase in property tax and permitting fees, a $0.3 million increase in travel expenses, a $0.2 million increase in operating costs for the Snyder commercial demonstration unit (“CDU”), and a $0.2 million increase in insurance costs.

Current wording

General and administrative expenses for the three months ended June 30, 2026 were $22.7 million, an increase of $3.5 million from $19.1 million for the same period in 2025. The increase was driven primarily by increases of $3.1 million in legal and professional fees, $1.9 million in project development costs, $0.3 million in travel expenses, $0.4 million in property tax and permitting fees, and $0.2 million in operating costs for the Snyder commercial demonstration unit (“Snyder CDU”). These increases were partially offset by a $2.6 million decrease in personnel-related expenses, primarily attributable to a $3.4 million decrease in stock-based compensation expense.

Previous wording

Depreciation, amortization, and accretion expense (excluding amounts included in cost of revenue) for the three months ended March 31, 2026 was $2.2 million, an increase of $1.9 million from $0.3 million for the same period in 2025. The increase primarily related to depreciation on the Snyder CDU, which was placed in service in the second half of 2025.

Current wording

Depreciation, amortization, and accretion expense (excluding amounts included in cost of revenue) for the three months ended June 30, 2026 was $1.9 million, an increase of $1.4 million from $0.5 million for the same period in 2025. Depreciation, amortization, and accretion expense (excluding amounts included in cost of revenue) for the six months ended June 30, 2026 was $4.1 million, an increase of $3.4 million from $0.8 million for the same period in 2025. The increases were primarily related to depreciation on the Snyder CDU, which was placed in service in the second half of 2025.

Previous wording

Interest income for the three months ended March 31, 2026 was $0.6 million, an increase of $0.3 million from $0.3 million for the same period in 2025. The increase in interest income primarily reflected higher average cash balances that earned interest compared to the same period in 2025.

Current wording

Interest income for the three months ended June 30, 2026 was $0.7 million, an increase of $0.4 million from $0.3 million for the same period in 2025. Interest income for the six months ended June 30, 2026 was $1.3 million, an increase of $0.6 million from $0.6 million for the same period in 2025. The increases primarily reflect higher average interest-earning cash balances that earned interest compared with the corresponding periods in 2025.

Previous wording

For corporate-level liquidity, we have accessed unsecured debt financings. Our indebtedness ranks senior to our common equity. If we raise additional funds through the issuance of debt securities, such instruments could also rank senior to our common equity and may include covenants or other terms that impose restrictions on our operations. Volatility in the credit markets and broader financial services sector could impact the availability and cost of both debt and equity financing in the future.

Current wording

For corporate-level liquidity, we have accessed both unsecured and secured debt financings. Our indebtedness ranks senior to our common equity. If we raise additional funds through the issuance of debt securities, such instruments could also rank senior to our common equity and may include covenants or other terms that impose restrictions on our operations. Volatility in the credit markets and broader financial services sector could impact the availability and cost of both debt and equity financing in the future.

Previous wording

To support non-cash backed performance bonding and surety obligations required under project EPC agreements, the Company partners with Marsh to access bonding and surety instruments issued by top-rated insurance firms.

Current wording

To support performance bonding and surety obligations required under project agreements, the Company partners with Marsh to access bonding and surety instruments issued by highly rated insurance firms.

Previous wording

As part of our ongoing business operations, the Company had a sales backlog of $1.3 billion as of March 31, 2026. Management expects this backlog to contribute to the future funding of our business, supported by a robust developed pipeline, which we anticipate to convert into additional contracted backlog as new agreements are executed.

Current wording

As part of our ongoing business operations, the Company had a sales backlog of $1.5 billion as of June 30, 2026. Management expects this backlog to contribute to the future funding of our business, and we anticipate that future contract awards will add to contracted backlog as new agreements are executed.

Previous wording

Energy Vault has historically incurred negative operating cash flows and operating losses and may continue to incur operating losses in the future. The Company may seek to raise additional capital through combinations of equity and/or debt financings, subject to prevailing market conditions. Issuance of equity securities could result in dilution to existing stockholders and may include rights, preferences, or privileges senior to those of the Company’s common stock.

Current wording

Energy Vault has historically incurred negative operating cash flows and operating losses and may continue to incur operating losses in the future. The Company may seek to raise additional capital through combinations of equity and/or debt financings, subject to prevailing market conditions. Issuance of equity securities could result in dilution to existing stockholders and may include rights, preferences, or privileges senior to those of the Company’s common stock. Debt financings, including secured debt financings, may require cash interest, amortization or redemption payments, may be secured by Company or subsidiary assets, and may include financial or operating covenants, borrowing base limitations, mandatory redemption provisions or other restrictions.

