Company Overview

i-80 Gold Corp. (the "Company" or "i-80 Gold") is a Nevada-focused growth-oriented gold and silver mining company engaged in the exploration and extraction of gold and silver. The Company is one of the largest mineral resource holders in the state with a pipeline of three underground and two open pit projects strategically located in some of Nevada's most prolific gold-producing trends. These wholly owned assets, which are largely brownfield project at various stages of permitting, construction, technical studies, development, and operation, are situated across four properties which include the Granite Creek property, the Ruby Hill property, the Lone Tree property, which hosts an autoclave and carbon-in-leach processing plant in the process of being refurbished (the "Lone Tree Plant"), and the Cove property.

The Company was incorporated on November 10, 2020, under the laws of the province of British Columbia, Canada. The Company’s common shares are listed on the NYSE under the trading symbol IAUX and on the Toronto Stock Exchange under the trading symbol IAU. The Company’s head office is located in Reno, Nevada, United States ("US") and its executive office is located in Toronto, Ontario, Canada.

Reference to $ or USD is to US dollars, reference to C$ or CAD is to Canadian dollars.

Operational and Financial Highlights

Three months endedJune 30, · Six months endedJune 30,
2026 · 2025 · 2026 · 2025
Revenues$000s24,34827,83676,73841,884
Gross profit$000s8,61879824,6973,704
Pre-development, evaluation and exploration expenses$000s29,2649,04554,96218,590
Net loss$000s(52,527)(30,215)(131,128)(71,420)
Net loss per share$/share(0.06)(0.05)(0.15)(0.14)
Adjusted net loss1$000s(41,164)(26,509)(69,889)(50,105)
Adjusted net loss per share1$/share(0.05)(0.04)(0.08)(0.10)
Cash used in operating activities$000s(49,584)(11,335)(94,664)(34,036)
Cash and cash equivalents$000s464,555133,691464,555133,691
Gold producedoz11,0984,17821,96414,326
Gold ounces sold2oz5,3358,40015,92313,352
Average realized gold price1$/oz4,5223,3014,8013,124

Three months ended June 30, 2026

Revenues were $24.3 million, representing 5,335 ounces in gold sold 2 at an average realized gold price 1 of $4,522 per ounce, compared to $27.8 million represented by 8,400 ounces at an average realized gold price 1 of $3,301 per ounce in the prior year period. The decrease in revenues was primarily driven by lower gold sold at Granite Creek as a result of delays at the third-party processing facility, partially offset by a higher average realized gold price 2. Revenues in the prior year quarter were higher due to the finalization of the third-party toll processing agreement in March 2025 and the processing of a higher volume of stockpile material.

Gold production increased to 11,098 ounces compared with 4,178 ounces in the prior year period.

Gross profit increased to $8.6 million from $0.8 million in the prior year period due to a higher realized gold price.

Net loss increased to $52.5 million compared to $30.2 million in the prior year period, due primarily to higher pre-development, evaluation and exploration costs incurred as the Company advances multiple projects within its development plan. The higher costs were related to drilling programs at the Ruby Hill property. Upon declaration of mineral reserves, certain pre-development, evaluation and exploration expenditures that are currently expensed will be capitalized.

Net loss per share increased to $0.06 compared to a $0.05 loss in the prior year period, primarily due to a higher net loss, partially offset by an increase in the weighted average number of common shares outstanding following the equity financing in May 2025.

2 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 56% in 2026 (2025 - 59%).

Adjusted net loss 1 increased to $41.2 million compared to $26.5 million in the prior year period due to increased spending on pre-development, evaluation and exploration expenses, partially offset by higher gross profit.

Cash used in operating activities increased to $49.6 million compared to $11.3 million in the prior year period as a result of comparative working capital changes of $20.9 million primarily as a result of increased inventory due to third-party processing availability and higher pre-development, evaluation and exploration expenses which was partially offset by higher gross profit.

Cash and cash equivalents were $464.6 million as of June 30, 2026, a decrease of $49.0 million compared to March 31, 2026, primarily due to cash used in operations of $49.6 million, capital expenditures of $21.5 million primarily driven by the start of the Lone Tree Plant refurbishment project partially offset by a release of restricted cash of $16.9 million and proceeds from warrant exercises.

