i-80 Gold Corp.
For the period ended Jun 30, 2026. Filed Aug 10, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2026 · Filed Aug 10, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2026-03-31; filed 2026-05-12.
0001628280-26-034207
OverviewDiscussion of Operational ResultsDiscussion of Financial ResultsLiquidity and Capital ResourcesNon-GAAP Financial Performance MeasuresCurrent report: 10-Q
Period ended 2026-06-30; filed 2026-08-10.
0001628280-26-055367
OverviewDiscussion of Operational ResultsDiscussion of Financial ResultsLiquidity and Capital ResourcesNon-GAAP and Supplementary Financial Performance MeasuresThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 192 previous paragraphs and 229 current paragraphs.
87 unchanged; 55 reworded; 83 added; 47 removed; 3 previous and 4 current paragraphs rearranged.
Tables are not compared: 18 previous and 22 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (83)
Current report
•Gold production increased to 11,098 ounces compared with 4,178 ounces in the prior year period.
Current report
•Net loss per share increased to $0.06 compared to a $0.05 loss in the prior year period, primarily due to a higher net loss, partially offset by an increase in the weighted average number of common shares outstanding following the equity financing in May 2025.
Current report
2 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 56% in 2026 (2025 - 59%).
Current report
•Cash used in operating activities increased to $49.6 million compared to $11.3 million in the prior year period as a result of comparative working capital changes of $20.9 million primarily as a result of increased inventory due to third-party processing availability and higher pre-development, evaluation and exploration expenses which was partially offset by higher gross profit.
Current report
•Cash and cash equivalents were $464.6 million as of June 30, 2026, a decrease of $49.0 million compared to March 31, 2026, primarily due to cash used in operations of $49.6 million, capital expenditures of $21.5 million primarily driven by the start of the Lone Tree Plant refurbishment project partially offset by a release of restricted cash of $16.9 million and proceeds from warrant exercises.
Current report
•At the Lone Tree Plant refurbishment, early works and pre-construction readiness activities progressed and continue to advance on schedule. Demolition commenced mid-June, ahead of major construction, which is expected to commence in the fourth quarter of 2026. As at June 30, 2026, capital commitments for refurbishment construction represented approximately 30% of total project capital.
Current report
•Revenues increased to $76.7 million from $41.9 million in the prior year which represented 15,923 ounces 2 at an average realized gold price 1 of $4,801 per ounce, compared to gold sales of 13,352 ounces 2 at an average realized gold price 1 of $3,124 per ounce in the prior year as mining activity at Granite Creek increased.
Current report
•Gold production increased to 21,964 ounces compared with 14,326 ounces in the prior year period. The Company remains on track to achieve it full year production guidance range.
Current report
•Gross profit improved to $24.7 million from a gross profit of $3.7 million in the prior year due to increased gold sales and gold price.
Current report
•Net loss per share of $0.15 increased from $0.14 in the comparative prior year due to a higher net loss, partially offset by an increase in the weighted average number of common shares outstanding following the equity financing in May 2025.
Current report
•Adjusted net loss 1 increased to $69.9 million from $50.1 million in the prior year period due to higher pre-development, evaluation and exploration expense, partially offset by higher gross profit.
Current report
•Cash used in operating activities was $94.7 million, higher than the $34.0 million in the prior year period primarily due to comparative working capital changes as a result of interest paid on the repayment of legacy debt. Higher pre-development costs were partially offset by higher gross profit and finance fee expense paid related to the refinancing in the first quarter.
Current report
•Cash and cash equivalents of $464.6 million as at June 30, 2026, increased by $401.3 million during the year. The increase was primarily due to the financing transactions discussed below partially offset by capital expenditures and higher comparative working capital changes.
Current report
2 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 56% in 2026 (2025 - 59%).
Current report
•Granite Creek underground development continued ahead of plan increasing access to high-grade headings supporting the ongoing ramp up. The project remains on track to achieve its full-year production guidance, with a published feasibility study anticipated in the third quarter of 2026.
Current report
•Archimedes underground advanced on schedule largely on budget with the main decline development on track, advancement of the exploration drift, which has since been completed, and commencement of the ventilation raise in preparation for first gold by year-end.
Current report
•Lone Tree Plant refurbishment advanced on schedule and on budget as early works and pre-construction readiness activities continued during the quarter, and commencement of demolition mid-June ahead of major construction. Procurement activities remain on schedule with approximately 50% of procurement packages, by value awarded as of mid-July. Project capital remains on budget with minimal contingency drawdown and approximately 40% of capital committed as of mid-July.
Current report
•Completed approximately 19,000 meters of drilling, across three projects, including infill drilling at Archimedes underground and Mineral Point open pit in support of planned 2027 technical studies for both projects, as well as resource definition drilling at Granite Creek underground beyond the area covered by the upcoming feasibility study.
Current report
•Permitting largely on track across the development plan as permitting actions continued to advance across the portfolio.
Current report
•Advanced community engagement across Northern Nevada by progressing community development, workforce development, and grant funding initiatives, including a joint $0.3 million donation with Franco-Nevada Corporation to support development of the first licensed childcare facility in Eureka County, neighboring the Company's Ruby Hill property
Current report
•Strengthened Board with the appointment of Stephen Gottesfeld at the annual general meeting, bringing nearly 30 years of global mining experience in environmental, sustainability, legal and governance matters across the mine lifecycle.
Current report
The Company is also focused on the future development of three additional projects: Cove, the third planned underground mine, Granite Creek open pit, and the Company's largest project Mineral Point open pit. With several feasibility and pre-feasibility studies currently in progress, the Company continues to identify opportunities to optimize the development schedule for these projects.
Current report
Mineral Point open pit project is expected to become the Company's largest producing asset and based on the PEA released in the first quarter of 2025, it is projected to have a life-of-mine production of approximately 282,000 gold equivalent ounces. The recently completed recapitalization provides flexibility to accelerate the feasibility study and permitting work for the Mineral Point open pit project, as well as the Company's other development projects.
Current report
•Growth capital expenditures are expected to be largely in line with the $150 million to $175 million guidance.
