What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 229 previous paragraphs and 239 current paragraphs.

96 unchanged; 88 reworded; 54 added; 42 removed; 3 previous and 1 current paragraphs rearranged.

Tables are not compared: 22 previous and 22 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (54)

Current report

•Revenues were $32.7 million, representing 7,744 ounces in gold sold 2 at an average realized gold price 1 of $4,211 per ounce, compared to $32.0 million represented by 9,368 ounces at an average realized gold price 1 of $3,412 per ounce in the prior year period. Gold sold was lower than the prior year quarter impacted by lower production.

Current report

•Gold production was marginally lower at 11,685 ounces compared with 12,428 ounces in the prior year period. Consolidated production is expected to be within the lower half of the guidance range.

Current report

•Net loss per share of $0.06 is comparable to the prior year period of $0.05.

Current report

2 Gold ounces sold include attributable gold from ore sales at a payable factor of 59% in 2026 (2025 - 58%).

Current report

3 This technical report was, or will be, prepared under both: National Instrument 43-101 – Standards of Disclosure for Mineral Projects which, in the opinion of the qualified persons, constitutes a feasibility study; and Subpart 1300 of Regulation S-K which, in the opinion of the qualified persons, constitutes a pre-feasibility study.

Current report

•Adjusted net loss 1 was $48.2 million compared to $34.3 million in the prior year period due to higher pre-development, evaluation and exploration expenses.

Current report

Nine months ended September 30, 2026

Current report

•On September 21, 2026, the Company announced the results of a feasibility study for Granite Creek underground supported by two technical reports: (1) a technical report prepared under National Instrument 43-101 - Standards of Disclosure for Mineral projects which, in the opinion of the qualified persons, constitutes a feasibility study under NI 43-101, and (2) a technical report summary prepared under Subpart 1300 of Regulation S-K ("S-K 1300"), which, in the opinion of the qualified persons, constitutes a pre-feasibility study under S-K 1300. (the "Granite Creek Underground Feasibility Study"). Initial Proven and Probable Mineral Reserves of 2.20 million tonnes grading 7.87 grams per tonne gold containing 556,500 ounces of gold. Measured and Indicated underground Mineral Resources increased by 229% to 3.73 million tonnes grading 7.17 grams per tonne gold containing 859,500 ounces of gold, compared to a Preliminary Economic Assessment published in March 2025 for the

Current report

2 Gold ounces sold include attributable gold from ore sales at a payable factor of 59% in 2026 (2025 - 58%).

Current report

project 1; Inferred Mineral Resources decreased by 38% to 0.89 million tonnes grading 7.06 grams per tonne gold containing 202,800 ounces of gold as the infill program converted a portion of Inferred Mineral Resources into the higher classification categories 2.

Current report

•Archimedes underground advanced on schedule and largely on budget, with main decline development on track and construction of the second ventilation and escape raise underway. Surface and underground infrastructure required to support the start of production mining remains scheduled for completion in early November, ahead of the planned start of production mining by year-end.

Current report

•Lone Tree Plant refurbishment advanced on schedule and largely on budget with bulk demolition activities complete and mobilization underway for initial construction activities to commence in the fourth quarter of 2026, as planned. Project capital remains largely on budget with approximately 44% of project capital having been committed and approximately 20% of the contingency having been drawn.

Current report

•Published the Company's 2025 and fourth annual sustainability report and data book which highlights key achievements in community partnerships, environmental stewardship, and governance in 2025, and reports on continued progress in expanding its sustainability strategy.

Current report

•Coordinated a roundtable with U.S. Senator Jacky Rosen, Eureka County leaders, and state and regional partners in Eureka, the neighboring community to the Ruby Hill property, which hosts the Archimedes and Mineral Point projects. Discussions focused on coordinated planning and long-term partnerships to address workforce readiness, housing, and infrastructure in anticipation of future project development.

Current report

On October 14, 2026, the Company updated its development plan to better align plant feed and processing capacity, and optimize capital allocation. While the Company’s operating and near-term development projects remain on their initial schedule, the sequence of medium-to-long term projects has been updated as follows:

Current report

Establish hub-and-spoke mining and processing platform: Ramp up production at Granite Creek underground, bring Archimedes underground into production, and refurbish and commission the Lone Tree Plant as a centralized processing facility — which remains consistent with previously forecasted plans.

Current report

Prioritize Mineral Point open pit as the next major development project: Add a large-scale open pit heap leach project.

Current report

1 All figures are rounded to reflect the relative accuracy of the estimates. Totals may not sum due to rounding. Mineral Reserves have been stated on the basis of a mine design, mine plan, and economic model.

Current report

2 Refer to the Company’s September 21, 2026 press release for the technical study results and accompanying notes to the Mineral Reserve and Mineral Resource estimates. Mineral Resources are reported inclusive of Mineral Reserves.

Current report

Advance remaining growth projects: Develop and construct the Granite Creek open pit once the Mineral Point open pit project is in operation with the Cove underground project sequenced later as an important source of future refractory feed to the Lone Tree Plant when future mining rates decline at the first two underground mines.

Current report

The Granite Creek Underground Feasibility Study reported an increase in measured and indicated underground mineral resources by approximately 230% compared to mineral resource estimate included in the project's 2025 PEA 1. At Archimedes underground, the Company expects the oxide mineralization to expand based on recently published drill results from the upper 426 zone, and continues to drill within the lower 426 and Ruby Deeps zones (see the Company’s June 25, 2026 press release). Together, these results continue to support the Company’s view that the mineralized bodies at both Granite Creek underground and Archimedes underground remain open for potential expansion and are expected to sufficiently supply the Lone Tree Plant with material feed for a significant period of time and longer than previously contemplated. As such, Cove underground has been sequenced later in the development plan as a future source of refractory feed for the Lone Tree Plant.

Current report

This revised sequence of development projects provides an opportunity for the Company to prioritize the Mineral Point open pit project, which is the Company’s largest and most valuable asset. Currently, the anticipated timing of Mineral Point development has not changed from its March 2025 PEA. The exploration program, early-stage pre-permitting activities, technical studies, metallurgical test work, and engineering are ongoing and continue to improve the Company’s understanding of the deposit to support future project planning.

Current report

The development plan targets annual gold production of 150,000 to 200,000 ounces beginning in 2028, supported by the Lone Tree Plant processing material from Granite Creek underground and Archimedes underground 1. With the addition of oxide heap leach production from Mineral Point open pit, consolidated annual gold equivalent production is targeted to increase to 400,000 to 500,000 ounces beginning in 20311. The broader development plan targets 500,000 to 600,000 ounces in annual gold production in the early 2030’s with the subsequent addition of Granite Creek open pit 1. Cove underground is expected to sustain this production level by supplying refractory feed to the Lone Tree Plant as production from Granite Creek underground and Archimedes underground declines.

