New Fortress Energy Inc
For the period ended Jun 30, 2024. Filed Aug 9, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2024 · Filed Aug 9, 2024
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-03-31; filed 2024-05-09.
0001749723-24-000052
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2024-06-30; filed 2024-08-09.
0001749723-24-000072
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 198 previous paragraphs and 207 current paragraphs.
106 unchanged; 68 reworded; 33 added; 16 removed; 8 previous and 0 current paragraphs rearranged.
Tables are not compared: 11 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (33)
Current report
In March 2024, our contract to provide emergency power services to support the grid stabilization project was terminated. We are pursuing a $659 million request for equitable adjustment related to the early termination of our contract. The actual amount of any such adjustment and the timing of any related payments may be materially different than management’s current estimate. As a result, the Company cannot offer any assurance as to the actual amount that may be recovered pursuant to such request or subsequent claim, if any. As the outcome of this process is uncertain, we have not recognized any revenue associated with the close out of our contract.
Current report
Recent Developments
Current report
The Company recently launched Klondike, a power and data center development business dedicated to working with hyperscale customers to build and operate data centers. This venture comes in response to a significant need for turnkey digital infrastructure to support the next stage of explosive growth in artificial intelligence.
Current report
Klondike will employ independent power sources that utilize behind-the-meter on-site power. This innovative approach is designed to address all major constraints of digital infrastructure development, providing grid stability, significant transmission capacity, power reliability, energy cost savings, and scalability. This approach not only reduces the demand for power from the grid but also contributes power back to it.
Current report
Klondike is currently developing a geographically diverse portfolio of data center sites to satisfy the requirements of hyperscale users. Klondike has more than 1,000 acres of developable land across sites in Brazil, Ireland, and the United States that it either owns or leases. These locations have large existing power plants or permits in process to build several gigawatts of power, connectivity to fiber networks, access to transmission and water.
Current report
The Company recognized unrealized losses of $108.3 million on the mark-to-market value of derivative transactions for the six months ended June 30, 2023, and these losses reconcile Cost of sales in the segment measure to Cost of sales in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss).
Current report
The Company has excluded contract acquisition costs that do not meet the criteria for capitalization from the segment measure. Contract acquisition costs of$6.2 million for the six months ended June 30, 2023 are shown as a reduction to Cost of sales in the segment measure.
Current report
(5) Deferred earnings from contracted sales represent forward sales transactions that were contracted in the current period and prepayment for these sales was received. Revenue will be recognized in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss) when delivery under these forward sales transactions is completed in the third and fourth quarters of 2024.
Current report
Total revenue for the Terminals and Infrastructure Segment decreased by $262.3 million for the three months ended June 30, 2024 as compared to the three months ended March 31, 2024. The decrease was primarily driven by decreases to revenue earned in our Puerto Rican operations after the termination of our contract to support the grid stabilization project late in the first quarter of 2024.
Current report
•For the six months ended June 30, 2024, volumes delivered to downstream customers were 42.1 TBtu as compared to 26.1 TBtu for the six months ended June 30, 2023. We delivered gas for two and half months for the grid stabilization project in Puerto Rico during the first half of 2024, while the project was just ramping up during the second quarter of 2023.
Current report
•In the third quarter of 2023, we started providing operations and maintenance services to PREPA's thermal generation assets recognizing $109.6 million of revenue during the six months ended June 30, 2024.
Current report
Although we delivered significantly higher volumes in the current year, our revenue was impacted by lower Henry Hub pricing and lower cargo sale revenue.
Current report
Cost of sales decreased by $7.3 million for the three months ended June 30, 2024 as compared to the three months ended March 31, 2024, which was attributable to lower cost of gas purchased and volumes delivered. We delivered 8% less volumes to our downstream terminal customers during the three months ended June 30, 2024 compared to the three months ended March 31, 2024. Our cost to deliver natural gas volumes decreased to $6.42 per MMBtu for the three months ended June 30, 2024 from $6.96 per MMBtu for the three months ended March 31, 2024. After our FLNG asset is fully commissioned and operational, we expect to be able to produce materially cheaper LNG than the LNG purchased under our supply contracts.
Current report
•Vessel costs increased by $47.3 million, for the six months ended June 30, 2024 as compared to the six months ended June 30, 2023. In 2023, we chartered additional vessels to enable us to rapidly have the infrastructure available to deliver additional LNG to Puerto Rico to support the grid stabilization contract. In future periods, we expect our vessel costs to decrease as we optimize our supply chain to Puerto Rico with fewer and less costly vessels. We were also able to sub-charter certain vessels for a portion of the current period, earning incremental charter revenue.
Current report
•We incurred decreased cost of LNG purchased from third parties for LNG cargo sales of $162.2 million during the six months ended June 30, 2024 as our LNG cargo sale activity has been significantly lower in the first half of 2024.
Current report
Operations and maintenance decreased $29.3 million for the three months ended June 30, 2024 as compared to the three months ended March 31, 2024. The decrease was primarily attributable to reduced operations, maintenance and lease costs of turbines to generate power as part of the grid stabilization project in Puerto Rico. In conjunction with the sale of certain turbines to PREPA, we have terminated our leases of certain turbines and are no longer incurring costs to operate these turbines.
