For the period ended Mar 31, 2025. Filed May 15, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 15, 2025

SLNH$0.52+13.2%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-14.

0001493152-24-045722

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-05-15.

0001641172-25-010886

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 170 previous paragraphs and 144 current paragraphs.

21 unchanged; 27 reworded; 95 added; 116 removed; 6 previous and 1 current paragraphs rearranged.

Tables are not compared: 18 previous and 19 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (95)

Current report

We develop and operate digital infrastructure that taps into a growing global opportunity: the convergence of renewable energy and High-Performance Computing (HPC). We call this modelRenewable Computing™.

Current report

Across the world, vast amounts of clean energy go to waste due to curtailment. At the same time, there is a critical shortage of power for energy-intensive infrastructure like AI, HPC, and Bitcoin mining. Renewable Computing™ bridges this gap—unlocking stranded renewable energy and turning it into scalable computing power.

Current report

We build, own or co-own, and operate data centers co-located with wind, solar, and hydroelectric plants. Our modular and scalable design supports high-throughput, batchable applications such as Bitcoin, and soon, HPC/AI workloads. These facilities are managed byMaestroOS™, our proprietary operating system (“MaestroOS”), which continuously analyzes signals like local power pricing, weather, grid demand, and market conditions to optimize performance and economics.

Current report

This intelligent orchestration enables long-term asset monetization and attractive returns on invested capital. Our approach is purpose-built for the energy transition. We specialize in curtailment solutions, working closely with leading renewable energy developers to access underutilized, low-cost power. Our behind-the-meter model allows us to draw energy directly from the plant or the grid, while also providing demand response services—reducing costs and enhancing grid resilience.

Current report

A key strategic advantage is our model of co-locating data centers directly with renewable power generation assets. By building behind the meter, we are able to bypass long interconnection queues and source electricity directly from the generation site. This structure not only improves power economics, but also accelerates time-to-market—an increasingly important factor for companies with large, time-sensitive computing workloads such as AI and HPC.

Current report

With a repeatable strategy and a growing pipeline of projects, we are scaling a new category of digital infrastructure—one that energizes the grid, lowers computing costs, and advances a more sustainable future.

Current report

We operate across multiple business lines and generate revenue from four primary sources, as described below:

Current report

We engage in proprietary Bitcoin mining, a process that verifies transactions and secures the Bitcoin blockchain. This process involves the use of specialized computing equipment to solve complex cryptographic algorithms. Miners compete to solve these algorithms; the first to do so is awarded a predetermined number of newly issued Bitcoins (the “Block Reward”) and any transaction fees associated with that block.

Current report

We participate in one or more mining pools—collaborative networks of miners who combine computing power to improve the probability of earning rewards. Block Rewards earned by the pool are distributed among participants based on each member’s proportional contribution. This model helps reduce revenue volatility compared to solo mining operations.

Current report

Our mining operations are energy-intensive and require significant computational resources. We operate data centers equipped with both proprietary and third-party hardware and software. Our proprietary data center operating system,MaestroOS, is used to optimize performance, manage power consumption, and increase operational efficiency.

Current report

Revenue from Bitcoin mining consists of Block Rewards and transaction fees and is recognized upon receipt in accordance with applicable accounting guidance. Upon receipt, all digital assets are promptly converted into U.S. dollars through the Coinbase cryptocurrency exchange.

Current report

The profitability of this business is affected by several variables, including the market price of Bitcoin, global network hash rate, mining difficulty, electricity and infrastructure costs, and mining pool fees. In addition, Bitcoin undergoes a periodic “halving” event approximately every four years, reducing the Block Reward and potentially impacting future revenue. For the three months ended March 31, 2025, our Bitcoin Mining Business represented approximately 51% of total revenue.

Current report

We provide colocation and hosting services for third-party Bitcoin mining customers at our data centers. Customers contract space based on their power requirements. Our current customer base includes several large-scale (“Hyperscale”) Bitcoin miners. Contracts typically range from 12 to 24 months in duration.

Current report

For the three months ended March 31, 2025, our Bitcoin Hosting Business accounted for approximately 40% of total revenue. Revenue in this business was concentrated among a small number of customers. For the three months ended March 31, 2025, three customers made up approximately 83% of hosting revenue and 33% of total revenue.

Current report

In June 2024, we began providing GPU-as-a-Service in partnership with Hewlett Packard Enterprise Company (“HPE”), offering GPU resources to startups, enterprises, and GPU marketplaces for a fee. As further described below in “Recent Developments”, we terminated our agreement with HPE.

Current report

We are currently developing new infrastructure projects intended to support AI and HPC workloads. These efforts include engagement with potential joint venture partners, conducting site and feasibility studies, securing access to power and land, and performing other early-stage development activities.

Current report

Our first planned AI/HPC colocation project isProject Kati, which is in advanced development. Additional projects, including the announcedProject Rosa, are also in progress. For the fiscal year 2024 and the three months ended March 31, 2025, we generated minimal revenue from our HPC Business.

Current report

We provide demand response services to grid operators and utilities by leveraging our data centers as dispatchable energy resources. In select states where we operate, our data centers are enrolled in ancillary services programs that support grid reliability.

Current report

Under these programs, we commit to reducing a facility’s power consumption to a predetermined level when called upon by the grid operator. In return, we receive compensation for maintaining this dispatch capability, provided we meet specific performance criteria. For example, to qualify for compensation in a given period—typically monthly—the data center must meet minimum uptime and availability requirements.

