Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-05-31; filed 2025-07-02.
0001683168-25-004889
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 113 previous paragraphs and 123 current paragraphs.
46 unchanged; 52 reworded; 24 added; 13 removed; 2 previous and 1 current paragraphs rearranged.
Tables are not compared: 9 previous and 11 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (24)
Current report
Our business strategy generally involves the accumulation of bitcoin for long-term investment, whether acquired by our bitcoin mining operations or from the proceeds of capital raising transactions. From time to time, subject to market conditions, we intend to (i) issue debt or equity securities or engage in other capital raising transactions with the objective of using the proceeds to purchase bitcoin, and (ii) expand our bitcoin mining operations and retain any bitcoin we generate to the extent it exceeds our working capital requirements. We intend to fund further bitcoin acquisitions and mining expansion primarily through issuances of common stock and a variety of fixed-income instruments, including debt, convertible notes and preferred stock. We may also finance our mining expansion by conservatively leveraging our bitcoin holdings.
Current report
We view our bitcoin holdings as long-term holdings and expect to continue to accumulate bitcoin. We have not set any specific target for the amount of bitcoin we seek to hold and we will continue to monitor market conditions in determining whether to engage in additional financings to purchase additional bitcoin. This overall strategy also contemplates that we may (i) periodically sell bitcoin for general corporate purposes or in connection with strategies that generate tax benefits in accordance with applicable law, (ii) enter into additional capital raising transactions that are collateralized by our bitcoin holdings, and (iii) consider pursuing strategies to create income streams or otherwise generate funds using our bitcoin holdings.
Current report
Our bitcoin mining operations focus in the short-term on placing our new miners with third party hosting firms because we do not have the data center capacity to accommodate new miners. Hosting services include the provision of mining equipment and energized space and the monitoring, troubleshooting, and repair and maintenance of customer mining equipment. In the long-term, we plan to build data centers for our miners because we believe our total costs of operating the miners will be less. At present, we host approximately 9% of our fleet of miners and the remainder is hosted by third parties on a fee basis.
Current report
Through our Mining-as-a-Service (“MaaS”) business model, we deliver end-to-end mining infrastructure and management to companies seeking direct bitcoin mining exposure without the operational burden. Our MaaS strategy includes (i) hardware and infrastructure: this involves the sale or lease of mining machines, as well as full deployment support; (ii) operational management: this involves full fleet oversight, uptime maximization, and mining pool payout optimization; and (iii) financial and compliance support: this involves providing GAAP-aligned reporting tools and treasury integration guidance.
Current report
We also offer bitcoin treasury consulting services which help companies strategically integrate bitcoin into their corporate treasury operations. This service provides guidance on how to acquire, store, manage, and account for bitcoin, as well as risk management and hedging strategies.
Current report
We also engage in synthetic bitcoin mining through a dual approach: (i) we act as buyers when public miners pre-sell at discounted rates, and (ii) we pre-sell our own future hashrate (as defined below) to buyers and use the proceeds to fund new mining equipment without large upfront costs. Synthetic bitcoin mining is a model that allows participants to gain exposure to bitcoin mining rewards without operating physical mining hardware. Participants or buyers purchase a miner’s hashrate via a contract where they make a one-time payment (in either fiat currency or bitcoin) and receive daily bitcoin rewards for the duration of the contract. Essentially, participants or buyers aim to purchase hashrate at a discount to the expected future bitcoin payout.
Current report
Our Revenue Sources
Current report
Our approach to synthetic bitcoin mining is also a source of revenue for us; we act as buyers when public miners pre-sell at discounted rates, and we pre-sell our own future hashrate to buyers. We entered into a Hashrate Purchase Agreement with a third party on April 22, 2025, wherein they presold the hashrate from their miners to us for approximately $104,670. The contract is for one month and we are expecting to receive between $110,000 to $115,000 worth of bitcoin throughout the duration of the contract. We expect to continue this arrangement with the third party on a month-to-month basis; however, there can be no assurance that we will continue this arrangement.
Current report
We also earn revenue from our MaaS and bitcoin treasury consulting services. Through an agreement with KULR Technology Group, Inc. (“KULR”), we leased 3,000 bitcoin ASIC miners to KULR through December 30, 2025, for $3,200,000, with $1,600,000 paid upfront. KULR also engaged us for an $800,000 consulting agreement for one year, focused on bitcoin Mining-as-a-Service and bitcoin treasury strategy.
Current report
During the three months ended May 31, 2025, we generated $813,027 in bitcoin revenue from self-mining digital assets, compared to $1,187,758 of revenue from self-mining in the three months ended May 31, 2024. Mining revenues were negatively impacted somewhat by several factors during the period, including delays in installing approximately 300 newly acquired miners which experienced warranty issues, and the termination of our hosting agreement with Soluna SW, LLC as of April 30, 2025 which impacted 1,095 miners, and which resulted in a sale of 850 miners and downtime for the remaining miners which were moved to our Silverton, Texas location. Revenues were also impacted by a machine lease agreement of 2,500 of our miners from March 8, 2025 to May 7, 2025, and a second machine lease agreement of 3,000 of our miners which was effective as of May 16, 2025. Under both machine lease agreements, the lessee was entitled to all revenues from the leased miners, which resulted in lower bitcoin mining revenue for us, although the lower mining revenues were offset by higher lease revenues. Future revenues will be impacted by the May 16, 2025 machine lease agreement involving 3,000 of our miners, under which the lessee is entitled to receive all revenues from the machines through December 31, 2025 in consideration for aggregate lease payments of $3,200,000.
Current report
Mining revenues are impacted by fluctuations in the price of bitcoin and the difficulty index, which could either cause revenues to decrease or increase; however, the impact of those factors will be lessened through December 31, 2025 since a substantial portion of our mining capacity has been leased to a third party through that date for fixed lease payments totaling $3,200,000.
Current report
During the three months ended May 31, 2025 we generated $1,074,561 in lease revenue from our miners, all of which were generated from the two machine lease agreements described above. Under the March 2025 machine lease agreement, the lessee paid us $850,000 for all revenues generated from 2,500 of our miners from March 8, 2025 to May 7, 2025. Under the May 2025 machine lease agreement, the lessee agreed to pay us $3,200,000 for all revenues generated from 3,000 of our miners from May 16, 2025 to December 31, 2025.
Current report
We generated $35,068 of bitcoin consulting revenue during the three months ended May 31, 2025, as compared to $-0- during the three months ended May 31, 2024. All of our consulting revenue in 2025 was derived from one consulting agreement under which we are obligated to provide various operational, maintenance and consulting services from May 16, 2025 to May 15, 2026 for aggregate consideration of $800,000, of which half was paid on May 16, 2025.
Current report
Cost of sales were $1,560,985 in the three months ended May 31, 2025, compared to $1,003,305 in the three months ended May 31, 2024.
Current report
Cost of sales related to consulting services was $7,500 for the three months ended May 31, 2025 and $-0- for the three months ended May 31, 2024. Cost of sales for consulting services consists primarily of an allocation of a percentage of the labor costs of the employees who provide the consulting services.