Previous wording

On March 28, 2025, the Company entered into a Tax Credit Transfer Commitment, on behalf of its majority and wholly-owned subsidiary companies, with a third-party purchaser pursuant to which the Company agreed to sell the investment tax credits (“ITC”) generated by the Calistoga Resiliency Center (“CRC”) energy storage system, the Cross Trails energy storage system, and the Snyder CDU. On February 26, 2026, the Company collected $11.8 million in proceeds from the transfer of the Cross Trails ITC to the third-party purchaser. As of the date of the Quarterly Report, the sales of the eligible ITCs generated by CRC and the Snyder CDU are expected to close following the satisfaction of certain customary closing conditions.

Current wording

On March 28, 2025, the Company entered into a Tax Credit Transfer Commitment, on behalf of its majority and wholly-owned subsidiary companies, with a third-party purchaser pursuant to which the Company agreed to sell the investment tax credits (“ITC”) generated by the Calistoga Resiliency Center (“CRC”) energy storage system, the Cross Trails energy storage system, and the Snyder CDU. The Company collected $11.8 million in proceeds from the transfer of the Cross Trails ITC on February 26, 2026 and collected $15.4 million in proceeds from the transfer of the CRC ITC on July 24, 2026 to the third-party purchaser. As of the date of the Quarterly Report, the sale of the eligible ITC generated by the Snyder CDU is expected to close following the satisfaction of certain customary closing conditions.

Previous wording

On November 12, 2024, we entered into an open market sales agreement (“Sales Agreement”) with Jefferies LLC, as sales agent (the “Sales Agent”), pursuant to which we may, from time to time, sell shares of our common stock, having an aggregate offering price of up to $50.0 million through the Sales Agent under an “at-the-market” equity offering program. We may seek, from time to time, to raise additional capital either under the Sales Agreement or otherwise.

Current wording

On November 12, 2024, we entered into an open market sales agreement (“Sales Agreement”) with Jefferies LLC, as sales agent (the “Sales Agent”), pursuant to which we may, from time to time, sell shares of our common stock, having an aggregate offering price of up to $50.0 million through the Sales Agent under an “at-the-market” equity offering program. As of June 30, 2026, $46.0 million remained available for sale under the program. We may seek, from time to time, to raise additional capital under the Sales Agreement. During the six months ended June 30, 2026, the Company sold 721,185 shares of its common stock under its at-the-market offering program at a weighted-average sales price of $5.61 per share. The Company received net proceeds of $3.9 million after deducting sales agent commissions.

Previous wording

In connection with the Hudson Equity Purchase Agreement, the Company entered into a Registration Rights Agreement, pursuant to which the Company agreed to register the Commitment Shares and the shares issuable pursuant to the Hudson Equity Purchase Agreement. The securities to be offered pursuant to the Hudson Equity Purchase Agreement will be offered pursuant to our effective shelf registration statement on Form S-3/A (File No. 333-273089), which was filed with the SEC on July 14, 2023 and declared effective on July 20, 2023.

Current wording

In connection with the Hudson Equity Purchase Agreement, the Company entered into a Registration Rights Agreement, pursuant to which the Company agreed to register the Commitment Shares and the shares issuable pursuant to the Hudson Equity Purchase Agreement.

Previous wording

The Company did not sell any shares under its ATM facility or equity purchase arrangements during the three months ended March 31, 2026 and 2025.

Current wording

The Company did not sell any shares under its equity purchase arrangements during the six months ended June 30, 2026 and 2025.

Previous wording

The Company expects to use the net proceeds from the sale of any shares under its ATM facility or equity purchase arrangements to invest in the development, construction, and deployment of energy storage-related projects, working capital, and general corporate purposes, including repayment of debt. The Company may find it necessary or advisable to use the net proceeds for other purposes.

Current wording

The Company intends to use the net proceeds from the sale of shares under its ATM facility or equity purchase arrangements to invest in the development, construction, and deployment of energy storage-related projects, working capital, and general corporate purposes, including repayment of debt. The Company may find it necessary or advisable to use the net proceeds for other purposes.

Previous wording

The CRC Senior Notes bear interest at 9.5% per annum and are senior secured obligations of CRC, backed by a first-priority pledge of all CRC assets and equity interests. The CRC Senior Notes include customary affirmative and negative covenants, including minimum cash reserves and a minimum debt service coverage ratio.