Current report
Operations and maintenance increased $47.5 million for the six months ended June 30, 2024 as compared to the six months ended June 30, 2023. The increase was primarily due to additional operations and maintenance cost including lease of turbines as part of the grid stabilization project in Puerto Rico. The project operated for two and a half months during the first half of 2024, while it was just ramping up during the second quarter of 2023.
Current report
Deferred earnings from contracted sales
Current report
In the second quarter of 2024, we completed forward sales receiving a prepayment from the buyer of $90.0 million. The prepayment was based on the fair market value of these sales as compared to our supply cost, and our CODM includes these results in his evaluation of Terminals and Infrastructure operations for the second quarter of 2024. Revenue for these sales will be recognized in our Condensed Consolidated Statements of Operations and Comprehensive Income (Loss) asdeliveries under this contract will occur in the third and fourth quarters of 2024. Both the forward contracted sale and our supply contract are based on Henry Hub which mitigates the impact that changes in commodity pricing will have on our results of operations.
Current report
Vessel operating expenses remained consistent during the three months ended June 30, 2024 as compared to the three months ended March 31, 2024. There were no changes to the vessels that comprise the Ships segment in the second quarter of 2024.
Current report
Selling, general and administrative remained consistent for the three months ended June 30, 2024, compared to the three months ended March 31, 2024. The Company incurred increased share-based compensation expense, that were partially offset by decrease in bad debt expense. We recognized an additional $14.7 million of share-based compensation expense for RSUs and other equity awards during the second quarter of 2024 as we recognized a full quarter of expense for RSUs granted during the first quarter of 2024. During the first quarter of 2024, the Company recorded an additional allowance for uncollectible receivables of$11.6 million. There was no such allowance recognized during the second quarter of 2024. We also incurred lower payroll and professional fees in the second quarter of 2024.
Current report
Selling, general and administrative increased by $33.4 million for the six months ended June 30, 2024 as compared to the six months ended June 30, 2023. The increases were primarily due to increased share-based compensation expense. We recognized $25.2 million of share-based compensation expense for RSUs and other equity awards during the first half of 2024; no significant cost was recognized in the first half of 2023. In addition, the allowance for bad debt increased by$11.6 million due to an additional allowance recorded during the three months ended March 31, 2024.
Current report
Depreciation and amortization decreased $13.1 million for the three months ended June 30, 2024 as compared to the three months ended March 31, 2024. We sold certain turbines and equipment to PREPA in the first quarter of 2024, and the decrease in depreciation was primarily a result of no longer owning these assets.
Current report
Other expense recognized in the three months ended June 30, 2024 was primarily comprised of foreign currency losses due to remeasurement of USD denominated debt in our Brazil subsidiary.
Current report
Other expense recognized in the six months ended June 30, 2024 was primarily comprised offoreign currency remeasurement losses and loss on termination of leases of turbines used in the grid stabilization project in Puerto Rico partially offset by interest income.
Current report
Our expectations of future liquidity needs and sources include numerous assumptions that are subject to various risks and uncertainties. Refer to Note 2 – “Significant Accounting Policies” for further information on liquidity and “Item 1A. Risk Factors” for risks and uncertainties that may cause our results to differ from our expectations, each in our Annual Report on Form 10-K.
Current report
PortoCem Financings
Current report
In April 2024, PortoCem and a syndicate of banks in Brazil entered into a commitment letter for R$2.9 billion of financing. PortoCem received funding under a short term credit note of R$600.0 million ("PortoCem Credit Note") from this syndicate that was due in July 2024, and a portion of the proceeds was used to repay the PortoCem BTG Loan.
Current report
In May 2024, the PortoCem Credit Note was replaced by a bridge financing agreement that allows PortoCem to borrow up to R$2.9 billion due in October 2025 ("PortoCem Bridge Loan"). PortoCem initially borrowed R$1.5 billion ($269.9 million based on rates in effect at June 30, 2024), and this initial funding was used to repay the PortoCem Credit Note and to begin the development and construction of a power plant to deliver under the capacity reserve contracts acquired in the PortoCem Acquisition. The PortoCem Bridge Loan bears interest at the one-day interbank deposit futures rate in Brazil plus 4.25%, and no principal payments are required until maturity in October 2025.
Current report
The PortoCem Bridge Loan contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The PortoCem Bridge Loan does not contain any restrictive financial covenants.
Current report
Turbine Financing
Current report
In May 2024, we executed a loan agreement with a lender to borrow $148.5 million under a promissory note secured by certain of our turbines (the “Turbine Financing”). The Turbine Financing bears interest at 10.30%, and the principal is partially repayable in monthly installments over the 36-month term of the loan with the balance due upon maturity in June 2027.
Current report
The Turbine Financing contains usual and customary representations and warranties, and usual and customary affirmative and negative covenants. The Turbine Financing does not contain any restrictive financial covenants. We were required to pay a deposit of approximately $6.0 million that will be held by the lender throughout the term of the borrowing.
Removed paragraphs (16)
Previous report
and fleet.
Previous report
In March 2024, our contract to provide emergency power services to support the grid stabilization project was terminated. We believe that there are remedies available under our customer contract, and we are currently in pursuit of these remedies. As the result of this process is uncertain, any transaction price associated with closing this contract has been fully constrained.
Previous report
The increase in revenue in the first quarter of 2024 when compared to the first quarter of 2023 was primarily attributable to increased volumes delivered to our downstream customers, partially offset by reduced market pricing of natural gas.
