Skip to main content

Soluna Holdings, Inc

For the period ended Mar 31, 2026. Filed May 15, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2026 · Filed May 15, 2026

SLNH$0.52+13.2%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-09-30; filed 2025-11-14.

0001493152-25-023503

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2026-03-31; filed 2026-05-15.

0001628280-26-035538

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 198 previous paragraphs and 188 current paragraphs.

58 unchanged; 46 reworded; 81 added; 87 removed; 7 previous and 3 current paragraphs rearranged.

Tables are not compared: 25 previous and 11 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (81)

Current report

We develop, own, and operate digital infrastructure for energy-intensive computing applications by colocating data centers with renewable energy power plants. We refer to this model as Renewable Computing™.

Current report

Renewable Computing™ is designed to address two converging market conditions: increasing curtailment of renewable energy generation and growing demand for power-intensive computing applications, including artificial intelligence (“AI”), high-performance computing (“HPC”), and Bitcoin mining. By locating our data centers near renewable generation assets, we seek to convert underutilized energy into economically productive computing capacity.

Current report

We utilize two distinct data center designs to serve different computing markets. For our Bitcoin mining and hosting business, we deploy a data center design optimized for flexible, large-scale digital asset operations. For AI and HPC workloads, we are developing an AI-ready data center design intended to support higher-density compute environments and customer requirements associated with advanced computing infrastructure.

Current report

Our facilities are managed by MaestroOS™ (“MaestroOS”), our proprietary software platform, which analyzes factors such as local power pricing, weather conditions, grid demand, and market signals to optimize operating performance and power consumption across our operating assets.

Current report

Our business model is intended to enhance the monetization of renewable generation assets while supporting scalable digital infrastructure growth. We work with renewable energy developers and power partners to access low-cost or otherwise constrained energy resources. Our data centers operate on a behind-the-meter basis, enabling them to draw electricity directly from the co-located renewable power plant and from the grid through the plant’s existing interconnection and substation infrastructure. By accessing both sources of power, our facilities are able to meet their energy needs while maintaining operating flexibility. In certain markets, our facilities also participate in demand response programs that support grid reliability.

Current report

A key element of our strategy is the colocation of data centers directly with renewable generation assets. By building behind the meter at renewable generation sites, we are able to access both on-site generation and existing grid interconnection infrastructure, which we believe can improve power economics and accelerate development timelines.

Current report

With a repeatable development approach and an expanding pipeline of projects, we are seeking to scale a differentiated digital infrastructure platform that supports renewable power utilization, flexible computing capacity, and long-term value creation.

Current report

•Bitcoin / Data Center Hosting Business – We provide hosting and colocation services to third-party Bitcoin mining customers at our data centers.

Current report

•Bitcoin Mining Business – We mine Bitcoin through proprietary operations and joint ventures at our data centers.

Current report

•HPC Business – Through Soluna HPC, Inc., we are developing AI-ready data center leasing and hosting capabilities for AI and HPC workloads, beginning with Project Kati 2, which is being engineered for more than 300 MW of capacity in partnership with Metrobloks, LLC ("Metrobloks").

Current report

•Wind Energy Generation Business - As of April 1, 2026, with the acquisition of the wind farm in Briscoe, Texas (the "Briscoe Wind Farm"), we sell power generated from owned wind turbines and also sell renewable energy credits.

Current report

•Fixed-Fee Model – Customers pay a fixed fee based on energy consumed.

Current report

•Profit-Share Model – Customers pay a share of the profits from their mining activity, with power costs generally passed through.

Current report

•Fixed-Fee Service Agreement Model – Customers pay a fixed fee for managed Bitcoin mining capacity and hashrate over the term of the service agreement.

Current report

As of March 31, 2026, five of our projects provide Bitcoin hosting services for a total MW capacity of approximately 137 MW.

Current report

As of March 31, 2026, only one of our projects provide Bitcoin self-mining for a total MW capacity of approximately 22 MWs.

Current report

Our HPC business is being developed through Soluna HPC, Inc. and is focused on data center leasing and hosting solutions for AI and other HPC workloads, with an initial target customer base of Hyperscalers and Neoclouds, and enterprise customers over time.

Current report

Unlike our Bitcoin mining and hosting operations, which use a data center design, our HPC business is based on an AI-ready data center design intended to support higher-density compute environments and the infrastructure requirements of AI and HPC customers.

Current report

Our first planned large-scale HPC development is Project Kati 2, which is being engineered for more than 300 MW of capacity in partnership with Metrobloks. We expect Project Kati 2 to serve as the initial platform for Soluna HPC, Inc.’s leasing and hosting business. We are also advancing additional projects from our development pipeline that are in various stages of evaluation, engineering, and development.

Current report

In March 2025, we terminated our prior agreement with Hewlett Packard Enterprise Company (“HPE”), which had supported our earlier GPU-as-a-Service offering. Following that termination, we refocused our HPC strategy on the development of dedicated data center infrastructure for third-party leasing and hosting.

Current report

•Spring Lane Capital (“SLC”) – A private venture capital firm with approximately $450 million in assets under management, focused on sustainability-oriented infrastructure. On May 3, 2022, SLC committed $35 million to finance Soluna’s Project Dorothy 1A (“D1A”). On July 22, 2024, SLC committed an additional $30 million to support the development of Soluna's Project Dorothy 2 ("D2"). On July 22, 2025, SLC committed an initial $20.0 million for the first phase of the construction on Project Kati 1, subject to customary conditions, in which the contribution cap is $48.98 million. Subsequent to March 31, 2026, the Company acquired SLC's membership interest in D1A and currently owns 100% of the issued and outstanding membership interests of D1A. SLC retains its membership interests in D2 and Project Kati 1.

Current report

•Navitas West Texas Investments SPV, LLC (“Navitas”) – an investment vehicle organized by Navitas Global, a private equity firm focused on sustainable Bitcoin mining. On May 9, 2023, we entered into a strategic partnership with Navitas to support mining operations at Project Dorothy 1B (“D1B”).

Current report

•Galaxy Digital, LLC (“Galaxy”) –a financial services and investment management innovator in the digital asset and blockchain technology sectors. On March 12, 2025, our subsidiaries entered into a five-year term loan facility in the principal amount of $5.0 million.

Current report

•Generate Capital (“Generate”) – a leading infrastructure investment firm. On September 12, 2025, we entered into a $100.0 million credit facility with Generate, in which as of March 31, 2026, we have drawn approximately $17.0 million to fund refinancing and construction of active data center projects. On April 1, 2026, an additional $12.5 million was drawn to fund a portion of the Briscoe Wind Farm acquisition as discussed in the recent developments note below.

Current report

D1A is focused on Bitcoin Hosting for some of the industry’s hyperscale miners. As of March 31, 2026, D1A has completed all customer deployments and executed fleet upgrades across multiple hosting partners, driving measurable hashrate growth throughout the period.

Current report

On April 15, 2026, we acquired SLC's equity interest in D1A for $16.5 million and now own 100% of the issued and outstanding membership interests of D1A. The transaction gives us complete equity ownership of D1A, and will allow for the beginning of changing the business plan of our Dorothy projects to support AI workloads.

