Item 1A. Risk Factors

Current report: 10-Q

Period ended 2026-09-30; filed 2026-11-10.

0001628280-26-072482

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 443 previous paragraphs and 447 current paragraphs.

355 unchanged; 87 reworded; 2 added; 1 removed; 0 previous and 3 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (2)

Current report

On August 26, 2026, Cape Generating Station 6 LLC, a wholly owned subsidiary of Fervo, entered into a 15-year PPA with Google Energy LLC (“Google”) for the sale of energy products from a 396 MW EGS project at Cape Station in Beaver County, Utah. The project is expected to be delivered in four 99 MW sub-tranches beginning in 2028. In connection with the PPA, the Company also agreed to offer Google an expansion of at least 604 MW of additional capacity, which would increase the combined project capacity to approximately 1,000 MW, subject to Google’s acceptance and the negotiation of a definitive agreement. The project and contemplated expansion are intended to support a potential data center in Utah and remain subject to applicable development, engineering and regulatory requirements. The 396 MW PPA is in addition to the capacity contemplated under the GFA; the proposed 604 MW expansion, if accepted by Google, would be the first qualifying project under the GFA.

Current report

We have taken, and will continue to take, steps to remediate the material weaknesses described above. Our remediation efforts include designing and implementing effective internal controls measures to improve our evaluation of disclosure controls and procedures and internal control over financial reporting. Specifically, we have enhanced segregation of duties through organizational changes and role design, designed information technology general controls, including user access and change management controls, and expanded our accounting and financial reporting team with individuals who have public company and technical accounting experience. While we believe that these efforts will improve our internal control over financial reporting, we will not be able to conclude whether the steps we are taking will remediate the material weaknesses in internal control over financial reporting until a sufficient period of time has passed to allow management to test the design and operating effectiveness of the new controls.
Removed paragraphs (1)

Previous report

We are focused on designing and implementing effective internal controls measures to improve our evaluation of disclosure controls and procedures, including internal control over financial reporting, and remediating the material weaknesses. We also plan to recruit additional qualified financial reporting and accounting personnel to enhance our financial reporting capabilities.
Reworded paragraphs (87)

Previous wording

The capital expenditures we expect to incur as we complete the development of our future projects will be significant, including wellfield drilling and completions for EGS reservoirs and procurement of binary, air-cooled ORC power plants. Our standardized modular approach contemplates deployment across GeoClusters via 50-megawatt GeoBlocks, and our estimate of capital expenditures to construct a single GeoBlock was approximately $7,000/kW as of June 30, 2026, inclusive of wellfield, surface facilities and plant equipment. As of June 30, 2026, we currently estimate capital expenditures of approximately $850.0 million to $900.0 million for the remainder of 2026, a majority of which relates to our facilities at Cape Station. Although we currently hold certain federal approvals that have already undergone National Environmental Policy Act (“NEPA”) review covering approximately 2 gigawatts of capacity potential, a portion of these capital expenditures (including exploration, geophysical surveys, test and delineation wells, stimulation, and other reservoir development activities) must be incurred before we obtain, or can finalize, certain material permits, land use authorizations, and approvals that are outside the scope of NEPA review, including site‑specific well permits (e.g., drilling, injection and production well permits), water rights and related authorizations, and state and local permits and approvals (such as land use, building, grading, cultural and environmental, and air and noise permits). As of the date of this filing, 79 out of 80 governmental permits and approvals necessary to commence commercial operations at Cape Station Phase I have been received, and the single remaining necessary permit is in process. Moreover, 82 out of 179 governmental permits and approvals necessary to commence commercial operations at Cape Station Phase II have been received, and the remaining 97 are in process. Of those in-process approvals and permits, all are individual, administrative geothermal well permits or administrative county permits, and we do not currently expect any material delays, conditions or denials with respect to any of these pending permits. If any such permits or approvals are delayed, impose burdensome conditions, or are not granted, the investments we make ahead of permitting may be stranded, impaired, or require redesign, leading to write‑offs, additional costs, and schedule slippage.