Current report
•Lone Tree plant refurbishment capital expenditures are expected to be lower in 2026 than guided, management was conservative in estimating expenditures for Lone Tree during the recapitalization planning process earlier in year to ensure that the Company raised sufficient capital.
Current report
•Archimedes expenditures are expected to be higher reflecting a change in strategy for long-term surface infrastructure. Based on positive drill results, management is pivoting from refurbishment of certain existing facilities on site to construction of a new worker change facility and additional offices that are expected to improve operating effectiveness both for Archimedes and Mineral Point.
Current report
•Exploration expenses are expected to be approximately $10 million lower in 2026 due to the personnel shortages at the Archimedes project and drill rig availability as well as contractor personnel shortages at Mineral Point project.
Current report
On June 26, 2026, the Company entered into a termination and settlement agreement with Vox Royalty Corp. to terminate its gold offtake agreement, eliminating the fixed obligation to deliver up to 40,000 ounces of refined gold per year from the Granite Creek and Ruby Hill properties through December 31, 2028, and subject to pricing based upon a lookback period. The Company issued 3,453,237 common shares valued at $4.8 million in consideration. The termination provides the Company with greater flexibility to manage future gold sales and to evaluate stockpiling opportunities in anticipation of the planned commissioning of the Lone Tree Plant within Phase 1 of its current development plan.
Current report
2 Operating costs excluding depletion, depreciation, amortization, and royalties. Royalties exclude NSR royalty payments.
Current report
Mining activities at Granite Creek for the three months ended June 30, 2026 were impacted by ground conditions in two of the mine highest-grade headings, which temporarily restricted access to high-grade mineralized material and deferred a portion of planned high-grade tonnes during the quarter. Remediation of the affected headings was completed and access was re-established late in the quarter, allowing these areas to contribute to production beginning in the third quarter.
Current report
Throughout the quarter, advancement of the main decline as well as horizontal development continued to progress ahead of the mine plan, with year-to-date development footage exceeding plan. As a result, the number of available high grade mineralized material headings has increased significantly throughout the quarter. The Company remains on track to meet its full-year production guidance.
Current report
At June 30, 2026, the Company had in-process material containing over 5,300 recoverable ounces at its third-party processing facility. The Company expects the material to be processed during the third quarter of 2026. Approximately 1,800 ounces of gold was also held in inventory at June 30, 2026. Gold ounces sold were lower than the prior year periods due to availability at the third-party processing facility.
Current report
Processing cost per unit has increased compared to the prior year periods due to a higher proportion of sulfide material being processed at the third-party processing facility.
Current report
During the three months ended and six months ended June 30, 2026, growth capital expenditures were primarily related to the water treatment plant project. Sustaining capital expenditures were related primarily to the electrical substation replacement.
Current report
1 Royalties excludes Net Smelter Return royalty repayments
Showing the first 40 of 83 passages. Open the source sections for the rest.
Removed paragraphs (47)
Previous report
•Loss per share of $0.09 decreased from $0.10 loss per share in the prior year period primarily due to an increase in the number of outstanding common shares following the equity raise in May 2025.
Previous report
1 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 57% in 2026 (2025 - 59%).
Previous report
•Cash used in operating activities increased to $45.1 million compared to $22.7 million in the prior year period as a result of interest payments made on the extinguishment of legacy debt of $25.7 million.
Previous report
•Cash and cash equivalents were $513.5 million as of March 31, 2026, an increase of $450.3 million compared to December 31, 2025, primarily due to the net proceeds received from the financing transactions to complete the Company's recapitalization plan, offset by higher capital expenditures compared to the prior year period driven by the commencement of the Lone Tree Plant refurbishment project, as well as the settlement of legacy debt obligations.
Previous report
•Three-phase development plan remains on track with 2026 development priorities, as well as full year production, operating and pre-development evaluation, and exploration cost guidance for 2026.
Previous report
Phase 2 of the development plan focuses on bringing two additional projects into operation: Cove, the third planned underground mine, and Granite Creek open pit. With four producing assets, average annual gold output is expected to increase to a range of between 300,000 to 400,000 ounces of gold in the early 2030s 1, representing a significant step in i-80 Gold’s transition to a mid-tier producer.
Previous report
Phase 3 is anchored by the Mineral Point open pit project, which is expected to become the Company’s largest producing asset and projected to help the Company achieve its target of an average annual gold output beyond 600,000 ounces in the early 2030s 1. The recent financing transactions provides flexibility to accelerate the feasibility study and permitting work for the Mineral Point open pit project. With several feasibility and pre-feasibility studies currently in progress, the Company continues to identify opportunities to optimize the development schedule for Phase 1 and Phase 3.
Previous report
With the recapitalization complete, the Company believes it is now fully funded to advance Phase 1 and Phase 2 of the development plan 1. Phase 1 and Phase 2 currently include advancing three underground projects (Granite Creek, Archimedes and Cove) and one open pit oxide project (Granite Creek open pit), as well as the refurbishment and commissioning of the Company’s centralized Lone Tree Plant. Phase 1 and Phase 2 projects are expected to generate sufficient operating cash flow to fund Phase 32 which currently includes the development of the Mineral Point open pit oxide project. The Company now has the financial flexibility to bring forward infill drilling, engineering, and technical studies in support of the pre-feasibility study and future permitting actions for Mineral Point ahead of Phase 3. With several feasibility and pre-feasibility studies currently in progress, the Company continues to identify opportunities to optimize the development schedule for Phase 2 and Phase 3.
Previous report
Following the successful completion of the recapitalization plan, the Company has discontinued the sale process for its non-core FAD property.
Previous report
1 The Company has secured over $1.0 billion in capital since the beginning of 2025 through a combination of financings. This includes (i) approximately $184 million in gross proceeds raised in May 2025 through a public offering and a concurrent private placement, with up to an additional $130 million assuming full exercise of the related in-the-money warrants over the next 18 months, (ii) a $250 million royalty financing with Franco-Nevada (of which $225 million was funded at closing on March 16, 2026 with approximately $165 million used to pay legacy debt obligations, and $25 million remains subject to drawdown conditions), (iii) convertible senior notes issued on March 23, 2026 for an aggregate principal amount of $287.5 million, and (iv) $150 million under the Gold Prepay Facility with National Bank of Canada and Macquarie Bank with an additional $100 million available under an accordion feature, subject to drawdown conditions.
Previous report
2 Based on capital costs, gold output estimates and average annual gold output targets in the most recent life of mine gold output schedules disclosed in the latest technical studies filed for each respective project and related property: the Lone Tree Facility, Granite Creek underground, Archimedes underground, Cove underground and Granite Creek open pit when using a gold price assumption of $3,600 per ounce for the purposes of anticipated cash flow from operations. While the economics of the latest technical studies were completed using a gold price assumption of $2,175 per ounce with gold price sensitivities of up to $3,000 per ounce, a gold price assumption of $3,600 per ounce is in line with current long term consensus prices.
Previous report
1 Low-grade mineralized material extracted as part of the mining process that is below cut-off grade but incrementally economic.
Previous report
2 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 57% in 2026 (2025 - 59%).
Previous report
3 Total mineralized material mined consists of sulfide, oxide, and low-grade mineralized material.
Previous report
Mining activities at Granite Creek for the three months ended March 31, 2026 were impacted by a main surface electrical substation transformer fire that occurred in January 2026, resulting in a loss of power to the underground operations. Temporary diesel generators were installed shortly after the incident to allow for mining operations to resume with minimal impact to the mine plan, and permanent replacement infrastructure was installed in mid-March.
Previous report
Throughout the quarter, waste development in the main decline and access ramps continued to progress according to the mine plan, despite limited access in January and early February due to the loss of power incident. For the remainder of the quarter, decline advance rates exceeded plan, and from the second quarter onwards, the development rate is expected to be sufficiently ahead of the mine workings to allow for the efficient extraction of the mineralized material for the foreseeable future.
Previous report
The Company continues to encounter elevated levels of oxide mineralized material compared to levels anticipated in the March 2025 PEA at Granite Creek underground.
Previous report
As at March 31, 2026, the Company had a sulfide stockpile with over 4,000 recoverable ounces of gold due to the availability of third-party processing. The Company expects this stockpile to be processed during the second quarter of 2026.
Previous report
Capital spend at Granite Creek consisted of costs related to the water treatment plant, RIB construction, and the electrical substation replacement.
Previous report
New assay results from 40 holes reported on January 20, 2026, continued to demonstrate robust high-grade mineralization throughout the South Pacific Zone confirming expansion of the mineralized envelope and potential for mineral resource expansion to the north and at depth.
Previous report
During the three months ended March 31, 2026, underground development at the Archimedes project advanced ahead of schedule, with approximately 660 meters completed during the quarter supported by favorable ground conditions. A new dewatering well was completed during the quarter, with pump testing scheduled for the second quarter of 2026. Predictive groundwater modeling and geochemical technical studies are ongoing in support of the Lower Archimedes permitting process. The timeframe for first gold mined is in the second half of 2026.
Previous report
The Company also completed 4,262 meters of infill drilling at the 426 zone of Upper Archimedes, with infill drilling of the Ruby Deeps zone within Lower Archimedes expected to commence in the second quarter of 2026, following the completion of the exploration drift. Together, these programs will form the technical basis for the Archimedes Underground feasibility study, which is targeting late in the first quarter of 2027, pending the potential expansion of the current drill program. New assay results from the first 20 holes from the Upper Archimedes drill program were reported subsequent to the first quarter on April 8, 2026, and continue to demonstrate high-grade mineralization throughout Upper Archimedes, returning high-grade intercepts consistent with the current geological model.
Previous report
Pre-development, evaluation and exploration expenditures were $12.4 million for the three months ended March 31, 2026, primarily due to increased underground development at the Archimedes underground project which began in the third quarter of 2025. During the first quarter of 2026, the higher expenditure is driven by a decline advance rate that exceeded expectations, resulting in accelerated development activity and the construction of surface infrastructure.
Previous report
At Mineral Point open pit, two surface core drill rigs completed 750 meters of surface core drilling during the first quarter of 2026. This drill program was designed to support a pre-feasibility trade-off study covering hydrogeology, metallurgy, and an optimized mine plan. Mineral Point currently hosts the Company’s largest gold and silver mineral resources. The $250 million NSR Royalty completed in the first quarter of 2026 includes $50 million allocated to advancing infill drilling, engineering, and early-stage pre-permitting at Mineral Point in 2026 in support of a pre-feasibility study anticipated for completion in 2027.
Previous report
NEPA permitting activities are underway with the BLM at Cove in anticipation of an EIS. i-80 Gold is actively advancing major permit applications with the goal of aligning regulatory approvals with planned development timelines.
Previous report
During the three months ended March 31, 2026, the Company continued to advance the feasibility study for the Cove Underground project, which is expected to be completed in the second quarter of 2026. Further, the Company also submitted updated hydrological and geochemical baseline reports to the BLM. During the second quarter, the Company submitted the updated biological baseline studies report, as well as the Plan of Operations amendment to the BLM.
Previous report
During the fourth quarter of 2025, an engineering study was completed for the Lone Tree Plant refurbishment, which updated an internal feasibility study completed in 2023 to incorporate design optimizations, value engineering initiatives, a filtered tailings system, and updated cost estimates to support an improved execution strategy. A positive construction decision was made in the first quarter of 2026 alongside the successful completion of the Company's recapitalization. Plant commissioning is anticipated at the end of 2027.
Previous report
During the first quarter, the Company provided Hatch with a formal Notice to Proceed ("NTP") for the Lone Tree refurbishment project. In preparation, procurement for long lead equipment and detailed engineering activities commenced in 2025 to optimize the schedule. At present, the project is on plan for the first gold pour in December 2027 and costs remain in line with the control estimate issued in November 2025. As of March 31, 2026, total construction commitments were $31.2 million, with approximately 50% of the project’s commitments expected towards the end of the first half of 2026. On-site early works commenced in the second quarter of 2026, which includes the mobilization of the Hatch construction team and the initiation of equipment demolition, building refurbishment and repairs, and installation of lighting and electrical replacement and upgrades.