Current report

D1B is focused on proprietary Bitcoin Mining. D1B is co-owned by Navitas, which owns approximately 49% of the membership interests of D1B, while we own the remaining 51% of the membership interests. In 2025, fleet consolidation and reinvestment at D1B resulted in the deployment of 1,000 upgraded S19 XP miners.. In March 2026, we started 3.3 MWs of Bitcoin Hosting at D1B, in addition to the Bitcoin Mining at this project.

Current report

D2 is a 48 MW expansion of the Company’s Dorothy campus, which construction and commissioning were completed in 2025. D2 is fully contracted with a mix of new and existing customers, including Blockware, Compass Mining, and a large-scale mining partner, and generates revenue through Bitcoin hosting and participation in demand response programs. D2 features a superior financial waterfall structure and enhanced management and development fees for Soluna compared to D1A, allowing us to benefit from improved income once the facility is operational.

Current report

Project Dorothy 3 is our next planned renewable-powered AI computing campus, advancing on 300 new acres adjacent to D1 and D2 in West Texas. Built on a foundation of vertically integrated wind generation and behind-the-meter infrastructure, Project Dorothy 3 is designed to support high-performance computing and generative AI workloads at scale.

Current report

Project Grace is a 2 MW project located at the D2 focused on an AI pilot. The Company is collaborating with Siemens at Project Grace, a leading technology company in electrification, automation and digitalization, to develop solutions addressing power demand fluctuations associated with AI workloads. In March 2026, we began technical simulations with our Siemens to confirm that the selected technology solution meets ERCOT grid stability and low-voltage ride-through requirements for AI load integration.

Current report

Project Kati 1 is the first phase of the Company’s data center campus under development in Willacy County, Texas, co-located with a 272.6 MW wind farm. Project Kati 1 comprises 83 MW dedicated to Bitcoin hosting. Construction began on September 18, 2025, and on July 22, 2025, the Company finalized a contribution agreement with SLC for the initial 35 MW of capacity, with initial energization beginning in the first quarter of 2026. Project Kati 1 started operating in February 2026, and completed 48MWs of construction on April 1, 2026, filled by Galaxy Digital, Inc.

Current report

Project Kati 2 is the second phase of development at the Company’s Kati site in Willacy County, Texas, and is focused on supporting AI and high-performance computing workloads. The project is being advanced through a joint venture with Metrobloks to develop an initial phase of 100 MW+ CIT (and upwards of 350MW CIT) of AI and HPC capacity, with the potential to expand to a larger multi-hundred-megawatt deployment. The campus is designed to leverage behind-the-meter integration with renewable energy and support customers requiring large-scale, high-density compute infrastructure with accelerated time to power. Discussions began in December 2025 with potential customers for the data center campus. In March and April of 2026 those discussions continue several additional potential customers. The final stages of the design RFP were completed in April 2026 and design work is set to begin in May 2026.

Current report

•Grow Pipeline: Expand Soluna’s Renewable Computing(™) pipeline by advancing projects inour 4.3 GW+power pipeline to shovel-ready status and securing behind-the-meter access to curtailed energy resources. Enable scalable capacity with accelerated speed to power.

Current report

•Develop AI: Advance Project Kati 2 with Metrobloks to shovel-ready and tenant-ready, in addition to advancing Project Dorothy 3 to shovel-ready and tenant-ready. Build a pipeline of AI-ready campuses designed for rapid deployment from the 4.3GW+ pipeline through joint ventures.

Showing the first 40 of 81 passages. Open the source sections for the rest.

Removed paragraphs (87)

Previous report

We develop and operate digital infrastructure that taps into a growing global opportunity: the convergence of renewable energy and High-Performance Computing (HPC). We call this modelRenewable Computing™.

Previous report

Across the world, vast amounts of clean energy go to waste due to curtailment. At the same time, there is a critical shortage of power for energy-intensive infrastructure like AI, HPC, and Bitcoin mining. Renewable Computing™ bridges this gap—unlocking stranded renewable energy and turning it into scalable computing power.

Previous report

We build, own or co-own, and operate data centers co-located with wind, solar, and hydroelectric plants. Our modular and scalable design supports high-throughput, batchable applications such as Bitcoin, and soon, HPC/AI workloads. These facilities are managed byMaestroOS™, our proprietary operating system (“MaestroOS”), which continuously analyzes signals like local power pricing, weather, grid demand, and market conditions to optimize performance and economics.

Previous report

This intelligent orchestration enables long-term asset monetization and attractive returns on invested capital. Our approach is purpose-built for the energy transition. We specialize in curtailment solutions, working closely with leading renewable energy developers to access underutilized, low-cost power. Our behind-the-meter model allows us to draw energy directly from the plant or the grid, while also providing demand response services—reducing costs and enhancing grid resilience.

Previous report

A key strategic advantage is our model of co-locating data centers directly with renewable power generation assets. By building behind the meter, we are able to bypass long interconnection queues and source electricity directly from the generation site. This structure not only improves power economics, but also accelerates time-to-market—an increasingly important factor for companies with large, time-sensitive computing workloads such as AI and HPC.

Previous report

With a repeatable strategy and a growing pipeline of projects, we are scaling a new category of digital infrastructure—one that enhances returns for renewable farms by purchasing excess capacity, lowers computing costs, and advances a more sustainable future.

Previous report

In 2024 and into 2025, our execution strategy was centered around four key initiatives:

Previous report

In June 2024, we began providing GPU-as-a-Service in partnership with Hewlett Packard Enterprise Company (“HPE”), offering GPU resources to startups, enterprises, and GPU marketplaces for a fee. As further described in our Annual Report, we terminated our agreement with HPE.

Previous report

Our first planned AI/HPC colocation project isProject Kati, which is in active construction, and breaking ground near the end of the third quarter 2025. Additional projects, including the announcedProject Rosa, are also in progress. For the fiscal year 2024 and the nine months ended September 30, 2025, we generated minimal revenue from our HPC Business.

Previous report

D1A is focused on Bitcoin Hosting for industry hyperscale miners. There are approximately 7,700 Bitcoin miners installed at D1A, which as of September 30, 2025, resulted in a hashrate of approximately 990 PH/s. For the year ended December 31, 2024, D1A consumed over 45,700 MWh of Curtailed Energy and for the three and nine months ended September 30, 2025, D1A consumed over 700 and 24,400 MWh of Curtailed Energy.

Previous report

D1B is focused on proprietary Bitcoin Mining. There are approximately 6,800 Bitmain Antminer S19s, S19j Pro and S19j Pro+ machines installed, including a September 2025 addition of S19 XP, resulting in an installed hashrate of 726 PH/s for the three months ended September 30, 2025. For the year ended December 31, 2024, D1B consumed over 44,600 MWh of Curtailed Energy and for the three and nine months ended September 30, 2025, D1B consumed over 500 MWh and 24,700 MWh of Curtailed Energy. D1B is co-owned by Navitas, which owns approximately 49% of D1B, while we own the remaining 51%.

Previous report

We began planning for the 48 MW expansion of Project Dorothy in 2023 – known as Project Dorothy 2. We partnered with SLC who agreed to finance up to $30 million of the project cost. We closed the initial financing contribution and operation agreement with SLC in July 2024 and broke ground in the third quarter of 2024. Initial energization and ramp-up began as of May 2025. This has enabled the commencement of the commissioning of the first of 3 phases, of 16 MW, that began in May 2025 and was completed at the end of October 2025, as the site is now fully operational. As each phase was commissioned, it began to generate revenue, both due to Bitcoin Hosting and Demand Response Services. D2 features a superior financial waterfall structure and enhanced management and development fees for Soluna compared to D1A, allowing us to benefit from improved income once the facility is operational.