At the Lone Tree Plant refurbishment, early works and pre-construction readiness activities progressed and continue to advance on schedule. Demolition commenced mid-June, ahead of major construction, which is expected to commence in the fourth quarter of 2026. As at June 30, 2026, capital commitments for refurbishment construction represented approximately 30% of total project capital.

Six months ended June 30, 2026

Revenues increased to $76.7 million from $41.9 million in the prior year which represented 15,923 ounces 2 at an average realized gold price 1 of $4,801 per ounce, compared to gold sales of 13,352 ounces 2 at an average realized gold price 1 of $3,124 per ounce in the prior year as mining activity at Granite Creek increased.

Gold production increased to 21,964 ounces compared with 14,326 ounces in the prior year period. The Company remains on track to achieve it full year production guidance range.

Gross profit improved to $24.7 million from a gross profit of $3.7 million in the prior year due to increased gold sales and gold price.

Net loss was $131.1 million compared to $71.4 million in the prior year period, due to higher non-cash fair value revaluation net losses on derivative financial instruments of $39.5 million, as a result of changes in metal prices and discount rates, higher pre-development, evaluation and exploration expenses as the Company advances multiple projects within its development plan that were partially offset by higher gross profit.

Net loss per share of $0.15 increased from $0.14 in the comparative prior year due to a higher net loss, partially offset by an increase in the weighted average number of common shares outstanding following the equity financing in May 2025.

Adjusted net loss 1 increased to $69.9 million from $50.1 million in the prior year period due to higher pre-development, evaluation and exploration expense, partially offset by higher gross profit.

Cash used in operating activities was $94.7 million, higher than the $34.0 million in the prior year period primarily due to comparative working capital changes as a result of interest paid on the repayment of legacy debt. Higher pre-development costs were partially offset by higher gross profit and finance fee expense paid related to the refinancing in the first quarter.

Cash and cash equivalents of $464.6 million as at June 30, 2026, increased by $401.3 million during the year. The increase was primarily due to the financing transactions discussed below partially offset by capital expenditures and higher comparative working capital changes.

The Company completed several financing transactions for a total amount of $787.5 million. Gross proceeds of $662.5 million and net proceeds of $637.2 million were received on closing, which completed the recapitalization plan ahead of the Company's mid-2026 target to support the development plan:

March 16, 2026: Completed a net smelter return royalty for $250 million (the "NSR Royalty") with Franco-Nevada U.S. Corporation ("Franco-Nevada") of which $225 million was received on closing, an additional $25.0 million is expected to be made available to advance Mineral Point, contingent upon satisfaction of specified project conditions.

March 16, 2026: Entered into a gold prepayment facility with National Bank of Canada (“NBC”) and Macquarie Bank Limited (“Macquarie”) for up to $250 million including a $100 million accordion option, subject to customary conditions and lender approval (the "2026 Gold Prepay").

March 23, 2026: Completed an offering of 3.75% unsecured convertible senior notes due 2031 in the aggregate amount of $287.5 million ("2026 Convertible Debentures").

Proceeds from the NSR Royalty were used to redeem the 2023 Convertible Debentures, Orion Gold Prepay, and the Orion convertible loan in the amount of $165.0 million.

Completed approximately 26,000 meters of drilling across the portfolio, including mineral resource definition drilling at Granite Creek underground project to support a feasibility study, technical drilling at Mineral Point open pit, infill drilling at Archimedes underground to enhance resource definition ahead of mining, and resource definition and geotechnical drilling at Cove underground to support a planned feasibility study.

Approved the construction decision to proceed with the Lone Tree Plant refurbishment during the first quarter of 2026.

Appointed four new directors who bring highly relevant experience and proven track records in mining operations, mineral processing, finance, capital markets and sustainability.

2 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 56% in 2026 (2025 - 59%).

Development Highlights

Granite Creek underground development continued ahead of plan increasing access to high-grade headings supporting the ongoing ramp up. The project remains on track to achieve its full-year production guidance, with a published feasibility study anticipated in the third quarter of 2026.

