Bimergen Energy Corp

For the period ended Mar 31, 2025. Filed Jun 9, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed Jun 9, 2025

BESS$3.03+14.8%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-14.

0001493152-24-045374

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-06-09.

0001641172-25-014338

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 33 previous paragraphs and 51 current paragraphs.

10 unchanged; 5 reworded; 36 added; 16 removed; 2 previous and 0 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (36)

Current report

We are a renewable energy project developer dedicated to enabling the clean energy transition and providing critical grid stability via solutions across a range of applications through our portfolio of utility-scale Battery Energy Storage System (BESS) and solar development projects. In April 2024, we acquired a portfolio of development-stage BESS and solar energy projects from Emergen Energy LLC (“Emergen”), making us the project owner of 23 development stage utility-scale BESS projects with an estimated cumulative storage capacity of 1.965 gigawatts (GW) and 13 development stage solar energy projects with an anticipated cumulative generation capacity of 1.640 GW (collectively, the “Development Projects”) once constructed and operational.

Current report

Our primary business objective is to become a grid-balancing operator by developing, commercializing, and operating a diversified portfolio of BESS and solar energy projects. We aim to leverage by partnering with advanced BESS technologies and Energy Management Systems (EMS) to address the critical challenges associated with the integration of renewable energy into the electrical grid, particularly the imbalance between energy supply and demand caused by the intermittent nature of solar and wind resources. This approach aligns with the increasing demand for grid stability in regions with high penetration of renewable energy, where imbalances between peak solar generation and peak energy demand create revenue opportunities through energy storage and dispatch. We plan to store excess energy generated during periods of low demand and dispatch it during peak demand periods, thereby enhancing grid stability and efficiency. Upon reaching commercial operation, we hope to play a key role in stabilizing grid demand and supporting renewable energy integration through energy arbitrage and ancillary services.

Current report

Our core business is anchored in the development and operation of BESS projects, which are strategically designed to mitigate the energy imbalances and power deficits observed in markets with substantial solar and wind energy generation. This event, often depicted by the grid balancing, highlights the timing mismatch between peak renewable energy generation and peak electricity demand. As renewable energy production peaks during daylight hours and declines in the evening when energy demand is highest, supplemental energy supply sources become increasingly critical. Our BESS projects are positioned to address this imbalance by storing surplus energy during periods of low demand and releasing it during high-demand periods, capturing value from daily price fluctuations. By purchasing and storing energy during low-cost, high-supply hours and selling it during high-demand periods when prices are at their peak, known as energy arbitrage trading, our BESS systems will provide critical support to compensate for the lack of supply from the current outdated energy grid infrastructure.

Current report

In addition to energy arbitrage, our BESS assets are positioned to provide essential grid services, including frequency regulation, voltage support, and emergency backup during grid outages. Frequency regulation refers to the rapid response to changes in grid frequency, maintaining stability and preventing potential grid failures. Voltage control enhances the quality and reliability of power supplied to consumers. The rapid response capabilities also maintain stability for key infrastructure during outages via immediate response to fluctuations in voltage and frequency. By reducing demand imbalances at peak times, known as peak shaving, we hope to flatten the energy demand and lower electricity costs for consumers. By integrating advanced EMS controls, we aim to optimize the dispatch timing and increase the overall economic value of stored energy, delivering both reliable performance efficient operation in dynamic market conditions. Our systems will enable more flexible and adaptive grid operations, accommodating dynamic energy flows and diverse generation sources. These ancillary services both relieve grid stress, offer additional potential revenue streams, and maximize likelihood of punctual project development within budget and ensure product quality standards. We believe we well- positioned to leverage our existing relationships to secure multi-year customer contracts prior to project construction and integrate cutting-edge battery technologies as they are developed into future developments. Our systems will also be capable of deferred infrastructure upgrades, which reduce the need for expensive grid infrastructure upgrades by efficiently managing local supply and demand.

