What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2026-03-31; filed 2026-05-14.
0001749723-26-000062
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-06-30; filed 2026-08-06.
0001749723-26-000106
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 182 previous paragraphs and 206 current paragraphs.
109 unchanged; 37 reworded; 57 added; 36 removed; 0 previous and 3 current paragraphs rearranged.
Tables are not compared: 11 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (57)
Current report
Barcarena Terminal
Current report
Upon effectuation of the Restructuring Transaction, we expect to no longer own BrazilCo, including the Barcarena Terminal.
Current report
Barcarena Power Plant
Current report
PortoCem Power Plant
Current report
Energos Restructuring Support Agreement
Current report
On March 8, 2026, the Company entered into a restructuring support agreement with Energos, which was further amended on March 17, 2026 (“Energos RSA”). The Energos RSA, among other things, cancels and terminates the Company's forward starting charter agreement for Nusantara Regas Satu. The Energos RSA will become effective upon completion of the Restructuring Transaction. This transaction will result in the sale of Nusantara Regas Satu that has been accounted for as a failed sale leaseback. Upon closing of the transaction, we expect to derecognize Nusantara Regas Satu from Property, plant and equipment, net, derecognize the related financing obligation, and recognize a non-cash loss of approximately $40.0 million as the carrying amount of the vessel exceeds the financing obligation balance.
Current report
The increase in revenue for the three months ended June 30, 2026 compared to the three months ended March 31, 2026, was primarily attributable to the Company's Barcarena Terminal being placed into service during the quarter, as well as higher volumes delivered in Puerto Rico and Mexico.
Current report
•Revenues from our Barcarena Terminal, which was placed into service in April 2026 were $59.3 million for the three months ended June 30, 2026. We delivered 6.2 TBtu of gas from the terminal during this period.
Current report
•Revenues attributable to our La Paz Facility in Mexico increased $39.1 million, primarily driven by higher volumes delivered to customers and a capacity payment true-up. Volume-related revenues increased $33.9 million as volumes increased from 1.5 TBtu to 2.9 TBtu, and revenues increased an additional $5.2 million due to a true-up of the estimated capacity payment recorded in the second quarter of 2026. These increases were partially offset by lower average Henry Hub index prices used to invoice our downstream customers.
Current report
•Revenues generated by our San Juan Facility in Puerto Rico increased by $19.4 million for the three months ended June 30, 2026 largely due to the increased volume nominations, partially offset by a decrease in the average Henry Hub index pricing used to invoice our downstream customers.
Current report
This increase was partially offset by lower cargo sales and Brazil power revenue in the second quarter of 2026.
Current report
•These cargo sales decreased from $43.9 million in the three months ended March 31, 2026 to $24.6 million in the three months ended June 30, 2026.
Current report
•In addition, revenue from our subsidiary, Genera, which provides operations and maintenance services in Puerto Rico, decreased from $29.5 million for the three months ended March 31, 2026 to $22.6 million for the three months ended June 30, 2026.
Current report
The decrease in revenue in the six months ended June 30, 2026 compared to the six months ended June 30, 2025 was primarily attributable to the sale of our Jamaica business, lower cargo sales and other factors described below.
Current report
•Revenue from cargo sales decreased from $207.0 million for the six months ended June 30, 2025 to $68.5 million for the six months ended June 30, 2026, as we utilized higher gas volumes at our terminal operations.
Current report
•Revenues from our San Juan Facility decreased $7.9 million due to lower volumes delivered during the six months ended June 30, 2026 compared to the six months ended June 30, 2025. In addition, we generated $11.5 million of revenue from turbine replacement during the six months ended June 30, 2025, with no comparable revenue recognized during the six months ended June 30, 2026.
Current report
•Vessel charter revenues decreased by $7.9 million, primarily due to the sale of certain vessels to Energos in the fourth quarter of 2025 and the expiration of certain third-party vessel charters.
Current report
The decreases were partially offset by higher revenues related to the delivery of power under PPAs and commencement of operations at our Barcarena Terminal.
Current report
Cost of sales increased by $10.7 million for the three months ended June 30, 2026 compared to the three months ended March 31, 2026. The increase was primarily attributable to a $57.5 million increase in the cost of operating our Barcarena Terminal, which was placed into service in April 2026.
Current report
This increase was partially offset by lower cargo sales cost, lower costs associated with the delivery of power under PPAs from the Barcarena Power plant, and lower vessel costs.
Current report
•While the volumes delivered to our customers remained consistent in the second quarter of 2026 compared to the first quarter of 2026, cost decreased due to a decrease in weighted average cost of gas purchased from $9.23 per MMBtu for the three months ended March 31, 2026 to $8.53 per MMBtu for the three months ended June 30, 2026, primarily driven by a 42% decrease in the Henry Hub index over the same period.
Current report
•We incurred $14.7 million of costs relating to cargo sales for the three months ended June 30, 2026, as compared to $44.5 million for the three months ended March 31, 2026, consistent with the lower cargo sales discussed above under Revenue.
Current report
•Cost of sales related to the delivery of power under the PPAs from the Barcarena Power Plant was $33.0 million for the three months ended June 30, 2026, compared to $43.6 million during the three months ended March 31, 2026, in line with the lower volumes of power delivered discussed above under Revenue.