Archimedes underground advanced on schedule largely on budget with the main decline development on track, advancement of the exploration drift, which has since been completed, and commencement of the ventilation raise in preparation for first gold by year-end.

Lone Tree Plant refurbishment advanced on schedule and on budget as early works and pre-construction readiness activities continued during the quarter, and commencement of demolition mid-June ahead of major construction. Procurement activities remain on schedule with approximately 50% of procurement packages, by value awarded as of mid-July. Project capital remains on budget with minimal contingency drawdown and approximately 40% of capital committed as of mid-July.

Completed approximately 19,000 meters of drilling, across three projects, including infill drilling at Archimedes underground and Mineral Point open pit in support of planned 2027 technical studies for both projects, as well as resource definition drilling at Granite Creek underground beyond the area covered by the upcoming feasibility study.

Permitting largely on track across the development plan as permitting actions continued to advance across the portfolio.

Sustainability Highlights

Advanced community engagement across Northern Nevada by progressing community development, workforce development, and grant funding initiatives, including a joint $0.3 million donation with Franco-Nevada Corporation to support development of the first licensed childcare facility in Eureka County, neighboring the Company's Ruby Hill property

Strengthened Board with the appointment of Stephen Gottesfeld at the annual general meeting, bringing nearly 30 years of global mining experience in environmental, sustainability, legal and governance matters across the mine lifecycle.

Strategy Overview

i-80 Gold is executing a multi-phase development plan aimed at creating a mid-tier gold producer in Nevada. The near-term focus is on developing two high-grade underground refractory gold projects (Granite Creek and Archimedes), and the refurbishment and commissioning of the Lone Tree Plant, which is expected to serve as a central processing hub for material from all three planned underground projects. Development of the Company’s third underground mine (Cove) as well as its two large, open pit oxide projects (Granite Creek and Mineral Point) are expected to follow to support a long-term target of approximately 600,0001 ounces of annual gold output. All of the Company's properties are currently considered to be in the exploration stage as mineral reserves have yet to be defined.

In support of the multi-phase development plan, the Company released Preliminary Economic Assessments prepared in accordance with NI 43-101 and a corresponding Initial Assessment prepared under S-K 1300, each published in the first quarter of 2025 (the "PEA"), covering all five gold projects. These PEAs outlined a clear and achievable path to gold output and cash flow growth. Permitting, technical studies, development work and ramp up are actively being advanced across the portfolio of five gold projects, in support of upcoming planned feasibility studies.

Near-term growth of Phase 1 of the Company's development plan includes the current ramp up at i-80 Gold’s first underground mine, Granite Creek, as well as commencing extraction at Archimedes, the second planned underground mine. A key milestone in Phase 1 is the refurbishment and commissioning of the Lone Tree Plant to unlock the full value of the Company’s underground mines. Once commissioned, the Lone Tree Plant is expected to enable processing of underground mineralized material to owner-operated processing in early 2028 and transition from the current toll milling arrangement. Average annual gold output is expected to increase to a range of between 150,000 to 200,000 ounces of gold in Phase 1 beginning in 20281.

The Company is also focused on the future development of three additional projects: Cove, the third planned underground mine, Granite Creek open pit, and the Company's largest project Mineral Point open pit. With several feasibility and pre-feasibility studies currently in progress, the Company continues to identify opportunities to optimize the development schedule for these projects.