Previous report

Project Grace is a 2 MW project located at the D2 site focused on next generation data center designs for AI. It contemplates new direct liquid cooling technologies, proprietary building and power designs – called Helix.

Previous report

We are developing Project Kati in Willacy County, Texas, which is expected to be developed into 166 MW (broken out in 2 phases) of data centers for HPC, Bitcoin Hosting and other computing-intensive applications. It is co-located with a 272.6MW wind farm. We have completed the necessary studies for the ERCOT planning phase, which is the last formal step to secure approvals by regulatory agencies or grid operators, such as ERCOT in Texas, to proceed with project construction and commissioning. We have completed the necessary amendments to the interconnection agreements with American Electric Power, the transmission service provider. We have secured land, contingent on reaching final agreement with local government and schools regarding taxation, for the project and have started capital formation activities. On July 22, 2025, we finalized a contribution agreement from SLC for the first 35 MW of the 83 MW phase of Kati 1 with the goal of achieving initial energization by the first quarter of 2026. On September 18, 2025, we held a groundbreaking ceremony and officially began construction of Project Kati in Willacy County Texas. Project Kati is designed as a two-phase buildout: Kati 1 (83MW) is dedicated to Bitcoin hosting with Galaxy Digital as the first customer already secured, while Kati 2 (83MW) will expand the site to support AI and high-performance computing (HPC) infrastructure.

Previous report

Our growth strategy is focused on expanding our pipeline of renewable energy-powered data center projects and accelerating their development through joint ventures, co-ownership structures, and other strategic partnerships. Over time, we intend to increase our ownership stake in these projects to enhance long-term value.

Previous report

We believe our renewable energy project pipeline—currently estimated at over 2.8 gigawatts (GW)—represents our most valuable strategic asset. We believe this pipeline has the potential to support the development of approximately 300 to 400 MW of new digital infrastructure annually over the next six to eight years.

Previous report

In parallel with new project development, we are refining our operational model across existing sites to position ourselves as a partner of choice for both AI/HPC colocation and Bitcoin Hosting.

Previous report

We continue to grow our pipeline by increasing the number of curtailment assessments completed with power generation partners. These assessments serve as a precursor to securing exclusive Power Purchase Agreements (“PPAs”), acquiring or leasing land, and executing other pre-construction development activities necessary to advance projects to shovel-ready status.

Previous report

On August 12, 2024, the Company entered into the SEPA with YA. Pursuant to the terms of the SEPA, the Company agreed to issue and sell to YA, from time to time, and YA agreed to purchase from the Company, up to $25 million of shares of the Company’s common stock (the “SEPA Shares”). The Company paid a commitment fee of approximately $250 thousand to YA and consent fee of $25 thousand to the holder of shares of Series B Preferred Stock, which was paid through the issuance of 65,320 shares of common stock. The commitment and consent fees were recorded within Other expense, net on the Company’s consolidated financial statements for the year ended December 31, 2024. The Company and YA also entered into a registration rights agreement, pursuant to which the Company agreed to prepare and file with the SEC a Registration Statement on Form S-1, registering the resale of the SEPA Shares. On November 12, 2024, the Company filed a registration statement on Form S-1 (File No. 333-282559) with the SEC for the resale by YA of 3,000,000 SEPA Shares, which was declared effective by the SEC on February 5, 2025. During the three and nine months ended September 30, 2025, the Company has issued and sold approximately 1.5 million and 3.0 million shares of common stock to YA pursuant to the SEPA for aggregate net proceeds to the Company of approximately $4.2 million and $6.2 million.

Previous report

During the three and nine months ended September 30, 2025, the Company sold 14,649,141 and 17,989,804 shares of common stock pursuant to the ATM Agreement for net proceeds of $20.8 million and $23.0 million after deducting sales agent commissions. The Company has sold an additional 2,690,679 shares of common stock pursuant to the ATM Agreement subsequent to September 30, 2025 for additional net proceeds of approximately $6.3 million.

Previous report

The shares of common stock sold under the ATM Agreement are offered and sold pursuant to the Company’s effective shelf registration statement on Form S-3 (File No. 333-286638) filed by the Company with the U.S. Securities and Exchange Commission (the “SEC”) on April 18, 2024 and declared effective by the SEC on April 29, 2025. As of the date of these condensed financial statements, we have approximately $69.7 million of shares of common stock that are available for issuance under the ATM.

Previous report

On July 15, 2025, the Company entered into a securities purchase agreement with the purchasers signatory thereto, pursuant to which the Company sold in a public offering (the “July 2025 Offering”) an aggregate of (i) 8,794,544 shares of common stock (each a “Share” and collectively, the “Shares”); (ii) pre-funded warrants (the “Pre-Funded Warrants”) to purchase 296,365 shares of common stock; (iii) Series A warrants (the “Series A Warrants”) to purchase 9,090,909 shares of common stock; and (iv) Series B warrants (the “Series B Warrants,” and together with the Series A Warrants, the “Common Warrants”) to purchase 9,090,909 shares of common stock,.

Previous report

Each Share or Pre-Funded Warrant was sold together with one Series A Warrant to purchase one Share and one Series B Warrant to purchase one Share. The combined public offering price for each Share (or Pre-Funded Warrant) and accompanying Common Warrants was $0.55. The Pre-Funded Warrants have an exercise price of $0.001 per share, are exercisable immediately upon issuance and will expire when exercised in full. Each Common Warrant has an exercise price of $0.55 per share and is exercisable immediately upon issuance. The Series A Warrants will expire on the five-year anniversary of the initial exercise date and the Series B Warrants will expire on the twenty-four-month anniversary of the initial exercise date.

Previous report

The net proceeds of the July 2025 Offering, after deducting the fees and expenses of the placement agent, and other offering expenses payable by the Company, but excluding the net proceeds, if any, from the exercise of the Common Warrants, is approximately $4.3 million. The July 2025 Offering closed on July 17, 2025. As of the date of these condensed financial statements, the Series A and B warrants have been fully exercised raising an additional $10.0 million in gross proceeds.

Previous report

On November 7, 2025, the Company held a Special Meeting of Stockholders (the “Special Meeting”) at which, among other matters of business acted upon, the Company’s stockholders approved an amendment to the Company’s Articles of Incorporation, as amended, to increase the Company’s authorized shares of common stock from 75,000,000 shares to 375,000,000 shares (the “Certificate of Amendment”). On November 7, 2025, the Company filed the Certificate of Amendment with the Secretary of State of the State of Nevada, and such amendment became effective immediately.

Previous report

As previously disclosed, the Company received written notice from Nasdaq indicating that the Company was not in compliance with the $1.00 minimum bid price requirement for continued listing on The Nasdaq Capital Market, as set forth in Nasdaq Listing Rule 5550(a)(2) (the “Bid Price Rule”), and in accordance with Nasdaq Listing Rule 5810(c)(3)(A), the Company was given until November 4, 2025, to regain compliance. On October 3, 2025, the Company received formal written notice from Nasdaq indicating that the Company had regained compliance with the Bid Price Rule and that this matter is now closed.

Previous report

As previously disclosed, on December 29, 2022, NYDIG ABL LLC (“NYDIG”) filed a complaint against (i) Soluna MC Borrowings, LLC 2021-1, a Delaware limited liability company (“Borrower”) and indirect wholly-owned subsidiary of Soluna Holdings, Inc., a Nevada corporation (the “Company”), and Soluna MC, LLC, a Nevada limited liability company and indirect wholly-owned subsidiary of the Company (“Guarantor”, and together with Borrower, the “Soluna Parties”) in Marshall Circuit Court of the Commonwealth of Kentucky (the “Court”) regarding a series of loans (the “NYDIG Loans”) made by NYDIG to Borrower pursuant to a Master Equipment Finance Agreement, dated December 30, 2021, that were secured by certain assets of Borrower and guaranteed by Guarantor pursuant to a written guaranty agreement. The Soluna Parties and NYDIG entered into a Stipulation and Agreed Judgment which was approved by the Court on February 23, 2024, whereby judgment was granted to NYDIG on the counts in the complaint and the Soluna Parties became jointly and severally liable for an aggregate amount of $9,182,646.13 plus interest (the “Agreed Judgment Amount”).

Previous report

On September 29, 2025, the Soluna Parties and NYDIG entered into a Settlement Agreement (the “Settlement Agreement”), pursuant to which the Soluna Parties and NYDIG agreed to fully settle and resolve the Agreed Judgment Amount and all other matters relating to the NYDIG Loans in exchange for the Soluna Parties’ agreement to make certain settlement payments to NYDIG in accordance with the Settlement Agreement. As of the date of filing these condensed financial statements, the Settlement Agreement has been fully satisfied and paid.

Showing the first 40 of 87 passages. Open the source sections for the rest.

Reworded paragraphs (46)

Previous wording

Unless the context requires otherwise in these condensed consolidated financial statements, the terms “SHI,” “Soluna,” the “Company,” “we,” “us,” and “our” refer to Soluna Holdings, Inc. together with its consolidated subsidiaries, “SDI” refers to Soluna Digital, Inc. “SCI” refers to Soluna Computing, Inc., formerly known as EcoChain, Inc., “Soluna Cloud” or “Cloud” refer to Soluna Cloud, Inc., and “SEI” refers to Soluna Energy, Inc. Other trademarks, trade names, and service marks used in this Quarterly Report on Form 10-Q are the property of their respective owners.

Current wording

Unless the context requires otherwise in these condensed consolidated financial statements, the terms “SHI,” “Soluna,” the “Company,” “we,” “us,” and “our” refer to Soluna Holdings, Inc. together with its consolidated subsidiaries, “SDI” refers to Soluna Digital, Inc., “Soluna Cloud” or “Cloud” refer to Soluna Cloud, Inc., “SEI” refers to Soluna Energy, Inc., and "Soluna Wind" refers to Soluna Wind Holding, Inc. Other trademarks, trade names, and service marks used in this Quarterly Report on Form 10-Q are the property of their respective owners.

Previous wording

Our mission is to make renewable energy a global superpower using computing as a catalyst.

Current wording

Our mission is to make renewable energy a global superpower by using computing as a catalyst.

Previous wording

We operate across multiple business lines and generate revenue from four primary sources, as described below:

Current wording

We operate across multiple business lines and currently or plan to generate revenue from five primary sources:

Previous wording

We provide colocation and hosting services for third-party Bitcoin mining customers at our data centers. Customers contract space based on their power requirements. Our current customer base includes several large-scale (“Hyperscale”) Bitcoin miners. Contracts typically range from 12 to 24 months in duration.

Current wording

We provide colocation and hosting services to third-party Bitcoin mining customers at our data centers. Customers typically contract for capacity based on their power requirements. Our customer base includes several large-scale Bitcoin mining operators. Contracts generally range from 12 to 24 months in duration.

Previous wording

For the three and nine months ended September 30, 2025, our Bitcoin Hosting Business accounted for approximately 62% and 53% of total revenue. For the three and nine months ended September 30, 2024, our Bitcoin Hosting Business accounted for approximately 57% and 49% of total revenue. Revenue in the Bitcoin Hosting Business was concentrated among a small number of customers. For the three months ended September 30, 2025, two customers made up approximately 63% of hosting revenue and 40% of total revenue. For the nine months ended September 30, 2025, three customers made up approximately 80% of hosting revenue and 42% of total revenue.

Current wording

For the three months ended March 31, 2026 and 2025, our Bitcoin Hosting Business accounted for approximately 71% and 40% of total revenue, respectively. Revenue in this business has been concentrated among a limited number of customers. For the three months ended March 31, 2026, three customers accounted for 74% of hosting revenue and 53% of total revenue.

Previous wording

We engage in proprietary Bitcoin mining, a process that verifies transactions and secures the Bitcoin blockchain. This process involves the use of specialized computing equipment to solve complex cryptographic algorithms. Miners compete to solve these algorithms; the first to do so is awarded a predetermined number of newly issued Bitcoins (the “Block Reward”) and any transaction fees associated with that block.

Current wording

We engage in proprietary Bitcoin mining, a process that validates transactions and secures the Bitcoin blockchain. This process uses specialized computing equipment to solve complex cryptographic algorithms. Miners compete to solve these algorithms, and the first to do so is awarded a predetermined number of newly issued Bitcoins (the “Block Reward”), together with the transaction fees associated with that block.

Previous wording

We participate in one or more mining pools—collaborative networks of miners who combine computing power to improve the probability of earning rewards. Block Rewards earned by the pool are distributed among participants based on each member’s proportional contribution. This model helps reduce revenue volatility compared to solo mining operations.

Current wording

We participate in one or more mining pools, which are collaborative networks of miners that combine computing power to improve the probability of earning rewards. Block Rewards earned by the pool are distributed among participants based on each participant’s proportional contribution. We believe this model reduces revenue volatility as compared to operating on a solo mining basis.

Previous wording

Our mining operations are energy-intensive and require significant computational resources. We operate data centers equipped with both proprietary and third-party hardware and software. Our proprietary data center operating system,MaestroOS, is used to optimize performance, manage power consumption, and increase operational efficiency.

Current wording

Mining operations are energy-intensive and require significant computational resources. We operate data centers using both proprietary and third-party hardware and software. MaestroOS is used to optimize performance, manage power consumption, and improve operating efficiency.

Previous wording

Revenue from Bitcoin mining consists of Block Rewards and transaction fees and is recognized upon receipt in accordance with applicable accounting guidance. Upon receipt, all digital assets are promptly converted into U.S. dollars through the Coinbase cryptocurrency exchange.

Current wording

Revenue from Bitcoin mining consists of Block Rewards and transaction fees and is recognized upon receipt in accordance with applicable accounting guidance. Upon receipt, digital assets are promptly converted into U.S. dollars through the Coinbase cryptocurrency exchange.

Previous wording

The profitability of this business is affected by several variables, including the market price of Bitcoin, global network hash rate, mining difficulty, electricity and infrastructure costs, and mining pool fees. In addition, Bitcoin undergoes a periodic “halving” event approximately every four years, reducing the Block Reward and potentially impacting future revenue. For the three and nine months ended September 30, 2025, our Bitcoin Mining Business represented approximately 33% and 42% of total revenue. For the three and nine months ended September 30, 2024, our Bitcoin Mining Business represented approximately 37% and 46% of total revenue.