Current report
During the nine months ended May 31, 2025, we generated $2,814,133 in bitcoin revenue from self-mining digital assets, compared to $2,378,507 of revenue from self-mining in the nine months ended May 31, 2024. Mining revenues were positively impacted during the 2025 period as a result of the purchase of 3,000 ASIC miners in November 2024, most of which were installed in December 2024. Mining revenues were somewhat negatively impacted by several factors during the period, including delays in installing approximately 300 newly acquired miners which experienced warranty issues, and the termination of our hosting agreement with Soluna SW, LLC as of April 30, 2025 which impacted 1,095 miners, and which resulted in a sale of 850 miners and downtime for the remaining miners which were moved to our Silverton, Texas location. Revenues were also impacted by a machine lease agreement of 2,500 of our miners from March 8, 2025 to May 7, 2025, and a second machine lease agreement of 3,000 of our miners which was effective as of May 16, 2025. Under both machine lease agreements, the lessee was entitled to all revenues from the leased miners, which resulted in lower bitcoin mining revenue for us, although the lower mining revenues were offset by higher lease revenues. Future revenues will be impacted by the May 16, 2025 machine lease agreement involving 3,000 of our miners, under which the lessee is entitled to receive all revenues from the machines through December 31, 2025 in consideration for aggregate lease payments of $3,200,000.
Current report
Mining revenues are impacted by fluctuations in the price of bitcoin and the difficulty index, which could either cause revenues to decrease or increase; however, the impact of those factors will be lessened through December 31, 2025 since a substantial portion of our mining capacity has been leased to a third party through that date for fixed lease payments totally $3,200,000.
Current report
During the nine months ended May 31, 2025 we generated $1,074,561 in lease revenue from our miners, all of which were generated from the two machine lease agreements described above. Under the March 2025 machine lease agreement, the lessee paid us $850,000 for all revenues generated from 2,500 of our miners from March 8, 2025 to May 7, 2025. Under the May 2025 machine lease agreement, the lessee agreed to pay us $3,200,000 for all revenues generated from 3,000 of our miners from May 16, 2025 to December 31, 2025.
Current report
We generated $35,069 of bitcoin consulting revenue during the three months ended May 31, 2025, as compared to $-0- during the three months ended May 31, 2024. All of our consulting revenue in 2025 was derived from one consulting agreement under which we are obligated to provide various operational, maintenance and consulting services from May 16, 2025 to May 15, 2026 for aggregate consideration of $800,000, of which half was paid on May 16, 2025.
Current report
Cost of sales were $3,854,316 in the nine months ended May 31, 2025, compared to $1,978,522 in the nine months ended May 31, 2024.
Current report
Cost of sales related to consulting services was $7,500 for the three months ended May 31, 2025 and $-0- for the three months ended May 31, 2024. Cost of sales for consulting services consists primarily of an allocation of a percentage of the labor costs of the employees who provide the consulting services.
Current report
We also reached an agreement with IDI in January 2025, which closed simultaneous with the closing of the public offering, under which
Current report
On June 30, 2025, we entered into a Securities Purchase Agreement with a number of institutional investors to sell up to 55,555,556 shares of common stock (or prefunded warrants exercisable to acquire common stock) at a price of $4.50 per share in a private placement. The expected aggregate proceeds are approximately $250 million before deducting placement agent fees and other offering expenses. The proceeds will be used to implement an Ethereum treasury strategy in the public equity markets. We intend to use the funds to acquire the native cryptocurrency of Ethereum blockchain commonly referred to as “ETH” and the establishment of our treasury operations. ETH will serve as our primary treasury reserve asset. Closing is subject to the approval of the transaction by the NYSE American Exchange.
Current report
Cash flows provided by operating activities in the in the nine months ended May 31, 2025 compared to the same period in 2024 were adversely affected by the following material factors:
Removed paragraphs (13)
Previous report
Since July 2021, our business has been as a blockchain technology company that is building out industrial scale digital asset mining, equipment sales and hosting operations. Our primary business is hosting third-party equipment used in mining of digital asset coins and tokens, specifically bitcoin, as well as self-mining for our own account. Our state-of-the-art facilities will be specifically designed and constructed for housing advanced mining equipment. Our existing data centers provide power, racks, proprietary thermodynamic management (heat dissipation and airflow management), redundant connectivity, and security, as well as software which provides infrastructure management and custom firmware that boosts performance and energy efficiency.
Previous report
Our digital asset mining operation is focused on the generation of digital assets by solving complex cryptographic algorithms to validate transactions on specific digital asset network blockchains, which is commonly referred to as “mining.” Mining requires the use of specialized computers equipped with application-specific integrated circuit (ASIC) chips (known as “miners”) to solve complex cryptographic algorithms in support of the bitcoin blockchain (in a process known as “solving a block”) in exchange for digital asset rewards (to date, only bitcoin). Whether we are hosting our client’s computers or mining for our own account with our own computers, the miners participate in “mining pools” organized by “mining pool operators” in which we or our clients share mining power (known as “hash rate”) with the hash rate generated by other miners participating in the pool to earn digital asset rewards. The mining pool operator provides a service that coordinates the computing power of the independent mining enterprises participating in the mining pool. Fees are paid to the mining pool operator to cover the costs of maintaining the pool. The pool uses software that coordinates the pool members’ mining power, identifies new block rewards, and records how much hash rate each participant contributes to the pool. We only use mining pools that pay rewards under the Full-Pay-Per-Share Method, which pays pool participants based on the hashing power contribution to the pool each day times the difficulty index (the “Full-Pay-Per-Share Method”). Even though we plan to effect our self-mining operations in data centers that we own, we reserve the right to operate miners in third-party data centers when we receive advantageous terms and/or do not have sufficient capacity in our own data centers.
Previous report
Our digital asset self-mining activity competes with a myriad of mining operations throughout the world to complete new blocks in the blockchain and earn the reward in the form of an established unit of a digital asset. Revenue from digital asset mining and hosting third party digital asset miners is impacted by volatility in bitcoin prices, as well as increases in the bitcoin blockchain’s network hash rate resulting from the growth in the overall quantity and quality of miners working to solve blocks on the bitcoin blockchain and the difficulty index associated with the secure hashing algorithm employed in solving the blocks. Gross profits from digital asset mining are primarily impacted by the cost of electricity to operate the miners and to a lesser extent by other operating costs. While we expect to sell or exchange a portion of the digital assets we mine to fund our growth strategies or for general corporate purposes, we reserve the right to hold our digital assets as a long-term investment.
Previous report
As the demand for digital assets increases and digital assets become more widely accepted, there is an increasing demand for professional-grade, scalable infrastructure to support growth of the blockchain ecosystem. We expect to continually evaluate the performance of our data centers, including our ability to access additional megawatts of electric power and to expand our total self-mining and customer and related party hosting hash rates.