1 Consolidated gold output estimates and average annual gold output targets are based on the most recent LOM output schedules disclosed in the latest technical studies filed for each respective project and related property: Granite Creek underground project, Archimedes underground project, Cove underground project, Granite Creek open pit project, and Mineral Point open pit project. These anticipated output figures are preliminary in nature and are based on mineral resources, which do not have demonstrated economic viability, and are not mineral reserves. In addition, each of the foregoing technical reports are preliminary economic assessments/initial assessments that are preliminary in nature and each include an economic analysis that is based, in part, on inferred mineral resources. Inferred mineral resources are considered too speculative geologically to have for the application of economic considerations applied to them that would enable them to be categorized as mineral reserves. As such, there is no certainty that the output targets will be realized. The anticipated output targets are also pending the refurbishment and commissioning of the Lone Tree Plant. The output targets presented herein are Company goals and not a projection of results and should not be taken as output guidance. All of the Company’s projects are considered exploration stage projects under S-K 1300 because the Company has not determined mineral reserves at any of its properties pursuant to S-K 1300. With respect to Granite Creek underground and Archimedes underground, located on the Ruby Hill property, the Company has started extraction activities without determining mineral reserves. The following technical reports for each project and related property have been prepared in accordance with NI 43-101: Preliminary Economic Assessment Technical Report for the Cove Project, Lander County, Nevada (March 31, 2025); Preliminary Economic Assessment Technical Report for the Granite Creek Mine Project, Humboldt County, Nevada, USA (March 31, 2025); and Preliminary Economic Assessment NI 43-101 Technical Report for the Ruby Hill Project, Eureka Country, Nevada, USA (March 31, 2025). Corresponding technical reports prepared in accordance with S-K 1300 are as follows: Initial Assessment & Technical Report Summary for the Cove Project, Lander County, Nevada (March 26, 2025); Initial Assessment of the Granite Creek Mine, Humboldt County, NV (March 26, 2025); and Initial Assessment of the Ruby Hill Project, Eureka County NV (March 29, 2025).

Mineral Point open pit project is expected to become the Company's largest producing asset and based on the PEA released in the first quarter of 2025, it is projected to have a life-of-mine production of approximately 282,000 gold equivalent ounces. The recently completed recapitalization provides flexibility to accelerate the feasibility study and permitting work for the Mineral Point open pit project, as well as the Company's other development projects.

Recapitalization Plan

i-80 Gold has executed several financing initiatives that have led to the successful completion of its recapitalization plan. During the first quarter of 2026, the Company completed several key transactions including the NSR Royalty with Franco-Nevada for up to $250 million,the 2026 Gold Prepay with National Bank and Macquarie Bank for up to $250 million, and the issuance of the 2026 Convertible Debentures in the aggregate principal amount of $287.5 million. These financings completed the Company's broader recapitalization plan ahead of its mid-2026 target and align with the projected capital requirements and cash flows of the current project development plan. Overall, the recapitalization secured over $1 billion 1 in raised and available capital from early 2025 through the first quarter of 2026, materially strengthening the Company's balance sheet, providing greater funding certainty, and de-risking the development plan.

Outlook

2026 Outlook

The Company’s 2026 production, operating and pre-development evaluation and exploration cost guidance is summarized below:

2026 Guidance
Gold production
Granite Creek undergroundoz30,000 - 40,000
Archimedes underground and residual heap leachoz10,000
Operating costs
Granite Creek underground$M$110 - $120
Archimedes underground$M$25 - $30
Sustaining capital$M$6 - $8
Growth capital
Lone Tree Plant$M$140 - $160
Granite Creek underground - water treatment$M$10 - $15
Pre-development expense
Granite Creek underground - mine development(a)$M$20 - $25
Archimedes underground - mine development$M$30 - $35
Evaluation and exploration expense
Resource expansion and infill drilling:
Granite Creek underground$M$10
Archimedes underground$M$25 - $30
Mineral Point open pit$M$45 - $50
Permitting and technical$M$20 - $30

(a)Granite Creek mine development costs will be capitalized upon declaration of reserves, assuming reserves will be declared in the feasibility study.

The Company remains on track to meet its 2026 guidance as originally published in its 2025 Year End Annual Report on Form 10-K on February 19, 2026 subject to the following:

Growth capital expenditures are expected to be largely in line with the $150 million to $175 million guidance.

Lone Tree plant refurbishment capital expenditures are expected to be lower in 2026 than guided, management was conservative in estimating expenditures for Lone Tree during the recapitalization planning process earlier in year to ensure that the Company raised sufficient capital.

Archimedes expenditures are expected to be higher reflecting a change in strategy for long-term surface infrastructure. Based on positive drill results, management is pivoting from refurbishment of certain existing facilities on site to construction of a new worker change facility and additional offices that are expected to improve operating effectiveness both for Archimedes and Mineral Point.