Previous report
Cost of sales for the three months ended March 31, 2026 was $35.8 million, an increase from $10.8 million in the comparative prior year quarter due to higher gold ounces sold 1 and a higher processing costs, driven by sulfide mineralized material processed under the third-party toll-milling agreement finalized in March 2025, with no processing activity in the comparable prior year period.
Previous report
1 Gold ounces sold include attributable gold from mineralized material sales at a payable factor of 57% in 2026 (2025 - 59%).
Previous report
The loss on convertible loans derivative represents the fair value measurement changes related to the conversion feature.
Previous report
Finance fee expense relates primarily to origination costs for the NSR Royalty as well as other general financing arrangement costs not allocable to the financing transactions that closed during the first quarter of March 31, 2026.
Previous report
Interest expense for the three months ended March 31, 2026 was $6.2 million, a decrease of $2.0 million compared to the prior year quarter. The decreased interest expense was primarily related to Orion Gold Prepay interest as a result of settlements.
Showing the first 40 of 47 passages. Open the source sections for the rest.
Reworded paragraphs (55)
Previous wording
i-80 Gold Corp. (the "Company" or "i-80 Gold") is a Nevada-focused growth-oriented gold and silver mining company engaged in the exploration and extraction of gold and silver. The Company is the fifth largest mineral resource holder in the state with a pipeline of three underground and two open pit projects strategically located in some of Nevada's most prolific gold-producing trends. These wholly owned assets, which are largely brownfield project at various stages of permitting, construction, technical studies, development, and operation, are situated across four properties which include the Granite Creek property, the Ruby Hill property the Lone Tree property, which hosts an autoclave and carbon-in-leach processing plant in the process of being refurbished (the "Lone Tree Plant") and the Cove property,.
Current wording
i-80 Gold Corp. (the "Company" or "i-80 Gold") is a Nevada-focused growth-oriented gold and silver mining company engaged in the exploration and extraction of gold and silver. The Company is one of the largest mineral resource holders in the state with a pipeline of three underground and two open pit projects strategically located in some of Nevada's most prolific gold-producing trends. These wholly owned assets, which are largely brownfield project at various stages of permitting, construction, technical studies, development, and operation, are situated across four properties which include the Granite Creek property, the Ruby Hill property, the Lone Tree property, which hosts an autoclave and carbon-in-leach processing plant in the process of being refurbished (the "Lone Tree Plant"), and the Cove property.
Previous wording
The Company was incorporated on November 10, 2020, under the laws of the province of British Columbia, Canada. The Company’s common shares are listed on the NYSE American under the trading symbol IAUX and on the TSX under the trading symbol IAU. The Company’s head office is located in Reno, Nevada, United States ("US") and its executive office is located in Toronto, Ontario, Canada.
Current wording
The Company was incorporated on November 10, 2020, under the laws of the province of British Columbia, Canada. The Company’s common shares are listed on the NYSE under the trading symbol IAUX and on the Toronto Stock Exchange under the trading symbol IAU. The Company’s head office is located in Reno, Nevada, United States ("US") and its executive office is located in Toronto, Ontario, Canada.
Previous wording
•Revenue increased to $52.4 million, representing 10,590 ounces in gold sold 1 at an average realized gold price 2 of $4,941 per ounce, compared to $14.0 million represented by 4,952 ounces 1 at an average realized gold price 2 of $2,825 per ounce in the prior year period. The increase in revenue was primarily driven by higher gold sales at Granite Creek as a result of the finalization of the third-party toll processing agreement in March 2025 and a higher average realized gold price 2.
Current wording
•Revenues were $24.3 million, representing 5,335 ounces in gold sold 2 at an average realized gold price 1 of $4,522 per ounce, compared to $27.8 million represented by 8,400 ounces at an average realized gold price 1 of $3,301 per ounce in the prior year period. The decrease in revenues was primarily driven by lower gold sold at Granite Creek as a result of delays at the third-party processing facility, partially offset by a higher average realized gold price 2. Revenues in the prior year quarter were higher due to the finalization of the third-party toll processing agreement in March 2025 and the processing of a higher volume of stockpile material.
Previous wording
•Gross profit increased to $16.1 million from $2.9 million in the prior year period due to increases in revenue.
Current wording
•Gross profit increased to $8.6 million from $0.8 million in the prior year period due to a higher realized gold price.
Previous wording
•Adjusted loss increased to $28.6 million compared to $23.6 million in the prior year period due to increased spending on pre-development, evaluation and exploration expenses, partially offset by higher gross profit.
Current wording
•Adjusted net loss 1 increased to $41.2 million compared to $26.5 million in the prior year period due to increased spending on pre-development, evaluation and exploration expenses, partially offset by higher gross profit.
Previous wording
•Net loss increased to $78.6 million compared to $41.2 million in the prior year period, due primarily to higher non-cash fair value revaluations on derivative financial instruments of $48.4 million driven by stronger metal prices. Additional non-cash losses on extinguishment of the gold prepay agreement, convertible loan, and convertible debentures of $7.1 million also contributed to lower net earnings, as well as financing expenses incurred in the amount of $9.9 million. Higher pre-development, evaluation and exploration expenses were incurred as the Company advances multiple projects within its development plan, which were partially offset by higher gross profit. Upon declaration of mineral reserves, certain pre-development, evaluation and exploration expenditures currently expensed, will be capitalized.
Current wording
•Net loss was $131.1 million compared to $71.4 million in the prior year period, due to higher non-cash fair value revaluation net losses on derivative financial instruments of $39.5 million, as a result of changes in metal prices and discount rates, higher pre-development, evaluation and exploration expenses as the Company advances multiple projects within its development plan that were partially offset by higher gross profit.