Current report

For the three months ended March 31, 2025, our Demand Response Business represented approximately 9% of total revenue.

Current report

As of March 31, 2025, we operate approximately 75 MW of capacity across two active sites located in Murray, Kentucky and Silverton, Texas. An additional 48 MW is under construction at our D2 project site, and as of March 31, 2025, we had over 623 MW of facilities in advanced development or near shovel-ready status. In total, our project pipeline includes over 2.6 gigawatts (GW) of renewable energy-powered data center developments.

Current report

We manage our data center operations using**MaestroOS.**MaestroOS continuously monitors and analyzes a variety of real-time signals, including local electricity prices, weather conditions, Bitcoin market metrics, and grid demand signals, to optimize facility performance. In addition, MaestroOS is used to coordinate and execute our participation in demand response programs.

Current report

We finance the development and construction of our data centers through a combination of public equity offerings, debt instruments, and partnerships with project-level capital providers. As of December 31, 2024, we had two primary project-level financing partners:

Current report

In November 2023, we completed registration of Project Dorothy in one of the ERCOT’s Demand Response Services (“DRS”) programs. This designation positioned Project Dorothy as a contributor to grid flexibility and resilience in the Texas power market, while also enabling us to diversify our revenue streams.

Current report

Under the DRS program, we commit to maintaining a specified level of curtailment capacity—measured as load reduction availability—on a monthly basis. When called upon by ERCOT, we are required to reduce the facility’s power consumption by the committed amount. In exchange, we receive compensation for maintaining this curtailment readiness, regardless of whether an actual dispatch occurs.

Current report

Participation in the program allows us to generate incremental revenue and offset power costs at Project Dorothy, enhancing its cost-efficiency. As a result, the facility ranks among the lowest-cost operators in the sector. Since registration, Project Dorothy has successfully fulfilled its obligations in the Winter, Spring, and Summer DRS periods, and is currently enrolled in the Fall standby period.

Current report

Project Grace is a 2 MW project located at the D2 site focused on next generation data center designs for AI. It contemplates new direct liquid cooling technologies, proprietary building and power designs – called Helix.

Current report

We are developing Project Kati in Willacy County, Texas, which is expected to be developed into 166 MW of data centers for HPC, Bitcoin Hosting and other computing-intensive applications. It is co-located with a 272.6MW wind farm in Texas. We have completed the necessary studies for the ERCOT planning phase, which is the last formal step to secure approvals by regulatory agencies or grid operators, such as ERCOT in Texas, to proceed with project construction and commissioning. We have also completed the necessary amendments to the interconnection agreements with American Electric Power, the transmission service provider. We have also secured land, contingent on reaching final agreement with local government and schools regarding taxation, for the project and have started capital formation activities.

Showing the first 40 of 95 passages. Open the source sections for the rest.

Removed paragraphs (116)

Previous report

We are a digital infrastructure company specializing in transforming surplus renewable energy into computing resources. Our modular data centers can co-locate with wind, solar, hydroelectric and other renewable power plants and support compute intensive applications including Bitcoin Mining, Generative AI, Scientific Computing and other forms of High-Performance Computing (HPC). This pioneering approach to data centers helps energize a greener grid while delivering cost-effective and sustainable computing solutions.

Previous report

SHI through its subsidiaries operates across several business lines:

Previous report

(1) Optimize Projects – improve the profitability, operational efficiency, customer satisfaction and customer mix at our operating data centers;

Previous report

(2) Grow Pipeline – increase the number of curtailment assessments completed, sign more term sheets for projects and mature more projects to shovel readiness;.

Previous report

(3) Launch AI – form, capitalize, and begin operations of our AI Cloud services business in partnership with a leading Original Equipment Manufacturer (“OEM”) partner and kick off customer development activities; and

Previous report

(4) Financing Opportunities – Raise capital to support our growth initiatives, including Project Dorothy 2, Project Ada, and Project Kati. to support.

Previous report

A summary of our overview and developments in these areas follows below.

Previous report

In November 2023, we completed registration of Project Dorothy for one of ERCOT’s Demand Response Services (“DRS”) programs establishing the project as a key contributor to intelligent and flexible energy solutions, promoting environmental and economic advantages for the state of Texas. It also allowed us to diversify our revenue. Under the program, we have a single promise to stand ready, on a monthly basis, to deliver a set amount of curtailment (committed capacity) per month when and if called upon by ERCOT. The Company is able to generate additional revenue for Project Dorothy by providing this grid resilience support which reduces its power costs, making it one of the lowest cost players in the industry. Since November 2023, Project Dorothy has successfully participated in and completed the Winter, Spring and Summer DRS periods in ERCOT, and is currently in the fall standby period.

Previous report

In the second quarter of 2023, we shifted our business from primarily proprietary Bitcoin Mining to Bitcoin Hosting. We signed 50 MW of hosting agreements at Dorothy 1A and Sophie.

Previous report

In February 2023, Project Marie, our 20 MW data center in Kentucky was decommissioned. The decision was sparked by following events:

Previous report

As a result, we disposed of all remaining assets at the site, terminated the Atlas hosting agreement, and decommissioned the site.

Previous report

In 2023, we implemented a number of cost improvement initiatives and ramped up a new Financial Planning and Analysis (“FP&A”) function to provide our management and operations teams better insight into the financial performance of our data centers. This helped us find opportunities to improve profitability and proactively address critical issues with infrastructure equipment at all sites. Our MaestroOS software platform managed the efficient operations of projects Dorothy and Sophie through record setting temperatures (hot and cold) in both Texas and Kentucky in 2023. In 2024, our Maestro control system has continued to respond well to increases in grid demand throughout the summer.