Current report

We expect our BESS projects to be located alongside traditional power transmission lines or near large offtakers with high energy demands, enhancing grid stability and reducing energy costs. These locations are suitable for battery storage facilities of approximately thirty acres and undergo environmental studies and assessments to ensure feasibility. While the letters of intent the Company has entered into or negotiated for these projects are for specific locations, the Company’s development plans are not dependent on the landowner or address, but, rather, are county based. The Company believes it could adjust its plans to find a similar, suitable location if it is unable to negotiate a definitive agreement to develop a project with the landowner.

Current report

We maintain strong relationships with tier-one battery and equipment suppliers, utilities, and power purchasers to optimize transmission efficiency and lower consumer costs. We believe these partnerships may also help us secure regulatory support, ensure timely project development within budget, and uphold high product quality standards. Our strategic position allows us to secure multi-year customer contracts before project construction and integrate emerging battery technologies into future developments. Additionally, our systems are designed to enable deferred infrastructure upgrades, reducing the need for costly grid enhancements by efficiently managing local supply and demand.

Current report

Our portfolio of Development Projects includes approximately 3.6 GW of alternating current (GWAC) power capacity across various regions served by Independent System Operators (ISOs) such as ERCOT, WECC, PJM, and MISO. These regions have been selected strategically based on favorable market conditions, grid infrastructure, and regulatory environments conducive to renewable energy integration. In connection with the Emergen transaction, we have secured rights to comprehensive “Work Product” Intangible assets essential for project development, including but not limited to: feasibility studies determining capacity and compatibility, establishing a production model of the project parameters, identifying any curtailment for the project, power flow site verification and substation identification, permitting and regulatory compliance documentation, engineering designs, equipment procurement plans, site preparation guidelines, and noting project specific challenges.

Current report

Subsequent to positive feasibility studies is the process of legal formation, analyzing and negotiating site control/surface and materials, and identifying engineering requirements for construction, identifying and negotiating interconnection to the grid, identifying tax abatements, and identifying permitting and study requirements, and noting additional project specific challenges. These assets provide a robust foundation for advancing our projects through the development lifecycle efficiently and effectively. We are in the process of negotiating grid interconnection agreements, ensuring compliance with applicable grid codes and standards, registering our projects for market participation, and coordinating with ISOs to align dispatch and grid service requirements. In addition, we are actively engaging with these ISOs to address cybersecurity compliance and to develop comprehensive monitoring and reporting frameworks, which are essential for maintaining operational integrity and grid support.

Current report

On April 24, 2024 (the “Closing”) the Company completed the acquisition of Emergen in accordance with the MIPA whereby the Company issued 1,587,300 unregistered shares of its common stock to Emergen’s sole member, C&C Johnson Holdings LLC (“C&C”) in exchange for 100% of Emergen’s equity interests. C&C is controlled by Cole Johnson who became our President and a director following the Closing as well as the President of the Company’s BESS and Solar Divisions. In addition, Emergen became a wholly-owned subsidiary of the Company with C&C’s owning approximately 31.3% of the Company’s issued and outstanding shares of the Company’s capital stock.

Current report

Emergen holds a portfolio of battery energy storage system (“BESS”) projects identified in the MIPA with a cumulative storage capacity estimated at 1.965 gigawatts (GW) upon completion of the construction of such project (the “BESS Development Projects”) and rights to develop a portfolio of solar energy development projects with a cumulative capacity estimated at 1.640 GW upon completion of construction of such project (the “Solar Development Projects,” together with the BESS Development Projects, collectively, the “Development Projects”). The Company agreed that following the Closing, the Company would take all commercially reasonable steps necessary to uplist the Company to the NASDAQ stock exchange.