Current wording

Mining profitability is affected by several factors, including the market price of Bitcoin, global network hash rate, mining difficulty, electricity and infrastructure costs, and mining pool fees. In addition, Bitcoin undergoes a periodic halving event, approximately every four years, that reduces the Block Reward and may adversely affect future revenue. The next Bitcoin halving event is expected in April 2028. For the three months ended March 31, 2026 and 2025, our Bitcoin Mining Business represented approximately 23% and 51% of total revenue, respectively.

Previous wording

We are currently developing new infrastructure projects intended to support AI and HPC workloads. These efforts include engagement with potential joint venture partners, conducting site and feasibility studies, securing access to power and land, and performing other early-stage development activities.

Current wording

We are currently advancing infrastructure projects intended to support AI and HPC workloads. These activities include site and feasibility studies, power and land procurement, engineering and design work, customer engagement, and evaluation of potential financing and partnership structures.

Previous wording

We provide demand response services to grid operators and utilities by leveraging our data centers as dispatchable energy resources. In select states where we operate, our data centers are enrolled in ancillary services programs that support grid reliability.

Current wording

We provide demand response services to grid operators and utilities by using our data centers as dispatchable energy resources. In certain markets in which we operate, our data centers participate in ancillary services and other demand response programs that support grid reliability.

Previous wording

Under these programs, we commit to reducing a facility’s power consumption to a predetermined level when called upon by the grid operator. In return, we receive compensation for maintaining this dispatch capability, provided we meet specific performance criteria. For example, to qualify for compensation in a given period—typically monthly—the data center must meet minimum uptime and availability requirements.

Current wording

Under these programs, we commit to reduce a facility’s power consumption to a predetermined level when called upon by the grid operator. In return, we receive compensation for maintaining this dispatch capability, provided we satisfy applicable performance requirements. These requirements typically include minimum uptime and availability thresholds during a measurement period, which is often monthly.

Previous wording

For the three and nine months ended September 30, 2025, our Demand Response Business represented approximately 5% and 5% of total revenue. For the three and nine months ended September 30, 2024, our Demand Response Business represented approximately 6% and 5% of total revenue. 2026 compensation rates are trending notably downward from increased participation in the program.

Current wording

For the three months ended March 31, 2026 and 2025, our Demand Response Business represented approximately 6% and 9% of total revenue, respectively.

Previous wording

As of September 30, 2025, we operate approximately 105 MW of capacity across two active sites located in Murray, Kentucky and Silverton, Texas. An additional 18 MW is under construction at our D2 project site, and as of September 30, 2025, we had over 900 MW of facilities in advanced development or near shovel-ready status. In total, our project pipeline includes over 2.8 gigawatts (GW) of renewable energy-powered data center developments.

Current wording

As of March 31, 2026, we operate approximately 159 MW of capacity across three active sites located in Murray, Kentucky, Silverton, Texas, and Willacy County, Texas. An additional 47 MW is under construction at our Kati 1 project site and 100+ MW is in development at our Kati 2 project site, and as of March 31, 2026, we had over 900 MW of facilities in advanced development or near shovel-ready status. In total, our project pipeline includes approximately 4.3 gigawatts (GW) of renewable energy-powered data center developments.

Previous wording

A summary of our pipeline, current and anticipated operating locations are as follows (as of September 30, 2025):

Current wording

A summary of our operations and project pipeline by location, are as follows (as of March 31, 2026):

Previous wording

During 2023, we transitioned our flagship data center Project Dorothy from construction to operations. This data center is co-located with Briscoe Wind Farm (“Briscoe”), a 150 MW wind power generation facility in Silverton, Texas. The project comprises three phases, D1A and D1B (each 25 MW facilities), and D2 (48 MW facility).

Current wording

During 2023, we transitioned our flagship data center Project Dorothy from construction to operations. This data center is co-located with Briscoe Wind Farm, a 150 MW wind power generation facility in Silverton, Texas. The project comprises three phases: D1A (25 MW), and D1B (25 MW), and D2 (48 MW).

Previous wording

In November 2023, we completed registration of Project Dorothy in one of the ERCOT’s Demand Response Services (“DRS”) programs. This designation positioned Project Dorothy as a contributor to grid flexibility and resilience in the Texas power market, while also enabling us to diversify our revenue streams.

Current wording

Project Dorothy is registered in one of the ERCOT’s Demand Response Services (“DRS”) programs. This designation positioned Project Dorothy as a contributor to grid flexibility and resilience in the Texas power market, while also enabling us to diversify our revenue streams.

Previous wording

Participation in the program allows us to generate incremental revenue and offset power costs at Project Dorothy, enhancing its cost-efficiency. As a result, the facility ranks among the lowest-cost operators in the sector. Since registration, Project Dorothy has successfully fulfilled its obligations in the Winter, Spring, and Summer DRS periods, and is currently enrolled in the Fall standby period.

Current wording

Participation in the program allows us to generate incremental revenue and offset power costs at Project Dorothy, enhancing its cost-efficiency. As a result, the facility ranks among the lowest-cost operators in the sector.

Previous wording

D1A was constructed in partnership with SLC, a leading venture capital firm focused on sustainability solutions. SLC owns approximately 85% of the Class B Membership Units of D1A, while we own 15% of the Class B Membership Units of D1A and own 100% of the Class A Membership Units of D1A. After SLC achieves an 18% Internal Rate of Return hurdle, Soluna retains 50% of the profits on D1A.

Current wording

D1A was constructed in partnership with SLC, a leading venture capital firm focused on sustainability solutions. As of March 31, 2026, SLC owned approximately 85% of the Class B membership interests of D1A, while we owned 15% of the Class B membership interests of D1A and 100% of the Class A membership interests of D1A.

Previous wording

Sophie is focused on Bitcoin Hosting of multiple large customers. The data center generates revenue via a combination of fixed services fees and profit share, while energy cost is passed through to customers. As of September 30, 2025, there are approximately 9,400 Bitcoin miners installed or contracted to be installed, resulting in an installed hashrate of approximately 1.23 EH/s.

Current wording

Sophie is focused on Bitcoin Hosting of multiple large customers. The data center generates revenue via a combination of fixed services fees and profit share, while energy cost is passed through. During 2025, Sophie completed three consecutive expansion agreements with long-standing hyperscale mining customers, reflecting sustained demand and high satisfaction with our hosting customers. In addition, Sophie closed a new 3.3 MW partnership with KULR Technology Group in October 2025, diversifying the customer base and expanding the site's renewable-powered computing footprint.

Previous wording

We have signed a term sheet for power for Project Annie, a new 75 MW data center co-located with a 114 MW solar farm in Northeast Texas. The solar farm is owned by a new power partner–a leader in renewable energy and sustainable infrastructure both in the U.S. and internationally.

Current wording

We have signed a term sheet for power for Project Annie, a new 74 MW data center which will be co-located with a 114 MW solar farm in Northeast Texas. The solar farm is owned by a new power partner–a leader in renewable energy and sustainable infrastructure both in the U.S. and internationally.