Previous report
While our TSTT site was delayed pending electrification, we entered into a hosting agreement with a third party in Trinidad to host up to 192 miners in one immersion container until December 31, 2024. We had previously sold two containers to the third party under a long-term note secured by the containers. In July 2024, we foreclosed on the containers as a result of a default by the third party on the note. We moved our miners to our existing TSTT site, where we now have 340 operational miners as of February 28, 2025, of which 315 were in operation, and 100 miners in transit to the site. We are currently evaluating other TSTT sites as a location for the two repossessed immersion containers, and expect to install them in the first calendar quarter of 2025.
Previous report
During the three months ended February 28, 2025, we generated $1,517,422 in bitcoin revenue from self-mining digital assets, compared to $861,613 of revenue from self-mining in the three months ended February 29, 2024. As of February 28, 2025, we owned 4,640 miners that were operable, of which 4,204 were deployed for self-mining. Of the remaining 436 miners, 403 have been delivered to our Trinidad and Silverton, Texas locations for installation and the remaining 33 were offline due to maintenance issues. The number of undeployed miners was mainly impacted by 403 miners that were purchased in November 2024 but were not installed immediately when they failed initial warranty testing and had to be replaced with conforming miners or repaired. Mining revenue should be higher in future periods as we begin to receive revenues from the miners that were not operating as of February 28, 2025. On the other hand, mining revenues will be impacted by fluctuations in the price of bitcoin and the difficulty index, which could either cause revenues to decrease or increase.
Previous report
On April 8, 2025, Soluna SW, LLC, which hosts 1,095 ASIC miners for us at its Murray, Kentucky location, elected not to renew its hosting agreement with us on the existing terms. The scheduled termination date is April 30, 2025. We are evaluating our options to enter into a new agreement with Soluna on less favorable terms, move our ASIC miners to an alternative hosting provider or sell the ASIC miners. The ASIC miners currently generate approximately $300,000 per quarter in mining revenue based on the price of bitcoin and the difficulty index as of February 28, 2025. If we elect to renegotiate our hosting agreement with Soluna, our revenues will not be impacted but our operating margin from the miners will be decreased. If we elect to move the ASIC miners to a new location, our revenues in the next one or two quarters could be adversely impacted due to the downtime that would occur. If we elect to sell the miners, our revenues in future periods will be reduced accordingly.
Previous report
Cost of sales were $1,212,706 in the three months ended February 28, 2025, compared to $567,991 in the three months ended February 29, 2024.
Previous report
During the six months ended February 28, 2025, we generated $2,001,105 in bitcoin revenue from self-mining digital assets, compared to $1,190,749 of revenue from self-mining in the six months ended February 29, 2024. As of February 28, 2025, we owned 4,640 miners that were operable, of which 4,204 were deployed for self-mining. Of the remaining 436 miners, 403 have been delivered to our Trinidad and Silverton, Texas locations for installation and the remaining 33 were offline due to maintenance issues. The number of undeployed miners was mainly impacted by 403 miners that were purchased in November 2024 but were not installed immediately when they failed initial warranty testing and had to be replaced with conforming miners or repaired. Mining revenue should be higher in future periods as we begin to receive revenues from the miners that were not operating as of February 28, 2025. On the other hand, mining revenues will be impacted by fluctuations in the price of bitcoin and the difficulty index, which could either cause revenues to decrease or increase.
Previous report
On April 8, 2025, Soluna SW, LLC, which hosts 1,095 ASIC miners for us at its Murray, Kentucky location, elected not to renew its hosting agreement with us on the existing terms. The scheduled termination date is April 30, 2025. We are evaluating our options to enter into a new agreement with Soluna on less favorable terms, move our ASIC miners to an alternative hosting provider or sell the ASIC miners. The ASIC miners currently generate approximately $300,000 per quarter in mining revenue based on the price of bitcoin and the difficulty index as of February 28, 2025. If we elect to renegotiate our hosting agreement with Soluna, our revenues will not be impacted but our operating margin from the miners will be decreased. If we elect to move the ASIC miners to a new location, our revenues in the next one or two quarters could be adversely impacted due to the downtime that would occur. If we elect to sell the miners, our revenues in future periods will be reduced accordingly.
Previous report
Cost of sales were $2,293,331 in the six months ended February 28, 2025, compared to $975,217 in the six months ended February 29, 2024.
Previous report
In December 2024 a majority of our shareholders, acting by written consent, approved a resolution approving a reverse stock split in the range of 1-for-5 through 1-for-30, as determined by our board of directors at a later date. After dissemination of an information statement relating to the shareholder action, the reverse split resolution became effective in January 2025. We are currently working with ThinkEquity to determine an appropriate reverse stock split ratio to complete the offering and obtain approval for our shares to be listed on an exchange.
Previous report
If the ThinkEquity-led public offering is successful, we have reached an agreement with IDI to restructure its loan as follows:
Reworded paragraphs (52)
Previous wording
The following discussion and analysis of the results of our operations and financial condition for the three and six months ended February 28, 2025 and February 29, 2024, should be read in conjunction with the other sections of this Quarterly Report, including the Financial Statements and notes thereto of included in this Quarterly Report. The various sections of this discussion contain forward-looking statements, all of which are based on our current expectations and could be affected by the uncertainties and risk factors described throughout this Quarterly Report as well as other matters over which we have no control. See “Cautionary Note Regarding Forward-Looking Statements.” Our actual results may differ materially. We do not undertake any obligation to update forward-looking statements to reflect events or circumstances occurring after the date of this Quarterly Report.
Current wording
The following discussion and analysis of the results of our operations and financial condition for the three and nine months ended May 31, 2025 and May 31, 2024, should be read in conjunction with the other sections of this Quarterly Report, including the Financial Statements and notes thereto of included in this Quarterly Report. The various sections of this discussion contain forward-looking statements, all of which are based on our current expectations and could be affected by the uncertainties and risk factors described throughout this Quarterly Report as well as other matters over which we have no control. See “Cautionary Note Regarding Forward-Looking Statements.” Our actual results may differ materially. We do not undertake any obligation to update forward-looking statements to reflect events or circumstances occurring after the date of this Quarterly Report.
Previous wording
We plan to operate our data centers using immersion cooling technology. Immersion cooling is the process of submerging computer components (or full servers) in a thermally, but not electrically, conductive liquid (dielectric coolant) allowing higher heat transfer performance than air and many other benefits. Manufacturers of immersion systems report that immersion cooling, as compared to air cooling, can reduce the energy costs associated with cooling a data center by up to 90% and can reduce the cost of operating servers by up to 10%. In addition, manufacturers of immersion systems report the cooler, dust-free environment provided by immersion cooling can extend the life of data center equipment when compared to an air-cooled environment.
Current wording
The data centers that we build use immersion cooling technology. Immersion cooling is the process of submerging computer components (or full servers) in a thermally, but not electrically, conductive liquid (dielectric coolant) allowing higher heat transfer performance than air and many other benefits. Manufacturers of immersion systems report that immersion cooling, as compared to air cooling, can reduce the energy costs associated with cooling a data center by up to 90% and can reduce the cost of operating servers by up to 10%. In addition, manufacturers of immersion systems report the cooler, dust-free environment provided by immersion cooling can extend the life of data center equipment when compared to an air-cooled environment.