Current report

At the Closing, the Company and Emergen entered into a Project Management Services Agreement (the “PMSA”) with Energy Independent Partners LLC (“Energy Independent Partners”), an entity owned or controlled by Mr. Johnson. Pursuant to the terms of the PMSA, Energy Independent Partners is obligated to provide the following project management services in connection with the development and operation of each of the Development Projects (collectively, the “Services”): (i) assist as needed with qualifying the Development Projects for financing; (ii) assist as needed with obtaining all permits required for development of the Development Projects which have sufficient rights to use all necessary real property, and for which the applicable draft interconnection agreement has been received for the Development Projects (“RTB Status”); and (iii) if Emergen foregoes the development of a Development Project, Energy Independent Partners will assist the Company as needed with marketing the Development Project to a third party or develop and retain the Development Project outside of Emergen.

Current report

*Payment for Service.*The Issuer agreed to pay Energy Independent Partners the following fees for providing the Services:

Current report

BESS Development Fees. In consideration of the provision of the Services related to the BESS Development Projects, and subject to the terms and conditions herein, during the Term, Bitech shall pay EIP the following amounts per BESS Development Project: $0.035 per W for each applicable BESS Development Project, subject to such BESS Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“BESS Development Fees”). Currently, the Company is focusing on developing the BESS projects and the total fees related to all 23 of the BESS projects would be the $0.035 per watt multiplied by the estimated capacity 1.965 GW (1,965,000,000 watts) or approximately $69 million.

Current report

Solar Development Fees. In consideration of the provision of the Services related to the Solar Development Projects, and subject to the terms and conditions herein, during the Term, Bitech shall pay EIP the following amounts per Solar Development Project: $0.035 per W for each applicable Solar Development Project, subject to such Solar Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“Solar Development Fees”). The Solar projects still in the Emergen portfolio have an estimated capacity of 1.640 GW and would have Solar Development Fees of approximately $57 million if developed.

Current report

If any Development Projects pursuant to the Agreement are sold by Emergen to a third-party then EIP would be due the greater of: (i) any unpaid project’s specific BESS Development Fees or Solar Development Fees defined in the PMSA agreement; or (ii) 62.5% of the proceeds less any project specific BESS Development Fees or Solar Development Fees paid previously.

Current report

Other Development Fees. For each other renewable energy development asset held by the Company, which are neither BESS Development Projects nor Solar Development Projects, located in the United States in which the Company engages during the term of the PMSA (the “Other Development Projects”), the Company shall pay Energy Independent Partners the higher of either (a) fifty percent (50%) of the gross margin or (b) $0.02 per watt in cash, subject to such Other Development Project achieving RTB Status (the “Other Development Fees”).

Current report

The BESS Development Fees shall be due and payable upon (i) Bitech, or any of its Affiliates, receiving project financing directly related to and collateralized by BESS Projects, this specifically excludes any general public or private offerings by Bitech not directly related to financing a BESS Project, and (ii) when a BESS Project’s financing funding terms is sufficient to pay the project specific Development Fees. EIP will be paid on the same timing as the funding terms. For example: if the terms for development fees are 50% at acceptance, 40% RTB and 10% at COD then EIP will be paid as the project development fees are funded.

Current report

These fees will be recorded as liabilities once the above contingencies and milestones are met, the most important being that of appropriate project financing enabling payment of these fees.

Current report

Acceleration of Payment Clause: Within ninety (90) days (i) of the effective date of a Change of Control or (ii) the removal of Cole W. Johnson as an employee or consultant to Emergen and/or the head of the BESS and Solar Division of Bimergen Energy, any remaining BESS Initial Fee and Solar Initial Fee shall become due and payable. A “Change of Control” shall be deemed to have occurred if, after the Effective Date, (x) the beneficial ownership (as defined in Rule 13d-3 under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) of securities representing more than 50% of the combined voting power of the Company is acquired by any “person” as defined in sections 13(d) and 14(d) of the Exchange Act (other than the Company, any subsidiary of the Company, or any trustee or other fiduciary holding securities under an employee benefit plan of the Company); (y) the merger or consolidation of the Company with or into another corporation where the shareholders of the Company, immediately prior to the consolidation or merger, would not, immediately after the consolidation or merger, beneficially own (as such term is defined in Rule 13d-3 under the Exchange Act), directly or indirectly, shares representing in the aggregate 50% or more of the combined voting power of the securities of the corporation issuing cash or securities in the consolidation or merger (or of its ultimate parent corporation, if any) in substantially the same proportion as their ownership of the Company immediately prior to such merger or consolidation; or (z) the sale or other disposition of all or substantially all of the Company’s assets to an entity, other than a sale or disposition by the Company of all or substantially all of the Company’s assets to an entity, at least 50% of the combined voting power of the voting securities of which are owned directly or indirectly by shareholders of the Company, immediately prior to the sale or disposition, in substantially the same proportion as their ownership of the Company immediately prior to such sale or disposition.