Current wording

The capital expenditures we expect to incur as we complete the development of our future projects will be significant, including wellfield drilling and completions for EGS reservoirs and procurement of binary, air-cooled Organic Rankine Cycle (“ORC”) turbines and power plants (“GeoBlocks”). Our standardized modular approach contemplates deployment across GeoClusters via 50-megawatt GeoBlocks, and our estimate of capital expenditures to construct a single GeoBlock was approximately $7,000/kW as of September 30, 2026, inclusive of wellfield, surface facilities and plant equipment. As of September 30, 2026, we currently estimate capital expenditures of approximately $450.0 million to $500.0 million for the remainder of 2026, a majority of which relates to our facilities at Cape Station. Although we currently hold certain federal approvals that have already undergone National Environmental Policy Act (“NEPA”) review covering approximately 2 gigawatts of capacity potential, a portion of these capital expenditures (including exploration, geophysical surveys, test and delineation wells, stimulation, and other reservoir development activities) must be incurred before we obtain, or can finalize, certain material permits, land use authorizations, and approvals that are outside the scope of NEPA review, including site‑specific well permits (e.g., drilling, injection and production well permits), water rights and related authorizations, and state and local permits and approvals (such as land use, building, grading, cultural and environmental, and air and noise permits). As of the date of this filing, all 80 governmental permits and approvals necessary to commence commercial operations at Cape Station Phase I have been received. Moreover, 96 out of 179 governmental permits and approvals necessary to commence commercial operations at Cape Station Phase II have been received, and the remaining 83 are in process. Of those in-process approvals and permits, all are individual, administrative geothermal well permits or administrative county permits, and we do not currently expect any material delays, conditions or denials with respect to any of these pending permits. If any such permits or approvals are delayed, impose burdensome conditions, or are not granted, the investments we make ahead of permitting may be stranded, impaired, or require redesign, leading to write‑offs, additional costs, and schedule slippage.

Previous wording

There is limited commercial operating experience for EGS of the type, configuration, and scale we have pioneered, particularly compared to that of the existing traditional geothermal industry. To date, we have completed Project Red and have 500 megawatts at Cape Station under construction. Project Red was a limited-scope, proof-of-concept initiative designed to demonstrate certain technical capabilities rather than a commercial-scale development. By contrast, Cape Station represents our first meaningful attempt to deploy our modules at commercial scale. Cape Station is not yet complete and, based on our current schedule, is not expected to have the first approximately 100 megawatts fully constructed, commissioned, and operational until early 2027. As a result, we have not yet demonstrated an ability to deliver consistent, reliable, and economic performance at scale, and our business, financial condition, and results of operations could be adversely affected if we experience delays, cost overruns, resource underperformance, operational failures, or other challenges in constructing, commissioning, and operating Cape Station Phase I or any subsequent commercial-scale project.

Current wording

There is limited commercial operating experience for EGS of the type, configuration, and scale we have pioneered, particularly compared to that of the existing traditional geothermal industry. To date, we have completed Project Red and have 466 megawatts at Cape Station under construction. Project Red was a limited-scope, proof-of-concept initiative designed to demonstrate certain technical capabilities rather than a commercial-scale development. By contrast, Cape Station represents our first meaningful attempt to deploy our modules at commercial scale. Cape Station is not yet complete and, based on our current schedule, is not expected to have the first approximately 100 megawatts fully constructed, commissioned, and operational until early 2027. As a result, we have not yet demonstrated an ability to deliver consistent, reliable, and economic performance at scale, and our business, financial condition, and results of operations could be adversely affected if we experience delays, cost overruns, resource underperformance, operational failures, or other challenges in constructing, commissioning, and operating Cape Station Phase I or any subsequent commercial-scale project.

Previous wording

While our wellfields, drilling operations, and power plants have been and will be actively managed through design reviews, prototyping, testing, involvement of external partners with subject matter expertise, and application of approaches utilized in the operation of Project Red and in the construction of Cape Station, we could still fail to identify latent design, manufacturing, construction, and operations issues early enough to avoid negative effects on production, fabrication, construction, or ultimate performance of power plant and related technologies. In addition, our wellfields, drilling operations, and power plants in their early stages may underperform due to operational uncertainties as well as engineering or operational limitations beyond our control, any of which could materially and adversely affect our business.

Current wording

While our wellfields, drilling operations, and GeoBlocks have been and will be actively managed through design reviews, prototyping, testing, involvement of external partners with subject matter expertise, and application of approaches utilized in the operation of Project Red and in the construction of Cape Station, we could still fail to identify latent design, manufacturing, construction, and operations issues early enough to avoid negative effects on production, fabrication, construction, or ultimate performance of GeoBlocks and related technologies. In addition, our wellfields, drilling operations, and GeoBlocks in their early stages may underperform due to operational uncertainties as well as engineering or operational limitations beyond our control, any of which could materially and adversely affect our business.

Previous wording

Moreover, the cost and time associated with the construction and maintenance of our wellfields, drilling operations, and power plants may be greater than we expect because of a lack of a labor force with relevant commercial experience and a shallow and otherwise immature supply chain for these types of geothermal systems. Where these issues may arise at later stages of deployment, deployment could be subject to greater costs or be significantly delayed, which could permit our counterparties to terminate their PPAs and otherwise materially and adversely affect our business.

Current wording

Moreover, the cost and time associated with the construction and maintenance of our wellfields, drilling operations, and GeoBlocks may be greater than we expect because of a lack of a labor force with relevant commercial experience and a shallow and otherwise immature supply chain for these types of geothermal systems. Where these issues may arise at later stages of deployment, deployment could be subject to greater costs or be significantly delayed, which could permit our counterparties to terminate their PPAs and otherwise materially and adversely affect our business.