Current report
•Vessel costs decreased by $6.5 million for the three months ended June 30, 2026 compared to the three months ended March 31, 2026. During the three months ended March 31, 2026, the owner of a vessel leased by the Company repossessed the vessel after the Company failed to make certain lease payments, resulting in lower vessel costs during the current period. In addition, the lease for one other vessel expired during the three months ended March 31, 2026, also contributing to the decrease in vessel costs.
Current report
•Cargo sales costs were $59.2 million for the six months ended June 30, 2026, compared to $119.5 million for the six months ended June 30, 2025, consistent with the decrease in cargo sales revenue over the same period, as discussed above under Revenue.
Current report
Operations and maintenance decreased $7.2 million for the three months ended June 30, 2026 compared to the three months ended March 31, 2026, and decreased $23.0 million for the six months ended June 30, 2026 compared to the six months ended June 30, 2025.
Current report
The decrease in operations and maintenance costs for the three months ended June 30, 2026 compared to the three months ended March 31, 2026 was primarily due to lower planned and unplanned maintenance at our terminal operations, partially offset by higher charter costs for a vessel used at the Barcarena Terminal.
Current report
The decrease in operations and maintenance costs for the six months ended June 30, 2026 compared to the six months ended June 30, 2025 was primarily due to lower vessel charter costs, the sale of our Jamaica business in May 2025, and lower planned and unplanned maintenance at our terminal operations.
Current report
The decrease in vessel charter costs was mainly driven by the sale of certain vessels as part of the Energos transaction completed in November 2025, the assignment of a vessel in connection with the sale of our Jamaica business, and expiration of certain vessel charters during 2025 and 2026. These decreases were partially offset by operations and maintenance costs at our Barcarena Terminal, which was placed into service in April 2026.
Current report
Total revenue for the Ships segment, which consists of the vessel Nusantara Regas Satu, increased by $6.0 million forthe three months ended June 30, 2026 compared to thethree months ended March 31, 2026.
Current report
Total vessel operating expenses, primarily related to the vessel Nusantara Regas Satu, increased by $5.9 million forthe three months ended June 30, 2026 compared to thethree months ended March 31, 2026.
Current report
The vessel operating expenses decreased by$7.6 million for thesix months ended June 30, 2026 compared to the six months ended June 30, 2025, due to the termination of our long-term charter agreements for Energos Eskimo and Energos Igloo during 2025, as discussed above.
Current report
Selling, general and administrative increased by$37.7 million for the three months ended June 30, 2026, compared to the three months ended March 31, 2026. The increase was primarily attributable to a $15.0 million increase in contingent losses related to certain legal proceedings. The increase also reflected higher screening costs associated with development projects, increased payroll-related expenses, and higher general and administrative costs incurred to support our business operations.
Current report
Selling, general and administrative increased by$24.6 million for the six months ended June 30, 2026, compared to the six months ended June 30, 2025. The increase was primarily attributable to a$14.2 million increase in contingent losses related to certain legal proceedings, a $5.4 million increase in share-based compensation expense, and a$6.7 million increase in payroll-related costs, as well as higher general and administrative expenses incurred to support our business operations. These increases were partially offset by decreased screening costs for our development projects. Share-based compensation expense for the six months ended June 30, 2025 was reduced by the reversal of previously recognized compensation expense resulting from employee forfeitures, which contributed to the year-over-year increase in share-based compensation expense during the current period.
Current report
Transaction and integration costs were$87.3 million for the six months ended June 30, 2025. The Company incurred$67.0 million of transaction and integration costs that were directly attributable to the Jamaica business sale, which included fees for novating a vessel charter to the buyer and contingent fees due to our advisors. The remainder of the transaction and integration costs related to legal and other third party costs incurred by the Company in connection with amendments to credit agreements.
Current report
Depreciation and amortization increased by$4.5 million for the three months ended June 30, 2026 as compared to the three months ended March 31, 2026. The increase was primarily attributable to the commencement of operations at our Barcarena terminal during the three months ended June 30, 2026.
Current report
During the six months ended June 30, 2025, the impairment charge of$123.1 million principally relates to the Lakach deepwater project, and certain development projects in Pennsylvania and Puerto Rico. We determined that it was not probable that we would pursue development of the Lakach deepwater project, and impaired the capitalized project costs. In addition, after testing the recoverability of the capitalized costs for the development projects in Pennsylvania and Puerto
Current report
Rico, we concluded that the asset groups were not recoverable. Accordingly, we recognized an impairment charge to reduce the carrying value of the asset groups to its estimated fair value.
Current report
Loss (Gain) on sale
Current report
There was no material gain or loss on sale for the three months ended June 30, 2026 and three months ended March 31, 2026. Gain on sale was$471.0 million for the six months ended June 30, 2025 related to the sale of the Jamaica business in May 2025. No comparable transaction occurred during the six months ended June 30, 2026.
Showing the first 40 of 57 passages. Open the source sections for the rest.
Removed paragraphs (36)
Previous report
Barcarena Facility
Previous report
The decrease in revenue in the first quarter of 2026 compared to the fourth quarter of 2025 was primarily attributable to lower cargo and power sales recognized during the three months ended March 31, 2026, as well as additional revenue recognized relating to the settlement agreement with our customer during the three months ended December 31, 2025.
Previous report
•In December 2025, we entered into a settlement agreement with our customer for $142.0 million, related to the early termination of our contract to provide emergency power services in Puerto Rico, and we recognized revenue of $74.8 million.
Previous report
•We recognized $43.9 million of revenue from cargos sales for the three months ended March 31, 2026 compared to $69.4 million for the three months ended December 31, 2025.
