A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 8, 2025

PESI$14.05+9.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-13.

0001493152-24-045114

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-05-08.

0001641172-25-009194

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 90 previous paragraphs and 74 current paragraphs.

24 unchanged; 23 reworded; 27 added; 40 removed; 3 previous and 0 current paragraphs rearranged.

Tables are not compared: 18 previous and 13 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (27)

Current report

Our forward-looking statements are based on the beliefs and assumptions of our management and the information available to our management at the time these statements were prepared. Although we believe the expectations reflected in these statements are reasonable, we cannot guarantee future results, levels of activity, performance, or achievements. You should not place undue reliance on the forward-looking statements as noted above, which apply only to as of the date of this Form 10-Q. We undertake no obligation to update these forward-looking statements, even if our situation changes in the future.

Current report

We were disappointed with our overall financial result for the first quarter of 2025 which were impacted by a number of factors which included the following, among other things:

Current report

The majority of these factors had limited duration effects as we began seeing improvement in waste receipts starting in the latter part of the first quarter of 2025 which is reflected in our strengthened waste backlog of approximately $10,237,000 as of March 31, 2025, an increase of approximately $2,378,000 or approximately 30.3%, from $7,859,000 as of December 31, 2024. We have also begun to see improvements in procurement actions within the government arena. We believe the continuing increase in waste receipts, combined with improving project visibility, should position us for a return to growth in the remainder of 2025.

Current report

In December 2024, BWXT Technologies and its team, of which we are a member, were awarded the West Valley Project contract for the cleanup operations at the West Valley Development Project in West Valley, New York. The contract has a 10-year ordering period with a maximum value of up to $3 billion that can be performed for up to 15 years. We expect revenue contribution from this project in the second half of 2025 as our scope under the contract is further defined, approved and transitions into operation. Additionally, we are optimistic that the Direct-Feed Low-Activity Waste (“DFLAW”) program at Hanford, Washington remains on track to begin initial tank waste treatment operations in the third quarter of 2025 which our Perma-Fix Northwest, Richland facility is well-positioned to support. We continue to focus on increasing our expansion into the international markets.

Current report

We are continually monitoring our operating costs in order to align with our revenue level.

Current report

See “Federal Funding” and “Market Trends and Uncertainties” in “Known Trends and Uncertainties” within this MD&A for a discussion of factors that could negatively impact our results of operations for the remainder of 2025.

Current report

Revenue for the first quarter of 2025 increased by approximately $302,000 or approximately 2.2% to $13,919,000 for the first quarter of 2025 from $13,617,000 for the first quarter of 2024. The increase was attributed entirely to our Treatment Segment where revenue increased to $9,186,000 for the first quarter of 2025 from $8,709,000 for the first quarter of 2024, an increase of approximately $477,000 or 5.5%. Services Segment revenue decreased by approximately $175,000 or 3.6% to $4,733,000 for the first quarter of 2025 from $4,908,000 for the first quarter of 2024. Overall gross profit increased by approximately $1,277,000 or 206.0% for the first quarter of 2025 as compared to the corresponding period of 2024. Selling, General, and Administrative (“SG&A”) expenses increased by $471,000 or 13.3% for the three months ended March 31, 2025, as compared to the corresponding period of 2024 (see below “Results of Operations” for further discussions of our financial results).

Current report

Consolidated revenues increased $302,000 for the three months ended March 31, 2025, compared to the three months ended March 31, 2024, as follows:

Current report

Gross profit increased $1,277,000 for the quarter ended March 31, 2025, compared to the quarter ended March 31, 2024, as follows:

Current report

Administrative SG&A expenses were higher primarily due to higher salaries, payroll related expenses and stock option compensation expenses totaling approximately $98,000. The hiring of the Company’s new COO in January 2025 contributed to this increase. Additionally, salaries and payroll related expenses were higher in the first quarter of 2025 as more employees took vacation time in the first quarter of 2024 resulting in more hours charged to vacation accrual account. Administrative Travel expenses were also higher by approximately $12,000 due trips made to the Company’s various facilities by the new COO. The remaining higher expenses in Administrative SG&A expenses were primarily due to higher outside services expenses by approximately $126,000 from more legal and consulting matters. Treatment Segment SG&A expenses were higher primarily due to higher salaries and payroll related expenses of approximately $204,000 as more employee hours were allocated to marketing initiatives of our new PFAS technology. Treatment Segment general expenses were also higher by approximately $87,000 primarily due to higher trade show expenses and higher expenses in various other categories. The decrease in Services Segment SG&A was primarily due to lower salaries and payroll related expenses totaling approximately $117,000, which was partially offset by higher general expenses of approximately $26,000 in various categories, higher travel expenses of approximately $9,000 and higher outside services expenses of approximately $26,000. Included in SG&A expenses is depreciation and amortization expense of $15,000 and $27,000 for the three months ended March 31, 2025, and 2024, respectively.

Current report

We had income tax expense of $0 and income tax benefit of approximately $956,000 for continuing operations for the three months ended March 31, 2025, and 2024, respectively. Our effective tax rate was approximately 0% and 21.7% for the three months ended March 31, 2025, and 2024, respectively. Our effective tax rate for the three months ended March 31, 2025, was impacted by our recognition of a full valuation allowance against our U.S federal and state deferred tax assets in the quarter ended September 30, 2024. Our effective tax rate for the three months ended March 31, 2024, was impacted by non-deductible expenses and state taxes.

Current report

Cash used in operating activities of our continuing operations during the first quarter of 2025 consisted mostly of the significant net loss that we incurred of approximately $3,500,000, adjusted for certain non-cash items, such as $196,000 of stock-based compensation expenses and $436,000 of depreciation and amortization expenses. Cash flow increase of approximately $668,000 resulting from net change in assets and liabilities included a decrease in accounts receivable (net of provision for credit losses) of $2,248,000 and a decrease in deferred revenue of approximately $830,000. Our accounts receivables are impacted by timing of invoicing and collections. Our contracts with our customers are subject to various payment terms and conditions.

Current report

Cash used in operating activities of our continuing operations during the first quarter of 2024 consisted primarily of the significant net loss that we incurred of approximately $3,458,000, adjusted for certain non-cash items, which included $152,000 of stock-based compensation expenses, $431,000 of depreciation and amortization expense and deferred income tax benefit of $956,000. Cash flow decrease of approximately $646,000 resulting from net change in assets and liabilities included a decrease in accounts payables of approximately $1,603,000 and a decrease in accounts receivable (net of recovery of credit losses) of $1,032,000. Our accounts payable are impacted by the timing of our payments as we are continually managing payment terms with our vendors to maximize our cash position.

Current report

Cash used in operating activities of our discontinued operations in the first quarter of 2025 and 2024 consisted primarily of expenses incurred in connection with management and administration of regulatory matters for the Company’s remediation projects. Cash used in operating activities of our discontinued operations in the first quarter of 2025 was reduced by monthly rent payments of approximately $8,800, received from a tenant under a leasing agreement entered into on June 1, 2024, by our PFSG subsidiary, leasing a portion of the PFSG property.

