URG$0.74+7.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-06-30; filed 2024-08-09.

0001654954-24-010255

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-09-30; filed 2024-11-06.

0001654954-24-013836

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 155 previous paragraphs and 153 current paragraphs.

66 unchanged; 49 reworded; 35 added; 36 removed; 4 previous and 3 current paragraphs rearranged.

Tables are not compared: 10 previous and 10 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (35)

Current report

In the past several years, the nuclear markets have been favorably affected in many ways through greater acceptance of nuclear energy. Recently, technology and other industries operating data centers (in what is now simply being referred to as “big data”) have realized the opportunities which exist to maintain carbon free baseload electricity while supporting the immense electric demand generated by these centers. The Electric Power Research Institute’s May 28, 2024, White Paper titled Powering Intelligence, suggests that data centers are expected to consume as much as 9.1% of U.S. electricity generation by 2030 versus an estimated 4% today.

Current report

The International Energy Agency stated in its Electricity 2024, Analysis and Forecast to 2026 report that

Current report

Data centres are significant drivers of growth in electricity demand in many regions. After globally consuming an estimated 460 terawatt-hours (TWh) in 2022, data centres’ total electricity consumption could reach more than 1 000 TWh in 2026. This demand is roughly equivalent to the electricity consumption of Japan.

Current report

The use of nuclear power by big data isn’t just a projection; it is already happening in a material way. Talen has already been selling significant power to big data. During the quarter, Constellation Energy announced a power purchase agreement with Microsoft for 835 megawatts of electricity. This is the largest ever power purchase agreement for Constellation and will result in the restart of the Three Mile Island Unit 1 nuclear reactor in Pennsylvania. While contributing 835 megawatts of carbon-free electricity to the grid, this historic project will create 3,400 jobs and offset approximately 61 million metric tons of CO 2 emissions over 20 years. Still others in big data, including Google and Amazon, have announced plans to utilize nuclear energy to satisfy these rapidly growing electrical needs.

Current report

The U.S. Department of Energy (DOE) has been progressing its requests for proposals under both its high-assay, low-enriched uranium (HALEU) and low-enriched uranium (LEU) programs for which domestic uranium supply is preferred. In October 2024, the DOE announced it awarded contracts to Centrus Energy Corp., Orano SA, General Matter Inc. and Louisiana Energy Services (a URENCO company) to provide enrichment services to develop HALEU to fuel small modular nuclear reactors. The contracts for enrichment are worth up to $2.7 billion over the next ten years. These programs also reflect efforts by the U.S. to advance energy security; Russia has been the only potential source of HALEU.

Current report

During 2024 Q3 we captured 75,075 pounds, dried and packaged 71,804 pounds and shipped 67,488 pounds U 3 O 8. Although not at previously anticipated rates, these figures represent increases in production numbers compared with the captured and dried figures of earlier quarters.

Current report

As we continue to work through the challenges of ramp-up at Lost Creek, we now anticipate 2024 production will be in a range between 240,000 and 280,000 pounds U 3 O 8 captured on IX resin.

Current report

We expect to satisfy our remaining 2024 contractual commitments to our customers with Lost Creek production and other available sources.

Current report

During the quarter, we brought Header Houses (HHs) 2-9 and 2-10 online, bringing the number of new header houses in the first three quarters of 2024 to five. HH 2-11 came online in early October. HH 2-12 is on the ground at Lost Creek, and HHs 2-13 through 2-15 are being constructed in our Casper facilities.

Current report

Throughout 2024 Q3 we increased our drill rig count at Lost Creek to 15. Two of the rigs which had been deployed to Shirley Basin returned to Lost Creek in October, such that our current rig count at Lost Creek is 17. We anticipate at least three additional drill rigs will mobilize to Lost Creek prior to the end of the year.

Current report

Our most recently completed deep disposal well, LCDW5, has been placed into operation, and with Lost Creek’s other two deep wells, is satisfying wastewater needs.

Current report

Because our incoming employees have little or no experience with uranium ISR operations, training remains a priority. As we are gaining a larger core group of staff, we continue to focus on retention as well as recruitment in efforts to stabilize our workforce.

Current report

Following our announcement in early 2024 of the “go” decision to begin buildout of our Shirley Basin in situ recovery facility in Carbon County, Wyoming we initiated several work programs for the year. These programs have complemented our initial purchasing plan for long lead-time equipment which began in 2023.

Current report

Installation of the monitor wells for the first mine unit at Shirley Basin is complete. The two drill rigs which were primarily responsible for the monitor well program have been redeployed to Lost Creek in October. We have begun to collect hydrologic data and have initiated aquifer pump testing for the first mine unit. This test program is anticipated to be completed in 2024 Q4. The hydrologic confinement at Shirley Basin is well established.

Current report

We have selected a contractor who has commenced renovation of existing site buildings which will be used for construction, maintenance and drill casing facilities. The office building layout has been approved and we are nearing completion of a construction agreement.

Current report

We continue to expect construction at Shirley Basin to be complete in late 2025 with a pre-operation inspection by the State of Wyoming following soon after.

Current report

We sold 175,000 pounds of U 3 O 8 in the nine months ended September 30, 2024 at an average price per pound sold of $61.65. In the nine months ended September 30, 2023, we sold 190,000 pounds at an average price per pound sold of $62.56.

Current report

The following table provides information on our U 3 O 8 product cost.

Current report

In 2023, the sales were made with a combination of pre-ramp up produced and purchased pounds the Company already had in its finished inventory at the conversion facility. The produced pounds were inventoried in earlier years with higher production rates and lower average costs per pound produced. As the post-ramp up production rates increase, we expect to again achieve lower average costs per pound produced.

Current report

The following table provides information on our U 3 O 8 product profit.

Current report

In the nine months ended September 30, 2023, the average price per pound sold into contracts was $62.56 and the average cost per pound sold was $32.38, which resulted in an average profit per pound sold of $30.18 and an average profit margin of approximately 48%. Higher average prices per pound and lower average costs per pound resulted in higher average profits per pound sold in 2023 as compared to 2024. As noted above, the produced pounds that were sold in 2023 had been produced in earlier years with higher production rates and lower average costs per pound produced.

Current report

Wellfield production at Lost Creek resumed in 2023 Q2 and pounds captured increased in each subsequent quarter, except in 2024 Q1 when drying issues at the plant slowed our ability to capture pounds. We captured 75,075 pounds in 2024 Q3.

Current report

In 2024 Q3, we had one sale and delivered 100,000 pounds of U 3 O 8 at an average price of $61.65 per pound. Through September, we have delivered a total of 175,000 pounds at an average price of $61.65. For the year, our total sales are projected at 570,000 pounds of U 3 O 8 at an average price of $58.15 per pound and we expect to realize revenues of $33.1 million.

Current report

Due to the nature of our contracts, we have a limited number of deliveries, which do not occur consistently during the year. Sales revenues are recognized when the product is transferred to the purchaser.

Current report

Excluding NRV adjustments, the cost of product sales was $4.9 million and $8.0 million, and $2.5 million and $6.2 million, for the three and nine months ended September 30, 2024, and 2023, respectively. In the three months ended September 30, 2024, we sold 100,000 pounds at $61.65 as compared to 90,000 pounds at $60.44 in the comparable 2023 period. For the nine months ended September 30, 2024, the sales of 175,000 pounds in 2024 were at an average cost of $45.82 per pound. The sales of 190,000 pounds in 2023 were at an average cost of $32.38 per pound. The 2023 sales were made with a combination of pre-ramp up produced and purchased pounds the Company already had in its finished inventory at the conversion facility. The produced pounds were inventoried in earlier years with higher production rates and lower average costs per pound produced. The pounds sold in 2024 were primarily from more expensive post ramp up production.

Current report

Gross profit (loss) is based on sales, which includes disposal fees, and cost of sales, which includes NRV adjustments. As we had sales during the three months ended September 30, 2024 and 2023, we recognized a gross profit for each period. For the nine months ended September 30, 2024, our net profit from sales exceeded our NRV adjustments as the latter has been greatly reduced due to increases in production. For the nine months ended September 30, 2023, our initial production levels were low, which resulted in higher NRV adjustments and a gross loss for the period.

Current report

Total operating costs increased $1.4 million and $20.2 million in the three and nine months ended September 30, 2024 as compared to 2023, respectively. The increases were mainly due to development costs at Lost Creek as the ramp up to operations began in 2023 and has continued throughout 2024. In addition, we constructed an additional disposal well at Lost Creek and initiated drilling and site construction activities at our Shirley Basin project which we expect to complete in late 2025.

Current report

Accounts payable included $1.4 million of insurance and surety bond expenses and $0.6 million in equipment purchases at September 30, 2024. Accounts payable included $0.2 million in equipment purchases at December 31, 2023. As these did not affect cash balances at the respective dates, they have been adjusted on the Statement of Cash Flow.

Current report

Because of continuing challenges of ramp-up at Lost Creek, we now anticipate 2024 production will be in a range between 240,000 and 280,000 pounds U 3 O 8 captured on IX resin.

Current report

During the quarter, uranium spot prices softened to an average of approximately $82 per pound U 3 O 8. However, average term pricing, which has increased steadily for several years now, reached approximately $81 per pound U 3 O 8 during the quarter.
Removed paragraphs (36)

Previous report

In April, members of the G7 committed to reducing dependency on Russian nuclear fuel supplies to create a diversified fuel supply chain free from Russian influence, and to offer support to countries which are working to diversify their nuclear fuel sources.

Previous report

During the quarter, Kazatomprom announced the Government of Kazakhstan adopted amendments to the Kazakh tax code increasing the mineral extraction tax by approximately fifty percent effective in 2025. Additionally, there are differentiated rates which will be applied based upon annual production volume under each subsoil use agreement held by a producer. These taxes are anticipated to bring costs of production for much of Kazakh uranium production in line with other global lower cost operations.

Previous report

Additionally, Kazakh production continues to be hindered by significant supply chain disruptions related to sufficient supply of sulfuric acid for its recovery processes and other materials shortages. Kazatomprom has announced substantially reduced production targets (~20% below state-concession required levels) due to this supply shortage as well as continuing construction delays.

Previous report

Nearly all uranium producers have faced challenges as they return to production operations. Even for experienced and well financed operators, ramp-up and return to commercial level operations has been impeded by labor, equipment, technical, supply chain and other challenges and delays. This slowed return to full production levels may continue to affect market pricing.

Previous report

Global factors continue to positively influence the uranium recovery market and the nuclear energy industries. Continued growth in the acceptance of nuclear energy, and geopolitics have also contributed to a stronger uranium market with a more optimistic future.

Previous report

Numerous nuclear power plants in the U.S. are planning extension of licensed lifespan while several others are considering returning to operations. The U.S. Department of Energy is proceeding with requests for proposals under both its HALEU and LEU programs for which domestic uranium supply is preferred.

Previous report

These developments have supported both spot and term pricing for uranium. Spot prices averaged $88 per pound U 3 O 8 through the quarter; term pricing remained at approximately $79 per pound U 3 O 8 through the quarter.

Previous report

Lost Creek production is advancing with three header houses having come online in 2024 H1. During Q2 we captured approximately 70,679 pounds, dried and packaged 64,170 pounds and shipped 70,390 pounds U 3 O 8. These figures represent an increase in each of these production numbers compared with Q1 production. Notwithstanding these improvements, we are guiding to the lower side of our earlier 2024 production guidance of 550,000 to 650,000 pounds captured on IX resin.

Previous report

Header House (HH) 2-9 came online mid-July and HH 2-10 is scheduled to come online mid-August. Our construction crew is now on track to meet its goal of routinely completing a new header house approximately every thirty days. Throughout Q2 we had 12 drill rigs working at Lost Creek; we anticipate additional drill rigs will mobilize to Lost Creek over the next two months.

Previous report

Fabrication of HHs 2‑11 through 2-14 is in progress in our Casper construction shop and onsite construction related to these next header houses is well advanced. We recently took delivery of and deployed two downhole geophysical logging trucks that were ordered in early 2023.

