What changed in Risk Factors?
Read the current filingPrevious report: 10-Q
Period ended 2026-03-31; filed 2026-05-20.
0001628280-26-036966
Item 1A. Risk FactorsCurrent report: 10-Q
Period ended 2026-06-30; filed 2026-08-13.
0001628280-26-056817
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 303 previous paragraphs and 296 current paragraphs.
279 unchanged; 16 reworded; 1 added; 5 removed; 3 previous and 0 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (1)
Current report
PMT Critical Minerals, a wholly-owned subsidiary of REalloys, is currently relies on short-term contract work to support its operations. There can be no assurance that PMT Critical Minerals will receive additional orders or secure new contracts in the future.
Removed paragraphs (5)
Previous report
We are dependent on short term contract work and there are no guarantees that REalloys will receive any additional orders or contracts.
Previous report
We may not be able to fulfill the capital infusion requirements set forth in the PMTCM Share Exchange Agreement on or before the completion deadline set forth therein.
Previous report
Pursuant to the PMTCM Share Exchange Agreement, as amended, REalloys was required to (I) complete several post acquisition transactions, including a capital injection of $1.75 million to settle liens and delivery of clean titles related to the acquired equipment, and (II) otherwise consummate all transactions contemplated by the PMTCM Share Exchange Agreement. Pursuant to the terms thereof, prior to completion, the PMTCM Share Exchange Agreement may be terminated by either party without liability to the terminating party. Upon such termination, among other things: (i) PMTCM shareholders will be required to return any shares of REalloys issued as payment to such shareholders and (ii) REalloys will be required to return to PMTCM shareholders any shares of PMTCM issued to REalloys. As of the date of this joint proxy and consent solicitation statement/prospectus, $0.4 million of the capital injection is outstanding and due on the completion of the merger.
Previous report
There can be no assurance that REalloys will be able to satisfy the foregoing requirements or obtain a waiver of any of the foregoing requirements. If REalloys’ obligations are not completed within the expected timeframe, such delay may materially and adversely affect the synergies and other benefits that REalloys expects to achieve from the PMTCM Share Exchange Agreement (including the potential total loss of anticipated benefits if the agreement is terminated and the share exchange is unwound pursuant to the terms thereof, as further described above) and could result in additional transaction costs, loss of revenue or other effects associated with uncertainty about the acquisition. Such failure could also significantly delay the execution of REalloys’ second phase of its overall business strategy of establishing a North American integrated magnet materials and magnet supply chain.
Previous report
Climate change is an international and community concern which may directly or indirectly affect our business and current and future activities. The continuing rise in global average temperatures has created varying changes to regional climates across the world and extreme weather events have the potential to delay or hinder our exploration activities at our mineral projects, and to delay or cease operations at any future mine. This may require us to make additional expenditures to mitigate the impact of such events, which may materially and adversely increase our costs and/or reduce production at a future mine. Governments at all levels are amending or enacting additional legislation to address climate change by regulating, among other things, carbon emissions and energy efficiency, or where legislation has already been enacted, regulation regarding emission levels and energy efficiency are becoming more stringent. As a significant emitter of greenhouse gas emissions, the mining industry is particularly exposed to such laws and regulations. Compliance with such legislation and regulations, including the associated costs, may have a material adverse effect on our business, financial condition, results of operations, prospects and our ability to commence or continue our exploration and future development and mining operations.
Reworded paragraphs (16)
Previous wording
•Mr. Sternheim has the ability, acting by written consent and without prior notice to or approval of our other stockholders, to remove and replace directors (other than himself), to fill vacancies on the Board of Directors, and to adopt amendments to our Bylaws, in each case in a manner that could limit the independence of the Board of
Current wording
•Mr. Sternheim has the ability, acting by written consent and without prior notice to or approval of our other stockholders, to remove and replace directors (other than himself), to fill vacancies on the Board of Directors, and to adopt amendments to our Bylaws, in each case in a manner that could limit the independence of the Board of Directors, alter the composition or authority of its standing committees, or otherwise reduce the protections currently available to our other stockholders.
Previous wording
•Mr. Sternheim's voting power, together with provisions in our Articles of Incorporation,, may have the effect of delaying, deterring, or preventing a change of control of the Company, including a transaction that other stockholders might consider favorable, and may limit the price that investors are willing to pay in the future for shares of our Common Stock.