Previous report
•For the three months ended March 31, 2024, volumes delivered to downstream customers were 22.0 TBtu as compared to 12.1 TBtu for the three months ended March 31, 2023. In 2023, we began to support the grid stabilization project in Puerto Rico, commissioning power generation assets in the second and third quarters of 2023, and the increase in volumes in the first quarter of 2024 is primarily attributable to additional sales in Puerto Rico. Our customer terminated the grid stabilization project in the first quarter of 2024, but we continue to sell volumes into these power plants under a new island-wide gas sale agreement signed with PREPA that will allow us to sell up to 80 TBtus annually.
Previous report
Cost of sales decreased by $30.9 million for the three months ended March 31, 2024 as compared to the three months ended December 31, 2023. We incurred additional development service costs of $19.6 million in the fourth quarter of 2023. When we perform these services for our customers, such costs are reimbursed and revenue is recognized as services are performed. Our cost to deliver natural gas volumes decreased to $6.96 per MMBtu for the three months ended March 31, 2024 from $7.08 per MMBtu for the three months ended December 31, 2023.
Previous report
Operations and maintenance increased by $6.6 million for the three months ended March 31, 2024 as compared to the three months ended December 31, 2023. The increase was primarily attributable to maintenance, logistics and other costs incurred for operating our terminals and power plants.
Previous report
Operations and maintenance increased by $41.9 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023. The increase was primarily due to additional lease cost for turbines leased to generate power at the Palo Seco Power Plant and San Juan Power Plant as part of the grid stabilization project in Puerto Rico. In addition, there were higher vessel operating costs included in Operations and maintenance as additional vessels started to support our terminal operations in 2024 as compared to the three months ended March 31, 2023.
Previous report
Vessel operating expenses for the three months ended March 31, 2024 were consistent with those incurred in the three months ended December 31, 2023.
Previous report
Selling, general and administrative increased $22.7 million for the three months ended March 31, 2024, compared to the three months ended December 31, 2023. During the quarter ended March 31, 2024, the Company recognized an additional allowance for uncollectible receivables of $11.6 million. The allowance reduces outstanding receivables for certain customers to reflect the amount that the Company expects to receive. We have also recognized $5.2 million of share-based compensation costs associated with RSUs issued. No significant allowance or share-based compensation costs were recognized during thethree months ended December 31, 2023.
Previous report
Selling, general and administrative increased by $18.6 million for three months ended March 31, 2024 as compared to the three months ended March 31, 2023. We incurred additional allowance for uncollectible receivables and share-based compensation costs associated with RSUs issued; no share based compensation expense or allowance was recognized in the first quarter of 2023. The remaining increase was due to additional professional fees incurred.
Previous report
Depreciation and amortization decreased by $11.7 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023. The decrease is primarily attributable to the end of the term of two acquired favorable charter contract intangibles in the fourth quarter of 2023, reducing amortization expense in the first quarter of 2024.
Previous report
The significant increase in Other expense recognized in the three months ended March 31, 2024 and December 31, 2023 was primarily due to unrealized foreign currency remeasurement losses in the first quarter of 2024 as compared to remeasurement gains in the fourth quarter of 2023.
Previous report
Other expense recognized in the three months ended March 31, 2023 was primarily comprised of a $37.4 million loss on disposal of Hilli equity method investment. This loss was partially offset by interest income, foreign currency remeasurement gains and gains on investments in equity securities.
Previous report
PortoCem BTG Loan
Previous report
We provided a parent company guarantee to the lenders under the PortoCem BTG Loan. The PortoCem BTG Loan contains usual and customary representations and warranties, usual and customary affirmative and negative covenants and events of default. No financial debt covenant compliance is required under this loan facility.
Previous report
In April 2024, we repaid the PortoCem BTG Loan with proceeds from a short term credit note.
Reworded paragraphs (68)
Previous wording
Unless the context otherwise requires, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.
Current wording
Unless the context indicates otherwise, references to “Company,” “NFE,” “we,” “our,” “us” or like terms refer to New Fortress Energy Inc. and its subsidiaries.
Previous wording
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers and from our own liquefaction facility in Miami, Florida. Upon the completion of commissioning in 2024, we expect to begin to source a portion of our LNG from our modular floating liquefaction facilities, which we refer to as "Fast LNG" or "FLNG." The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allows us to optimally manage our LNG supply
Current wording
Our Terminals and Infrastructure segment includes the entire production and delivery chain from natural gas procurement and liquefaction to logistics, shipping, facilities and conversion or development of natural gas-fired power generation. We currently source LNG from long-term supply agreements with third-party suppliers and from our own liquefaction facility in Miami, Florida. We expect to begin to source a portion of our LNG from our modular floating liquefaction facilities, which we refer to as "Fast LNG" or "FLNG." Our first FLNG facility began producing LNG in July 2024. Following the anticipated sale of our Miami Facility, we expect to continue sourcing LNG from third parties and for a portion of our supply to be generated by our first FLNG unit. The Terminals and Infrastructure segment includes all terminal operations in Jamaica, Puerto Rico, Mexico and Brazil, as well as vessels utilized in our terminal or logistics operations. We centrally manage our LNG supply and the deployment of our vessels utilized in our terminal or logistics operations, which allows us to optimally manage our LNG supply and fleet.