Current report

Mineral Point is the Company’s largest development project by mineral resource, estimated valuation and anticipated annual production, and represents a key driver of anticipated future production growth for the Company. It hosts one of the largest undeveloped bulk-mineable oxide gold-silver resources in Nevada. It is an advanced stage project envisioned as a large-scale gold and silver heap leach oxide operation. Infill and step-out drilling are supporting a planned pre-feasibility study in mid-20272, pending the timing of additional drilling. Initial infill and step-out drill results were very encouraging, highlighting the potential to expand the mineralized footprint (see the Company’s September 22, 2026 press release).

Current report

In addition to the quarter end cash balance of $411 million, additional liquidity is available through: (i) the remaining $25 million from the committed NSR Royalty; (ii) the $100 million accordion feature under the 2026 Gold Prepay – each of which are subject to certain specified project and drawdown conditions; (iii) future anticipated proceeds from warrant exercises which are due to mature in 2027 and 2028; (iv) and a proposed ore stockpile financing facility which has been approved as an additional permitting financing facility under the 2026 Gold Prepay. Together, these sources could provide up to approximately $350 million of additional liquidity over the next 18 months. Other than the remaining $25 million under the NSR Royalty, each of these sources is subject to lender approval, the negotiation of definitive agreements or the exercise of outstanding warrants by their holders, as applicable. To support Mineral Point’s development scope, the Company is in dialogue with its lead lenders to establish a corporate revolving credit facility for additional liquidity, if needed.

Current report

Parallel to the updated development plan, the Company has optimized its processing strategy where a large portion of refractory material from the Granite Creek and Archimedes underground projects is expected to be stockpiled in 2027 for processing at the Company's wholly owned Lone Tree Plant once commissioned, rather than processed through a third-party facility. Commissioning is expected in the fourth quarter of 2027.

Current report

2 This technical report was, or is expected to be, prepared under both: National Instrument 43-101 – Standards of Disclosure for Mineral Projects which, in the opinion of the qualified persons, constitutes a feasibility study (Granite Creek underground, Cove and Archimedes underground) or pre-feasibility study (Mineral Point open pit and Granite Creek open pit); and Subpart 1300 of Regulation S-K which, in the opinion of the qualified persons, constitutes a pre-feasibility study.

Current report

•Gold production is expected to be in the lower half of the guidance range. This is in part due to the decision to leach Archimedes oxide material on our existing leach pad rather than selling it under the ore purchase agreement, which is expected to delay recording production from the fourth quarter of 2026 to the first quarter of 2027.

Current report

•Operating costs are expected to be at the low end of the range due to gold production being in the lower half of the range and the mining of more oxide material than planned, at lower processing costs, from Granite Creek.

Current report

•Sustaining capital, growth capital and pre-development expense are all anticipated to be at the low end of the guidance range.

Current report

•The Lone Tree Plant refurbishment is on schedule, however, capital expenditures for 2026 are expected to be lower than guidance. Management was conservative in estimating these expenditures during the recapitalization process earlier in year to ensure the Company raised sufficient capital. The original guidance assumed a gap between commitment and invoicing/payment of 30 days, in practice, the Company is experiencing between four to five months for this timing difference. The Company continues to expect the refurbishment capital to be nearly fully committed by year-end.

Current report

•Exploration expenses are expected to be lower than planned for 2026, reflecting fewer meters drilled due to previously reported contractor personnel shortages and limited drill rig availability at Archimedes and Mineral Point. During the third quarter, drill rigs have since arrived on site and staffing levels have increased, addressing these constraints.

Current report

Nine months ended September 30, 2026

Current report

On September 21, 2026, the Granite Creek Underground Feasibility Study declared maiden mineral reserves at the project. Accordingly, qualifying development expenditures at Granite Creek incurred after the declaration of reserves, which were previously expensed as pre-development, evaluation and exploration costs, will be capitalized in future periods.

Current report

The Company continued mining in the Ogee, upper South Pacific, and Otto zones at Granite Creek underground. During the three months ended September 30, 2026, mining activities were impacted by employee turnover at its mining contractor as a result of increased competition for skilled underground labor in the region, which reduced ore and waste mining rates and delayed access to several high-grade headings. In response, to strengthen workforce retention and support planned mining rates, the Company implemented a competitive retention incentive program for its mining contractor personnel. The mining contractor has since increased staffing to align with the mining rates required through the balance of 2026.

Current report

Horizontal development remains on track and, as part of the mine plan optimization, vertical development of the ventilation raise has been postponed to late 2026 or early 2027. The Company expects full-year production for the project to be within its guidance range.

Current report

Water inflow volumes to the mine remained largely unchanged and continue to be managed well using the current underground pumping system and expanded sump. Work on an enhanced pumping system, including expanded sumps at lower levels and higher-capacity pumps, advanced during the quarter. Power and discharge lines were completed for the two completed dewatering wells, with transformers and assemblies expected to be installed during the fourth quarter of 2026. The second water treatment plant is fully operational and expected to increase water flows towards its capacity of approximately 3,500 gallons per minute with the commissioning of the two new dewatering wells in the fourth quarter. The water is being treated to potable drinking standards and discharged to the rapid infiltration basins.

Current report

The Granite Creek Underground Feasibility Study outlined several improvements relative to the Granite Creek 2025 PEA, including an optimized mine design, improved geological definition, increased mining flexibility and additional working faces, particularly within the Ogee Zone.

Current report

Successful infill and definition drilling within the South Pacific Zone closed gaps in the mineralization, improved continuity and upgraded existing mineral resources to higher-confidence categories. These results supported a larger mineable inventory and an 8.5-year mine life after more than a year of mining. Improved geological definition also increased the number of available ore faces and total planned ore mined, supporting higher planned production and reduced waste development requirements. Ongoing infrastructure upgrades, including increased water treatment and dewatering capacity and ventilation optimization, further support the mine plan.

Current report

The Granite Creek Underground Feasibility study also incorporated an optimized processing strategy which includes stockpiling Granite Creek's sulfide and oxide ore ahead of the planned commissioning of the Lone Tree Plant. This strategy is expected to increase the amount of Granite Creek ore processed at the Lone Tree Plant at more favorable processing costs, while reducing reliance on third-party processing.

Showing the first 40 of 54 passages. Open the source sections for the rest.

Removed paragraphs (42)

Previous report

•Revenues were $24.3 million, representing 5,335 ounces in gold sold 2 at an average realized gold price 1 of $4,522 per ounce, compared to $27.8 million represented by 8,400 ounces at an average realized gold price 1 of $3,301 per ounce in the prior year period. The decrease in revenues was primarily driven by lower gold sold at Granite Creek as a result of delays at the third-party processing facility, partially offset by a higher average realized gold price 2. Revenues in the prior year quarter were higher due to the finalization of the third-party toll processing agreement in March 2025 and the processing of a higher volume of stockpile material.

Previous report

2 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 56% in 2026 (2025 - 59%).

Previous report

•Adjusted net loss 1 increased to $41.2 million compared to $26.5 million in the prior year period due to increased spending on pre-development, evaluation and exploration expenses, partially offset by higher gross profit.