Current wording
•Mr. Sternheim’'s voting power, together with provisions in our Articles of Incorporation,, may have the effect of delaying, deterring, or preventing a change of control of the Company, including a transaction that other stockholders might consider favorable, and may limit the price that investors are willing to pay in the future for shares of our Common Stock.
Previous wording
The February 24, 2026 Merger combined two businesses with different operating models, customer bases, regulatory profiles and financial-reporting cadences. The integration process — including the integration of accounting, treasury, equity-administration, billing, customer-support and IT general controls — is ongoing as of the date of this Quarterly Report and is subject to material weaknesses in our internal control environment described above. The May 5, 2026 Option Exercise, which will result in the anticipated deconsolidation of Blackbox.io in the second quarter of 2026, will further reduce the period over which the integration of the Blackbox.io business will benefit our consolidated results. The performance, recoverability or impairment of the EVTEC Holdings Group Limited investment acquired in the Merger remains subject to material uncertainty, as evidenced by the $6.4 million impairment recognized at the closing of the Merger. The anticipated benefits of the Merger may not be realized fully, or at all, if integration challenges, control deficiencies, or further write-downs of acquired assets materialize.
Current wording
The February 24, 2026 Merger combined two businesses with different operating models, customer bases, regulatory profiles and financial-reporting cadences. The integration process — including the integration of accounting, treasury, equity-administration, billing, customer-support and IT general controls — is ongoing as of the date of this Quarterly Report and is subject to material weaknesses in our internal control environment described above. The May 5, 2026 Option Exercise resulted in the deconsolidation of Blackbox.io in the second quarter of 2026, further reducing the period over which the integration of the Blackbox.io business benefited our consolidated results. The performance, recoverability or impairment of the EVTEC Holdings Group Limited investment acquired in the Merger remains subject to material uncertainty, as evidenced by the $6.4 million impairment recognized at the closing of the Merger. The anticipated benefits of the Merger may not be realized fully, or at all, if integration challenges, control deficiencies, or further write-downs of acquired assets materialize.
Previous wording
The Euclid Magnet Facility is currently producing rare earth metals and magnet materials for the DLA, the DOE’s AMES National Laboratory and NdFeB magnet industry clients. Contract works are short term in nature, often less than six months, and there are no guarantees that any additional orders will be receive by REalloys.
Current wording
PMT Critical Minerals is currently producing rare earth materials for the DLA, the DOE’s AMES National Laboratory and NdFeB magnet industry clients. Contract works are short term in nature, often less than six months, and there are no guarantees that any additional orders will be received by REalloys.
Previous wording
REalloys’ commercial framework agreements with the Saskatchewan Research Counsel (“SRC”), located in Saskatoon, Saskatchewan Province, Canada, outlines the rare earth oxide and metal products the SRC will provide to the REalloys, in return for REalloys providing funding towards SRC’s contemplated expanded processing capabilities. The expanded processing would allow SRC to process the oxide and metal products it intends to provide REalloys. Under the framework agreements REalloys is entitled to priority offtake rights, including rights of first refusal on future volumes to be processed at SRC’s expanded Separation Facilities. There can be no assurances that the conditions required for REalloys to fund toward the SRC’s expansion, including agreement of detailed scope and budget, over which REalloys has unilateral and sole discretion of the approval, will occur. If we are unable to and maintain the agreements or enter into an alternative arrangement with another processing facility and/or satisfy the conditions therein, or if we are only able to do so on terms that are unfavorable to us, this will have a negative effect on our supply chain, strategy and current projections, including projections related to future production capabilities. If this happens, our results of operations and financial condition could be materially and adversely affected. Additionally, there are no assurances that the framework agreements will lead to suitable and verified third party sources of rare earth concentrates and/or light rare earth oxides and/or re-cycled magnets and/or heavy rare earth oxides available for process at the SRC Separation Facilities prior to or after HLREE concentrate becomes available. Currently, the SRC Separation Facilities’ expansion to meet the forecasted feedstock requirements of the Euclid Magnet Facility is not scheduled to be commissioned until the second quarter of 2026 and any delays in completion, any capital and operating cost overruns and any quality issues will have an adverse impact on REalloys’ forecasted second quarter 2026 production schedules and financial viability.
