Skip to main content

New Fortress Energy Inc.

For the period ended Mar 31, 2025. Filed Jun 30, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed Jun 30, 2025

NFE$4.49+16.6%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-12.

0001749723-24-000116

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-06-30.

0001749723-25-000100

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 256 previous paragraphs and 208 current paragraphs.

80 unchanged; 68 reworded; 58 added; 105 removed; 3 previous and 2 current paragraphs rearranged.

Tables are not compared: 15 previous and 11 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (58)

Current report

In March 2025, we entered into an equity and asset purchase agreement (the "EAPA") to sell our Jamaica business, including operations at the LNG import terminal in Montego Bay, the offshore floating storage and regasification terminal in Old Harbour and the 150 megawatt Combined Heat and Power Plant in Clarendon, along with the associated infrastructure (the "Jamaica Business") for cash consideration of approximately $1.06 billion, subject to certain purchase price adjustments. On May 14, 2025, we completed the sale of the Jamaica Business and received net proceeds of approximately $678 million, with additional $99 million proceeds held in escrow and to be returned to the Company on the release dates as stated in the EAPA.

Current report

In August 2024, we acquired 100% of the outstanding equity interest of Usina Termeletrica de Lins S.A. ("Lins"), which owns key rights and permits to develop a natural gas-fired power plant for up to 2.05GW located in the State of Sao Paulo, within the city limits of Lins. We expect to participate in the power auctions anticipated to occur in 2025 in Brazil, and to the extent that NFE is successful in these auctions, we plan to develop a gas-fired power plant using natural gas from the Santa Catarina Facility.

Current report

We no longer own the Montego Bay Facility after we completed the sale of the Jamaica Business, and starting in the second quarter of 2025, we will no longer reflect the results of operations from the Montego Bay Facility in our financial statements.

Current report

We no longer own the Old Harbour Facility and CHP Plant after we completed the sale of the Jamaica Business, and starting in the second quarter of 2025, we will no longer reflect the results of operations from the Old Harbour Facility and CHP Plant in our financial statements.

Current report

Fast LNG is anchored by key benefits over conventional liquefaction projects. In particular, we believe installing modular equipment in a shipyard will meaningfully expedite timelines. In addition, placing solutions offshore provides greater access to natural gas and optimized marine logistics.

Current report

We describe our operational and planned FLNG projects below.

Current report

Further, in March 2025, ABP granted our application to construct a 600 MW power plant and a separate application to construct the 220 kV electricity interconnect. We are able to fuel this power plant via our LNG marine import terminal, if approved, or using gas provided from our permitted pipeline interconnection. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, which could preclude the development of this project; however, management continues to assess all options in respect of future developments for the land held.

Current report

On May 12, 205, the Company entered into the following credit agreement amendments:

Current report

The Company entered into the Twelfth Amendment to Credit Agreement (the “Twelfth Amendment”) which amends that certain Credit Agreement, dated as of April 15, 2021 (as amended, restated or otherwise modified from time to time, the

Current report

“Existing RCF” and the Existing RCF as amended by the Twelfth Amendment, the “Amended RCF”), by and among the Company, as the borrower, the guarantors from time to time party thereto, the several lenders and issuing banks from time to time party thereto, and MUFG Bank Ltd., as administrative agent and as collateral agent. Among other things, the Twelfth Amendment waives the requirement that the Company pay 75% of net proceeds from certain asset sales to repay indebtedness, allowing the Company to apply $270,000 of proceeds from the sale of the Jamaica Business to the extended tranche of the Existing RCF prior to September 30, 2025, when such amount was due. The Company plans to use the remaining proceeds to reinvest in the Company’s business and repay indebtedness under the Amended TLA (as defined below).

Current report

The Company entered into the Fifth Amendment to Credit Agreement (the “Fifth Amendment”) which amends that certain Credit Agreement, dated as of July 19, 2024 (as amended, restated or otherwise modified from time to time, the “Existing TLA” and the Existing TLA as amended by the Fifth Amendment, the “Amended TLA”).

Current report

The Company entered into the Eighth Amendment to Uncommitted Letter of Credit and Reimbursement Agreement (the “Eighth Amendment”) which amends that certain Uncommitted Letter of Credit and Reimbursement Agreement, dated as of July 16, 2021 (as amended, restated or otherwise modified from time to time, the “Existing ULCA” and the Existing ULCA as amended by the Eighth Amendment, the “Amended ULCA”), by and among the Company, the guarantors from time to time party thereto, Natixis, New York Branch, as Administrative Agent, Natixis, New York Branch, as ULCA Collateral Agent, Natixis, New York Branch, and each of the other financial institutions party thereto, as Lenders and Issuing Banks.

Current report

The Fifth Amendment, the Eighth Amendment and the Twelfth Amendment are referred to herein collectively as the “Amendments;” the Amended TLA, the Amended ULCA and the Amended RCF are referred to herein collectively as the “Amended Credit Agreements.” The Existing TLA, the Existing ULCA and Existing RCF are referred to herein collectively as the “Existing Credit Agreements.”

Current report

The Twelfth Amendment, among other things, (i) provides for a covenant holiday with respect to the consolidated first lien debt ratio and fixed charge coverage ratio contained therein for the fiscal quarter ending June 30, 2025, (ii) permits $270,000 of proceeds from the sale of the Jamaica Business to be used to prepay and terminate a portion of loans and commitments currently outstanding and otherwise does not require the proceeds of the sale of the Jamaica Business to be used to prepay loans and commitments and (iii) provides that the asset sale sweep mandatory prepayment will now terminate effectiveness once aggregate commitments are reduced to $550,000 from $600,000.

Current report

The Fifth Amendment, among other things, (i) requires $55,000 of proceeds from the sale of the Jamaica Business to be used to prepay a portion of loans currently outstanding and otherwise does not require the proceeds from the sale of the Jamaica Business to be used to prepay loans; (ii) increases the applicable margin to 6.70% for SOFR loans and 5.70% for Base Rate Loans and implements a SOFR floor of 4.30% and a base rate floor of 5.30%; (iii) requires the Company to make mandatory prepayments with 12.5% of proceeds of a $659,000 request for equitable adjustment and any other proceeds related to the early termination of our FEMA contracts, if and when such proceeds are received, to pay down a portion of the indebtedness outstanding under loans thereunder and, in the case of certain asset sales, reduce the commitments thereunder.

Current report

The Eighth Amendment, among other things, provides for a covenant holiday with respect to the consolidated first lien debt ratio and fixed charge coverage ratio contained therein for the fiscal quarter ending June 30, 2025.

Current report

Further to the above, the Amendments each added a covenant limiting the amount of cash the Company can use to repurchase outstanding senior secured notes due 2026, other than payments to avoid springing maturities in respect thereof or with proceeds of certain permitted debt or equity refinancing transactions.