Previous wording
The primary factors that will impact proprietary mining revenues include: (i) the price of bitcoin; (ii) the completion of operational facilities to provide us with a cost-effective facility to operate in; (iii) the availability of attractive electricity prices, since power usage is the primary marginal cost for any mining operation; and (iv) the availability of mining equipment suitable for our immersion hosting environment at attractive prices and available capacity in our hosting facilities.
Current wording
We generate revenues primarily from proprietary mining of bitcoin, consisting of our share of rewards from solving a block and transaction fees. Our digital asset self-mining activity competes with a myriad of mining operations throughout the world to complete new blocks in the blockchain and earn the reward in the form of an established unit of a digital asset. The primary factors that impact proprietary mining revenues include: (i) the price of bitcoin; (ii) the efficiency of our miners relative to that of our competitors; (iii) the availability of attractive electricity prices since power usage is the primary marginal cost for any mining operation; (iv) the availability of mining and immersion hosting equipment at attractive prices; and (v) whether we have available capacity for mining in our data center facilities or are required to use third party hosting firms for our miners.
Previous wording
The primary factors that will impact future hosting revenues include: (i) the price of bitcoin, since hosting revenues are primarily a percentage of bitcoin mined by clients; (ii) the completion of operational hosting facilities, as potential hosting clients have been reluctant to sign contracts prior to the date we have a fully operational hosting facility; and (iii) the availability of attractive electricity prices, since power usage is the primary marginal cost for any mining operation.
Current wording
We have occasionally earned hosting revenues by hosting third party miners when we had spare capacity in our hosting facilities described below. The primary factors that impact future hosting revenues include: (i) the price of bitcoin, since hosting revenues are primarily a percentage of bitcoin mined by clients; (ii) the completion of operational hosting facilities as potential hosting clients have been reluctant to sign contracts prior to the date we have a fully operational hosting facility; and (iii) the availability of attractive electricity prices since power usage is the primary marginal cost for any mining operation. At the present time, we do not have any hosting clients and are not marketing our services to hosting clients.
Previous wording
Revenues from cryptocurrency mining, whether derived from hosting clients or from proprietary mining, are impacted significantly by volatility in bitcoin prices, as well as increases in the bitcoin blockchain’s network hash rate resulting from the growth in the overall quantity and quality of miners working to solve blocks on the bitcoin blockchain and the difficulty index associated with the secure hashing algorithm employed in solving the blocks. Below are changes in key metrics effecting the profitability of mining bitcoin during the six months ended February 28, 2025:
Current wording
Revenues from cryptocurrency mining, whether derived from hosting clients or from proprietary mining, are impacted significantly by volatility in bitcoin prices, as well as increases in the bitcoin blockchain’s network hash rate resulting from the growth in the overall quantity and quality of miners working to solve blocks on the bitcoin blockchain and the difficulty index associated with the secure hashing algorithm employed in solving the blocks. Below are changes in key metrics effecting the profitability of mining bitcoin during the nine months ended May 31, 2025:
Previous wording
We initially decided to locate our initial facilities in Trinidad, because it has some of the cheapest electricity in the world due to its abundant supplies of oil and gas and because some of our technical staff is located there. We have entered into an agreement with Telecommunications Services of Trinidad & Tobago Limited (“TSTT”), the largest and oldest telecom company in Trinidad, to co-locate up to 125 800 kW containers for hosting digital asset miners. TSTT has numerous potential locations for co-location of our containers. Under the agreement, we have the option, but not the obligation, to co-locate containers at our own pace. We pay a fixed amount per container, plus the actual electricity costs incurred by our containers in the amount billed to TSTT by the local utility without any markup. The term of the agreement expires on October 14, 2031. We have the right to terminate our agreement with TSTT at any time that the price for electricity consumption exceeds $0.05 per kWh.
Current wording
We have entered into an agreement with Telecommunications Services of Trinidad & Tobago Limited (“TSTT”), the largest and oldest telecom company in Trinidad, to co-locate up to 125 800 kilowatt (“kW”) containers for hosting digital asset miners. TSTT has numerous potential locations for co-location of our containers. Under the agreement, we have the option, but not the obligation, to co-locate containers at our own pace. We pay a fixed amount per container, plus the actual electricity costs incurred by our containers in the amount billed to TSTT by the local utility without any markup. The agreement provides that our hosting containers will be billed for electricity usage at the local utility’s standard rate which is the greater of 3.5 cents per kilowatt hour (“kWh”) or 75% of the declared reserve capacity, which is equal to the customer’s highest expected monthly kilovolt-ampere demand at $7.40. The term of the agreement expires on October 14, 2031. We have the right to terminate our agreement with TSTT at any time that the price for electricity consumption exceeds $0.05 per kWh. Also, both parties have the right to terminate the agreement on one month’s notice to the other party in either the third or sixth year of the term.
Previous wording
We are also leasing space from a third party on an at will basis to co-host 60 miners, for which we pay a flat rate of $0.06 per kWh for the electricity used by our miners. We ultimately intend to move all of our Trinidad miners to our TSTT hosting facilities.
Current wording
We have one site with two containers operational in Trinidad. As of the date of this prospectus, we had 465 miners located at the site, of which 315 were in operation. We have two additional unused containers in Trinidad and are evaluating other TSTT sites as a location for those containers. We are also leasing space from a third party under an oral at-will agreement to co-host 60 miners for which we pay a flat rate of $0.06 per kWh each month. We ultimately intend to move all of our miners in Trinidad to our TSTT hosting facilities.
Previous wording
In October 2022, we entered into a joint venture arrangement with ROC Manager to jointly develop and operate a bitcoin mining operation in Pecos, Texas. Under the joint venture, we contributed one immersion container, six transformers, and cash with an aggregate value of $987,429 as a capital contribution to ROC Digital. An affiliate of ROC Manager also contributed an immersion container. We simultaneously sold ROC Digital four immersion containers for $1,200,000, which is payable pursuant to a promissory note that bears interest at 5% per annum, and is payable through monthly payments of $31,203.64 per month until May 31, 2026. We own approximately 30% of ROC Digital, and 33 1/3% of ROC Manager.
Current wording
In October 2022, we entered into a joint venture arrangement with ROC Manager to jointly develop and operate a bitcoin mining operation in Pecos, Texas. Under the joint venture, we contributed one immersion container, six transformers, and cash with an aggregate value of $987,429 as a capital contribution to ROC Digital. An affiliate of ROC Manager also contributed an immersion container. We simultaneously sold ROC Digital four immersion containers for $1,200,000, which is payable pursuant to monthly amortizing payments with interest at 5% per annum through May 31, 2026. The note is secured by the equipment that was sold. As of May 31, 2024 the principal and interest due on the note receivable from ROC Digital was $592,870. We own approximately 30% of ROC Digital, and 33 1/3% of ROC Manager.