Current wording
REalloys’ commercial framework agreements with the Saskatchewan Research Council (“SRC”), located in Saskatoon, Saskatchewan Province, Canada, outlines the rare earth oxide and metal products the SRC will provide to the REalloys, in return for REalloys providing funding towards SRC’s contemplated expanded processing capabilities. The expanded processing would allow SRC to process the oxide and metal products it intends to provide REalloys. Under the framework agreements REalloys is entitled to priority offtake rights, including rights of first refusal on future volumes to be processed at SRC’s expanded Separation Facilities. There can be no assurances that the conditions required for REalloys to fund toward the SRC’s expansion, including agreement of detailed scope and budget, over which REalloys has unilateral and sole discretion of the approval, will occur. If we are unable to maintain the agreements or enter into an alternative arrangement with another processing facility and/or satisfy the conditions therein, or if we are only able to do so on terms that are unfavorable to us, this will have a negative effect on our supply chain, strategy and current projections, including projections related to future production capabilities. If this happens, our results of operations and financial condition could be materially and adversely affected. Additionally, there are no assurances that the framework agreements will lead to suitable and verified third party sources of rare earth concentrates and/or light rare earth oxides and/or recycled magnets and/or heavy rare earth oxides available for processing at the SRC Separation Facilities prior to or after HLREE concentrate becomes available. The SRC Separation Facilities’ upgrade is currently underway and expected to be commissioned in 2027 and any delays in completion, any capital and operating cost overruns and any quality issues will have an adverse impact on REalloys’ production schedules and financial viability.
Previous wording
REalloys also has limited operating history upon which to base estimates of future operating costs and capital requirements. Actual operating costs and economic returns of any and all of REalloys’ projects may materially differ from the costs and returns estimated, and accordingly our financial condition, results of operations and cash flows may be negatively affected. Further, REalloys has no history in operating a business, except for the Euclid Magnet Facility’s contract works, other than pursuing a business combination. In the near term, REalloys’ development and growth depends on its ability to: (i) to extend and source new contract works, (ii) successfully produce magnet materials and magnets at the Euclid Magnet Facility; (iii) secure additional reliable sources of Light Rare Earth Elements (“LREE”) and Heavy Rare Earth Elements (“HREE”) feedstock at prices that are acceptable and attractive to REalloys, (iv) receive processed LREE and HREE materials from the SRC Separation Facilities on acceptable commercial terms and conditions; and (v) secure additional NdFeB magnet materials and magnet customers that are willing and able to purchase REalloys’ magnet materials and magnets at prices that are expected to be profitable for REalloys. Delays in the completion of the expansion of the Euclid Magnet Facility could have a material adverse effect on our business, results of operations and financial condition as well as any delays to the completion and commissioning of the expansion at the SRC Separation Facilities, currently anticipated for the second quarter of 2025.
Current wording
REalloys also has limited operating history upon which to base estimates of future operating costs and capital requirements. Actual operating costs and economic returns of any and all of REalloys’ projects may materially differ from the costs and returns estimated, and accordingly our financial condition, results of operations and cash flows may be negatively affected. Further, REalloys has no history in operating a business, except for the Euclid Magnet Facility’s contract works, other than pursuing a business combination. In the near term, REalloys’ development and growth depends on its ability to: (i) to extend and source new contract works, (ii) successfully produce magnet materials and magnets at the Euclid Magnet Facility; (iii) secure additional reliable sources of Light Rare Earth Elements (“LREE”) and Heavy Rare Earth Elements (“HREE”) feedstock at prices that are acceptable and attractive to REalloys, (iv) receive processed LREE and HREE materials from the SRC Separation Facilities on acceptable commercial terms and conditions; and (v) secure additional NdFeB magnet materials and magnet customers that are willing and able to purchase REalloys’ magnet materials and magnets at prices that are expected to be profitable for REalloys. Delays in the completion of the expansion of the Euclid Magnet Facility could have a material adverse effect on our business, results of operations and financial condition as well as any delays to the completion and commissioning of the expansion at the SRC Separation Facilities.