Current report

On May 14, 2025, the Company completed the sale of the Jamaica Business to Excelerate Energy Limited Partnership (“EELP”), a subsidiary of Excelerate Energy, Inc., for $1.055 billion in cash, subject to certain purchase price adjustments. In conjunction with closing, the Company repurchased all outstanding South Power Bonds for $227,157, including a 1.0% prepayment penalty and accrued interest. After the repayment of debt, the Company received net proceeds of approximately $678,480, with an additional $98,635 proceeds held in escrow and to be returned to the Company on the release dates as stated in the EAPA.

Current report

As a result of the Amended Agreements, the Company repaid and permanently reduced the Revolving Facility commitments of $270,000 and repaid $55,000 of the Term Loan A Credit Agreement with the sale proceeds.

Current report

Total revenue for the Terminals and Infrastructure Segment decreased by $97.0 million for the three months ended March 31, 2025 as compared to the three months ended December 31, 2024, and total revenue for the Terminals and Infrastructure Segment decreased by $215.8 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024.

Current report

•The Company novated an LNG supply contract to a customer, recognizing $235.6 million within segment revenue in the fourth quarter of 2024. No such contract novation income was recognized during the three months ended March 31, 2025.

Current report

•We recognized $182.7 million of revenue from cargos sales for the three months ended March 31, 2025 as compared to $91.9 million for the three months ended December 31, 2024.

Current report

The decrease in revenue in the first quarter of 2025 when compared to the first quarter of 2024 was primarily attributable to the termination of our grid stabilization project in the first quarter of 2024. The decrease in revenue was partially offset by higher Henry Hub index pricing and cargo sales.

Current report

•In the first quarter of 2025, we incurred $103.8 million of cargo sales costs as compared to $53.9 million for the three months ended December 31, 2024.

Current report

•We delivered 25% lower volumes to our customers in the first quarter of 2025, decreasing the cost of LNG to supply our downstream customers by $27.7 million. The weighted average cost of gas purchased increased from $8.75 per MMBtu for the three months ended December 31, 2024 to $9.57 per MMBtu for the three months ended March 31, 2025.

Current report

•In the first quarter of 2025, we incurred $103.8 million of cargo sales costs. In the first quarter of 2024, we did not have any cargo sales and we delivered higher volumes to our downstream terminal customers.

Current report

•We delivered 37% lower volumes to our customers during the first quarter of 2025. Though we delivered lower volumes to our downstream customers, the cost of gas purchased increased significantly from $6.96 per MMBtu in the first quarter of 2024 to $9.57 per MMBtu in the first quarter of 2025. In addition, the Henry Hub pricing also increased by 63% from March 2024 to March 2025.

Current report

•Vessel costs increased by $12.3 million, for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024, principally due to lower vessel utilization in the first quarter of 2025.

Current report

Operations and maintenance increased by $20.5 million for the three months ended March 31, 2025 as compared to the three months ended December 31, 2024. We placed our first Fast LNG project and Santa Catarina Facility into service in the fourth quarter of 2024. The increase was primarily attributable to payroll, maintenance, logistics and other costs incurred for operating these new facilities placed into service in 2024.

Current report

Operations and maintenance decreased by $13.6 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. In the first quarter of 2024, our grid stabilization contract was terminated and assets related to the project were sold to PREPA. The decrease in costs during the three months ended March 31, 2025 are primarily due to lease and other maintenance costs that were no longer incurred for the sold assets, partially offset by the increased costs incurred for new facilities placed into service in 2024.

Current report

Vessel operating expenses decreased $1.0 million for the three months ended March 31, 2025 as compared to the three months ended December 31, 2024. Vessel operating expenses decreased $1.2 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. As discussed above, the vessel operating costs were lower as the vessel Mariahas been utilized for our terminal operations.

Current report

Selling, general and administrative decreased by $2.5 million for the three months ended March 31, 2025, compared to the three months ended December 31, 2024. The decrease was mostly driven by the reversal of previously recorded share-based compensation expense due to forfeitures during the quarter ended March 31, 2025.

Current report

Selling, general and administrative decreased by $11.5 million for three months ended March 31, 2025 as compared to the three months ended March 31, 2024. During the quarter ended March 31, 2024, the Company recognized an additional allowance for uncollectible receivables of $11.6 million. The allowance reduces outstanding receivables for certain customers to reflect the amount that the Company expects to receive. No significant allowance was recognized during the three months ended March 31, 2025. We recognized $5.2 million of share-based compensation costs associated with RSUs issued for the three months ended March 31, 2024. Due to forfeitures during the quarter ended March 31, 2025, the Company recognized a reversal of previously recorded share-based compensation expense which significantly lowered the expense for the period. The decreases above were partially offset by higher screening costs incurred for our development projects during the first quarter of 2025.

Current report

The transaction and integration costs of $11.9 million and $6.0 million during the three months ended March 31, 2025 and December 31, 2024, respectively, primarily relate to legal fees and other third party costs incurred by the Company in connection with amendments to credit agreements. During the first quarter of 2025, we paid the Barcarena Debentures and amended the Term Loan B Credit Agreement, and $6.1 million of third party costs associated with these modifications were recognized as Transaction and integration costs. During the first quarter of 2025, we also incurred $3.9 million of legal fees related to the sale of our Jamaica Business.

Current report

Depreciation and amortization increased by $14.3 million for the three months ended March 31, 2025 as compared to the three months ended December 31, 2024. The increase is mainly due to depreciation expense on the Fast LNG project and the Santa Catarina Facility that were placed into service during the fourth quarter of 2024.

Current report

Depreciation and amortization expense increased by $2.6 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. The increase in depreciation expense resulting from the Fast LNG project and the Santa Catarina Facility being placed into service in December 2024, was partially offset by a reduction due to the sale of certain turbines and equipment to PREPA in March 2024.

Current report

Interest expense increased by $114.2 million for the three months ended March 31, 2025 as compared to the three months ended December 31, 2024. The increase was primarily due to lower interest capitalized of $74.1 million during the quarter ended March 31, 2025 compared to $139.5 million during the quarter ended December 31, 2024. We placed the Fast LNG project and Santa Catarina Facility into service during the quarter ended December 31, 2024, and are no longer capitalizing interest towards these projects. In addition, we have incurred increased borrowing costs under the New 2029 Notes (as defined in our Annual Report) and the Brazil Financing Notes. We also amended our Term Loan A Credit Agreement and recognized an interest expense of$18.1 million relating to origination, structuring and other fees, which were previously capitalized.

Current report

Interest expense increased by $136.4 million for the three months ended March 31, 2025, as compared to the three months ended March 31, 2024. The increase was primarily due to an increase in total principal outstanding due to additional principal balance outstanding. The total principal balance on outstanding facilities was $9.4 billion as of March 31, 2025 as compared to total outstanding debt of $7.2 billion as of March 31, 2024. We also capitalized lower interest expense of$74.1 million during the first quarter of 2025 compared to $104.2 million during the first quarter of 2024 asthe Fast LNG project and Santa Catarina Facility were placed into service towards the end of 2024. In addition, we recognized an interest expense of$18.1 million upon amendment of our Term Loan A credit agreement.

Showing the first 40 of 58 passages. Open the source sections for the rest.