Previous wording
In March 2024, we completed a suite of transactions that included the sale of turbines and related equipment deployed to support the grid stabilization project to PREPA under an Asset Purchase Agreement ("APA"). The purchase price was $306.6 million, and the APA includes an option for PREPA to purchase three additional turbines for additional purchase price of $65.7 million. We recognized a loss of $77.5 million in Loss on sale of assets, net in the Condensed Consolidated Statements of Operations and Comprehensive Income.
Current wording
In March 2024, we completed a series of transactions that included the sale of turbines and related equipment deployed to support the grid stabilization project to PREPA under an Asset Purchase Agreement ("APA"). The purchase price was $306.6 million, and the APA includes an option for PREPA to purchase three additional turbines for additional purchase price of $65.7 million. We recognized a loss of $77.5 million in Loss on sale of assets, net in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss).
Previous wording
In the fourth quarter of 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). The La Paz Facility also supplies our gas-fired power units located adjacent to the La
Current wording
In the fourth quarter of 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the “La Paz Facility”). The La Paz Facility also supplies our gas-fired power units located adjacent to the La Paz Facility (the “La Paz Power Plant”) and could have a maximum capacity of up to 135MW of power. We placed the La Paz Power Plant into service in the third quarter of 2023.
Previous wording
Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 8,300 MMBtu of LNG per day and enables us to produce LNG for sales directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers.
Current wording
Our Miami Facility began operations in April 2016. This facility has liquefaction capacity of approximately 8,300 MMBtu of LNG per day and enables us to produce LNG for sales directly to industrial end-users in southern Florida, including Florida East Coast Railway via our train loading facility, and other customers throughout the Caribbean using ISO containers. On June 30, 2024, the Company entered into a definitive agreement to sell its Miami Facility for $62 million. The transaction is expected to close in the third quarter of 2024 subject to customary terms and conditions.
Previous wording
NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) additional LNG supply contracts expected to commence in 2027; 3) our Miami Facility; and 4) supply from our own Fast LNG production. We have secured commitments to purchase and receive physical delivery of LNG volumes for 100% of our expected committed volumes for each of our downstream terminals inclusive of our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility, Puerto Sandino Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027. Finally, we plan to commence production from our own Fast LNG facilities upon the completion of commissioning in 2024. We plan to expand that capacity when additional Fast LNG units come online.
Current wording
NFE provides reliable, affordable and clean energy supplies to customers around the world that we plan to satisfy through the following sources: 1) our current contractual supply commitments; 2) additional LNG supply contracts expected to commence in 2027; and 3) supply from our own Fast LNG production. We have secured commitments to purchase and receive physical delivery of LNG volumes for 100% of our expected committed volumes for each of our downstream terminals inclusive of our Montego Bay Facility, Old Harbour Facility, San Juan Facility, La Paz Facility, Puerto Sandino Facility, Barcarena Facility and Santa Catarina Facility. Additionally, we have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027. Finally, we plan to commence production from our own Fast LNG facilities, the first of which began to produce LNG in July 2024. We plan to expand that capacity when additional Fast LNG units come online.
Previous wording
exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production, we plan to further mitigate our exposure to variability in LNG prices. In 2022 and 2023, our revenue and results of operations have benefited from selling cargos into the global LNG market. As FLNG facilities commence production, our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.
Current wording
Natural gas and LNG markets have experienced unprecedented price volatility in recent years. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our exposure to fluctuations in natural gas prices as our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Additionally, with our own Fast LNG production, we plan to further mitigate our exposure to variability in LNG prices. In 2022 and 2023, our revenue and results of operations benefited from selling cargos into the global LNG market. As FLNG facilities commence production, our long-term strategy is to sell substantially all cargos produced to customers on a long-term, take-or-pay basis through our downstream terminals.
Previous wording
In August 2022, we completed a transaction(the “Energos Formation Transaction”)with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of 11 vessels to Energos in exchange for approximately$1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our consolidated balance sheet as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii)
Current wording
In August 2022, we completed a transaction(the “Energos Formation Transaction”)with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of eleven vessels to Energos in exchange for approximately$1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevent the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels continue to be recognized on our Consolidated Balance Sheet as Property, plant and equipment, and the proceeds are recognized as debt. Consistent with this treatment as a failed sale leaseback, (i) the third party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the costs of operating the vessels is included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.
Previous wording
Our projects currently under development include our development of a series of modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Barcarena Facility”) and power plant (“Barcarena Power Plant”) located in Pará, Brazil; our LNG terminal located on the southern coast of Brazil ("Santa Catarina Terminal"); our LNG terminal (“Ireland Facility”) and power plant in Ireland, and our first green hydrogen project ("ZeroPark I"). We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.
Current wording
Our projects currently under development include our development of a series of modular liquefaction facilities to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua (“Puerto Sandino Facility”); our LNG terminal (“Barcarena Facility”) and power plants (“Barcarena Power Plant” and "PortoCem Power Plant") located in Pará, Brazil; our LNG terminal located on the southern coast of Brazil ("Santa Catarina Terminal"); our LNG terminal (“Ireland Facility”) and power plant in Ireland, our first green hydrogen project ("ZeroPark I") and Klondike Digital Infrastructure, our newly-launched power and data center infrastructure business ("Klondike"). We are also in active discussions to develop projects in multiple regions around the world that may have significant demand for additional power, LNG and natural gas, although there can be no assurance that these discussions will result in additional contracts or that we will be able to achieve our target revenue or results of operations.