Previous wording
•The Company completed several financing transactions for total amount of $787.5 million. Gross proceeds of $662.5 million and net proceeds of $637.2 million were received on closing which completed the recapitalization plan ahead of the Company's mid-2026 target and established a fully funded development plan:
Current wording
•The Company completed several financing transactions for a total amount of $787.5 million. Gross proceeds of $662.5 million and net proceeds of $637.2 million were received on closing, which completed the recapitalization plan ahead of the Company's mid-2026 target to support the development plan:
Previous wording
•Completed approximately 7,000 meters of drilling, initiating the largest 12-month drill program in Company history. First quarter activities included infill drilling at Upper Archimedes underground to enhance mineral resource definition ahead of mining, resource definition drilling at Granite Creek underground beyond a planned feasibility study, and infill drilling at Mineral Point open pit to upgrade resource classification for the planned pre-feasibility study.
Current wording
•Completed approximately 26,000 meters of drilling across the portfolio, including mineral resource definition drilling at Granite Creek underground project to support a feasibility study, technical drilling at Mineral Point open pit, infill drilling at Archimedes underground to enhance resource definition ahead of mining, and resource definition and geotechnical drilling at Cove underground to support a planned feasibility study.
Previous wording
•Approved the construction decision to proceed with the Lone Tree Plant refurbishment during the first quarter of 2026 with capital commitments of $31.2 million at March 31, 2026, with approximately 50% of total project capital expected to be committed by mid-2026.
Current wording
• Approved the construction decision to proceed with the Lone Tree Plant refurbishment during the first quarter of 2026.
Previous wording
•Strengthened the Board with the appointment of three new directors who bring highly relevant experience and proven track records in mining operations, mineral processing, finance, and capital markets.
Current wording
•Appointed four new directors who bring highly relevant experience and proven track records in mining operations, mineral processing, finance, capital markets and sustainability.
Previous wording
i-80 Gold is executing a three-phase multi-asset development plan aimed at creating a mid-tier gold producer in Nevada. The near-term focus is on developing two high-grade underground refractory gold projects (Granite Creek and Archimedes), and the refurbishment and commissioning of the Lone Tree Plant, which is expected to serve as a central processing hub for underground refractory material from all three planned underground projects. Development of the Company’s third underground mine (Cove) as well as its two large, open pit oxide projects (Granite Creek and Mineral Point) are expected to follow to support a long-term target of more than 600,0001 ounces of annual gold output. All of the Company's properties are currently considered to be in the exploration stage as mineral reserves have yet to be defined.
Current wording
i-80 Gold is executing a multi-phase development plan aimed at creating a mid-tier gold producer in Nevada. The near-term focus is on developing two high-grade underground refractory gold projects (Granite Creek and Archimedes), and the refurbishment and commissioning of the Lone Tree Plant, which is expected to serve as a central processing hub for material from all three planned underground projects. Development of the Company’s third underground mine (Cove) as well as its two large, open pit oxide projects (Granite Creek and Mineral Point) are expected to follow to support a long-term target of approximately 600,0001 ounces of annual gold output. All of the Company's properties are currently considered to be in the exploration stage as mineral reserves have yet to be defined.
Previous wording
In support of the three-phase development plan, the Company released Preliminary Economic Assessments prepared in accordance with NI 43-101 and a corresponding Initial Assessment prepared under S-K 1300, each published in the first quarter of 2025 (the "PEA"), covering all five gold projects. These PEAs outlined a clear and achievable path to gold output and cash flow growth. Permitting, technical studies, development work and ramp up are actively being advanced across the portfolio of five gold projects, as well as the Lone Tree Plant, in support of upcoming planned feasibility studies.
Current wording
In support of the multi-phase development plan, the Company released Preliminary Economic Assessments prepared in accordance with NI 43-101 and a corresponding Initial Assessment prepared under S-K 1300, each published in the first quarter of 2025 (the "PEA"), covering all five gold projects. These PEAs outlined a clear and achievable path to gold output and cash flow growth. Permitting, technical studies, development work and ramp up are actively being advanced across the portfolio of five gold projects, in support of upcoming planned feasibility studies.
Previous wording
Phase 1 of the development plan includes the current ramp up at i-80 Gold’s first underground mine, Granite Creek, as well as commencing extraction at Archimedes, the second planned underground mine. A key milestone in Phase 1 is the refurbishment and commissioning of the Lone Tree Plant to unlock the full value of the Company’s underground mines. Once commissioned, the Lone Tree Plant is expected to enable processing of underground mineralized material to shift from third-party toll-milling to owner-operated processing in 2028. Average annual gold output is expected to increase to a range of between 150,000 to 200,000 ounces of gold in Phase 1 beginning in 20281.
Current wording
Near-term growth of Phase 1 of the Company's development plan includes the current ramp up at i-80 Gold’s first underground mine, Granite Creek, as well as commencing extraction at Archimedes, the second planned underground mine. A key milestone in Phase 1 is the refurbishment and commissioning of the Lone Tree Plant to unlock the full value of the Company’s underground mines. Once commissioned, the Lone Tree Plant is expected to enable processing of underground mineralized material to owner-operated processing in early 2028 and transition from the current toll milling arrangement. Average annual gold output is expected to increase to a range of between 150,000 to 200,000 ounces of gold in Phase 1 beginning in 20281.
Previous wording
Over the past 12 months, i-80 Gold executed on several financing initiatives that have led to the successful completion of its recapitalization plan. Most recently during the first quarter of 2026, the Company completed several key transactions including the NSR Royalty with Franco-Nevada for up to $250 million,the 2026 Gold Prepay with National Bank and Macquarie Bank for up to $250 million, and the issuance of the 2026 Convertible Debentures in the aggregate principal amount of $287.5 million. These financings completed the Company's broader recapitalization plan ahead of its mid-2026 target and align with the projected capital requirements and cash flows of the project development plan.
Current wording
i-80 Gold has executed several financing initiatives that have led to the successful completion of its recapitalization plan. During the first quarter of 2026, the Company completed several key transactions including the NSR Royalty with Franco-Nevada for up to $250 million,the 2026 Gold Prepay with National Bank and Macquarie Bank for up to $250 million, and the issuance of the 2026 Convertible Debentures in the aggregate principal amount of $287.5 million. These financings completed the Company's broader recapitalization plan ahead of its mid-2026 target and align with the projected capital requirements and cash flows of the current project development plan. Overall, the recapitalization secured over $1 billion 1 in raised and available capital from early 2025 through the first quarter of 2026, materially strengthening the Company's balance sheet, providing greater funding certainty, and de-risking the development plan.