Removed paragraphs (105)

Previous report

In March 2024, we completed a series of transactions that included the sale of turbines and related equipment deployed to support the grid stabilization project to PREPA under an Asset Purchase Agreement ("APA"). The purchase price was $306.6 million, and the APA includes an option for PREPA to purchase three additional turbines for additional purchase price of $65.7 million. We recognized a loss of $77.5 million in Loss on sale of assets, net in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss).

Previous report

Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 8,300 MMBtu of LNG per day and enables us to produce LNG for sales directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers. On June 30, 2024, the Company entered into a definitive agreement to sell its Miami Facility for $62 million. The transaction is expected to close in the fourth quarter of 2024 subject to customary terms and conditions.

Previous report

Our initial Fast LNG units were constructed at the Kiewit Offshore Services shipyard near Corpus Christi, Texas. The Kiewit facility specializes in the fabrication and integration of liquefaction projects. In partnership with Kiewit, we believe we have established an efficient and repeatable process to reduce cost and time to build incremental liquefaction capacity. Our first Fast LNG unit has been deployed offshore to Altamira, Mexico, and we expect to deploy additional units over the next two years. We describe our currently planned projects below.

Previous report

On October 1, 2024, the Company entered into an Underwriting Agreement with several underwriters to issue and sell 46,349,942 shares of our Class A common stock, par value $0.01 per share, at a purchase price to the public of $8.63 per share, less underwriting discounts and commissions, in a registered public offering (the "Equity Offering"). Our chief executive officer, Wesley R. Edens, agreed to purchase 5,793,742 shares at the public offering price per share and on the same terms as the other purchasers in the Equity Offering. The Equity Offering closed on October 2, 2024. We received net proceeds of approximately $387.3 million after underwriters' discounts and commissions and the estimated offering expenses payable by the Company.

Previous report

Transaction Support Agreement and Exchange and Subscription Agreement

Previous report

On September 30, 2024, we entered into a Transaction Support Agreement (the "TSA") with certain holders of our 2025 Notes, 2026 Notes, and 2029 Notes. The TSA relates to a series of transactions, among the Company, certain of the Company's direct and indirect subsidiaries and certain holders of the 2025 Notes, 2026 Notes and 2029 Notes ( the "Supporting Holders"), intended to extend the maturity profile of our indebtedness while providing additional operating liquidity and financial flexibility.

Previous report

On November 6, 2024, we entered into a privately negotiated exchange and subscription agreement (the "Exchange and Subscription Agreement") with the Supporting Holders to implement the transactions described in the TSA. Pursuant to the Exchange and Subscription Agreement, (i) NFE Financing LLC ("NFE Financing"), an indirectly owned subsidiary of the Company, will sell to the Supporting Holders approximately $1.2 billion aggregate principal amount of 12.00% Senior Secured Notes due 2029 (the "New Notes") (the transactions described in clause (i), the "Subscription Transactions") and (ii) NFE Financing will issue to the Supporting Holders $1.5 billion aggregate principal amount of New Notes in a dollar-for-dollar exchange for our 2026 Notes and 2029 Notes (the "Exchange Transactions" and together with the Subscription Transactions, the "Transactions"). The New Notes will be issued pursuant to an indenture (the "New Notes Indenture") and will be issued in private placements in reliance on the exemption from registration provided by Section 4(a)(2) of the Securities Act. We intend to use net proceeds from the Transactions to repay in full the outstanding aggregate principal amount of our 2025 Notes and for general corporate purposes.

Previous report

Pursuant to the Exchange and Subscription Agreement, the Supporting Holders may elect to receive a commitment fee equal to either (i) 5% of the aggregate principal amount of such Supporting Holder’s New Notes, payable in shares of our Class A common stock, at a price of $8.63 per share (the "Commitment Fee Shares"), (ii) 2% of the aggregate principal amount of such Supporting Holder’s New Notes, payable in kind in the form of additional New Notes (the "Commitment Fee Notes"), or (iii) a combination of the foregoing. To the extent any Supporting Holder elects to receive Commitment Fee Notes, the equivalent value in Commitment Fee Shares will be ratably reallocated amongst the other Supporting Holders to ensure that the Supporting Holders will in any case receive 5% of the total amount of New Notes payable in Commitment Fee Shares. In the event any Supporting Holder elects to receive the Commitment Fee Shares, such Supporting Holder will enter into a Registration Rights Agreement with the Company, pursuant to which such Supporting Holder is entitled to certain registration rights and subject to certain lock-up restrictions. Any Supporting Holders may not, subject to customary exceptions, offer, sell, contract to sell, pledge or otherwise dispose of the Commitment Fee Shares for a period of six months from the date of the Registration Rights Agreement without our prior written consent.

Previous report

Interest on the New Notes will be payable semi-annually in arrears on May 15 and November 15 of each year, beginning on May 15, 2025. The New Notes will mature on November 15, 2029 and are payable in full on maturity date. NFE Financing may redeem the New Notes, in whole or in part, at any time prior to maturity, subject to certain prepayment premiums. NFE Financing is required to prepay the New Notes, subject to repurchase premiums, upon occurrence of change of control events and other specified prepayment events. Additionally, the New Notes will be subject to a par repurchase offer in connection with any “Pass Through Prepayment Event” (defined as any prepayment made under the Brazil Parent Credit Agreement or the Series II Credit Agreement (each, as defined below)).

Previous report

The New Notes will be guaranteed on a senior secured basis by NFE Financing’s wholly-owned subsidiary, Bradford County Real Estate Partners LLC ("New Notes Guarantor"), which owns our land in Wyalusing, Pennsylvania. The New Notes will be secured by first-priority liens on (a) all assets of NFE Financing, including the promissory note evidencing indebtedness under the Series II Credit Agreement, the promissory note evidencing indebtedness under the Brazil Parent Credit Agreement, approximately 45% of the equity in NFE Brazil Holdings Limited ("NFE Brazil Holdings"), which owns our Brazil business, and 100% of the equity in the New Notes Guarantor and (b) all assets of the New Notes Guarantor.

Previous report

In connection with NFE Financing’s issuance of the New Notes, NFE will: (i) enter into approximately $1.4 billion Series II Credit Agreement (as defined below) with NFE Financing, (ii) enter into an approximately $970 million Series I Credit Agreement (as defined below) with NFE Brazil Investments LLC (“Brazil Parent”), an indirectly owned, restricted subsidiary of the Company and the direct parent of NFE Financing, and (iii) further cause Brazil Parent to enter into an approximately $970 million Brazil Parent Credit Agreement (as defined below) with NFE Financing.

Previous report

NFE Financing and Brazil Parent will enter into a credit agreement (the “Brazil Parent Credit Agreement”), whereby NFE Financing will provide a term loan of approximately $970 million (the “Brazil Parent Term Loan”) to Brazil Parent, which will mature in November 2029. The obligations under the Brazil Parent Credit Agreement will be secured by substantially all assets of Brazil Parent (including a pledge of the equity interests held by Brazil Parent in NFE Brazil Holdings). Brazil Parent may redeem the Brazil Parent Term Loan, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums. Brazil Parent is required to prepay the Brazil Parent Term Loan, subject to repurchase premiums, upon occurrence of certain events, including any change of control and receipt of net proceeds from any prepayment under the Series I Credit Agreement (as defined below).

Previous report

The Brazil Parent Credit Agreement is expected to contain usual and customary representations and warranties, covenants and events of default for financings of this type.

Previous report

NFE and Brazil Parent will enter into a term loan credit agreement (“Series I Credit Agreement”), under which Brazil Parent will provide NFE a senior secured term loan in an aggregate principal amount of approximately $970 million (the “Series I Term Loan”).

Previous report

We intend to use proceeds to repay in full the outstanding aggregate principal amount of our 2025 Notes and consummate a portion of the Exchange Transactions.

Previous report

NFE and NFE Financing will enter into a term loan credit agreement (“Series II Credit Agreement”), under which NFE Financing will provide NFE a senior secured term loan in an aggregate principal amount of approximately $1.4 billion (the “Series II Term Loan”). The proceeds will be used to consummate the Exchange Transactions.

Previous report

Both Series I and Series II Term Loan will mature in November 2029 and will be payable in full on the maturity date. The obligations under both the Series I Credit Agreement and Series II Credit Agreement will be guaranteed, jointly and severally, on a senior secured basis by each subsidiary that is a guarantor under the 2026 Notes and the 2029 Notes. The obligations under the Series I and Series II Credit Agreement will be secured by substantially the same collateral that currently secures the 2026 Notes and 2029 Notes. An equal priority intercreditor agreement will govern the treatment of the collateral.

Previous report

We may redeem the Series I and Series II Term Loan, in whole or in part, at any time prior to maturity, subject to certain make-whole premiums. In addition, we will be required to prepay the Series I and Series II Term Loan upon the occurrence of any change of control (as defined in the New Notes Indenture and the Brazil Parent Credit Agreement), and with the net proceeds of certain asset sales, condemnations and debt and convertible securities issuances.

Previous report

Both Series I and Series II Credit Agreement are expected to contain customary representations, warranties, covenants and events of default, subject to certain thresholds and grace periods, typical for financings of this type.

Previous report

On November 6, 2024, we entered into the Ninth Amendment to our Revolving Credit Agreement (the “Ninth Amendment”), which extends the maturity date of the Revolving Facility for consenting lenders from April 15, 2026 to October 15, 2027, subject to certain events that would cause the maturity to spring to an earlier date as described in the Ninth Amendment.

Previous report

On November 6, 2024, we entered into the Fifth Amendment to Uncommitted Letter of Credit and Reimbursement Agreement (the “Fifth Amendment”, and together with the “Ninth Amendment,” the “Amendments”). The Amendments, among other things, modify the definition of Excluded Assets and exclude certain assets of our Brazil business from the definition of Excluded Assets. The Amended Credit Agreements also amend the financial covenant that tests the consolidated first lien debt ratio. The consolidated first lien debt ratio cannot exceed (i) 9.50 to 1.00, for the fiscal quarters ending March 31, 2025 through June 30, 2025, (ii) 8.50 to 1.00, for the fiscal quarters ending September 30, 2025 through December 31, 2025, (iii) 8.00 to 1.00, for the fiscal quarters ending March 31, 2026 through June 30, 2026, and (iv) 7.50 to

Previous report

On November 6, 2024, NFE Brazil Financing Limited (“NFE Brazil”), a wholly-owned, indirect subsidiary of the Company, entered into a note purchase agreement (the “Note Purchase Agreement”) to issue and sell up to $350 million aggregate principal amount of its 15% Senior Secured Notes due 2029 (the “NFE Brazil Notes”) at a purchase price of 97.75% of the principal amount. The obligations under the NFE Brazil Notes will be guaranteed by the Company and certain subsidiaries of NFE Brazil, and NFE Brazil, its subsidiary guarantors and certain of its other subsidiaries will grant security interests in certain of their assets to secure the NFE Brazil Notes.

Previous report

(1) Cost of sales in our segment measure only includes realized gains and losses on derivative transactions that are economic hedges of our commodity purchases and sales, and realized losses of $0.3 million and realized gains of $141.6 million for the three and nine months ended September 30, 2023, respectively, were recognized as a reduction to Cost of sales in the segment measure. No such transactions were completed in 2024.

Previous report

We recognized unrealized gains of $0.4 million and unrealized losses of $107.9 million on the mark-to-market value of derivative transactions for the three and nine months ended September 30, 2023, respectively, and these gains and losses reconcile Cost of sales in the segment measure to Cost of sales in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss).

Previous report

We have excluded contract acquisition costs that do not meet the criteria for capitalization from the segment measure. Contract acquisition costs of$6.2 million for the nine months ended September 30, 2023 are shown as a reduction to Cost of sales in the segment measure. There were no contract acquisition costs incurred in 2024.

Previous report

In 2023, the effective share of revenues, expenses and operating margin attributable to our ownership of the common units of Hilli LLC in the segment measure, prior to the disposition to this investment, as well as unrealized mark-to-market gain or loss on derivative instruments, are also removed.

Previous report

(5) Deferred earnings from contracted sales represent forward sales transactions that were contracted in the current period and prepayment for these sales was received. Revenue will be recognized in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss) when delivery under these forward sales transactions is completed from the fourth quarter of 2024 through 2025.

Previous report

Total revenue for the Terminals and Infrastructure Segment increased by $96.8 million for the three months ended September 30, 2024 as compared to the three months ended June 30, 2024. The increase was primarily driven by higher cargo sales and Henry Hub index that forms a portion of the pricing to invoice most of our customers in this segment, partially offset by lower incentive fee revenue from the Genera's operation and maintenance contract.

Previous report

•Revenue from cargo sales was $174.6 million for the three months ended September 30, 2024, increasing from $24.5 million for the three months ended June 30, 2024.

Previous report

Total revenue for the Terminals and Infrastructure Segment increased by $69.3 million for the nine months ended September 30, 2024 as compared to the nine months ended September 30, 2023, and the increase in revenue was primarily attributable to the following:

Previous report

Although we delivered significantly higher volumes in the current year, our revenue was impacted by lower Henry Hub pricing and lower cargo sale revenue.

Previous report

We incurred increased cost of LNG for LNG cargo sales during the third quarter of 2024 by $76.7 million compared to the second quarter of 2024 due to higher volumes delivered.

Showing the first 40 of 105 passages. Open the source sections for the rest.

Reworded paragraphs (68)

Previous wording

Unless the context indicates otherwise, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.

Current wording

Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.

Previous wording

We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable and clean energy. We own and operate natural gas and liquefied natural gas ("LNG") infrastructure, and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets; additionally, we have expanded our focus to building our modular LNG manufacturing business. Our near-term mission is to provide modern infrastructure solutions to create cleaner, reliable energy while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading companies providing power free from carbon emissions by leveraging our global portfolio of integrated energy infrastructure. We discuss this important goal in more detail in our Annual Report, “Items 1 and 2: Business and Properties” under “Sustainability—Toward a Very-Low Carbon Future.”