Previous report

Our site workforce is stabilizing, with safety and task training advancing. We continue to effectively navigate ongoing supply chain issues through the implementation of our long lead-time purchasing program. The lead time for electrical transformers remains challenging but we have a sufficient number of header house transformers on the ground for at least the next year.

Previous report

In Q1 we were pleased to announce plans to begin the buildout of our Shirley Basinin situ recovery facility in Carbon County, Wyoming. Installation of the monitor wells for the first mine unit is on schedule with all of the planned wells piloted and approximately 95% of the wells cased. Well completion is ongoing. After all monitor wells are installed, we will collect baseline water quality and perform hydrologic aquifer tests. The hydrologic confinement at Shirley Basin is well established. We currently have two drill rigs working at Shirley Basin and expect to add a third rig in coming weeks. When the monitor well program is complete, the three rigs will redeploy to Lost Creek until construction and development drilling begins at Shirley Basin in 2025 H1.

Previous report

Subsequent to quarter-end we provided notice to one of our purchasers of a delivery of 100,000 pounds U 3 O 8 which was transferred and sold on August 8, 2024.

Previous report

As previously disclosed, in April we signed the third of three new offtake agreements completed in 2024. The newest agreement calls for annual delivery commitments of up to 100,000 pounds U 3 O 8 in 2026 through 2029, a portion of which is based upon production milestones. Pricing is a combination of escalated fixed price, well above anticipated all-in costs of production, and a market-related pricing component that is subject to an escalated floor and ceiling. We have provided notice to the buyer of satisfaction of the milestones related to the 2026 and 2027 deliveries.

Previous report

In April, we announced the appointment of John Paul Pressey and Elmer W. Dyke as new members of the Ur‑Energy Board of Directors. Following the Company’s Annual Meeting of Shareholders, June 6, 2024, founding Director James M. Franklin and Director, and former President and CEO, W. William Boberg both retired.

Previous report

John Paul Pressey had a nearly three-decade long career in the assurance practice at PricewaterhouseCoopers LLP, with 16 years as a partner. With a Bachelor of Commerce degree from the University of Alberta, Mr. Pressey is a Chartered Professional Accountant with extensive experience working with U.S. and Canadian publicly traded companies in the mining industry, and other industries including manufacturing, utilities, and alternative energy. His experience includes acquisitions and capital markets transactions, working with clients to identify and implement practical business solutions to accounting, audit and financial issues. Mr. Pressey spent six years at PricewaterhouseCoopers as its Assurance Leader for British Columbia, overseeing all aspects of PricewaterhouseCoopers’s assurance results and operations for that Province.

Previous report

Elmer Dyke has over 35 years’ experience in the commercial and government nuclear industry. Mr. Dyke has a Bachelor of Arts Degree in International Political Economy from Davidson College and served as a U.S. Army Officer for thirteen years. Mr. Dyke’s professional career includes a tenure with the U.S. Department of State during which he directed international security programs, including nuclear nonproliferation and high technology projects and was detailed to the Departments of Defense and Commerce. Mr. Dyke has worked within global firms NAC International and Booz Allen Hamilton where he served as an expert on nuclear nonproliferation, strategy and nuclear fuel cycle. More recently, Mr. Dyke filled senior executive roles at Centrus Energy Corporation, a global nuclear fuel supplier and technical services provider. At Centrus Energy and in prior executive roles, Mr. Dyke led strategic planning and business development, financial performance, and risk management for the businesses. Currently, Mr. Dyke leads New Horizons Nuclear Associates, LLC, a global nuclear consulting firm he formed in 2022.

Previous report

On July 29, 2024, we closed an underwritten public offering of 57,150,000 common shares at a price of $1.05 per common share. The gross proceeds to the Company from the offering were approximately $60.0 million, before deducting the underwriting discounts and commissions and other offering expenses payable by the Company.

Previous report

We sold 75,000 pounds of U 3 O 8 in the six months ended June 30, 2024 at an average price per pound sold of $61.65.

Previous report

In 2023 Q3 and 2023 Q4, we delivered a total of 180,000 produced pounds of U 3 O 8 into term contracts at an average price per pound sold of $60.45.

Previous report

In 2023 Q3 and 2023 Q4, a total of 180,000 produced pounds of U 3 O 8 were sold into term contracts. The average cost per pound sold was $28.04.

Previous report

The following table provides information on our U 3 O 8 gross profit.

Previous report

In 2023 Q3 and 2023 Q4, the average price per pound sold into term contracts was $60.45 and the average cost per pound sold was $28.04, which resulted in an average gross profit per pound sold of $32.41 and an average gross profit margin of nearly 54%.

Previous report

Wellfield production at Lost Creek resumed in 2023 Q2 and 4,392 pounds were captured during the quarter. Pounds captured was 30,491 pounds in 2023 Q3 and increased again to 68,448 pounds in 2023 Q4 as mining activities increased. Pounds captured in 2024 Q1 decreased to 38,221 pounds but rebounded to 70,679 pounds in 2024 Q2. The decrease in Q1 was due to dryer issues in the plant, which limited our ability to bring new pounds into the plant.

Previous report

In 2024 Q2, we sold 75,000 pounds of U 3 O 8 under one of our long-term sales agreements at an average price of $61.65 per pound. There were no U 3 O 8 sales in the three months ended June 30, 2023. For the six months ended June 30, 2023, we sold 100,000 pounds of U 3 O 8 to the U.S. DOE uranium reserve program at an average price of $64.47 per pound.

Previous report

Including NRV cost of sales adjustments, cost of sales was $3.3 million and $4.5 million for the three and six months ended June 30, 2024, and $3.0 million and $9.5 million for the three and six months ended June 30, 2023, respectively. Excluding NRV adjustments, cost of sales was $3.1 million and $3.6 million for the six months ended June 30, 2024, and 2023, respectively. The sales of 75,000 pounds of U 3 O 8 in 2024 were all out of produced product at a cost of $41.69 per pound. The sale in 2023 was from existing conversion facility inventory that the Company had in place at the end of 2022. We sold 43,259 produced pounds of U 3 O 8 at a cost per pound sold of $28.06 and 56,741 purchased pounds at a cost per pound sold of $42.56, which resulted in an average U 3 O 8 cost per pound sold of $36.29 for the six months ended June 30, 2023.

