What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-11-05.
0001628280-25-049623
Item 2. : Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-03-31; filed 2026-05-06.
0001628280-26-031364
Item 2. : Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 260 previous paragraphs and 174 current paragraphs.
83 unchanged; 60 reworded; 29 added; 91 removed; 26 previous and 2 current paragraphs rearranged.
Tables are not compared: 28 previous and 14 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (29)
Current report
Although Registrant operates solely in the U.S., geopolitical developments abroad, such as the ongoing U.S. military operation in Iran, could indirectly affect our business through volatility in commodity prices, inflationary pressures, supply chain and operating cost impacts, and potential disruptions in banking systems and capital markets. Management is actively engaged with vendors and business partners to monitor and mitigate financial risks of global uncertainties; however, the scope and duration of any impacts remain uncertain. As of the date of this filing, geopolitical developments during the first quarter of 2026 have not had a material impact on the Company.
Current report
General Rate Case Filings:
Current report
In December 2025, GSWC received approval from the CPUC to implement its full second-year rate increases, effective January 1, 2026, that will result in higher adopted operating revenues less water supply cost for 2026 of approximately $32.0 million compared to 2025’s adopted operating revenues less water supply cost. Included in the 2026 increase is nearly $11 million related to the advice letter capital projects previously discussed. The assets from the advice letter projects and the related amounts in the memorandum account were added to the adopted rate base for inclusion in the revenue requirement effective January 1, 2026.
Current report
The new 2026 rates have been reflected in GSWC’s earnings for the three months ended March 31, 2026 resulting in an increase in recorded revenues of $11.1 million largely from the second-year rates and advice letter filings, and an increase in recorded water supply costs of $4.8 million, which combined is an increase of $6.3 million, compared to the same period in 2025. As a result of the discontinuation of the WRAM and MCBA effective January 1, 2025, GSWC’s earnings have been and will continue to be subject to volatility as a result of fluctuations in consumption and/or changes in water supply source mix compared to adopted levels.
Current report
On January 30, 2026, BVES filed a new general rate case application that will determine new electric rates for the years 2027 through 2030. Among other things, BVES requested (i) capital budgets of approximately $133 million for the four-year rate cycle, and another approximately $17 million, plus AFUDC, for capital projects to be filed for revenue recovery through advice letters when the projects are completed, and (ii) a capital structure for BVES of 60% equity and 40% debt, a return on equity of 11.30%, an embedded cost of debt of 5.92%, and a return on rate base of 9.15%.
Current report
Contracted Services Segment:
Current report
Summary of First Quarter Results by Segment
Current report
Water Segment:
Current report
Diluted earnings from the electric utility segment increased $0.01 per share for the first quarter of 2026 as compared to the same period in 2025 largely resulting from an increase of $3.7 million in electric revenues due to the CPUC-authorized fourth-year rate increases in 2026 and additional revenues approved after the first quarter of 2025 to recover the cost plus AFUDC of certain advice letter capital projects, partially offset by an increase in electric supply costs of $0.3 million, which combined is an increase of approximately $3.4 million compared to the same period in 2025.
Current report
The net increase discussed above was partially offset by (i) an overall increase in operating expenses of $2.3 million, mostly from operation and maintenance-related activities, and (ii) an increase in interest expense (net of interest and other income) of $0.5 million compared to the same period in 2025 due to a decrease in AFUDC related to certain advice letter projects approved by the CPUC in the latest general rate case, as previously discussed, that was recorded in 2025 with no similar level of AFUDC recorded in 2026, lower interest income earned on regulatory assets, and an increase in interest expense from higher average borrowing levels. The advice letter projects discussed are now included in adopted rate base and are part of the increase in 2026 revenues.
Current report
Contracted Services Segment:
Current report
For the three months ended March 31, 2026, revenues from water operations increased by $11.1 million to $113.1 million as compared to the same period in 2025. The increase in water revenues during the first quarter of 2026 is primarily a result of the CPUC-approved second-year rate increases effective January 1, 2026 and, as previously discussed, additional revenues approved to recover the advice letter capital projects that were added to adopted rate base for inclusion in the revenue requirement effective January 1, 2026.