Current wording

We are a global energy infrastructure company founded to help address energy poverty and accelerate the world’s transition to reliable, affordable and clean energy. We own and operate natural gas and liquefied natural gas ("LNG") infrastructure, and an integrated fleet of ships and logistics assets to rapidly deliver turnkey energy solutions to global markets; additionally, we have expanded our focus to building our modular LNG manufacturing business. Our near-term mission is to provide modern infrastructure solutions to create cleaner, reliable energy while generating a positive economic impact worldwide. Our long-term mission is to become one of the world’s leading companies providing power free from carbon emissions by leveraging our global portfolio of integrated energy infrastructure. We discuss this important goal in more detail in our Annual Report, “Items 1 and 2: Business and Properties” under “Sustainability—Toward a Low Carbon Future.”

Previous wording

Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers and from our own liquefaction facility in Miami, Florida. We expect to begin to source a portion of our LNG from our modular floating liquefaction facilities, which we refer to as "Fast LNG" or "FLNG." Our first FLNG facility began producing LNG in July 2024. The first full cargo was loaded onto the Energos Princess vessel and set sail for Europe on September 30, 2024. Following the anticipated sale of our Miami Facility, we expect to continue sourcing LNG from third parties and for a portion of our supply to be generated by our first FLNG unit. The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allows us to optimally manage our LNG supply and fleet.

Current wording

Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers. We placed our first floating liquefaction unit, which we refer to as "Fast LNG" or "FLNG", into service in the fourth quarter of 2024, and we plan to source a portion of our LNG needs from this facility. The Terminals and Infrastructure segment includes all terminal operations in Jamaica (prior to the sale of our Jamaica Business (as defined below)), Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal, logistics or sub-charter operations, which allows us to optimally manage our LNG supply and fleet.

Previous wording

Our Ships segment includes all vessels which are leased to customers under long-term arrangements. Over time, we expect to utilize these vessels in our own terminal operations as charter agreements for these vessels expire.

Current wording

Our Ships segment includes certain vessels which are currently chartered under long-term arrangements to third parties and are part of the Energos Formation Transaction (defined below). Over time, we expect to utilize these vessels in our own terminal operations as charter agreements for these vessels expire, and these vessels are expected to be included in our Terminals and Infrastructure segment at such time.

Previous wording

Power Company Limited (“SJPC”), an affiliate of JPS, Jamalco, a bauxite mining and alumina producer in Jamaica, the Puerto Rico Electric Power Authority (“PREPA”), and Comisión Federal de Electricidad (“CFE”), Mexico’s power utility, each of which is described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.

Current wording

Our management team has successfully employed our strategy to secure long-term contracts with significant customers, including Jamaica Public Service Company Limited (“JPS”), the sole public utility in Jamaica, South Jamaica Power Company Limited (“SJPC”), an affiliate of JPS, and Jamalco, a bauxite mining and alumina producer in Jamaica, prior to the sale of the Jamaica Business, as well as the Puerto Rico Electric Power Authority (“PREPA”) and Comisión Federal de Electricidad (“CFE”), Mexico’s power utility, each of which is described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.

Previous wording

Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant, industrial end-user customers in Puerto Rico, and after being awarded a new gas sale agreement in the first quarter of 2024, PREPA's gas-fired power plants throughout the island of Puerto Rico.

Current wording

Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant and industrial end-user customers in Puerto Rico.

Previous wording

In the first and second quarters of 2023, we entered into agreements for the installation and operation of approximately 350MW of additional power to be generated at the Palo Seco Power Plant and San Juan Power Plant in Puerto Rico as well as the supply of natural gas. Our customer was contracted by the U.S. Army Corps of Engineers to support the island’s grid stabilization project with additional power capacity to enable maintenance and repair work on Puerto Rico’s power system and grid. We commissioned 150MW of duel-fuel power generation using our gas supply in the second quarter of 2023, and the remaining 200MW was commissioned in September 2023.

Current wording

In 2023, we entered into agreements for the installation and operation of approximately 350MW of additional power to be generated at the Palo Seco Power Plant and San Juan Power Plant in Puerto Rico as well as the supply of natural gas. Our customer was contracted by the U.S. Army Corps of Engineers to support the island’s grid stabilization project with additional power capacity to enable maintenance and repair work on Puerto Rico’s power system and grid. We commissioned 350MW of duel-fuel power generation using our gas supply in less than 180 days.

Previous wording

In the first quarter of 2024, we were also awarded a new gas sale agreement with PREPA to supply up to 80 TBtu annually to PREPA's gas-fired power plants, including to the turbines that were sold pursuant to the APA. The contract initially has a one year term that is renewable annually for three additional annual periods.

Current wording

In March 2024, our contract to provide emergency power services to support the grid stabilization project was terminated, and we completed a series of transactions that included the sale of turbines and related equipment deployed to support the grid stabilization project to PREPA. We were also awarded a gas sale agreement with PREPA to supply up to 80 TBtu annually to PREPA's gas-fired power plants, including to the turbines that were sold to PREPA. The contract initially has a one year term that is renewable annually for three additional annual periods. In March 2025, the agreement was amended to extend the term by 100 days to June 2025.

Previous wording

In March 2024, our contract to provide emergency power services to support the grid stabilization project was terminated. We are pursuing a $659 million request for equitable adjustment related to the early termination of our contract. The actual amount of any such adjustment and the timing of any related payments may be materially different than management’s current estimate. As a result, the Company cannot offer any assurance as to the actual amount that may be recovered pursuant to such request or subsequent claim, if any. As the outcome of this process is uncertain, we have not recognized any revenue associated with the close out of our contract.

Current wording

We are pursuing a $659 million request for equitable adjustment related to the early termination of our contract to provide emergency power services. The actual amount of any such adjustment and the timing of any related payments may be materially different than management’s current estimate. As a result, the Company cannot offer any assurance as to the actual amount that may be recovered pursuant to such request or subsequent claim, if any.

Previous wording

In the first quarter of 2023, our wholly-owned subsidiary, Genera PR LLC ("Genera"), was awarded a 10-Year contract for the operation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and improving reliability of power generation in Puerto Rico. We receive an annual management fee and are eligible for performance-based incentive fees. The service period under the contract commenced on July 1, 2023.

Current wording

In 2023, our wholly-owned subsidiary, Genera PR LLC ("Genera"), was awarded a 10-year contract for the operation and maintenance of PREPA’s thermal generation assets with the goal of reducing costs and improving reliability of power generation in Puerto Rico. We receive an annual management fee and are eligible for performance-based incentive fees. The service period under the contract commenced on July 1, 2023.

Previous wording

The Santa Catarina Facility is located on the southern coast of Brazil and consists of an FSRU with a processing capacity of approximately 500,000 MMBtu from LNG per day and LNG storage capacity of up to 138,000 cubic meters. We have developed a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day. We are in the process of final commissioning of our Santa Catarina Facility.