Previous wording

We have signed a term sheet for power for Project Fei is a 100 MW data center in development co-located with a 240 MW utility-scale solar farm, Soluna’s second solar-based project to date. Developed in partnership with a global leader in energy infrastructure investment, Project Fei will convert underutilized solar energy into clean, high-performance computing power. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Current wording

We have signed a term sheet for power for Project Fei, a 100 MW data center in development which will be co-located with a 240 MW utility-scale solar farm, Soluna’s second solar-based project to date. Being developed in partnership with a global leader in energy infrastructure investment, Project Fei will convert underutilized solar energy into clean, high-performance computing power. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Previous wording

We have signed a term sheet for power for Project Gladys is a 150 MW facility in development, which will be co-located with a 226 MW wind farm and developed in partnership with a prominent U.S.-based independent power producer (“IPP”) managing over $40 billion in assets and more than 80 energy facilities nationwide. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Current wording

We have signed a term sheet for power for Project Gladys, a 150 MW facility in development which will be co-located with a 226 MW wind farm and developed in partnership with a prominent U.S.-based independent power producer managing over $40 billion in assets and more than 80 energy facilities nationwide. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Previous wording

In 2025 and 2026, we are focused on advancing the following key initiatives:

Current wording

In 2026, we are focused on advancing the following key initiatives:

Previous wording

On September 12, 2025, the Company caused its subsidiaries Soluna DVSL ComputeCo, LLC (“Dorothy 1A Borrower”), Soluna DVSL II ComputeCo, LLC, and Soluna KK I ComputeCo, LLC (collectively, the “Borrowers”) to enter into a Credit and Guaranty Agreement (the “Credit Agreement”) with Generate Lending, LLC, as administrative agent and collateral agent (the “Agent”), and Generate Strategic Credit Master Fund I-A, L.P. (the “Lender”). The Credit Agreement provides for senior secured term loan commitments in an aggregate principal amount of up to $35.5 million, comprised of (i) Tranche A-1 ($5.5 million), (ii) Tranche A-3 ($11.5 million), and (iii) Tranche B ($18.5 million). In addition, the Credit Agreement permits the Borrowers to request one or more Additional Tranche Loan Commitments (as defined in the Credit Agreement), in the aggregate amount of up to $64.5 million, subject to the approval of the Lender and the Agent, for project-level financing of eligible projects. On September 12, 2025, the Borrowers borrowed $12,623,591 under the Credit Agreement, comprised of Tranche A-1 loans and Tranche A-3 loans. The Company can draw upon Tranche B from September 12, 2025 until October 31, 2026, subject to the conditions set forth in the Credit Agreement. The maturity date for the Tranche A and Tranche B loans is the earlier of (i) payment of outstanding principal, interest, and fees and (ii) September 12, 2030. Additional Tranche Loan Commitments will have maturity dates as set forth in their respective amendments to the Credit Agreement. See further details on the Generate Loan Facility in Note 8.

Current wording

On September 12, 2025, the Company caused its subsidiaries Soluna DVSL ComputeCo, LLC , Soluna DVSL II ComputeCo, LLC , and Soluna KK I ComputeCo, LLC (collectively, the “Existing Borrowers”) to enter into a Credit and Guaranty Agreement (the “Credit Agreement”) with Generate Lending, LLC, as administrative agent and collateral agent (the “Agent”), and Generate Strategic Credit Master Fund I-A, L.P. (the “Lender”). The Credit Agreement provides for senior secured term loan commitments in an aggregate principal amount of up to $35.5 million, comprised of (i) Tranche A-1 ($5.5 million), (ii) Tranche A-3 ($11.5 million), and (iii) Tranche B ($18.5 million). In addition, the Credit Agreement permits the Existing Borrowers to request one or more Additional Tranche Loan Commitments (as defined in the Credit Agreement), in the aggregate amount of up to $64.5 million, subject to the approval of the Lender and the Agent, for project-level financing of eligible projects.

Previous wording

Pursuant to the Credit Agreement, the Company issued to Generate Strategic Credit Master Fund I-B, L.P., an affiliate of the Lender and the Agent (“Generate”), in a private placement: (i) a pre-funded warrant to purchase up to 2,000,000 shares of common stock; and (ii) a common warrant to purchase up to 2,000,000 shares of common stock (collectively, the “Generate Warrants”).

Current wording

Pursuant to the Amended Credit Agreement, the Company issued to Generate Strategic Credit Master Fund I-B, L.P., an affiliate of the Lender and the Agent, in a private placement: (i) a pre-funded warrant to purchase up to 700,000 shares of common stock; (ii) a common warrant to purchase up to 1,350,000 shares of common stock; and (iii) a common warrant to purchase up to 650,000 shares of common stock.

Previous wording

Data Hosting Revenue: Hosting revenue increased for the three months ended September 30, 2025, compared to the same period in 2024. This increase was primarily driven by the ramped-up energization and resulting revenue contribution from the D2 facility during the third quarter of 2025. This positive impact was partially offset by a shift in the customer contract mix at the D1A and Sophie locations. Specifically, following the exit of one of our largest fixed-fee customers in December 2024, the Company onboarded replacement customers operating under a profit-sharing fee structure, thereby impacting the overall revenue contribution model.

Current wording

Data Hosting Revenue: Hosting revenue increased for the three months ended March 31, 2026, compared to the same period in 2025. This increase was primarily driven by the ramped-up energization and resulting revenue contribution from the D2 and Kati facility during the first quarter of 2026, whereas both sites did not generate revenue in the first quarter of 2025.

Previous wording

The decrease in the cost of cryptocurrency mining revenue for the three months ended September 30, 2025, compared to the same period in 2024, was primarily due to a reduction in operating and electricity costs, corresponding from a 18% decrease in electricity usage.

Current wording

The decrease in the cost of cryptocurrency mining revenue for the three months ended March 31, 2026, compared to the same period in 2025, was primarily driven by lower electricity consumption and associated operating expenses, reflecting a reduction in total power utilization during the period.

Previous wording

Cost of data hosting increased for the three months ended September 30, 2025, compared to the same period in 2024. This increase was primarily driven by the initial energization of the Dorothy 2 facility during the second quarter of 2025 and the subsequent increase in MWs capacity and associated operating costs in the third quarter of 2025. This cost increase was partially offset by a favorable change in the hosting contract mix, specifically the replacement of certain fixed-rate volume contracts with new agreements that include an electricity cost passthrough provision.

Current wording

Cost of data hosting increased for the three months ended March 31, 2026, compared to the same period in 2025. This increase was primarily driven by the initial energization of the D2 facility during the second quarter of 2025 and the subsequent increase in MWs capacity and associated operating costs in the first quarter of 2026, in addition to the initial energization of Project Kati during the first quarter of 2026.

Previous wording

Interest expense: Interest expense for the three months ended September 30, 2025 was approximately $1.2 million compared to the $821 thousand for the three months ended September 30, 2024. See table below noting the difference mainly relates to the new loans entered into in fiscal year 2024 and 2025 (June SPA, Galaxy Loan, Generate loan, and equipment loan), which includes amortization of deferred financing costs.

Current wording

Interest expense: Interest expense for the three months ended March 31, 2026 was approximately$1.5 million compared to the$838 thousand for the three months ended March 31, 2025. See table below noting the difference mainly relates to the new loans entered into in fiscal year 2025 (Generate loan and Galaxy loan), which includes amortization of deferred financing costs, offset by the NYDIG ABL LLC ("NYDIG") equipment financing loan that was settled in September 2025.