Previous report
•The Company recognized a $16.4 million decrease in revenues related to vessel charters due to the sale of certain vessels to Energos in the fourth quarter of 2025 and end of third-party charters for certain vessels.
Previous report
•These decreases were partially offset by increased volumes delivered to downstream terminal customers from 6.4 TBtu in the fourth quarter of 2025 to 6.9 TBtu in the first quarter of 2026, primarily due to higher volumes offtake at our San Juan Facility. This increase in volumes resulted in a $12.7 million increase in revenue.
Previous report
•The decreases were also partially offset by a $20.6 million increase in revenues attributable to our Mexico operations, most of which is related to higher revenue recognized for an estimated capacity fee payment in the first quarter of 2026 compared to the three months ended December 31, 2025.
Previous report
The decrease in revenue in the first quarter of 2026 compared to the first quarter of 2025 was primarily attributable to the sale of our Jamaica business and lower cargo sales. The decrease was partially offset by higher revenues related to the delivery of power under PPAs from the Barcarena Power Plant.
Previous report
•Revenue from cargos sales decreased from $182.7 million to $43.9 million for the three months ended March 31, 2025 and March 31, 2026, respectively.
Previous report
Cost of sales decreased by $11.5 million for the three months ended March 31, 2026 compared to the three months ended December 31, 2025, primarily driven by reduced costs of cargo sales. Increased gas costs were largely offset by lower vessel related costs in the first quarter of 2026.
Previous report
•In the first quarter of 2026, we incurred $44.5 million of cargo sales costs as compared to $54.3 million for the three months ended December 31, 2025.
Previous report
•We delivered 8% higher volumes to our customers in the first quarter of 2026 compared to the last quarter of 2025. The weighted average cost of gas purchased increased from $8.58 per MMBtu for the three months ended
Previous report
December 31, 2025 to $9.23 per MMBtu for the three months ended March 31, 2026. In addition, the Henry Hub index increased by 42% over the same period.
Previous report
•Cargo sales costs incurred during three months ended March 31, 2026 were $44.5 million compared to $103.8 million during the three months ended March 31, 2025, consistent with the level of cargo sales during the corresponding periods.
Previous report
Operations and maintenance remained relatively consistent between the three months ended March 31, 2026 and the three months ended December 31, 2025, increasing by $0.6 million.
Previous report
Operations and maintenance expenses decreased by $6.7 million for the three months ended March 31, 2026 compared to the three months ended March 31, 2025. The decrease was primarily attributable to the lower operating and maintenance costs resulting from the sale of our Jamaica business in May 2025. This decrease was partially offset by higher planned maintenance at our San Juan Facility during the three months ended March 31, 2026.
Previous report
Vessel operating expenses were$3.4 million and$7.2 millionfor the three months ended December 31, 2025 and March 31, 2025, respectively. We did not incur any vessel operating expenses for thethree months ended March 31, 2026 related to the vessel Nusantara Regas Satu, as such costs are borne by the third-party charterer.
Previous report
Selling, general and administrative decreased by$65.1 million for the three months ended March 31, 2026, compared to the three months ended December 31, 2025. We recorded$45.6 million ofcontingent losses related to certain legal proceedings during the three months ended December 31, 2025. There were no significant incremental contingent losses recorded during the three months ended March 31, 2026. In addition, screening costs for development projects, and payroll and bonus expenses decreased by $14.8 million during the first quarter of 2026.
Previous report
Selling, general and administrative decreased by$4.3 million for three months ended March 31, 2026, compared to the three months ended March 31, 2025. The decrease was primarily driven by an$11.5 million reduction inscreening costs for development projects, partially offset by higher legal and professional fees and share-based compensation expense. The share-based compensation expense was lower in the first quarter of 2025 due to the reversal of previously recorded expense related to forfeitures during that period.
Previous report
The transaction and integration costs of$11.9 million during the three months ended March 31, 2025 primarily related to legal fees and other third-party costs incurred in connection with amendments to certain credit agreements. In addition, during the first quarter of 2025, we incurred $3.9 million of legal fees related to the sale of our Jamaica business.
Previous report
Depreciation and amortization decreased by$3.9 million for the three months ended March 31, 2026 as compared to the three months ended December 31, 2025. The decrease was primarily attributable to the sale of certain vessels to Energos in November 2025.
Previous report
During the three months ended December 31, 2025, as part of the Company’s ongoing discussions with creditors, the Company has determined that it was not probable that it would pursue the development of certain Fast LNG projects and the ZeroParks hydrogen project and recognized impairment charges of$733.0 million to reduce the carrying values of the asset groups to their estimated fair value.
Previous report
(Gain) loss on sale
Previous report
The Company had no significant asset sales during the first quarter of 2026. For the three months ended December 31, 2025, the Company recorded a gain of $199.9 million. In November 2025, we completed a transaction with Energos, pursuant to which the Company early terminated the long-term charter agreements with Energos for certain vessels and novated associated sub-charter agreements for these vessels to Energos, in exchange for cash considerations of $150.0 million. The Company recognized a gain of $217.1 million from the transaction, which was partially offset by a $17.2 million adjustment to the gain on sale of the Jamaica business.
Previous report
Interest expense decreased marginally by $6.0 million for the three months ended March 31, 2026 compared to the three months ended December 31, 2025, primarily due to lower outstanding debt resulting from the vessel sale transaction completed during the fourth quarter of 2025, with the decrease partially offset by higher interest expense incurred during continuance of events of default under certain of our debt agreements.