Current wording

We placed our Santa Catarina Facility in service in the fourth quarter of 2024. The Santa Catarina Facility is located on the southern coast of Brazil and consists of an FSRU with a processing capacity of approximately 500,000 MMBtu from LNG per day and LNG storage capacity of up to 138,000 cubic meters. We have developed and constructed a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day of natural gas.

Previous wording

NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) additional LNG supply contracts expected to commence in 2027; and 3) supply from our own Fast LNG production. We have secured commitments to purchase and receive physical delivery of LNG volumes for 100% of our expected committed volumes for each of our downstream terminals inclusive of our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility, Puerto Sandino Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027. Finally, we plan to source production from our own Fast LNG facilities, the first of which began to produce LNG in July 2024. We sold the first full cargo from this facility on September 30, 2024. We plan to expand that capacity when additional Fast LNG units come online.

Current wording

NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) our own FLNG production; and 3) additional LNG supply contracts expected to commence in 2027. Our first FLNG facility began to produce LNG in July 2024, and we expect to generate up to 70 TBtu annually from this facility. When expected production from FLNG is combined with our commitments to purchase and receive physical delivery of LNG volumes, we expect to have sufficient supply for 100% of our committed volumes for each of our downstream terminals inclusive of our San Juan Facility, La Paz Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027 and 2029.

Previous wording

Natural gas and LNG markets have experienced unprecedented price volatility in recent years. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production, we plan to further mitigate our exposure to variability in LNG prices. In 2022 and 2023, our revenue and results of operations benefited from selling cargos into the global LNG market. As FLNG facilities commence production, our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.

Current wording

Geopolitical events have substantially impacted and may continue to impact the natural gas and LNG markets, which have experienced significant volatility in recent years. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production, we plan to further mitigate our exposure to variability in LNG prices, and our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.

Previous wording

Our Ships segment includes Floating Storage and Regasification Units ("FSRUs"), Floating Storage Units ("FSUs") and LNG carriers ("LNGCs"), which are leased to customers under long-term arrangements. At the expiration of third party charters of vessels owned by Energos Infrastructure (“Energos”), an entity formed in 2022 and described in more detail below, we plan to charter these vessels for our own operational purposes. The results of operations of vessels utilized in our terminal operations are reflected in the Terminals and Infrastructure segment.

Current wording

Our shipping assets include Floating Storage and Regasification Units ("FSRUs"), Floating Storage Units ("FSUs") and LNG carriers ("LNGCs"). Our shipping assets are included in both of our operating segments. Certain vessels are currently chartered to third parties under long-term arrangements and are part of the Energos Formation Transaction (defined below); such vessels are included in our Ships segment. At the expiration of third party charters of these vessels, we plan to utilize these vessels for our own operational purposes. Vessels we operate at our terminal operations or that we decide to sub-charter are included in our Terminals and Infrastructure segment.

Previous wording

In August 2022, we completed a transaction(the “Energos Formation Transaction”)with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of eleven vessels to Energos in exchange for approximately$1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our Consolidated Balance

Current wording

In August 2022, we completed a transaction(the “Energos Formation Transaction”)with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of eleven vessels to Energos in exchange for approximately$1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our Consolidated Balance Sheet as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.

Previous wording

Our projects currently under development include our development of a series of modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Barcarena Facility”) and power plants (“Barcarena Power Plant” and "PortoCem Power Plant") located in Pará, Brazil; our LNG terminal located on the southern coast of Brazil ("Santa Catarina Terminal"); our LNG terminal (“Ireland Facility”) and power plant in Ireland, our first green hydrogen project ("ZeroPark I") and Klondike Digital Infrastructure, our newly-launched power and data center infrastructure business ("Klondike"). We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.

Current wording

Our projects currently under development include our development of a series of modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Barcarena Facility”) and power plant located in Pará, Brazil; our LNG terminal (“Ireland Facility”) and power plant in Ireland, our first green hydrogen project ("ZeroPark I") and Klondike Digital Infrastructure, our newly-launched power and data center infrastructure business ("Klondike"). We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.

Previous wording

We are currently developing multiple modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world. We have designed and are constructing liquefaction facilities for our growing customer base that we believe are both faster and more economical to construct than many traditional liquefaction solutions. Our “Fast LNG,” or “FLNG,” design pairs advancements in modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar marine floating infrastructure to enable a lower cost and faster deployment schedule than other greenfield alternatives. Semi-permanently moored floating storage unit(s) (FSUs) will provide LNG storage alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas. As noted below, we are also in discussions with CFE to utilize our FLNG design in an onshore application.

Current wording

We are currently developing multiple modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world. We have designed and are constructing liquefaction facilities for our growing customer base that we believe are both faster and more economical to construct than many traditional liquefaction solutions. Our “Fast LNG,” or “FLNG,” design pairs advancements in modular, midsize liquefaction technology with jack up rigs, semi-submersible rigs or similar marine floating infrastructure to enable a lower cost and faster deployment schedule than other greenfield alternatives. Semi-permanently moored FSUs will provide LNG storage alongside the floating liquefaction infrastructure, which can be deployed anywhere there is abundant and stranded natural gas. As noted below, we are also in discussions with CFE to utilize our FLNG design in an onshore application.

Previous wording

In the first quarter of 2023, we executed an agreement with CFE to supply natural gas for one FLNG unit located off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit is utilizing CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. Our first FLNG unit has been installed and connected to the gas pipeline at Altamira, and we are in the process of commissioning the project. While we experienced delays in commissioning our first FLNG unit, which impacted our results of operations in this period and may impact our results in future periods, in July 2024, we began to produce LNG, and we expect to achieve run-rate production later in 2024. We sold the first full cargo from this facility on September 30, 2024.

Current wording

Our first Fast LNG unit has been deployed off the coast of Altamira, Tamaulipas, Mexico, and was placed into service in the fourth quarter of 2024. The 1.4 million ton per annum (“MTPA”) FLNG unit utilizes CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. This first FLNG unit has been fully commissioned, and we are in the process of increasing available liquefaction capacity through optimization projects.

Previous wording

In the first quarter of 2024, we executed an agreement with CFE to supply natural gas to an onshore liquefied natural gas terminal with up to two 1.4 MTPA FLNG units. The terminal is to be located at the existing Altamira LNG import facility and would source feedgas from the Sur de Texas-Tuxpan Pipeline. The Altamira onshore LNG facility is a world class import facility that will be converted to export LNG similar to other gulf coast regasification terminals. Existing infrastructure at the facility includes two 150,000m3 storage tanks, deepwater marine berth and access to local gas and power networks.

Current wording

We expect to deploy up to two 1.4MTPA additional FLNG units onshore at the existing Altamira LNG import facility. The terminal also would source feedgas from the CFE from the Sur de Texas-Tuxpan Pipeline. The Altamira onshore LNG facility is a world class import facility that will be converted to export LNG similar to other gulf coast regasification terminals. Existing infrastructure at the facility includes two 150,000m3 storage tanks, deepwater marine berth and access to local gas and power networks.