Previous wording

In addition, our business plan anticipates that our drilling operations will drill to greater depth and temperatures, and makes assumptions with respect to learnings, efficiencies and regulatory approvals as a result of this concurrent development approach. If such assumptions regarding concurrent development at greater depths and temperatures are not accurate, we may be unable to successfully introduce, market, and sell these configurations of our power plants in a timely and cost-effective manner, and properly position and/or price our products, our business, results of operations, or financial position could be materially impacted.

Current wording

In addition, our business plan anticipates that our drilling operations will drill to greater depth and temperatures, and makes assumptions with respect to learnings, efficiencies and regulatory approvals as a result of this concurrent development approach. If such assumptions regarding concurrent development at greater depths and temperatures are not accurate, we may be unable to successfully introduce, market, and sell these configurations of our GeoBlocks in a timely and cost-effective manner, and properly position and/or price our products, our business, results of operations, or financial position could be materially impacted.

Previous wording

We depend on transmission facilities owned and operated by others to deliver the power we sell from our power plants to our customers. If transmission is disrupted, or if the transmission capacity infrastructure is inadequate, or if there is a failure that requires a long shutdown for repair, or if curtailment is required due to load system inefficiency, our ability to sell and deliver power to our customers may be adversely impacted and we may either incur additional costs or forego revenues. For example, if a transmission provider curtails our facility or recalls our transmission rights, we could experience prolonged or repeated outages, face liquidated damages or termination under our PPAs, face damages under tax credit sales agreements, and face potential defaults under financing arrangements. In addition, lack of access to new transmission capacity may affect our ability to develop new projects. Existing congestion of transmission capacity, as well as expansion of transmission systems and competition from other developers seeking access to expanded systems, could also affect our performance. Although our modular GeoCluster approach may offer interconnection optionality at multi-gigawatt sites, new transmission remains uncertain, and behind-the-meter opportunities with data centers may not be available or sufficient to offset transmission constraints.

Current wording

We depend on transmission facilities owned and operated by others to deliver the power we sell from our GeoBlocks to our customers. If transmission is disrupted, or if the transmission capacity infrastructure is inadequate, or if there is a failure that requires a long shutdown for repair, or if curtailment is required due to load system inefficiency, our ability to sell and deliver power to our customers may be adversely impacted and we may either incur additional costs or forego revenues. For example, if a transmission provider curtails our facility or recalls our transmission rights, we could experience prolonged or repeated outages, face liquidated damages or termination under our PPAs, face damages under tax credit sales agreements, and face potential defaults under financing arrangements. In addition, lack of access to new transmission capacity may affect our ability to develop new projects. Existing congestion of transmission capacity, as well as expansion of transmission systems and competition from other developers seeking access to expanded systems, could also affect our performance. Although our modular GeoCluster approach may offer interconnection optionality at multi-gigawatt sites, new transmission remains uncertain, and behind-the-meter opportunities with data centers may not be available or sufficient to offset transmission constraints.

Previous wording

The successful development of our project pipeline depends on our ability to obtain sufficient interconnection and transmission capacity to support delivery obligations under our PPAs. For example, for Cape Station Phase II, we currently have approximately 290 megawatts of interconnection and transmission rights. This capacity is sufficient to meet the obligations under our original PPAs with Southern California Edison (SCE) and Clean Power Alliance (CPA), but is insufficient to support the full 384 megawatts of combined contracted capacity with the subsequent expansions of the SCE and CPA PPAs. If we are unable to secure additional interconnection and transmission capacity or alternative delivery arrangements on a timely basis or at all, our original PPAs would remain in effect; however, we may be unable to deliver the additional megawatts of contracted capacity, which could result in reduced revenues, payment of liquidated damages, contract modifications or terminations, or other adverse effects on our business and financial condition.

Current wording

The successful development of our project pipeline depends on our ability to obtain sufficient interconnection and transmission capacity to support delivery obligations under our PPAs. For example, for our next project at Cape Station, we currently have approximately 300 megawatts of interconnection and transmission rights, which is insufficient to support the 396 megawatts of capacity contracted under our Google PPA. If we are unable to secure additional interconnection and transmission capacity or alternative delivery arrangements on a timely basis or at all, our original PPAs would remain in effect; however, we may be unable to deliver the additional megawatts of contracted capacity, which could result in reduced revenues, payment of liquidated damages, contract modifications or terminations, or other adverse effects on our business and financial condition.

Previous wording

Prior to February 2017, we conducted no business operations and we recorded no revenue or expenses. During the three and six months ended June 30, 2026, we reported net losses of $55.9 million and $87.7 million, respectively. During the three and six months ended June 30, 2025, we reported net losses of $11.4 million and $20.6 million, respectively.