Exploration expenses are expected to be approximately $10 million lower in 2026 due to the personnel shortages at the Archimedes project and drill rig availability as well as contractor personnel shortages at Mineral Point project.

This outlook, including expected results and targets, is subject to various risks, uncertainties and assumptions, which may impact future performance and the Company’s ability to achieve the results and targets discussed in this section. Please refer to "Forward-Looking Information" section. The Company may, but is under no obligation to, update this outlook depending on changes in metal prices and other factors.

Financing Overview

Three months ended June 30, 2026

Termination of Offtake Agreement

On June 26, 2026, the Company entered into a termination and settlement agreement with Vox Royalty Corp. to terminate its gold offtake agreement, eliminating the fixed obligation to deliver up to 40,000 ounces of refined gold per year from the Granite Creek and Ruby Hill properties through December 31, 2028, and subject to pricing based upon a lookback period. The Company issued 3,453,237 common shares valued at $4.8 million in consideration. The termination provides the Company with greater flexibility to manage future gold sales and to evaluate stockpiling opportunities in anticipation of the planned commissioning of the Lone Tree Plant within Phase 1 of its current development plan.

Six months ended June 30, 2026

In support of the recapitalization strategy, the Company completed the following financing transactions :

On March 16, 2026, the Company announced that it had completed the closing of the $250 million NSR Royalty financing in exchange for a 1.5% life of mine ("LOM") net smelter return royalty with Franco-Nevada, stepping up to a 3.0% LOM net smelter return royalty on January 1, 2031. The NSR Royalty applies to production from all mineral properties in the portfolio, including Granite Creek, Cove, the Ruby Hill Complex and Lone Tree.

Upon closing of NSR Royalty, $225 million was made available to the Company, of which $25 million is required to be allocated to the advancement of technical and permitting work for Mineral Point in 2026. An additional $25 million of the NSR Royalty is also expected to be made available in 2026 to further advance Mineral Point, following the expenditure of the initial disbursement toward the project. In total, the NSR Royalty allows the Company to allocate $50 million to advance exploration, technical work and early stage pre-permitting activities at Mineral Point in 2026.

Gold Prepay

On March 16, 2026, the Company closed a Gold Prepay facility with National Bank and Macquarie, for an initial advance of $150 million at closing, with a $100 million accordion feature. Upon closing, the Company has the obligation to deliver 39,978 ounces of gold over a 30-month period beginning in January 2028. The accordion feature provides access to an additional $100 million for a 24-month period upon closing of the facility, subject to customary conditions and lender approval. The Company anticipates executing the accordion feature in the first half of 2027, at which point the number of additional gold ounces to be delivered will be determined. The Company expects the total ounces to be delivered for the $250 million facility to represent approximately 15% of total gold output over the projected period of January 2028 to June 2030.

On March 23, 2026, The Company closed the 2026 Convertible Debentures for an aggregate principal amount of $287.5 million, which includes the upsized offering of $250 million and the exercises in full of $37.5 million option granted to the initial purchasers of the convertible debentures. The initial conversion rate of the 2026 Convertible Debentures is 519.4805 common share of the Company per $1,000 principal amount, equivalent to an initial conversion price of approximately $1.93 per share.

Debt repayments

With the proceeds received from the NSR Royalty, the Company redeemed all of its legacy debt obligations except for the silver purchase and sale agreement with Orion (the "Silver Purchase Agreement") during the first quarter of 2026. The 2023 Convertible Debentures were redeemed for total cash consideration of $72.9 million, with accrued interest and the 4% mandatory redemption premium settled through the issuance of 8.1 million common shares and a cash payment of $5.3 million. The Orion Convertible Loan was repaid for total consideration of $75.0 million, comprised of a cash payment of $69.7 million and the issuance of 3.0 million common shares with a fair value of $5.3 million. The remaining outstanding deliveries of 4,440 ounces of gold from the Orion Gold Prepay were redeemed with a cash payment of $22.4 million.