Previous wording
In the first quarter of 2023, we executed an agreement with CFE to supply natural gas for one FLNG unit located off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit will utilize CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. Our first FLNG unit has been installed and connected to the gas pipeline at Altamira, and we are in the process of commissioning the project.
Current wording
In the first quarter of 2023, we executed an agreement with CFE to supply natural gas for one FLNG unit located off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum (“MTPA”) FLNG unit will utilize CFE’s firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. Our first FLNG unit has been installed and connected to the gas pipeline at Altamira, and we are in the process of commissioning the project. While we experienced a delays in commissioning our first FLNG unit, which impacted our results of operations in this period and may impact our results in future periods, in July 2024, we began to produce LNG, and we expect to achieve run-rate production later in 2024.
Previous wording
We are developing an offshore liquefied natural gas receiving and storage facility off the coast of Puerto Sandino, Nicaragua, as well as an onshore regasification facility. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. As part of our long-term partnership with the local utility, we are evaluating solutions to optimize power generation efficiency and allow for additional electrical capacity in a market that is underserved. We expect to complete this optimization in 2024.
Current wording
We are developing a liquefied natural gas receiving, transloading and regasification facility in Puerto Sandino, Nicaragua, as well as a pipeline connecting the facility with our Puerto Sandino Power Plant. We have entered into a 25-year PPA with Nicaragua’s electricity distribution companies, and we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in connection with the 25-year power purchase agreement. As part of our long-term strategy, we are evaluating solutions to optimize power generation and delivery to other markets, connected to our power plant through a regional transmission line starting in 2025.
Previous wording
The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of processing over one million MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility. We substantially completed our Barcarena Facility in 2022 and expect to commence operations, including delivery to the Alunorte Alumina Refinery in the first half of 2024.
Current wording
The Barcarena Facility consists of an FSRU and associated infrastructure, including mooring and offshore and onshore pipelines. The Barcarena Facility is capable of processing over one million MMBtu from LNG per day and storing up to 160,000 cubic meters of LNG. We have entered into a 15-year gas supply agreement with a subsidiary of Norsk Hydro ASA for the supply of natural gas to the Alunorte Alumina Refinery in Pará, Brazil, through our Barcarena Facility. We substantially completed our Barcarena Facility in 2022 and expect to commence operations, including delivery to the Alunorte Alumina Refinery in the second half of 2024.
Previous wording
In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. ("PortoCem"), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior ("Ceiba Energy") in exchange for newly issued 4.8% NFE redeemable Series A Convertible Preferred Stock. PortoCem isthe owner of a 15-year 1.6GW power power purchase agreement in Brazil. We have received approvalto transfer the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE will build a power plant to supply the capacity reserve contract using gas from the Barcarena Facility. We expect to begin delivering electricity under the acquired capacity reserve contract in July 2026.
Current wording
In March 2024, we closed the acquisition of PortoCem Geração de Energia S.A. ("PortoCem"), a wholly-owned subsidiary of Ceiba Fundo de Investimento em Participações Multiestratégia- Investimento no Exterior ("Ceiba Energy") in exchange for newly issued 4.8% NFE redeemable Series A Convertible Preferred Stock. PortoCem isthe owner of a 15-year 1.6GW capacity reserve contract in Brazil. We have received approvalto transfer the 1.6 GW capacity reserve contract to a site owned by NFE that is adjacent to the Barcarena Facility, where NFE will build the PortoCem Power Plant to supply the capacity reserve contract using gas from the Barcarena Facility. We expect to begin delivering electricity under the acquired capacity reserve contract in July 2026.
Previous wording
The Santa Catarina Facility is located on the southern coast of Brazil and consists of an FSRU with a processing capacity of approximately 500,000 MMBtu from LNG per day and LNG storage capacity of up to 138,000 cubic meters. We are developing a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day. We expect to complete our Santa Catarina Facility and commence operations in the first half of 2024.
Current wording
The Santa Catarina Facility is located on the southern coast of Brazil and consists of an FSRU with a processing capacity of approximately 500,000 MMBtu from LNG per day and LNG storage capacity of up to 138,000 cubic meters. We have developed a 33-kilometer, 20-inch pipeline that connects the Santa Catarina Facility to the existing inland Transportadora Brasileira Gasoduto Bolivia-Brasil S.A. (“TBG”) pipeline via an interconnection point in the municipality of Garuva. The Santa Catarina Facility and associated pipeline are expected to have a total addressable market of 15 million cubic meters per day. We expect to complete commissioning of our Santa Catarina Facility and commence operations in the second half of 2024.
Previous wording
Our first clean hydrogen project, known as ZeroPark I, is located in Beaumont, Texas. The ZeroPark I facility is sited within a 10-mile radius of the two largest refineries in the western hemisphere and numerous petrochemical manufacturers, many of which require significant amounts of hydrogen for their businesses. ZeroPark I, as planned, could use up to 200 MW of power, constructed in two distinct phases, each using 100 MW of electrolysis technology. In total, ZeroPark I is expected to produce up to 86,000 kg of clean hydrogen per day, or approximately 31,000 TPA. We have commenced design, engineering and permitting for ZeroPark I and expect to commence operations on the first phase in the first half of 2025. Additionally, we have secured a binding offtake commitment for the clean hydrogen produced at ZeroPark I. Once completed, we expect ZeroPark I to be the largest green hydrogen plant in the United States.