Previous report

In 2024, our objective is to achieve operational excellence across all data centers, targeting a budgeted EBITDA and maintaining high customer satisfaction. Our infrastructure optimization efforts have been completed to protect equipment against the severe summer heat to include miner heat shielding, building insulation upgrades, and transformer fan kit installations.

Previous report

In addition, we have 2 MW of our Project Dorothy 2 site slated for our Helix Pilot, focused on next generation data centers for AI.

Previous report

Project Kati is planned to be a 166 MW data center integrated with a 300 MW wind farm in South Texas. It is expected to host a mix of Bitcoin Mining and AI/HPC customers in separate data center facilities located onsite and sharing certain infrastructure. The project has progressed rapidly from term sheet signing in 2023 through the ERCOT planning process and signing of a PPA with EDF Renewables and Masdar - Abu Dhabi Future Energy Company.

Previous report

Project Rosa is planned to be a 187 MW data center integrated with a 240 MW wind farm in North Texas. It is, like Kati, expected to host a mix of Bitcoin Mining and AI/HPC customers in separate data center facilities located onsite and sharing certain infrastructure. Term sheets for power and land were signed in September 2024 and the project will soon move into and through the ERCOT planning process as well as securing a PPA.

Previous report

We are on track to nearly double our assets under management by the end of 2024 or early 2025 and thereafter which is our goal.

Previous report

Project Ada launched when a subsidiary of Soluna Cloud entered into a $12.5 million credit facility with GreenCloud Partners in June 2024 and a $1.25 million credit facility on the same terms with a syndicated group of lenders related to Alpha Capital in July. These funds enabled us to fund ongoing working capital needs and to secure an agreement with Hewlett Packard Enterprise Company (“HPE”) to acquire access to datacenter and cloud services for AI and HPC processes for 36 months at a cost of $34 million, with $10.3 million pre-paid in June at contract execution.

Previous report

Soluna Cloud began offering its services by leveraging HPE’s renewable-powered high performance data centers. Their cutting-edge facilities, known for their energy efficiency and sustainability, support the environmental sustainability of Soluna Cloud’s operations. Additionally, this collaboration expands Soluna Cloud’s offering beyond just bare-metal infrastructure, making available HPE’s comprehensive software solutions for AI pipelines. As an HPE Partner Ready Service Provider partner, Soluna Cloud will offer its advanced cloud solutions to HPE’s global customer base demonstrating AI expertise and delivery capabilities. This partnership can be expanded in the future.

Previous report

Project Grace will leverage Soluna’s new Helix data center model to be built at 2 MW capacity adjacent to Project Dorothy. The Helix model will serve as the growth pathway for customers, addressing the growing demand for more sustainable data centers for AI powered by renewable energy and will demonstrate Soluna’s proprietary data center design and its substantial expected benefits.

Previous report

We secured a $25 million SEPA in August 2024 with a subsidiary fund of Yorkville Advisors. This facility provides cash to us by way of draws against it which can be made once the S-1 registration statement that was filed in September 2024 is effective and can be fully used once shareholder approval to remove the exchange cap is obtained which is expected to be in November 2024. Funds from this facility will fund critical Soluna Cloud AI operations and data center development, capital for deployment into projects to improve equity ownership and cash flows, to strengthen the balance sheet and to retire existing convertible loan notes.

Previous report

In order to secure necessary consents for the SEPA, agreements were reached with existing convertible loan noteholders and the Preferred Series B stockholder. The agreements with convertible loan note holders resulted in prepayment of convertible loan note prepayment fees, payment of a waiver fee of $750 thousand and an obligation to purchase the $1.25 million Soluna Cloud notes and pay unconverted convertible loan note balances from cash raised from the SEPA. The agreements with the Preferred Series B stockholder resulted in limitations of future rights of first refusal, participation, consent and warrant or stock conversion and repricing of the conversion price and existing warrants and issuance of new warrants.

Showing the first 40 of 116 passages. Open the source sections for the rest.

Reworded paragraphs (27)

Previous wording

Unless the context requires otherwise in these notes to the consolidated financial statements, the terms “SHI,” the “Company,” “we,” “us,” and “our” refer to Soluna Holdings, Inc. together with its consolidated subsidiaries, “SDI” refers to Soluna Digital, Inc. and previously “SCI” refers to Soluna Computing, Inc., formerly known as EcoChain, Inc.

Current wording

Unless the context requires otherwise in these condensed consolidated financial statements, the terms “SHI,” “Soluna,” the “Company,” “we,” “us,” and “our” refer to Soluna Holdings, Inc. together with its consolidated subsidiaries, “SDI” refers to Soluna Digital, Inc. “SCI” refers to Soluna Computing, Inc., formerly known as EcoChain, Inc., “Soluna Cloud” or “Cloud” refer to Soluna Cloud, Inc., and “SEI” refers to Soluna Energy, Inc. Other trademarks, trade names, and service marks used in this Quarterly Report on Form 10-Q are the property of their respective owners.

Previous wording

Our mission is tomake renewable energy a global superpower using computing as a catalyst.

Current wording

Our mission is to make renewable energy a global superpower using computing as a catalyst.