Previous report

Excluding the NRV adjustments, the U 3 O 8 gross profit in the three months and six months ended June 30, 2024 was $1.5 million, or approximately $19.96 per pound on average. The gross profit for the six months ended June 30, 2023 was $36.41 per produced pound sold and $21.91 per purchased pound sold for an average of $28.18 per pound.

Previous report

Total operating costs increased $6.7 million in the first three months and $18.8 million for the six months of 2024 as compared to 2023. The increases were mainly due to development costs at Lost Creek, including disposal well completion costs, and higher labor costs, which resulted from an increase in staffing.

Previous report

Changes in foreign exchange rates were negligible for the three and six months ended June 30, 2024. In 2023, we briefly held higher U.S. dollar balances in a Canadian bank following the February 2023 underwritten public offering, which led to a $0.3 million foreign exchange gain.

Previous report

Header House (HH) 2-10 is scheduled to come online mid-August. Our construction crew is now on track to meet its goal of routinely completing a new header house approximately every thirty days. Throughout Q2 we had 12 drill rigs working at Lost Creek; we anticipate additional drill rigs will mobilize to Lost Creek in the next two months.

Previous report

Although we continue to experience equipment and operational challenges, we are seeing month-over-month increases in production, drying and packaging. At August 4, 2024, we drummed and packaged an estimated 25,800 pounds U 3 O 8 since quarter end. We continue to see very positive grades and production from the latest header houses brought online.

Previous report

Notwithstanding the advances we have made, we are guiding to the lower side of our earlier 2024 production guidance of 550,000 and 650,000 pounds U 3 O 8 captured at Lost Creek. We have made four shipments of U 3 O 8 to the converter in 2024 and anticipate routine shipments throughout the remainder of the year.

Previous report

Uranium spot prices remained strong and relatively stable in 2024 Q2, with pricing averaging approximately $88 per pound U 3 O 8 during the quarter. Nuclear utilities and other purchasers are back in the market, which has sustained term pricing, which averaged $78 per pound U 3 O 8 at the end of 2024 Q1 and $80 per pound U 3 O 8 at the end of 2024 Q2.
Reworded paragraphs (49)

Previous wording

Our Lost Creek wellfield is permitted and licensed for annual recovery of up to 1.2 million pounds U 3 O 8. The processing facility at Lost Creek, which includes all circuits for the production, drying and packaging of U 3 O 8 for delivery into sales transactions, is designed and approved under current licensing to process up to 2.2 million pounds of U 3 O 8 annually, which provides additional capacity of up to one million pounds U 3 O 8 to process material from other sources. The Lost Creek processing facility will be utilized to process captured U 3 O 8 from our Shirley Basin Project for which a satellite plant will be built in 2025. However, the Shirley Basin permit and license allow for the construction of a full processing facility, providing greater construction and operating flexibility as may be dictated by market conditions.

Current wording

Our Lost Creek Project is permitted and licensed for annual recovery of up to 1.2 million pounds U 3 O 8. The processing facility at Lost Creek, which includes all circuits for the production, drying and packaging of U 3 O 8 for delivery into sales transactions, is designed and approved under current licensing to process up to 2.2 million pounds of U 3 O 8 annually, which provides additional capacity of up to one million pounds U 3 O 8 to process material from other sources. The Lost Creek processing facility will be utilized to process captured U 3 O 8 from our Shirley Basin Project for which a satellite plant will be built in 2025. However, the Shirley Basin permit and license allow for the construction of a full processing facility, providing greater construction and operating flexibility as may be dictated by future market conditions.

Previous wording

Currently, our sales deliveries in 2024 are projected to be 570,000 pounds U 3 O 8 into two of our sales agreements secured in 2022. We now have six multi-year sales agreements which together anticipate sales of approximately 5.7 million pounds U 3 O 8 between 2024 and 2030.

Current wording

Our sales deliveries in 2024 are projected to be 570,000 pounds U 3 O 8 into two of our sales agreements secured in 2022. We now have six multi-year sales agreements which together anticipate sales of approximately 5.7 million pounds U 3 O 8 between 2024 and 2030.

Previous wording

Utilities and other buyers continue to identify energy security as a nearly universal priority. Beyond the war in Ukraine, continuing Russian misconduct has only strengthened the resolve of fuel purchasers to reduce dependence on Russian nuclear products. U.S. and global utilities have increasingly been seeking non-Russian supplies when negotiating uranium term sales agreements.

Current wording

Throughout 2024, utilities and other buyers continue to identify energy security as a nearly universal priority. Ongoing war and geopolitics have only strengthened the resolve of fuel purchasers to reduce dependence on Russian nuclear products. U.S. and global utilities have increasingly been seeking non-Russian supplies when negotiating uranium term sales agreements.

Previous wording

In May 2024, a ban on Russian imports of nuclear fuels to the U.S. was signed into law. The law is due to become effective in August 2024. While the legislation has certain waivers available until January 1, 2028, the prohibitions on imports continue through 2040. The ban will help to secure the U.S. nuclear fuel supply chain and advance domestic uranium recovery operations.

Current wording

In the U.S., the ban on Russian imports of nuclear fuels, signed into law earlier in the year, became effective in August 2024. While allowing certain waivers until January 1, 2028, the prohibitions on imports continue through 2040. The ban will help to secure the U.S. nuclear fuel supply chain and advance domestic uranium recovery operations.

Previous wording

At quarter end, our in-process inventory was approximately 86,204 pounds, our drummed inventory at Lost Creek was 21,570 pounds, and our finished inventory at the conversion facility was 74,625 pounds U 3 O 8. We shipped 35,199 pounds U 3 O 8 to the conversion facility on July 25, 2024.