Previous wording

We are developing a liquefied natural gas receiving, transloading and regasification facility in Puerto Sandino, Nicaragua, as well as a pipeline connecting the facility with our Puerto Sandino Power Plant. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. As part of our long-term strategy, we are evaluating solutions to optimize power generation and delivery to other markets, connected to our power plant through a regional transmission line starting in 2025.

Current wording

We are developing a liquefied natural gas receiving, transloading and regasification facility in Puerto Sandino, Nicaragua, as well as a pipeline connecting the facility with our Puerto Sandino Power Plant. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. Construction of the terminal and power plant is substantially complete; however, we will determine timing of final commissioning and commencement under our PPA based on the most optimal use of our LNG supply chain. As part of our long-term strategy, we are also evaluating solutions to optimize power generation and delivery to other markets, connected to our power plant through a regional transmission line.

Previous wording

The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of processing over one million MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility. We substantially completed our Barcarena Facility in 2022 and are in process of final commissioning.

Current wording

The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of delivering almost 600,000 MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility.

Previous wording

The Barcarena Facility will also supply our new 630MW combined cycle thermal power plant to be located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to complete the Barcarena Power Plant and begin delivering power to nine committed offtakers for 25 years beginning in 2025.

Current wording

The Barcarena Facility will also supply our new 630MW combined cycle natural gas-fired power plant located in Pará, Brazil (the “Barcarena Power Plant”). The power plant is fully contracted under multiple 25-year power purchase agreements to supply electricity to the national electricity grid. We expect to complete the Barcarena Power Plant in 2025.

Previous wording

In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. ("PortoCem"), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior ("Ceiba Energy") in exchange for newly issued 4.8% NFE redeemable Series A Convertible Preferred Stock. PortoCem isthe owner of a 15-year 1.6GW capacity reserve contract in Brazil. We have received approvalto transfer the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE will build the PortoCem Power Plant to supply the capacity reserve contract using gas from the Barcarena Facility. We expect to begin delivering electricity under the acquired capacity reserve contract in July 2026.

Current wording

In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. ("PortoCem"), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior ("Ceiba Energy"). PortoCem isthe owner of a 15-year 1.6GW capacity reserve contract in Brazil. We have transferred the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE is building the 1.6 GW simple cycle, natural gas-fired power plant ("PortoCem Power Plant") to supply the capacity reserve contract using gas from the Barcarena Facility. We expect the PortoCem Power Plant to be completed in 2026.

Previous wording

In the third quarter of 2023, An Bord Pleanála, Ireland's planning commission, denied our application for the development of an LNG terminal and power plant. We challenged this decision, and in September 2024, the High Court of Ireland ruled that the ABP did not have appropriate grounds for the denial of our permit. The ABP has been directed to reconsider our permit application in accordance with Irish law. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, that could preclude the development of this project, and the results of these risks could have a material effect on our results of operations.

Current wording

In the third quarter of 2023, An Bord Pleanála ("ABP"), Ireland's planning commission, denied our application for the development of an LNG terminal and power plant. We challenged this decision, and in September 2024, the High Court of Ireland ruled that ABP did not have appropriate grounds for the denial of our permit. In March 2025, APB withdrew their appeal to the September 2024 High Court decision. ABP is now reconsidering our planning application in accordance with Irish Law.

Previous wording

We recently launched Klondike, a power and data center development business dedicated to working with hyperscale customers to build and operate data centers. This venture comes in response to a significant need for turnkey digital infrastructure to support the next stage of explosive growth in artificial intelligence.

Current wording

In 2024, we launched Klondike, a power and data center development business dedicated to working with hyperscale customers to build and operate data centers. This venture comes in response to a significant need for turnkey digital infrastructure to support the next stage of explosive growth in artificial intelligence.

Previous wording

Klondike will employ independent power sources that utilize behind-the-meter on-site power. This innovative approach is designed to address all major constraints of digital infrastructure development, providing grid stability, significant transmission capacity, power reliability, energy cost savings, and scalability. This approach not only reduces the demand for power from the grid but also contributes power back to it.

Current wording

Klondike will develop independent power sources that utilize and provide behind-the-meter on-site power. This innovative approach is designed to address all major constraints of digital infrastructure development, providing grid stability, significant transmission capacity, power reliability, energy cost savings, and scalability. This approach not only reduces the demand for power from the grid but also contributes power back to it.

Previous wording

Klondike is currently developing a geographically diverse portfolio of data center sites to satisfy the requirements of hyperscale users. Klondike has more than 1,000 acres of developable land across sites in Brazil, Ireland, and the United States that it either owns or leases. These locations have large existing power plants or permits in process to build several gigawatts of power, connectivity to fiber networks, access to transmission and water.

Current wording

Klondike plans to develop a geographically diverse portfolio of data center sites to satisfy the requirements of hyperscale users. Klondike has more than 1,000 acres of developable land across sites in Brazil, Ireland, and the United States that it either owns or leases. These locations have, or will have, large existing power plants or permits in process to build several gigawatts of power, connectivity to fiber networks, access to transmission and water.

Previous wording

1.00, for the fiscal quarters ending September 30, 2026 and each fiscal quarter thereafter. The Amended Credit Agreements also add a fixed charge coverage ratio test. Commencing with the fiscal quarter ending March 31, 2025, we cannot permit the fixed charge coverage ratio (the ratio of consolidated EBITDA to fixed charges) for the Company and its restricted subsidiaries to be less than 0.80 to 1.00 for the fiscal quarter ending March 31, 2025 and, for the fiscal quarter ending June 30, 2025 and each fiscal quarter thereafter, 1.00 to 1.00. Additionally, the Amendments modify how consolidated EBITDA is calculated to more closely align with the calculations in certain of our existing term loan facilities and also remove the Debt to Total Capitalization Ratio.

Current wording

Additionally, the Fifth Amendment amends certain of the financial covenants. After giving effect to the Fifth Amendment, the consolidated first lien debt ratio cannot exceed (i) 8.75 to 1.00, for the fiscal quarters ending March 31, 2025, (ii) 6.75 to 1.00, for the fiscal quarter ending September 30, 2025, (iii) 6.50 to 1.00, for the fiscal quarter ending December 31, 2025, (iv) 7.25 to 1.00, for the fiscal quarters ending March 31, 2026 and September 30, 2026 and (v) 6.75 to 1.00, for the fiscal quarter ending December 31, 2026 and each fiscal quarter thereafter. The Fifth Amendment added a fixed charge coverage ratio covenant and removed the debt to total capitalization covenant to the Amended TLA. Commencing with the fiscal quarter ending March 31, 2025, the Company cannot permit the fixed charge coverage ratio for the Company and its restricted subsidiaries to be less than or equal to 0.80 to 1.00 for the fiscal quarter ending March 31, 2025 and, for the fiscal quarter ending September 30, 2025 and each fiscal quarter thereafter, 1.00 to 1.00. Neither the first lien debt ratio covenant nor the fixed charge coverage ratio covenant will be tested for the fiscal quarter ending June 30, 2025. After giving effect to the Fifth Amendment, the financial covenants set forth above are consistent with the corresponding financial covenants in the Amended RCF and Amended LCF.