Current wording
Our first clean hydrogen project, known as ZeroPark I, is located in Beaumont, Texas. The ZeroPark I facility is sited within a 10-mile radius of the two largest refineries in the western hemisphere and numerous petrochemical manufacturers, many of which require significant amounts of hydrogen for their businesses. ZeroPark I, as planned, could use up to 200 MW of power, constructed in two distinct phases, each using 100 MW of electrolysis technology. In total, ZeroPark I is expected to produce up to 86,000 kg of clean hydrogen per day, or approximately 31,000 TPA. We have commenced design, engineering and permitting for ZeroPark I and expect to commence operations on the first phase in 2025. Additionally, we have secured a binding offtake commitment for the clean hydrogen produced at ZeroPark I. Once completed, we expect ZeroPark I to be the largest green hydrogen plant in the United States.
Previous wording
Results of Operations – Three Months Ended March 31, 2024 compared to Three Months Ended December 31, 2023 and Three Months Ended March 31, 2023
Current wording
Results of Operations – Three Months Ended June 30, 2024 compared to Three Months Ended March 31, 2024 and Six Months Ended June 30, 2024 compared to Six Months Ended June 30, 2023
Previous wording
The tables below present our segment information for the three months ended March 31, 2024, December 31, 2023 and March 31, 2023:
Current wording
The tables below present our segment information for the three months ended June 30, 2024 and March 31, 2024, and for the six months ended June 30, 2024 and June 30, 2023:
Previous wording
(1) Cost of sales in our segment measure only includes realized gains and losses on derivative transactions that are economic hedges of our commodity purchases and sales. For the three months ended March 31, 2024, December 31, 2023 and March 31, 2023, Terminals and Infrastructure does not include unrealized mark-to-market gains (losses) of derivative transactions of $–, 1.5 million and $111.1 million, respectively. In the first quarter of 2023, a realized gain of $146.1 million were recognized as a reduction to Cost of sales in the segment measure.
Current wording
(1) Cost of sales in our segment measure only includes realized gains and losses on derivative transactions that are economic hedges of our commodity purchases and sales, and realized gains of $141.9 million for the six months ended June 30, 2023 were recognized as a reduction to Cost of sales in the segment measure. No such transactions were completed in 2024.
Previous wording
(2) Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Condensed Consolidated Statements of Operations and Comprehensive Income.
Current wording
(2) Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss).
Previous wording
(3) Consolidation and Other adjusts for the inclusion of the effective share of revenues, expenses and operating margin attributable to the Company's ownership of the common units of Hilli LLC in the segment measure, prior to the disposition to this investments, and exclusion of the unrealized mark-to-market gain or loss on derivative instruments.
Current wording
(3) Consolidation and Other adjusts for the inclusion of deferred earnings on contracted LNG sales of $90,000. The effective share of revenues, expenses and operating margin attributable to the Company's ownership of the common units of Hilli LLC in the segment measure, prior to the disposition to this investment, as well as unrealized mark-to-market gain or loss on derivative instruments, are also removed.
Previous wording
The decrease in revenue in the first quarter of 2024 when compared to the fourth quarter of 2023 was primarily attributable to decreases in the market price of natural gas. The average Henry Hub index pricing used to invoice our downstream customers decreased by 22% for the three months ended March 31, 2024 as compared to the three months ended December 31, 2023. Volumes delivered to downstream terminal customers decreased from 22.2 TBtus in the fourth quarter of 2023 to 22.0 TBtu in the first quarter of 2024.
Current wording
Additionally, volumes delivered to downstream terminal customers decreased from 22.0 TBtu in the first quarter of 2024 to 20.2 TBtu in the second quarter of 2024, which was primarily due to contract termination and maintenance in our Puerto Rico operations. The average Henry Hub index pricing used to invoice our downstream customers decreased by 15% for the three months ended June 30, 2024 as compared to the three months ended March 31, 2024.
Previous wording
Total revenue for the Terminals and Infrastructure Segment decreased by $47.3 million for the three months ended March 31, 2024 as compared to the three months ended December 31, 2023, and total revenue for the Terminals and Infrastructure Segment increased by $145.1 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023.
Current wording
Total revenue for the Terminals and Infrastructure Segment increased by $35.1 million for the six months ended June 30, 2024 as compared to the six months ended June 30, 2023, and the increase in revenue was primarily attributable to the following:
Previous wording
•The average Henry Hub index pricing used to invoice our downstream customers decreased by 35% for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023.
Current wording
•The average Henry Hub index pricing used to invoice our downstream customers decreased by 25% for the six months ended June 30, 2024 as compared to the six months ended June 30, 2023.
Previous wording
•The Company had no cargo sales for the three months ended March 31, 2024 as we were able to utilize all volumes under our supply contracts in our downstream terminal operations. Revenue from cargos sales was $349.3 million for the three months ended March 31, 2023.
Current wording
•The Company had $24.5 million in cargo sales for the six months ended June 30, 2024. Revenue from cargos sales was$617.1 million for the six months ended June 30, 2023
Previous wording
Cost of sales includes the procurement of feedgas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. Our LNG and natural gas supply are purchased from third parties or converted in our Miami Facility. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our Miami Facility are also included in Cost of sales. Starting in the third quarter of 2023, our subsidiary, Genera, began to provide operations and maintenance services to PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue.
