Vistra Corp
For the period ended Mar 31, 2025. Filed May 8, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2025 · Filed May 8, 2025
What changed in Risk Factors?
Read the current filingPrevious report: 10-Q
Period ended 2024-09-30; filed 2024-11-08.
0001692819-24-000069
Item 1A. Risk FactorsCurrent report: 10-Q
Period ended 2025-03-31; filed 2025-05-08.
0001692819-25-000035
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 23 previous paragraphs and 2 current paragraphs.
1 unchanged; 1 reworded; 0 added; 21 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Removed paragraphs (21)
Previous report
We may suffer material losses, costs and liabilities due to operation risks, regulatory risks, and the risk of nuclear accidents arising from the ownership and operation of the nuclear generation facilities.
Previous report
We own and operate nuclear generation facilities in Texas, Ohio, and Pennsylvania. The ownership and operation of nuclear generation facilities involves certain risks. These risks include:
Previous report
•unscheduled outages or unexpected costs due to equipment, mechanical, structural, cybersecurity, insider threat, third-party compromise or other problems;
Previous report
•the impairment of reactor operation and safety systems due to human error or force majeure;
Previous report
•the costs of, and liabilities relating to, storage, handling, treatment, transport, release, use and disposal of radioactive materials;
Previous report
•the costs of procuring nuclear fuel, including impacts from restrictions on imports from Russia or China (see Part I, Item 2. Management's Discussion and Analysis of Financial Condition, and Results of Operations – Significant Activities and Events, and Items Influencing Future Performance – Macroeconomic Conditions);
Previous report
•the costs of storing and maintaining spent nuclear fuel at our on-site dry cask storage facility;
Previous report
•terrorist or cybersecurity attacks by nation-states or other threat actors and the cost to protect and recover against any such attack;
Previous report
•financial risk associated with retrospective insurance premium that could become due under secondary coverage required by the Price Anderson Act;
Previous report
•limitations on the amounts and types of insurance coverage commercially available; and
Previous report
•uncertainties with respect to the technological and financial aspects of modifying or decommissioning nuclear facilities at the end of their useful lives.
Previous report
Our financial performance could be materially and negatively affected by matters arising from our ownership and operation of nuclear facilities, including any prolonged unavailability of any of our nuclear generation facilities. The following are among the more significant related risks:
Previous report
•Operational Risk — Operations at any generation facility could degrade to the point where the facility would have to be shut down. If such degradations were to occur at a nuclear generation facility, the process of identifying and correcting the causes of the operational downgrade to return the facility to operation could require significant time and expense, resulting in both lost revenue and increased fuel and purchased power expense to meet supply commitments. Furthermore, a shut-down or failure at any other nuclear generation facility could cause regulators to require a shut-down or reduced availability at our nuclear generation facilities.
Previous report
•Regulatory Risk — The NRC may modify, suspend or revoke licenses and impose civil penalties for failure to comply with the Atomic Energy Act, the regulations under it or the terms of the licenses of nuclear generation facilities. Unless extended, as to which no assurance can be given, the NRC operating license for the unit at the Perry Facility will expire in 2026, and is pending a license renewal application subject to review by the NRC. Changes in regulations by the NRC could require a substantial increase in capital expenditures or result in increased operating or decommissioning costs.
Previous report
•Spent Nuclear Fuel Storage. Our nuclear operations produce various types of nuclear waste materials, including spent nuclear fuel. The availability of a national repository for the storage of spent nuclear fuel and the timing of that facility opening will significantly affect the costs associated with storage of spent nuclear fuel and the ultimate amounts received from the DOE to reimburse us for these costs. Any regulatory action relating to the timing and availability of a repository for spent nuclear fuel could adversely affect our ability to decommission fully our nuclear units. We cannot predict whether a fee may be established or to what extent in the future for spent nuclear fuel disposal.
Previous report
•Decommissioning Obligation and Funding. NRC regulations require that licensees of nuclear generating facilities demonstrate reasonable assurance that funds will be available in certain minimum amounts at the end of the life of the facility to decommission the facility.
Previous report
Actual costs to decommission our nuclear facilities may substantially exceed our estimates as a result of changes in the approach and timing of decommissioning activities, changes in decommissioning costs, changes in federal or state regulatory requirements, other changes in our estimates or ability to effectively execute on our planned decommissioning activities.
Previous report
Forecasting trust fund investment earnings and costs to decommission nuclear generating stations requires significant judgment, and actual results could differ significantly from current estimates. In addition, financial market performance directly affects the asset values in the NDT trust funds. If the investments held by our PJM NDT funds are not sufficient to fund the decommissioning of our nuclear units, we could be required to take steps, such as providing financial guarantees through letters of credit or parent company guarantees or making additional contributions to the trusts, which could be significant, to ensure that the trusts are adequately funded and that current and future NRC minimum funding requirements are met.
Previous report
•Nuclear Accident Risk — Although the safety record of our nuclear generation facilities generally has been very good, accidents and other unforeseen problems have occurred at nuclear stations both in the U.S. and elsewhere. The consequences of an accident can be severe and include loss of life, injury, lasting negative health impacts and property damage. Any accident, or perceived accident, could result in significant liabilities that may exceed our resources, including insurance coverages, and could damage our reputation. Such liabilities to third parties are currently covered by a primary layer of financial protection required by the Price Anderson Act in the form of insurance carried by the owners of each nuclear facility and by a secondary layer of insurance coverage into which each nuclear licensee in the country is required to contribute in the event of an accident at any facility which exceeds the primary level of coverage for that facility. Our potential exposure for the secondary layer of coverage is currently capped at $165.9 million per reactor but is subject to adjustment for inflation, and the total retrospective premium per reactor per incident is capped at $24.7 million in any one year. Any such resulting liability from a nuclear accident could exceed our resources, including insurance coverage, and could ultimately result in the suspension or termination of power generation from the impacted facility. Such accidents could also result in property damage to our nuclear plant and equipment, which could exceed coverage available under insurance provided by Nuclear Electric Insurance Limited. If a serious nuclear incident were to occur, our business, reputation, financial condition and results of operations could be materially adversely affected.
Reworded paragraphs (1)
Previous wording
As of the date of this Quarterly Report on Form 10-Q, except as set forth below, there have been no material changes to the risk factors discussed in Part I, Item 1ARisk Factors in our 2023 Form 10-K. We could also be affected by additional factors that are not presently known to us or that we currently consider to be immaterial to our operations.
Current wording
As of the date of this Quarterly Report on Form 10-Q, there have been no material changes to the risk factors discussed in Part I, Item 1ARisk Factors in our 2024 Form 10-K. We could also be affected by additional factors that are not presently known to us or that we currently consider to be immaterial to our operations.