Previous wording
The Texas site became fully electrified in June 2023 and has six containers owned by the joint venture. The joint venture initially filled its six immersion containers with ASIC miners provided by hosting clients, although most of the hosting clients’ agreements terminated in April 2024. Currently, approximately five of the hosting containers owned by the joint venture are fully or partially occupied by clients, and the joint venture is aggressively trying to fill the remaining capacity with hosting clients. The joint venture also owns two immersion containers which are not installed, which we expect the joint venture to install if hosting demand warrants.
Current wording
The site became fully electrified in June 2023 and has six containers owned by the joint venture. The joint venture initially filled its six immersion containers with ASIC miners provided by hosting clients, although most of the hosting clients’ agreements terminated in April 2024. Currently, approximately five of the hosting containers owned by the joint venture are fully or partially occupied by clients, and the joint venture is aggressively trying to fill the remaining capacity with hosting clients. The joint venture also owns two immersion containers which are not installed, which we expect the joint venture to install if hosting demand warrants.
Previous wording
We have entered into a hosting agreement with ROC Digital under which we have located one immersion container at our Pecos, Texas data center. We pay $500 per month, plus our pro rata share of electricity, internet, and insurance for the site. The hosting agreement has a term of one year, subject to our right to renew the agreement for two one-year terms after receipt of notice of the renewal terms of ROC Digital’s electricity supply agreement for the upcoming year. In April 2024, we renewed the hosting agreement for an additional year. As of February 28, 2025, we had deployed 145 Antminer S-19 pro miners to our hosting container at the site.
Current wording
We have entered into a hosting agreement with ROC Digital under which we have located one immersion container at our Pecos, Texas data center. We pay $500 per month, plus our pro rata share of electricity, internet, and insurance for the site. The hosting agreement has a term of one year, subject to our right to renew the agreement for two one-year terms after receipt of notice of the renewal terms of ROC Digital’s electricity supply agreement for the upcoming year. In April 2025, we renewed the hosting agreement for an additional year running from May 2025 to April 2026. As of May 31, 2025, we had deployed 145 Antminer S-19 pro miners to our hosting container at the site.
Previous wording
On April 29, 2024, ROC Digital executed an energy services agreement for the site that runs from May 1, 2024 to April 30, 2025. Under the current agreement, the site will receive electricity at the prevailing rate plus $0.0055 per kWh. ROC Digital is not obligated to purchase any specific quantity of electricity, and employs software which automatically discontinues mining operations when the prevailing rate exceeds certain levels.
Current wording
Effective on April 30, 2025, ROC Digital executed an energy services agreement for the site that runs from May 1, 2025 to April 30, 2027. Under the current agreement, the site will receive electricity at the prevailing rate plus $0.00449 per kWh. ROC Digital is not obligated to purchase any specific quantity of electricity, and employs software which automatically discontinues mining operations when the prevailing rate exceeds certain levels.
Previous wording
On October 4, 2023, we purchased 1,050 used ASIC miners from Luxor Technology Corporation (“Luxor”) for $488,775, and on October 9, 2023 we entered into a Co-Location Services Agreement to host the miners at a hosting facility owned by Soluna SW, LLC (“Soluna”) in Murray, Kentucky. We subsequently added 45 ASIC miners in May 2024 that we purchased from Soluna for $10,000. The hosting agreement terminates on April 8, 2025, provided that the hosting agreement will continue after the termination date on a month-to-month basis if neither party sends a notice of termination at least 30 days before its scheduled termination date. The hosting agreement provides that we are obligated to reimburse Soluna for the actual cost of the electricity used by our machines and pay a hosting fee equal to 50% of the net profit generated by the machines each month. The hosting fee is payable in bitcoin. The hosting facility has an electricity cost of $0.025 per kWh and guarantees uptime of 83% per week.
Current wording
On October 9, 2023, we entered into a hosting agreement with Soluna SW, LLC to host 1,095 ASIC miners at its data center at its Murray, Kentucky location. The hosting agreement had a term through April 8, 2025. The hosting agreement provides that we are obligated to reimburse Soluna for the actual cost of the electricity used by our machines and pay a hosting fee equal to 50% of the net profit generated by the machines each month. The hosting fee is payable in bitcoin under certain circumstances. On April 8, 2025, Soluna SW, LLC, elected not to renew its hosting agreement with us on the existing terms, and on April 30, 2025, we terminated our engagement with Soluna SW, LLC. We sold 850 of the ASIC miners hosted by Soluna, SW LLC to a third party for $120,000 and moved the remaining 245 to the Silverton, Texas location.
Previous wording
On November 14, 2024, we acquired 3,000 S-19j Pro computers from Luxor Technology Corporation for $1,035,000. On December 3, 2024, we entered into a hosting agreement with DVSL ComputeCo, LLC to host 2,900 miners at its location. The hosting agreement terminates on December 2, 2025, provided that the hosting agreement will continue after the termination date on a month-to-month basis if neither party sends a notice of termination at least 30 days before its scheduled termination date. The hosting agreement provides that we are obligated to reimburse the DVSL for the actual cost of the electricity used by our machines plus 1.6 cents per kWh, and pay a hosting fee equal to 50% of the net profit generated by the machines each month. All 3,000 computers were shipped to DVSL’s hosting site in Silverton, Texas, for warranty testing, with 2,900 to remain in Silverton, Texas and 100 to be shipped to our Trinidad data center upon the completion of testing. As of April 9, 2025, approximately 2,597 of the acquired miners were operating, while approximately 300 did not satisfy the warranty and will be replaced with comparable miners.
Current wording
On December 3, 2024, we entered into a hosting agreement with DVSL ComputeCo, LLC to host 2,900 ASIC miners at its Silverton, Texas location. The hosting agreement terminates on December 2, 2025, provided that the hosting agreement will continue after the termination date on a month-to-month basis if neither party sends a notice of termination at least 30 days before its scheduled termination date. The hosting agreement provides that we are obligated to reimburse DVSL for the actual cost of the electricity used by our machines plus 1.6 cents per kWh, and pay a hosting fee equal to 50% of the net profit generated by the machines each month. As of the date of this prospectus, we had 3,145 miners at the site.
Previous wording
During the three months ended February 28, 2025, we generated $1,517,422 of revenue, compared to $891,613 of revenue in the three months ended February 29, 2024.
Current wording
During the three months ended May 31, 2025, we generated $2,051,857 of revenue, compared to $1,224,992 of revenue in the three months ended May 31, 2024.
Previous wording
During the three months ended February 28, 2025, we generated $-0- in revenue from equipment sales, compared to $20,471 in revenue from equipment sales in the three months ended February 29, 2024.
Current wording
During the three months ended May 31, 2025, we generated $129,200 in revenue from equipment sales, compared to $20,470 in revenue from equipment sales in the three months ended May 31, 2024.
Previous wording
During the three months ended February 28, 2025 and February 29, 2024, we did not record any revenues from sales of equipment recorded under the “completed sale” method.
Current wording
During the three months ended May 31, 2025, we recorded $129,200 in revenues from the sale of 850 ASIC miners under the “completed sale” method. During the three months ended May 31, 2024, we did not record any revenues from sales of equipment recorded under the “completed sale” method.