Current wording

Prior to May 2017, we conducted no business operations, and we recorded no revenue or expenses. During the three and nine months ended September 30, 2026, we reported net income of $11.7 million and net loss of $76.1 million, respectively. During the three and nine months ended September 30, 2025, we reported net losses of $15.8 million and $36.4 million, respectively.

Previous wording

We have plans for rapid continued growth, with 500 megawatts under construction and a significant number of additional megawatts in the pipeline for planned construction. Our future growth will be impacted by, among other things: adverse macroeconomic conditions, including the rate of growth of U.S. electricity demand; changing interest rates; our ability to develop our wellfields and power plants, market acceptance of our technology, including our EGS systems, our ability to meet demand for funding; sales of power pursuant to our PPAs; increasing competition; credit market volatility; increasing regulatory costs and challenges; prices of construction of projects; and our failure to capitalize on growth opportunities.

Current wording

We have plans for rapid continued growth, with 466 megawatts under construction and a significant number of additional megawatts in the pipeline for planned construction. Our future growth will be impacted by, among other things: adverse macroeconomic conditions, including the rate of growth of U.S. electricity demand; changing interest rates; our ability to develop our wellfields and GeoBlocks, market acceptance of our technology, including our EGS systems, our ability to meet demand for funding; sales of power pursuant to our PPAs; increasing competition; credit market volatility; increasing regulatory costs and challenges; prices of construction of projects; and our failure to capitalize on growth opportunities.

Previous wording

Our financial performance depends on the successful operation of our geothermal power plants, which is subject to various operational risks.

Current wording

Our financial performance depends on the successful operation of our GeoBlocks, which is subject to various operational risks.

Previous wording

Our financial performance depends on the successful operation of our geothermal power plants. In connection with such operations, we anticipate we will derive substantially all of our future revenues from the sale of electricity. Following commissioning of our power plants, we plan to manage, operate, and maintain such power plants in-house through our subsidiaries. We are in the process of building out our team to manage and operate the power plants, and as a result we will be exposed to various operational risks as we expand that team and bring power plants online. The cost of operation and maintenance and the operating performance of our geothermal power plants may be adversely affected by a variety of factors, including:

Current wording

Our financial performance depends on the successful operation of our GeoBlocks. In connection with such operations, we anticipate we will derive substantially all of our future revenues from the sale of electricity. Following commissioning of our GeoBlocks, we plan to manage, operate, and maintain such GeoBlocks in-house through our subsidiaries. We are in the process of building out our team to manage and operate the GeoBlocks, and as a result we will be exposed to various operational risks as we expand that team and bring GeoBlocks online. The cost of operation and maintenance and the operating performance of our geothermal GeoBlocks may be adversely affected by a variety of factors, including:

Previous wording

•our limited track record with managing and operating our own power plants;

Current wording

•our limited track record with managing and operating our own GeoBlocks;

Previous wording

•our power plants performing below expected levels of efficiency or capacity or required changes to specifications for continued operations;

Current wording

•our GeoBlocks performing below expected levels of efficiency or capacity or required changes to specifications for continued operations;

Previous wording

•our potential inability to recruit and retain key personnel to successfully manage and operate the power plants;

Current wording

•our potential inability to recruit and retain key personnel to successfully manage and operate the GeoBlocks;

Previous wording

•a lack of adequate and qualified personnel to crew and operate the power plants;

Current wording

•a lack of adequate and qualified personnel to crew and operate the GeoBlocks;

Previous wording

•the presence of hazardous substances on our geothermal power plant sites and releases of hazardous substances into the environment;

Current wording

•the presence of hazardous substances on or near our sites and releases of hazardous substances into the environment;

Previous wording

•catastrophic events such as fires, explosions, earthquakes, volcanic activity, landslides, floods, severe weather storms, or other weather events (including weather conditions associated with climate change) or similar occurrences affecting our power plants or any of the power purchases or other third parties providing services to our power plants;

Current wording

•catastrophic events such as fires, explosions, earthquakes, volcanic activity, landslides, floods, severe weather storms, or other weather events (including weather conditions associated with climate change) or similar occurrences affecting our GeoBlocks or any of the power purchases or other third parties providing services to our GeoBlocks;

Previous wording

•the aging of power plants and ORC turbines (which may reduce their availability and increase the cost of their maintenance);

Current wording

•the aging of GeoBlocks and ORC turbines (which may reduce their availability and increase the cost of their maintenance);

Previous wording

•cyber-attacks that may interrupt the operation of our power plants; and

Current wording

•cyber-attacks that may interrupt the operation of our GeoBlocks; and

Previous wording

Any of these events could significantly increase the expense of operating our power plants or could reduce the overall effectiveness of the generating capacity of our power plants, which in turn would reduce our net income and could materially and adversely affect our business, financial condition, future results and cash flows.

Current wording

Any of these events could significantly increase the expense of operating our GeoBlocks or could reduce the overall effectiveness of the generating capacity of our GeoBlocks, which in turn would reduce our net income and could materially and adversely affect our business, financial condition, future results and cash flows.

Previous wording

Our ability to be profitable and generate positive operating cash flows is primarily dependent on our ability to generate revenues, and in turn net profits and operating cash flows, after commercial operation date (“COD”) occurs for a given project, through the sale of electricity pursuant to our PPAs that are effective after their respective COD, as well as our ability to monetize our tax credits and our other assets, including any intellectual property, data, or advisory arrangements that may be pursued in the ordinary course.

Current wording

Our ability to be profitable and generate positive operating cash flows is primarily dependent on our ability to generate revenues, and in turn net profits and operating cash flows, after COD occurs for a given project, through the sale of electricity pursuant to our PPAs that are effective after their respective COD, as well as our ability to monetize our tax credits and our other assets, including any intellectual property, data, or advisory arrangements that may be pursued in the ordinary course.

Previous wording

Our ability to generate sales of electricity following COD at each of our projects depends on our ability to successfully commence and maintain production under our PPAs. We expect to begin delivering first power from our 500-megawatt Cape Station project in the fourth quarter of 2026, and to reach approximately 100 megawatts of operating capacity in the first quarter of 2027. However, there is no guarantee that we will achieve such CODs within those timeframes or at all. We may fail to receive the required approvals and permits from governmental and regulatory agencies for our projects. As a result, there can be no assurance as to when we will commence deliveries under our PPAs, and therefore when, if at all, we will commence generating revenues and operating cash flows from our PPAs. If we do not commence operations under our PPA on Cape Station Phase I (Unit 1), Cape Station Phase I (Units 2-3), and Cape Station Phase II by the COD under the applicable PPA, we will incur liquidated damages under the provisions of the applicable PPA. If we do not commence operations within six months of the applicable PPA COD deadline, our counterparty has the right to terminate the contract. Accordingly, there is significant uncertainty about our ability to maintain profitability and operating cash flows.

Current wording

Our ability to generate sales of electricity following COD at each of our projects depends on our ability to successfully commence and maintain production under our PPAs. We began delivering first power from GeoBlock 1 at our 500-megawatt Cape Station project in the third quarter of 2026 and expect to reach approximately 100 megawatts of operating capacity by early 2027. However, there is no guarantee that we will achieve such CODs within those timeframes or at all. We may fail to receive the required approvals from governmental and regulatory agencies for our projects. As a result, there can be no assurance as to when we will commence deliveries under our PPAs, and therefore when, if at all, we will commence generating revenues and operating cash flows from our PPA related to GeoBlocks 2-3 on Cape Station Phase I. If we do not commence operations under our PPA on Cape

Previous wording

Additionally, the imposition of sanctions, tariffs, or material changes in import and export requirements on a nation-by-nation basis, on materials or supplied components for our power plants could have a material adverse effect on our operations. Prolonged disruptions in the supply of any of our key materials or components, difficulty qualifying new sources of supply, implementing use of replacement materials or new sources of supply or any volatility in prices could have a material adverse effect on our ability to operate in a cost-efficient, timely manner. Such prolonged disruptions could also cause us to experience cancellations or delays of scheduled launches, customer cancellations or reductions in our prices and margins, any of which could harm our business, financial condition, results of operations and cash flows. Our reliance on a domestic supply chain for drilling services and ORC equipment remains subject to capacity, even as we seek to partner with established service providers and turbine manufacturers.

Current wording

Additionally, the imposition of sanctions, tariffs, or material changes in import and export requirements on a nation-by-nation basis, on materials or supplied components for our GeoBlocks could have a material adverse effect on our operations. Prolonged disruptions in the supply of any of our key materials or components, difficulty qualifying new sources of supply, implementing use of replacement materials or new sources of supply or any volatility in prices could have a material adverse effect on our ability to operate in a cost-efficient, timely manner. Such prolonged disruptions could also cause us to experience cancellations or delays of scheduled launches, customer cancellations or reductions in our prices and margins, any of which could harm our business, financial condition, results of operations and cash flows. Our reliance on a domestic supply chain for drilling services and ORC equipment remains subject to capacity, even as we seek to partner with established service providers and turbine manufacturers.

Previous wording

We are exposed to the credit and financial condition of our offtakers. We currently have [two] long-term PPAs related to Cape Station. Because our contracts are long-term, we may be adversely affected if the credit quality of any of these customers were to decline or if their respective financial conditions were to deteriorate or if they are otherwise unable to perform their obligations under our long-term contracts. While we have executed binding offtake agreements with credit-worthy counterparties in certain cases, long-term exposure to a concentrated offtaker base remains a risk.

Current wording

We are exposed to the credit and financial condition of our offtakers. We currently have three long-term PPAs related to Cape Station. Because our contracts are long-term, we may be adversely affected if the credit quality of any of these customers were to decline or if their respective financial conditions were to deteriorate or if they are otherwise unable to perform their obligations under our long-term contracts. While we have executed binding offtake agreements with credit-worthy counterparties in certain cases, long-term exposure to a concentrated offtaker base remains a risk.

Previous wording

We are a holding company and our cash depends substantially on the performance of our subsidiaries and the power plants they operate, most of which are subject to restrictions and taxation on dividends and distributions.

Current wording

We are a holding company and our cash depends substantially on the performance of our subsidiaries and the GeoBlocks they operate, most of which are subject to restrictions and taxation on dividends and distributions.

Previous wording

As a holding company, our financial health and liquidity are closely tied to the performance of our subsidiaries and the geothermal power plants they operate. These subsidiaries are the primary source of our cash flow, and any adverse developments in their operations can directly impact our ability to generate revenue and maintain financial stability. The geothermal power plants are subject to various operational risks, including resource variability, technological challenges, and maintenance requirements, which can affect their efficiency and output. Additionally, fluctuations in energy prices and demand can influence the profitability of these plants, further impacting the cash flow available to the holding company.

Current wording

As a holding company, our financial health and liquidity are closely tied to the performance of our subsidiaries and the GeoBlocks they operate. These subsidiaries are the primary source of our cash flow, and any adverse developments in their operations can directly impact our ability to generate revenue and maintain financial stability. The GeoBlocks are subject to various operational risks, including resource variability, technological challenges, and maintenance requirements, which can affect their efficiency and output. Additionally, fluctuations in energy prices and demand can influence the profitability of these plants, further impacting the cash flow available to the holding company.

Previous wording

Moreover, our subsidiaries operate in diverse regulatory environments, each with its own set of restrictions and taxation policies on dividends and distributions. These regulations can limit the amount of cash that can be transferred to the holding company, affecting our ability to meet financial obligations and invest in growth opportunities. Changes in tax laws or regulatory frameworks could increase the tax burden on our subsidiaries, reducing the funds available for distribution. As a result, our financial results and ability to execute strategic initiatives are inherently linked to the operational success and regulatory compliance of our subsidiaries and the geothermal power plants they manage.

Current wording

Moreover, our subsidiaries operate in diverse regulatory environments, each with its own set of restrictions and taxation policies on dividends and distributions. These regulations can limit the amount of cash that can be transferred to the holding company, affecting our ability to meet financial obligations and invest in growth opportunities. Changes in tax laws or regulatory frameworks could increase the tax burden on our subsidiaries, reducing the funds available for distribution. As a result, our financial results and ability to execute strategic initiatives are inherently linked to the operational success and regulatory compliance of our subsidiaries and the GeoBlocks they manage.

Previous wording

Management and operation of our wellfield and power plants will involve significant risks.

Current wording

Management and operation of our wellfield and GeoBlocks will involve significant risks.

Previous wording

Following commissioning of our power plants, we plan to manage, operate, and maintain such power plants through our subsidiaries. We are in the process of building out our team to manage and operate the power plants, and as a result we will be exposed to various new operational risks as we expand that team and bring power plants online. For example, we will be exposed to the following risks with respect to the operation of power plants:

Current wording

Following commissioning of our GeoBlocks, we plan to manage, operate, and maintain such GeoBlocks through our subsidiaries. We are in the process of building out our team to manage and operate the GeoBlocks, and as a result we will be exposed to various new operational risks as we expand that team and bring GeoBlocks online. For example, we will be exposed to the following risks with respect to the operation of GeoBlocks:

Previous wording

•our limited track record with managing and operating our own power plants;

Current wording

•our limited track record with managing and operating our own GeoBlocks;

Previous wording

•our power plants performing below expected levels of efficiency or capacity or required changes to specifications for continued operations;

Current wording

•our GeoBlocks performing below expected levels of efficiency or capacity or required changes to specifications for continued operations;

Previous wording

•aging of power plants and ORC turbines (which may reduce their availability and increase the cost of their maintenance);

Current wording

•aging of GeoBlocks and ORC turbines (which may reduce their availability and increase the cost of their maintenance);

Previous wording

•a lack of adequate and qualified personnel to crew and operate the power plants;

Current wording

•a lack of adequate and qualified personnel to crew and operate the GeoBlocks;

Previous wording

•our potential inability to recruit and retain key personnel to successfully manage and operate the power plants;

Current wording

•our potential inability to recruit and retain key personnel to successfully manage and operate the GeoBlocks;

Previous wording

We recently entered into the GFA, a framework agreement with Google Energy LLC under which we have committed to propose geothermal development projects representing at least one gigawatt of geothermal capacity to Google within two years and up to three gigawatts over the term of the agreement. The GFA establishes a binding framework under which we may propose geothermal development projects to Google, but it does not obligate Google to accept any project, execute any power purchase agreement or provide us with any project financing. Google has the sole and unilateral right to accept or reject any proposed project for any reason or no reason, and may terminate the GFA in accordance with its terms. While the GFA provides for termination fees payable by Google if it withdraws from a project at certain development stages, these fees may not fully compensate us for the development costs we have incurred, and investors should not assume they reflect the full economic value of the projects to which they relate. In addition, either party may terminate the GFA entirely if no definitive offtake agreement has been executed by March 19, 2028, approximately two years from its effective date, which means the GFA could lapse in its entirety without resulting in any binding commitment from Google to purchase power from us. There can be no assurance that any project proposed under the GFA will progress to a binding offtake agreement or that the GFA will result in any contracted capacity or revenue.

Current wording

We recently entered into the GFA, a framework agreement with Google Energy LLC under which we have committed to propose geothermal development projects representing at least one gigawatt of geothermal capacity to Google within two years and up to three gigawatts over the term of the agreement. The GFA establishes a binding framework under which we may propose geothermal development projects to Google, but it does not obligate Google to accept any project, execute any power purchase agreement or provide us with any project financing. Google has the sole and unilateral right to accept or reject any proposed project for any reason or no reason, and may terminate the GFA in accordance with its terms. While the GFA provides for termination fees payable by Google if it withdraws from a project at certain development stages, these fees may not fully compensate us for the development costs we have incurred, and investors should not assume they reflect the full economic value of the projects to which they relate.

Previous wording

Even in the event that projects do proceed under the GFA, the pricing and other terms of the GFA may limit our ability to fully recover costs or achieve our targeted returns. The GFA establishes pricing on a cost-plus targeted return basis, subject to caps, floors, and escalating discounts on expansion projects, any of which could compress our margins or require us to absorb cost overruns on affected projects. The GFA also grants Google audit rights over our project costs and pricing methodology, which could give rise to disputes that delay or disrupt the execution of definitive agreements. These pricing constraints could have a material adverse effect on our business, financial condition, and results of operations.

Current wording

Even in the event that projects beyond the 396 MW EGS project do proceed under the GFA, the pricing and other terms of the GFA may limit our ability to fully recover costs or achieve our targeted returns. The GFA establishes pricing on a cost-plus targeted return basis, subject to caps, floors, and escalating discounts on expansion projects, any of which could compress our margins or require us to absorb cost overruns on affected projects. The GFA also grants Google audit rights over our project costs and pricing methodology, which could give rise to disputes that delay or disrupt the execution of definitive agreements. These pricing constraints could have a material adverse effect on our business, financial condition, and results of operations.

Previous wording

We do not have manufacturing assets and will rely on third party manufacturers and construction firms to build power plants, wellfields and associated equipment. Our growth strategy assumes that manufacturers of geothermal turbines, drilling equipment, and other critical components will expand capacity in line with our development pipeline. The existing supplier base for these highly specialized products is limited, and there is no assurance that it can scale production, workforce, or logistics to match sector‑wide demand. If suppliers are unable or unwilling to increase output on the timelines and terms we require, we could face extended lead times, higher equipment and construction costs, and delays in reaching commercial operation, which could adversely affect our revenues, project returns, and ability to meet contractual milestones. Moreover, we are dependent on future supplier capability to meet production demands attendant to our forecasts. If our supply chain cannot meet the schedule demands of the market, our projected sales revenues could be materially impacted.

Current wording

We do not have manufacturing assets and will rely on third party manufacturers and construction firms to build wellfields, GeoBlocks and associated equipment. Our growth strategy assumes that manufacturers of geothermal turbines, drilling equipment, and other critical components will expand capacity in line with our development pipeline. The existing supplier base for these highly specialized products is limited, and there is no assurance that it can scale production, workforce, or logistics to match sector‑wide demand. If suppliers are unable or unwilling to increase output on the timelines and terms we require, we could face extended lead times, higher equipment and construction costs, and delays in reaching commercial operation, which could adversely affect our revenues, project returns, and ability to meet contractual milestones. Moreover, we are dependent on future supplier capability to meet production demands attendant to our forecasts. If our supply chain cannot meet the schedule demands of the market, our projected sales revenues could be materially impacted.

Previous wording

We are in the process of developing and constructing a number of new power plants. Our success in developing a project is contingent upon, among other things, negotiation of satisfactory engineering, construction, and procurement agreements and obtaining PPAs and transmission services agreements, receipt of required governmental permits (including environmental permits), obtaining adequate financing, and the timely implementation and satisfactory completion of field development, testing and power plant construction and commissioning. We may be unsuccessful in accomplishing any of these matters or doing so on a timely basis, such as in cases where we have to handle legal proceedings with respect to environmental permits. Although we may attempt to minimize the financial risks attributable to the development of a project by securing a favorable PPA and applicable transmission services agreements, obtaining all required governmental permits and approvals and arranging, in certain cases, adequate financing prior to the commencement of construction, the development of a power project may require us to incur significant expenses for preliminary engineering, permitting and legal and other expenses before we can determine whether a project is feasible, economically attractive or capable of being financed.

Current wording

We are in the process of developing and constructing a number of new GeoBlocks. Our success in developing a project is contingent upon, among other things, negotiation of satisfactory engineering, construction, and procurement agreements and obtaining PPAs and transmission services agreements, receipt of required governmental permits (including environmental permits), obtaining adequate financing, and the timely implementation and satisfactory completion of field development, testing and GeoBlock construction and commissioning. We may be unsuccessful in accomplishing any of these matters or doing so on a timely basis, such as in cases where we have to handle legal proceedings with respect to environmental permits. Although we may attempt to minimize the financial risks attributable to the development of a project by securing a favorable PPA and applicable transmission services agreements, obtaining all required governmental permits and approvals and arranging, in certain cases, adequate financing prior to the commencement of construction, the development of a power project may require us to incur significant expenses for preliminary engineering, permitting and legal and other expenses before we can determine whether a project is feasible, economically attractive or capable of being financed.

Previous wording

•Failure to secure sufficient land positions for the wellfield, power plant, and rights of way;

Current wording

•Failure to secure sufficient land positions for the wellfield, GeoBlocks, and rights of way;

Previous wording

Certain of our wellfields and power plants are dependent upon collaborations with national laboratories and/or various regulatory approvals. In particular, many of our projects are located on, cross, or otherwise rely on access to lands administered by the Bureau of Land Management (“BLM”), and our development and operations depend on obtaining and maintaining BLM rights-of-way, leases, drilling and construction permits, and related approvals. Government agency budgets and staffing are driven by the priorities of leadership at federal agencies as well as policymakers. Changes in governmental agency budgets, personnel, and any resulting staffing shortages may delay our geothermal power plants and resource management facilities and delay or prevent the issuance of required regulatory approvals (e.g., permits or licenses) for our geothermal operations. Additionally, lapses in federal appropriations and related government shutdowns can suspend or significantly slow agency activities, including BLM processing of applications, consultations, and environmental reviews, which can halt field work, delay access to federal lands, and extend project schedules. These delays can impact our ability to commence or expand operations, affecting our revenue generation and growth prospects.

Current wording

Certain of our wellfields and GeoBlocks are dependent upon collaborations with national laboratories and/or various regulatory approvals. In particular, many of our projects are located on, cross, or otherwise rely on access to lands administered by the Bureau of Land Management (“BLM”), and our development and operations depend on obtaining and maintaining BLM rights-of-way, leases, drilling and construction permits, and related approvals. Government agency budgets and staffing are driven by the priorities of leadership at federal agencies as well as policymakers. Changes in governmental agency budgets, personnel, and any resulting staffing shortages may delay our GeoBlocks and resource management facilities and delay or prevent the issuance of required regulatory approvals (e.g., permits or licenses) for our geothermal operations. Additionally, lapses in federal appropriations and related government shutdowns can suspend or significantly slow agency activities, including BLM processing of applications, consultations, and environmental reviews, which can halt field work, delay access to federal lands, and extend project schedules. These delays can impact our ability to commence or expand operations, affecting our revenue generation and growth prospects.

Showing the first 40 of 87 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

Station Phase I (GeoBlocks 2-3), and Cape Station Phase II by the COD under the applicable PPA, we will incur liquidated damages under the provisions of the applicable PPA. If we do not commence operations within six months of the applicable PPA COD deadline, our counterparty has the right to terminate the contract. Accordingly, there is significant uncertainty about our ability to maintain profitability and operating cash flows.

Current report — wording carried from elsewhere

Our Class B common stock is beneficially owned by our Co-Founders, Tim Latimer and Jack Norbeck, PhD, who also serve as our Chief Executive Officer and Chief Technology Officer, respectively, whose interests may differ from or conflict with the interests of our other stockholders. Each share of our Class A common stock is entitled to one vote per share. Each share of our Class B common stock is entitled to 40 votes per share. Because of the forty-to-one voting ratio between our Class B and Class A common stock, the holders of our Class B common stock collectively continue to control a significant percentage of the combined voting power of our common stock and therefore are able to control all matters submitted to our stockholders for approval. Our Co-Founders hold all of the issued and outstanding shares of our Class B common stock and, accordingly, beneficially own approximately 2.6% of our outstanding capital stock and control approximately 52.0% of the voting power of our outstanding capital stock. Assuming all outstanding stock options held by the Co-Founders that are exercisable on or before

Current report — wording carried from elsewhere

Pursuant to the Registration Rights Agreement entered into in connection with our IPO, certain of our stockholders and their permitted transferees can demand that we register the resale of their registrable shares of