Current wording
Cost of sales includes the procurement of feed gas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. Historically, our LNG and natural gas supply has been purchased from third parties or converted in our Miami Facility. Following the anticipated sale of our Miami Facility, we expect to continue sourcing LNG from third parties and for a portion of our supply to be generated by our first FLNG unit. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our liquefaction facilities are also included in Cost of sales. Starting in the third quarter of 2023, our subsidiary, Genera, began to provide operations and maintenance services to PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue.
Previous wording
Cost of sales increased by $155.3 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023, which was attributable to the following:
Current wording
Cost of sales increased by $154.8 million for the six months ended June 30, 2024 as compared to the six months ended June 30, 2023, which was attributable to the following activity:
Previous wording
•Realized gain of $146.1 from the settlement of a commodity swap transaction, entered into as an economic hedge to reduce the market risks associated with commodity prices, was included as reduction of cost of sales in the first quarter of 2023. For segment performance measures, unrealized mark to market gains and losses are excluded until settled. We had no settlements of commodity derivative transactions in the first quarter of 2024.
Current wording
•In the six months ended June 30, 2023, realized gains of $141.9 million from the settlement of commodity swap transactions, entered into as an economic hedge to reduce the market risks associated with commodity prices, were included as reduction of cost of sales in the segment measure. For segment performance measures, unrealized mark to market gains and losses are excluded until settled. No such transactions occurred in the current period.
Previous wording
•In the first quarter of 2024, we did not have any cargo sales and we delivered higher volumes to our downstream terminal customers in the current period as compared to the three months ended March 31, 2023. While we delivered more volumes to our downstream customers, our pricing to purchase LNG for delivery to such customers decreased to $6.96 per MMBtu for the three months ended March 31, 2024 from $7.23 per MMBtu for the three months ended March 31, 2023.
Current wording
•We incurred increased cost of LNG purchased from third parties for sale to our downstream customers of $71.1 million during the six months ended June 30, 2024 due to increased volumes delivered. We delivered 61% more volume to our downstream terminal customers in the current period. While we delivered significantly more volumes to our downstream customers, our pricing to purchase LNG for delivery to such customers was lower, decreasing to $6.65 per MMBtu for the six months ended June 30, 2024 from $7.66 per MMBtu for the six months ended June 30, 2023.
Previous wording
•We recognized additional payroll and other operating costs of $21.0 million to provide services under Genera's operations and maintenance contract; these costs are passed onto PREPA.
Current wording
•We recognized additional payroll and other operating costs of $47.6 million to provide services under Genera's operations and maintenance contract; these costs are passed onto PREPA. No such costs were incurred during the six months ended June 30, 2023 as our contract commenced on July 1, 2023.
Previous wording
The weighted-average cost of our LNG inventory balance to be used in our operations as of March 31, 2024 and December 31, 2023 was $7.10 per MMBtu and $7.33 per MMBtu, respectively.
Current wording
The weighted-average cost of our LNG inventory balance to be used in our operations as of June 30, 2024 and December 31, 2023 was $7.30 per MMBtu and $8.09 per MMBtu, respectively.
Previous wording
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. As of December 31, 2023 and March 31, 2024, three FSRUs and one LNG carrier were leased to customers under long-term arrangements.
Current wording
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. As of June 30, 2024, three FSRUs and one LNG carrier were leased to customers under long-term arrangements.
Previous wording
On March 15, 2023, we completed disposition of our investment in the common units of Hilli LLC, and after this point, the revenue, expenses and operating margin attributable to our 50% ownership of the Hilli are no longer included in our segment results. In the first quarter of 2024, we sold the vessel Mazo, for a total consideration of $22.4 million resulting in a gain of $0.4 million. The gain on sale is included in Loss on sale of assets, net, in the Condensed Consolidated Statements of Operations and Comprehensive Income.
Current wording
On March 15, 2023, we completed disposition of our investment in the common units of Hilli LLC, and after this point, the revenue, expenses and operating margin attributable to our 50% ownership of the Hilli are no longer included in our segment results. In the first quarter of 2024, we sold the vessel Mazo, for a total consideration of $22.4 million resulting in a gain of $0.4 million. The gain on sale is included in Loss on sale of assets, net, in the Condensed Consolidated Statements of Operations and Comprehensive Income (Loss).
Previous wording
Total revenue for the Ships segment decreased $20.7 million for the three months ended March 31, 2024 as compared to the three months ended December 31, 2023. Subsequent to the Energos Formation Transaction, we continue to be, for accounting purposes, the owner of certain vessels included in the transaction, and as such, we continue to recognize revenue from the charter of these vessels to third parties. The decrease in revenue was primarily driven by end of third-party charters of Winter and Princess during the fourth quarter of 2023.
Current wording
Total revenue for the Ships segment remained consistent for the three months ended June 30, 2024 as compared to thethree months ended March 31, 2024. Subsequent to the Energos Formation Transaction, we continue to be, for accounting purposes, the owner of certain vessels included in the transaction, and as such, we continue to recognize revenue from the charter of these vessels to third parties.