Previous wording
(a)Granite Creek mine development costs will be capitalized upon declaration of reserves, assuming reserves will be declared in the feasibility study, which is expected in the second quarter of 2026.
Current wording
(a)Granite Creek mine development costs will be capitalized upon declaration of reserves, assuming reserves will be declared in the feasibility study.
Previous wording
The Company is on track to meet its 2026 guidance as originally published in its 2025 Year End Annual Report on Form 10K published on February 19, 2026.
Current wording
The Company remains on track to meet its 2026 guidance as originally published in its 2025 Year End Annual Report on Form 10-K on February 19, 2026 subject to the following:
Previous wording
2 This is a Non-GAAP and Supplementary Financial measure; please see “Non-GAAP and Supplementary Financial Performance Measures” section.
Current wording
3 This is a Non-GAAP and Supplementary Financial measure; please see “Non-GAAP and Supplementary Financial Performance Measures” section.
Previous wording
Mineralized material mined at Granite Creek underground is processed as follows: (i) sulfide mineralized material is processed at a third-party processing facility and subject to a toll milling agreement entered into in March 2025, (ii) high-grade oxide mineralized material is subject to an ore sales agreement, (iii) low-grade oxide mineralized material shipped as part of the ore sales agreement beginning in the first quarter of 2026, and (iv) residual leaching of low-grade oxide material previously placed on a segregated section of the Company’s Lone Tree heap leach facility.
Current wording
Mineralized material mined at Granite Creek underground is processed as follows: (i) sulfide mineralized material is processed at a third-party processing facility and subject to a toll milling agreement entered into in March 2025, (ii) high-grade and low-grade oxide mineralized material is subject to an ore sales agreement. Low-grade oxide mineralized material was sold under the ore purchase beginning in the first quarter of 2026, and (iii) residual leaching of low-grade oxide material previously placed on a segregated section of the Company’s Lone Tree heap leach facility continues with no additional mineralized material being placed after the first quarter of 2026.
Previous wording
Water inflow volumes to the mine remained largely unchanged and continue to be managed well using the current underground pumping system, which presently operates near capacity. An enhanced pumping system that includes expanded sumps and higher capacity pumps will be installed throughout the year to allow for an increase in overall water discharge capacity of the contact water as the mine progresses at depth. Further, commissioning of a second water treatment plant currently under construction remains on track for June 2026, which is expected to increase surface water treatment capacity to support the Company's long-term groundwater management objectives.
Current wording
Water inflow volumes to the mine remained largely unchanged and continue to be managed well using the current underground pumping system, which presently operates near capacity. Work on an enhanced pumping system, that includes expanded sumps at lower levels and higher-capacity pumps, advanced during the quarter. Pumps were sized and ordered with installation continuing throughout the remainder of the year to increase overall water discharge capacity as the mine progresses at depth. Further, initial phases of commissioning a second water treatment plant began in late July, with mechanical completion having recently been completed. The second water treatment plant will increase surface water treatment capacity to approximately 3,500 gallons per minute to support the Company's long-term groundwater management objectives.
Previous wording
Pre-development, evaluation, and exploration expenses were $11.4 million for the three months ended March 31, 2026, which were primarily related to underground mine development and infill drilling to upgrade mineral resources and step-out drilling beyond the drill program completed in 2025 in advance of the feasibility study.
Current wording
Pre-development, evaluation, and exploration expenses were $7.9 million for the three months ended June 30, 2026, which were related to underground mine development and infill drilling to upgrade mineral resources and step-out drilling.
Previous wording
During the three months ended March 31, 2026, the Company continued infill and step-out drilling at Granite Creek, completing approximately 1,925 meters of core drilling across the property. The underground drill program remained focused on infill drilling to support resource conversion and mine planning, while surface drilling targeted northerly step-out holes on the South Pacific Zone and Rangefront fault to test the potential for resource expansion. The updated mineral resource estimate will incorporate drilling data from 2023, 2024, and 2025, and will utilize a revised resource modeling approach. The feasibility study is expected to be completed in the second quarter of 2026.
Current wording
During the three and six months ended June 30, 2026, the Company continued infill and step-out drilling at Granite Creek. The underground drill program remained focused on infill drilling to support resource conversion and mine planning. Drilling progressed slower than anticipated during the quarter due to water management, maintenance downtime, and rig relocation. The updated mineral resource estimate is near completion and under internal review. The feasibility study is now expected to be completed in the third quarter of 2026.
Previous wording
Following the completion of the Granite Creek open pit PEA, a pre-feasibility trade-off study commenced. Simultaneously, technical trade-off analyses are being conducted to optimize project economics. Based on preliminary assessments of potential environmental impacts, the project may require preparation of an Environmental Impact Statement ("EIS") under the Bureau of Land Management ("BLM") process. Early-stage pre-permitting activities and technical studies are currently underway, followed by planned baseline field studies commencing in 2027 to support the National Environmental Policy Act ("NEPA") permitting process.
Current wording
Following the completion of the Granite Creek open pit PEA, preparation for a pre-feasibility trade-off study has commenced. Simultaneously, technical trade-off analyses are being conducted to optimize project economics. Based on preliminary assessments of potential environmental impacts, the project may require preparation of an Environmental Impact Statement ("EIS") under the Bureau of Land Management ("BLM") process. Early-stage pre-permitting activities and technical studies are currently underway, followed by projected baseline field studies commencing in 2027 to support the National Environmental Policy Act ("NEPA") permitting process.
Previous wording
The Ruby Hill property includes the Archimedes underground project, the Company's second planned underground mine for which construction began during 2025, and the Mineral Point open pit, which is a large oxide gold and silver deposit with the potential to become the Company’s largest gold producing asset.
Current wording
The Ruby Hill property includes the Archimedes underground project, the Company's second planned underground mine for which construction began during 2025, and the Mineral Point open pit, which is a large oxide gold and silver deposit with the potential to become the Company’s largest gold producing asset. During the first quarter of 2025, the Company finalized a PEA for the Ruby Hill property covering both Archimedes underground and Mineral Point open pit projects.