Previous wording
•delays to the commissioning of the expansion at the SRC Separation Facilities, currently schedule for the second quarter of 2026;
Current wording
•delays to the commissioning of the expansion at the SRC Separation Facilities;
Previous wording
In addition, US government contracts generally contain provisions permitting termination, in whole or in part, without prior notice at the US government’s convenience upon payment only for work done and commitments made at the time of termination. We can give no assurance that one or more of our US government contracts will not be terminated and this also applies to our non-US government clients thar are reliant on US government contracts. Also, we can give no assurance that we would be able to procure new contracts to offset the revenue or backlog lost as a result of any termination of our and/or our non-US government US government contracts. Because a significant portion of our revenue and our non-US government clients’ US government contracts will be dependent on performance and payment under our US government contracts, the loss of one or more large contracts could have a material adverse impact on our business, financial condition, results of operations and cash flows.
Current wording
In addition, US government contracts generally contain provisions permitting termination, in whole or in part, without prior notice at the US government’s convenience upon payment only for work done and commitments made at the time of termination. We can give no assurance that one or more of our US government contracts will not be terminated and this also applies to our non-US government clients that are reliant on US government contracts. Also, we can give no assurance that we would be able to procure new contracts to offset the revenue or backlog lost as a result of any termination of our and/or our non-US government US government contracts. Because a significant portion of our revenue and our non-US government clients’ US government contracts will be dependent on performance and payment under our US government contracts, the loss of one or more large contracts could have a material adverse impact on our business, financial condition, results of operations and cash flows.
Previous wording
William J. Lewis, P.Geo. of Micon International Limited prepared a S-K 1300 Technical Report (“Technical Report”) on HLREE dated December 6, 2024, and we plan to de-risk this project as recommended in the Technical Report while concurrently expanding the capabilities and capacity of the Euclid Magnet Facility. HLREE is at the exploration phase and is not and production and therefore is not able to satisfy the feedstock needs necessary for the development and commercial operation of our Euclid Magnet Facility and may never be able to do so. Unless and until HLREE is capable of satisfying our feedstock needs, we will be required to enter into feedstock supply agreements with third parties. We currently intend on sourcing rare earth feedstocks for the SRC Separation Facilities to process and deliver to the Euclid Magnet Facility from verified third-party sources prior to the development of the HLREE. We are in the process of pursuing feedstock supply and offtake arrangements with potential counterparties to provide adequate sources of feedstock for the purchase of all or substantially all our production from the Euclid Magnet Facility, once operational, on terms favorable to us. Such arrangements may not be able to provide all the feedstock which we may require or at economical or favorable prices to us. If we are unable to secure supply agreements that ensure that all our feedstock needs are met or if we are able to secure such agreements, but the counterparties fail to meet their obligations, we may not achieve our goals. If this happens, our results of operations and financial condition could be materially and adversely affected.
Current wording
William J. Lewis, P.Geo. of Micon International Limited prepared a S-K 1300 Technical Report (“Technical Report”) on HLREE dated December 6, 2024, and we plan to de-risk this project as recommended in the Technical Report while concurrently expanding the capabilities and capacity of the Euclid Magnet Facility. HLREE is at the exploration phase and is not at production and therefore is not able to satisfy the feedstock needs necessary for the development and commercial operation of our Euclid Magnet Facility and may never be able to do so. Unless and until HLREE is capable of satisfying our feedstock needs, we will be required to enter into feedstock supply agreements with third parties. We currently intend on sourcing rare earth feedstocks for the SRC Separation Facilities to process and deliver to the Euclid Magnet Facility from verified third-party sources prior to the development of the HLREE. We are in the process of pursuing feedstock supply and offtake arrangements with potential counterparties to provide adequate sources of feedstock for the purchase of all or substantially all our production from the Euclid Magnet Facility, once operational, on terms favorable to us. Such arrangements may not be able to provide all the feedstock which we may require or at economical or favorable prices to us. If we are unable to secure supply agreements that ensure that all our feedstock needs are met or if we are able to secure such agreements, but the counterparties fail to meet their obligations, we may not achieve our goals. If this happens, our results of operations and financial condition could be materially and adversely affected.
Previous wording
Until commercial production is achieved by our projects, we will continue to incur operating and investing net cash outflows associated with including, but not limited to, build out and growth of our Euclid Magnet Facility, maintaining and acquiring properties, undertaking ongoing activities, funding the working capital requirements of our contract works and the funding obligations to develop the assets of our projects. We will require additional capital to fund our ongoing operations, complete our Euclid Magnet Facility, potentially invest into expanding production at the SRC Separation Facilities and — in connection with our HLREE — explore and define HREE mineralization and establish any future mining or HREE manufacturing operations. Such additional funding may not be available to us on satisfactory terms, or at all.