Previous report

•At the Lone Tree Plant refurbishment, early works and pre-construction readiness activities progressed and continue to advance on schedule. Demolition commenced mid-June, ahead of major construction, which is expected to commence in the fourth quarter of 2026. As at June 30, 2026, capital commitments for refurbishment construction represented approximately 30% of total project capital.

Previous report

Six months ended June 30, 2026

Previous report

•Gold production increased to 21,964 ounces compared with 14,326 ounces in the prior year period. The Company remains on track to achieve it full year production guidance range.

Previous report

•Completed approximately 26,000 meters of drilling across the portfolio, including mineral resource definition drilling at Granite Creek underground project to support a feasibility study, technical drilling at Mineral Point open pit, infill drilling at Archimedes underground to enhance resource definition ahead of mining, and resource definition and geotechnical drilling at Cove underground to support a planned feasibility study.

Previous report

2 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 56% in 2026 (2025 - 59%).

Previous report

•Archimedes underground advanced on schedule largely on budget with the main decline development on track, advancement of the exploration drift, which has since been completed, and commencement of the ventilation raise in preparation for first gold by year-end.

Previous report

•Lone Tree Plant refurbishment advanced on schedule and on budget as early works and pre-construction readiness activities continued during the quarter, and commencement of demolition mid-June ahead of major construction. Procurement activities remain on schedule with approximately 50% of procurement packages, by value awarded as of mid-July. Project capital remains on budget with minimal contingency drawdown and approximately 40% of capital committed as of mid-July.

Previous report

•Advanced community engagement across Northern Nevada by progressing community development, workforce development, and grant funding initiatives, including a joint $0.3 million donation with Franco-Nevada Corporation to support development of the first licensed childcare facility in Eureka County, neighboring the Company's Ruby Hill property

Previous report

•Strengthened Board with the appointment of Stephen Gottesfeld at the annual general meeting, bringing nearly 30 years of global mining experience in environmental, sustainability, legal and governance matters across the mine lifecycle.

Previous report

Near-term growth of Phase 1 of the Company's development plan includes the current ramp up at i-80 Gold’s first underground mine, Granite Creek, as well as commencing extraction at Archimedes, the second planned underground mine. A key milestone in Phase 1 is the refurbishment and commissioning of the Lone Tree Plant to unlock the full value of the Company’s underground mines. Once commissioned, the Lone Tree Plant is expected to enable processing of underground mineralized material to owner-operated processing in early 2028 and transition from the current toll milling arrangement. Average annual gold output is expected to increase to a range of between 150,000 to 200,000 ounces of gold in Phase 1 beginning in 20281.

Previous report

The Company is also focused on the future development of three additional projects: Cove, the third planned underground mine, Granite Creek open pit, and the Company's largest project Mineral Point open pit. With several feasibility and pre-feasibility studies currently in progress, the Company continues to identify opportunities to optimize the development schedule for these projects.

Previous report

Mineral Point open pit project is expected to become the Company's largest producing asset and based on the PEA released in the first quarter of 2025, it is projected to have a life-of-mine production of approximately 282,000 gold equivalent ounces. The recently completed recapitalization provides flexibility to accelerate the feasibility study and permitting work for the Mineral Point open pit project, as well as the Company's other development projects.

Previous report

•Growth capital expenditures are expected to be largely in line with the $150 million to $175 million guidance.

Previous report

•Lone Tree plant refurbishment capital expenditures are expected to be lower in 2026 than guided, management was conservative in estimating expenditures for Lone Tree during the recapitalization planning process earlier in year to ensure that the Company raised sufficient capital.

Previous report

•Archimedes expenditures are expected to be higher reflecting a change in strategy for long-term surface infrastructure. Based on positive drill results, management is pivoting from refurbishment of certain existing facilities on site to construction of a new worker change facility and additional offices that are expected to improve operating effectiveness both for Archimedes and Mineral Point.

Previous report

•Exploration expenses are expected to be approximately $10 million lower in 2026 due to the personnel shortages at the Archimedes project and drill rig availability as well as contractor personnel shortages at Mineral Point project.

Previous report

Three months ended June 30, 2026

Previous report

Six months ended June 30, 2026

Previous report

Mining activities at Granite Creek for the three months ended June 30, 2026 were impacted by ground conditions in two of the mine highest-grade headings, which temporarily restricted access to high-grade mineralized material and deferred a portion of planned high-grade tonnes during the quarter. Remediation of the affected headings was completed and access was re-established late in the quarter, allowing these areas to contribute to production beginning in the third quarter.

Previous report

Throughout the quarter, advancement of the main decline as well as horizontal development continued to progress ahead of the mine plan, with year-to-date development footage exceeding plan. As a result, the number of available high grade mineralized material headings has increased significantly throughout the quarter. The Company remains on track to meet its full-year production guidance.

Previous report

Water inflow volumes to the mine remained largely unchanged and continue to be managed well using the current underground pumping system, which presently operates near capacity. Work on an enhanced pumping system, that includes expanded sumps at lower levels and higher-capacity pumps, advanced during the quarter. Pumps were sized and ordered with installation continuing throughout the remainder of the year to increase overall water discharge capacity as the mine progresses at depth. Further, initial phases of commissioning a second water treatment plant began in late July, with mechanical completion having recently been completed. The second water treatment plant will increase surface water treatment capacity to approximately 3,500 gallons per minute to support the Company's long-term groundwater management objectives.

Previous report

Following the completion of the Granite Creek open pit PEA, preparation for a pre-feasibility trade-off study has commenced. Simultaneously, technical trade-off analyses are being conducted to optimize project economics. Based on preliminary assessments of potential environmental impacts, the project may require preparation of an Environmental Impact Statement ("EIS") under the Bureau of Land Management ("BLM") process. Early-stage pre-permitting activities and technical studies are currently underway, followed by projected baseline field studies commencing in 2027 to support the National Environmental Policy Act ("NEPA") permitting process.

Previous report

1 Royalties excludes Net Smelter Return royalty repayments

Previous report

Drilling activities during the quarter included the completion of the 2025-2026 program in the upper 426 zone and commencement of the 2026 infill drill program with 3,124 meters of infill drilling completed in the lower 426 and Ruby Deeps zones in support of a feasibility study. The latest assay results from the 2025-2026 drill program were published during the second quarter in a press release dated June 25, 2026. The results continued to confirm high-grade mineralization, demonstrate continuity within the planned mining areas, and extend mineralization beyond the boundaries of the current mineral resource estimate supporting the 2025 PEA. Drilling also continued to intersect significant intervals of oxide mineralization not included in the current mineral resource estimate.

Previous report

During the six months ended June 30, 2026, the Company continued to advance technical and economic studies for the Cove Underground project. Various baseline studies and agency comment responses were submitted to the BLM. In addition, water pollution control permit renewal and modification applications were submitted to NDEP—BMRR for the underground mine and rapid infiltration basins. Additional federal and state permitting actions continue to progress. A feasibility study for Cove is expected to be completed in the third quarter of 2026.