Previous wording

In addition to financial measures calculated in accordance with GAAP, we also use “EBITDA” and “Adjusted EBITDA.” “EBITDA” is defined as earnings before interest, taxes, and depreciation and amortization. “Adjusted EBITDA” is defined as EBITDA adjusted for stock-based compensation costs, loss on sale of fixed assets, loss on debt extinguishment and revaluation, placement agent release expense, loss on contract, provision for credit losses, convertible note inducement expense and impairment on fixed assets. Management believes that EBITDA and Adjusted EBITDA results in a performance measurement that represents a key indicator of our business operations of cryptocurrency mining, hosting customers engaged in cryptocurrency mining, demand service revenue, and high-performance computing services.

Current wording

In addition to financial measures calculated in accordance with GAAP, we also use “EBITDA” and “Adjusted EBITDA.” “EBITDA” is defined as earnings before interest, taxes, and depreciation and amortization. “Adjusted EBITDA” is defined as EBITDA adjusted for stock-based compensation costs, gain on sale of fixed assets, gain on debt extinguishment, fair value adjustments, and other non-cash activity. Management believes that EBITDA and Adjusted EBITDA results in a performance measurement that represents a key indicator of our business operations of cryptocurrency mining, hosting customers engaged in cryptocurrency mining, demand service revenue, and high-performance computing services.

Previous wording

As of September 30, 2025, we had a consolidated accumulated deficit of approximately $353.2 million and we had positive working capital of approximately $10.2 million, in which was due to significant financings in the third quarter of 2025. As of September 30, 2025, we had total debt outstanding of approximately $23.3 million as summarized further below in the Debt table. In addition, we had outstanding commitments related to Soluna Digital Inc. (“SDI”) of approximately $11.9 million in capital expenditures mainly related to Project Dorothy 2 and Project Kati. In addition, due to CloudCo’s termination of the HPE Agreement on March 24, 2025, and HPE’s termination of the HPE Agreement on March 26, 2025, and the acceleration of the remaining unpaid amounts of the contract in accordance with the HPE Agreement, we have recognized a liability for the remainder of the HPE Agreement on the consolidated balance sheet of approximately $19.3 million. As of September 30, 2025, we had $51.4 million of cash available to fund our operations.

Current wording

As of March 31, 2026, we had a consolidated accumulated deficit of approximately $385.2 million and we had positive working capital of approximately $38.8 million. As of March 31, 2026, we had total debt outstanding of approximately $26.0 million as summarized further below in the Debt table. In addition, we had outstanding commitments related to Soluna Digital Inc. (“SDI”) of approximately $8.2 million in capital expenditures related to Project Kati. In addition, due to CloudCo’s termination of the HPE Agreement on March 24, 2025, and HPE’s termination of the HPE Agreement on March 26, 2025, and the acceleration of the remaining unpaid amounts of the contract in accordance with Section 8(h)(ii) of the HPE Agreement, we have recognized a liability for the remainder of the HPE Agreement on the balance sheet of our subsidiary, CloudCo, of approximately $19.3 million. As of March 31, 2026, we had $68.6 million of cash available to fund our operations.

Previous wording

Based on business developments, including changes in production levels, staffing requirements, and network infrastructure improvements, we will require additional capital equipment in the foreseeable future. We are focused on developing and monetizing green, zero-carbon computing and cryptocurrency mining facilities, as well as facilities capable of hosting customers engaged in cryptocurrency mining, and data centers to provide specialized AI Cloud and colocation services.

Current wording

Based on business developments, including changes in production levels, staffing requirements, and network infrastructure improvements, we will require additional capital equipment in the foreseeable future. We are focused on developing and monetizing green cryptocurrency mining facilities, as well as facilities capable of hosting customers engaged in cryptocurrency mining, and data centers to provide specialized AI Cloud and colocation services.

Previous wording

On April 29, 2025, the Company entered into an At the Market Offering Agreement (the “ATM Agreement”) with H.C. Wainwright & Co., LLC (“Wainwright”), as sales agent, pursuant to which the Company may offer and sell, from time to time, through Wainwright, up to $3.75 million of shares of common stock. The Company will pay Wainwright a commission of 3.0% of the aggregate gross proceeds from each sale of shares and has agreed to provide Wainwright with customary indemnification and contribution rights. An additional prospectus supplement was filed on September 2, 2025, in which the Company may offer and sell shares of our common stock having an aggregate offering price of up to $8,585,280 from time to time through Wainwright, and an additional prospectus supplement was filed on September 23, 2025, in which the Company may offer and sell shares of our common stock having an aggregate offering price up to $87,650,000 from time to time through Wainwright.

Current wording

•At the Market Offering Agreement (the “ATM Agreement”) with H.C. Wainwright & Co., LLC (“Wainwright”), as sales agent, pursuant to which we may offer and sell, from time to time, through Wainwright, up to $87.65 million. As of December 31, 2025, we had drawn approximately $34.2 million in net proceeds pursuant to the ATM Agreement. No draws were done for the three months ended March 31, 2026. On March 9, 2026, the Company filed a shelf registration statement on Form S-3 which was subsequently declared effective in whichthe Company may offer and sell shares of the Company’s common stock having an aggregate offering price up to$500 million from time to time through Wainwright. Subsequent to March 31, 2026 and through the date of the issuance of these condensed financial statements, the Company has issued 36,820,572 shares of common stock for net proceeds of approximately $52.2 million.

Previous wording

We plan to continue funding operations, including working capital and operating deficits, from operating cash flows and cash flow debt and equity financings, including the ATM Agreement, SEPA, July 2025 Offering, and others to be closed as needed consistent with management’s plans.

Current wording

For 2026, we plan to continue funding operations, including operating deficits, from operating cash flows and cash flow debt and equity financings, including the ATM Agreement, 2024 SEPA, additional borrowings from the Generate loan facility for the Briscoe Wind Farm acquisition, the unsecured promissory note with YA for the membership interest purchase of D1A, and others to be closed as needed consistent with management’s plans.

Previous wording

The ability to continue as a going concern is dependent upon the Company generating profitable operations in the future and/or obtaining the necessary financing to meet its obligations and repay its liabilities arising from normal business operations when they come due. In the near term, management is evaluating and implementing different strategies to obtain financing to fund the Company’s expenses and growth to achieve a level of revenue adequate to support the Company’s current cost structure. Financing strategies may include, but are not limited to, stock issuances, project level equity, debt borrowings, partnerships and/or collaborations. If the Company is unable to meet its financial obligations, it could be forced to restructure or refinance, seek additional equity capital or sell its assets. The Company might then be unable to obtain such financing or capital or sell its assets on satisfactory terms. There can be no assurance that additional financing will be available to the Company when needed or, if available, that it can be obtained on commercially reasonable terms. If the Company is not able to obtain the additional financing on a timely basis, if and when it is needed, it will be forced to delay or scale down some or all of its development activities or perhaps even cease the operation of its business.

Current wording

The Company is dependent on generating profitable operations in the future and/or obtaining the necessary financing to meet its obligations and repay its liabilities arising from normal business operations when they come due. In the near term, management is evaluating and implementing different strategies to obtain financing to fund the Company’s expenses and growth to achieve a level of revenue adequate to support the Company’s current cost structure. Financing strategies may include, but are not limited to, stock issuances, project level equity, debt borrowings, partnerships and/or collaborations. If the Company is unable to meet its financial obligations, it could be forced to restructure or refinance, seek additional equity capital or sell its assets. The Company might then be unable to obtain such financing or capital or sell its assets on satisfactory terms. There can be no assurance that additional financing will be available to the Company when needed or, if available, that it can be obtained on commercially reasonable terms. If the Company is not able to obtain the additional financing on a timely basis, if and when it is needed, it will be forced to delay or scale down some or all of its development activities or perhaps even cease the operation of its business.

Previous wording

Net cash used by operations was approximately $3.4 million during the nine months ended September 30, 2024. The Company had a net loss for the nine months ended September 30, 2024 of approximately $19.8 million. Non-cash items included approximately $4.6 million of depreciation expense and $7.1 million of amortization expenses, $3.3 million of stock compensation expenses, $7.1 million of loss on debt extinguishment and revaluation, $611 thousand in provision for credit losses, and $179 thousand amortized deferred financing costs. These non-cash items were offset with a deferred tax benefit of $1.8 million. The change in asset and liabilities is mainly due to an increase in prepaid expenses and other long-term assets by $9.2 million due to a prepayment of an arrangement with HPE of $10.3 million that is being amortized over the life of the agreement, an increase in accrued expenses and accounts payable of $4.2 million in relation to bonus accruals, NYDIG interest, and Project Dorothy 2 and Kati related bills. The other changes in assets and liabilities were not material.

Current wording

Net cash used in operations was approximately $6.4 million during the three months ended March 31, 2026. The Company had a net loss for the three months ended March 31, 2026 of approximately $17.9 million. Non-cash items mainly included approximately $2.2 million of depreciation expense, $2.4 million of amortization expenses, and $10.2 million of stock compensation expenses. The other non-cash items were not material. The change in asset and liabilities of $3.3 million mainly relates to increases in prepaid expenses and other current assets of $1.5 million in relation to prepaid utility expense for Project Kati, and timing of energy deposits, in addition to an increase in accounts payable of $2.1 million related to legal and fixed asset invoices not paid. The other changes in assets and liabilities were not material.

Previous wording

Net cash used in operations was approximately $3.5 million during the nine months ended September 30, 2025. The Company had a net loss for the nine months ended September 30, 2025 of approximately $40.9 million. Non-cash items included approximately $4.9 million of depreciation expense, $7.1 million of amortization expenses, $22.0 million in fair value adjustments mainly related to warrants being exercised, and $5.7 million of stock compensation expenses. These non-cash items were offset with a deferred tax benefit of $1.7 million and gain on extinguishment of debt of approximately $10.7 million. The change in asset and liabilities of $8.4 million mainly relates to increase in accrued expense of $5.2 million in relation to increase in construction fees for Project Kati and Dorothy 2, legal fees, financing costs, and bonus accrual. In addition, there was a $2.0 million increase in accounts payable due to timing and billing of invoices, and a $2.1 million increase in customer deposits due to new contract agreements being entered into. The other changes in assets and liabilities of approximately $885 thousand mainly related to increase in accounts receivable and other current assets related to timing and billing amounts of invoices, in addition with payment made to HPE in January, offset decrease in other long-term assets of $1.6 million in relation to receipt of Briscoe deposit in January 2025.

Current wording

Net cash used by operations was approximately $177 thousand during the three months ended March 31, 2025. The Company had a net loss for the three months ended March 31, 2025 of approximately $7.4 million. Non-cash items included approximately $1.5 million of depreciation expense, and $2.4 million of amortization expenses, and $1.8 million of stock compensation expenses. These non-cash items were offset with a deferred tax benefit of $437 thousand and gain on extinguishment of debt of approximately $551 thousand. The change in asset and liabilities of $1.9 million mainly relates to decrease in other long term assets of $1.6 million in relation to receipt of the Briscoe deposit in January 2025. The other changes in assets and liabilities of approximately $500 thousand mainly related to decrease in accounts receivable due to timing and amounts billed related to March services, an increase in accounts payable related to timing and billing amounts of invoices, including increases in legal fees, an increase in interest payable in relation to NYDIG loan and Galaxy loan, offset with payment made to HPE in January and payment of sales and use tax.

Previous wording

Net cash used in investing activities during the nine months ended September 30, 2025 was approximately $18.1 million consisting mainly of capital expenditures of $17.0 million, which consist of additions to property, plant, and equipment offset with transfers from deposits on equipment, and $1.0 million deposit on equipment purchases. Net cash used in investing activities during the nine months ended September 30, 2024 was approximately $7.7 million consisting mainly of capital expenditures of $3.7 million and deposits on equipment purchases of $4.1 million.

Current wording

Net cash used in investing activities during the three months ended March 31, 2026 was approximately $6.2 million consisting mainly of capital expenditures of $2.6 million, which consist of additions to property, plant, and equipment mainly for Project Kati offset with transfers from deposits on equipment, and $3.6 million deposit on equipment purchases.

Showing the first 40 of 46 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

•Demand Response Business – We leverage our data center infrastructure to provide demand response services to grid operators and utilities.

Current report — wording carried from elsewhere

Net cash used in investing activities during the three months ended March 31, 2025 was approximately $3.6 million consisting mainly of capital expenditures and deposits on equipment for D2.

Current report — wording carried from elsewhere

“Green Cloud Secured Note”). The Green Cloud Secured Note accrues interest at a rate 9.0% per annum, subject to adjustment upon an event of default. The Green Cloud Secured Note matures on June 20, 2027. In relation to the Green Cloud Secured Note, as of March 31, 2026, the Company had an outstanding principal balance of approximately $7.3 million.
Rearranged previous paragraphs (7)

Previous report — wording carried elsewhere

Project Fei is a 100 MW data center in development co-located with a 240 MW utility-scale solar farm, Soluna’s second solar-based project to date. Developed in partnership with a global leader in energy infrastructure investment, Project Fei will convert underutilized solar energy into clean, high-performance computing power. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Previous report — wording carried elsewhere

Project Gladys is a 150 MW facility in development, which will be co-located with a 226 MW wind farm and developed in partnership with a prominent U.S.-based independent power producer (“IPP”) managing over $40 billion in assets and more than 80 energy facilities nationwide. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Previous report — wording carried elsewhere

The following table summarizes changes in the various components of our net loss during the nine months ended September 30, 2025 compared to the nine months ended September 30, 2024.

Previous report — wording carried elsewhere

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs attributable to the operations of our cryptocurrency mining facilities in Texas.

Previous report — wording carried elsewhere

***Cost of Data Hosting Revenue, exclusive of depreciation:***Cost of data hosting revenue includes direct utility costs, site overhead expenses, and overhead costs attributable to the operations of data hosting facilities in Kentucky and Texas.

Previous report — wording carried elsewhere

General and Administrative Expenses, exclusive of depreciation and amortization: General and administrative expenses, exclusive of depreciation and amortization include cash and non-cash compensation, benefits, and related costs in support of our general corporate operations, including general management, finance and accounting, human resources, marketing, information technology, corporate development, and legal services.

Previous report — wording carried elsewhere

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the nine months ended September 30, 2025, and 2024, totaling approximately $7.2 million in each period. The expense primarily relates to the amortization of the strategic pipeline contract acquired in October 2021.