Previous wording
We generated $-0- in revenues from hosting in the three months ended February 28, 2025, as compared to $10,116 in hosting revenues in the three months ended February 29, 2024. We terminated all of our hosting clients in the fourth quarter of fiscal 2024, and did not have any hosting clients during the three months ended February 28, 2025. In the current market environment, we believe self-mining is more profitable than hosting third party miners, however we will pursue hosting opportunities on a selective basis. While we still see good opportunities to acquire mining equipment at attractive prices, the price of mining equipment has recently increased with the recent increase in the price of bitcoin.
Current wording
We generated $-0- in revenues from hosting in the three months ended May 31, 2025, as compared to $16,762 in hosting revenues in the three months ended May 31, 2024. We terminated all of our hosting clients in the fourth quarter of fiscal 2024, and did not have any hosting clients during the three months ended May 31, 2025. In the current market environment, we believe self-mining is more profitable than hosting third party miners, however we will pursue hosting opportunities on a selective basis. While we still see good opportunities to acquire mining equipment at attractive prices, the price of mining equipment has recently increased with the recent increase in the price of bitcoin.
Previous wording
Cost of sales related to mining was $1,212,706 in the three months ended February 28, 2025, compared to $556,849 in the three months ended February 29, 2024. Cost of sales normally includes electricity, utilities, facilities costs, and supplies where we perform mining from our own facilities. Major components of cost of sales include rent to house mining and hosting equipment, electricity, and supplies. Where our miners are hosted by third parties, major components of cost of sales include hosting fees and/or electricity costs. Cost of sales for both owned and hosted facilities does not include depreciation, which is stated separately.
Current wording
Cost of sales related to self-mining was $785,129 in the three months ended May 31, 2025, compared to $988,094 in the three months ended May 31, 2024. Cost of sales normally includes electricity, utilities, facilities costs, and supplies where we perform mining from our own facilities. Major components of cost of sales include rent to house mining and hosting equipment, electricity, and supplies. Where our miners are hosted by third parties, major components of cost of sales include hosting fees and/or electricity costs. Cost of sales for both owned and hosted facilities does not include depreciation, which is stated separately.
Previous wording
Cost of sales related to hosting was $-0- in the three months ended February 28, 2025, compared to $11,142 in the three months ended February 29, 2024. Cost of sales normally includes utilities, facilities costs, and supplies. Unlike the cost of sales from mining, cost of sales from hosting does not include electricity costs, as such costs are passed on to the hosting client.
Current wording
Cost of sales related to hosting was $-0- in the three months ended May 31, 2025, compared to $15,212 in the three months ended May 31, 2024. Cost of sales normally includes utilities, facilities costs, and supplies. Unlike the cost of sales from mining, cost of sales from hosting does not include electricity costs, as such costs are passed on to the hosting client.
Previous wording
Cost of sales related to sales of mining equipment was $-0- for both the three months ended February 28, 2025 and the three months ended February 29, 2024 because all sales of mining equipment during both periods were reported under the installment sales method. Cost of sales from equipment sales includes the purchase price of equipment sold, plus shipping and value added tax on the equipment for sales reported under the completed sales method. There is no cost of sales associated with equipment sales reported under the installment sales method.
Current wording
Cost of sales related to sales of mining equipment was $82,432 for the three months ended May 31, 2025 and $-0- the three months ended May 31, 2024 because all sales of mining equipment during both periods were reported under the installment sales method. Cost of sales from equipment sales includes the purchase price of equipment sold, plus shipping and value added tax on the equipment for sales reported under the completed sales method. There is no cost of sales associated with equipment sales reported under the installment sales method.
Previous wording
During the three months ended February 28, 2025, we incurred $,1218,339 in operating expenses, compared to $972,362 in operating expenses during the three months ended February 29, 2024. Major components of operating expenses for the 2025 period as compared to the 2024 period were:
Current wording
During the three months ended May 31, 2025, we incurred $958,824 in operating expenses, compared to $756,224 in operating expenses during the three months ended May 31, 2024. Major components of operating expenses for the 2025 period as compared to the 2024 period were:
Previous wording
The higher level of operating expenses in the 2025 period as compared to the 2024 period is primarily attributable to increased officer, director and employee/shareholder compensation that we began accruing as of September 1, 2024. Specifically, we issued two of our officers 500,000 shares of common stock on September 1, 2024, each as partial compensation for fiscal 2025 officer services, and we began accruing additional cash and share compensation for our officers as of September 1, 2024, the cash portion of which is not payable until we have sufficient liquidity. The total cash accrual to officers and employee/shareholders is $195,000 per quarter, and the total common stock accrual to officers is 765,000 shares per quarter. We also adopted a board compensation plan under which we accrue an aggregate of 1,080,000 shares per quarter payable for board and board committee service, beginning as of September 1, 2024. All shares issued during the 2025 period were valued at $0.289 per share based on a third party valuation of our shares.
Current wording
The higher level of operating expenses in the 2025 period as compared to the 2024 period is primarily attributable to increased officer, director and employee/shareholder compensation that we began accruing as of September 1, 2024. Specifically, we issued two of our officers 25,000 shares of common stock on September 1, 2024, each as partial compensation for fiscal 2025 officer services, and we began accruing additional cash and share compensation for our officers as of September 1, 2024, the cash portion of which is not payable until we have sufficient liquidity. The total cash accrual to officers and employee/shareholders is $195,000 per quarter. We also adopted a stock compensation package, beginning September 1, 2024, under which we accrue 30,750 shares per quarter for compensation to officers and employees, including for board and board committee service. All shares accrued during the 2025 period were valued at $5.78 per share based on a third party valuation of our shares. In addition, legal fees increased approximately $101,000 in the 2025 period compared to 2024 due to legal expense associated with the Company’s public offering of common stock and its uplisting to the NYSE American exchange. See “Item 1. Financial Statements -- Note 11 -- Subsequent Events .”
Previous wording
Operating expenses were also adversely impacted in the 2025 period by increased general and administrative expenses, and a loss from changes in the fair value of cryptocurrency as compared to a gain in the 2024 period. Operating expenses were positively impacted by decreased depreciation expense, investor relations expenses, professional fees.
Current wording
Operating expenses were also adversely impacted in the 2025 period by a loss from changes in the fair value of cryptocurrency as compared to a gain in the 2024 period. Operating expenses were positively impacted by decreased depreciation expense and investor relations expenses.
Previous wording
We expect that operating expenses will trend materially higher in future periods as we begin paying regular compensation to existing officers and directors, hire additional employees, and incur other costs, such as increased depreciation expense due to the addition of new mining equipment.
Current wording
We expect that operating expenses will trend materially higher in future periods as we begin paying regular compensation to existing officers and directors, hire additional employees, and incur other costs, such as increased depreciation expense due to the addition of new mining and hosting equipment.
Previous wording
During the three months ended February 28, 2025, we incurred ($243,269) in other expenses, net, as compared to ($253,941) of other expenses, net, in the three months ended February 29, 2024. Interest expense was $60,496 in the three months ended February 28, 2025, as compared to $54,279 in the three months ended February 29, 2024. Other expenses in the 2025 period were impacted by a bad debt expense of $124,815 taken in regard to our note receivable from ROC Digital during the 2025 period and a loss on extinguishment of debt of $57,958 taken in regard to our Hashrate Sale Agreement with Luxor. Other expenses in the 2024 period were impacted by a loss on extinguishment of debt of $183,670 relating to a different financing with Luxor, a loss of $68,559 from the Company’s investment in ROC Digital in 2024 period as compared to $-0- in the 2025 period, and income of $37,777 from a change in derivative liability in 2024 as compared to $-0- in 2025.
Current wording
During the three months ended May 31, 2025, we incurred $154,810 in other expenses, net, as compared to $119,691 of other expenses, net, in the three months ended May 31, 2024. Interest expense was $71,867 in the three months ended May 31, 2025, as compared to $56,563 in the three months ended May 31, 2024, mainly as a result of increased balances due under the LOC Agreement with IDI. Other expenses in the 2025 period were impacted by a reversal of bad debt expense of $124,815 in regard to our note receivable from ROC Digital during the 2025 period, and a loss on extinguishment of debt of $207,758 taken in regard to our Hashrate Sale Agreement with Luxor. Other expenses in the 2024 period were impacted by a loss on extinguishment of debt of $133,915 relating to a different financing with Luxor, a loss of $58,840 from the Company’s investment in ROC Digital in 2024 period as compared to $-0- in the 2025 period. Also, we recorded a change in the derivative liability from a financing with Luxor of a positive $114,835 in the 2024 compared to $-0- in 2025. Interest income was $-0- in the 2025 period as compared to $14,792 in the 2024 period primarily as a result of the fact that we did not receive any payments on our note from ROC Digital in the 2025 period, and our placing the ROC Digital note on non-accrual status.
Previous wording
As a result of the foregoing, during the three months ended February 28, 2025, we incurred a net loss attributable to common stockholders of $1,156,891, or $(0.03) per share, as compared to a net loss attributable to common stockholders of $902,682, or $(0.02) per share during the three months ended February 29, 2024. The increase in our net loss in the three months ended February 28, 2025, compared to the three months ended February 29, 2024, is attributable to the factors discussed above.
Current wording
As a result of the foregoing, during the three months ended May 31, 2025, we incurred a net loss attributable to common stockholders of $622,762, or $(0.31) per share, as compared to a net loss attributable to common stockholders of $654,228, or $(0.26) per share during the three months ended May 31, 2024. The increase in our net loss in the three months ended May 31, 2025, compared to the three months ended May 31, 2024, is attributable to the factors discussed above.
Previous wording
Comparison of Results of Operations for the Six Months Ended February 28, 2025 and February 29, 2024.
Current wording
Comparison of Results of Operations for the Nine Months Ended May 31, 2025 and May 31, 2024.
Previous wording
During the six months ended February 28, 2025, we generated $2,718,252 of revenue, compared to $1,402,921 of revenue in the six months ended February 29, 2024.
Current wording
During the nine months ended May 31, 2025, we generated $4,770,110 of revenue, compared to $2,627,913 of revenue in the nine months ended May 31, 2024.
Previous wording
During the six months ended February 28, 2025, we generated $717,147 in revenue from equipment sales, compared to $190,192 in revenue from equipment sales in the six months ended February 29, 2024.
Current wording
During the nine months ended May 31, 2025, we generated $846,347 in revenue from equipment sales, compared to $210,662 in revenue from equipment sales in the nine months ended May 31, 2024.
Previous wording
Our revenue from equipment sales in the six months ended February 28, 2025 and February 29, 2024 were derived from the following transactions:
Current wording
Our revenue from equipment sales in the nine months ended May 31, 2025 and May 31, 2024 were derived from the following transactions:
Previous wording
Under the guidelines of ASC 606, we determined that payments due under notes receivable from ROC Digital and the Trinidad borrower were not “probable” due to the start-up nature of the customers and their lack of capitalization. As a result, we report revenue from the equipment sales to both parties under the installment sale method, under which we report our gross profit on the sale as payments are received from the purchaser. With regard to the note receivable from ROC Digital, we recorded revenues of $13,6471 in the six months ended February 28, 2025 from two monthly payments received on the note, as compared to revenues of $40,942 in the six months ended February 29, 2024 from six monthly payments received on the note. With regard to the note receivable from the Trinidad borrower, we did not record any revenues in the six months ended February 29, 2024 because the borrower only made interest only payments in that period, and we did not record any revenues in the six months ended February 28, 2025 because we accelerated and foreclosed on the note in the fourth quarter of 2024.
Current wording
Under the guidelines of ASC 606, we determined that payments due under notes receivable from ROC Digital and the Trinidad borrower were not “probable” due to the start-up nature of the customers and their lack of capitalization. As a result, we report revenue from the equipment sales to both parties under the installment sale method, under which we report our gross profit on the sale as payments are received from the purchaser. With regard to the note receivable from ROC Digital, we recorded revenues of $13,6471 in the nine months ended May 31, 2025 from two monthly payments received on the note, as compared to revenues of $40,942 in the nine months ended May 31, 2024 from nine monthly payments received on the note. With regard to the note receivable from the Trinidad borrower, we did not record any revenues in the nine months ended May 31, 2024 because the borrower only made interest only payments in that period, and we did not record any revenues in the nine months ended May 31, 2025 because we accelerated and foreclosed on the note in the fourth quarter of 2024.
Previous wording
During the six months ended February 28, 2025 and February 29, 2024, we recorded $703,500 and $149,250, respectively, from sales of equipment recorded under the “completed sale” method from the transactions described above.
Current wording
During the nine months ended May 31, 2025 and May 31, 2024, we recorded $832,700 and $149,250, respectively, from sales of equipment recorded under the “completed sale” method from the transactions described above.
Previous wording
We generated $-0- in revenues from hosting in the six months ended February 28, 2025, as compared to $21,980 in hosting revenues in the six months ended February 29, 2024. We terminated all of our hosting clients in the fourth quarter of fiscal 2024, and did not have any hosting clients during the six months ended February 28, 2025. In the current market environment, we believe self-mining is more profitable than hosting third party miners, however we will pursue hosting opportunities on a selective basis. While we still see good opportunities to acquire mining equipment at attractive prices, the price of mining equipment has recently increased with the recent increase in the price of bitcoin.
Current wording
We generated $-0- in revenues from hosting in the nine months ended May 31, 2025, as compared to $38,743 in hosting revenues in the nine months ended May 31, 2024. We terminated all of our hosting clients in the fourth quarter of fiscal 2024, and did not have any hosting clients during the nine months ended May 31, 2025. In the current market environment, we believe self-mining is more profitable than hosting third party miners, however we will pursue hosting opportunities on a selective basis. While we still see good opportunities to acquire mining equipment at attractive prices, the price of mining equipment has recently increased with the recent increase in the price of bitcoin.
Previous wording
Cost of sales related to mining was $1,623,331 in the six months ended February 28, 2025, compared to $779,791 in the six months ended February 29, 2024. Cost of sales normally includes electricity, utilities, facilities costs, and supplies where we perform mining from our own facilities. Major components of cost of sales include rent to house mining and hosting equipment, electricity, and supplies. Where our miners are hosted by third parties, major components of cost of sales include hosting fees and/or electricity costs. Cost of sales for both owned and hosted facilities does not include depreciation, which is stated separately.
Current wording
Cost of sales related to mining was $2,408,459 in the nine months ended May 31, 2025, compared to $1,767,885 in the nine months ended May 31, 2024. Cost of sales normally includes electricity, utilities, facilities costs, and supplies where we perform mining from our own facilities. Major components of cost of sales include rent to house mining and hosting equipment, electricity, and supplies. Where our miners are hosted by third parties, major components of cost of sales include hosting fees and/or electricity costs. Cost of sales for both owned and hosted facilities does not include depreciation, which is stated separately.
Previous wording
The table below describes the average cost of mining each bitcoin for the six months ended February 28, 2025 and February 29, 2024, and the total energy usage and cost per each kilowatt hour (“KWH”) utilized within both of our facilities.
Current wording
The table below describes the average cost of mining each bitcoin for the nine months ended May 31, 2025 and May 31, 2024, and the total energy usage and cost per each kilowatt hour (“KWH”) utilized within both of our facilities.
Previous wording
Cost of sales related to hosting was $-0- in the six months ended February 28, 2025, compared to $14,534 in the six months ended February 29, 2024. Cost of sales normally includes utilities, facilities costs, and supplies. Unlike the cost of sales from mining, cost of sales from hosting does not include electricity costs, as such costs are passed on to the hosting client.
Current wording
Cost of sales related to hosting was $-0- in the nine months ended May 31, 2025, compared to $29,746 in the nine months ended May 31, 2024. Cost of sales normally includes utilities, facilities costs, and supplies. Unlike the cost of sales from mining, cost of sales from hosting does not include electricity costs, as such costs are passed on to the hosting client.
Previous wording
Cost of sales related to sales of mining equipment was $670,000 for the six months ended February 28, 2025, as compared to $180,891 for the six months ended February 29, 2024. Cost of sales from equipment sales includes the purchase price of equipment sold, plus shipping and value added tax on the equipment for sales reported under the completed sales method. There is no cost of sales associated with equipment sales reported under the installment sales method.
Current wording
Cost of sales related to sales of mining equipment was $752,432 for the nine months ended May 31, 2025, as compared to $180,891 for the nine months ended May 31, 2024. Cost of sales from equipment sales includes the purchase price of equipment sold, plus shipping and value added tax on the equipment for sales reported under the completed sales method. There is no cost of sales associated with equipment sales reported under the installment sales method.
Previous wording
During the six months ended February 28, 2025, we incurred $2,222,563 in operating expenses, compared to $1,686,295 in operating expenses during the six months ended February 29, 2024. Major components of operating expenses for the 2025 period as compared to the 2024 period were:
Current wording
During the nine months ended May 31, 2025, we incurred $3,181,387 in operating expenses, compared to $2,436,401 in operating expenses during the nine months ended May 31, 2024. Major components of operating expenses for the 2025 period as compared to the 2024 period were:
Previous wording
The higher level of operating expenses in the 2025 period as compared to the 2024 period is primarily attributable to increased officer, director and employee/shareholder compensation that we began accruing as of September 1, 2024. Specifically, we issued two of our officers 500,000 shares of common stock on September 1, 2024, each as partial compensation for fiscal 2025 officer services, and we began accruing additional cash and share compensation for our officers as of September 1, 2024, the cash portion of which is not payable until we have sufficient liquidity. The total cash accrual to officers and employee/shareholders is $195,000 per quarter, and the total common stock accrual to officers is 765,000 shares per quarter. We also adopted a board compensation plan under which we accrue an aggregate of 1,080,000 shares per quarter payable for board and board committee service, beginning as of September 1, 2024. All shares issued during the 2025 period were valued at $0.289 per share based on a third party valuation of our shares.
Current wording
The higher level of operating expenses in the 2025 period as compared to the 2024 period is primarily attributable to increased officer, director and employee/shareholder compensation that we began accruing as of September 1, 2024. Specifically, we issued two of our officers 25,000 shares of common stock on September 1, 2024, each as partial compensation for fiscal 2025 officer services, and we began accruing additional cash and share compensation for our officers as of September 1, 2024, the cash portion of which is not payable until we have sufficient liquidity. The total cash accrual to officers and employee/shareholders is $195,000 per quarter. We also adopted a stock compensation package, beginning September 1, 2024, under which we accrue 30,750 shares per quarter for compensation to officers and employees, including for board and board committee service. All shares accrued during the 2025 period were valued at $5.78 per share based on a third party valuation of our shares. In addition, legal fees increased approximately $101,000 in the 2025 period compared to 2024 due to legal expenses associated with the Company’s proposed public offering of common stock and its uplisting to the NYSE American exchange. See “Item 1. Financial Statements -- Note 11 -- Subsequent Events.”
Previous wording
We expect that operating expenses will trend materially higher in future periods as we begin paying regular compensation to existing officers and directors, hire additional employees, and incur other costs, such as increased depreciation expense due to the addition of new mining equipment.
Current wording
We expect that operating expenses will trend materially higher in future periods as we begin paying regular compensation to existing officers and directors, hire additional employees, and incur other costs, such as increased depreciation expense due to the addition of new mining and hosting equipment.
Showing the first 40 of 52 pairs. Open the source sections for the rest.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
We also generate revenues from the advantageous purchase and sale of equipment used for digital asset mining and hosting. We have verbal arrangements with some suppliers that enable us to acquire highly desired equipment at wholesale prices which we sometimes resell to third parties. The primary factors that impact resales of mining equipment include the availability of equipment at attractive prices and the number of participants willing to enter the mining business or expand their existing operations, which is highly correlated to the margin from mining as determined by the market price of bitcoin and prevailing energy costs. Also, we believe our resales of mining equipment will be impacted by the existence of hosting capacity with attractive electricity rates in our hosting operations, as hosting clients have historically been a major source of customers for this line of business.
Rearranged previous paragraphs (2)
Previous report — wording carried elsewhere
We also generate revenues from the advantageous purchase and sale of equipment used for digital asset mining and hosting. We have relationships with some suppliers that enable us to acquire highly desired equipment at attractive prices, which we sometimes resell to third parties. In most cases, resales of digital asset mining equipment would be to our hosting customers, which have the dual benefit of generating short-term gross profits from the equipment sale as well as growing the customer base of our hosting business.
Previous report — wording carried elsewhere
In October 2022, we completed the installation of initial hosting containers under our agreement with TSTT. Our rate for electricity is TSTT’s existing rate of 3.5 cents per kWh or 75% of the declared reserve capacity, which is equal to the customer’s highest expected monthly kilovolt-ampere demand at $7.40.