Current wording

At quarter end, our in-process inventory was approximately 90,140 pounds, our drummed inventory at Lost Creek was 26,580 pounds, and our finished inventory at the conversion facility was 40,713 pounds U 3 O 8. In addition to the two shipments made to the conversion facility during 2024 Q3, we made two shipments following the end of the quarter, which totaled 46,592 pounds U 3 O 8.

Previous wording

The existing south access road to the site has been upgraded to an all-season road. Materials are on-hand and construction will soon commence for the secondary 15kV electrical power line distribution to the mine site. Engineering design is underway for the refurbishment of the pre-existing substation that serviced historic Shirley Basin operations. The office building layout has been approved and bids are under review for the refurbishment of existing site buildings for use as construction, maintenance and casing facilities. Engineering related to the satellite plant, including the wastewater treatment system, is at various stages of design and layout. Steel has been rolled and welded for the 15 IX columns under construction at a fabrication facility in Casper. Long-lead items are advancing on schedule.

Current wording

The existing south access road to the site has been upgraded to an all-season road. Power supply to the satellite plant construction area has been completed and the line is energized. We are advancing the refurbishment of the pre-existing substation that serviced historic Shirley Basin operations. The septic system is installed.

Previous wording

We sold 75,000 pounds U 3 O 8 in Q2 at an average price of $61.65 per pound for proceeds of $4.6 million. In addition to the 75,000 pounds sold in Q2, we have received binding notices from our customers for the delivery of 495,000 pounds in the second half of this year for total sales of 570,000 pounds U 3 O 8 in 2024. Including the revenue received during the quarter, we expect to realize revenues of $33.1 million from our 2024 U 3 O 8 sales.

Current wording

We sold 100,000 pounds U 3 O 8 in 2024 Q3 at an average price of $61.65 per pound for proceeds of $6.2 million.

Previous wording

Deliveries for 2025 are committed to three of our customers for a base amount of 700,000 pounds of U 3 O 8. Under these agreements, two of the three buyers may elect to flex up or down by as much as 10% of the annual base delivery quantity. We received notice from one of our purchasers of its election to flex up its 2025 purchases by 10%, such that we now estimate we will deliver 730,000 pounds of U 3 O 8 into our term sales agreements in 2025. We have not received all the 2025 delivery notices from our purchasers.

Current wording

Deliveries for 2025 are committed to three of our customers for a base amount of 700,000 pounds U 3 O 8. Under these agreements, two of the three buyers may elect to flex up or down by as much as 10% of the annual base delivery quantity. Both purchasers have elected to flex up their 2025 purchases by 10%, such that we now anticipate we will deliver 740,000 pounds U 3 O 8 into our term sales agreements in 2025.

Previous wording

The Company also granted the underwriters a 30-day option to purchase up to 8,572,500 additional common shares on the same terms. On July 30, 2024, the underwriters exercised in full their option to purchase the option shares. The exercise closed on July 31, 2024. The gross proceeds to the Company from the exercise of the underwriters’ option were approximately $9.0 million, before deducting underwriting discounts and commissions and other estimated offering expenses payable by the Company. In the aggregate, we issued a total of 65,722,500 common shares. The gross proceeds to Ur-Energy from this offering and the option were approximately $69.0 million.

Current wording

On July 29, 2024, the Company closed an underwritten public offering of 57,150,000 common shares at a price of $1.05 per common share. The Company also granted the underwriters a 30-day option to purchase up to 8,572,500 additional common shares on the same terms. The option was exercised in full. Including the exercised option, Ur-Energy issued a total of 65,722,500 common shares. The gross proceeds to Ur-Energy from this offering were approximately $69.0 million. After fees and expenses of $3.8 million, net proceeds to the Company were approximately $65.2 million.

Previous wording

The following tables include measures specific to U 3 O 8 sales, cost of sales, gross profit, pounds sold, price per pound sold, cost per pound sold, and gross profit per pound sold. These measures do not have standardized meanings within US GAAP or a defined basis of calculation. These measures are used by management to assess business performance and determine production and pricing strategies. They may also be used by certain investors to evaluate performance. The following two tables provide a reconciliation of U 3 O 8 price per pound sold and U 3 O 8 cost per pound sold to the consolidated financial statements.

Current wording

The following tables include measures specific to U 3 O 8 sales, product cost, product profit, pounds sold, price per pound sold, cost per pound sold, and product profit per pound sold. These measures do not have standardized meanings within US GAAP or a defined basis of calculation. These measures are used by management to assess business performance and determine production and pricing strategies. They may also be used by certain investors to evaluate performance. The following two tables provide a reconciliation of U 3 O 8 price per pound sold and U 3 O 8 cost per pound sold to the consolidated financial statements.

Previous wording

Our sales in 2024 are projected at 570,000 pounds of U 3 O 8 at an average price per pound sold of $58.15 and we expect to realize revenues of $33.1 million. The deliveries are under contracts negotiated in 2022, when the long-term price was between $43 and $52 per pound.

Current wording

Our total sales in 2024 are projected at 570,000 pounds of U 3 O 8 at an average price per pound sold of $58.15 and we expect to realize revenues of $33.1 million. The deliveries are under contracts negotiated in 2022, when the long-term price was between $43 and $52 per pound.

Previous wording

Deliveries for 2025 are committed to three of our customers for a base amount of 700,000 pounds U 3 O 8. Under these agreements, two of the three buyers may elect to flex up or down by as much as 10% of the annual base delivery quantity. We have received notice from one of our purchasers of its election to flex up its 2025 purchases by 10%, such that we now anticipate we may deliver 730,000 pounds U 3 O 8 into our term sales agreements in 2025. We have not received all the 2025 delivery notices from our purchasers.

Current wording

Deliveries for 2025 are committed to three customers for a base amount of 700,000 pounds of U 3 O 8. Under our agreements, two of the three buyers may elect to flex up or down by as much as 10% of the annual base delivery quantity. We received notice from both purchasers of their election to flex up their 2025 purchases by 10%, such that we now anticipate we will deliver 740,000 pounds of U 3 O 8 into our term sales agreements in 2025.

Previous wording

We sold 75,000 pounds of U 3 O 8 in the six months ended June 30, 2024 at an average price per pound sold of $61.65. The average cost per pound sold was $41.69 for the six months ended June 30, 2024.