Previous wording

On September 26, 2024, the United States Coast Guard ("USCG") filed a Letter of Recommendation with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7 and are awaiting a response.

Current wording

On September 26, 2024, the United States Coast Guard ("USCG") filed a Letter of Recommendation with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, on September 26, 2024, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7. In December 2024 and February 2025, we submitted an updated Letter of Intent and Waterway Suitability Assessments detailing our alternative operational plans to the USCG and are working collaboratively with the USCG to obtain a new Letter of Recommendation to FERC in support of our operations, which we expect to be imminently forthcoming. In concert with our collaboration with the USCG regarding our new operational plans, we withdrew our appeal on February 14, 2025.

Previous wording

On October 25, 2024, FERC issued a notice of intent to prepare an Environmental Impact Statement, which included, among other things, two public scoping sessions in Puerto Rico scheduled for November 18, 2024 in accordance with the National Environmental Policy Act.

Current wording

On October 25, 2024, FERC issued a notice of intent to prepare an Environmental Impact Statement, which included, among other things, two public scoping sessions in Puerto Rico held on November 18, 2024 in accordance with the National Environmental Policy Act.

Previous wording

Results of Operations – Three Months Ended September 30, 2024 compared to Three Months Ended June 30, 2024 and Nine Months Ended September 30, 2024 compared to Nine Months Ended September 30, 2023

Current wording

Results of Operations – Three Months Ended March 31, 2025 compared to Three Months Ended December 31, 2024 and Three Months Ended March 31, 2024

Previous wording

Performance of our two segments, Terminals and Infrastructure and Ships, is evaluated based on Segment Operating Margin. Segment Operating Margin reconciles to Consolidated Segment Operating Margin as reflected below, which is a non-GAAP measure. We reconcile Consolidated Segment Operating Margin to GAAP Gross margin, inclusive of depreciation and amortization. Consolidated Segment Operating Margin is mathematically equivalent to Revenue minus Cost of sales (excluding depreciation and amortization reflected separately) minus Operations and maintenance minus

Current wording

Performance of our two segments, Terminals and Infrastructure and Ships, is evaluated based on Segment Operating Margin. Segment Operating Margin reconciles to Consolidated Segment Operating Margin as reflected below, which is a non-GAAP measure. We reconcile Consolidated Segment Operating Margin to GAAP Gross margin, inclusive of depreciation and amortization. Consolidated Segment Operating Margin is mathematically equivalent to Revenue minus Cost of sales (excluding depreciation and amortization reflected separately) minus Operations and maintenance minus Vessel operating expenses, each as reported in our financial statements. We believe this non-GAAP measure, as we have defined it, offers a useful supplemental measure of the overall performance of our operating assets in evaluating our profitability in a manner that is consistent with metrics used for management’s evaluation of the overall performance of our operating assets.

Previous wording

The tables below present our segment information for the three months ended September 30, 2024 and June 30, 2024, and for the nine months ended September 30, 2024 and September 30, 2023:

Current wording

The tables below present our segment information for the three months ended March 31, 2025, December 31, 2024 and March 31, 2024:

Previous wording

(2) Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss).

Current wording

(1) Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Condensed Consolidated Statements of Operations and Comprehensive (Loss) Income.

Previous wording

(3) Consolidation and Other adjusts for the inclusion of deferred earnings from contracted sales of $150.0 million; a portion of these deferred earnings of $42.3 million were recognized upon delivery during the third quarter of 2024.

Current wording

(2)For the three months ended December 31, 2024, Consolidation and Other adjusts for the inclusion of deferred earnings from contracted sales of$107.7 million which were recognized during the fourth quarter of 2024.

Previous wording

The increase in revenue in the third quarter of 2024 when compared to the second quarter of 2024 was primarily attributable to the following:

Current wording

The decrease in revenue in the first quarter of 2025 when compared to the fourth quarter of 2024 was primarily attributable to contract novation income recognized during the three months ended December 31, 2024, and a decrease in volumes delivered to downstream customers.

Previous wording

•Volumes delivered to downstream terminal customers were substantially consistent, increasing from 20.2 TBtu in the second quarter of 2024 to 20.7 TBtu in the third quarter of 2024.

Current wording

•Volumes delivered to downstream terminal customers decreased from 18.4 TBtu in the fourth quarter of 2024 to 13.8 TBtu in the first quarter of 2025 due to maintenance at our Old Harbour and San Juan facilities.

Previous wording

•The average Henry Hub index pricing used to invoice our downstream customers increased by 14% for the three months ended September 30, 2024 as compared to the three months ended June 30, 2024.

Current wording

•The average Henry Hub index pricing used to invoice our downstream customers increased by 31% for the three months ended March 31, 2025 as compared to the three months ended December 31, 2024.

Previous wording

•For the nine months ended September 30, 2024, volumes delivered to downstream customers were 62.8 TBtu as compared to 46.1 TBtu for the nine months ended September 30, 2023.

Current wording

•For the three months ended March 31, 2025, volumes delivered to downstream customers were 13.8 TBtu as compared to 22.0 TBtu for the three months ended March 31, 2024 due to maintenance at our Old Harbour and San Juan facilities.

Previous wording

•In 2023, we began to support the grid stabilization project in Puerto Rico, commissioning power generation assets in the second and third quarters of 2023, and the increase in volumes for the nine months ended September 30, 2024 is primarily attributable to additional sales in Puerto. Our customer terminated the grid stabilization project in the first quarter of 2024, but we continue to sell volumes into these power plants under a new island-wide gas sale agreement signed with PREPA.

Current wording

•The higher volumes in the first quarter of 2024 was primarily attributable to additional sales in Puerto Rico from our grid stabilization project. Our customer terminated the grid stabilization project in the first quarter of 2024, but we continue to sell volumes into these power plants under an island-wide gas sale agreement signed with PREPA. The agreement is set to expire in June 2025, and we are in active discussions with PREPA for an extension.

Showing the first 40 of 68 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

Barcarena Power Plant, PortoCem Power Plant, Puerto Sandino Facility and Ireland Facility, and our current results do not include revenue and operating results from these projects.

Current report — wording carried from elsewhere

Our cash flow used in investing activities was $335.9 million for the three months ended March 31, 2025, which increased by $116.1 million from cash used in investing activities of $219.8 million for the three months ended March 31, 2024. Cash flows from investing activities during the three months ended March 31, 2025 were used primarily for continued development of our onshore FLNG project and the construction of the PortoCem Power Plant.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

Our management team has successfully employed our strategy to secure long-term contracts with significant customers, including Jamaica Public Service Company Limited (“JPS”), the sole public utility in Jamaica, South Jamaica

Previous report — wording carried elsewhere

Sheet as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.

Previous report — wording carried elsewhere

Vessel operating expenses, each as reported in our financial statements. We believe this non-GAAP measure, as we have defined it, offers a useful supplemental measure of the overall performance of our operating assets in evaluating our profitability in a manner that is consistent with metrics used for management’s evaluation of the overall performance of our operating assets.