Current wording
Until commercial production is achieved by our projects, we will continue to incur operating and investing net cash outflows associated with including, but not limited to, build out and growth of our Euclid Facility, maintaining and acquiring properties, undertaking ongoing activities, funding the working capital requirements of our contract works and the funding obligations to develop the assets of our projects. We may require additional capital to fund our ongoing operations, complete our Euclid Magnet Facility, potentially invest into expanding production at the SRC Separation Facilities and — in connection with our HLREE — explore and define HREE mineralization and establish any future mining or HREE manufacturing operations. Such additional funding may not be available to us on satisfactory terms, or at all.
Previous wording
US and non-US tax legislation and the ultimate enactment of any of them could have a negative impact on our effective tax rate. Foreign governments may enact tax laws, including in response to guidelines issued by international organizations that could result in further changes to global taxation and materially affect our financial position and results of operations. In addition, we are subject to the continuous examination of our income tax returns by the Internal Revenue Service and other tax authorities. We regularly assess the likelihood of adverse outcomes resulting from these examinations to determine the adequacy of our provision for income taxes. These continuous examinations may result in unforeseen tax-related liabilities, which may harm our future financial results.
Current wording
Our future effective income tax rates may be favorably or unfavorably affected by unanticipated changes in the valuation of our deferred tax assets and liabilities or by changes in tax laws or their interpretation. Any proposed changes to US and non-US tax legislation and the ultimate enactment of any of them could have a negative impact on our effective tax rate. Foreign governments may enact tax laws, including in response to guidelines issued by international organizations that could result in further changes to global taxation and materially affect our financial position and results of operations. In addition, we are subject to the continuous examination of our income tax returns by the Internal Revenue Service and other tax authorities. We regularly assess the likelihood of adverse outcomes resulting from these examinations to determine the adequacy of our provision for income taxes. These continuous examinations may result in unforeseen tax-related liabilities, which may harm our future financial results.
Previous wording
Before any commercial production, the Company will rely on the timely availability of suitable rare earth feedstock, and disruptions in supply could adversely affect our operations and growth plans. Global supply of rare earth concentrates and intermediate products is heavily concentrated, with China accounting for a significant share of mining, refining and metallization capacity and periodically using export quotas, licensing and other policy tools that can constrain or redirect material flows. Outside China, commercially available sources of heavy rare earth–rich feedstock we require, remain limited to a small number of projects and by‑product streams, making procurement sensitive to permitting delays, mine‑plan changes, operational outages, and counterparty-specific issues at individual producers. Any reduction in the volume, quality or reliability of feedstock available to us at acceptable prices—including as a result of geopolitical developments, trade restrictions, environmental regulations, logistics disruptions or increased competition from other users
Current wording
Before any commercial production, the Company will rely on the timely availability of suitable rare earth feedstock, and disruptions in supply could adversely affect our operations and growth plans. Global supply of rare earth concentrates and intermediate products is heavily concentrated, with China accounting for a significant share of mining, refining and metallization capacity and periodically using export quotas, licensing and other policy tools that can constrain or redirect material flows. Outside China, commercially available sources of heavy rare earth–rich feedstock we require, remain limited to a small number of projects and by‑product streams, making procurement sensitive to permitting delays, mine‑plan changes, operational outages, and counterparty-specific issues at individual producers. Any reduction in the volume, quality or reliability of feedstock available to us at acceptable prices—including as a result of geopolitical developments, trade restrictions, environmental regulations, logistics disruptions or increased competition from other users—could lead to underutilization of our processing and metallization assets, increased unit costs, and delays in meeting customer demand, which could materially and adversely affect our business, financial condition and results of operations.
Previous wording
The Company operates through its subsidiaries, including PMT Critical Metals Inc. and related entities. The preparation of consolidated financial information is dependent on the timely and accurate completion of financial reporting by these subsidiaries. Delays or deficiencies in subsidiary financial reporting could impact the Company’s ability to meet its reporting obligations.
Current wording
The Company operates through its subsidiaries, including PMTCM and related entities. The preparation of consolidated financial information is dependent on the timely and accurate completion of financial reporting by these subsidiaries. Delays or deficiencies in subsidiary financial reporting could impact the Company’s ability to meet its reporting obligations.