Current wording

We sold 175,000 pounds of U 3 O 8 in the nine months ended September 30, 2024 at an average price per pound sold of $61.65. The average cost per pound sold was $45.82 for the nine months ended September 30, 2024. In the nine months ended September 30, 2023, we sold 190,000 pounds at an average price per pound sold of $62.56. The average cost per pound sold was $32.38 for the nine months ended September 30, 2023.

Previous wording

We sold a total of 75,000 pounds of U 3 O 8 in the six months ended June 30, 2024 at an average price per pound sold of $61.65. The average cost per pound sold was $41.69 for the six months ended June 30, 2024, which resulted in an average gross profit per pound sold of $19.96 and an average gross profit margin of approximately 32%.

Current wording

We sold a total of 175,000 pounds of U 3 O 8 in the nine months ended September 30, 2024 at an average price per pound sold of $61.65. The average cost per pound sold was $45.82 for the nine months ended September 30, 2024, which resulted in an average profit per pound sold of $15.83 and an average profit margin of approximately 26%.

Previous wording

Plant production at Lost Creek resumed in 2023 Q3 with 15,759 pounds drummed during the quarter. Drying operations encountered labor and equipment issues that reduced plant throughput in 2023 Q4. The equipment issues were addressed, and 39,229 pounds were drummed in 2024 Q1 and 64,170 pounds were drummed in 2024 Q2.

Current wording

Plant production at Lost Creek resumed in 2023 Q3. Drying operations encountered labor and equipment issues that reduced plant throughput in 2023 Q4. The equipment issues were addressed, and pounds dried increased in each subsequent quarter. We dried 71,804 pounds in 2024 Q3. Despite the quarterly increases, drying operations have not reached targeted levels due to maintenance and manpower issues.

Previous wording

There were no shipments in 2023. The first shipment of U 3 O 8 to the conversion facility since the return to commercial operations was completed in 2024 Q1, when 35,445 pounds were delivered to the conversion facility. During 2024 Q2, two shipments totaling 70,390 pounds were shipped to the conversion facility.

Current wording

There were no shipments in 2023. The first shipment of U 3 O 8 to the conversion facility since the return to commercial operations was completed in 2024 Q1, when 35,445 pounds were delivered to the conversion facility. During 2024 Q2, two shipments totaling 70,390 pounds U 3 O 8 were shipped to the conversion facility. We shipped another two shipments totaling 67,488 pounds U 3 O 8 in 2024 Q3. In October 2024, we made two shipments to the conversion facility totaling 46,601 pounds U 3 O 8.

Previous wording

We ended the quarter with 86,204 pounds in process, 21,570 drummed pounds in the plant, and 74,625 pounds at the conversion facility.

Current wording

We ended the quarter with 90,140 pounds in process, 26,580 drummed pounds in the plant, and 40,713 pounds at the conversion facility.

Previous wording

Because production rates were low during the initial ramp up period, the cost per pound to produce inventory exceeded its NRV. Production increased in 2024 Q1 and Q2. As expected, the NRV adjustments decreased from $2.5 million in 2023 Q4 to $1.1 million in 2024 Q1 and decreased again to $0.2 million in 2024 Q2. The last NRV adjustment was in April 2024, which was the only NRV adjustment of the second quarter.

Current wording

Because production rates were low during the initial ramp up period, the cost per pound to produce inventory exceeded its NRV. The NRV adjustments decreased from $2.5 million in 2023 Q4 to $1.1 million in 2024 Q1 and decreased again to $0.2 million in 2024 Q2. The NRV adjustment increased in 2024 Q3 to $0.7 million primarily due to higher production cost during the period.

Previous wording

The cost per produced pound at the conversion facility increased during the quarter reflecting the higher cost per pound of the drummed inventory shipped to the conversion facility in 2024. As production and shipments continue to increase to targeted levels, we expect the cost per pound in ending inventory and ultimately the cost per pound sold to level off and then decrease accordingly.

Current wording

The cost per pound at the conversion facility increased during the quarter reflecting the higher cost per pound of the drummed inventory shipped to the conversion facility in 2024. As production and shipments continue to increase to targeted levels, we expect the cost per pound in ending inventory and ultimately the cost per pound sold to level off and then decrease accordingly.

Previous wording

Three and six months ended June 30, 2024, compared to the three and six months ended June 30, 2023

Current wording

Three and nine months ended September 30, 2024, compared to the three and nine months ended September 30, 2023

Previous wording

The following table summarizes the results of operations for the three and six months ended June 30, 2024 and 2023:

Current wording

The following table summarizes the results of operations for the three and nine months ended September 30, 2024 and 2023 (in thousands of U.S. dollars, except per share and per pound data):

Previous wording

Cost of sales per the financial statements includes U 3 O 8 costs of sales and lower of cost or NRV adjustments.

Current wording

Cost of sales per the financial statements includes U 3 O 8 costs of sales and lower of cost or NRV adjustments and consists of the following (in thousands of U.S. dollars):

Previous wording

Cost of sales for the three and six months ended June 30, 2024 included $0.2 million and $1.3 million of NRV adjustments, respectively. Cost of sales for the three and six months ended June 30, 2023 included NRV adjustments of $3.0 million and $9.5 million, respectively. The decrease is attributable to increased production for the respective periods. The last NRV adjustment was in April 2024, which was the only NRV adjustment of the second quarter.

Current wording

Cost of sales for the three and nine months ended September 30, 2024 included $0.7 million and $2.1 million of NRV adjustments, respectively. Cost of sales for the three and nine months ended September 30, 2023 included NRV adjustments of $2.3 million and $8.2 million, respectively. The decrease is attributable to increased production for the respective periods. The current NRV adjustments are due to increased production costs in combination with lower than anticipated production thus far in 2024.