Previous wording
Total revenue for the Ships segment decreased $55.3 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023. After the disposition of our investment in the common units of Hilli LLC at the end of the first quarter of 2023, we no longer recognize revenue from the Hilli, decreasing revenue in the Ships segment. Additionally the charters for four vessels concluded in 2023, lowering vessel revenue for thethree months ended March 31, 2024. We are now utilizing these vessels in our operations.
Current wording
Total revenue for the Ships segment decreased $78.6 million for the six months ended June 30, 2024 as compared to the six months ended June 30, 2023. After the disposition of our investment in the common units of Hilli LLC at the end of the first quarter of 2023, we no longer recognize revenue from the Hilli, decreasing revenue in the Ships segment. Additionally the charters for four vessels concluded in 2023, lowering vessel revenue for the six months ended June 30, 2024. We are now utilizing these vessels in our operations.
Previous wording
Vessel operating expenses decreased $10.8 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023. The decrease in vessel operating expenses was primarily due to lower costs related to the Hilli after the disposition our investment in the common units of Hilli LLC at the end of the first quarter of 2023. During 2024, we started using four vessels that were in the Ships segment in 2023 in our terminal operations, resulting in lower vessel operating costs.
Current wording
Vessel operating expenses decreased$13.8 million for thesix months ended June 30, 2024 as compared to thesix months ended June 30, 2023. The decrease in vessel operating expenses was primarily due to lower costs related to the Hilli after the disposition our investment in the common units of Hilli LLC at the end of the first quarter of 2023. During 2024, we started using four vessels that were in the Ships segment in 2023 in our terminal operations, resulting in lower vessel operating costs.
Previous wording
The Company did not incur significant transaction and integration costs for the three months ended March 31, 2024, December 31, 2023 and March 31, 2023.
Current wording
We did not incur significant transaction and integration costs for the three or six months ended June 30, 2024 or six months ended June 30, 2023.
Previous wording
Depreciation and amortization increased by $16.1 million for the three months ended March 31, 2024 as compared to the three months ended March 31, 2023. The increase is primarily resulting from turbines placed into service as part of the grid stabilization project during the second and third quarters of 2023. In addition, the Company placed the La Paz power plant into service in September 2023.
Current wording
Depreciation and amortization increased $11.4 million for the six months ended June 30, 2024 as compared to the six months ended June 30, 2023. In 2023, we began to place assets in service as part of the grid stabilization project in Puerto Rico, including turbines leased for the Palo Seco Power Plant under a finance lease. The increase is primarily resulting from depreciation of the leasehold improvements that were placed into service during the second and third quarters of 2023, prior to the sale of these assets in the first quarter of 2024.
Previous wording
In December 2023, the Company recognized an impairment of $11.0 million in conjunction with the classification as held for sale of its vessel Mazo. There was no impairment of assets during three months ended March 31, 2024 or March 31, 2023.
Current wording
In December 2023, the Company recognized an impairment of$4.3 million in conjunction with the classification as the Miami Facility as held for sale in the second quarter of 2024. There was no impairment of assets during three months ended March 31, 2024 or six months ended June 30, 2023.
Previous wording
During the three months ended March 31, 2024, the Company recognized a loss of $77.5 million from the sale of turbines and related equipment to the PREPA. During the fourth quarter of 2023, we completed the sale of 100% of shares in two project companies in Brazil for a total gain of $21.5 million.
Current wording
During the three months ended March 31, 2024, the Company recognized a loss of $77.5 million from the sale of turbines and related equipment to the PREPA. We did not have any losses on sales during the three months ended June 30, 2024 or six months ended June 30, 2023.
Previous wording
Interest expense increased by $0.4 million for the three months ended March 31, 2024 as compared to the three months ended December 31, 2023. The increase was primarily due to new 2029 Notes (defined below).
Current wording
Interest expense increased by $3.1 million for the three months ended June 30, 2024 as compared to the three months ended March 31, 2024. We have incremental borrowings under the PortoCem Bridge Loan and our new Turbine Financing (each as defined below), and much of this increased interest expense was capitalized.
Showing the first 40 of 68 pairs. Open the source sections for the rest.
Rearranged previous paragraphs (8)
Previous report — wording carried elsewhere
Paz Facility (the “La Paz Power Plant”) and could have a maximum capacity of up to 135MW of power. We placed the La Paz Power Plant into service in the third quarter of 2023.
Previous report — wording carried elsewhere
Natural gas and LNG markets have experienced unprecedented price volatility in recent years. The majority of our LNG supply contracts are based on a natural gas-based index, Henry Hub, plus a contractual spread. We limit our
Previous report — wording carried elsewhere
such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.
Previous report — wording carried elsewhere
merger transaction, sale of a minority interest and/ or initial public offering. There can be no assurance that the exploration
Previous report — wording carried elsewhere
of capital raising and strategic alternatives will result in any agreements or transactions, or that, if completed, any
Previous report — wording carried elsewhere
agreements or transactions will be successful or on attractive terms.
Previous report — wording carried elsewhere
We carefully manage our contractual commitments, the related funding needs and our various sources of funding including cash on hand, cash flow from operations, and borrowings under existing and future debt facilities. We may also enter into other financing arrangements to generate proceeds to fund our developments.
Previous report — wording carried elsewhere
Lenders under the PortoCem BTG Loan waived acceleration requirements in the event of a change in control in conjunction with the PortoCem Acquisition, and repayment of the PortoCem BTG Loan is now required upon the earlier of PortoCem obtaining additional financing or the original maturity date of December 2024.