Previous report
Interest expense decreased by $13.4 million for the three months ended March 31, 2026 compared to the three months ended March 31, 2025. The decrease was driven by lower outstanding debt resulting from the vessel sale transaction, and repayment of debt related to the Jamaica business. The decreases were partly offset by higher interest expense resulting from the issuance of additional debt and higher interest rates.
Previous report
Other (income) expense, net was $(43.2) million, $5.9 million and $(63.9) million for the three months ended March 31, 2026, December 31, 2025 and March 31, 2025, respectively.
Previous report
The Company had no material extinguishment of debt for the three months ended March 31, 2026, December 31, 2025, and March 31, 2025.
Previous report
Cash outflows during the three months ended March 31, 2026 were impacted by significant professional and consulting fees relating to our capital restructuring process. We have recognized reduced cash flows following the sale of our Jamaica Business in 2025. Following the sale of the Jamaica business during 2025, we continue to incur operational and administrative costs that supported all of our operations.
Previous report
Cash used in investing activities
Previous report
Cash outflows for investing activities during the three months ended March 31, 2025 were used primarily for continued development of our onshore FLNG project and the construction of the PortoCem Power Plant.
Previous report
During the three months ended March 31, 2025 we had total borrowings of $943.6 million, with such borrowings primarily used to fund continued development of the onshore FLNG project andfor other corporate expenses. Such borrowings were also used to repay the Barcarena Debentures in full. We also repaid our Revolving Facility by $275.0 million.
Previous report
EB-5 Loan Agreement
Previous report
On March 13, 2026, the Company entered into a term sheet with CanAm Texas Regional Center LP. IV., a Delaware limited partnership in respect of the EB-5 Loan Agreement that contemplates, among other things, the incurrence by the Company of a new unsecured note in the aggregate principal amount of $22.5 million, with an interest rate of 7.0% per annum, with the option to pay interest in kind, and that matures on December 31, 2029.
Previous report
Letter of Credit Facility
Previous report
In March 2026, the Company entered into an amendment to the Letter of Credit Facility to extend the maturity date to September 15, 2026. As of March 31, 2026, the Company had$195.6 million of letters of credit outstanding under the Letter of Credit Facility.
Reworded paragraphs (37)
Previous wording
In response to the Company’s ongoing liquidity challenges, and the events of default under the Company’s indentures and credit agreement, on March 17, 2026, the Company entered into a RSA with the Supporting Creditors, including a majority of the holders of the New 2029 Notes, a majority of the lenders under the Term Loan B Credit Agreement and a majority of the lenders under the Revolving Facility. The RSA provides a framework for a comprehensive restructuring transaction designed to address the Company’s capital structure and restore financial stability. Under the terms of the RSA, the holders of the New 2029 Notes, holders of debt under the R-2 Revolving Credit Facility and the holders of the debt under the Term Loan A Credit Agreement, as applicable, will receive 100% of the common equity interests of NFE Brazil Holdings, the parent company of NFE’s Brazil business expected to be separated in connection with the restructuring. In addition, the Supporting Creditors will receive one or a combination of the following: senior secured term loans, non-recourse term loans secured by the Company’s Fast LNG assets, shares of a new class of NFE’s preferred stock as well as shares of NFE’s Class A common stock, and shares of FLNG 2 preferred stock. Certain lenders have also agreed to provide the Company with incremental funding in exchange for additional term loans or additional letter of credit facility capacity to support ongoing operations and liquidity needs.
Current wording
In response to the Company’s ongoing liquidity challenges, and the events of default under the Company’s indentures and credit agreement, on March 17, 2026, the Company entered into a RSA with the Supporting Creditors, including a majority of the holders of the New 2029 Notes, a majority of the lenders under the Term Loan B Credit Agreement and a majority of the lenders under the Revolving Facility. The RSA provides a framework for a comprehensive restructuring transaction designed to address the Company’s capital structure and restore financial stability. Under the terms of the RSA, the holders of the New 2029 Notes, holders of debt under the R-2 Revolving Credit Facility and the holders of the debt under the Term Loan A Credit Agreement, as applicable, will receive 100% of the common equity interests of NFE Brazil Holdings, the parent company of NFE’s Brazil business expected to be separated in connection with the restructuring. In addition, the Supporting Creditors will receive one or a combination of the following: senior secured term loans, non-recourse term loans secured by the Company’s Fast LNG assets, shares of a new class of NFE’s preferred stock as well as shares of NFE’s Class A common stock, and shares of FLNG 2 preferred stock. Certain lenders have also agreed to provide the Company with incremental funding in exchange for additional term loans or additional letter of credit facility capacity to support ongoing operations and liquidity needs. The Restructuring Transaction is expected to close during the third quarter of 2026, upon satisfaction of the remaining conditions.
Previous wording
The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of delivering almost 600,000 MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility. We have substantially completed our Barcarena Facility and are in process of final commissioning.
Current wording
We placed the Barcarena Terminal in service in the second quarter of 2026. The Barcarena Terminal consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Terminal is capable of delivering almost 600,000 MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Terminal. For further discussion on the gas supply agreement, see Note 18 of our condensed consolidated financial statements.
Previous wording
Our projects currently under development include our development of a second modular liquefaction facility to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal (“Barcarena Facility”) and power plants located in Pará, Brazil; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); and our LNG terminal and power plant in Ireland (“Ireland Facility”). Subsequent to the Restructuring Transaction, we will focus on operational efficiency of our current facilities and cost-effective completion of in-process development projects.