Previous report

During the three months ended June 30, 2026, detailed engineering and procurement advanced with the Company's contractor, with procurement package preparation and long-lead item ordering a key focus. Cleaning and environmental testing of the existing tanks, containment, and piping was completed, and demolition of existing infrastructure commenced during the quarter. The Company also progressed the tailings storage facility and new filtered tailings design work. The refurbishment timing remains on track with the engineering study timeline and scope of work. Early works and pre-construction readiness activities are well underway on site and continue to advance on schedule ahead of major construction, which is expected to commence in the fourth quarter of 2026. Second and third quarter pre-construction activities include mobilization of the EPCM contractor to site, commencement of demolition of the existing plant components requiring replacement as part of the refurbishment and advancement of detailed engineering, procurement packages, and the award of key contracts.

Previous report

The Lone Tree Plant is permitted for the existing operational components in use. The approval of new and revised permit applications pertaining to air quality, mercury control, water pollution control, reclamation management, and other secondary programs for the new design remain outstanding. The Company submitted the necessary applications for air quality, mercury control and water quality environmental permits in the first quarter of 2026, as planned, with several permits received to date and further permits pending. Various construction activities are scheduled to commence in the second half of 2026 upon the anticipated approval of the associated permits, with major construction activities anticipated to commence in the fourth quarter of 2026.The permitting process is currently on track and aligns with the construction schedule.

Previous report

The refurbishment has a capital cost estimate of $412 million, inclusive of contingency, owner’s costs, and first fills, plus $18 million in capital spares for a total of $430 million. The refurbishment capital costs incurred to date remain in line with the engineering study and the Company’s 2026 guidance of between $140 million to $160 million in expenditures.

Previous report

As of June 30, 2026, total construction commitments were $110.1 million with approximately 30% of the project cost committed. Subsequent to the quarter, procurement activities remain on schedule, with approximately 50% of procurement packages, by value, awarded as of mid-July. Project capital remains on budget with minimal contingency drawdown and approximately 40% of capital committed as of mid-July.

Previous report

Other income and expenses, net

Previous report

Loss on loan extinguishment related to the Convertible Debentures, Orion Gold Prepay and Orion Convertible Loan were recognized on the settlement of these debt instruments prior to maturity as well as for the convertible debentures related to the premium paid.

Previous report

At Granite Creek, expenses increased due to underground development largely related to the main decline and South Pacific ramp, the enhanced underground pumping system and sump, as well as drilling costs and other technical work related to the preparation of a feasibility study targeted for completion in the third quarter of 2026.

Previous report

Other income and expenses, net

Previous report

Gains and losses on the Gold Prepay Agreements, Silver Purchase Agreement and NSR royalty were comprised of realized gains due to metal prices compared to agreement inception prices on settlement as well as unrealized fair value measurement gains and losses which are driven by changes in the gold and silver forecast prices during the period and discount rate changes.

Previous report

Loss on loan extinguishment

Showing the first 40 of 42 passages. Open the source sections for the rest.

Reworded paragraphs (88)

Previous wording

i-80 Gold Corp. (the "Company" or "i-80 Gold") is a Nevada-focused growth-oriented gold and silver mining company engaged in the exploration and extraction of gold and silver. The Company is one of the largest mineral resource holders in the state with a pipeline of three underground and two open pit projects strategically located in some of Nevada's most prolific gold-producing trends. These wholly owned assets, which are largely brownfield project at various stages of permitting, construction, technical studies, development, and operation, are situated across four properties which include the Granite Creek property, the Ruby Hill property, the Lone Tree property, which hosts an autoclave and carbon-in-leach processing plant in the process of being refurbished (the "Lone Tree Plant"), and the Cove property.

Current wording

i-80 Gold Corp. (the "Company" or "i-80 Gold") is a Nevada-focused growth-oriented gold and silver mining company engaged in the exploration and extraction of gold and silver. The Company is one of the largest mineral resource holders in the state with a pipeline of three underground and two open pit projects strategically located in some of Nevada's most prolific gold-producing trends. These wholly owned assets, which are largely brownfield project at various stages of technical studies, permitting, construction, development, and operation, are situated across four properties which include the Granite Creek property, the Ruby Hill property, the Lone Tree property, which hosts an autoclave and carbon-in-leach processing plant in the process of being refurbished (the "Lone Tree Plant"), and the Cove property.

Previous wording

The Company was incorporated on November 10, 2020, under the laws of the province of British Columbia, Canada. The Company’s common shares are listed on the NYSE under the trading symbol IAUX and on the Toronto Stock Exchange under the trading symbol IAU. The Company’s head office is located in Reno, Nevada, United States ("US") and its executive office is located in Toronto, Ontario, Canada.

Current wording

The Company was incorporated on November 10, 2020, under the laws of the province of British Columbia, Canada. The Company’s common shares are listed on the NYSE American under the trading symbol IAUX and on the Toronto Stock Exchange under the trading symbol IAU. The Company’s head office is located in Reno, Nevada, United States ("US") and its executive office is located in Toronto, Ontario, Canada.

Previous wording

•Gross profit increased to $8.6 million from $0.8 million in the prior year period due to a higher realized gold price.

Current wording

•Gross profit increased to $5.0 million from $3.1 million in the prior year period due to a higher realized gold price.

Previous wording

•Net loss increased to $52.5 million compared to $30.2 million in the prior year period, due primarily to higher pre-development, evaluation and exploration costs incurred as the Company advances multiple projects within its development plan. The higher costs were related to drilling programs at the Ruby Hill property. Upon declaration of mineral reserves, certain pre-development, evaluation and exploration expenditures that are currently expensed will be capitalized.

Current wording

•Net loss increased to $48.4 million compared to $41.9 million in the prior year period, due primarily to higher pre-development, evaluation and exploration costs incurred as the Company advances multiple projects within its development plan. The higher costs were related to drilling programs at the Ruby Hill property partially offset by lower revaluation expenses recorded within other expenses. In September 2026, the company issued the Granite Creek Feasibility Study 3 which declared initial mineral reserves. Accordingly, the Company will capitalize qualifying development expenditures at Granite Creek, which were previously expensed as pre-development, evaluation and exploration costs.

Previous wording

•Cash used in operating activities increased to $49.6 million compared to $11.3 million in the prior year period as a result of comparative working capital changes of $20.9 million primarily as a result of increased inventory due to third-party processing availability and higher pre-development, evaluation and exploration expenses which was partially offset by higher gross profit.

Current wording

•Cash used in operating activities increased to $32.5 million compared to $15.2 million in the prior year period as a result of higher pre-development, evaluation and exploration expenses which was partially offset by higher gross profit.

Previous wording

•Cash and cash equivalents were $464.6 million as of June 30, 2026, a decrease of $49.0 million compared to March 31, 2026, primarily due to cash used in operations of $49.6 million, capital expenditures of $21.5 million primarily driven by the start of the Lone Tree Plant refurbishment project partially offset by a release of restricted cash of $16.9 million and proceeds from warrant exercises.