Current report

Cash used in investing activities of our continuing operations in the first quarter of 2025 consisted mostly of our purchases of property and equipment totaling approximately $655,000, of which $132,000 was financed. The remaining cash used in investing activities consisted of cash outlays made in connection with our operating permits and certain intangible assets.

Current report

Cash used in investing activities of our discontinued operations in the first quarter of 2025 consisted of payments made in connection with a certain regulatory permit at our PFSG subsidiary.

Current report

Cash used in investing activities of our continuing operations in the first quarter of 2024 consisted mostly of our purchases of property and equipment totaling approximately $288,000, of which $44,000 was financed. The remaining cash used in investing activities consisted of cash outlays made in connection with our operating permits and certain intangible assets.

Current report

The increase in our purchases of property and equipment in 2025 as compared to 2024 was primarily due to capital expenditures made in connection with our PFAS technology which included the installation of our first unit in addition to upgrades made to the unit.

Current report

We anticipate making capital expenditures of approximately $2,000,000 to $5,500,000 in 2025 to maintain operations and regulatory compliance requirements and support revenue growth. Our anticipated capital expenditures for 2025 include certain strategic project initiatives which include the installation of our second generation unit for our PFAS technology. We plan to fund our capital expenditures for 2025 from cash from operations, Liquidity and/or financing. The initiation and timing of our capital expenditures in 2025 are subject to a number of factors which include, among other things, cost/benefit analysis, the pace of our strategic project initiatives and improvement in our operations.

Current report

Our cash used in financing during the first quarter of 2025 consisted mostly of principal payments of approximately $157,000 primarily for our Term and Capital Loans under our Credit Facility (see below for a discussion of our Credit Facility) principal payments of $71,000 for our finance leases, payments of $194,000 of offering costs from the equity raise that we completed in December 2024, partially offset by proceeds received from option exercises of approximately $41,000.

Current report

Our cash used in financing during the first quarter of 2024 consisted mostly of principal payments of approximately $259,000 for our Term and Capital Loans under our Credit Facility principal payments of $75,000 for our finance leases, partially offset by proceeds received from option and warrant exercises of approximately $209,000.

Current report

*Federal Funding.*On March 15, 2025, the President signed a full-year Continuing Resolution (“CR”) that provides funding to federal government agencies through the rest of the fiscal year which ends September 30, 2025. Under the enactment of the CR, federal government entities continue to operate at the 2024 fiscal year budget approved level. As discussed above, a significant portion of our revenue is generated through contracts entered into indirectly as subcontractors for others who are prime contractors or directly as the prime contractor to federal government authorities. We have, in the past experienced delays in waste shipments and projects from certain federal government related customers resulting from numerous factors, including, but not limited to, impact of CR. Additionally, the mission to slash federal spending by the Department of Government Efficiency (“DOGE”) continues to contribute uncertainties in federal agencies from which we obtain, directly, or indirectly, government contracts. These aforementioned factors, among others, continue to create uncertainties in federal government spendings that could negatively impact our financial results by impairing our ability to perform work on existing contracts, delaying or cancelling procurement actions by government entities, and/or cause other disruptions or delays.

Current report

Market Trends and Uncertainties. Macroeconomic conditions which include recent government and policy changes implemented in the United States, tariff actions and uncertainties related to trade wars, ambiguity around interest rates, softening labor markets, have created significant uncertainty in the global economy, volatility in the capital markets and recessionary pressures. We continue to monitor potential effects from these conditions that could impact our revenue and profitability which include supply chain challenges, cost volatility in goods that we utilize in our revenue production, and economic pressures on our customers that may result in reduced spending. While we have experienced limited impact from these conditions at this time, we continue to evaluate and implement a range of strategic options to manage potential impacts from these factors, including supply chain optimization, pricing strategies, sourcing adjustments and cost reduction measures in order to minimize impacts to our financial results.
Removed paragraphs (40)

Previous report

Our third quarter financial results were impacted by continued acceleration of our investments and a number of unexpected events/factors which included the following:

Previous report

In addition to the aforementioned factors, we continue to experience delays in procurements and contract awards from government clients in the first nine months of 2024. Although we are disappointed with our 2024 financial results for the first nine months of 2024, we believe our base business is positioned for improvement in 2025 and that our results of operations should improve in 2025. As previously disclosed, we continue to advance a variety of additional initiatives that are expected to be more fully realized in 2025. These initiatives include, among other things, positioning ourselves for large and mid-size procurements within the U.S. Department of Energy (“DOE”) and U.S. Navy and waste treatment in support of DOE’s Hanford closure strategy, continued investments in our facilities and capabilities to allow for broader waste treatment (including PFAS), and continued expansion of our waste treatment offerings within the international and commercial markets.

Previous report

As a result of the aforementioned events and factors, our overall revenue decreased by $5,065,000 or 23.2% to $16,812,000 for the three months ended September 30, 2024, from $21,877,000 for the corresponding period of 2023. We saw decreases in both segments where Treatment Segment revenue decreased by $1,731,000 to $9,064,000 or 16.0% from $10,795,000 and Services Segment revenue decreased by $3,334,000 or 30.1% to $7,748,000 from $11,082,000. Gross profit for the third quarter of 2024 was approximately $1,334,000 as compared to gross profit of $4,549,000 for the corresponding period of 2023, reflecting a decrease in gross profit of approximately $3,215,000 or 70.7%, primarily due to decreased revenue in both segments. Selling, General and Administrative (“SG&A”) expenses decreased by $301,000 or 7.7% for the three months ended September 30, 2024, as compared to the corresponding period of 2023.

Previous report

During the third quarter of 2024, we provided a full valuation allowance against our deferred tax assets (see a discussion of this valuation allowance and the impact to our financial statements in “Results of Operations – Income Taxes” below).

Previous report

For the nine months ended September 30, 2024, overall revenue decreased by $22,601,000 or 33.7% to $44,415,000 from $67,016,000 for the corresponding period of 2023 where we saw decrease in revenue in both segments. Treatment Segment revenue decreased by $7,107,000 to $26,116,000 or 21.4% from $33,223,000 and Services Segment revenue decreased by $15,494,000 or 45.8% to $18,299,000 from $33,793,000. The decrease in revenue within the Treatment Segment was attributed to factors which included among other things, delays in waste shipments by certain customers due to poor weather conditions and earlier Continuing Resolution (“CR”) impacts, temporary outages at our three primary facilities for equipment replacement and repairs, program enhancement and testing to support permit expansion and broader market penetration, weather impacts at certain of our treatment facilities resulting in temporary shutdown which limited revenue production and accelerated investment in R&D on our new technology to treat PFAS. Overall lower averaged price from waste mix within the Treatment Segment also contributed to revenue decrease. The decrease in revenue in the Services Segment was due to slower mobilization and delays in certain projects from the earlier impact of CR and poor weather conditions. Additionally, the decrease in revenue in the Services Segment was also attributed to the completion of two large projects in late 2023 which were not replaced by new projects of similar value. Together, these two large projects had generated a significant amount of revenues in the first nine months of 2023 when they were in full operational status. Total gross profit for the nine months ended 2024 decreased $12,666,000 or 104.9% due to decreased revenue generated in both segments. SG&A expenses decreased $338,000 or 3.1% for the nine months ended September 30, 2024, as compared to the corresponding period of 2023.

Previous report

We continue to aggressively bid on various contracts, including potential contracts within the international markets.

Previous report

Summary – Three and Nine Months Ended September 30, 2024, and 2023

Previous report

Consolidated revenues decreased $5,065,000 for the three months ended September 30, 2024, compared to the three months ended September 30, 2023, as follows:

Previous report

Consolidated revenues decreased $22,601,000 for the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023, as follows:

Previous report

Cost of goods sold decreased $9,935,000 for the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023, as follows:

Previous report

Cost of goods sold for the Treatment Segment decreased by approximately $1,031,000 or 3.7%. Treatment Segment’s variable costs decreased by approximately $1,092,000 primarily due to overall lower material and supplies, transportation, disposal and lab costs. Treatment Segment’s overall fixed costs increased by approximately $61,000 resulting from the following: salaries and payroll related expenses were higher by $1,057,000 due to higher headcount; depreciation expenses were lower by approximately $641,000 due to fully depreciated AROs that occurred in the third quarter of 2023 in connection with our EWOC facility; regulatory expenses were lower by approximately $75,000; maintenance expenses were lower by approximately $80,000; general expenses were lower by $196,000 in various categories; and travel expenses were slightly lower by approximately $4,000. Services Segment cost of goods sold decreased $8,904,000 or 33.0% primarily due to lower revenue. The decrease in cost of goods sold was primarily due to overall lower salaries/payroll related, outside services, and travel costs totaling approximately $8,673,000; lower depreciation expenses of approximately $204,000; lower general expenses of $75,000 in various categories; and overall higher material and supplies, regulatory, disposal and lab expenses totaling approximately $48,000. Included within cost of goods sold is depreciation and amortization expense of $1,218,000 and $2,063,000 for the nine months ended September 30, 2024, and 2023, respectively.

Previous report

Gross profit for the quarter ended September 30, 2024, decreased $3,215,000 over the same period of 2023, as follows:

Previous report

Treatment Segment gross profit decreased by $1,084,000 or approximately 72.6% and gross margin decreased to 4.5% from 13.8% primarily due to lower revenue from lower waste volume and the impact of our fixed costs structure. Services Segment gross profit decreased by $2,131,000 or 69.8% primarily due to decreased revenue as discussed in the “Overview” above. The decrease in gross margin in the Services Segment from 27.6% to 11.9% was attributed to overall lower margin projects as the two large projects completed in late 2023 were higher margin projects. Our overall Services Segment gross margin is impacted by our current projects which are competitively bid on and will therefore, have varying margin structures.

Previous report

Gross profit for the nine months ended September 30, 2024, decreased $12,666,000 over the same period in 2023, as follows:

Previous report

The decrease in Administrative SG&A expenses was primarily due to lower accrued incentives expenses. In the prior year quarter, approximately $178,000 in estimated accrued incentive expenses were recorded in connection with the Company’s management incentive plans (“MIPs”) and other employees’ bonus plans. Treatment Segment SG&A expenses were higher primarily due to higher salaries and payroll related expenses of approximately $139,000 which were offset by lower outside services expenses of $20,000 from fewer consulting matters and lower general expenses of $74,000 in various categories. The decrease in Services Segment SG&A was primarily due to the following: salaries and payroll related expenses were lower by approximately $65,000; outside services expenses were lower by approximately $69,000 due to fewer consulting/legal matters; and overall general expenses were lower by approximately $29,000 in various categories. Included in SG&A expenses is depreciation and amortization expenses of $25,000 and $20,000 for the three months ended September 30, 2024, and 2023, respectively.

Previous report

SG&Aexpenses decreased $338,000 for the nine months ended September 30, 2024, as compared to the corresponding period for 2023, as follows:

Previous report

Administrative SG&A expenses were lower primarily due to the following: payroll-related expenses were lower by approximately $178,000 primarily due to lower accrued incentive expenses. Administrative SG&A expenses in the third quarter of 2023 included estimated incentives recorded in the amount of approximately $178,000 in connection with the Company’s management incentive plans (“MIPs”) and other employees’ bonus plans. Such incentives were not recorded in the first nine months of 2024; outside services expenses were lower by approximately $40,000 from fewer consulting/legal matters; and overall general and maintenance expenses were higher by approximately $71,000. Treatment Segment SG&A expenses were higher primarily due to higher salaries and payroll related expenses of approximately $332,000 which were offset by overall lower travel, outside services and general expenses totaling approximately $179,000. The decrease in Services Segment SG&A was primarily due to lower outside services expenses of approximately $116,000 from fewer consulting and legal matters, lower salaries and payroll related expenses of approximately $203,000 and lower general expenses of $25,000 in various categories. Included in SG&A expenses is depreciation and amortization expenses of $77,000 and $61,000 for the nine months ended September 30, 2024, and 2023, respectively.

Previous report

The increase in interest income for the nine months ended September 30, 2024, as compared to the corresponding period of 2023 was primarily due to higher interest income earned from our finite risk sinking fund from higher interest rates that took effect starting in April 2023. Additionally, the increase in interest income resulted from interest income earned from our MMDA that we maintained with our lender starting in late 2023. The overall increase in interest income from the above was reduced by interest income received in March of 2023 of approximately $60,000 in connection with the Employee Retention Credit refund that we received.

Previous report

Interest expense increased by approximately $32,000 and $157,000 for the three and nine months ended September 30, 2024, respectively, as compared to the corresponding period of 2023. The increase for each of the periods above was attributed primarily to interest incurred on the $2,500,000 term loan dated July 31, 2023, under our credit facility and the promissory note that we entered into on July 24, 2024, for the purchase of our EWOC facility. The higher interest expense was also from more finance leases.

Previous report

We use an estimated annual effective tax rate, which is based on expected annual income, statutory tax rates and tax planning opportunities available in the various jurisdictions in which we operate, to determine our quarterly provision for income taxes.

Previous report

We record valuation allowances against our net deferred tax assets to the extent we determine it is more likely than not that such assets will not be realized in the future. We regularly evaluate the probability that our deferred tax assets will be realized and determines whether valuation allowances or adjustments thereto are needed. This determination involves judgement and the use of estimates and assumptions, including expectations of future taxable income and tax planning strategies. We apply judgment to consider the relative impact of negative and positive evidence, and the weight given to negative and positive evidence is commensurate with the extent to which such evidence can be objectively verified. Based on our evaluation of all available positive and negative evidence, and with greater weight placed on the objectively verifiable evidence which included our substantial losses incurred during the nine months ended September 30, 2024, we determined, at the end of the third quarter, that it is more likely than not that our net U.S. deferred tax assets will not be realized. As a result, we provided a full valuation allowance against our U.S. federal and state deferred tax assets resulting in a recorded income tax expense in the amount of approximately $6,417,000. We continue to maintain a valuation allowance against foreign tax attributes that may not be realized.

Previous report

We had income tax expenses of $6,417,000 and $4,300,000 for the three and nine months ended September 30, 2024, respectively, and income tax expenses of $254,000 and $482,000 for the three and nine months ended September 30, 2023, respectively, for our continuing operations. Our effective tax rates were approximately 268.6% and 36.6% for the three and nine months ended September 30, 2024, respectively, and 50.8% and 51.8% for the three and nine months ended September 30, 2023, respectively. Our effective tax rates for the three and nine months ended September 30, 2024, were primarily impacted by the full valuation allowance on our deferred assets as discussed above.

Previous report

Accounts receivable, net of credit losses, totaled $8,741,000 as of September 30, 2024, a decrease of $981,000 from the December 31, 2023, balance of $9,722,000. The decrease was attributed to reduced billing from decreased revenues which were negatively impacted by a number of events as previously discussed (See “Overview” within this MD&A). Our accounts receivable was also reduced by the collection in May 2024 of outstanding accounts receivable for work performed for a certain Canadian project for which a settlement agreement was reached, with collection subject to meeting certain conditions/terms precedent (see “Perma-Fix Canada Inc. (“PF Canada”)”) below for a discussion on the collection of the receivables).

Previous report

Accounts payable totaled $7,675,000 as of September 30, 2024, a decrease of $1,907,000 from the December 31, 2023, balance of $9,582,000. The decrease in accounts payable was attributed to our overall reduced operations as discussed previously. Additionally, our accounts payable are impacted by the timing of payments as we are continually managing payment terms with our vendors to maximize our cash position throughout our segments.

Previous report

For the nine months ended September 30, 2024, our purchases of capital equipment totaled approximately $2,630,000, of which $406,000 was subject to financing, with the remaining funded from cash from operations, cash from the equity raise that we completed in May 2024 and our Credit Facility. We budgeted approximately $2,000,000 for 2024 capital expenditures for our Treatment and Services Segments to maintain operations and regulatory compliance requirements and support revenue growth. Our capital expenditures for 2024 also included additional expenditures made to support our PFAS initiatives from cash from our equity raise completed in May 2024. Certain of our 2024 budgeted projects may either be delayed until later years or deferred altogether. We plan to fund our capital expenditures from cash from operations, Liquidity under our Credit Facility and/or financing. The initiation and timing of projects are also determined by financing alternatives or funds available for such capital projects.

Previous report

On July 24, 2024, the Company purchased the property which its EWOC facility operates on pursuant to a Purchase and Sales Agreement for a purchase price of $425,000. In connection with this transaction, we paid $63,750 in cash and financed the remaining $361,250 of the purchase price with a bank (“see Financing Activities” below for a discussion of the Note and its terms).

Previous report

Pursuant to our Loan Agreement, payments of annual interest rates are as follows: (i) interest due on the revolving credit is at prime (8.00% at September 30, 2024) plus 2% or SOFR (as defined in the Loan Agreement, as amended) plus 3.00% plus an SOFR Adjustment applicable for an interest period selected by us; (ii) interest due on each Term Loan 1 and the Capital Line was/is at prime plus 2.50% or SOFR plus 3.50% plus an SOFR Adjustment applicable for an interest period selected by us; and (iii) interest due on Term Loan 2 is at prime plus 3% or SOFR plus 4.00% plus an SOFR Adjustment applicable for an interest period selected by us. SOFR Adjustment rates of 0.10% and 0.15% are applicable for a one-month interest period and three-month period, respectively, that may be selected by us.

Previous report

We agreed to pay PNC 0.5% of the total financing if we pay off our obligations under our Loan Agreement to our lender after July 31, 2024, to and including July 31, 2025. No early termination fee shall apply if we pays off our obligations under Loan Agreement after July 31, 2025.

Previous report

In connection with the amendment, we paid our lender a fee of $25,000 which is being amortized over the remaining term of the Loan Agreement as interest expense-financing fees.

Previous report

In connection with the amendment, we paid our lender a fee of $12,500.

Previous report

On May 21, 2024, we entered into a Securities Purchase Agreement (the “Securities Purchase Agreement”) with certain institutional and retail investors (the “Purchasers”), pursuant to which we sold and issued, in a registered direct offering, an aggregate of 2,051,282 shares of the Company’s Common Stock, at a negotiated purchase price per share of $9.75 (the “Shares”), for aggregate gross proceeds to us of approximately $20,000,000, before deducting fees payable to the placement agents and other estimated offering expenses payable by the Company (the “Offering”). The net proceeds from the Offering is to fund (i) continued R&D and business development relating to the Company’s patent-pending process for the destruction of PFAS, as well as the cost of installing at least one commercial treatment unit; (ii) ongoing facility capital expenditures and maintenance costs; and (iii) general corporate and working capital purposes.

Previous report

The Shares were offered and sold by us pursuant to the our “shelf” registration statement on Form S-3 and prospectus supplement relating thereto.

Previous report

Craig-Hallum Capital Group LLC (“Craig-Hallum”) and Wellington Shields & Co. LLC (“Wellington Shields”) (Wellington Shields and Craig-Hallum together are known as the “Placement Agents”) served as the exclusive placement agents in connection with the Offering. We paid the Placement Agents a total cash fee of 6.00% of the aggregate gross proceeds in the Offering, which totaled approximately $1,200,000. We also reimbursed the Placement Agents certain expenses in connection with the Offering in an aggregate amount of approximately $80,000. As additional compensation to the Placement Agents in connection with the Offering, we also issued to the Placement Agents and two (2) of their members designees, warrants (the “Placement Agents’ Warrants”) to purchase an aggregate of 61,538 shares of Common Stock (the “Warrant Shares”), with the aggregate number of Warrant Shares that may be acquired under the Placement Agents’ Warrants equal to 3.0% of the number of Shares sold in the registered direct offering, at an exercise price per share equal to $12.19, which is equal to approximately 125% of the price per share of the Shares sold in the Offering. Neither the Placement Agents’ Warrants nor the Warrant Shares have been registered under the Registration Statement or otherwise. The Placement Agents’ Warrants have a term of five years, are exercisable at any time and from time to time, in whole or in part, during the four and one-half (4 ½) year period commencing 180 days from the last date of closing of the Offering which was May 24, 2024, and are exercisable via “cashless exercise” in certain circumstances. The aggregate fair value of the “Placement Agents’ Warrants” was determined to be approximately $331,000 using the Black-Scholes pricing model with the following assumptions: 58.78% volatility, risk free interest rate of 4.53%, an expected life of five years and no dividend. The aggregate fair market value of the Placement Agent’s Warrants was recorded as an offset to gross proceeds of the Offering and an increase to additional-paid-in capital.

Previous report

After deducting costs incurred of approximately $1,544,000 (exclusive of the aggregate fair market value of the Placement Agents’ Warrants as discussed above) which were recorded as a deduction to equity in connection with the Offering, net cash proceeds to us totaled approximately $18,456,000. We have paid approximately $1,505,000 of the $1,544,000 costs incurred in connection with the Offering.

Previous report

On July 24, 2024, We purchased the property which our EWOC facility operates on pursuant to a Purchase and Sales Agreement dated April 30, 2024, for a purchase price of $425,000. We paid $63,750 in cash and entered into a promissory note dated July 24, 2024, in an amount of $361,250 with a bank (the “lender”) for the remaining balance of the purchase price, with a maturity date in twenty years or July 24, 2044 (the “Note”). For the first five years starting August 24, 2024, monthly payments under the Note will consists of approximately $3,100 which include an annual fixed interest rate of 8.10%. Monthly payments under the Note will then be adjusted at the end of years five, ten and fifteen, with interest calculated based on the weekly average five-year US Treasury Securities Rate plus 3.0%. Under no circumstances will the variable interest rate on the Note be less than 4.0% per annum or more than (except in the case of default) the lesser of 20.5% per annum or the maximum rate allowed by applicable law. We agreed to pay the lender 3.0% of the total outstanding principal balance under the Note in the event we pays off our obligations during the first year of the Note. The prepayment penalty rate will be reduced by 1.0% at each subsequent annual anniversary of the Note. No prepayment penalty will apply in the event we pay off the Note on the fourth anniversary of the Note or thereafter. The property was previously accounted for under our operating leases.

Previous report

During the fourth quarter of 2021, PF Canada received a Notice of Termination (“NOT”) from Canadian Nuclear Laboratories, LTD. (“CNL”) on a Task Order Agreement (“TOA”) that PF Canada entered into with CNL in May 2019 for remediation work within Ontario, Canada (“Agreement”). The NOT was received after work under the TOA was substantially completed and work under the TOA has since been completed. CNL may terminate the TOA at any time for convenience. At year-end 2023, PF Canada had approximately $2,389,000 in outstanding receivables due from CNL as a result of work performed under the TOA. A settlement agreement was reached between PF Canada and CNL on the payment of the aforementioned amount by CNL, subject to certain conditions/terms precedents being met. PF Canada received a partial payment from CNL of the outstanding receivables during the first quarter of 2024. In May 2024, PF Canada received the remaining approximately $1,612,000 in outstanding receivables from CNL. As a result of the aforementioned payments received from CNL, no outstanding receivables remain under the TOA from CNL.

Previous report

Potential U.S Government Shutdown. As discussed above, a significant portion of our revenue is generated through contracts entered into indirectly as subcontractors for others who are prime contractors or directly as the prime contractor to U.S. government authorities. In September 2024, a CR was enacted by Congress to avoid a U.S. government shutdown and provide temporary funding for government operations through December 20, 2024. If Congress in unable to enact FY 2025 appropriation bills by the deadline of December 20, 2024, or extend the CR, the U.S. government could enter into shutdown. In the past, even with the enactment of a CR by Congress, there were instances in which certain of our government clients delayed procurement, waste shipments and project starts due to uncertain budget projections. The full impact of any government shutdown or further CR is uncertain and could negatively impact our financial results by delays in procurement actions, contract awards, waste shipments and/or project starts.
Reworded paragraphs (23)

Previous wording

Our Treatment and Services Segments’ business continues to be heavily dependent on services that we provide to U.S governmental clients, primarily as subcontractors for others who are prime contractors to government entities or directly as the prime contractor. We believe demand for our services will continue to be subject to fluctuations due to a variety of factors beyond our control, including, without limitation, the economic conditions, the manner in which the applicable government will be required to spend funding to remediate various sites and potential future federal budget issues. In addition, our governmental contracts and subcontracts relating to activities at governmental sites in the United States are generally subject to termination for convenience at any time at the government’s option. Our Italian contract under our partnership may be terminated by the Contracting Authority under certain conditions as set forth in the contract. Significant reductions in the level of governmental funding or specifically mandated levels for different programs that are important to our business could have a material adverse impact on our business, financial position, results of operations, and cash flows.

Current wording

Our Treatment and Services Segments’ business continues to be heavily dependent on services that we provide to federal governmental clients, primarily as subcontractors for others who are contractors to government entities or directly as the prime contractor. We believe demand for our services will continue to be subject to fluctuations due to a variety of factors beyond our control, including, without limitation, current economic and political conditions, the manner in which the applicable government authority will be required to spend funding to remediate various sites, and the potential impact from the Continuing Resolution enacted by Congress through the next fiscal federal government budget. In addition, our governmental contracts and subcontracts relating to activities at federal governmental sites are generally subject to termination for convenience at any time, at the government’s option. Significant reductions in the level of governmental funding or specifically mandated levels for different programs that are important to our business could have a material adverse impact on our business, financial position, results of operations, and cash flows.

Previous wording

The reporting of financial results and pertinent discussions are tailored to our two reportable segments: The Treatment Segment and Services Segment.

Current wording

The reporting of financial results and pertinent discussions are tailored to our two reportable segments: The Treatment and Services.

Previous wording

(1)Includes wastes generated by government clients of $784,000 and $653,000 for the three months ended September 30, 2024, and the corresponding period of 2023, respectively.

Current wording

(1) Includes wastes generated by government clients of $440,000 and $628,000 for the three months ended March 31, 2025, and the corresponding period of 2024, respectively.

Previous wording

Treatment Segment revenue decreased by $7,107,000 or 21.4% for the nine months ended September 30, 2024, over the same period in 2023. The overall decrease in revenue was primarily due to lower waste volume attributed from the factors as discussed in the “Overview” section above. Overall lower averaged price from waste mix within the Treatment Segment also contributed to the revenue decrease. Services Segment revenue decreased by approximately $15,494,000 or 45.8%. The decrease in revenue in the Services Segment was due to the reasons as discussed in the “Overview” above. Additionally, our Services Segment revenues are project based; as such, the scope, duration, and completion of each project vary.

Current wording

Treatment Segment revenue increased by $477,000 or 5.5% for the three months ended March 31, 2025, over the same period in 2024. The overall increase in revenue generated from government clients was primarily due to higher waste volume, partially offset by lower averaged price from waste mix. Revenue generated from government clients included approximately $2,207,000 in revenue generated from foreign waste receipts as the Company remains focused on its international initiatives. The decrease in other nuclear waste was primarily due to lower waste volume, partially offset by higher averaged price from waste mix. The decrease in revenue in the Services Segment was due to lack of projects due in part, to delay in procurement action resulting from the new Administration transition as previously discussed in the “Overview” section. Additionally, our Services Segment revenues are project based; as such, the scope, duration, and completion of each project vary.

Previous wording

Cost of goods sold decreased $1,850,000 for the quarter ended September 30, 2024, as compared to the quarter ended September 30, 2023, as follows:

Current wording

Cost of goods sold decreased $975,000 for the quarter ended March 31, 2025, compared to the quarter ended March 31, 2024, as follows:

Previous wording

Cost of goods sold for the Treatment Segment decreased by approximately $647,000 or 7.0% primarily due to lower revenue. Treatment Segment’s variable costs decreased by approximately $931,000 primarily due to overall lower transportation, disposal and lab costs. Treatment Segment’s overall fixed costs were higher by approximately $284,000 resulting from the following: salaries and payroll related expenses were higher by approximately $528,000 due to higher headcount; maintenance expenses were higher by approximately $136,000 due to unexpected breakdowns of certain equipment which required repair/replacement as discussed in the “Overview” previously; travel expenses were lower by approximately $22,000; depreciation expenses were lower by approximately $213,000 due to fully depreciated asset retirement obligations (“AROs”) that occurred in the third quarter of 2023 in connection with our EWOC facility; regulatory expenses were lower by approximately $41,000; and general expenses were lower by $104,000 in various categories. Services Segment cost of goods sold decreased $1,203,000 or 15.0% primarily due to lower revenue. The decrease in cost of goods sold was primarily due to overall lower salaries/payroll related, outside services, and travel costs totaling approximately $1,379,000; lower depreciation expenses of approximately $44,000; lower general expenses of approximately $110,000 in various categories; and overall higher material and supplies, regulatory, disposal and lab expenses totaling approximately $330,000. Included within cost of goods sold is depreciation and amortization expense of $408,000 and $666,000 for the three months ended September 30, 2024, and 2023, respectively.

Current wording

Cost of goods sold for the Treatment Segment increased by approximately $175,000 or 2.0%. Treatment Segment’s variable costs decreased by approximately $368,000 primarily due to lower disposal costs, partially offset by higher material and transportation costs. Treatment Segment’s overall fixed costs were higher by approximately $543,000 resulting from the following: salaries and payroll related expenses were higher by $556,000 due to higher headcount, attributed partly to the hiring of additional staff in connection with a certain waste stream as discussed in the “Overview” above. Also, salaries and payroll related expenses were higher in the first quarter of 2025 as more employees took vacation time in the first quarter of 2024 resulting in more hours charged to vacation accrual account; general expenses were higher by $113,000 primarily due to higher utility costs; maintenance expenses were higher by approximately $14,000; and regulatory expenses were lower by approximately $140,000. Services Segment cost of goods sold decreased by $1,150,000 or 21.0%. The decrease in cost of goods sold was primarily due to lower salaries/payroll related, outside services, and travel costs totaling approximately $1,513,000; lower general expenses by approximately $78,000 in various categories; and higher overall material and supplies, disposal, lab and regulatory expenses totaling approximately $441,000. The overall decrease in cost of goods sold within the Services Segment was attributed partly to cost cutting initiatives that we implemented in order to align expenses with revenue backlog. Additionally, cost of goods sold within our Services Segment are subject to variability as projects are competitively bid on. Included within cost of goods sold is depreciation and amortization expense of $421,000 and $404,000 for the three months ended March 31, 2025, and 2024, respectively.

Previous wording

Treatment Segment gross profit decreased by $6,076,000 or approximately 116.0% and gross margin decreased to (3.2)% from 15.8% primarily due to lower revenue from lower waste volume, overall lower averaged price from waste mix and the impact of our fixed costs structure. Services Segment gross profit decreased by $6,590,000 or 96.4% primarily due to decreased revenue as discussed in the “Overview” above. The decrease in gross margin from 20.2% to 1.3% was attributed to overall lower margin projects as the two large projects completed in late 2023 were higher margin projects. Our overall Services Segment gross margin is impacted by our current projects which are competitively bid on and will therefore, have varying margin structures.

Current wording

Treatment Segment gross profit increased by $302,000 or approximately 580.8% and gross margin increased to 2.7% from (0.6)% primarily due higher revenue from overall higher waste volume, partially offset by overall lower averaged price from waste mix. The increase in fixed costs negatively impacted gross margin. Services Segment gross profit increased by $975,000 or 171.7% and gross margin increased to 8.6% from (11.6)%. The increase was attributed partly to cost cutting initiatives that we implemented within our Service Segment to align expenses with its revenue backlog as procurement cycles stabilize. Additionally, our overall Services Segment gross margin is impacted by our current projects which are competitively bid on and will therefore, have varying margin structures.

Previous wording

SG&Aexpenses decreased $301,000 for the three months ended September 30, 2024, as compared to the corresponding period for 2023, as follows:

Current wording

SG&A expenses increased $471,000 for the three months ended March 31, 2025, as compared to the corresponding period for 2024, as follows:

Previous wording

R&D expenses increased by $183,000 and $532,000 for the three and nine months ended September 30, 2024, respectively, as compared to the corresponding period of 2023 primarily due to expenses incurred in connection with our new PFAS technology.

Current wording

R&D expenses increased by approximately $87,000 in the first quarter of 2025 as compared to the corresponding period of 2024 primarily due to expenses incurred for our PFAS technology (see “Known Trends and Uncertainties – New Processing Technology” within this MD&A for a discussion of this technology).

Previous wording

Interest income increased by approximately $146,000 and $234,000 for the three and nine months ended September 30, 2024, respectively, as compared to the corresponding period of 2023. The higher interest income for the third quarter of 2024 as compared to the corresponding quarter of 2023 was primarily due to interest income earned from our money market deposit account (“MMDA”) that we maintained with our lender starting in late 2023.

Current wording

Interest income increased by approximately $161,000 in the first quarter of 2025 as compared to the corresponding period of 2024 primarily due to interest income earned from funds deposited into our money market deposit account (“MMDA”) from the two equity raises that were completed in May 2024 and December 2024.

Previous wording

Our cash flow requirements during the nine months ended September 30, 2024, were primarily financed by our operations and Liquidity (defined as borrowing availability under the revolving credit plus cash in our MMDA maintained with our lender) under our Credit Facility. Our cash included net proceeds received from the sale of 2,051,282 shares our Common Stock to certain institutional and retail investors in May 2024 (see “Financing Activities” below for a discussion of this direct offering, including the planned usage of the proceeds). Our cash flow requirements for the next twelve months will consist primarily of general working capital needs, scheduled principal payments on our debt obligations, remediation projects, R&D on our PFAS technology and capital expenditures which include our PFAS technology (see “Known Trends and Uncertainties – New Processing Technology” within this MD&A for a discussion of this technology). We plan to fund these requirements from our operations and Liquidity under our Credit Facility. Our ability to utilize our Credit Facility from our lender is subject to meeting our quarterly financial covenant requirements, among other things. We are continually reviewing operating costs and reviewing the possibility of further reducing operating costs and non-essential expenditures to bring them in line with revenue levels. At September 30, 2024, we had no outstanding borrowing under our revolving credit and our Liquidity under our Credit Facility was approximately $13,984,000. We believe that our cash flows from operations and our Liquidity should be sufficient to fund our operations for the next twelve months. Although we believe we should be profitable in 2025, if we continue to incur losses, such may cause a reduction in our Liquidity.

Current wording

Our cash flow requirements during the three months ended March 31, 2025, were primarily financed by our Liquidity (defined under our Loan Agreement as borrowing availability under the revolving credit plus cash in our MMDA maintained with our lender). We believe our cash flow requirements for the next twelve months will consist primarily of general working capital needs, scheduled principal payments on our debt obligations, remediation projects, R&D on our PFAS technology and capital expenditures (which include our PFAS technology) (see “Known Trends and Uncertainties – New Processing Technology” within this MD&A for a discussion of this technology). We plan to fund these requirements from our operations and our Liquidity. We are continually reviewing operating costs and reviewing the possibility of further reducing operating costs and non-essential expenditures to bring them in line with revenue levels. As of March 31, 2025, we had no outstanding borrowing under our revolving credit and our Liquidity was approximately $29,277,000. We believe that our cash flows from operations and our Liquidity should be sufficient to fund our operations for the next twelve months. Although we believe our operations should improve in the remainder of 2025, if we continue to incur losses such as in the first quarter of 2025, this could cause a reduction in our Liquidity.

Previous wording

The following table reflects the cash flow activities during the first nine months of 2024

Current wording

The following table reflects the cash flow activities during the first three months of 2025 and 2024:

Previous wording

As of September 30, 2024, we were in a positive cash position with no revolving credit balance. At September 30, 2024, we had cash on hand of approximately $10,567,000.

Current wording

As of March 31, 2025, we were in a positive cash position with no revolving credit balance. As of March 31, 2025, we had cash on hand of approximately $25,745,000.

Previous wording

We had working capital of $9,424,000 (which included working capital of our discontinued operations) as of September 30, 2024, as compared to working capital of $4,613,000 as of December 31, 2023. The improvement in our in our working capital was primarily due to the increase in our cash from the sale of our Common Stock (see “Financing Activities” below for a discussion of this direct offering, including the planned usage of the proceeds) which was offset by the significant losses incurred from our results of operations attributed to the various factors as previously discussed.

Current wording

We had working capital of $24,632,000 (which included working capital of our discontinued operations) as of March 31, 2025, as compared to working capital of $28,283,000 as of December 31, 2024. The decrease in our working capital was primarily due to the significant losses incurred from our operations as previously discussed.

Previous wording

We entered into a Second Amended and Restated Revolving Credit, Term Loan and Security Agreement, dated May 8, 2020, which has since been amended from time to time, with PNC National Association (“PNC” and “lender”), acting as agent and lender (the “Loan Agreement”). The Loan Agreement provides us with the following credit facility with a maturity date of May 15, 2027 (the “Credit Facility): (a) up to $12,500,000 revolving credit (“revolving credit”), which borrowing capacity is subject to eligible receivables (as defined) and reduced by outstanding standby letters of credit ($3,950,000 as of September 30, 2024) and borrowing reductions that our lender may impose from time to time ($750,000 as of September 30, 2024); (b) a term loan (“Term Loan 1”) of approximately $1,742,000, requiring monthly installments of $35,547 (Term Loan 1 was paid off by us in June 2024); (c) a term loan (“Term Loan 2”) of $2,500,000, requiring monthly installments of $41,667; and (d) a capital expenditure line (“Capital Line”) of up to $1,000,000 with advances on the line, subject to certain limitations, permitted for up to twelve months starting May 4, 2021 (the “Borrowing Period”). Amounts advanced under the Capital Line at the end of the Borrowing Period totaled approximately $524,000, requiring monthly installments of principal of approximately $8,700 plus interest, commencing June 1, 2022.

Current wording

We entered into a Second Amended and Restated Revolving Credit, Term Loan and Security Agreement, dated May 8, 2020, which has since been amended, with PNC National Association (“PNC” and “lender”), acting as agent and lender (the “Loan Agreement”). The Loan Agreement provides us with a credit facility with a maturity date of May 15, 2027 (the “Credit Facility”) which consists of the following as of March 31, 2025: (a) up to $12,500,000 revolving credit (“revolving credit”), which borrowing capacity is subject to eligible receivables (as defined) and reduced by outstanding standby letters of credit ($3,200,000 as of March 31, 2025) and borrowing reductions that our lender may impose from time to time ($750,000 as of March 31, 2025); (b) a term loan (“Term Loan”) of $2,500,000, requiring monthly installments of $41,667; and (c) a capital expenditure loan (“Capital Loan”) of approximately $524,000, requiring monthly installments of principal of approximately $8,700 plus interest.

Previous wording

Our Credit Facility under our Loan Agreement with PNC contains certain financial covenants, along with customary representations and warranties. A breach of any of these financial covenants, unless waived by PNC, could result in a default under our Credit Facility allowing our lender to immediately require the repayment of all outstanding debt under our Credit Facility and terminate all commitments to extend further credit. We were not required to perform testing of our FCCR requirement for the first and second quarters of 2024 pursuant to the amendment dated May 8, 2024, to our Loan Agreement as discussed above. We were also not required to perform testing of our FCCR requirement for the third quarter of 2024 pursuant to the amendment dated November 12, 2024, to our Loan Agreement, as amended, as discussed above. Otherwise, we met all of our other financial covenant requirements in each of the first three quarters of 2024. We expect to meet our quarterly financial covenant requirements for the next twelve months.

Current wording

Our Loan Agreement, as amended, with PNC, contains certain financial covenant requirements, along with customary representations and warranties. A breach of any of these financial covenant requirements, unless waived by PNC, could result in a default under our Loan Agreement allowing our lender to immediately require the repayment of all outstanding debt under our Loan Agreement and terminate all commitments to extend further credit. We met all of our financial covenant requirements in the first quarter of 2025. We expect to meet our covenant requirements under our Loan Agreement for the next twelve months.

Previous wording

From time to time, we are required to post standby letters of credit and various bonds to support contractual obligations to customers and other obligations, including facility closures. At September 30, 2024, the total amount of standby letters of credit outstanding totaled approximately $3,950,000 and the total amount of bonds outstanding totaled approximately $20,568,000. We also provide closure and post-closure requirements through a financial assurance policy for certain of our Treatment Segment facilities through AIG. At September 30, 2024, the closure and post-closure requirements for these facilities were approximately $23,379,000.

Current wording

From time to time, we are required to post standby letters of credit and various bonds to support contractual obligations to customers and other obligations, including facility closures. As of March 31, 2025, the total amount of standby letters of credit outstanding totaled approximately $3,200,000 and the total amount of bonds outstanding totaled approximately $21,481,000. We also provide closure and post-closure requirements through a financial assurance policy for certain of our Treatment Segment facilities through AIG. As of March 31, 2025, the closure and post-closure requirements for these facilities were approximately $23,949,000.

Previous wording

See “Note 2 – Summary of Significant Accounting Policies” in the “Notes to Condensed Consolidated Financial Statements” for the recent accounting pronouncement that will be adopted in future periods.

Current wording

See “Note 2 – Summary of Significant Accounting Policies” in the “Notes to Condensed Consolidated Financial Statements” for the recent accounting pronouncement that was adopted in the first quarter of 2025 and recent accounting pronouncements that will be adopted in future periods.

Previous wording

Significant Customers. The contracts that we are a party to with others as subcontractors to the U.S government or directly with the U.S government generally provide that the government may terminate the contract at any time for convenience at the government’s option. Our inability to continue under existing contracts that we have with U.S. government authorities (directly or indirectly as a subcontractor) or significant reductions in the level of governmental funding in any given year could have a material adverse impact on our operations and financial condition. We performed services relating to waste generated by U.S government clients, either directly as a prime contractor or indirectly for others as a subcontractor to U.S. government entities, representing approximately $11,749,000 or 69.9% and $31,748,000 or 71.5% of our total revenues generated during the three and nine months ended September 30, 2024, respectively, as compared to 14,923,000 or 68.2% and $52,270,000 or 78.0% of our total revenues generated during the three and nine months ended September 30, 2023, respectively. Our partnership’s Italian contract may be terminated by the Contracting Authority under certain conditions as set forth in the contract. The scope of work to be performed in the initial phases of the Italian contract will be performed predominately by our JV partner. Revenue generated by the Company under the initial phases of the Italian contract will be limited to project management support through 2025 and is not material to date. The Company expects to generate an increase in revenue under the Italian contract starting in 2026 when the waste treatment phases begin.

Current wording

Significant Customers. The contracts that we are a party to with others as subcontractors to the federal government or directly with the federal government generally provide that the government may terminate the contract at any time for convenience at the government’s option. Our inability to continue under existing contracts that we have with the federal government authorities (directly or indirectly as a subcontractor) or significant reductions in the level of governmental funding in any given year could have a material adverse impact on our operations and financial condition. We performed services relating to waste generated by federal government clients, either indirectly as a subcontractor or directly as a prime contractor to federal government entities, representing approximately $8,404,00 or 60.4% of our total revenue during the three months ended March 31, 2025, as compared to $9,373,000 or 68.8% of our total revenue during the corresponding period of 2024.

Previous wording

*New Processing Technology.*We have completed the fabrication, installation, commissioning and startup of our first full scale commercial Perma-FAS system (“System”) for PFAS (commonly known as “forever chemicals”) destruction at our Perma-Fix Florida, Inc. facility. Our System and patent-pending technology successfully processed commercial PFAS-containing waste materials. There are limited current treatment options for these materials, and we expect that our process will exceed any of these methods. Some of the sizable markets for PFAS include AFFF (aqueous film-forming foam) firefighting foams, both expired concentrate and flushing liquids, contaminated liquids from PFAS systems, and other water-based separation products from a variety of industrial systems. We have already secured approximately 6,000 gallons of AFFF liquids to support ongoing operations and demonstration, and we believe that we will receive an additional 20,000 gallons in the coming months.

Current wording

*New Processing Technology.*We have completed the fabrication, installation, commissioning and startup of our first full scale commercial Perma-FAS system (“System”) for PFAS destruction, located at our Perma-Fix Florida, Inc. facility. PFAS, commonly known as “forever chemicals,” is the acronym for Perfluoroalkyl and Polyfluoroalkyl Substances, a diverse group of thousands of human-made chemical pollutants that have the potential to persist in both the environment and the human body. An increasing number of studies have documented adverse health risks that are associated with PFAS exposure, including increased risks of some cancers, reduced immune function, and developmental delays in children. Commercial destruction of PFAS offers a promising new source of revenue for us, as it complements our core waste remediation technologies, and we have filed patent applications relating to our System technology for PFAS destruction. With the successful startup of our pilot System, we have already processed commercial quantities of PFAS-containing waste materials. There are limited current treatment options for these materials, and we expect that our process will exceed any of these other current methods. Some of the sizable markets for PFAS include AFFF (aqueous film-forming foam) firefighting foams, both expired concentrate and flushing liquids, contaminated liquids from PFAS systems, and other water-based separation products from a variety of industrial systems. We have already secured and are treating approximately 10,000 gallons of AFFF liquids to support ongoing operations, demonstration, and further testing of our System. We believe that we will receive an additional 50,000 gallons in the coming months.

Previous wording

Our strategy for our System includes continued treatment of PFAS liquids over the coming months and targeting engineering refinements to support larger-scale Systems. By mid-2025, we expect to advance this technology into pilot-scale applications for soil, biosolids, and filter media, broadening the reach of our System’s destruction capabilities.

Current wording

Our strategy for our System includes continued treatment of PFAS liquids over the coming months and targeting engineering refinements to support larger-scale Systems. With significant upgrades to our prototype currently in the design phase, we anticipate deployment of the second generation unit in the fourth quarter of 2025 at one of our other existing treatment facilities. By the third quarter of 2025, we expect to advance this technology into pilot-scale applications for soil, biosolids, and filter media, broadening the reach of our System’s PFAS destruction capabilities.

Previous wording

We routinely use third party disposal companies, who ultimately destroy, or secure landfill residual materials generated at our facilities or at a client’s site. In the past, numerous third-party disposal sites have improperly managed waste and consequently require remedial action; consequently, any party utilizing these sites may be liable for some or all of the remedial costs. Despite our aggressive compliance and auditing procedures for disposal of wastes, we could further be notified, in the future, that we are a PRP at a remedial action site, which could have a material adverse effect.

Current wording

We routinely use third party disposal companies, who ultimately destroy, or secure landfill residual materials generated at our facilities or at a client’s site. In the past, numerous third-party disposal sites have improperly managed waste and consequently require remedial action; consequently, any party utilizing these sites may be liable for some or all of the remedial costs. Despite our aggressive compliance and auditing procedures for disposal of wastes, we could further be notified, in the future, that we are a potentially responsible party (“PRP”) at a remedial action site, which could have a material adverse effect.

Previous wording

We have three environmental remediation projects, all within our discontinued operations, which principally entail the removal/remediation of contaminated soil, and, in most cases, the remediation of surrounding ground water. We expect to fund the expenses to remediate these sites from funds generated from operations. As of September 30, 2024, we had total accrued environmental remediation liabilities of $767,000, a decrease of approximately $78,000 from the December 31, 2023, balance of $845,000. The decrease represents payments for remediation projects. At September 30, 2024, $1,000 of the total accrued environmental liabilities was recorded as current.

Current wording

We have three environmental remediation projects, all within our discontinued operations, which principally entail the removal/remediation of contaminated soil, and, in most cases, the remediation of surrounding ground water. We expect to fund the expenses to remediate these sites from funds generated from operations. As of March 31, 2025, we had total accrued environmental remediation liabilities of $767,000, no change from the December 31, 2024 balance of $767,000. As of March 31, 2025, the total balance of the accrued environmental remediation liabilities was recorded as long-term.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

Treatment Segment revenue decreased by $1,731,000 or 16.0% for the three months ended September 30, 2024, over the same period in 2023. The overall decrease in revenue in the Treatment Segment was primarily due to lower waste volume as discussed in the “Overview” above. Services Segment revenue decreased by approximately $3,334,000 or 30.1%. The decrease in revenue in the Services Segment was due to reasons as discussed in the “Overview” above. Additionally, our Services Segment revenues are project based; as such, the scope, duration, and completion of each project vary.

Previous report — wording carried elsewhere

(1)Includes wastes generated by government clients of $2,330,000 and $2,126,000 for the nine months ended September 30, 2024, and the corresponding period of 2023, respectively.

Previous report — wording carried elsewhere

On November 12, 2024, we entered into an amendment to our Loan Agreement, as amended, with our lender which provided the following, among other things: