CENTRUS ENERGY CORP
For the period ended Jun 30, 2026. Filed Aug 6, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2026 · Filed Aug 6, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2026-03-31; filed 2026-05-06.
0001628280-26-030891
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-06-30; filed 2026-08-06.
0001628280-26-053863
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 188 previous paragraphs and 217 current paragraphs.
129 unchanged; 50 reworded; 30 added; 7 removed; 2 previous and 8 current paragraphs rearranged.
Tables are not compared: 5 previous and 8 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (30)
Current report
On June 30, 2026, DOE issued an amendment to the HALEU Operation Contract to extend the period of performance to September 30, 2026 and to divide the upcoming two-year option period (formerly Option 1b) into a first option period of three months (still referred to as “Option 1b”) and a second option period of 21 months (“Option 1c”). Option 1b now requires 3 months of cascade maintenance and HALEU storage, with no HALEU production, for a fixed price of $15.0 million. Option 1c encompasses the remaining 21 months of HALEU production that were part of the former Option 1b. In conjunction with the amendment, the DOE exercised Option 1b. As of June 30, 2026, Option 1a is funded for the contract value of $108.2 million. The current DOE Budget proposed for fiscal year 2027 does not include funding for the operation of this cascade. Separately, DOE has communicated that it does not currently intend to exercise further options under the HALEU Operation Contract. As announced on July 1, 2026, the Company is working with DOE on agreements to enable the Company to privately operate the cascade on a commercial basis.
Current report
In June 2026, the DOE issued two RFTOPs under the HALEU Deconversion Contract, each for a maximum fixed price of $80.0 million. Centrus has submitted bids for both RFTOPs under this contract.
Current report
In June 2026, Centrus and Oklo signed a letter of intent in which Centrus agreed to supply enough domestic HALEU to power, for multiple years, up to five of Oklo’s reactors of the type identified by the trade name Aurora Powerhouse, subject to negotiation of definitive agreements. If a definitive agreement is entered into, Centrus would supply HALEU from its ACP in Pike County, Ohio to support Oklo’s planned 1.2 GW power campus in the region, with deliveries to Oklo scheduled to begin in 2029.
Current report
Cost of sales for the Technical Solutions segment was $24.4 million and $25.6 million for the three months ended June 30, 2026 and 2025, respectively, a decrease of $1.2 million (or 5%). The decrease was primarily attributable to a $1.9 million decrease in costs incurred under the HALEU Operation Contract, while the remaining change was attributable to other contracts.
Current report
Gross Profit (Loss)
Current report
Gross profit (loss) for the Technical Solutions segment was a loss of $1.7 million and profit of $3.2 million for the three months ended June 30, 2026 and 2025, respectively, a decrease of $4.9 million (or 153%). The decrease was primarily attributable to the factors discussed above in relation to the HALEU Operation Contract.
Current report
Revenue
Current report
Revenue from the LEU segment was $198.0 million and $177.0 million for the six months ended June 30, 2026 and 2025, respectively, an increase of $21.0 million (or 12%). Uranium revenue increased by $56.4 million. SWU revenue decreased by $35.4 million as a result of a 31% decrease in the volume of SWU sold, partially offset by a 16% increase in the average price of SWU sold.
Current report
Cost of Sales
Current report
Cost of sales for the LEU segment was $118.5 million and $95.1 million for the six months ended June 30, 2026 and 2025, respectively, an increase of $23.4 million (or 25%). Uranium costs increased for the six months ended June 30, 2026. SWU costs decreased as a result of a 31% decrease in the volume of SWU sold, partially offset by a 23% increase in the average unit cost of SWU sold.
Current report
Cost of sales for the Technical Solutions segment was $52.9 million and $45.7 million for the six months ended June 30, 2026 and 2025, respectively, an increase of $7.2 million (or 16%). The increase was primarily attributable to a $6.3 million increase in costs incurred under the HALEU Operation Contract, while the remaining change was attributable to other contracts.
Current report
Gross profit for the Technical Solutions segment was $1.9 million and $4.9 million for the six months ended June 30, 2026 and 2025, respectively, a decrease of $3.0 million (or 61%). The decrease was primarily attributable an increase in costs incurred under the HALEU Operation Contract.
Current report
Selling, General, and Administrative
Current report
Selling, general, and administrative costs were $26.2 million and $13.4 million for the three months ended June 30, 2026 and 2025, respectively, an increase of $12.8 million (or 96%). The increase was primarily as a result of a non-cash stock compensation charge of $17.2 million due to the reclassification of certain Board RSU grants from equity to liability.
Current report
Net income was $16.8 million and $28.9 million for the three months ended June 30, 2026 and 2025, respectively, a decrease of $12.1 million (or 42%). The decrease was primarily attributable to an increase in selling, general, and administrative costs of $12.8 million (driven by the $17.2 million stock-compensation expense related to Board RSUs), an increase in advanced technology costs of $7.5 million, and a decrease in gross profit of $4.0 million. This decrease in net income was partially offset by an increase of $8.3 million in investment income and a decrease of $3.7 million in income tax expense, as discussed above.
Current report
Advanced Technology Costs
Current report
Selling, General, and Administrative
Current report
Selling, general, and administrative costs were $36.2 million and $21.7 million for the six months ended June 30, 2026 and 2025, respectively, an increase of $14.5 million (or 67%). This increase was primarily as a result of a non-cash stock-compensation charge of $17.2 million due to the reclassification of certain Board RSU grants from equity to liability.
Current report
Investment Income
Current report
Income Tax Expense
Current report
Net Income and Comprehensive Income
Current report
The following tables present a reconciliation of the operating income, the most directly comparable GAAP measure, to Adjusted Operating Income, a reconciliation of the net income, the most directly comparable GAAP measure, to Adjusted Net Income, and a reconciliation of the net income per share, the most directly comparable GAAP measure, to Adjusted Net Income Per Share, for each of the periods indicated:
Current report
On June 30, 2026, DOE issued an amendment to the HALEU Operation Contract extend the period of performance to September 30, 2026 and to divide the upcoming two-year option period (formerly Option 1b) into a first option period of three months (still referred to as “Option 1b”) and a second option period of 21 months (“Option 1c”). Option 1b now requires 3 months of cascade maintenance and HALEU storage, with no HALEU production, for a fixed price of $15.0 million. Option 1c encompasses the remaining 21 months of HALEU production that were part of the former Option 1b. In conjunction with the amendment, the DOE exercised Option 1b. The current DOE budget proposed for fiscal year 2027 does not include funding for the operation of this cascade. Separately, DOE has communicated that it does not currently intend to exercise further options under the HALEU Operation Contract. As announced on July 1, 2026, the Company is working with DOE on future agreements to enable the Company to privately operate the cascade on a commercial basis, but there can be no assurances that any additional agreements are ultimately agreed.
Current report
vertical integration initiatives, such as the potential acquisition of one or more suppliers within our supply chain. In connection with any such transaction, we may seek to satisfy our liquidity needs through a combination of working capital, cash generated from operations, additional debt or equity financing, although there can be no assurances that any such additional financing will be available on a timely basis, on terms acceptable to us, or at all.
Current report
Capital expenditures were $94.8 million and $5.7 million for the six months ended June 30, 2026 and 2025, respectively.
Current report
Pursuant to a sales agreement with its agents, the Company sold through ATM offerings an aggregate of 1,157,727 and 1,415,924 shares of its Class A Common Stock at the market price in the three and six months ended June 30, 2025, respectively, for a total of $117.1 million and $143.2 million, respectively. After expenses and commissions paid to the agents, the Company’s proceeds totaled $114.7 million and $140.1 million in the three and six months ended June 30, 2025, respectively. Additionally, the Company recorded direct costs of $0.5 million and $0.6 million in the three and six months ended June 30, 2025, respectively, related to the issuance. As of June 30, 2025, the ATM offering was completed.
Current report
Rights Agreement
Current report
On June 18, 2026, the Company entered into a Seventh Amendment to the Section 382 Rights Agreement (the “Rights Agreement”), which amended the Rights Agreement, dated as of April 6, 2016, by and among the Company, and Computershare Trust Company, N.A. and Computershare Inc., as rights agent, as previously amended. The Seventh Amendment was approved by the Board on March 10, 2026, and approved by the Company’s stockholders at the Company’s annual meeting of the stockholders held on June 18, 2026.
Current report
The Seventh Amendment (a) extended the Final Expiration Date (as defined in the Rights Agreement) from June 30, 2026 to June 30, 2029 and (b) increased the purchase price for each one one-thousandth (1/1000th) of a share of the Company’s Series A Participating Cumulative Preferred Stock, par value $1.00 per share, from $160.38 to $1,143.95 in light of the increase in the trading price of the Company’s Class A common stock since the purchase price was last amended.
Current report
The Seventh Amendment was not adopted as a result of, or in response to, any effort to acquire control of the Company. The Seventh Amendment has been adopted in order to preserve for the Company’s stockholders the long-term value of the Company’s net operating loss carry-forwards for United States federal income tax purposes and other tax benefits.
Removed paragraphs (7)
Previous report
The DOE has not yet issued any RFP under the HALEU Deconversion Contract. Centrus plans to compete for any future task orders under this contract.
Previous report
Three Months Ended March 31, 2026 Compared with Three Months Ended March 31, 2025
Previous report
Cost of sales for the Technical Solutions segment was $28.5 million and $20.1 million for the three months ended March 31, 2026 and 2025, respectively, an increase of $8.4 million (or 42%). The increase is primarily attributable to an $8.2 million increase in costs incurred under the HALEU Operation Contract, while the remaining change is attributable to other contracts.
Previous report
Gross profit for the Technical Solutions segment was $3.6 million and $1.7 million for the three months ended March 31, 2026 and 2025, respectively, an increase of $1.9 million (or 112%). The increase was primarily attributable to the factors discussed above. Because of the delay in completing Phase 2 of the HALEU Operation Contract, DOE extended the Phase 2 period of performance through January 31, 2026. Costs incurred subsequent to November 2024 have not yet been subject to a fee as this portion of Phase 2 remains undefinitized and is subject to negotiation.
Previous report
Three Months Ended March 31, 2026 Compared with Three Months Ended March 31, 2025
Previous report
The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. On June 17, 2025, the DOE exercised Option 1a of Phase 3 of the HALEU Operation Contract with a period of performance extending through June 30, 2026. Option 1a of Phase 3 of the HALEU Operation Contract has a contract value and related funding of $108.2 million.
Previous report
Capital expenditures were $23.2 million and $2.1 million for the three months ended March 31, 2026 and 2025, respectively.
Reworded paragraphs (50)
Previous wording
Published spot price indicators for SWU reached previous historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a period of price increases, reaching $200 per SWU by December 31, 2025, which surpassed the previous historic high. As of March 31, 2026, spot prices remained steady at $200 per SWU. This represents an increase of 488% over the 2018 historic low. This surge in the SWU spot price beginning in 2022 has been driven primarily by uncertainty created as a result of the war in Ukraine, coupled with growing interest in nuclear power as a source of reliable carbon-free energy. The contemplation of the imposition of tariffs on LEU, if ultimately imposed, may put additional upward pressure on the price of SWU.
Current wording
Published spot price indicators for SWU reached previous historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices fell to a low of $34 per SWU by August 2018. This was followed by a period of price increases, reaching $200 per SWU by December 31, 2025. As of June 30, 2026, spot prices remained steady at $200 per SWU. The increase in the SWU spot price beginning in 2022 has been driven primarily by uncertainty created as a result of the war in Ukraine coupled with growing interest in nuclear power as a source of reliable carbon-free energy. The contemplation of imposition of tariffs on LEU may put additional upward pressure on the price of SWU.
Previous wording
While the monthly price indicators have increased for several years, the uranium enrichment segment of the nuclear fuel market remains oversupplied and faces uncertainty about future demand for nuclear power generation. However, without Russian supply, the global market would be undersupplied for uranium enrichment. Recent data from the International Trade Commission shows a significant increase in the importation of enriched uranium into the U.S. from China beginning in 2023. If this trend continues, it will likely result in significant changes in the competitive landscape that will affect pricing trends, affect customer spending patterns, create uncertainty and will likely have a negative impact on our business. To address these changes, we have taken steps to adjust our cost structure; we may seek further adjustments to our cost structure and operations and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.
Current wording
When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied. But without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy. Data from the International Trade Commission shows a significant increase in the importation of enriched uranium into the U.S. from China in 2023. If this continues, it will likely result in significant changes in the competitive landscape that will affect pricing trends, affect customer spending patterns, create uncertainty and will likely have a negative impact on our business. To address these changes, we have taken steps to adjust our cost structure; we may seek further adjustments to our cost structure and operations and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.
Previous wording
The war in Ukraine, along with the Import Ban Act and the Russian Decree, have contributed to a significant increase in market prices for enrichment and prompted calls for public and private investment in new, domestic uranium enrichment capacity not only for HALEU production, but also for LEU production to support the existing fleet of reactors. As a result, coupled with the Company’s contract awards for HALEU and LEU production, Centrus is exploring the opportunity to deploy LEU enrichment alongside HALEU enrichment to meet a range of commercial and U.S. government requirements, which would bring cost synergies while increasing revenue opportunities. Our ability to deploy LEU and/or HALEU enrichment, and the timing, sequencing, and scale of those capabilities, is subject to the availability of funding and/or offtake commitments.
Current wording
The war in Ukraine, along with the Import Ban Act and the Russian Decree, have prompted calls for public and private investment in new, domestic uranium enrichment capacity not only for HALEU production, but also for LEU production to support the existing fleet of reactors. As a result, coupled with the Company’s contract awards for HALEU and LEU production, Centrus is exploring the opportunity to deploy LEU enrichment alongside HALEU enrichment to meet a range of commercial and U.S. government requirements, which would bring cost synergies while increasing revenue opportunities. Our ability to deploy LEU and/or HALEU enrichment, and the timing, sequencing, and scale of those capabilities, is subject to the availability of funding and/or offtake commitments.
Previous wording
Our Technical Solutions segment is focused on uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing, engineering and other technical services to government and private sector customers. Under a contract with the DOE, our Technical Solutions segment is operating uranium enrichment capacity for HALEU production, and other capabilities necessary for production of advanced nuclear fuel to meet the evolving needs of the global nuclear industry and the U.S. government. We are also leveraging our unique technical expertise, operational experience, and specialized facilities to expand and diversify our business beyond uranium enrichment, offering new services to existing and new customers in complementary markets.
Current wording
Our Technical Solutions segment is focused on uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing, engineering and other technical services to government and private sector customers. Under a contract with the DOE, our Technical Solutions segment has been operating uranium enrichment capacity for HALEU production, and other capabilities necessary for production of advanced nuclear fuel to meet the evolving needs of the global nuclear industry and the U.S. government. We are also leveraging our unique technical expertise, operational experience, and specialized facilities to expand and diversify our business beyond uranium enrichment, offering new services to existing and new customers in complementary markets.
Previous wording
In November 2023, the Company announced that it made its first contractual delivery of HALEU to the DOE, completing Phase 1 of the HALEU Operation Contract. As a result of delays in obtaining 5B Cylinders DOE is contractually obligated to provide under the HALEU Operation Contract, Phase 2 of the HALEU Operation Contract was extended through June 2025, when Centrus contractually delivered the Phase 2 production target of 900 kilograms of HALEU to DOE, completing Phase 2. The fee for the Phase 2 period of performance that was extended beyond November 30, 2024 was not definitized and is subject to negotiation.
Current wording
In November 2023, the Company announced that it made its first contractual delivery of HALEU to the DOE, completing Phase 1 of the HALEU Operation Contract. As a result of delays in obtaining 5B Cylinders DOE is contractually obligated to provide under the HALEU Operation Contract, Phase 2 of the HALEU Operation Contract was extended through June 2025, when Centrus contractually delivered the Phase 2 production target of 900 kilograms of HALEU to DOE, completing Phase 2, and then was extended further through January 31, 2026 to allow the Company to complete outstanding change orders. The fee for the Phase 2 period of performance that was extended beyond November 30, 2024 was not definitized and is subject to negotiation.
Previous wording
On June 17, 2025, the DOE amended the HALEU Operation Contract to divide the first three-year option period into a first option period of one year (“Option 1a”) and a second option period of two years (“Option 1b”). The amendment established a target cost and fee for Option 1a of approximately $99.3 million and $8.7 million, respectively, and a target cost and fee for Option 1b of $163.5 million and $15.2 million, respectively. In conjunction with the amendment, the DOE exercised Option 1a — launching Phase 3 of the contract effective June 30, 2025, with a period of performance through June 30, 2026. As of March 31, 2026, Option 1a is funded for the contract value of $108.2 million. The current fiscal year 2027 DOE budget proposal does not include funding for the operation of this cascade.
Current wording
On June 17, 2025, the DOE amended the HALEU Operation Contract to divide the first three-year option period into a first option period of one year (“Option 1a”) and a second option period of two years (“Option 1b”). The amendment established a target cost and fee for Option 1a of approximately $99.3 million and $8.7 million, respectively, and a target cost and fee for Option 1b of $163.5 million and $15.2 million, respectively. In conjunction with the amendment, the DOE exercised Option 1a — launching Phase 3 of the contract effective June 30, 2025, with a period of performance through June 30, 2026. Production under Option 1a was completed in mid-June.
Previous wording
The Company does not have a contractual obligation to perform work in excess of the funding provided by the DOE. If the DOE does not commit to additional costs above the existing funding, the Company may incur material additional costs or losses in future periods that could have an adverse impact on its financial condition and liquidity. The DOE owns any HALEU produced from the demonstration cascade. Pursuant to an amendment to the Company’s lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.
Current wording
The Company does not have a contractual obligation to perform work in excess of the funding provided by the DOE. If the DOE does not commit to additional costs above the existing funding, the Company may incur material additional costs or losses in future periods that could have an adverse impact on its financial condition and liquidity. The DOE owns any HALEU produced under the HALEU Operation Contract. Pursuant to an amendment to the Company’s lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.
Previous wording
The Energy Act of 2020 (“The Energy Act”) required the DOE to establish a program to support the availability of HALEU for civilian domestic research, development, demonstration, and commercial use. The Energy Act also reauthorized DOE nuclear energy research, development, demonstration, and commercial application activities, including advanced fuel, research and development for advanced reactors, used fuel technologies, and integration of nuclear energy systems for both existing plants and advanced nuclear concepts. It also authorized the funding of an ARDP which was launched by the DOE in May 2020. There are a number of advanced reactors under development that would use HALEU. Nine of the ten advanced reactor designs initially selected by the DOE for its ARDP will require HALEU. Various agencies of the U.S. government, including the U.S. Department of Defense, the Defense Advanced Research Projects Agency, and the DOE are building small modular reactors and microreactors, which demonstrates the focus on both the development of microreactors and HALEU. We believe our investments in advanced enrichment technology and our progress in demonstrating HALEU production will position the Company to meet the needs of government and commercial customers in the future as they deploy advanced reactors and next generation fuels and also offers potential cost synergies for a return to LEU production. Further, the Company is taking steps to pursue, including through the exploration of strategic partnerships, technologies that are complementary to HALEU production and critical to the HALEU ecosystem, including deconversion and fuel fabrication.
Current wording
The Energy Act of 2020 (“The Energy Act”) required the DOE to establish a program to support the availability of HALEU for civilian domestic research, development, demonstration, and commercial use. The Energy Act also reauthorized DOE nuclear energy research, development, demonstration, and commercial application activities, including advanced fuel, research and development for advanced reactors, used fuel technologies, and integration of nuclear energy systems for both existing plants and advanced nuclear concepts. It also authorized the funding of an ARDP which was launched by the DOE in May 2020. Nine of the ten advanced reactor designs initially selected by the DOE for its ARDP will require HALEU. Various agencies of the U.S. government, including the U.S. Department of Defense, the Defense Advanced Research Projects Agency, and the DOE are building small modular reactors and microreactors, which demonstrates the focus on both the development of microreactors and HALEU. We believe our investments in advanced enrichment technology and our progress in demonstrating HALEU production will position the Company to meet the needs of government and commercial customers in the future as they deploy advanced reactors and next generation fuels and also offers potential cost synergies for a return to LEU production. Further, the Company is taking steps to pursue, including through the exploration of strategic partnerships, technologies that are complementary to HALEU production and critical to the HALEU ecosystem, including deconversion and fuel fabrication.
Previous wording
On January 5, 2026, the DOE announced one LEU and two HALEU task order awards to three companies for $900 million each, including one $900 million task order to Centrus subsidiary, ACO, under the HALEU Production Contract. Centrus was not selected for a task order award under the LEU Production Contract. Centrus remains eligible to compete for any future LEU or HALEU task orders from the DOE should additional funding become available, but additional government funding has not been requested or announced.
Current wording
On January 5, 2026, the DOE announced one LEU and two HALEU task order awards to three companies for $900.0 million each, including one $900.0 million task order to Centrus subsidiary, ACO, under the HALEU Production Contract. Centrus was not selected for a task order award under the LEU Production Contract. Centrus remains eligible to compete for any future LEU or HALEU task orders from the DOE should additional funding become available, but additional government funding has not been requested or announced.
Previous wording
The $900 million task order award to ACO under the HALEU Production Contract calls for the Company to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of HALEU. The award also includes options, exercisable at the DOE’s discretion, for up to an additional $170.0 million to produce and deliver HALEU to the DOE. The task order is subject to negotiation of a definitive agreement and there are no guarantees about whether or when funding by the DOE for such expansion would be awarded or whether we will successfully perform any awarded contract.
Current wording
On July 1, 2026, ACO signed a contract with the DOE governing ACO’s performance of the task order award under the HALEU Production Contract. The task order contract calls for the Company to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of HALEU. The contract also includes options, exercisable at the DOE’s discretion, for up to an additional $170.0 million to produce and deliver HALEU to the DOE. There are no guarantees about whether or when funding by the DOE for such expansion would be awarded or whether we will successfully perform any awarded contract.
Previous wording
In November 2024, the Company announced an anticipated $60 million investment over an 18-month period to expand the capacity of its centrifuge manufacturing facility in Oak Ridge, Tennessee. In January 2025, the Company announced plans to invest more than $560 million over several years to transition its Oak Ridge centrifuge manufacturing plant to high-rate manufacturing and support the production of thousands of advanced centrifuges. Centrifuge manufacturing began in Oak Ridge in December 2025, with the first new centrifuges expected to come online in Ohio in 2029.
Current wording
In the time leading up to the July 1, 2026 task order contract, the Company announced, in November 2024, an anticipated $60 million investment over an 18-month period to expand the capacity of its centrifuge manufacturing facility in Oak Ridge, Tennessee.
Previous wording
In December 2025, the Company initiated design work on a 150,000 square foot training, operations and maintenance facility in Piketon, Ohio – a critical piece of site infrastructure necessary to support the Company's plans for a major expansion of its uranium enrichment capacity in Piketon. The project involves a significant renovation and rehabilitation of an existing, largely vacant building on the site of the American Centrifuge Plant in Piketon, Ohio. Construction activities began in early 2026. The facility is expected to include a mix of office space, training facilities, and maintenance bays to support plant operations.
Current wording
In December 2025, the Company initiated design work on a 150,000 square foot training, operations and maintenance facility in Piketon, Ohio – a critical piece of site infrastructure necessary to support the Company's plans for a major expansion of its uranium enrichment capacity in Piketon. The project involves a significant renovation and rehabilitation of an existing, largely vacant building on the site of the ACP in Piketon, Ohio. Construction activities began in early 2026. The facility is expected to include a mix of office space, training facilities, and maintenance bays to support plant operations.
Previous wording
Also in December 2025, the Company began domestic centrifuge manufacturing to support commercial LEU enrichment activities at its Piketon, Ohio, facility. This enables the Company to capitalize on its many first-mover advantages in U.S.-owned domestic uranium enrichment, and marks one of the most consequential transformations in the Company's and the United States' uranium enrichment history. Centrus plans to leverage its pending multi-billion-dollar uranium enrichment expansion to meet its growing backlog of $2.4 billion in contingent LEU sales to U.S. and international customer contracts, along with commercial-scale HALEU production. There is no assurance that the Company will successfully complete the announced expansion of its uranium enrichment capacity in Piketon, Ohio, or execute plans for large-scale production of both LEU and HALEU to meet commercial and government requirements.
Current wording
Also in December 2025, the Company began commercial centrifuge production from its Oak Ridge, Tennessee facility to support commercial LEU enrichment activities at its Piketon, Ohio facility, with the first new centrifuges expected to come online in Ohio in 2029. In January 2026, the Company announced plans to invest more than $560 million over several years to transition its Oak Ridge centrifuge manufacturing plant to high-rate manufacturing and support the production of thousands of advanced centrifuges. This enables the Company to capitalize on its many first-mover advantages in U.S.-owned domestic uranium enrichment, and marks one of the most consequential transformations in the Company's and the United States' uranium enrichment history. Centrus plans to leverage its pending multi-billion-dollar uranium enrichment expansion to meet its growing, partially-contingent backlog of $3.7 billion in LEU and HALEU sales under contracts with U.S. and international customers, along with commercial-scale HALEU production. There is no assurance that the Company will successfully complete the announced expansion of its uranium enrichment capacity in Piketon, Ohio, or execute plans for large-scale production of both LEU and HALEU to meet commercial and government requirements.
Previous wording
In February 2026, ACO entered into an engineering, procurement and construction contract with Fluor Federal Services, Inc. (“Fluor”), a third-party contractor, for the commercial expansion and deployment of LEU and HALEU production capability at the American Centrifuge Plant in Piketon, Ohio. The contract provides for compensation on a time and materials basis at agreed labor rates and extends until the completion of performance.
Current wording
In February 2026, ACO entered into an EPC Contract with Fluor for the commercial expansion and deployment of LEU and HALEU production capability at the ACP in Piketon, Ohio. The contract provides for compensation on a time and materials basis at agreed labor rates and extends until the completion of performance.
Previous wording
In April 2026, Centrus entered into a contract with Geiger Brothers, Inc. (“Geiger Brothers”) as the construction contractor for the expansion of our uranium enrichment capacity in Piketon, Ohio. Fluor is serving as the project’s EPC contractor, while Geiger Brothers will conduct the on-the-ground construction work in Ohio.
Current wording
In April 2026, Centrus entered into a contract with Geiger Brothers, as the construction contractor for the expansion of our uranium enrichment capacity in Piketon, Ohio. Fluor is serving as the project’s EPC contractor, while Geiger Brothers will conduct the on-the-ground construction work in Ohio. For further discussion, refer to Note 11, Commitments and Contingencies, of the Financial Statements in this Quarterly Report on Form 10-Q.
Previous wording
In March 2026, Centrus announced that the Company is exploring a joint venture with Oklo Inc. (“Oklo”) focused on deconversion services for HALEU – which currently does not exist commercially. Activities under this contemplated joint venture would occur at Centrus’ site in Piketon, Ohio, to be co-located with Centrus’ enrichment operations and adjacent to Oklo’s planned 1.2 GW power campus.
Current wording
In March 2026, Centrus announced that the Company is exploring a joint venture with Oklo Inc. (“Oklo”) focused on deconversion services for HALEU – which currently do not exist commercially. Activities under this contemplated joint venture would occur at Centrus’ site in Piketon, Ohio, to be co-located with Centrus’ enrichment operations and adjacent to Oklo’s planned 1.2 GW power campus.
Previous wording
For calendar quarters in which the Convertible Notes became convertible at the option of the holders, the Company provided notice to the holders of the Convertible Notes that the notes became convertible beginning on the first day of the respective subsequent quarter, and ending at the close of business on the last day of said quarter. As of April 30, 2026, no notes were converted during those periods.
Current wording
For calendar quarters in which the Convertible Notes became convertible at the option of the holders, the Company provided notice to the holders of the Convertible Notes that the notes became convertible beginning on the first day of the respective subsequent quarter, and ending at the close of business on the last day of said quarter. As of July 31, 2026, one noteholder converted $2,000 worth of 2.25% Convertible Notes, which will settle in the third quarter of 2026. No other notes were converted during those periods.
Previous wording
We are also actively considering and expect to consider potential strategic transactions from time to time, which could involve, without limitation, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products or technologies or changes to our capital structure. In connection with any such transaction, we may seek additional debt or equity financing, contribute or dispose of assets, assume additional indebtedness, or partner with other parties to consummate a transaction. For further discussion, refer to Liquidity and Capital Resourcesin this Quarterly Report on Form 10-Q.
Current wording
within our supply chain. In connection with any such transaction, we may seek additional debt or equity financing, contribute or dispose of assets, assume additional indebtedness, or partner with other parties to consummate a transaction. To provide flexibility in funding our strategic objectives, we may opportunistically raise capital through large follow-on offerings of our common stock, warrants, or a combination thereof, which could result in substantial dilution to our current investors. For further discussion, refer to Liquidity and Capital Resourcesin this Quarterly Report on Form 10-Q.
Previous wording
According to the WNA, as of March 2026, there were 78 reactors under construction worldwide, approximately one-half of which are in China. The United States, with 94 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years. Eight U.S. reactors have prematurely shut down in the past ten years, and others could shut down in the next few years. At the same time, construction was completed, and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart.
Current wording
According to the WNA, as of June 2026, there were approximately 80 reactors under construction worldwide, approximately one-half of which are in China. The United States, with 94 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years. Eight U.S. reactors have prematurely shut down in the past ten years, and others could shut down in the next few years. At the same time, construction was completed, and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart.
Previous wording
In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. For example, effective January 10, 2025, the U.S. Secretary of the Treasury, made a determination pursuant to section l(a)(i) of Executive Order 14024, to apply certain sanctions to any person determined, pursuant to that section, to operate or have operated in “the energy sector of the Russian Federation economy.” TENEX’s financial institutions have had challenges in accepting payments denominated in U.S. dollars and the Company and TENEX had for a period of time agreed to delay certain payments under the TENEX Supply Contract as the parties reviewed payment processing options. Additionally, on April 17, 2025, the Office of the USTR released a notice issuing the results of its investigation into China’s dominance in the maritime, logistics, and shipbuilding sectors pursuant to Section 302(a) of the Trade Act of 1974, as amended. The USTR imposed new service fees on Chinese-built vessels entering U.S. ports above certain capacity. Our shipper of Russian LEU from Russia to the U.S. uses ships manufactured in China which happen to be exempt from the new fees under this notice. However, these fees would be significant if they were to be imposed on our shipper. If the USTR changes its position and does not exempt the type of vessel our shipper uses, then the additional fees imposed on our shipper for docking at U.S. ports would be cost prohibitive, would have a significant impact on our ability to transport Russian LEU and would also have a material adverse effect on our financial position and results of operations. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.
Current wording
In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. For example, effective January 10, 2025, the U.S. Secretary of the Treasury, made a determination pursuant to section l(a)(i) of Executive Order 14024, to apply certain sanctions to any person determined, pursuant to that section, to operate or have operated in “the energy sector of the Russian Federation economy.” TENEX’s financial institutions have had challenges in accepting payments denominated in U.S. dollars and the Company and TENEX had for a period of time agreed to delay certain payments under the TENEX Supply Contract as the parties reviewed payment processing options. Additionally, on April 17, 2025, the Office of the USTR released a notice issuing the results of its investigation into China’s dominance in the maritime, logistics, and shipbuilding sectors pursuant to Section 302(a) of the Trade Act of 1974, as amended. The USTR imposed new service fees on Chinese-built vessels entering U.S. ports above certain capacity. Our shipper of Russian LEU from Russia to the U.S. uses ships manufactured in China which happen to be exempt from the new fees under this notice. However, these fees would be significant if they were to be imposed on our shipper. If the USTR changes its position and does not exempt the type of vessel our shipper uses, then the additional fees imposed on our shipper for docking at U.S. ports would be cost prohibitive, would have a significant impact on our ability to transport Russian LEU and would also have a material adverse effect on our financial position and results of operations. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government. Further, the United States government is presently considering draft legislation that, if adopted in its current form, could lead to the imposition of significant duties on goods being imported from Russia. While the draft legislation excludes uranium from the scope of such duties, application of such duties to the ancillary goods that are necessarily transported together with uranium could impact the cost or availability of uranium shipping services.
Previous wording
For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors, in our Annual Report on Form 10-K for the year ended December 31, 2025 and under Part II, Item 1A, Risk Factors of this Quarterly Report on Form 10-Q.
Current wording
For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2025 and under Part II, Item 1A, Risk Factors of our Quarterly Report on Form 10-Q for the quarter ended March 31, 2026, and under Part II, Item 1A, Risk Factors, of this Quarterly Report on Form 10-Q.
Previous wording
For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2025 and under Part II, Item 1A, Risk Factors of this Quarterly Report on Form 10-Q.
Current wording
For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors, in our Annual Report on Form 10-K for the year ended December 31, 2025, under Part II, Item 1A, Risk Factorsof our Quarterly Report on Form 10-Q for the quarter ended March 31, 2026, and under Part II, Item 1A, Risk Factors of this Quarterly Report on Form 10-Q.
Previous wording
The Company’s backlog is $3.9 billion and $3.8 billion as of March 31, 2026 and December 31, 2025, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.
Current wording
The Company’s backlog is $4.5 billion and $3.8 billion as of June 30, 2026 and December 31, 2025, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.
Previous wording
Our backlog in the LEU segment extends to 2040. As of March 31, 2026 and December 31, 2025, our backlog was approximately $3.1 billion and $2.9 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments. Of the $3.1 billion, approximately $2.4 billion represents contingent LEU sales contracts and commitments, all of which are under definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. The contingent sales commitments depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.1 billion of deferred revenue and advances from customers as of March 31, 2026, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to other significant risks and uncertainties, including existing trade laws and restrictions such as the RSA, Import Ban Act, and the Russian Decree, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.
Current wording
Our backlog in the LEU segment extends to 2040. As of June 30, 2026 and December 31, 2025, our backlog was approximately $3.7 billion and $2.9 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments. Of the $3.7 billion, approximately $3.0 billion represents contingent LEU and HALEU sales contracts and commitments, $2.4 billion of which are under definitive agreements, in support of potential construction of LEU and HALEU production capacity at the Piketon, Ohio facility. The contingent sales commitments tend to relate to achievement of operational milestones. The LEU segment backlog also includes approximately $0.1 billion of deferred revenue and advances from customers as of June 30, 2026, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to other significant risks and uncertainties, including existing trade laws and restrictions such as the RSA, Import Ban Act, and the Russian Decree, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.
Previous wording
Our backlog in the Technical Solutions segment extends to 2034. As of both March 31, 2026 and December 31, 2025, our backlog was approximately $0.8 billion and $0.9 billion, respectively. Our backlog includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options.
Current wording
Our backlog in the Technical Solutions segment extends to 2034. As of June 30, 2026 and December 31, 2025, our backlog was approximately $0.8 billion and $0.9 billion, respectively. Our backlog includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options. The current DOE budget proposed for fiscal year 2027 does not include further funding for the operation of the HALEU cascade under the HALEU Operation Contract, which represents $0.8 billion of the Technical Solutions backlog as of June 30, 2026. Separately, DOE has communicated that it does not currently intend to exercise further options under the HALEU Operation Contract.
Previous wording
Revenue from our LEU segment accounted for approximately 58% of our total revenue for the three months ended March 31, 2026. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 44% of revenue from our LEU segment since 2024. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride or uranium concentrates to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in the three months ended March 31, 2026 averaged approximately $13.7 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results period over period.
Current wording
Revenue from our LEU segment accounted for approximately 87% and 78% of our total revenue for the three and six months ended June 30, 2026. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 50% of revenue from our LEU segment since 2024. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride or uranium concentrates to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in the six months ended June 30, 2026 averaged approximately $11.7 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results period over period.
Previous wording
Revenue from the LEU segment was $44.6 million and $51.3 million for the three months ended March 31, 2026 and 2025, respectively, a decrease of $6.7 million (or 13%). SWU revenue decreased by $9.7 million as a result of a 47% decrease in the volume of SWU sold, partially offset by a 52% increase in the average price of SWU sold. The Company had uranium revenue of $3.0 million for the three months ended March 31, 2026.
Current wording
Revenue from the LEU segment was $153.4 million and $125.7 million for the three months ended June 30, 2026 and 2025, respectively, an increase of $27.7 million (or 22%). The Company had uranium revenue of $53.4 million for the three months ended June 30, 2026. SWU revenue decreased for the three months ended June 30, 2026 by $25.7 million as a result of a 23% decrease in the volume of SWU sold, partially offset by a 3% increase in the average price of SWU sold.
Previous wording
Cost of sales for the LEU segment was $16.7 million and $20.1 million for the three months ended March 31, 2026 and 2025, respectively, a decrease of $3.4 million (or 17%). SWU costs decreased as a result of a 47% decrease in the volume of SWU sold, partially offset by a 45% increase in the average unit cost of SWU sold. Uranium costs increased primarily as a result of an increase in the volume of uranium sold.
Current wording
Cost of sales for the LEU segment was $101.8 million and $75.0 million for the three months ended June 30, 2026 and 2025, respectively, an increase of $26.8 million (or 36%). Uranium costs increased primarily as a result of an increase in the volume of uranium sold. SWU costs decreased as a result of a 23% decrease in the volume of SWU sold, partially offset by a 13% increase in the average unit cost of SWU sold.
Previous wording
Gross profit for the LEU segment was $27.9 million and $31.2 million for the three months ended March 31, 2026 and 2025, respectively, a decrease of $3.3 million (or 11%). LEU customers generally have multi-year contracts that carry annual purchase commitments, not quarterly commitments. The gross profit in our LEU business varies based upon the timing of those contracts. The pricing applied to deliveries varies depending upon the market conditions at the time the contract was signed. The decrease for the three months ended March 31, 2026 was primarily due to the composition of contracts in the current quarter, compared to the prior quarter.
Current wording
Gross profit for the LEU segment was $51.6 million and $50.7 million for the three months ended June 30, 2026 and 2025, respectively, an increase of $0.9 million (or 2%). LEU customers generally have multi-year contracts that carry annual purchase commitments, not quarterly commitments. The gross profit in our LEU business varies based upon the timing of those contracts. The pricing applied to deliveries varies depending upon the market conditions at the time the contract was signed. The increase for the three months ended June 30, 2026 was primarily due to the change in the composition of contracts quarter over quarter.
Previous wording
Revenue from the Technical Solutions segment was $32.1 million and $21.8 million for the three months ended March 31, 2026 and 2025, respectively, an increase of $10.3 million (or 47%). The increase in revenue is primarily attributable to a $9.8 million increase in revenue generated by the HALEU Operation Contract, while the remaining change is related to other contracts. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phases 2 and 3 of the contract.
Current wording
Revenue from the Technical Solutions segment was $54.8 million and $50.6 million for the six months ended June 30, 2026 and 2025, respectively, an increase of $4.2 million (or 8%). The increase in revenue was primarily attributable to a $3.9 million increase in revenue generated by the HALEU Operation Contract, while the remaining change was related to other contracts. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phases 2 and 3 of the contract.
Previous wording
Advanced technology costs were $18.9 million and $3.0 million for the three months ended March 31, 2026 and 2025, respectively, an increase of $15.9 million (or 530%). Advanced technology costs consist of American Centrifuge work and related expenses that are outside of our customer contracts in the Technical Solutions segment, including bid and proposal activities and work to improve our enrichment capability. The increase is due to costs associated with our previously announced expansion projects at Oak Ridge and Piketon.
Current wording
Advanced technology costs were $10.8 million and $3.3 million for the three months ended June 30, 2026 and 2025, respectively, an increase of $7.5 million (or 227%). Advanced technology costs consist of American Centrifuge work and related expenses that are outside of our customer contracts in the Technical Solutions segment, including bid and proposal activities and work to improve our enrichment capability. The increase was primarily due to costs associated with our previously announced expansion projects at Oak Ridge and Piketon.
Previous wording
Investment income was $17.0 million and $7.3 million for the three months ended March 31, 2026 and 2025, respectively, an increase of $9.7 million (or 133%). The Company’s investment income represents interest earned on operating cash, which is primarily held in money market accounts. The increase was due primarily to a higher cash balance driven by the proceeds from the issuance of the 0% Convertible Notes in August 2025 and proceeds from the issuance of Class A Common Stock under our ATM program in the second and fourth quarters of 2025.
Current wording
Investment income was $16.3 million and $8.0 million for the three months ended June 30, 2026 and 2025, respectively, an increase of $8.3 million (or 104%). The Company’s investment income represents interest earned on operating cash, which is primarily held in money market accounts. The increase was due primarily to a higher cash balance driven by the proceeds from the issuance of the 0% Convertible Notes in August 2025 and proceeds from the issuance of Class A Common Stock under our ATM program in the second and fourth quarters of 2025 and second quarter of 2026.
Previous wording
Income tax expense was $2.5 million and $8.0 million in the three months ended March 31, 2026 and 2025, respectively, a decrease of $5.5 million (or 69%). Income tax expense for both periods resulted from applying the annual effective tax rate to the quarterly income from continuing operations adjusted for discrete items. For more information about the valuation allowance, see Note 14, Income Taxes, in our Consolidated Financial Statements on Form 10-K for the year ended December 31, 2025.
Current wording
Income tax expense was $4.8 million and $8.5 million in the three months ended June 30, 2026 and 2025, respectively, a decrease of $3.7 million (or 44%). Income tax expense for both periods resulted from applying the annual effective tax rate to the quarterly income from continuing operations adjusted for discrete items. For more information about the valuation allowance, see Note 14, Income Taxes, in our Consolidated Financial Statements in our Annual Report on Form 10-K for the year ended December 31, 2025.
Previous wording
Pursuant to a redemption notice, on March 26, 2025, the Company redeemed all of the outstanding 8.25% Notes at a redemption price equal to 100% of the principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million related to the extinguishment of the 8.25% Notes in the year ended December 31, 2025.
Current wording
Pursuant to a redemption notice, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million related to the extinguishment of the 8.25% Notes in the six months ended June 30, 2025.
Previous wording
Net income was $10.0 million and $27.2 million for the three months ended March 31, 2026 and 2025, respectively, a decrease of $17.2 million (or 63%). The decrease was primarily attributable to an increase in advanced technology costs of $15.9 million and a decrease in extinguishment of long-term debt of $11.8 million. This was partially offset by an increase of $9.7 million in investment income and a decrease of $5.5 million in income tax expense, as discussed above.
Current wording
Net income was $26.8 million and $56.1 million in the six months ended June 30, 2026 and 2025, respectively, a decrease of $29.3 million (or 52%). The decrease was primarily attributable to an increase of $23.4 million in advanced technology costs, an increase of $14.5 million in selling, general, and administrative costs (driven by the $17.2 million stock-compensation expense related to Board RSUs), and a decrease in the gain on extinguishment of long-term debt of $11.8 million. This decrease in net income was partially offset by an increase of $18.0 million in investment income and a decrease of $9.2 million in income tax expense, as discussed above.
Previous wording
On January 5, 2026, the DOE announced that Centrus subsidiary, ACO, was awarded a $900.0 million task order to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of HALEU. The award also includes options, at the DOE’s discretion, for up to an additional $170.0 million to produce and deliver HALEU to the DOE. The task order is subject to negotiation of a definitive agreement and there are no guarantees about whether or when funding by the DOE for such expansion would be awarded.
Current wording
On January 5, 2026, the DOE announced that Centrus subsidiary, ACO, was awarded a $900.0 million task order to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of HALEU. The award also includes options, at the DOE’s discretion, for up to an additional $170.0 million to produce and deliver HALEU to the DOE. The task order contract was signed in July 2026. There are no guarantees about whether or when funding by the DOE for such expansion would be awarded.
Previous wording
Although the Company believes demand for HALEU will emerge over the next several years, there are no guarantees about whether or when government or commercial demand for HALEU will materialize, and there are a number of technical, regulatory, and economic hurdles that must be overcome for these fuels and the reactors that will use these fuels to come to market. For further discussion, refer to Part I, Item 1A, Risk Factors, in our Annual Report on Form 10-K for the year ended December 31, 2025 and under Part II, Item 1A, Risk Factors of this Quarterly Report on Form 10-Q.
Current wording
Although the Company believes demand for HALEU will emerge over the next several years, there are no guarantees about whether or when government or commercial demand for HALEU will materialize, and there are a number of technical, regulatory, and economic hurdles that must be overcome for these fuels and the reactors that will use these fuels to come to market. For further discussion, refer to Part I, Item 1A, Risk Factors, in our Annual Report on Form 10-K for the year ended December 31, 2025, under Part II, Item 1A, Risk Factors of our Quarterly Report on Form 10-Q for the quarter ended March 31, 2026, and under Part II, Item 1A, Risk Factors of this Quarterly Report on Form 10-Q.
Previous wording
Further, any sanctions or other restrictions, including the Import Ban Act banning LEU imports from Russia and the Russian Decree prohibiting LEU exports out of Russia in the absence of a license, represent a significant risk to our business as we rely on the TENEX Supply Contract as a significant supply source to meet our delivery obligations. Such restrictions on LEU imports to the U.S. or exports from Russia could have a material impact on our operations and liquidity. For further discussion, please refer to Part I, Item 1A, Risk Factors, in our Annual Report on Form 10-K for the year ended December 31, 2025 and under Part II, Item 1A, Risk Factors of this Quarterly Report on Form 10-Q.
Current wording
Further, any sanctions or other restrictions, including the Import Ban Act banning LEU imports from Russia and the Russian Decree prohibiting LEU exports out of Russia in the absence of a license, represent a significant risk to our business as we rely on the TENEX Supply Contract as a significant supply source to meet our delivery obligations. Such restrictions on LEU imports to the U.S. or exports from Russia could have a material impact on our operations and liquidity. For further discussion, please refer to Part I, Item 1A, Risk Factors, in our Annual Report on Form 10-K for the year ended December 31, 2025, under Part II, Item 1A, Risk Factors of our Quarterly Report on Form 10-Q for the quarter ended March 31, 2026, and under Part II, Item 1A, Risk Factors of this our Quarterly Report on Form 10-Q.
Previous wording
In December 2025, the Company initiated design work on a 150,000 square foot training, operations and maintenance facility in Piketon, Ohio – a critical piece of site infrastructure necessary to support the Company's plans for a major expansion of its uranium enrichment capacity in Piketon. The project involves a significant renovation and rehabilitation of an existing, largely vacant building on the site of the American Centrifuge Plant in Piketon, Ohio. Construction activities began in early 2026. The facility is expected to include a mix of office space, training facilities, and maintenance bays to support plant operations. Also in December 2025, the Company began domestic centrifuge manufacturing to support commercial LEU enrichment activities at the Piketon, Ohio, facility. This strategic move enables the Company to capitalize on its many first-mover advantages in U.S.-owned domestic uranium enrichment, and marks one of the most consequential transformations in the Company's and the United States' uranium enrichment history. Centrus plans to leverage its multi-billion-dollar uranium enrichment expansion to meet its growing backlog of $2.4 billion in contingent LEU sales to U.S. and international customer contracts, and targets future commercial-scale production of HALEU, as well.
Current wording
In December 2025, the Company initiated design work on a 150,000 square foot training, operations and maintenance facility in Piketon, Ohio – a critical piece of site infrastructure necessary to support the Company's plans for a major expansion of its uranium enrichment capacity in Piketon. The project involves a significant renovation and rehabilitation of an existing, largely vacant building on the site of the ACP in Piketon, Ohio. Construction activities began in early 2026. The facility is expected to include a mix of office space, training facilities, and maintenance bays to support plant operations. Also in December 2025, the Company began domestic centrifuge manufacturing to support commercial LEU enrichment activities at the Piketon, Ohio, facility. This strategic move enables the Company to capitalize on its many first-mover advantages in U.S.-owned domestic uranium enrichment, and marks one of the most consequential transformations in the Company's and the United States' uranium enrichment history. Centrus plans to leverage its multi-billion-dollar uranium enrichment expansion to meet its growing backlog of $3.0 billion in contingent LEU and HALEU sales to U.S. and international customer contracts, and targets future commercial-scale production of HALEU, as well.
Previous wording
In March 2026, Centrus announced a partnership with Palantir to apply Palantir’s artificial intelligence (“AI”)-driven software tools in support of the American Centrifuge Plant expansion. Through this partnership, Centrus is leveraging Palantir’s Foundry and Artificial Intelligence Platform to integrate disparate systems across classified and unclassified environments and utilize AI to optimize project controls, engineering, manufacturing execution, supply chain management, and regulatory compliance.
Current wording
In March 2026, Centrus announced a partnership with Palantir to apply Palantir’s artificial intelligence (“AI”)-driven software tools in support of the ACP expansion. Through this partnership, Centrus is leveraging Palantir’s Foundry and Artificial Intelligence Platform to integrate disparate systems across classified and unclassified environments and utilize AI to optimize project controls, engineering, manufacturing execution, supply chain management, and regulatory compliance.
Showing the first 40 of 50 pairs. Open the source sections for the rest.
Rearranged current paragraphs (8)
Current report — wording carried from elsewhere
We are also actively considering and expect to consider potential strategic transactions from time to time, which could involve, without limitation, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products or technologies or changes to our capital structure. These strategic transactions may include vertical integration initiatives, such as the potential acquisition of one or more suppliers
Current report — wording carried from elsewhere
Revenue from the Technical Solutions segment was $22.7 million and $28.8 million for the three months ended June 30, 2026 and 2025, respectively, a decrease of $6.1 million (or 21%). The decrease in revenue was primarily attributable to a $5.9 million decrease in revenue generated by the HALEU Operation Contract, while the remaining change was related to other contracts. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phases 2 and 3 of the contract.
Current report — wording carried from elsewhere
Gross profit for the LEU segment was $79.5 million and $81.9 million for the six months ended June 30, 2026 and 2025, respectively, a decrease of $2.4 million (or 3%). LEU customers generally have multi-year contracts that carry annual purchase commitments, not quarterly commitments. The gross profit in our LEU business varies based upon the timing of those contracts. The pricing applied to deliveries varies depending upon the market conditions at the time the contract was signed. The decrease for the six months ended June 30, 2026 was primarily due to the composition of contracts delivered during the period.
Current report — wording carried from elsewhere
Advanced technology costs were $29.7 million and $6.3 million for the six months ended June 30, 2026 and 2025, respectively, an increase of $23.4 million (or 371%). Advanced technology costs consist of American Centrifuge work and related expenses that are outside of our customer contracts in the Technical Solutions segment, including bid and proposal activities and work to improve our enrichment capability. The increase was primarily due to costs associated with our previously announced expansion projects at Oak Ridge and Piketon.
Current report — wording carried from elsewhere
Investment income was $33.3 million and $15.3 million for the six months ended June 30, 2026 and 2025, respectively, an increase of $18.0 million (or 118%). The Company’s investment income represents interest earned on operating cash, which is primarily held in money market accounts. The increase was due primarily to a higher cash balance driven by the proceeds from the issuance of the 0% Convertible Notes in August 2025 and proceeds from the issuance of Class A Common Stock under our ATM program in the second and fourth quarters of 2025 and second quarter of 2026.
Current report — wording carried from elsewhere
Income tax expense was $7.3 million and $16.5 million in the six months ended June 30, 2026 and 2025, respectively, a decrease of $9.2 million (or 56%). Income tax expense for both periods resulted from applying the annual effective tax rate to the quarterly income from continuing operations adjusted for discrete items. For more information about the valuation allowance, see Note 14, Income Taxes, in our Consolidated Financial Statements in our Annual Report on for the year ended December 31, 2025.
Current report — wording carried from elsewhere
On June 17, 2025, the DOE issued an amendment to the HALEU Operation Contract that split the first three-year option period into a first option period of one year (“Option 1a”) and a second option period of two years (“Option 1b”). The amendment established a target cost and fee for Option 1a of approximately $99.3 million and $8.7 million, respectively, and a target cost and fee for Option 1b of $163.5 million and $15.2 million, respectively. In conjunction with the amendment, the DOE exercised Option 1a and extended the period of performance to June 30, 2026. The Company completed production under Option 1a in mid-June. As of June 30, 2026, Option 1a is funded for the contract value of $108.2 million.
Current report — wording carried from elsewhere
On April 16, 2026, the Company and Geiger Brothers, a third-party contractor, entered into an agreement for the performance of construction activities associated with the commercial expansion and deployment of LEU and HALEU production capability at the American Centrifuge Plant in Piketon, Ohio. The contract provides for compensation on a time and materials basis at agreed labor rates and extends until the completion of performance. The total price paid to the Geiger Brothers will depend on the scope of the services authorized by the ACO, in accordance with the terms of the contract. For further details, refer to Item 2, Overview.
Rearranged previous paragraphs (2)
Previous report — wording carried elsewhere
When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied. But without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy.
Previous report — wording carried elsewhere
The Company was selected for the $900 million task award from DOE on January 5, 2026. Later that month, the Company announced plans to invest more than $560 million over several years to transition its Oak Ridge centrifuge manufacturing plant to high-rate manufacturing and support the production of thousands of advanced centrifuges. Centrifuge manufacturing began in Oak Ridge in December 2025, with the first new centrifuges expected to come online in Ohio in 2029.