Previous wording
We may be subject to claims that former employees, collaborators or other third parties have an interest in our patents or other intellectual property, such as an inventor or co-inventor or an author. For example, we may have inventorship or ownership disputes arise from conflicting obligations of consultants or others who are involved in developing our products. Litigation may be necessary to defend against these and other claims challenging inventorship or our ownership of our patents or other intellectual property. If we fail in defending any such claims, in addition to paying monetary damages, we may lose valuable intellectual property rights, such as exclusive ownership of, or the right to use, valuable intellectual property. Such an outcome could have a material adverse effect on our business. Even if we are successful in defending against such claims, litigation could result in substantial costs and be a distraction to management and other employees.
Current wording
We may be subject to claims that former employees, collaborators or other third parties have an interest in our patents or other intellectual property, such as an inventor or co-inventor or an author. For example, we may have inventorship or ownership disputes arise from conflicting obligations of consultants or others who are involved in developing our products. Litigation may be necessary to defend against these and other claims challenging inventorship or our ownership of our patents or other intellectual property. If we fail in defending any such claims, in addition to paying monetary damages, we may lose valuable intellectual property rights, such as exclusive ownership of, or the right to use, valuable intellectual property. Such an outcome could have a material adverse effect on our business. Even if we are
Previous wording
For the period ended December 31, 2024, we had a net loss of approximately $5.4 million and no revenues. As of December 31, 2024, we had an accumulated deficit of approximately $5.2 million. We expect to incur losses for at least the next year, as we continue to incur expenses related to the Euclid Magnet Facility and the HLREE. We may not be able to generate sufficient revenues to cover our expenses and achieve profitability or be able to maintain profitability.
Current wording
For the six months ended June 30, 2026, we had a net loss of approximately $143.5 million and net revenues of approximately $1.5 million. As of June 30, 2026, we had an accumulated deficit of approximately $224.7 million. We expect to continue to incur losses for the foreseeable future, as we continue to incur expenses related to the Euclid Magnet Facility, the SRC processing and metallization arrangements, and the HLREE. We may not be able to generate sufficient revenues to cover our expenses and achieve profitability or be able to maintain profitability.
Previous wording
Since its inception, REalloys has generated negative operating cash flows and may experience negative cash flow from operations in the future. Our consolidated financial statements have been prepared on a going-concerned basis, which contemplates the realization of assets and the discharge of liabilities in the normal course of business. Our independent registered public accounting firm has included in its report for the period ended December 31, 2024, an explanatory paragraph expressing substantial doubt about our ability to continue as a going concern. Our ability to continue as a going concern is contingent upon other factors, our ability to achieve our revenue forecasts and our ability to raise additional capital through sales of our securities, including this offering, and incurrence of debt, as needed to fund future growth. Our future operations are dependent upon the identification and successful completion of equity or debt financing and the continued achievement of profitable operations at an indeterminate time in the future. We may not be successful in completing equity or debt financing or in achieving profitability. The financial statements do not give effect to any adjustments relating to the carrying values and classifications of assets and liabilities that would be necessary should we be unable to continue as a going concern.
Current wording
Since its inception, REalloys has generated negative operating cash flows and may experience negative cash flow from operations in the future. Our consolidated financial statements have been prepared on a going-concern basis, which contemplates the realization of assets and the discharge of liabilities in the normal course of business. In connection with the preparation of these consolidated financial statements, management concluded that substantial doubt about the Company’s ability to continue as a going concern does not exist based on the Company’s current liquidity position, including the successful completion of approximately $142 million in net equity proceeds during the six months ended June 30, 2026. See Note 3 – Going Concern. Our future operations are dependent upon the identification and successful completion of equity or debt financing and the continued achievement of profitable operations at an indeterminate time in the future. We may not be successful in completing equity or debt financing or in achieving profitability.
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
Directors, alter the composition or authority of its standing committees, or otherwise reduce the protections currently available to our other stockholders.
Previous report — wording carried elsewhere
Our future effective income tax rates may be favorably or unfavorably affected by unanticipated changes in the valuation of our deferred tax assets and liabilities or by changes in tax laws or their interpretation. Any proposed changes to
Previous report — wording carried elsewhere
—could lead to underutilization of our processing and metallization assets, increased unit costs, and delays in meeting customer demand, which could materially and adversely affect our business, financial condition and results of operations.