Current report

If any Development Projects pursuant to the Agreement are sold by Emergen to a third-party then EIP would be due the greater of: (i) any unpaid project’s specific BESS Development Fees or Solar Development Fees defined in Section 2.06; or (ii) 62.5% of the proceeds less any project specific BESS Development Fees or Solar Development Fees paid previously.

Current report

The timing and other requirements for the payment of Other Development Fees shall be as agreed in writing by the parties to the PMSA via an addendum to the PMSA prior to the parties undertaking such Other Development Projects.

Current report

Subject to the terms and conditions of the PMSA, in addition to the other requirements therein, payment of the BESS Development Fees, the Solar Development Fees and any Other Development Fees is further contingent upon Cole W. Johnson (a) remaining an employee or consultant to Emergen and/or the head of the BESS and Solar Division of the Company and/or (b) as an interest owner in the Energy Independent Partners during the period of time in which the applicable BESS Development Fees, the Solar Development Fees or Other Development Fees are payable. Subject to the foregoing, the BESS Development Fees, the Solar Development Fees or Other Development Fees are payable within ten (10) days of satisfaction of the conditions to payment as discussed above.

Current report

Payment for Sale of Development Projects. In the event the Company decides not to proceed with any Development Project(s), the Company may elect to sell such Development Project(s) to one or more third parties. In such event, the Company and Energy Independent Partners agree to a sales price for the applicable Development Project being sold, and provided that the parties to the PMSA agree that any sale agreement for such Development Projects shall provide that the buyer thereof shall remain obligated to pay to Energy Independent Partners the BESS Development Fees and/or the Solar Development Fee(s), as applicable, to the extent not already paid by the Company hereunder, unless otherwise agreed upon by the Company and Energy Independent Partners.

Current report

Termination. The PMSA may be terminated at any time prior to the expiration of its term: (a) by the mutual written consent of the parties; (b) by the Company if Energy Independent Partners has violated or breached any of the covenants or agreements of Energy Independent Partners set forth therein, or any of the representations or warranties of Energy Independent Partners set forth in the PMSA has become inaccurate or untrue, which violation, breach, inaccuracy or untruth, if reasonable capable of cure, has not been cured by Energy Independent Partners, within 20 business days after receipt by Energy Independent Partners of written notice thereof from the Company; (c) by Energy Independent Partners if the Company or Emergen has violated or breached any of the covenants or agreements of the Company or Emergen set forth in the PMSA, or any of the representations or warranties of the Company or Emergen set forth in the PMSA has become inaccurate or untrue, which violation, breach, inaccuracy or untruth, if reasonable capable of cure, has not been cured by the Company or Emergen, within 20 business days after receipt by the Company of written notice thereof from Energy Independent Partners; or (d) by any party, if a court of competent jurisdiction or other governmental authority shall have issued an order or taken any other action permanently restraining, enjoining or otherwise prohibiting the Combination or the transactions contemplated by the PMSA and such order or action shall have become final and nonappealable. Any of the Parties has a right to seek specific performance of the other parties’ obligations under the PMSA in lieu of its right to terminate the agreement.