Previous wording
The Company continues to leach the historic leach pads on the Ruby Hill property recovering minor amounts of gold. For the residual leaching process, management continues to focus on improving solution flows to control ponding and optimizing cyanide application rates with the objective of increasing production from the historic leach pad during the first quarter of 2026.
Current wording
The Company continues to leach the historic leach pads on the Ruby Hill property, recovering gold. Year-to-date gold production from the historic leach pad remained below expectation as infiltration on the pad remained challenging. Higher processing cost per ounce compared to the prior year periods was due to lower produced ounces. For the residual leaching process, management continues to focus on managing ponding, maximizing the area under leach, and optimizing cyanide application rates.
Previous wording
Capital expenditures for the three months ended March 31, 2026 were primarily from construction of a dry room trailer, office infrastructure upgrades, power upgrades and mine load centers for the underground.
Current wording
Growth capital expenditures for the three and six months ended June 30, 2026 were primarily related to heavy mobile equipment, infrastructure upgrades, power upgrades and mine load centers for the underground.
Previous wording
The Lone Tree property is a historic producing mine that ceased mining operations in 2006 and is located within the Battle Mountain-Eureka Trend, midway between the Company's Granite Creek property and Cove underground project. The Lone Tree open pit is not currently included in the new development plan. The Lone Tree Plant is currently non-operational and a construction decision on its refurbishment was made by the Board of Directors during the first quarter of 2026. i-80 Gold is one of two gold companies in Nevada with an autoclave processing plant (the other being owned by Nevada Gold Mines Inc., a joint venture between Barrick Mining Corporation and Newmont Corporation).
Current wording
The Lone Tree property contains the Lone Tree plant and a historic producing mine that ceased mining operations in 2006 and is located within the Battle Mountain-Eureka Trend, midway between the Company's Granite Creek property and Cove underground project. The Lone Tree open pit is not currently included in the new development plan. The Lone Tree Plant (the "Plant") is currently undergoing refurbishment following a positive construction decision made by the Board of Directors during the first quarter of 2026. i-80 Gold is one of two gold companies in Nevada with an autoclave processing plant (the other being owned by Nevada Gold Mines Inc., a joint venture between Barrick Mining Corporation and Newmont Corporation).
Previous wording
The Lone Tree Plant is envisioned to process material from the Company’s three underground mines, Granite Creek, Archimedes, and Cove, to establish a regional hub-and-spoke mining and processing model. Upon refurbishment and commissioning, the Lone Tree Plant will allow the Company to transition from toll milling to owner-operated processing. This shift is expected to materially increase operating margins and enhance free cash flow generation.
Current wording
The Plant is envisioned to process material from the Company’s three underground mines, Granite Creek, Archimedes, and in the future Cove, to establish a regional hub-and-spoke mining and processing model. Upon refurbishment and commissioning, the Plant will allow the Company to transition from toll milling to owner-operated processing. This shift is expected to materially increase operating margins and enhance free cash flow generation.
Previous wording
The leaching of the historic leach pad at Lone Tree continues to produce gold at profitable quantities.
Current wording
The leaching of the historic leach pad at Lone Tree continues to produce gold at profitable quantities. Processing costs per produced ounce is higher than the prior year periods due to a higher volume of reagents used to improve gold production.
Previous wording
The Lone Tree Plant is expected to operate at a nameplate capacity of 2,268 tonnes per day or 827,806 tonnes per annum, consistent with historic production rates. The processing circuit will incorporate an integrated pressure oxidation (“POX”) and carbon-in-leach (“CIL”) circuits capable of processing both refractory (sulfide) and non-refractory (oxide) mineralized material. The scope of work includes a combination of improved design components and the replacement of some existing infrastructure aimed at modernizing the Lone Tree Plant to improve process efficiency and operating flexibility, and to meet new environmental compliance standards, including the upgrade of the existing autoclave to a modern pressure oxidation circuit.
Current wording
During the first quarter of 2026, the Company provided Hatch with a formal Notice to Proceed ("NTP") for the Lone Tree refurbishment project. In preparation, procurement for long lead equipment and detailed engineering activities commenced in 2025 to optimize the schedule. The Plant is expected to operate at a nameplate capacity of 2,268 tonnes per day or 827,806 tonnes per annum, consistent with historic production rates. The scope of refurbishment work at the Plant includes a combination of new and improved design components and the replacement of some existing infrastructure. This work is aimed at modernizing the Plant to improve process efficiency and operating flexibility, and to meet new environmental compliance standards, including the refurbishment and upgrade of the existing autoclave to a modern pressure oxidation (“POX”) circuit.
Previous wording
The Lone Tree Plant is permitted for the existing operational components in use. The approval of new and revised permit applications pertaining to air quality, mercury control, water pollution control, reclamation management, and other secondary programs for the new design remain outstanding. The Company submitted the necessary applications for air quality, mercury control and water quality environmental permits in the first quarter of 2026, ahead of schedule. Various construction activities are expected to commence upon the approval of needed permits, the Company does not envision delays in the construction schedule due to the permitting process at this time.
Current wording
The Lone Tree Plant is permitted for the existing operational components in use. The approval of new and revised permit applications pertaining to air quality, mercury control, water pollution control, reclamation management, and other secondary programs for the new design remain outstanding. The Company submitted the necessary applications for air quality, mercury control and water quality environmental permits in the first quarter of 2026, as planned, with several permits received to date and further permits pending. Various construction activities are scheduled to commence in the second half of 2026 upon the anticipated approval of the associated permits, with major construction activities anticipated to commence in the fourth quarter of 2026.The permitting process is currently on track and aligns with the construction schedule.
Previous wording
The refurbishment has a capital cost estimate of $412 million, inclusive of contingency, owner’s costs, and first fills, plus $18 million in capital spares for a total of $430 million.