Current wording

•Cash and cash equivalents were $411.4 million as of September 30, 2026, a decrease of $53.2 million compared to June 30, 2026, primarily due to cash used in operations of $32.5 million and capital expenditures of $15.0 million primarily driven by the start of the Lone Tree Plant refurbishment project.

Previous wording

•Revenues increased to $76.7 million from $41.9 million in the prior year which represented 15,923 ounces 2 at an average realized gold price 1 of $4,801 per ounce, compared to gold sales of 13,352 ounces 2 at an average realized gold price 1 of $3,124 per ounce in the prior year as mining activity at Granite Creek increased.

Current wording

•Revenues increased to $109.5 million from $73.9 million in the prior year period which represented 23,668 ounces 2 at an average realized gold price 1 of $4,608 per ounce, compared to gold sales of 22,720 ounces 2 at an average realized gold price 1 of $3,243 per ounce in the prior year.

Previous wording

•Gold production increased to 11,098 ounces compared with 4,178 ounces in the prior year period.

Current wording

•Gold production increased to 33,649 ounces compared with 26,256 ounces in the prior year period.

Previous wording

•Gross profit improved to $24.7 million from a gross profit of $3.7 million in the prior year due to increased gold sales and gold price.

Current wording

•Gross profit improved to $29.7 million from a gross profit of $6.8 million in the prior year due to increased gold sales and gold price.

Previous wording

•Net loss was $131.1 million compared to $71.4 million in the prior year period, due to higher non-cash fair value revaluation net losses on derivative financial instruments of $39.5 million, as a result of changes in metal prices and discount rates, higher pre-development, evaluation and exploration expenses as the Company advances multiple projects within its development plan that were partially offset by higher gross profit.

Current wording

•Net loss was $179.5 million compared to $113.3 million in the prior year period, due to higher pre-development, evaluation and exploration expenses as the Company advances multiple projects within its development plan and higher non-cash fair value revaluation losses on a net basis partially offset by higher gross profit.

Previous wording

•Net loss per share of $0.15 increased from $0.14 in the comparative prior year due to a higher net loss, partially offset by an increase in the weighted average number of common shares outstanding following the equity financing in May 2025.

Current wording

•Net loss per share of $0.21 increased from $0.18 in the comparative prior year due to a higher net loss, partially offset by an increase in the weighted average number of common shares outstanding following the equity financing in May 2025.

Previous wording

•Adjusted net loss 1 increased to $69.9 million from $50.1 million in the prior year period due to higher pre-development, evaluation and exploration expense, partially offset by higher gross profit.

Current wording

•Adjusted net loss 1 increased to $118.0 million from $85.1 million in the prior year period due to higher pre-development, evaluation and exploration expense, partially offset by higher gross profit.

Previous wording

•Cash used in operating activities was $94.7 million, higher than the $34.0 million in the prior year period primarily due to comparative working capital changes as a result of interest paid on the repayment of legacy debt. Higher pre-development costs were partially offset by higher gross profit and finance fee expense paid related to the refinancing in the first quarter.

Current wording

•Cash used in operating activities was $127.2 million, higher than the $49.3 million in the prior year period primarily due to higher pre-development costs and comparative working capital changes as a result of interest paid on the repayment of legacy debt partially offset by higher gross profit.

Previous wording

•Cash and cash equivalents of $464.6 million as at June 30, 2026, increased by $401.3 million during the year. The increase was primarily due to the financing transactions discussed below partially offset by capital expenditures and higher comparative working capital changes.

Current wording

•Cash and cash equivalents of $411.4 million at September 30, 2026, increased by $348.1 million during the year. The increase was primarily due to the financing transactions discussed below partially offset by capital expenditures and higher cash used in operations.

Previous wording

◦ Proceeds from the NSR Royalty were used to redeem the 2023 Convertible Debentures, Orion Gold Prepay, and the Orion convertible loan in the amount of $165.0 million.

Current wording

◦March 23, 2026: Completed an offering of 3.75% unsecured convertible senior notes due 2031 in the aggregate amount of $287.5 million ("2026 Convertible Debentures"). The proceeds from the NSR Royalty were used to redeem the 2023 Convertible Debentures, Orion Gold Prepay, and the Orion Convertible Loan in the amount of $165.0 million.

Previous wording

• Approved the construction decision to proceed with the Lone Tree Plant refurbishment during the first quarter of 2026.

Current wording

•Approved the construction decision to proceed with the Lone Tree Plant refurbishment during the first quarter of 2026. Bulk demolition was completed in the third quarter of 2026 as planned, and mobilization has begun in preparation for the start of initial construction, with a focus on civil preparation and concrete work.

Previous wording

•Granite Creek underground development continued ahead of plan increasing access to high-grade headings supporting the ongoing ramp up. The project remains on track to achieve its full-year production guidance, with a published feasibility study anticipated in the third quarter of 2026.

Current wording

•Granite Creek underground development continued to expand access to high-grade headings, supporting the ongoing production ramp up. The project is expected to be within its full-year production guidance range.

Previous wording

•Completed approximately 19,000 meters of drilling, across three projects, including infill drilling at Archimedes underground and Mineral Point open pit in support of planned 2027 technical studies for both projects, as well as resource definition drilling at Granite Creek underground beyond the area covered by the upcoming feasibility study.

Current wording

•Completed approximately 36,000 meters of drilling for the quarter bringing the total to approximately 62,000 meters for the nine months ended September 30, 2026. Activities primarily focused on technical drilling at Mineral Point open pit and infill drilling at Archimedes underground to enhance resource definition in support of the planned 2027 technical studies, as well as resource definition drilling at Granite Creek underground beyond the area included in the September 2026 feasibility study.

Previous wording

•Permitting largely on track across the development plan as permitting actions continued to advance across the portfolio.

Current wording

•Permitting remained largely on track across the development portfolio as associated actions continued to advance.

Previous wording

i-80 Gold is executing a multi-phase development plan aimed at creating a mid-tier gold producer in Nevada. The near-term focus is on developing two high-grade underground refractory gold projects (Granite Creek and Archimedes), and the refurbishment and commissioning of the Lone Tree Plant, which is expected to serve as a central processing hub for material from all three planned underground projects. Development of the Company’s third underground mine (Cove) as well as its two large, open pit oxide projects (Granite Creek and Mineral Point) are expected to follow to support a long-term target of approximately 600,0001 ounces of annual gold output. All of the Company's properties are currently considered to be in the exploration stage as mineral reserves have yet to be defined.

Current wording

i-80 Gold is executing a multi-phase development plan aimed at creating a mid-tier gold producer in Nevada. The near-term focus is on developing two high-grade underground refractory gold projects (Granite Creek and Archimedes), and the refurbishment and commissioning of the Lone Tree Plant, which is expected to serve as a central processing hub for material from all underground projects. Development of the Company’s two large, open pit oxide projects (Mineral Point and Granite Creek), as well as its third underground mine (Cove), are expected to follow to support a long-term target of 500,000 to 600,0003 ounces of annual gold output.

Previous wording

In support of the multi-phase development plan, the Company released Preliminary Economic Assessments prepared in accordance with NI 43-101 and a corresponding Initial Assessment prepared under S-K 1300, each published in the first quarter of 2025 (the "PEA"), covering all five gold projects. These PEAs outlined a clear and achievable path to gold output and cash flow growth. Permitting, technical studies, development work and ramp up are actively being advanced across the portfolio of five gold projects, in support of upcoming planned feasibility studies.

Current wording

In support of the multi-phase development plan, the Company released Preliminary Economic Assessments prepared in accordance with NI 43-101 and a corresponding Initial Assessment prepared under S-K 1300, each published in the first quarter of 2025 (the "2025 PEA"), covering all five gold projects. The Company believes these 2025 PEAs outlined a clear and achievable path to gold output and cash flow growth. Permitting, technical studies, development work and ramp up are actively being advanced across the portfolio of five gold projects. During the third quarter of 2026, the Company announced the results of the Granite Creek Underground Feasibility Study.

Previous wording

1 Consolidated gold output estimates and average annual gold output targets are based on the most recent LOM output schedules disclosed in the latest technical studies filed for each respective project and related property: Granite Creek underground project, Archimedes underground project, Cove underground project, Granite Creek open pit project, and Mineral Point open pit project. These anticipated output figures are preliminary in nature and are based on mineral resources, which do not have demonstrated economic viability, and are not mineral reserves. In addition, each of the foregoing technical reports are preliminary economic assessments/initial assessments that are preliminary in nature and each include an economic analysis that is based, in part, on inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have for the application of economic considerations applied to them that would enable them to be categorized as mineral reserves. As such, there is no certainty that the output targets will be realized. The anticipated output targets are also pending the refurbishment and commissioning of the Lone Tree Plant. The output targets presented herein are Company goals and not a projection of results and should not be taken as output guidance. All of the Company’s projects are considered exploration stage projects under S-K 1300 because the Company has not determined mineral reserves at any of its properties pursuant to S-K 1300. With respect to Granite Creek underground and Archimedes underground, located on the Ruby Hill property, the Company has started extraction activities without determining mineral reserves. The following technical reports for each project and related property have been prepared in accordance with NI 43-101: Preliminary Economic Assessment Technical Report for the Cove Project, Lander County, Nevada (March 31, 2025); Preliminary Economic Assessment Technical Report for the Granite Creek Mine Project, Humboldt County, Nevada, USA (March 31, 2025); and Preliminary Economic Assessment NI 43-101 Technical Report for the Ruby Hill Project, Eureka Country, Nevada, USA (March 31, 2025). Corresponding technical reports prepared in accordance with S-K 1300 are as follows: Initial Assessment & Technical Report Summary for the Cove Project, Lander County, Nevada (March 26, 2025); Initial Assessment of the Granite Creek Mine, Humboldt County, NV (March 26, 2025); and Initial Assessment of the Ruby Hill Project, Eureka County NV (March 29, 2025).

Current wording

3 Consolidated gold output estimates and average annual gold output targets are based on the most recent LOM output schedules disclosed in the latest technical studies filed for each respective project and related property: Granite Creek underground project, Archimedes underground project, Cove underground project, Granite Creek open pit project, and Mineral Point open pit project. These anticipated output figures are preliminary in nature and are based on mineral resources, which do not have demonstrated economic viability, and are not mineral reserves. In addition, each of the foregoing technical reports are preliminary economic assessments/initial assessments that are preliminary in nature and each include an economic analysis that is based, in part, on inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have for the application of economic considerations applied to them that would enable them to be categorized as mineral reserves. As such, there is no certainty that the output targets will be realized. The anticipated output targets are also pending the refurbishment and commissioning of the Lone Tree Plant. The output targets presented herein are Company goals and not a projection of results and should not be taken as output guidance. All of the Company’s projects, except Granite Creek underground are considered exploration stage projects under S-K 1300 because the Company has not determined mineral reserves at any of its properties pursuant to S-K 1300. Granite Creek underground is considered to be in production stage. The following technical reports for each project and related property have been prepared in accordance with NI 43-101: Preliminary Economic Assessment Technical Report for the Cove Project, Lander County, Nevada (March 31, 2025); Preliminary Economic Assessment Technical Report for the Granite Creek Mine Project, Humboldt County, Nevada, USA (March 31, 2025); and Preliminary Economic Assessment NI 43-101 Technical Report for the Ruby Hill Project, Eureka Country, Nevada, USA (March 31, 2025). Corresponding technical reports prepared in accordance with S-K 1300 are as follows: Initial Assessment & Technical Report Summary for the Cove Project, Lander County, Nevada (March 26, 2025); Initial Assessment of the Granite Creek Mine, Humboldt County, NV (March 26, 2025); and Initial Assessment of the Ruby Hill Project, Eureka County NV (March 29, 2025).

Previous wording

i-80 Gold has executed several financing initiatives that have led to the successful completion of its recapitalization plan. During the first quarter of 2026, the Company completed several key transactions including the NSR Royalty with Franco-Nevada for up to $250 million,the 2026 Gold Prepay with National Bank and Macquarie Bank for up to $250 million, and the issuance of the 2026 Convertible Debentures in the aggregate principal amount of $287.5 million. These financings completed the Company's broader recapitalization plan ahead of its mid-2026 target and align with the projected capital requirements and cash flows of the current project development plan. Overall, the recapitalization secured over $1 billion 1 in raised and available capital from early 2025 through the first quarter of 2026, materially strengthening the Company's balance sheet, providing greater funding certainty, and de-risking the development plan.

Current wording

i-80 Gold has executed several financing initiatives that have led to the successful completion of its recapitalization plan. During the first quarter of 2026, the Company completed several key transactions including the NSR Royalty with Franco-Nevada for up to $250 million, the 2026 Gold Prepay with NBC and Macquarie for up to $250 million, and the issuance of the 2026 Convertible Debentures in the aggregate principal amount of $287.5 million. These financings completed the Company's broader recapitalization plan ahead of its mid-2026 target and align with the projected capital requirements and cash flows of the current project development plan. Overall, the recapitalization secured just over $1 billion 1 in raised and available capital from early 2025 through the first quarter of 2026, materially strengthening the Company's balance sheet, providing greater funding certainty, and de-risking the development plan.

Previous wording

The Company’s 2026 production, operating and pre-development evaluation and exploration cost guidance is summarized below:

Current wording

The Company’s 2026 production, operating and pre-development evaluation and exploration expense guidance are summarized below:

Previous wording

(a)Granite Creek mine development costs will be capitalized upon declaration of reserves, assuming reserves will be declared in the feasibility study.

Current wording

(1)Granite Creek mine development costs will be capitalized upon declaration of Mineral Reserves as of September 21, 2026.

Previous wording

The Company remains on track to meet its 2026 guidance as originally published in its 2025 Year End Annual Report on Form 10-K on February 19, 2026 subject to the following:

Current wording

The Company expects to be largely within its guidance ranges published in its Annual Report on Form 10-K for the year ended December 31, 2025, on February 19, 2026. The Company’s expectations for 2026 have changed from that guidance as follows:

Previous wording

On March 16, 2026, the Company announced that it had completed the closing of the $250 million NSR Royalty financing in exchange for a 1.5% life of mine ("LOM") net smelter return royalty with Franco-Nevada, stepping up to a 3.0% LOM net smelter return royalty on January 1, 2031. The NSR Royalty applies to production from all mineral properties in the portfolio, including Granite Creek, Cove, the Ruby Hill Complex and Lone Tree.

Current wording

On March 16, 2026, the Company announced that it had completed the closing of the $250 million NSR Royalty financing in exchange for a 1.5% life of mine ("LOM") net smelter return royalty with Franco-Nevada, stepping up to a 3.0% LOM net smelter return royalty on January 1, 2031. The NSR Royalty applies to production from all mineral properties in the portfolio, including Granite Creek, Cove, Ruby Hill and Lone Tree.

Previous wording

On March 16, 2026, the Company closed a Gold Prepay facility with National Bank and Macquarie, for an initial advance of $150 million at closing, with a $100 million accordion feature. Upon closing, the Company has the obligation to deliver 39,978 ounces of gold over a 30-month period beginning in January 2028. The accordion feature provides access to an additional $100 million for a 24-month period upon closing of the facility, subject to customary conditions and lender approval. The Company anticipates executing the accordion feature in the first half of 2027, at which point the number of additional gold ounces to be delivered will be determined. The Company expects the total ounces to be delivered for the $250 million facility to represent approximately 15% of total gold output over the projected period of January 2028 to June 2030.

Current wording

On March 16, 2026, the Company closed a Gold Prepay facility with NBC and Macquarie, for an initial advance of $150 million at closing, with a $100 million accordion feature. Upon closing, the Company has the obligation to deliver 39,978 ounces of gold over a 30-month period beginning in January 2028. The accordion feature provides access to an additional $100 million for a 24-month period upon closing of the facility, subject to customary conditions and lender approval. The Company anticipates executing the accordion feature in the first half of 2027, at which point the number of additional gold ounces to be delivered will be determined. The Company expects the total ounces to be delivered for the $250 million facility to represent approximately 15% of total gold output over the projected period of January 2028 to June 2030.

Previous wording

With the proceeds received from the NSR Royalty, the Company redeemed all of its legacy debt obligations except for the silver purchase and sale agreement with Orion (the "Silver Purchase Agreement") during the first quarter of 2026. The 2023 Convertible Debentures were redeemed for total cash consideration of $72.9 million, with accrued interest and the 4% mandatory redemption premium settled through the issuance of 8.1 million common shares and a cash payment of $5.3 million. The Orion Convertible Loan was repaid for total consideration of $75.0 million, comprised of a cash payment of $69.7 million and the issuance of 3.0 million common shares with a fair value of $5.3 million. The remaining outstanding deliveries of 4,440 ounces of gold from the Orion Gold Prepay were redeemed with a cash payment of $22.4 million.

Current wording

With the proceeds received from the NSR Royalty, the Company redeemed all of its legacy debt obligations except for the silver purchase and sale agreement with OMF Fund III (HG) LTD., as affiliate of Orion Mine Finance (“Orion”), (the "Silver Purchase Agreement") during the first quarter of 2026. The 2023 Convertible Debentures were redeemed for total cash consideration of $72.9 million, with accrued interest and the 4% mandatory redemption premium settled through the issuance of 8.1 million common shares and a cash payment of $5.3 million. The Orion Convertible Loan was repaid for total consideration of $75.0 million, comprised of a cash payment of $69.7 million and the issuance of 3.0 million common shares with a fair value of $5.3 million. The remaining outstanding deliveries of 4,440 ounces of gold from the Orion Gold Prepay were redeemed with a cash payment of $22.4 million.

Previous wording

The Company owns and operates four past producing gold properties in Nevada, one of the largest gold producing regions in the world. The Company continued to advance its exploration stage gold properties following successful exploration programs.

Current wording

The Company owns and operates past producing gold properties in Nevada, one of the largest gold producing regions in the world. The Company continued to advance its gold properties following successful exploration programs.

Previous wording

2 Operating costs excluding depletion, depreciation, amortization, and royalties. Royalties exclude NSR royalty payments.

Current wording

2 Operating costs excluding depletion, depreciation, amortization, and royalties. Royalties exclude Net Smelter Return royalty payments.

Previous wording

Mineralized material mined at Granite Creek underground is processed as follows: (i) sulfide mineralized material is processed at a third-party processing facility and subject to a toll milling agreement entered into in March 2025, (ii) high-grade and low-grade oxide mineralized material is subject to an ore sales agreement. Low-grade oxide mineralized material was sold under the ore purchase beginning in the first quarter of 2026, and (iii) residual leaching of low-grade oxide material previously placed on a segregated section of the Company’s Lone Tree heap leach facility continues with no additional mineralized material being placed after the first quarter of 2026.

Current wording

Ore mined at Granite Creek underground is currently processed as follows: (i) sulfide ore is processed at a third-party processing facility and subject to a toll milling agreement entered into in March 2025; (ii) high-grade and low-grade oxide ore is subject to an ore purchase agreement. Low-grade oxide ore was sold under the ore purchase agreement beginning in the first quarter of 2026; and (iii) residual leaching of low-grade oxide material previously placed on a segregated section of the Company’s Lone Tree heap leach facility continues with no additional ore having been placed after the first quarter of 2026.

Previous wording

At June 30, 2026, the Company had in-process material containing over 5,300 recoverable ounces at its third-party processing facility. The Company expects the material to be processed during the third quarter of 2026. Approximately 1,800 ounces of gold was also held in inventory at June 30, 2026. Gold ounces sold were lower than the prior year periods due to availability at the third-party processing facility.

Current wording

At September 30, 2026, the Company had in-process material containing over 6,200 recoverable gold ounces at its third-party processing facility. The Company expects over half of the material at the third-party facility to be processed by the end of 2026. Approximately 4,100 ounces of gold was also held in inventory at September 30, 2026. Gold ounces sold were lower than the prior year periods due to timing of settlements.

Previous wording

Processing cost per unit has increased compared to the prior year periods due to a higher proportion of sulfide material being processed at the third-party processing facility.

Current wording

Mining cost per tonne has increased due to higher contractor costs and increased labor to support the mine, as well as lower tonnes produced. Processing cost per unit has increased compared to the prior year periods due to a higher proportion of sulfide material being processed at the third-party processing facility.

Previous wording

During the three months ended and six months ended June 30, 2026, growth capital expenditures were primarily related to the water treatment plant project. Sustaining capital expenditures were related primarily to the electrical substation replacement.

Current wording

During the three and nine months ended September 30, 2026, growth capital expenditures were primarily related to the water treatment plant project. Sustaining capital expenditures were related primarily to the electrical substation replacement.