Current wording
Our projects currently under development include our development of a second modular liquefaction facility to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our power plants located in Pará, Brazil (“Barcarena Power Plant”); our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); and our LNG terminal and power plant in Ireland (“Ireland Facility”). Subsequent to the Restructuring Transaction, we will focus on operational efficiency of our current facilities and cost-effective completion of in-process development projects.
Previous wording
Following the completion of the Restructuring Transaction, we do not plan to incur significant capital expenditures to develop our second 1.4 MTPA Fast LNG unit (“FLNG 2”). We are in active discussions with third parties to co-develop FLNG 2, which is expected to take approximately 24 months to complete from the time our partner is engaged. Estimated cost to complete is uncertain and is dependent upon final design and engineering, but we currently expect the remaining cost to be between $750.0 million and $1,500.0 million.
Current wording
FLNG 2, which is expected to take approximately 24 months to complete from the time our partner is engaged. Estimated cost to complete is uncertain and is dependent upon final design and engineering, but we currently expect the remaining cost to be between $750.0 million and $1.5 billion.
Previous wording
The Barcarena Facility will also supply our new 630 MW combined cycle natural gas-fired power plant located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to place the Barcarena Power Plant into service in the second quarter of 2026.
Current wording
The recently completed Barcarena Terminal will also supply our new 630 MW combined cycle natural gas-fired power plant located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to place the Barcarena Power Plant into service in the third quarter of 2026.
Previous wording
In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. (“PortoCem”), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior (“Ceiba Energy”). PortoCem isthe owner of a 15-year 1.6 GW capacity reserve contract in Brazil. We have transferred the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE is building the 1.6 GW simple cycle, natural gas-fired power plant (“PortoCem Power Plant”) to supply the capacity reserve contract using gas from the Barcarena Facility. We expect the PortoCem Power Plant to be completed in 2026.
Current wording
In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. (“PortoCem”), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior (“Ceiba Energy”). PortoCem isthe owner of a 15-year 1.6 GW capacity reserve contract in Brazil. We have transferred the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Terminal, where NFE is building the 1.6 GW simple cycle, natural gas-fired power plant (“PortoCem Power Plant”) to supply the capacity reserve contract using gas from the Barcarena Terminal. We expect the PortoCem Power Plant to be completed in 2026.
Previous wording
Upon effectuation of the Restructuring Transaction, we expect to no longer own BrazilCo, including the Barcarena Facility, Barcarena Power Plant and PortoCem Power Plant.
Current wording
Upon effectuation of the Restructuring Transaction, we expect to no longer own BrazilCo, including the Barcarena Power Plant and PortoCem Power Plant.
Previous wording
On September 26, 2024, the United States Coast Guard ("USCG") filed a Letter of Recommendation ("LOR") with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, on September 26, 2024, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7. In December 2024 and February 2025, we submitted an updated Letter of Intent and Waterway Suitability Assessments detailing our alternative operational plans to the USCG and are working collaboratively with the USCG to obtain a new LOR to FERC in support of our operations, which we expect to be imminently forthcoming. In concert with our collaboration with the USCG regarding our new operational plans, we withdrew our appeal on February 14, 2025. On January 12, 2026, the Acting Captain of the Port of San Juan for the USCG issued a LOR in response to NFE’s filings. The LOR determined that the Port of San Juan waterway is suitable for the transit and docking of larger LNG Carriers.
Current wording
On September 26, 2024, the United States Coast Guard ("USCG") filed a Letter of Recommendation ("LOR") with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, on September 26, 2024, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7. In December 2024 and February 2025, we submitted an updated Letter of Intent and Waterway Suitability Assessments detailing our alternative operational plans to the USCG and are working collaboratively with the USCG to obtain a new LOR to FERC in support of our operations, which we expect to be imminently forthcoming. In concert with our collaboration with the USCG regarding our operational plans, we withdrew our appeal on February 14, 2025. On January 12, 2026, the Acting Captain of the Port of San Juan for the USCG issued a LOR in response to NFE’s filings. The LOR determined that the Port of San Juan waterway is suitable for the transit and docking of larger LNG Carriers.
Previous wording
Results of Operations – Three Months Ended March 31, 2026 compared to Three Months Ended December 31, 2025 and Three Months Ended March 31, 2025
Current wording
Results of Operations – Three Months Ended June 30, 2026 compared to Three Months Ended March 31, 2026 and Six Months Ended June 30, 2026 compared to Six Months Ended June 30, 2025
Previous wording
The tables below present our segment information for the three months ended March 31, 2026, December 31, 2025 and March 31, 2025:
Current wording
The tables below present our segment information for the three months ended June 30, 2026 and March 31, 2026, and for the six months ended June 30, 2026 and June 30, 2025:
Previous wording
Total revenue for the Terminals and Infrastructure Segment decreased by $159.4 million for the three months ended March 31, 2026 compared to the three months ended December 31, 2025, and decreased by $214.0 million for the three months ended March 31, 2026 compared to the three months ended March 31, 2025.
Current wording
Total revenue for the Terminals and Infrastructure Segment increased by $79.6 million for the three months ended June 30, 2026 compared to the three months ended March 31, 2026, and decreased by $180.4 million for the six months ended June 30, 2026 compared to the six months ended June 30, 2025.