Current wording
The refurbishment has a capital cost estimate of $412 million, inclusive of contingency, owner’s costs, and first fills, plus $18 million in capital spares for a total of $430 million. The refurbishment capital costs incurred to date remain in line with the engineering study and the Company’s 2026 guidance of between $140 million to $160 million in expenditures.
Previous wording
Capital expenditures for the three months ended March 31, 2026 were primarily related to the refurbishment of the Lone Tree Plant.
Current wording
Capital expenditures for the three months and six months ended June 30, 2026 were primarily related to the refurbishment of the Lone Tree Plant. The project spend is weighted in the second half of the year and the Company expects to meet full-year guidance.
Previous wording
Revenue for the three months ended March 31, 2026 was $52.4 million, an increase from $14.0 million in the comparative prior period. During the three months ended March 31, 2026, gold ounces sold 1 totaled 10,590 ounces at an average realized gold price 2 of $4,941 per ounce, compared to gold ounces sold 1 of 4,952 at an average realized gold price 1 of $2,825 per ounce during the same period of 2025.
Current wording
Revenues for the three months ended June 30, 2026 was $24.3 million, a decrease from $27.8 million in the prior year period. The decrease in revenues is mainly related to availability at the third-party processing facility. During the three months ended June 30, 2026, gold ounces sold 1 totaled 5,335 ounces at an average realized gold price 2 of $4,522 per ounce, compared to gold ounces sold 1 of 8,400 at an average realized gold price 1 of $3,301 per ounce during the same period of 2025.
Previous wording
For the three months ended March 31, 2026, the Company incurred higher pre-development, evaluation and exploration expenses, compared to the prior year period reflecting the increased activity to advance key development milestones across all five gold projects within its development plan. At Granite Creek, expenses increased primarily due to increased underground development expenditures, largely related to dewatering infrastructure, along with drilling costs and other technical work related to the preparation of a feasibility study targeted for the second quarter of 2026.
Current wording
For the three months ended June 30, 2026, the Company incurred higher pre-development, evaluation and exploration expenses, compared to the prior year period reflecting the increased activity to advance key development milestones across all five gold projects within its development plan. the increase in pre-development, evaluation and exploration cost over the prior year quarter was mainly attributable to the Ruby Hill property and the increased surface drill program for the Mineral Point project and the Archimedes underground project.
Previous wording
Losses and gains on Silver Purchase Agreement, NSR Royalty, 2026 Gold Prepay derivative represents fair value revaluation driven by changes in the gold and silver forecast prices during the period.
Current wording
Losses and gains on the Silver Purchase Agreement, NSR Royalty, 2026 Gold Prepay derivative represents fair value revaluation driven by changes in the gold and silver forecast prices during the period and discount rate changes.
Previous wording
At Ruby Hill, spending increased primarily due to expenditures related to Archimedes underground development as the advancement rate of the decline exceeded expectations, resulting in accelerated development activity and higher drilling expenses related to geologic mapping of the underground and construction of the drill bays. In the prior year quarter, no underground development activity had commenced.
Current wording
At Ruby Hill, expenditures increased due to the initiation of construction at Archimedes underground where the advancement rate of the decline exceeded expectations, resulting in accelerated development activity, along with higher drilling expenses related to geologic mapping of the underground and construction of the drill bays.
Previous wording
Cove pre-development, evaluation and exploration expenditures decreased in the current quarter compared to the prior year quarter as the feasibility study work completed in the first quarter of 2026 was lower than the drilling cost performed during the first quarter of 2025.
Current wording
Cove pre-development, evaluation and exploration expenditures decreased in the six months ended June 30, 2026 compared to the prior year period due to the completion of the delineation drilling program in the first quarter of 2025. Current period expenses related primarily to technical study work.
Previous wording
For the three months ended March 31, 2026, general and administrative expenses are higher compared to the prior year period primarily due to the revaluation of share based compensation due to the increase in the Company's share price of approximately $1.6 million.
Current wording
For the six months ended June 30, 2026, general and administrative expenses were higher compared to the prior year primarily due to share based compensation expense. Personnel costs were higher compared to the prior year period due to the growing resourcing requirements of a company moving from development stage to production stage.
Previous wording
Cash and cash equivalents increased by $450.3 million from $63.2 million at December 31, 2025 to $513.5 million as at March 31, 2026. Refer to the Liquidity and Capital Resources and cash flow section below for further details.
Current wording
•Cash and cash equivalents increased by $401.3 million from $63.2 million at December 31, 2025 to $464.6 million as at June 30, 2026. Refer to the Liquidity and Capital Resources and cash flow section below for further details.
Previous wording
Property, plant and equipment have increased by $13.7 million due to increase in the Lone Tree Plant refurbishment activities, Granite Creek and Ruby Hill capital expenditures.
Current wording
•Property, plant and equipment have increased by $42.2 million due to increase in the Lone Tree Plant refurbishment activities, Granite Creek and Ruby Hill capital expenditures.
Showing the first 40 of 55 pairs. Open the source sections for the rest.
Rearranged current paragraphs (4)
Current report — wording carried from elsewhere
•Net loss increased to $52.5 million compared to $30.2 million in the prior year period, due primarily to higher pre-development, evaluation and exploration costs incurred as the Company advances multiple projects within its development plan. The higher costs were related to drilling programs at the Ruby Hill property. Upon declaration of mineral reserves, certain pre-development, evaluation and exploration expenditures that are currently expensed will be capitalized.
Current report — wording carried from elsewhere
Financial results for the six months ended June 30, 2026
Current report — wording carried from elsewhere
Pre-development, evaluation and exploration expenses
Current report — wording carried from elsewhere
Cash flows for the six months ended June 30, 2026
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
Overall, the recapitalization secured over $1 billion 1 in raised and available capital from early 2025 through the first quarter of 2026, materially strengthening the Company's balance sheet, providing funding certainty, and de-risking the development plan.
Previous report — wording carried elsewhere
During the first quarter of 2025, the Company finalized a PEA for the Ruby Hill property covering both Archimedes underground and Mineral Point open pit projects.
Previous report — wording carried elsewhere
2 This is a Non-GAAP and Supplementary Financial measure; please see “Non-GAAP and Supplementary Financial Performance Measures” section.