Previous wording

In 2024, our execution has been focused on four key initiatives, namely:

Current wording

In 2024, our execution strategy was centered around four key initiatives:

Previous wording

We currently operate 75 MW of facilities at two locations. We have another 405 MW of facilities in development or near shovel ready in the United States. In addition, we have a 2 GW+ pipeline of renewable-energy powered projects. A summary of our pipeline, current and anticipated operating locations are as follows (as of September 30, 2024):

Current wording

A summary of our pipeline, current and anticipated operating locations are as follows (as of March 31, 2025):

Previous wording

We transitioned our flagship data center Project Dorothy from construction to operations during 2023 between spring and fall. The data center is co-located with Briscoe Wind Farm (“Briscoe”), a 150 MW wind power generation facility in Silverton, Texas. The project is comprised of two elements, Project Dorothy 1A (“D1A”), and Project Dorothy 1B (“D1B”), each 25 MW facilities.

Current wording

During 2023, we transitioned our flagship data center Project Dorothy from construction to operations. This data center is co-located with Briscoe Wind Farm (“Briscoe”), a 150 MW wind power generation facility in Silverton, Texas. The project comprises three phases, D1A, and D1B, each 25 MW facilities, and D2 (48 MW).

Previous wording

D1A is focused on Bitcoin Hosting of two large customers. There are approximately 7,700 Bitcoin miners installed between the two customers, resulting in an installed hashrate of approximately 950 PH/s. From May 2023 through December 31, 2023, D1A consumed over 11,900 MWh of Curtailed Energy and achieved a power usage effectiveness (“PUE”) of 1.03. For the three and nine months ended September 30, 2024, D1A consumed over 2,900 MWh and 31,000 MWh of Curtailed Energy and achieved a PUE of 0.99.

Current wording

D1A is focused on Bitcoin Hosting for some of the industry’s hyperscale miners. There are approximately 7,800 Bitcoin miners installed at D1A, which as of March 31, 2025, resulted in a hashrate of approximately 900 TH/s. For the year ended December 31, 2024, D1A consumed over 45,700 MWh of Curtailed Energy and for the three months ended March 31, 2025, D1A consumed over 11,900 MWh of Curtailed Energy.

Previous wording

D1A was constructed in partnership with Spring Lane Capital (“SLC”), a leading venture capital firm focused on sustainability solutions. SLC owns approximately 85% of the Class B Membership Units, while we own 15% and own 100% of the Class A Membership Units. After SLC achieves an 18% Internal Rate of Return hurdle, Soluna retains 50% of the profits on D1A.

Current wording

D1A was constructed in partnership with SLC, a leading venture capital firm focused on sustainability solutions. SLC owns approximately 85% of the Class B Membership Units of D1A, while we own 15% of the Class B Membership Units of D1A and own 100% of the Class A Membership Units of D1A. After SLC achieves an 18% Internal Rate of Return hurdle, Soluna retains 50% of the profits on D1A.

Previous wording

D1B is focused on proprietary Bitcoin Mining. There are approximately 7,900 Bitmain Antminer S19s, S19j Pro and S19j Pro+ machines installed, resulting in an installed hashrate of 817 PH/s From July 2023 through December 31, 2023, D1B consumed over 10,600 MWh of Curtailed Energy and achieved a PUE of 1.03. For the three and nine months ended September 30 2024, D1B consumed over 2,650 and 30,800 MWh of Curtailed Energy and achieved a PUE of 0.99.

Current wording

D1B is focused on proprietary Bitcoin Mining. There are approximately 7,700 Bitmain Antminer S19s, S19j Pro and S19j Pro+ machines installed, resulting in an installed hashrate of 817 PH/s. For the year ended December 31, 2024, D1B consumed over 44,500 MWh of Curtailed Energy and for the three months ended March 31, 2025, D1B consumed over 13,000 MWh of Curtailed Energy. D1B is co-owned by Navitas, which owns approximately 49% of D1B, while we own the remaining 51%.

Previous wording

We began planning for the 50 MW expansion of Project Dorothy in 2023. We partnered with SLC who will finance up to $30 million of the project cost. We closed the initial financing contribution and operation agreement with SLC in July 2024 and broke ground in the third quarter of 2024. Initial energization and ramp-up is expected by the end of the first quarter of 2025. Dorothy 2 will feature a stronger waterfall structure and enhanced management and development fees compared to Dorothy 1A, allowing Soluna to benefit from substantial income once the facility is operational.

Current wording

We began planning for the 48 MW expansion of Project Dorothy in 2023 – known as Project Dorothy 2. We partnered with SLC who agreed to finance up to $30 million of the project cost. We closed the initial financing contribution and operation agreement with SLC in July 2024 and broke ground in the third quarter of 2024. Initial energization and ramp-up is expected by the end of the second quarter of 2025. This will enable the commencement of the commissioning of the first of 3 phases, each of 16MW, that will occur between May and October 2025 when the site is expected to be fully operational. As each phase is commissioned, it will begin to generate revenue, both due to Bitcoin Hosting and Demand Response Services. D2 features a superior financial waterfall structure and enhanced management and development fees for Soluna compared to D1A, allowing us to benefit from improved income once the facility is operational.

Previous wording

Sophie is focused on Bitcoin Hosting of multiple large customers such as Bit Digital and Compass. The data center generates revenue via a combination of fixed services fees and profit share, while energy cost is passed through. There are approximately 9,000 Bitcoin miners installed, resulting in an installed hashrate of approximately 801 PH/s. For 2023, the facility achieved a PUE of 1.03. For the three and nine months ended September 30, 2024, the facility achieved a PUE of 1.02.