Previous wording

The following table summarizes the operating costs for the three and six months ended June 30, 2024 and 2023:

Current wording

The following table summarizes the operating costs for the three and nine months ended September 30, 2024 and 2023:

Previous wording

Exploration and evaluation expense consists of labor and the associated costs of the exploration, evaluation, and regulatory departments, as well as land holding and exploration costs on properties that have not reached the development or operations stage. Exploration and evaluation expenses increased approximately $0.2 million and $0.8 million in the three and six months ended June 30, 2024, respectively. For the quarter, the biggest increase was for outside services. For the six months, the largest increase was for labor, much of which was additional staffing, as well as the increase in services, which occurred primarily in the second quarter.

Current wording

Exploration and evaluation expense consists of labor and the associated costs of the exploration, evaluation, and regulatory departments, as well as land holding and exploration costs on properties that have not reached the development or operations stage. The increases in cost of $0.4 million and $1.2 million for the three and nine months ended September 30, 2024, respectively, were driven by increases in outside service costs and labor costs for additional staffing.

Previous wording

The Company is considered an exploration stage issuer and expenses its pre-production development costs. As noted above, these development costs are incurred in advance of production from the related mining areas. Development expense includes costs incurred at the Lost Creek Project not directly attributable to production activities, including wellfield construction, drilling, and development costs. It also includes costs incurred at the Shirley Basin Project not directly attributable to the construction of the capitalizable assets of the project, including the installation of the wellfield monitor well ring and other development costs. The following table summarizes the development costs included in operating costs for the three and six months ended June 30, 2024 and 2023:

Current wording

The Company is considered an exploration stage issuer and expenses its pre-production development costs. As noted above, these development costs are incurred in advance of production from the related mining areas. Development expense includes costs incurred at the Lost Creek Project not directly attributable to current production activities, including wellfield construction, drilling, and development costs. It also includes costs incurred at the Shirley Basin Project not directly attributable to the construction of the capitalizable assets of the project, including the installation of the wellfield monitor well ring and other development costs. The following table summarizes the development costs included in operating costs for the three and nine months ended September 30, 2024 and 2023:

Previous wording

Development expenses increased approximately $7.0 million and $17.4 million in the three and six months ended June 30, 2024, respectively. The increases were driven by drilling activities and the related wellfield construction costs that relate to the MU2 development program at Lost Creek. In addition, development costs also included $3.7 million related to completion of a new disposal well at Lost Creek. At Shirley Basin, we have begun to install the monitor well ring and incurred approximately $1.1 million and $1.3 million in related development costs in the three and six months ended June 30, 2024, respectively.

Current wording

Development expenses increased approximately $0.7 million and $18.2 million in the three and nine months ended September 30, 2024, respectively. The increases were driven by increased drilling activities and the related wellfield construction costs that relate to the mine unit (“MU”) two development program at Lost Creek. In addition, development costs in 2023 and 2024 also included $7.7 million in direct costs primarily related to the construction of a new disposal well at Lost Creek. At Shirley Basin, we incurred approximately $1.3 million and $2.5 million development costs in the three and nine months ended September 30, 2024, respectively. Development activities at Shirley Basin included drilling costs related to the installation of the first monitor well ring.

Previous wording

General and administration expenses relate to the administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs. For the three and six months ended June 30, 2024, the expenses decreased $0.5 million and increased $0.6 million, respectively. The $0.6 million increase was primarily due to the higher labor costs.

Current wording

General and administration expenses relate to the administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs. For the three and nine months ended September 30, 2024, the expenses increased $0.1 million and increased $0.7 million, respectively. The increases for the nine months were driven by higher labor costs, insurance costs, and stock compensation expense.

Previous wording

Higher interest rates and cash balances have generated significant interest income in 2024. At the same time, interest expense decreased after the Company paid off the loan in March 2024.

Current wording

Higher interest rates and cash balances have generated significant interest income in 2024. At the same time, interest expense decreased after the Company paid off the Wyoming state bond loan in March 2024.

Previous wording

For the three months and six months ended June 30, 2024, the warrant liability mark to market revaluation resulted in $4.2 and $1.5 million gains, compared to $1.2 and $3.1 million gains in 2023, respectively. As a part of the February 2021 and February 2023 underwritten public offerings, we issued warrants that were priced in U.S. dollars. The outstanding warrant positions combined with volatility in the Company’s stock price led to a significant decrease in the warrant liability and a corresponding mark to market gain.

Current wording

For the three months and nine months ended September 30, 2024, the warrant liability revaluation resulted in $3.0 and $4.4 million gains, compared to $7.2 and $4.2 million losses in 2023, respectively. As a part of the February 2021 and February 2023 underwritten public offerings, we issued warrants that were priced in U.S. dollars. The changes in liability are primarily related to the share price of the company’s stock which is a significant factor in the Black-Scholes computations.

Previous wording

The basic and diluted losses per common share for the three and six months ended June 30, 2024, was $0.02 and $0.9, respectively. For the three and six months ended June 30, 2023, the losses per share were $0.03 for both periods. The diluted loss per common share is equal to the basic loss per common share due to the anti-dilutive effect of all convertible securities in periods of loss.

Current wording

The basic and diluted losses per common share for the three and nine months ended September 30, 2024, were $0.02 and $0.11, respectively. For the three and nine months ended September 30, 2023 the losses were $0.07 and $0.10 per share. The diluted loss per common share is equal to the basic loss per common share due to the anti-dilutive effect of all convertible securities in periods of loss.

Previous wording

As shown in the Interim Consolidated Statements of Cash Flow, our cash, cash equivalents, and restricted cash increased from the December 31, 2023 balance of $68.2 million to $72.1 million as of June 30, 2024. Cash resources consist of Canadian and U.S. dollar denominated deposit and money market accounts, and U.S. treasury fund investments. During the six months ended June 30, 2024, we spent $25.6 million on operating activities, used $1.9 million for investing activities, and generated $31.4 million from financing activities.

Current wording

As shown in the Interim Consolidated Statements of Cash Flow, our cash, cash equivalents, and restricted cash and cash equivalents increased from the December 31, 2023 balance of $68.2 million to $129.4 million as of September 30, 2024. Cash resources consist of Canadian and U.S. dollar denominated deposit and money market accounts, and U.S. treasury fund investments. During the nine months ended September 30, 2024, we spent $32.5 million on operating activities, used $5.7 million on investing activities, and generated $99.3 million from financing activities.