Current wording

On April 4, 2025, Calistoga Resiliency Center, LLC (“CRC”), a subsidiary of the Company, entered into a Note Purchase Agreement, as amended by Amendment No. 1 thereto, dated as of August 4, 2025 (the “CRC Note Purchase Agreement”), with Eagle Point Credit Management, LLC, pursuant to which CRC issued $27.8 million of senior notes (“CRC Senior Notes”). The CRC Senior Notes bear interest at 9.5% per annum and are senior secured obligations of CRC, backed by a first-priority pledge of all CRC assets and equity interests. The CRC Senior Notes include customary affirmative and negative covenants, including minimum cash reserves and a minimum debt service coverage ratio. Principal and interest are payable semi-annually, with installments due each February 28 and August 31, and the CRC Senior Notes mature on April 4, 2032.

Previous wording

On July 23, 2025, Cross Trails Energy Storage Project, LLC (“Cross Trails”), a subsidiary of the Company (the “Cross Trails Borrower”), entered into a credit agreement (the “Cross Trails Senior Note”) with Wilmington Trust, National Association, as administrative agent and collateral agent, and Jefferies Capital Services, LLC, as initial lender.

Current wording

On July 23, 2025, Cross Trails Energy Storage Project, LLC (“Cross Trails”), a subsidiary of the Company, entered into a credit agreement (the “Cross Trails Credit Agreement”) with Wilmington Trust, National Association, as administrative agent and collateral agent, and each of the lenders party thereto.

Previous wording

The Cross Trails Senior Note provides for a senior secured term loan facility in an aggregate principal amount of approximately $17.8 million. The Cross Trails Senior Note is structured as a single-draw term loan, with the full amount funded on July 23, 2025. The borrowing bears interest, at the Company’s election, at (i) the alternate base rate (“ABR”) plus 5.00% or (ii) the term secured overnight financing rate (“SOFR”) plus 6.00%. As of March 31, 2026, the Company was utilizing a SOFR of 3.6%, resulting in an interest rate of 9.6%.

Current wording

The Cross Trails Credit Agreement provides for a senior secured term loan facility in an aggregate principal amount of approximately $17.8 million. The Cross Trails Credit Agreement is structured as a single-draw term loan, with the full amount funded on July 23, 2025. The borrowing bears interest, at the Company’s election, at (i) the alternate base rate (“ABR”) plus 5.00% or (ii) the term secured overnight financing rate (“SOFR”) plus 6.00%. As of June 30, 2026, the Company was utilizing a SOFR of 3.6%, resulting in an interest rate of 9.6%.

Previous wording

Principal and interest are payable semi-annually, with installments due each February 28 and August 31. The Cross Trails Senior Note matures on July 23, 2032.

Current wording

Principal and interest are payable semi-annually, with installments due each February 28 and August 31, beginning on February 28, 2026. The Cross Trails Credit Agreement matures on July 23, 2032

Previous wording

The Company did not fully repay the Cedar Arrangement within 60 days of funding, therefore the applicable aggregate amount to be remitted to Cedar will be $6.3 million. Through March 31, 2026, the Company had remitted $5.1 million to Cedar, with $1.2 million remaining.

Current wording

The Company did not fully repay the Cedar Arrangement within 60 days of funding, therefore the applicable aggregate amount remitted to Cedar was $6.3 million. As of June 30, 2026, the Company had remitted the full $6.3 million to Cedar, and no amounts remained outstanding.

Showing the first 40 of 53 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

Revenue for the three months ended June 30, 2026 was $17.4 million, an increase of $8.9 million from $8.5 million for the same period in 2025. The increase was primarily due to a $7.0 million increase in energy storage product sales and a $1.6 million increase in tolling and PPA revenue. The increase in sales of energy storage products primarily related to progress on the Company’s Australian EPC projects. The increase in tolling and PPA revenue primarily related to the Company’s owned energy storage systems placed in service during the second and third quarters of 2025.

Current report — wording carried from elsewhere

As of June 30, 2026, $80.0 million of principal remained outstanding under the 2026 Debentures.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

On February 20, 2026, the U.S. Supreme Court held that IEEPA does not authorize the President to impose tariffs, and IEEPA based tariffs were invalidated. The decision does not affect Section 301 tariffs or tariffs under Section 232 of the

Previous report — wording carried elsewhere

On February 17, 2026, we closed an upsized offering of $140.0 million of our 5.250% Senior Convertible Notes due 2031 (the “Senior Convertible Notes”) in a private placement to persons reasonably believed to be qualified institutional buyers pursuant to Rule 144A under the Securities Act. The offering was upsized from the previously announced offering size of $125.0 million aggregate principal amount of Senior Convertible Notes. The initial purchasers subsequently exercised their option to purchase an additional $10.0 million of Senior Convertible Notes, in a transaction that closed on February 27, 2026. Refer to “Liquidity and Capital Resources—Sources of Liquidity— Senior Convertible Notes” below for more information.

Previous report — wording carried elsewhere

Principal and interest are payable semi-annually, with installments due each February 28 and August 31. A final balloon payment of $7.0 million is due at maturity on April 4, 2032.