Current report

Indemnification. Subject to certain limitations provided for in the PMSA, each of the parties to the PMSA mutually agreed to indemnify and hold harmless each other and each of their affiliates and each of their respective members, managers, partners, directors, officers, employees, stockholders, attorneys and agents and permitted assignees to the fullest extent permitted by applicable law, against and in respect of any and all losses incurred or sustained by such party as a result of or in connection with (i) any breach, inaccuracy or nonfulfillment or the alleged breach, inaccuracy or nonfulfillment of any of the representations, warranties, covenants and agreements of the other party contained in the PMSA or in any of the additional agreements or any certificate or other writing delivered pursuant hereto; or (ii) any claim for brokerage commissions in connection with the transactions contemplated hereby as a result of the actions or agreements of the other party or any of their representatives.

Current report

For the three months ended March 31, 2025, cash provided by financing was approximately $83,000 including proceeds of $135,000 from short term loan due to a related party compared to $256,000 provided for the three months ended March 31, 2024 from sale of common stock.

Current report

The Company received and recorded as deferred revenue during 2024 a $943,500 deposit payment from the Project Sale Agreement with Bridgelink for an estimated 2.425 GW of Emergen’s estimated 3.840 GW of solar energy development projects. The total amount to be received by Emergen for the projects sold to Bridgelink is expected to be $19,400,000 unless certain of the projects are returned without development to the payment milestones. We have paid EIP $250,000 during 2024 related to the $943,500 deposit and owe an additional $339,688 currently recorded in due to related party. EIP will be due 62.5% of the proceeds received related to the Project Sale Agreement. If the remaining $18.5 million is received from the ultimate purchaser via Bridgelink we will owe EIP $11.5 million for their portion per the agreement.

Current report

A description of recently issued accounting pronouncements that may potentially impact our financial position, results of operations or cash flows is disclosed in Note 2 to our condensed financial statements included elsewhere in this Quarterly Report on Form 10-Q.

Current report

Our significant accounting policies and critical accounting estimates are described in Note 2 to our audited financial statements for the year ended December 31, 2024 included in Part II, Item 8 of our Annual Report on Form 10-K for the year ended December 31, 2024, filed with the SEC on May 30, 2025. There have been no material changes to our significant accounting policies or critical accounting estimates during the three months ended March 31, 2025.
Removed paragraphs (16)

Previous report

S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Previous report

Currently, we have refocused our business development plans as we seek to position ourselves as a global technology solution enabler dedicated to providing a suite of green energy solutions with plans to develop Battery Energy Storage System (BESS) projects, commercial and residential renewable energy solutions, enterprise utility services, public service engagements, and other renewable energy initiatives. We plan to pursue these innovative energy technologies and become a grid-balancing operator by developing a portfolio of battery energy storage system (“BESS”) projects with a cumulative storage capacity estimated at 1.965 gigawatts (“GW”) and rights to develop a portfolio of solar energy development projects with a cumulative capacity estimated at 3.840 GW (collectively, the “Development Projects”) that we acquired in connection with our acquisition of Emergen Energy LLC (“Emergen”). See Note 8 – Solar Projects Sale to the financial statements included elsewhere in this Quarterly Report on Form 10-Q discussing the recent sale of 2.425 GW estimated capacity of the 3.84 solar energy development projects. We plan to raise the working capital we need to commence the Development Projects. See Management’s Discussion and Analysis of Financial Condition and Results of Operations - Liquidity and Capital Resources. In addition, our team has identified two highly competitive battery energy storage suppliers who have expressed interest in establishing partnerships with us, as we seek to integrate their products into our recently acquired Development Projects. In addition, we are seeking business partnerships with defensible technology innovators and renewable energy providers to facilitate investments, provide new market entries toward emerging-growth regions and implement innovative, scalable energy system solutions with technological focuses on smart grid, Home Energy Management System (HEMS), Building Energy Management System (BEMS), City Energy Management System (CEMS), energy storage, and EV infrastructure.

Previous report

To accelerate growth of a planned intellectual property (IP) portfolio through acquisition strategies, we plan to execute our Smart Acquisition Model with selected acquisitions of defensible technologies accompanied with visionary management teams who can demonstrate a common goal with us in order to unlock the full potential with capital infusion, accelerate growth. To achieve our development plans, we plan to incubate those acquired companies toward foreseeable plans for mergers and acquisitions, formation of global joint ventures, while facilitating new market entry to today’s fastest growing Southeast Asia region. With this acquisition model, we expect to build a valuable technology portfolio of IP assets in various innovative green energy technologies, leveraging our network of global capital partners with low-cost manufacturing capacity and oversea outsourcing technical talents from our niche sources in Vietnam.

Previous report

Further, we plan to execute a Dual Growth Business Model encompassing (1) IP portfolio growth which includes technology licensing or technology acquisitions, enhanced with our plans to carry out research and development for specific applications, and (2) sustainable revenue growth by executing planned BESS acquisitions via joint ventures with capital partners to collect joint venture income from BESS operations or Vietnam-based manufacturing partners which can manufacture products derived from our technology solutions.

Previous report

The Company acquired Bitech Mining on March 31, 2022 pursuant to a Share Exchange Agreement. Pursuant to the Share Exchange Agreement we acquired an aggregate of 94,312,250 shares of Bitech Mining’s Common Stock representing 100% of the issued and outstanding shares of Bitech Mining in exchange for an aggregate of 9,000,000 shares of the Company’s newly authorized Series A Convertible Preferred Stock. Effective June 27, 2022, each share of Series A Preferred Stock automatically converted into 53.975685 shares (an aggregate of 485,781,168) of the Company’s Common Stock upon filing of an amendment to its Certificate of Incorporation increasing the number of the Company’s authorized common stock to 1,000,000,000. Upon conversion of the Series A Preferred Stock, the Sellers held, in the aggregate, approximately 96% of the issued and outstanding shares of Company capital stock on a fully diluted basis.

Previous report

The Share Exchange was treated as a recapitalization and reverse acquisition for financial reporting purposes, and Bitech Mining is considered the acquirer for accounting purposes. As a result of the Share Exchange and the change in our business and operations, a discussion of the past financial results of our predecessor, Spine Injury Solutions Inc., is not pertinent, and under applicable accounting principles, the historical financial results of Bitech Mining, the accounting acquirer, prior to the Share Exchange are considered our historical financial results.

Previous report

During the nine months ended September 30, 2024, we incurred $1,948,487 of general and administrative expenses compared to $596,941 for the same period in 2023. General and administrative expenses the nine months ended September 30, 2024 have increased primarily related to $928,000 of non-cash stock compensation expense and the increases in the nine months ended September 30, 2024 of approximately $70,000 legal fees related to the Emergen Acquisition and $249,000 contractor fees related to the Emergen projects. We have booked $943,500 deferred revenue related to cash received for the sale of certain solar projects originally acquired as part of the Emergen Acquisition.

Previous report

As a result of the foregoing, we had net loss of ($1,948,159) for the nine months ended September 30, 2024, compared to a net loss of ($589,941) which included $7,000 other income to offset the general and administrative expenses for the nine months ended September 30, 2023.

Previous report

The calculation of Working Capital provides additional information and is not defined under GAAP but it is acknowledged that it is a defined term by the FASB. We define Working Capital as current assets less current liabilities. This measure should not be considered in isolation or as a substitute for any standardized measure under GAAP. This information is intended to provide investors with information about our liquidity.

Previous report

Other companies in our industry may calculate this measure differently than we do, limiting its usefulness as a comparative measure.

Previous report

There were no material changes in or adoption of new accounting practices during the nine months ended September 30, 2024.

Previous report

See Note 2 of the accompanying notes to unaudited condensed consolidated financial statements, which note is incorporated herein by reference.
Reworded paragraphs (5)

Previous wording

This management discussion and analysis (“MD&A”) of the financial condition and results of operations of Bitech Technologies Corporation (the “Company,” “Bitech Technologies,” “our” or “we”) is for the nine months ended September 30, 2024 and 2023. It is supplemental to, and should be read in conjunction with, our condensed consolidated financial statements for the nine months ended September 30, 2024 and 2023 and the accompanying notes for such period included in our Current Report on Form 8-K filed with the Securities and Exchange Commission, or SEC, on April 4, 2022. Our financial statements are prepared in accordance with accounting principles generally accepted in the United States of America (“GAAP”). Financial information presented in this MD&A is presented in United States dollars (“$” or “US$”), unless otherwise indicated.

Current wording

This management discussion and analysis (“MD&A”) of the financial condition and results of operations of Bimergen Energy Corporation (the “Company,” “Bimergen Energy,” “our” or “we”) is for the three months ended March 31, 2025 and 2024. It is supplemental to, and should be read in conjunction with, our condensed consolidated financial statements for the three months ended March 31, 2025 and 2024 and the accompanying notes for such period included in our Current Report on Form 8-K filed with the Securities and Exchange Commission, or SEC, on April 4, 2022. Our financial statements are prepared in accordance with accounting principles generally accepted in the United States of America (“GAAP”). Financial information presented in this MD&A is presented in United States dollars (“$” or “US$”), unless otherwise indicated.

Previous wording

During the three months ended September 30, 2024, we incurred $811,752 of general and administrative expenses compared to $135,434 for the same period in 2023. General and administrative expenses have increased primarily related to approximately $339,880 of non-cash stock compensation expense and approximately $70,000 legal fees related to the Emergen Acquisition and $166,000 contractor fees related to the Emergen projects. We have booked $943,500 deferred revenue related to cash received for the sale of certain solar projects originally acquired as part of the Emergen Acquisition.

Current wording

During the three months ended March 31, 2025, we incurred $857,037 of general and administrative expenses compared to $313,835 for the same period in 2024. General and administrative expenses have increased primarily related to approximately $313,000 of non-cash stock compensation expense and $95,000 contractor fees related to the Emergen projects.

Previous wording

As a result of the foregoing, we had net loss of ($811,762) for the three months ended September 30, 2024, compared to a net loss of ($135,434) for the three months ended September 30, 2023.

Current wording

As a result of the foregoing, we had net loss of ($857,644) for the three months ended March 31, 2025, compared to a net loss of ($313,507) for the three months ended March 31, 2024.

Previous wording

As of September 30, 2024 and December 31, 2023, we had total current liabilities of $1,154,995 and $35,229, respectively, and current assets of $725,311 and $163,417, respectively, to meet our current obligations. As of September 30, 2024, we had working capital of $529,625, a decrease of working capital of $453,943 as compared to December 31, 2023, driven primarily by $943,500 deferred revenue recorded related to cash provided from the sale of solar projects and cash used in operations offset by $396,000 cash proceeds from the sale of common stock during the nine months ended September 30, 2024.

Current wording

As of March 31, 2025 and December 31, 2024, we had total current liabilities of $2.2 million and $1.8 million, respectively, and current assets of $1.0 million and $1.0 million, respectively, to meet our current obligations. As of March 31, 2025, we had working capital of ($1.2 million) as compared to working capital of ($0.7 million) as of December 31, 2024.

Previous wording

For the nine months ended September 30, 2024, cash used by operations was approximately ($83,000) which primarily included the net loss of approximately ($1,948,000) but adjusted for the deferred revenue payment of $943,500, the non-cash stock based compensation of $928,000, and common stock issued for legal services of $66,000.

Current wording

For the three months ended March 31, 2025, cash used by operations was approximately ($142,000) which primarily included the net loss of approximately ($858,000) but adjusted for the non-cash stock based compensation of $313,000, common stock issued for legal services of $116,000, an increase in accounts payable of $85,000 compared to approximately ($166,000) cash used by operations which primarily included the net loss of approximately ($313,000) but adjusted for the non-cash stock based compensation of $94,000
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

Comparison of the nine month period ended September 30, 2024 with the nine month period ended September 30, 2023.

Previous report — wording carried elsewhere

The Company has generated minimal revenues from its primary business for the nine months ended September 30, 2024 and September 30, 2023.