Previous wording

Operating activities used $25.6 million in the six months ended June 30, 2024. We sold 75,000 pounds of U 3 O 8 for $4.6 million during the quarter and generated $1.1 million from interest income, net of loan interest expense of $0.1 million. We spent $5.8 million on production-related cash costs, $26.0 million on operating costs, and had a $0.5 million favorable working capital movement primarily related to an increase in accounts payable and accrued liabilities.

Current wording

During the nine-month period, we sold 175,000 pounds of U 3 O 8 for $10.8 million, received $0.3 million in disposal fees, and generated $2.4 million from interest income, net of loan interest expense of $0.1 million. We spent $9.8 million on production-related cash costs, $37.0 million on operating costs, and had a $0.8 million favorable working capital movement primarily related to increases in accounts payable and accrued liabilities.

Previous wording

Investing activities used $1.9 million during the six months ended June 30, 2024. We spent $1.0 million on construction and equipment at Shirley Basin and $0.9 million for vehicles and equipment. The vehicles and equipment will be used primarily at Lost Creek.

Current wording

Investing activities used $5.7 million during the nine months ended September 30, 2024. We spent $2.8 million on construction and equipment at Shirley Basin and $2.9 million for vehicles and equipment. The vehicles and equipment will be used primarily at Lost Creek.

Previous wording

Financing activities provided $31.4 million in the six months ended June 30, 2024. We received net proceeds of $25.8 million from the sale of common shares through our At Market Facility, and $11.4 million from the exercise of warrant and stock options. We spent $5.7 million on the Wyoming bond loan, ultimately paying off the loan in March 2024 and $0.1 million on lease payments.

Current wording

Financing activities provided $99.3 million in the nine months ended September 30, 2024. In July, we closed an equity financing by issuing 65,722,500 shares including an 8,572,000 overallotment at $1.05 per share for net proceeds after commissions and fees of $65.2 million. We received net proceeds of $27.7 million from the sale of common shares through our At Market Facility, and $12.3 million from the exercise of warrants and stock options. We spent $5.7 million on the Wyoming bond loan, ultimately paying off the loan in March 2024, and $0.2 million on lease payments.

Previous wording

On March 27, 2024, we pre-paid the remaining $4.4 million due on the bond loan. The State Bond Loan was secured by all the assets of the Lost Creek Project. All releases of collateral have been obtained following the final repayment of the facility.

Current wording

On March 27, 2024, the remaining $4.4 million balance due on the State Bond Loan was prepaid in full. The State Bond Loan was secured by all the assets of the Lost Creek Project. All releases of collateral have been obtained following the final repayment of the facility.

Previous wording

For the six months ended June 30, 2024, we utilized the Amended Sales Agreement for gross proceeds of $26.6 million from sales of 15,573,025 common shares.

Current wording

For the nine months ended September 30, 2024, we utilized the Amended Sales Agreement for gross proceeds of $28.6 million from sales of 16,939,825 common shares.

Previous wording

As of August 6, 2024, our unrestricted cash position was $121.3 million, which reflects the proceeds from our recent underwritten public offering.

Current wording

As of October 30, 2024, our unrestricted cash position was $110.3 million.

Previous wording

We expect to realize revenues of $33.1 million from the sale of 570,000 pounds of uranium to be delivered in 2024. We had 74,625 pounds of conversion facility inventory on June 30, 2024. We delivered 75,000 pounds into sales contracts in April 2024. As of August 6, 2024, we had 109,824 pounds of U 3 O 8 in our conversion facility inventory. As noted above, of that conversion facility inventory, we will deliver and sell 100,000 pounds U 3 O 8 to one of our customers on August 8, 2024.

Current wording

We expect to realize revenues of $33.1 million from the sale of 570,000 pounds of U 3 O 8 to be delivered in 2024. We had 40,713 pounds of conversion facility inventory on September 30, 2024. We delivered 100,000 pounds into sales contracts in August 2024. As of October 30, 2024, we had 87,314 pounds of U 3 O 8 in our conversion facility inventory. We expect to deliver 395,000 pounds U 3 O 8 in 2024 Q4 from production at Lost Creek and other available sources.

Previous wording

Our unrestricted cash position and expected proceeds from uranium sales are anticipated to cover production and development costs as we ramp up production at Lost Creek, ongoing corporate overhead, and development and construction expenditures at Shirley Basin.

Current wording

Our unrestricted cash position and expected proceeds from uranium sales are expected to cover production and development costs of the continuing ramp up of production at Lost Creek, ongoing corporate overhead, and development and construction expenditures at Shirley Basin.

Showing the first 40 of 49 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

Engineering related to the satellite plant, including the wastewater treatment system, is at various stages of design and layout. Steel has been rolled and welded for 15 IX columns at a fabrication facility in Casper. Construction of these columns is progressing toward expected delivery in 2025 Q3. Long-lead items remain on schedule, and we are vigilant in our review of timing for additional long- and mid-lead time purchases.

Current report — wording carried from elsewhere

We continue to anticipate that we will deliver and sell 570,000 pounds U 3 O 8 in 2024. Including the revenue received during the quarter, we expect to realize revenues of $33.1 million from our 2024 U 3 O 8 sales.

Current report — wording carried from elsewhere

On July 29, 2024, the Company closed an underwritten public offering of 57,150,000 common shares at a price of $1.05 per common share. The Company also granted the underwriters a 30-day option to purchase up to 8,572,500 additional common shares on the same terms. The option was exercised in full. Including the exercised option, the Company issued a total of 65,722,500 common shares. The gross proceeds to the Company from this offering were approximately $69.0 million. After fees and expenses of $3.8 million, net proceeds to the Company were approximately $65.2 million.
Rearranged previous paragraphs (4)

Previous report — wording carried elsewhere

U 3 O 8 Price per Pound Sold Reconciliation

Previous report — wording carried elsewhere

The following table provides information on our U 3 O 8 cost of sales.

Previous report — wording carried elsewhere

Cost of sales consists of the following: