Company Overview

i-80 Gold Corp. (the "Company" or "i-80 Gold") is a Nevada-focused growth-oriented gold and silver mining company engaged in the exploration and extraction of gold and silver. The Company is one of the largest mineral resource holders in the state with a pipeline of three underground and two open pit projects strategically located in some of Nevada's most prolific gold-producing trends. These wholly owned assets, which are largely brownfield project at various stages of technical studies, permitting, construction, development, and operation, are situated across four properties which include the Granite Creek property, the Ruby Hill property, the Lone Tree property, which hosts an autoclave and carbon-in-leach processing plant in the process of being refurbished (the "Lone Tree Plant"), and the Cove property.

The Company was incorporated on November 10, 2020, under the laws of the province of British Columbia, Canada. The Company’s common shares are listed on the NYSE American under the trading symbol IAUX and on the Toronto Stock Exchange under the trading symbol IAU. The Company’s head office is located in Reno, Nevada, United States ("US") and its executive office is located in Toronto, Ontario, Canada.

Reference to $ or USD is to US dollars, reference to C$ or CAD is to Canadian dollars.

Operational and Financial Highlights

Three months endedSeptember 30, · Nine months endedSeptember 30,
2026 · 2025 · 2026 · 2025
Revenues$000s32,72832,019109,46673,903
Gross profit$000s4,9543,11829,6516,822
Pre-development, evaluation and exploration expenses$000s33,35520,06288,31738,652
Net loss$000s(48,350)(41,867)(179,478)(113,287)
Net loss per share$/share(0.06)(0.05)(0.21)(0.18)
Adjusted net loss1$000s(48,151)(34,255)(118,034)(85,140)
Adjusted net loss per share1$/share(0.06)(0.04)(0.14)(0.14)
Cash used in operating activities$000s(32,541)(15,246)(127,206)(49,282)
Cash and cash equivalents$000s411,355102,867411,355102,867
Gold producedoz11,68512,42833,64926,256
Gold ounces sold2oz7,7449,36823,66822,720
Average realized gold price1$/oz4,2113,4124,6083,243

Three months ended September 30, 2026

Revenues were $32.7 million, representing 7,744 ounces in gold sold 2 at an average realized gold price 1 of $4,211 per ounce, compared to $32.0 million represented by 9,368 ounces at an average realized gold price 1 of $3,412 per ounce in the prior year period. Gold sold was lower than the prior year quarter impacted by lower production.

Gold production was marginally lower at 11,685 ounces compared with 12,428 ounces in the prior year period. Consolidated production is expected to be within the lower half of the guidance range.

Gross profit increased to $5.0 million from $3.1 million in the prior year period due to a higher realized gold price.

Net loss increased to $48.4 million compared to $41.9 million in the prior year period, due primarily to higher pre-development, evaluation and exploration costs incurred as the Company advances multiple projects within its development plan. The higher costs were related to drilling programs at the Ruby Hill property partially offset by lower revaluation expenses recorded within other expenses. In September 2026, the company issued the Granite Creek Feasibility Study 3 which declared initial mineral reserves. Accordingly, the Company will capitalize qualifying development expenditures at Granite Creek, which were previously expensed as pre-development, evaluation and exploration costs.

Net loss per share of $0.06 is comparable to the prior year period of $0.05.

2 Gold ounces sold include attributable gold from ore sales at a payable factor of 59% in 2026 (2025 - 58%).

3 This technical report was, or will be, prepared under both: National Instrument 43-101 – Standards of Disclosure for Mineral Projects which, in the opinion of the qualified persons, constitutes a feasibility study; and Subpart 1300 of Regulation S-K which, in the opinion of the qualified persons, constitutes a pre-feasibility study.

Adjusted net loss 1 was $48.2 million compared to $34.3 million in the prior year period due to higher pre-development, evaluation and exploration expenses.

Cash used in operating activities increased to $32.5 million compared to $15.2 million in the prior year period as a result of higher pre-development, evaluation and exploration expenses which was partially offset by higher gross profit.

Cash and cash equivalents were $411.4 million as of September 30, 2026, a decrease of $53.2 million compared to June 30, 2026, primarily due to cash used in operations of $32.5 million and capital expenditures of $15.0 million primarily driven by the start of the Lone Tree Plant refurbishment project.

Nine months ended September 30, 2026

Revenues increased to $109.5 million from $73.9 million in the prior year period which represented 23,668 ounces 2 at an average realized gold price 1 of $4,608 per ounce, compared to gold sales of 22,720 ounces 2 at an average realized gold price 1 of $3,243 per ounce in the prior year.

Gold production increased to 33,649 ounces compared with 26,256 ounces in the prior year period.

Gross profit improved to $29.7 million from a gross profit of $6.8 million in the prior year due to increased gold sales and gold price.

Net loss was $179.5 million compared to $113.3 million in the prior year period, due to higher pre-development, evaluation and exploration expenses as the Company advances multiple projects within its development plan and higher non-cash fair value revaluation losses on a net basis partially offset by higher gross profit.

Net loss per share of $0.21 increased from $0.18 in the comparative prior year due to a higher net loss, partially offset by an increase in the weighted average number of common shares outstanding following the equity financing in May 2025.

Adjusted net loss 1 increased to $118.0 million from $85.1 million in the prior year period due to higher pre-development, evaluation and exploration expense, partially offset by higher gross profit.

Cash used in operating activities was $127.2 million, higher than the $49.3 million in the prior year period primarily due to higher pre-development costs and comparative working capital changes as a result of interest paid on the repayment of legacy debt partially offset by higher gross profit.

Cash and cash equivalents of $411.4 million at September 30, 2026, increased by $348.1 million during the year. The increase was primarily due to the financing transactions discussed below partially offset by capital expenditures and higher cash used in operations.

The Company completed several financing transactions for a total amount of $787.5 million. Gross proceeds of $662.5 million and net proceeds of $637.2 million were received on closing, which completed the recapitalization plan ahead of the Company's mid-2026 target to support the development plan:

March 16, 2026: Completed a net smelter return royalty for $250 million (the "NSR Royalty") with Franco-Nevada U.S. Corporation ("Franco-Nevada") of which $225 million was received on closing, an additional $25.0 million is expected to be made available to advance Mineral Point, contingent upon satisfaction of specified project conditions.

March 16, 2026: Entered into a gold prepayment facility with National Bank of Canada (“NBC”) and Macquarie Bank Limited (“Macquarie”) for up to $250 million including a $100 million accordion option, subject to customary conditions and lender approval (the "2026 Gold Prepay").

March 23, 2026: Completed an offering of 3.75% unsecured convertible senior notes due 2031 in the aggregate amount of $287.5 million ("2026 Convertible Debentures"). The proceeds from the NSR Royalty were used to redeem the 2023 Convertible Debentures, Orion Gold Prepay, and the Orion Convertible Loan in the amount of $165.0 million.

Approved the construction decision to proceed with the Lone Tree Plant refurbishment during the first quarter of 2026. Bulk demolition was completed in the third quarter of 2026 as planned, and mobilization has begun in preparation for the start of initial construction, with a focus on civil preparation and concrete work.

Appointed four new directors who bring highly relevant experience and proven track records in mining operations, mineral processing, finance, capital markets and sustainability.

Development Highlights

On September 21, 2026, the Company announced the results of a feasibility study for Granite Creek underground supported by two technical reports: (1) a technical report prepared under National Instrument 43-101 - Standards of Disclosure for Mineral projects which, in the opinion of the qualified persons, constitutes a feasibility study under NI 43-101, and (2) a technical report summary prepared under Subpart 1300 of Regulation S-K ("S-K 1300"), which, in the opinion of the qualified persons, constitutes a pre-feasibility study under S-K 1300. (the "Granite Creek Underground Feasibility Study"). Initial Proven and Probable Mineral Reserves of 2.20 million tonnes grading 7.87 grams per tonne gold containing 556,500 ounces of gold. Measured and Indicated underground Mineral Resources increased by 229% to 3.73 million tonnes grading 7.17 grams per tonne gold containing 859,500 ounces of gold, compared to a Preliminary Economic Assessment published in March 2025 for the

2 Gold ounces sold include attributable gold from ore sales at a payable factor of 59% in 2026 (2025 - 58%).

project 1; Inferred Mineral Resources decreased by 38% to 0.89 million tonnes grading 7.06 grams per tonne gold containing 202,800 ounces of gold as the infill program converted a portion of Inferred Mineral Resources into the higher classification categories 2.

Granite Creek underground development continued to expand access to high-grade headings, supporting the ongoing production ramp up. The project is expected to be within its full-year production guidance range.

Archimedes underground advanced on schedule and largely on budget, with main decline development on track and construction of the second ventilation and escape raise underway. Surface and underground infrastructure required to support the start of production mining remains scheduled for completion in early November, ahead of the planned start of production mining by year-end.

Lone Tree Plant refurbishment advanced on schedule and largely on budget with bulk demolition activities complete and mobilization underway for initial construction activities to commence in the fourth quarter of 2026, as planned. Project capital remains largely on budget with approximately 44% of project capital having been committed and approximately 20% of the contingency having been drawn.

Completed approximately 36,000 meters of drilling for the quarter bringing the total to approximately 62,000 meters for the nine months ended September 30, 2026. Activities primarily focused on technical drilling at Mineral Point open pit and infill drilling at Archimedes underground to enhance resource definition in support of the planned 2027 technical studies, as well as resource definition drilling at Granite Creek underground beyond the area included in the September 2026 feasibility study.

Permitting remained largely on track across the development portfolio as associated actions continued to advance.

Sustainability Highlights

Published the Company's 2025 and fourth annual sustainability report and data book which highlights key achievements in community partnerships, environmental stewardship, and governance in 2025, and reports on continued progress in expanding its sustainability strategy.

Coordinated a roundtable with U.S. Senator Jacky Rosen, Eureka County leaders, and state and regional partners in Eureka, the neighboring community to the Ruby Hill property, which hosts the Archimedes and Mineral Point projects. Discussions focused on coordinated planning and long-term partnerships to address workforce readiness, housing, and infrastructure in anticipation of future project development.

Strategy Overview

i-80 Gold is executing a multi-phase development plan aimed at creating a mid-tier gold producer in Nevada. The near-term focus is on developing two high-grade underground refractory gold projects (Granite Creek and Archimedes), and the refurbishment and commissioning of the Lone Tree Plant, which is expected to serve as a central processing hub for material from all underground projects. Development of the Company’s two large, open pit oxide projects (Mineral Point and Granite Creek), as well as its third underground mine (Cove), are expected to follow to support a long-term target of 500,000 to 600,0003 ounces of annual gold output.

In support of the multi-phase development plan, the Company released Preliminary Economic Assessments prepared in accordance with NI 43-101 and a corresponding Initial Assessment prepared under S-K 1300, each published in the first quarter of 2025 (the "2025 PEA"), covering all five gold projects. The Company believes these 2025 PEAs outlined a clear and achievable path to gold output and cash flow growth. Permitting, technical studies, development work and ramp up are actively being advanced across the portfolio of five gold projects. During the third quarter of 2026, the Company announced the results of the Granite Creek Underground Feasibility Study.

On October 14, 2026, the Company updated its development plan to better align plant feed and processing capacity, and optimize capital allocation. While the Company’s operating and near-term development projects remain on their initial schedule, the sequence of medium-to-long term projects has been updated as follows:

  1. Establish hub-and-spoke mining and processing platform: Ramp up production at Granite Creek underground, bring Archimedes underground into production, and refurbish and commission the Lone Tree Plant as a centralized processing facility — which remains consistent with previously forecasted plans.

  2. Prioritize Mineral Point open pit as the next major development project: Add a large-scale open pit heap leach project.

1 All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding. Mineral Reserves have been stated on the basis of a mine design, mine plan, and economic model.

2 Refer to the Company’s September 21, 2026 press release for the technical study results and accompanying notes to the Mineral Reserve and Mineral Resource estimates. Mineral Resources are reported inclusive of Mineral Reserves.

3 Consolidated gold output estimates and average annual gold output targets are based on the most recent LOM output schedules disclosed in the latest technical studies filed for each respective project and related property: Granite Creek underground project, Archimedes underground project, Cove underground project, Granite Creek open pit project, and Mineral Point open pit project. These anticipated output figures are preliminary in nature and are based on mineral resources, which do not have demonstrated economic viability, and are not mineral reserves. In addition, each of the foregoing technical reports are preliminary economic assessments/initial assessments that are preliminary in nature and each include an economic analysis that is based, in part, on inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have for the application of economic considerations applied to them that would enable them to be categorized as mineral reserves. As such, there is no certainty that the output targets will be realized. The anticipated output targets are also pending the refurbishment and commissioning of the Lone Tree Plant. The output targets presented herein are Company goals and not a projection of results and should not be taken as output guidance. All of the Company’s projects, except Granite Creek underground are considered exploration stage projects under S-K 1300 because the Company has not determined mineral reserves at any of its properties pursuant to S-K 1300. Granite Creek underground is considered to be in production stage. The following technical reports for each project and related property have been prepared in accordance with NI 43-101: Preliminary Economic Assessment Technical Report for the Cove Project, Lander County, Nevada (March 31, 2025); Preliminary Economic Assessment Technical Report for the Granite Creek Mine Project, Humboldt County, Nevada, USA (March 31, 2025); and Preliminary Economic Assessment NI 43-101 Technical Report for the Ruby Hill Project, Eureka Country, Nevada, USA (March 31, 2025). Corresponding technical reports prepared in accordance with S-K 1300 are as follows: Initial Assessment & Technical Report Summary for the Cove Project, Lander County, Nevada (March 26, 2025); Initial Assessment of the Granite Creek Mine, Humboldt County, NV (March 26, 2025); and Initial Assessment of the Ruby Hill Project, Eureka County NV (March 29, 2025).

  1. Advance remaining growth projects: Develop and construct the Granite Creek open pit once the Mineral Point open pit project is in operation with the Cove underground project sequenced later as an important source of future refractory feed to the Lone Tree Plant when future mining rates decline at the first two underground mines.

The Granite Creek Underground Feasibility Study reported an increase in measured and indicated underground mineral resources by approximately 230% compared to mineral resource estimate included in the project's 2025 PEA 1. At Archimedes underground, the Company expects the oxide mineralization to expand based on recently published drill results from the upper 426 zone, and continues to drill within the lower 426 and Ruby Deeps zones (see the Company’s June 25, 2026 press release). Together, these results continue to support the Company’s view that the mineralized bodies at both Granite Creek underground and Archimedes underground remain open for potential expansion and are expected to sufficiently supply the Lone Tree Plant with material feed for a significant period of time and longer than previously contemplated. As such, Cove underground has been sequenced later in the development plan as a future source of refractory feed for the Lone Tree Plant.

This revised sequence of development projects provides an opportunity for the Company to prioritize the Mineral Point open pit project, which is the Company’s largest and most valuable asset. Currently, the anticipated timing of Mineral Point development has not changed from its March 2025 PEA. The exploration program, early-stage pre-permitting activities, technical studies, metallurgical test work, and engineering are ongoing and continue to improve the Company’s understanding of the deposit to support future project planning.

The development plan targets annual gold production of 150,000 to 200,000 ounces beginning in 2028, supported by the Lone Tree Plant processing material from Granite Creek underground and Archimedes underground 1. With the addition of oxide heap leach production from Mineral Point open pit, consolidated annual gold equivalent production is targeted to increase to 400,000 to 500,000 ounces beginning in 20311. The broader development plan targets 500,000 to 600,000 ounces in annual gold production in the early 2030’s with the subsequent addition of Granite Creek open pit 1. Cove underground is expected to sustain this production level by supplying refractory feed to the Lone Tree Plant as production from Granite Creek underground and Archimedes underground declines.

Mineral Point is the Company’s largest development project by mineral resource, estimated valuation and anticipated annual production, and represents a key driver of anticipated future production growth for the Company. It hosts one of the largest undeveloped bulk-mineable oxide gold-silver resources in Nevada. It is an advanced stage project envisioned as a large-scale gold and silver heap leach oxide operation. Infill and step-out drilling are supporting a planned pre-feasibility study in mid-20272, pending the timing of additional drilling. Initial infill and step-out drill results were very encouraging, highlighting the potential to expand the mineralized footprint (see the Company’s September 22, 2026 press release).

In addition to the quarter end cash balance of $411 million, additional liquidity is available through: (i) the remaining $25 million from the committed NSR Royalty; (ii) the $100 million accordion feature under the 2026 Gold Prepay – each of which are subject to certain specified project and drawdown conditions; (iii) future anticipated proceeds from warrant exercises which are due to mature in 2027 and 2028; (iv) and a proposed ore stockpile financing facility which has been approved as an additional permitting financing facility under the 2026 Gold Prepay. Together, these sources could provide up to approximately $350 million of additional liquidity over the next 18 months. Other than the remaining $25 million under the NSR Royalty, each of these sources is subject to lender approval, the negotiation of definitive agreements or the exercise of outstanding warrants by their holders, as applicable. To support Mineral Point’s development scope, the Company is in dialogue with its lead lenders to establish a corporate revolving credit facility for additional liquidity, if needed.

Parallel to the updated development plan, the Company has optimized its processing strategy where a large portion of refractory material from the Granite Creek and Archimedes underground projects is expected to be stockpiled in 2027 for processing at the Company's wholly owned Lone Tree Plant once commissioned, rather than processed through a third-party facility. Commissioning is expected in the fourth quarter of 2027.

Recapitalization Plan

i-80 Gold has executed several financing initiatives that have led to the successful completion of its recapitalization plan. During the first quarter of 2026, the Company completed several key transactions including the NSR Royalty with Franco-Nevada for up to $250 million, the 2026 Gold Prepay with NBC and Macquarie for up to $250 million, and the issuance of the 2026 Convertible Debentures in the aggregate principal amount of $287.5 million. These financings completed the Company's broader recapitalization plan ahead of its mid-2026 target and align with the projected capital requirements and cash flows of the current project development plan. Overall, the recapitalization secured just over $1 billion 1 in raised and available capital from early 2025 through the first quarter of 2026, materially strengthening the Company's balance sheet, providing greater funding certainty, and de-risking the development plan.

1 Based on gold output estimates in the most recent life of mine gold output schedules disclosed in the latest technical studies filed for each respective project and related property: Granite Creek underground, Archimedes underground, Cove underground, and Mineral Point open pit. These anticipated output figures are preliminary in nature and are largely based on mineral resources, which do not have demonstrated economic viability and subject to successful project development. Only Granite Creek underground has declared mineral reserves. In addition, for all gold projects except Granite Creek underground, the foregoing technical reports are preliminary economic assessments/initial assessments that are preliminary in nature. The Granite Creek underground technical report was a feasibility study/technical report summary. Each include an economic analysis that is based, in part, on inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have for the application of economic considerations applied to them that would enable them to be categorized as mineral reserves. As such, there is no certainty that the output targets will be realized. Anticipated output targets are also pending the commissioning of the Lone Tree Plant, and are Company goals and not a projection of results and should not be taken as output guidance. All of the Company’s projects other than Granite Creek underground are considered exploration stage projects under S-K 1300, as the Company has not determined mineral reserves at such properties pursuant to S-K 1300. With respect to Archimedes underground, located on the Ruby Hill property, the Company has started extraction activities without determining mineral reserves. The following technical reports for each project and related property have been prepared in accordance with NI 43-101: Preliminary Economic Assessment Technical Report for the Cove Project, Lander County, Nevada (March 31, 2025); NI 43-101 Technical Report Feasibility Study Granite Creek, Humboldt County, Nevada, USA (September 21, 2026); and Preliminary Economic Assessment NI 43-101 Technical Report for the Ruby Hill Project, Eureka Country, Nevada, USA (March 31, 2025). Corresponding technical reports prepared in accordance with S-K 1300 are as follows: Initial Assessment & Technical Report Summary for the Cove Project, Lander County, Nevada (March 26, 2025); S-K 1300 SEC Technical Report Summary Pre-Feasibility Study Granite Creek, Humboldt County, NV (September 21, 2026); and Initial Assessment of the Ruby Hill Project, Eureka County NV (March 29, 2025).

2 This technical report was, or is expected to be, prepared under both: National Instrument 43-101 – Standards of Disclosure for Mineral Projects which, in the opinion of the qualified persons, constitutes a feasibility study (Granite Creek underground, Cove and Archimedes underground) or pre-feasibility study (Mineral Point open pit and Granite Creek open pit); and Subpart 1300 of Regulation S-K which, in the opinion of the qualified persons, constitutes a pre-feasibility study.

Outlook

2026 Outlook

The Company’s 2026 production, operating and pre-development evaluation and exploration expense guidance are summarized below:

Gold production
Granite Creek undergroundoz30,000 - 40,000
Archimedes underground and residual heap leachoz10,000
Operating costs
Granite Creek underground$M$110 - $120
Archimedes underground$M$25 - $30
Sustaining capital$M$6 - $8
Growth capital
Lone Tree Plant$M$140 - $160
Granite Creek underground - water treatment$M$10 - $15
Pre-development expense
Granite Creek underground - mine development(1)$M$20 - $25
Archimedes underground - mine development$M$30 - $35
Evaluation and exploration expense
Resource expansion and infill drilling:
Granite Creek underground$M$10
Archimedes underground$M$25 - $30
Mineral Point open pit$M$45 - $50
Permitting and technical$M$20 - $30

(1)Granite Creek mine development costs will be capitalized upon declaration of Mineral Reserves as of September 21, 2026.

The Company expects to be largely within its guidance ranges published in its Annual Report on Form 10-K for the year ended December 31, 2025, on February 19, 2026. The Company’s expectations for 2026 have changed from that guidance as follows:

Gold production is expected to be in the lower half of the guidance range. This is in part due to the decision to leach Archimedes oxide material on our existing leach pad rather than selling it under the ore purchase agreement, which is expected to delay recording production from the fourth quarter of 2026 to the first quarter of 2027.

Operating costs are expected to be at the low end of the range due to gold production being in the lower half of the range and the mining of more oxide material than planned, at lower processing costs, from Granite Creek.

Sustaining capital, growth capital and pre-development expense are all anticipated to be at the low end of the guidance range.

The Lone Tree Plant refurbishment is on schedule, however, capital expenditures for 2026 are expected to be lower than guidance. Management was conservative in estimating these expenditures during the recapitalization process earlier in year to ensure the Company raised sufficient capital. The original guidance assumed a gap between commitment and invoicing/payment of 30 days, in practice, the Company is experiencing between four to five months for this timing difference. The Company continues to expect the refurbishment capital to be nearly fully committed by year-end.

Exploration expenses are expected to be lower than planned for 2026, reflecting fewer meters drilled due to previously reported contractor personnel shortages and limited drill rig availability at Archimedes and Mineral Point. During the third quarter, drill rigs have since arrived on site and staffing levels have increased, addressing these constraints.

This outlook, including expected results and targets, is subject to various risks, uncertainties and assumptions, which may impact future performance and the Company’s ability to achieve the results and targets discussed in this section. Please refer to "Forward-Looking Information" section. The Company may, but is under no obligation to, update this outlook depending on changes in metal prices and other factors.

Financing Overview

Nine months ended September 30, 2026

In support of the recapitalization strategy, the Company completed the following financing transactions:

On March 16, 2026, the Company announced that it had completed the closing of the $250 million NSR Royalty financing in exchange for a 1.5% life of mine ("LOM") net smelter return royalty with Franco-Nevada, stepping up to a 3.0% LOM net smelter return royalty on January 1, 2031. The NSR Royalty applies to production from all mineral properties in the portfolio, including Granite Creek, Cove, Ruby Hill and Lone Tree.

Upon closing of NSR Royalty, $225 million was made available to the Company, of which $25 million is required to be allocated to the advancement of technical and permitting work for Mineral Point in 2026. An additional $25 million of the NSR Royalty is also expected to be made available in 2026 to further advance Mineral Point, following the expenditure of the initial disbursement toward the project. In total, the NSR Royalty allows the Company to allocate $50 million to advance exploration, technical work and early stage pre-permitting activities at Mineral Point in 2026.

Gold Prepay

On March 16, 2026, the Company closed a Gold Prepay facility with NBC and Macquarie, for an initial advance of $150 million at closing, with a $100 million accordion feature. Upon closing, the Company has the obligation to deliver 39,978 ounces of gold over a 30-month period beginning in January 2028. The accordion feature provides access to an additional $100 million for a 24-month period upon closing of the facility, subject to customary conditions and lender approval. The Company anticipates executing the accordion feature in the first half of 2027, at which point the number of additional gold ounces to be delivered will be determined. The Company expects the total ounces to be delivered for the $250 million facility to represent approximately 15% of total gold output over the projected period of January 2028 to June 2030.

On March 23, 2026, The Company closed the 2026 Convertible Debentures for an aggregate principal amount of $287.5 million, which includes the upsized offering of $250 million and the exercises in full of $37.5 million option granted to the initial purchasers of the convertible debentures. The initial conversion rate of the 2026 Convertible Debentures is 519.4805 common share of the Company per $1,000 principal amount, equivalent to an initial conversion price of approximately $1.93 per share.

Debt repayments

With the proceeds received from the NSR Royalty, the Company redeemed all of its legacy debt obligations except for the silver purchase and sale agreement with OMF Fund III (HG) LTD., as affiliate of Orion Mine Finance (“Orion”), (the "Silver Purchase Agreement") during the first quarter of 2026. The 2023 Convertible Debentures were redeemed for total cash consideration of $72.9 million, with accrued interest and the 4% mandatory redemption premium settled through the issuance of 8.1 million common shares and a cash payment of $5.3 million. The Orion Convertible Loan was repaid for total consideration of $75.0 million, comprised of a cash payment of $69.7 million and the issuance of 3.0 million common shares with a fair value of $5.3 million. The remaining outstanding deliveries of 4,440 ounces of gold from the Orion Gold Prepay were redeemed with a cash payment of $22.4 million.

Termination of Offtake Agreement

On June 26, 2026, the Company entered into a termination and settlement agreement with Vox Royalty Corp. to terminate its gold offtake agreement, eliminating the fixed obligation to deliver up to 40,000 ounces of refined gold per year from the Granite Creek and Ruby Hill properties through December 31, 2028, and subject to pricing based upon a lookback period. The Company issued 3,453,237 common shares valued at $4.8 million in consideration. The termination provides the Company with greater flexibility to manage future gold sales and to evaluate stockpiling opportunities in anticipation of the planned commissioning of the Lone Tree Plant within Phase 1 of its current development plan.