Previous wording
•We are required to deliver power under power purchase agreements (“PPAs”) from the Barcarena Power Plant starting in the third quarter of 2025. The Barcarena Power Plant is currently being commissioned, and as such, we partnered with a local energy trader to supply the required power. During the first quarter of 2026, PPAs with certain local distribution companies were suspended. As a result, the Company was required to procure and deliver less power, resulting in decreased revenue from $109.7 million in the fourth quarter of 2025 to $35.7 million in the first quarter of 2026.
Current wording
•We are required to deliver power under power purchase agreements (“PPAs”) from the Barcarena Power Plant starting in the third quarter of 2025. As the Barcarena Power Plant is still being commissioned, we have partnered with a local energy trader to supply the required power. Revenue from these arrangements decreased from $35.7 million in the first quarter of 2026 to $27.1 million in the second quarter of 2026, primarily due to lower volumes of power delivered.
Previous wording
•The average Henry Hub index pricing used to invoice our downstream customers increased by 42% for the three months ended March 31, 2026 as compared to the three months ended December 31, 2025.
Current wording
•The average Henry Hub index pricing used to invoice our downstream customers decreased by 42% for the three months ended June 30, 2026 as compared to the three months ended March 31, 2026.
Previous wording
•For the three months ended March 31, 2026, volumes delivered to downstream customers were 6.9 TBtu compared to 13.8 TBtu for the three months ended March 31, 2025 due to the sale of our Jamaica business, resulting in $94.1 million lower revenues.
Current wording
•For the six months ended June 30, 2026, volumes delivered to downstream customers were 21.5 TBtu compared to 28.1 TBtu for the six months ended June 30, 2025 due to the sale of our Jamaica business, resulting in $140.7 million lower revenues.
Previous wording
•The decrease in revenue was partially offset by an increase of $35.7 million from delivery of power under PPAs from the Barcarena Power Plant during the three months ended March 31, 2026. No such revenue was recognized in the three months ended March 31, 2025.
Current wording
•Revenues increased by $62.8 million from delivery of power under PPAs from the Barcarena Power Plant and $59.3 million from gas sales following the commencement of operations at the Barcarena Terminal during the six months ended June 30, 2026. No such revenue was recognized during the six months ended June 30, 2025.
Previous wording
•The average Henry Hub index pricing used to invoice our downstream customers increased by 38% for the three months ended March 31, 2026 as compared to the three months ended March 31, 2025.
Current wording
•The average Henry Hub index pricing used to invoice our downstream customers increased by 12% for the six months ended June 30, 2026 as compared to the six months ended June 30, 2025.
Previous wording
Cost of sales decreased by $102.7 million for the three months ended March 31, 2026 as compared to the three months ended March 31, 2025, which was attributable to the following:
Current wording
Cost of sales decreased by $100.5 million for the six months ended June 30, 2026 as compared to the six months ended June 30, 2025, attributable to the following:
Previous wording
•We delivered 50% lower volumes to our customers during the first quarter of 2026 compared to the first quarter of 2025, driven mostly by the sale of our Jamaica business in May 2025, resulting in a $52.6 million decrease in cost of sales.
Current wording
•We delivered 46% lower volumes to our customers during the six months ended June 30, 2026 compared to the six months ended June 30, 2025, driven mostly by the sale of our Jamaica business in May 2025, resulting in a $79.1 million decrease in cost of sales. Cost of sales at our La Paz Facility and San Juan Facility also decreased by $20.9 million due to lower volumes delivered.
Previous wording
•Vessel costs decreased by $32.8 million, for the three months ended March 31, 2026 compared to the three months ended March 31, 2025, due to the reduced number of vessels chartered in our fleet. The decrease reflects the assignment of vessels related to the Jamaica business that we sold in May 2025, and charter expirations or terminations during 2025 and the first quarter of 2026.
Current wording
•Vessel costs decreased $66.6 million during the six months ended June 30, 2026 compared to the six months ended June 30, 2025, due to a reduced number of vessels chartered in our fleet. The decrease reflects the assignment of vessels as part of the sale of our Jamaica business in May 2025, and charter expirations or terminations during 2025 and the first two quarters of 2026.
Previous wording
•The decrease in cost of sales was partially offset by an increase in cost of sales of $43.6 million related to the delivery of power under the PPAs from the Barcarena Power Plant. No such costs were incurred during the three months ended March 31, 2025.
Current wording
•The decrease in cost of sales was partially offset by a $76.6 million increase in cost of sales related to the delivery of power under the PPAs from the Barcarena Power Plant, and a $57.5 million increase in cost of sales related to gas sales following the commencement of operations at our Barcarena Terminal. No such costs were incurred during the six months ended June 30, 2025.
Previous wording
The weighted-average cost of our LNG inventory balance to be used in our operations as of March 31, 2026 and December 31, 2025 was $8.38 per MMBtu and $8.35 per MMBtu, respectively.
Current wording
The weighted-average cost of our LNG inventory balance to be used in our operations as of June 30, 2026 and December 31, 2025 was $9.01 per MMBtu and $8.35 per MMBtu, respectively.
Previous wording
The vessel operating expenses were not material to our results of operations for the periods presented.
Current wording
The vessel operating expenses within the Terminals and Infrastructure Segment were not material to our results of operations for the periods presented.
Previous wording
Total revenue for the Ships segment decreased $9.4 million for the three months ended March 31, 2026 as compared to thethree months ended December 31, 2025, and decreased $31.3 million compared to the three months ended March 31, 2025. These decreases were primarily attributable to a transaction with Energos, pursuant to which we early terminated the long-term charter agreements with Energos for certain vessels, including Energos Eskimo and Energos Igloo, which were included in the Ships segment during 2025. This transaction resulted in a sale of Energos Eskimo and Energos Igloo to Energos and a reduction in charter revenue for the three months ended March 31, 2026 compared to the three months ended December 31, 2025 and March 31, 2025.
Current wording
The total revenue for the Ships segment decreased by $56.5 million compared to the six months ended June 30, 2025. These decreases were primarily attributable to a transaction with Energos, pursuant to which we early terminated the long-term charter agreements with Energos for certain vessels, including Energos Eskimo and Energos Igloo, which were included in the Ships segment during 2025. This transaction resulted in a sale of the two vessels to Energos, resulting in a reduction in charter revenue for the six months ended June 30, 2026 as compared to the same period in 2025.
Previous wording
We incurred transaction and integration costs of$53.3 million and$54.8 million during the three months ended March 31, 2026 and December 31, 2025, respectively. These costs were primarily comprised of professional and consulting fees related to our debt restructuring process.
Current wording
Transaction and integration costs were$72.5 million and$53.3 million for the three months ended June 30, 2026 and March 31, 2026, respectively, and$125.8 million for the six months ended June 30, 2026. These costs were primarily comprised of professional and consulting fees related to our debt restructuring process (Note 2).
Previous wording
Depreciation and amortization expense decreased by$15.2 million for the three months ended March 31, 2026 as compared to the three months ended March 31, 2025. The decrease in depreciation expense resulted from the sale of our Jamaica business in May 2025, and sale of certain vessels to Energos in November 2025.
Current wording
Depreciation and amortization expense decreased by$22.5 million for the six months ended June 30, 2026 as compared to the six months ended June 30, 2025. The decrease in depreciation expense resulted from the sale of our Jamaica business in May 2025, and sale of certain vessels to Energos in November 2025.
Previous wording
During the three months ended March 31, 2026, the owner of a vessel under an operating lease repossessed the vessel after the Company failed to make certain lease payments. As the Company no longer has control of the leased asset, the Company recognized an impairment charge on the right-of-use asset of $60.6 million.
Current wording
During the six months ended June 30, 2026, the owner of a vessel under an operating lease repossessed the vessel after the Company failed to make certain lease payments. As the Company no longer has control of the leased asset, the Company recognized an impairment charge on the right-of-use asset of $60.6 million.
Previous wording
There was no material asset impairment expense during the three months ended March 31, 2025.
Current wording
There was no asset impairment expense during the three months ended June 30, 2026.
Previous wording
During the three months ended December 31, 2025, we recognized an impairment of goodwill of $15.9 million in our Ships segment, primarily as a result of a reduction in forecasted cash flows following the sale of certain vessels to Energos. There was no goodwill impairment expense recognized during the three months ended March 31, 2026 and 2025.
Current wording
For the six months ended June 30, 2025, we recognized an impairment of goodwill of$582.2 million primarily as a result of (i) the significant increase in the weighted average cost of capital which reflected a higher company specific risk premium, and (ii) a reduction in forecasted cash flows following changes in customer revenue projections and the timing of completion of development projects.There was no goodwill impairment expense recognized during thethree months ended June 30, 2026, three months ended March 31, 2026, andsix months ended June 30, 2026.
Previous wording
Other (income) expense for these periods primarily reflected remeasurement gains and losses on U.S. dollar denominated debt held by our Brazil subsidiary, driven by fluctuations in the Brazilian Real relative to the U.S. Dollar, as well as gains or losses from the fair value remeasurement of derivative contracts. Other income also included interest income, which was derived largely from the restricted cash related to our development projects in Brazil.
Current wording
Other (income) expense, net for these periods primarily reflected remeasurement gains and losses related to our operations in Mexico and Brazil, and gains or losses from the fair value remeasurement of foreign currency derivative contracts and contingent consideration arrangements. Other income also included interest income, which was derived largely from the restricted cash related to our development projects in Brazil.
Previous wording
We recognized a tax provision for the three months ended March 31, 2026 of $31.5 million compared to a tax provision of $19.4 million for the three months ended December 31, 2025 and a tax provision of $26.1 million for the three months ended March 31, 2025. The tax provision recognized in the first quarter of 2026 was primarily driven by estimated Pillar 2 expense, as well as, taxes on our foreign earnings in certain jurisdictions where we operate.
Current wording
We recognized a tax benefit for the three months ended June 30, 2026 of $(8.0) million compared to a tax provision of $31.5 million for the three months ended March 31, 2026. Our tax provision was $23.6 million and $36.5 million for the six months ended June 30, 2026 and June 30, 2025, respectively. The tax benefit recognized in the second quarter of 2026 was primarily driven by a decrease in estimated expense under the Organization for Economic Cooperation and Development's Pillar Two framework, as well as a decrease in the valuation allowance in certain of our foreign subsidiaries.
Previous wording
The following table summarizes the changes to our cash flows for the three months ended March 31, 2026 and 2025, respectively:
Current wording
The following table summarizes the changes to our cash flows for the six months ended June 30, 2026 and 2025, respectively:
Previous wording
Our cash flow used in operating activities was $118.9 million for the three months ended March 31, 2026, which increased by $111.7 million from cash used in operating activities of $7.2 million for the three months ended March 31, 2025. Our net loss for the three months ended March 31, 2026, when adjusted for non-cash items, increased by $156.6 million from the three months ended March 31, 2025.
Current wording
Our cash flow used in operating activities was $278.2 million for the six months ended June 30, 2026, which decreased by $58.0 million from cash used in operating activities of $336.2 million for the six months ended June 30, 2025. Our net loss for the six months ended June 30, 2026, when adjusted for non-cash items, was $573.0 million and $316.8 million for the six months ended June 30, 2026 and 2025, respectively.
Previous wording
Cash (used in) / provided by financing activities
Current wording
Cash used in / (provided by) investing activities
Previous wording
Our cash flow used in investing activities was $43.6 million for the three months ended March 31, 2026, which decreased by $207.0 million from cash used in investing activities of $250.5 million for the three months ended March 31, 2025. Cash flows used in investing activities during the three months ended March 31, 2026 were used primarily for capital expenditures for continued construction of the PortoCem Power Plant and the Puerto Sandino Facility, of which $5.0 million of these capital expenditures was paid significantly beyond our vendors customary payment terms, and as such, is presented as a financing activity.
Current wording
Our cash flow used in investing activities was $83.8 million for the six months ended June 30, 2026, which decreased by $536.4 million from cash provided by investing activities of $452.5 million for the six months ended June 30, 2025. Cash flows used in investing activities during the six months ended June 30, 2026 were used primarily for capital expenditures for continued construction of the PortoCem Power Plant and Puerto Sandino Facility, of which $16.1 million of these capital expenditures was paid significantly beyond our vendors customary payment terms, and as such, is presented as a financing activity.
Previous wording
Our cash flow used in financing activities was $11.0 million for the three months ended March 31, 2026, which increased by $105.6 million from cash provided by financing activities of $94.6 million for the three months ended March 31, 2025. Cash flows used in financing activities during the three months ended March 31, 2026 were primarily used for capital expenditures paid significantly beyond our vendors customary payment terms.
Current wording
Cash provided by / (used in) financing activities
Previous wording
We have construction purchase commitments in connection with our development projects, including our Puerto Sandino Facility, Barcarena Facility, Barcarena Power Plant and PortoCem Power Plant, and any remaining unpaid commitments on our FLNG projects. Commitments included in the table above include commitments under engineering, procurement and construction contracts where a notice to proceed has been issued. Our remaining committed capital expenditures, inclusive of invoiced amounts in Accounts payable, towards these projects is approximately $271 million. We have secured financing commitments to continue to develop our Barcarena Power Plant and PortoCem Power Plant, which represents approximately $97 million of our upcoming committed capital expenditures.
Current wording
We have construction purchase commitments in connection with our development projects, including our Puerto Sandino Facility, Barcarena Facility, Barcarena Power Plant and PortoCem Power Plant, and any remaining unpaid commitments on our FLNG projects. Commitments included in the table above include commitments under engineering, procurement and construction contracts where a notice to proceed has been issued. Our remaining committed capital expenditures, inclusive of invoiced amounts in Accounts payable, towards these projects is approximately $271.0 million. We have secured financing commitments to continue to develop our Barcarena Power Plant and PortoCem Power Plant, which represents approximately $97.0 million of our upcoming committed capital expenditures.
Previous wording
On May 10, 2026, the Company did not provide the $79.1 million bank guarantee that was due to the holders under the PortoCem Debentures (as defined in the Company's Annual Report on Form 10-K). If the Company fails to provide the bank guarantee prior to the expiration of the 45-day cure period, an automatic early maturity event will occur and substantially all of the Company's outstanding indebtedness would be payable on demand. Additionally, other non-financial requirements due on April 30, 2026 were not met, and the debenture holders have the ability to declare an event of early maturity. As of the date of the issuance of these financial statements, the debenture holders have not declared an early maturity event. Nonetheless, the outstanding principal balance of the PortoCem Debentures has been presented as a current liability as of March 31, 2026 as the Company determined that it is not currently probable that the bank guarantee can be provided. Following the completion of the Restructuring Transaction, the Company will no longer own BrazilCo, and the liabilities of BrazilCo, including the PortoCem Debentures will no longer be included in the Company's consolidated financial statements.
Current wording
On May 10, 2026, the Company did not provide the$79.1 million bank guarantee that was due to the holders under the PortoCem Debentures (as defined in the Company's Annual Report on Form 10-K) by June 24, 2026. Additionally, other non-financial requirements due on April 30, 2026 were not met, including certain financial ratio and certification requirements.
Rearranged current paragraphs (3)
Current report — wording carried from elsewhere
Following the completion of the Restructuring Transaction, we do not plan to incur significant capital expenditures to develop our second 1.4 MTPA Fast LNG unit (“FLNG 2”). We are in active discussions with third parties to co-develop
Current report — wording carried from elsewhere
The outstanding principal balance of the PortoCem Debentures remains presented as a current liability as of June 30, 2026, given the conditional nature of the waivers obtained and the remaining conditions to be satisfied. Following the completion of the Restructuring Transaction, the Company will no longer own BrazilCo, and the liabilities of BrazilCo, including the PortoCem Debentures will no longer be included in the Company's consolidated financial statements.
Current report — wording carried from elsewhere
Upon completion of the Restructuring Transaction contemplated under the RSA, NFE will no longer own BrazilCo, and the liabilities of BrazilCo, including the New Brazil Notes, will no longer be included in the Company's consolidated financial statements.