Previous wording

Pre-development, evaluation, and exploration expenses were $7.9 million for the three months ended June 30, 2026, which were related to underground mine development and infill drilling to upgrade mineral resources and step-out drilling.

Current wording

Pre-development, evaluation, and exploration expenses were $5.5 million for the three months ended September 30, 2026, which were related to underground mine development and infill drilling to upgrade mineral resources and step-out drilling.

Previous wording

During the three and six months ended June 30, 2026, the Company continued infill and step-out drilling at Granite Creek. The underground drill program remained focused on infill drilling to support resource conversion and mine planning. Drilling progressed slower than anticipated during the quarter due to water management, maintenance downtime, and rig relocation. The updated mineral resource estimate is near completion and under internal review. The feasibility study is now expected to be completed in the third quarter of 2026.

Current wording

During the three and nine months ended September 30, 2026, the Company continued infill and step-out drilling at Granite Creek. The underground drill program remained focused on infill drilling to support resource conversion and mine planning. Drilling progressed slower than anticipated during the quarter due to water management and insufficient contractor personnel to maintain continuous operations. Ongoing 2026 infill and step-out drilling supports continued reserve development and resource growth in the South Pacific, Rangefront, Otto and Ogee zones, with the high-grade portion of the CX Zone targeted for further evaluation as part of an anticipated extensive multi-year drill program planned to commence in 2027.

Previous wording

The Company continues to leach the historic leach pads on the Ruby Hill property, recovering gold. Year-to-date gold production from the historic leach pad remained below expectation as infiltration on the pad remained challenging. Higher processing cost per ounce compared to the prior year periods was due to lower produced ounces. For the residual leaching process, management continues to focus on managing ponding, maximizing the area under leach, and optimizing cyanide application rates.

Current wording

The Company continues to leach gold from the historic leach pads on the Ruby Hill property. Year-to-date gold production from the historic leach pad is below plan due to lower leaching rates in areas of the pad, partly in preparation for placement of mineralized material from the underground in the fourth quarter and partly to manage localized ponding at surface. Higher processing cost per ounce compared to the prior year periods was due to lower produced ounces. For the residual leaching process, management continues to focus on managing localized areas of ponding and optimizing cyanide application rates.

Previous wording

During the three months ended June 30, 2026, underground development at the Archimedes project continued to advance on schedule, with 899 meters of development completed during the quarter, supported by favorable ground conditions and high productivity rates from contractors. Pump testing was conducted on a recently completed dewatering well, and permitting activities for below the 5,100-foot level continued to advance as planned. The planned start of mining above the 5,100-foot level is fully supported by existing permits and is not dependent on the timing or outcome of permitting activities below the 5,100-foot level. The Company continues to expect to achieve first gold from Archimedes in the fourth quarter of 2026.

Current wording

During the three months ended September 30, 2026, underground development at the Archimedes project continued to advance on schedule, with 760 meters of development completed during the quarter, supported by favorable ground conditions and high productivity rates from contractors. The first ventilation raise was completed and the second ventilation raise commenced in September of 2026. Permitting activities for Lower Archimedes, (located below the 5,100-foot elevation of the deposit) continued to advance as planned. Mining in Upper Archimedes (located above the 5,100-foot elevation of the deposit) has been on schedule with first gold expected in the fourth quarter of 2026. Refractory material is expected to be stockpiled for processing at the wholly-owned Lone Tree Plant, once commissioned, rather than processed through a third-party facility, while placement of the oxide material on the existing leach pad at the Ruby Hill property is expected to begin by the end of 2026.

Previous wording

Growth capital expenditures for the three and six months ended June 30, 2026 were primarily related to heavy mobile equipment, infrastructure upgrades, power upgrades and mine load centers for the underground.

Current wording

Growth capital expenditures for the three and nine months ended September 30, 2026, were primarily related to infrastructure upgrades and power upgrades.

Showing the first 40 of 88 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

1 Based on gold output estimates in the most recent life of mine gold output schedules disclosed in the latest technical studies filed for each respective project and related property: Granite Creek underground, Archimedes underground, Cove underground, and Mineral Point open pit. These anticipated output figures are preliminary in nature and are largely based on mineral resources, which do not have demonstrated economic viability and subject to successful project development. Only Granite Creek underground has declared mineral reserves. In addition, for all gold projects except Granite Creek underground, the foregoing technical reports are preliminary economic assessments/initial assessments that are preliminary in nature. The Granite Creek underground technical report was a feasibility study/technical report summary. Each include an economic analysis that is based, in part, on inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have for the application of economic considerations applied to them that would enable them to be categorized as mineral reserves. As such, there is no certainty that the output targets will be realized. Anticipated output targets are also pending the commissioning of the Lone Tree Plant, and are Company goals and not a projection of results and should not be taken as output guidance. All of the Company’s projects other than Granite Creek underground are considered exploration stage projects under S-K 1300, as the Company has not determined mineral reserves at such properties pursuant to S-K 1300. With respect to Archimedes underground, located on the Ruby Hill property, the Company has started extraction activities without determining mineral reserves. The following technical reports for each project and related property have been prepared in accordance with NI 43-101: Preliminary Economic Assessment Technical Report for the Cove Project, Lander County, Nevada (March 31, 2025); NI 43-101 Technical Report Feasibility Study Granite Creek, Humboldt County, Nevada, USA (September 21, 2026); and Preliminary Economic Assessment NI 43-101 Technical Report for the Ruby Hill Project, Eureka Country, Nevada, USA (March 31, 2025). Corresponding technical reports prepared in accordance with S-K 1300 are as follows: Initial Assessment & Technical Report Summary for the Cove Project, Lander County, Nevada (March 26, 2025); S-K 1300 SEC Technical Report Summary Pre-Feasibility Study Granite Creek, Humboldt County, NV (September 21, 2026); and Initial Assessment of the Ruby Hill Project, Eureka County NV (March 29, 2025).
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

•Net loss per share increased to $0.06 compared to a $0.05 loss in the prior year period, primarily due to a higher net loss, partially offset by an increase in the weighted average number of common shares outstanding following the equity financing in May 2025.

Previous report — wording carried elsewhere

◦ March 23, 2026: Completed an offering of 3.75% unsecured convertible senior notes due 2031 in the aggregate amount of $287.5 million ("2026 Convertible Debentures").

Previous report — wording carried elsewhere

On December 13, 2021, in exchange for $30.0 million, the Company entered into a silver purchase and sale agreement with Orion ("Silver Purchase Agreement"). Pursuant to the terms of the Silver Purchase Agreement, which commenced as of April 30, 2022, the Company is to deliver to Orion 100% of the silver production from the Granite Creek and Ruby Hill projects until the delivery of 1.2 million ounces of silver, after which the delivery will be reduced to 50% until the delivery of an aggregate of 2.5 million ounces of silver, after which the delivery will be reduced to 10% of the silver production solely from Ruby Hill Project. Orion will pay the Company an ongoing cash purchase price equal to 20% of the prevailing silver price.