Current wording

Sophie is focused on Bitcoin Hosting of multiple large customers. The data center generates revenue via a combination of fixed services fees and profit share, while energy cost is passed through. As of March 31, 2025, there are approximately 8,600 Bitcoin miners installed or contracted to be installed, resulting in an installed hashrate of approximately 1.07 EH/s and achieved a PUE of 1.03.

Previous wording

On June 20, 2024, pursuant to the terms and subject to the conditions of a June SPA by and among (i) CloudCo, (ii) Soluna Cloud, (iii) the Company and (iv) Investor, CloudCo issued to the Investor a secured promissory note in a principal amount equal to $12.5 million (the “June 2024 Note”). The June 2024 Note accrues interest at a rate 9.0% per annum, subject to adjustment upon an event of default. The June 2024 Note matures on June 20, 2027. On July 12, 2024, the Company, CloudCo, Soluna Cloud, and the Existing Investor entered into a First Amendment to the Note Purchase Agreement. This amendment allows CloudCo to issue additional secured promissory notes totaling $1,250,000 to new accredited investors. These Additional Notes are subject to the same terms and conditions as the June SPA financing.

Current wording

On June 20, 2024, pursuant to the terms and subject to the conditions of a Note Purchase Agreement (the “June SPA”) by and among (i) CloudCo, (ii) Soluna Cloud, (iii) the Company and (iv) the accredited investor named therein (the “Investor” and collectively, the “Note Parties), CloudCo issued to the Investor a secured promissory note in a principal amount equal to $12.5 million (the “Note”).

Current wording

On August 12, 2024, we entered into a Standby Equity Purchase Agreement (the “SEPA”) with YA II PN, LTD., a Cayman Islands exempt limited company (“YA”). Pursuant to the terms of the SEPA, we agreed to issue and sell to YA, from time to time, and YA agreed to purchase from us, up to $25 million of shares of our common stock (the “SEPA Shares”). We and YA also entered into a registration rights agreement (the “Registration Rights Agreement”), pursuant to which we agreed to prepare and file with the SEC a Registration Statement on Form S-1, registering the resale of the SEPA Shares. On November 12, 2024, we filed a registration statement on Form S-1 (File No. 333-282559) with the SEC for the resale by YA of 3,000,000 SEPA Shares, which was declared effective by the SEC on February 5, 2025. As of the date of this report, we have issued and sold approximately 1.5 million shares of our common stock to YA pursuant to the SEPA for aggregate net proceeds to us of approximately $2.0 million. We intend to continue issuing shares of our common stock to YA pursuant to the SEPA in future periods.

Previous wording

Consolidated Results of Operations for the Three Months Ended September 30, 2024 Compared to the Three Months Ended September 30, 2023.

Previous wording

Data Hosting Revenue: The Company’s cryptocurrency hosting services provide energized space and operating services to third-party mining companies who locate their mining hardware at one of our mining locations. Services include fees for hosting the miners which could be fixed fees or profit sharing, as well as potential additional fees for services provided such as installation charges or other services fees. Data hosting revenue was approximately $4.3 million for the three months ended September 30, 2024 compared to $4.0 million for the three months ended September 30, 2023. The increase was primarily related to continued energization and the deployment of hosting customers at Project Dorothy 1A which began in the second quarter of 2023 creating approximately $3.5 million in data hosting revenue for the third quarter of 2024 compared to approximately $3.0 million for the third quarter of 2023, approximately a $500 thousand increase, in which was offset by a slight decrease in revenue of $235 thousand at Project Sophie who switched their business model from proprietary mining to data hosting in the second quarter of 2023.

Current wording

Data Hosting Revenue: Cryptocurrency hosting services provide energized space and operating services to third-party mining companies who locate their mining hardware at our mining locations- D1A and Project Sophie. Services include fees for hosting the miners which could be fixed fees or profit sharing, as well as potential additional fees for services provided such as installation charges or other services fees. The decrease for the three months ended March 31, 2025 compared to the three months ended March 31, 2024 relate to the Bitcoin halving event that occurred in April 2024, which drove down the dollar Petahash (“PH”) per day. Also, in December 2024, one of our largest customers exited leaving 20 MW of capacity to fill that was ultimately filled slowly over December 2024 and into March 2025.

Previous wording

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas. Going forward, cost of cryptocurrency revenue will include any additional cryptocurrency mining facilities that are part of the Company’s future pipeline.

Current wording

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas.

Previous wording

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the three months ended September 30, 2024 and the three months ended September 30, 2023 in which the balances totaled approximately $2.4 million, respectively. The balances mainly related to amortization expense related to the strategic pipeline contract that was acquired in October 2021.

Current wording

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the three months ended March 31, 2025 and three months ended March 31, 2024 in which the balances totaled approximately $2.4 million, respectively. The balances mainly related to amortization expense related to the strategic pipeline contract that was acquired in October 2021.

Previous wording

Loss on Debt Extinguishment and Revaluation, net: For the nine months ended September 30, 2024, the Company had a loss on debt extinguishment and revaluation of approximately $6.1 million. This was due to on February 28, 2024, the Company entered into the Fourth Amendment with the Noteholders and lowered the conversion price and issued new warrants and repriced additional warrants with certain exercise features. The issuance and reprice of warrants created a loss of extinguishment of debt of approximately $5.8 million, in which was offset by a gain on debt revaluation of the convertible debt of approximately $1.3 million as of February 28, 2024 (date of Fourth Amendment) and March 31, 2024 due to several factors including assumptions on conversions and payouts, annual volatility and stock price conditions on the dates of valuations. In addition, there was a revaluation of the warrant liability, in which created a gain on revaluation of approximately $1.5 million. The Company did a fair value assessment of the notes as of June 30, 2024, in which created a loss on revaluation of approximately $4.0 million due to factors including assumptions on conversions and payouts, annual volatility and stock price conditions on the dates of valuations compared to what the noteholders could convert at as of June 30, 2024. The convertible notes were revalued again on September 30, 2024, in which a gain was recorded of approximately $2.3 million due mainly to change in Company stock price offsetting the previous quarter assessments. In addition, in the second quarter of fiscal year 2024, the Company did a revaluation of the warrants through May 30, 2024 in which was the date of Annual Shareholder approval, in which created a loss on revaluation of approximately $1.6 million. In addition to the revaluation of the notes and warrants the loss on debt extinguishment had an additional loss on debt of approximately $1.4 million due to the satisfaction and redemption of the Dorothy 2 equipment loan through issuance of Class B Membership interests in the Dorothy 2 project valued at three times the borrowing amount (i.e., $2.16 million), in which created approximately a $1.4 million loss for the nine months ended September 30, 2024. The Company notes for the nine months ended September 30, 2023, the Company had a net loss on debt extinguishment and revaluation of $2.4 million due to the extinguishment and revaluation of the convertible debt agreement in the second quarter of 2023, as well as quarter end revaluations effected by changes in annual volatility, offset with a gain of $473 thousand in the first quarter of 2023. See Note 7 for further details.

Current wording

For the three months ended March 31, 2024, the Company incurred a $3.1 million loss on debt extinguishment and revaluation. On February 28, 2024, the Company entered into the Fourth Amendment with the Noteholders and lowered the conversion price and issued new warrants and repriced additional warrants with certain exercise features. The issuance and reprice of warrants created a loss of extinguishment of debt of approximately $5.8 million, in which was offset by a gain on debt revaluation of the convertible debt of approximately $1.3 million as of February 28, 2024 (date of Fourth Amendment) and March 31, 2024 due to several factors including assumptions on conversions and payouts, annual volatility and stock price conditions on the dates of valuations. In addition, there was a revaluation of the warrant liability as of March 31, 2024, in which created a gain on revaluation of approximately $1.5 million.

Previous wording

We believe Adjusted EBITDA can be an important financial measure because it allows management, investors, and the Board to evaluate and compare our operating results, including our return on capital and operating efficiencies, from period-to-period by making such adjustments. Non-GAAP financial measures are subject to material limitations as they are not in accordance with, or a substitute for, measurements prepared in accordance with U.S. GAAP. For example, we expect that stock-based compensation costs, which is excluded from the non-GAAP financial measures, will continue to be a significant recurring expense over the coming years and is an important part of the compensation provided to certain employees, officers, and directors. Similarly, we expect that depreciation and amortization of fixed assets will continue to be a recurring expense over the term of the useful life of the assets.

Current wording

We believe EBITDA and Adjusted EBITDA can be important financial measures because they allow management, investors, and the Board to evaluate and compare our operating results, including our return on capital and operating efficiencies, from period-to-period by making such adjustments. Non-GAAP financial measures are subject to material limitations as they are not in accordance with, or a substitute for, measurements prepared in accordance with GAAP. For example, we expect that stock-based compensation costs, which is excluded from the non-GAAP financial measures, will continue to be a significant recurring expense over the coming years and is an important part of the compensation provided to certain employees, officers, and directors. Similarly, we expect that depreciation and amortization of fixed assets will continue to be a recurring expense over the term of the useful life of the assets.

Previous wording

Adjusted EBITDA is provided in addition to and should not be considered to be a substitute for, or superior to net income, the comparable measure calculated in accordance with U.S. GAAP. Further, Adjusted EBITDA should not be considered as an alternative to revenue growth, net income, or any other performance measure calculated in accordance with GAAP, or as an alternative to cash flow from operating activities as a measure of our liquidity. Adjusted EBITDA has limitations as an analytical tool, and you should not consider such measures either in isolation or as substitutes for analyzing our results as reported under GAAP.

Current wording

EBITDA and Adjusted EBITDA are provided in addition to and should not be considered to be substitutes for, or superior to net income, the comparable measure calculated in accordance with GAAP. Further, EBITDA and Adjusted EBITDA should not be considered as alternatives to revenue growth, net income, or any other performance measure calculated in accordance with GAAP, or as alternatives to cash flow from operating activities as a measure of our liquidity. EBITDA and Adjusted EBITDA have limitations as analytical tools, and you should not consider such measures either in isolation or as substitutes for analyzing our results as reported under GAAP.

Previous wording

Reconciliations of Adjusted EBITDA to net loss, the most comparable GAAP financial metric, for historical periods are presented in the table below:

Current wording

Reconciliations of EBITDA and Adjusted EBITDA to net loss, the most comparable GAAP financial metric, for historical periods are presented in the table below:

Previous wording

The following table represents the Adjusted EBITDA activity between each three-month period from January 1, 2024 through September 30, 2024.

Current wording

The following table represents the EBITDA and Adjusted EBITDA activity between each three-month period from January 1, 2024 through March 31, 2025 (unaudited).

Previous wording

Based on business developments, including changes in production levels, staffing requirements, and network infrastructure improvements, we will require additional capital equipment in the foreseeable future. The Company is focused on developing and monetizing green, zero-carbon computing and cryptocurrency mining facilities, as well as facilities capable of hosting customers engaged in cryptocurrency mining, and data centers to provide specialized AI Cloud and colocation services.

Current wording

Based on business developments, including changes in production levels, staffing requirements, and network infrastructure improvements, we will require additional capital equipment in the foreseeable future. We are focused on developing and monetizing green, zero-carbon computing and cryptocurrency mining facilities, as well as facilities capable of hosting customers engaged in cryptocurrency mining, and data centers to provide specialized AI Cloud and colocation services.

Previous wording

Net cash used in operations for continuing operations was approximately $4.4 million during the nine months ended September 30, 2023. The Company had a net loss for the nine months ended September 30, 2023 of $22.7 million. Non-cash items included $2.4 million of depreciation expense and approximately $7.1 million of amortization expenses, as well as amortization of deferred financing costs and discount on notes of approximately $748 thousand, $3.7 million of stock-based compensation expenses, and $2.4 million loss on debt extinguishment and revaluation, net. These non-cash items were offset with a deferred tax benefit of $524 thousand. The change in asset and liabilities of approximately $1.5 million related to increase in accrued expenses of $2.6 million in which related to increases in NYDIG loan, utility accruals, and security deposits, in addition to an increase of $1.3 million in other long term liabilities related to electricity deposits to Western Kentucky and Washington state, offset with an increase in accounts receivable of $1.6 million in relation to performing further hosting services as of September 30, 2023. The other changes in assets and liabilities were not material.

Current wording

Net cash used by operations was approximately $177 thousand during the three months ended March 31, 2025. The Company had a net loss for the three months ended March 31, 2025 of approximately $7.4 million. Non-cash items included approximately $1.5 million of depreciation expense, and $2.4 million of amortization expenses, and $1.8 million of stock compensation expenses. These non-cash items were offset with a deferred tax benefit of $437 thousand and gain on extinguishment of debt of approximately $551 thousand. The change in asset and liabilities of $1.9 million mainly relates to decrease in other long term assets of $1.6 million in relation to receipt of Briscoe deposit in January 2025. The other changes in assets and liabilities of approximately $500 thousand mainly related to decrease in accounts receivable due to timing and amounts billed related to March services, an increase in accounts payable related to timing and billing amounts of invoices, including increases in legal fees, an increase in interest payable in relation to NYDIG loan and Galaxy loan, offset with payment made to HPE in January and payment of sales and use tax.

Previous wording

Net cash used by operations was approximately $3.4 million during the nine months ended September 30, 2024. The Company had a net loss for the nine months ended September 30, 2024 of approximately $19.8 million. Non-cash items included approximately $4.6 million of depreciation expense and $7.1 million of amortization expenses, $3.3 million of stock compensation expenses, $7.1 million of loss on debt extinguishment and revaluation, $611 thousand in provision for credit losses, and $179 thousand amortized deferred financing costs. These non-cash items were offset with a deferred tax benefit of $1.8 million. The change in asset and liabilities is mainly due to an increase in prepaid expenses and other long term assets by $9.2 million due to a prepayment of an arrangement with HPE of $10.3 million that is being amortized over the life of the agreement, an increase in accrued expenses and accounts payable of $4.2 million in relation to bonus accruals, NYDIG interest, and Project Dorothy 2 and Kati related bills. The other changes in assets and liabilities were not material.

Current wording

Net cash provided by operations was approximately $3.9 million during the three months ended March 31, 2024. The Company had a net loss for the three months ended March 31, 2024 of approximately $2.5 million. Non-cash items included approximately $1.6 million of depreciation expense, and $2.4 million of amortization expenses, $661 thousand of stock compensation expenses, $3.1 million of loss on debt extinguishment and revaluation, and $130 thousand of impairment of fixed assets. These non-cash items were offset with a deferred tax benefit of $548 thousand. The change in asset and liabilities of $942 thousand related to increase in accounts receivable of $1.5 million attributable for demand service revenue and data hosting customer receivables significantly increasing, offset with increases in accrued expenses and accounts payable of $929 thousand. The other changes in assets and liabilities were not material.

Previous wording

Net cash used in investing activities during the nine months ended September 30, 2024 was approximately $7.7 million consisting mainly of capital expenditures of $3.8 million and increase in deposits on equipment of $4.0 million. Net cash used in investing activities during the nine months ended September 30, 2023 was approximately $10.1 million consisting mainly of capital expenditures of $12.5 million, less cash proceeds from sale of equipment of $2.3 million.

Current wording

Net cash used in investing activities during the three months ended March 31, 2025 was approximately $3.6 million consisting mainly of capital expenditures of $3.8 million offset with a decrease in deposits on equipment of $213 thousand. Net cash used in investing activities during the three months ended March 31, 2024 was approximately $827 thousand consisting mainly of capital expenditures of $524 thousand and increase in deposits on equipment of $343 thousand.

Previous wording

On January 14, 2022, the Company effected an initial drawdown under the Master Equipment Finance Agreement with NYDIG in the aggregate principal amount of approximately $4.6 million that bore interest at 14%. On January 26, 2022, the Company had a subsequent drawdown of $9.6 million. On December 20, 2022, Soluna MC Borrowing 2021-1 LLC (“Borrower”) received a Notice of Acceleration and Repossession (the “NYDIG Notice”) from NYDIG with respect to the Master Agreement, by and between Borrower and NYDIG. The obligations of Borrower under the Master Agreement and reflected in the NYDIG Notice are ring-fenced to Borrower and its direct parent company, Soluna MC LLC. The Company is not a party to any guaranty, collateral agreement or other support agreement with or for the benefit of NYDIG. As such, the principal balance of $10.5 million as of December 31, 2022 became due immediately and the Borrower shall bear interest, at a rate per annum equal to 2.0% plus the rate per annum otherwise applicable to such obligations set forth in the Master Agreement. On February 23, 2023, NYDIG proceeded to foreclose on all of the collateral securing the MEFA, and repossessed the collateralized assets that totaled approximately $3.4 million, in which approximately $560 thousand was first used to pay off accrued interest and penalty to date. On September 5, 2023, NYDIG provided a letter finalizing the accounting for the repossessed collateralized assets totaling proceeds of approximately $3.4 million. This included legal and other expenses associated with the sale of the assets net a modest gain on the estimated net book value of the assets totaling $251 thousand that was expensed as a loss on disposition of assets for the year ended December 31, 2023. On December 7, 2023, NYDIG filed its Motion for Summary Judgment seeking entry of a judgment against Soluna in the approximate amount of $10.3 million for principal and interest and penalties. On January 12, 2024, Soluna filed its objection to NYDIG’s motion for summary judgment on the grounds that NYDIG failed to explain what collateral of which loan was sold and how the sale proceeds were allocated to each loan. A summary judgment motion was performed on February 13, 2024 and was agreed upon by both NYDIG and the Borrower, that the total outstanding loan principal balance would be approximately $9.2 million, in which a penalty fee was applied of approximately $1.0 million to the repossessed collateralized assets, and outstanding interest and penalty balance would be approximately $936 thousand as of December 31, 2023. As of September 30, 2024, the Company still has an outstanding loan principal of approximately $9.2 million and outstanding interest and penalty balance of approximately $1.9 million.

Current wording

On January 14, 2022, the Company effected an initial drawdown under the Master Equipment Finance Agreement (“MEFA”) with NYDIG in the aggregate principal amount of approximately $4.6 million that bore interest at 14%. On January 26, 2022, the Company had a subsequent drawdown of $9.6 million. On December 20, 2022, Soluna MC Borrowing 2021-1 LLC (“Borrower”) received a Notice of Acceleration and Repossession (the “NYDIG Notice”) from NYDIG with respect to the MEFA, by and between Borrower, a subsidiary of Soluna MC, LLC, a subsidiary of Soluna Digital, a subsidiary of the Company, and NYDIG. The obligations of Borrower under the MEFA and reflected in the NYDIG Notice are ring-fenced to Borrower and its direct parent company, Soluna MC LLC. The Company is not a party to any guaranty, collateral agreement, or other support agreement with or for the benefit of NYDIG. As such, the principal balance of $10.5 million as of December 31, 2022 became due immediately and the Borrower shall bear interest, at a rate per annum equal to 2.0% plus the rate per annum otherwise applicable to such obligations set forth in the MEFA. On February 23, 2023, NYDIG proceeded to foreclose on all of the collateral securing the MEFA, and repossessed the collateralized assets that totaled approximately $3.4 million, in which approximately $560 thousand was first used to pay off accrued interest and penalty to date. On September 5, 2023, NYDIG provided a letter finalizing the accounting for the repossessed collateralized assets totaling proceeds of approximately $3.4 million. A summary judgment motion was performed on February 13, 2024 and was agreed upon by both NYDIG and the Borrower, that the total outstanding loan principal balance would be approximately $9.2 million, in which a penalty fee was applied of approximately $1.0 million to the repossessed collateralized assets, and outstanding interest and penalty balance would be approximately $936 thousand as of December 31, 2023. As of March 31, 2025, the Company still has an outstanding loan principal of approximately $9.2 million and outstanding interest and penalty balance of approximately $2.6 million as of March 31, 2025.

Previous wording

On May 9, 2023, Soluna DV ComputeCo, LLC and Navitas West Texas Investments SPV, LLC entered into a 2-year Loan Agreement for $2,050,000. The unpaid principal balance of the Term Loan shall bear interest at per annum rate equal to 15%. As of September 30, 2024, the Company has an outstanding principal balance of approximately $290 thousand.

Current wording

On May 9, 2023, DVCC and Navitas West Texas Investments SPV, LLC entered into a 2-year Loan Agreement for $2,050,000. The unpaid principal balance of the Term Loan shall bear interest at per annum rate equal to 15%. As of December 31, 2024, the Company has an outstanding principal balance of approximately $137 thousand. As of March 31, 2025, the Navitas loan has been fully paid off.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
Rearranged previous paragraphs (6)

Previous report — wording carried elsewhere

The following table summarizes changes in the various components of our net loss during the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023.

Previous report — wording carried elsewhere

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas. Going forward, cost of cryptocurrency revenue will include any additional cryptocurrency mining facilities that are part of the Company’s future pipeline.

Previous report — wording carried elsewhere

***Cost of Data Hosting Revenue, exclusive of depreciation:***Cost of data hosting revenue includes utility charges, site overhead expenses, and other charges.

Previous report — wording carried elsewhere

General and Administrative Expenses, exclusive of depreciation and amortization: General and administrative expenses, exclusive of depreciation and amortization include cash and non-cash compensation, benefits and related costs in support of our general corporate operations, including general management, finance and accounting, human resources, marketing, information technology, corporate development, and legal services.

Previous report — wording carried elsewhere

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the nine months ended September 30, 2024 and the nine months ended June, 2023 in which the balances totaled approximately $7.2 million, respectively. The balances mainly related to amortization expense related to the strategic pipeline contract that was acquired in October 2021.

Previous report — wording carried elsewhere

The following table represents the Adjusted EBITDA activity between each three-month period from January 1, 2023 through December 31, 2023.