Current report
Water consumption for the three months ended March 31, 2026 was consistent with the same period in 2025 and adopted levels. Prior to 2025, changes in consumption had not had a significant impact on recorded revenues due to the CPUC-approved full revenue decoupling mechanism, known as the WRAM, which adjusted volumetric revenues to adopted levels authorized by the CPUC. As previously discussed, the final decision in the latest general rate case rejected GSWC’s request for the continuation of the WRAM, and instead ordered GSWC to transition to a modified rate adjustment mechanism (a Monterey-style WRAM or “M-WRAM”). Without having a full revenue decoupling mechanism, GSWC’s revenues and earnings will be subject to future volatility as a result of significant fluctuations in customer consumption compared to adopted levels.
Current report
Contracted Services
Current report
The sum of the water and electric supply-cost balancing accounts are shown on AWR’s Consolidated Statements of Income and totaled $(0.3) million and $(1.7) million for the three months ended March 31, 2026 and 2025, respectively.
Current report
Water purchased costs for the first quarter of 2026 increased to $21.4 million as compared to $16.3 million for the same period in 2025 due primarily to higher wholesale water prices when compared to the same period in 2025 that are being recovered in current rates, and higher purchased water volume compared to the same period in 2025 resulting from certain wells being temporarily offline in a few customer service areas.
Current report
The sum of the water and electric supply-cost balancing accounts are shown on AWR’s Consolidated Statements of Income and totaled $(0.3) million and $(1.7) million for the three months ended March 31, 2026 and 2025, respectively.
Current report
The increase in other operation expenses at the water segment was primarily due to higher operation-related labor costs and increases in lab fees for water quality testing and water conservation spending.
Current report
The overall increase in depreciation and amortization expense resulted primarily from capital additions to utility plant and other fixed assets placed in service.
Current report
Maintenance expense increased at the electric services segment due largely to $1.0 million in billed surcharges to recover previously incurred costs that had been tracked in CPUC-authorized memorandum accounts, and higher maintenance activities compared to same period in 2025. Increases in revenues from billed surcharges have a corresponding and offsetting increase in maintenance expenses, resulting in no impact to earnings.
Current report
Maintenance expense increased at the contracted services segment due to higher overall maintenance activities compared to the same period in 2025.
Current report
For the three months ended March 31, 2026, other expense (net of other income) increased largely because of losses of $1.3 million recorded on investments held to fund one of the Company’s retirement plans in 2026, compared to losses of $0.6 million recorded in 2025. The increase in the losses from investments was partially offset by a decrease in the non-service cost components related to GSWC’s benefit plans resulting from changes in actuarial assumptions. However, as a result of GSWC’s two-way pension balancing account authorized by the CPUC, changes in total net periodic benefit costs related to the pension plan have no material impact to earnings.
Current report
BVES has a separate revolving credit facility without a parent guaranty that supports its electric operations and capital expenditures, which provides a borrowing capacity of$65.0 million and matures in December 2028. BVES has an option to expand the borrowing capacity by up to an additional $25.0 million, subject to lender’s approval. BVES’s revolving credit facility is considered a short-term debt arrangement by the CPUC. Therefore, pursuant to the CPUC’s requirements, borrowings under this credit facility are required to be fully paid off within a 24 month period, after which, BVES may borrow under the credit facility again. BVES’s next pay-off period currently ends in April 2028. As of March 31, 2026, there were no outstanding borrowings under BVES’s credit facility.
Current report
Net cash used by financing activities was $7.5 million for the three months ended March 31, 2026 as compared to $18.2 million net cash provided for the same period in 2025. The change in net cash used by financing activities in 2026 is due primarily to dividends paid to AWR of $19.7 million as compared to no dividend paid during the same period in 2025. GSWC’s net cash provided by financing activities was also lower due to an overall decrease in borrowings needed in 2026 under its credit facility as compared to 2025 resulting, in part, from an increase in cash flows from operating activities. During the three months ended March 31, 2026, GSWC had net borrowings on its credit facility of $9.0 million, while during the three months ended March 31, 2025, GSWC had net borrowings on its credit facility of $19.0 million.
Current report
Contracted Services
Current report
General Rate Cases and Changes in Rates During 2026
Current report
Water Segment:
Current report
Water year 2025-26 (“WY2026”), which began on October 1, 2025, has resulted in average precipitation, above average reservoir levels, and snowpack peaking early in the season in mid-February. Drier conditions experienced since February have resulted in below average snow levels. As of April 2, 2026, the average level for the State’s major reservoirs is at 117% of the historical average for this time of the year. As of April 28, 2026, the U.S. Drought Monitor reported that none of California was considered in a “Severe Drought” condition and only 5% was in “Moderate Drought” condition, as compared to a year ago where nearly 25% of California was considered in “Severe Drought” and 8% in “Extreme Drought.” Changes in weather patterns will continue to impact drought conditions in California.
Current report
Valley Water District, Metropolitan Water District (“MWD”), Palo Verde Irrigation District and the City of Needles. Operational agreements on how the Colorado River is managed will expire in Fall 2026. On April 17, 2026, the Bureau announced that it will add approximately 2.48 million acre feet of water to Lake Powell by moving water from the upstream Flaming Gorge Reservoir and by reducing releases from Lake Powell. These actions are expected to increase Lake Powell’s elevation, but will likely accelerate the downstream decline of Lake Mead, with the potential for up to an additional 40% reduction to Hoover Dam’s hydropower generating capacity as early as this fall. Reclamation and its lower basin partners are collaborating to conserve water in Lake Mead and maintain its water levels, even as releases from Lake Powell are planned to decrease. GSWC will continue to monitor developments related to the Colorado River System and assess its impact on MWD and GSWC’s systems that utilized water sources provided by MWD member agencies.
Removed paragraphs (91)
Previous report
The U.S. government announced a comprehensive set of tariffs in the second quarter. Following the pause of certain of these tariffs, the majority of the previously announced tariffs have been implemented. The U.S. government has indicated that they could impose additional tariffs on particular countries and to impose global tariffs on certain goods. Such tariffs could impact our results of operations by increasing the costs of various goods, including construction materials. Management is actively engaged with vendors and business partners to reduce financial risks of tariffs; however, the impact of such tariffs is subject to uncertainties regarding the timing of their implementation, whether the U.S. government ultimately imposes additional tariffs, the magnitude of such tariffs and possible exemption for certain goods, among other unknowns.
Previous report
The new 2025 rates and the implementation of the new M-WRAM and ICBA regulatory mechanisms approved in the final decision have been reflected in GSWC’s earnings for the nine months ended September 30, 2025 that resulted in an increase in recorded revenues of $29.3 million largely from the new rates and an increase in recorded water supply costs of $11.7 million, which combined is an increase of $17.6 million, compared to the same period in 2024. GSWC’s earnings during the three and nine months ended September 30, 2025 were favorably impacted by an actual water supply source mix that included less purchased water than what was authorized in the general rate case and included in the revenue requirement. Generally, the variable cost of producing water from wells is less than the cost of water purchased from wholesale suppliers. GSWC obtains its water supplies from a variety of sources, which vary among its water systems and will fluctuate depending on the available source. Furthermore, the demand for water varies by season. For instance, water consumption tends to be higher during the third quarter of each year when weather in California is hotter and dryer. During cooler periods, such as the first six months, GSWC’s customers generally use less water, and as a result, GSWC’s pumped water sources are capable of meeting a greater portion of customer demand. The overall favorable water supply source mix experienced during the first nine months may or may not continue during the remainder of the 2025 year, and without a full cost balancing account for water supply, GSWC’s earnings will be subject to future volatility as a result of favorable and unfavorable changes in the water supply source mix compared to the adopted mix incorporated in the revenue requirement.
Previous report
Water Cost of Capital (“COC”) Proceeding:
Previous report
Investor-owned water utilities serving California are required to file their cost of capital applications on a triennial basis. In December 2024, GSWC, along with three other investor-owned California water utilities, requested a further extension of the date by which each of them must file their cost of capital applications. On January 14, 2025, the CPUC approved the request to defer the cost of capital application by another year. The CPUC’s approval postponed this filing date by one year until May 1, 2026, with a corresponding effective date of January 1, 2027. The CPUC also approved the joint parties’ request to leave the current WCCM in place through the one-year deferral period. GSWC’s current authorized rate of return on rate base is 7.93%, based on its weighted cost of capital, which will continue in effect through December 31, 2026. The 7.93% return on rate base includes a return on equity of 10.06%, an embedded cost of debt of 5.1%, and a capital structure with 57% equity and 43% debt.
Previous report
The new electric rates were implemented on March 1, 2025. BVES was also authorized by the CPUC to establish a general rate case memorandum account that made the new rates retroactive to January 1, 2023. Due to the delay in finalizing the electric general rate case, billed electric revenues for the years 2023 and 2024, were based on 2022 adopted rates. The general rate case memorandum account tracks the revenue differences between the 2022 adopted rates and the 2023 and 2024 new rates authorized by the CPUC for future recovery. As of September 30, 2025, the aggregate cumulative under-collection in retroactive revenues related to the full year of 2023 and 2024 amounted to $8.9 million. On April 1, 2025, BVES implemented surcharges to recover the retroactive amounts accumulated related to the new rates, as well as recovery of incremental operating costs incurred prior to 2023 in connection with BVES’s wildfire mitigation plans that were being tracked in memorandum accounts prior to the new rate cycle.
Previous report
Summary of Third Quarter Results by Segment
Previous report
Diluted earnings from the electric utility segment increased $0.02 per share for the third quarter of 2025 as compared to the same period in 2024 largely resulting from an increase in revenues from new rates implemented in 2025 as a result of receiving a final decision from the CPUC in connection with BVES’s general rate case proceeding that set new rates for 2023 - 2026 (retroactive to January 1, 2023), as compared to 2022 rates used to record revenues during the same period of 2024.
Previous report
The new rates resulted in an increase in electric revenues that supports, among other things, the growth in rate base and higher operating costs related to BVES’s wildfire mitigation plans that were previously not included in customer rates and not expensed during the third quarter of 2024 because they were being tracked in memorandum accounts. Therefore, the increase in revenues was partially offset by overall increases in operating expenses due, in large part, to higher expenses recorded in connection with BVES’s vegetation management and other wildfire mitigation activities, as well as an increase in outside services related to various regulatory filings, partially offset by a decrease in interest expense (net of interest income).
Previous report
AWR (Parent):
Previous report
For the three months ended September 30, 2025, diluted losses from AWR (parent) increased by $0.01 per share when compared to the same period in 2024 due largely to an increase in interest expense resulting from higher borrowing levels under AWR’s credit facility, partially offset by lower average interest rates.
Previous report
Summary of Year-to-Date Results by Segment
Previous report
The table below sets forth the year-to-date diluted earnings per share by business segment and for the parent company:
Previous report
Note: Certain amounts in the table above may not foot or crossfoot due to rounding.
Previous report
For the nine months ended September 30, 2025, AWR’s recorded consolidated diluted earnings were $2.63 per share, as compared to $2.42 per share recorded for the same period in 2024, an increase of $0.21 per share, primarily generated from higher earnings at the water and electric utility segments resulting largely from the implementation of new customer rates. AWR’s consolidated diluted earnings for the nine months ended September 30, 2025 were negatively impacted by approximately $0.08 per share due to the continued dilutive effects from the issuance of equity under AWR’s ATM offering program.
Previous report
Note: Certain amounts in the table above may not foot or crossfoot due to rounding.
Previous report
•An increase in water supply costs of $11.7 million primarily related to higher overall per-unit purchased water costs covered in rates. As a result of transitioning from a full cost balancing account for water supply to the ICBA, GSWC’s earnings during the nine months ended September 30, 2025 were favorably impacted by an actual water supply source mix that included less purchased water than what was authorized in the general rate case and included in the revenue requirement. During the nine months ended September 30, 2025, GSWC’s pumped water sources, which cost less than purchased water, were capable of meeting a greater portion of customer demand when compared to a higher purchased water mix being recovered in the new adopted rates. GSWC’s earnings will be subject to future volatility as a result of favorable and unfavorable changes in the water supply source mix compared to the adopted mix incorporated in the revenue requirement.
Previous report
•An overall decrease in other income (net of other expenses) of $0.4 million due primarily to gains of $4.6 million generated on investments held to fund one of the Company’s retirement plans as compared to gains of $5.1 million recorded during the same period in 2024, due to financial market conditions.
Previous report
Diluted earnings from the electric utility segment increased $0.07 per share for the nine months ended September 30, 2025 as compared to the same period in 2024, largely resulting from an increase in revenues from the new rates implemented in 2025 as a result of receiving a final decision from the CPUC in connection with BVES’s general rate case proceeding that set new rates for 2023 - 2026 (retroactive to January 1, 2023), as compared to 2022 rates used to record revenues during the same period of 2024.
Previous report
The new rates resulted in an increase in electric revenues that supports, among other things, the growth in rate base and higher operating costs related to BVES’s wildfire mitigation plans that were previously not included in customer rates and not expensed during the nine months of 2024 because they were being tracked in memorandum accounts. Therefore, the increase in revenues was partially offset by overall increases in operating expenses due, in large part, to higher expenses recorded in connection with BVES’s vegetation management and other wildfire mitigation activities, as well as an increase in outside services related to various regulatory filings, partially offset by a decrease in interest expense (net of interest income).
Previous report
Diluted earnings from the contracted services segment increased $0.01 per share for the nine months ended September 30, 2025 as compared to the same period in 2024, largely due to (i) an increase in management fee revenue resulting from the commencement of operations in April 2024 at the new bases (Naval Air Station Patuxent River and Joint Base Cape Cod) and the resolution of various economic price adjustments, and (ii) lower interest expense from lower borrowing levels; partially offset by higher overall operating expenses (excluding construction expenses) and a decrease in construction activity. Furthermore, there was a decrease in earnings of approximately $0.01 per share due to the dilutive effects from the issuance of equity under AWR’s ATM offering program. During the nine months ended September 30, 2025, construction activities were negatively impacted by unfavorable weather conditions and timing, which were less impactful to construction activities during the same period of 2024. The majority of these issues have been resolved as of September 30, 2025 and the contracted services segment is still expected to contribute $0.59 to $0.63 per share for the full 2025 year.
Previous report
AWR (Parent):
Previous report
For the nine months ended September 30, 2025, the diluted loss from AWR (parent) decreased by $0.01 per share compared to the same period in 2024 due, in part, to a decrease in overall interest expense from borrowings made under AWR’s revolving credit facility, compared to the same period in 2024.
Previous report
The following discussion and analysis for the three and nine months ended September 30, 2025 and 2024 provides information on AWR’s consolidated operations and, where necessary, includes specific references to AWR’s individual segments and subsidiaries: GSWC, BVES, and ASUS and its subsidiaries.
Previous report
For the three months ended September 30, 2025, revenues from water operations increased by $8.3 million to $132.3 million as compared to the same period in 2024. The increase in water revenues during the third quarter of 2025 is primarily a result of the CPUC-approved new 2025 rate increases effective January 1, 2025 in connection with the recently approved general rate case. There was also an increase in CPUC-approved surcharges billed in 2025 compared to the same period in 2024 to recover previously incurred costs. These surcharges are largely offset by corresponding increases in operating expenses, resulting in no impact to earnings. Billed water consumption for thethird quarter of 2025 wasconsistent as compared to the same period in 2024. Without having a full revenue decoupling mechanism, GSWC’s revenues and earnings will be subject to future volatility as a result of significant fluctuations in customer consumption compared to adopted levels.
Previous report
The sum of the water and electric supply-cost balancing accounts are shown on AWR’s Consolidated Statements of Income and totaled $(0.4) million for both the three months ended September 30, 2025 and 2024, respectively.
Previous report
Purchased water costs for the third quarter of 2025 increased to $27.7 million as compared to $24.1 million for the same period in 2024 primarily due to an increase in wholesale water costs. There was a decrease in power purchased for pumping due to lower production.
Previous report
The change in water supply cost balancing accounts was primarily due to a change in the supply cost recovery mechanisms, as previously described. Unlike the MCBA, the incremental supply cost balancing account only tracks differences between the authorized per-unit prices of water production costs and actual per-unit prices of water production costs.
Previous report
The sum of the water and electric supply-cost balancing accounts are shown on AWR’s Consolidated Statements of Income and totaled $(0.4) million for both the three months ended September 30, 2025 and 2024, respectively.
Previous report
At the water segment, increases in billed surcharges of $0.5 million to recover previously incurred administrative and general expenses that had been tracked in CPUC-authorized memorandum accounts were largely offset by lower outside services costs including those related to regulatory filings as compared to the same period in 2024.
Previous report
Administrative and general expenses increased at the electric segment due primarily to higher outside-services costs incurred related to BVES’s wildfire mitigation activities and various regulatory filings. Higher expenses related to the wildfire mitigation activities are reflected and recovered in the new customer rates implemented in 2025. As previously mentioned, costs to support BVES’s wildfire mitigation plans were not included in customer rates and not expensed during the third quarter of 2024 because they were being tracked in memorandum accounts prior to receiving the approved general rate case decision in January 2025. In addition, there was an increase of $0.5 million in billed surcharges to recover previously incurred costs that had been tracked in CPUC-authorized memorandum accounts. Increases in revenues from billed surcharges have a corresponding and offsetting increase in administrative and general expenses, resulting in no impact to earnings.
Previous report
Depreciation and amortization expense increased at the water and contracted services segments due largely to capital additions to utility plant and other fixed assets placed in service.
Previous report
Overall depreciation and amortization expense is consistent at the electric segment with a decrease from an overall lower composite depreciation rate supported by the latest depreciation study adopted in the final decision in the electric general rate case largely offset by an increase in depreciation and amortization expense from additions to utility plant and other fixed assets placed in service. The lower adopted depreciation expense levels from the updated study is also reflected in the new revenue requirements, resulting in no significant impact to earnings.
Previous report
Overall maintenance expense increased at the water segment due to higher maintenance-related activities as compared to the same period in 2024 due to timing.
Previous report
At the electric segment, higher vegetation management costs contributed to the majority of the increase compared to the same period in 2024. Higher expenses related to vegetation management costs are reflected and recovered in the new customer rates implemented in 2025. As discussed, vegetation management costs were not previously included in customer rates and not expensed during the third quarter of 2024 because they were being tracked in memorandum accounts prior to receiving the approved general rate case decision in January 2025. In addition, there was an increase of $0.7 million in billed surcharges to recover previously incurred costs that had been tracked in CPUC-authorized memorandum accounts. Increases in revenues from billed surcharges have a corresponding and offsetting increase in maintenance expenses, resulting in no impact to earnings.
Previous report
Property and other taxes increased at the water segment due largely to an increase in franchise fees from higher revenues and property taxes from capital additions. The increase at the electric segment was due to higher property taxes resulting from capital additions and related higher assessed values. Increases at the contracted services segment was due to higher gross receipts taxes resulting from higher revenues.
Previous report
Operating Revenues:
Previous report
General
Previous report
Water
Previous report
For the nine months ended September 30, 2025, revenues from water operations increased by $29.3 million to $354.0 million as compared to the same period in 2024. The increase in water revenues during the nine months of 2025 is primarily a result of the CPUC-approved new 2025 rate increases effective January 1, 2025 in connection with the recently approved general rate case, as well as an increase in water consumption compared to the same period in 2024. There was also an increase in CPUC-approved surcharges billed in 2025 compared to the same period in 2024 to recover previously incurred costs. These surcharges are largely offset by corresponding increases in operating expenses, resulting in no impact to earnings. Billed water consumption for the nine months ended September 30, 2025 was higher by 5.7% as compared to the same period in 2024 due primarily to lower amounts of seasonal precipitation for the nine months of 2025 as compared to the same period in 2024. Without having a full revenue decoupling mechanism, GSWC’s revenues and earnings will be subject to future volatility as a result of significant fluctuations in customer consumption compared to adopted levels.
Showing the first 40 of 91 passages. Open the source sections for the rest.
Reworded paragraphs (60)
Previous wording
AWR uses earnings per share by business segment as an important measure in evaluating its operating results and believes it provides investors with clarity surrounding the performance of its segments. AWR reviews this measurement regularly and compares it to historical periods and to its operating budget. A reconciliation to AWR’s consolidated diluted earnings per share prepared in accordance with GAAP is included in the discussion under the section titled“Summary of Third Quarter Results by Segment.”
Current wording
AWR uses earnings per share by business segment and AWR (parent) as an important measure in evaluating its operating results and believes it provides investors with clarity surrounding the performance of its business segments and the parent company. AWR reviews this measurement regularly and compares it to historical periods and to its operating budget. A reconciliation to AWR’s consolidated diluted earnings per share prepared in accordance with GAAP is included in the discussion under the section titled“Summary of First Quarter Results by Segment.”
Previous wording
On January 30, 2025, the CPUC issued a final decision in GSWC’s general rate case application for all its water regions and the general office, which determines new water rates for the years 2025 - 2027. Among other things, the approved settlement authorizes GSWC to invest approximately $573.1 million in capital infrastructure over the three-year capital cycle. The $573.1 million of infrastructure investment includes $17.7 million of advice letter capital investments to be filed for revenue recovery during the second and third year attrition increases when those projects are completed. In addition, the approved settlement agreement includes $58.2 million of advice letter capital investments that began construction in 2023 that we expect to file for revenue recovery during the second and third year attrition increases when those projects are completed. For all of the advice letter projects, GSWC will be allowed to accrue interest during construction at the adopted cost of debt and recover the full rate of return, including all applicable components of the revenue requirement after the assets are placed in service up until the assets are formally included in customer rate calculations. Excluding revenues for all of the advice letter capital projects discussed above, under the terms of the settlement agreement GSWC’s adopted operating revenues less water supply costs for 2025 are projected to increase by approximately $23 million as compared to the 2024 adopted operating revenues less water supply costs.
Current wording
On January 30, 2025, the CPUC issued a final decision in GSWC’s general rate case application for all its water regions and the general office, which determines new water rates for the years 2025 - 2027. Among other things, the approved settlement authorizes GSWC to invest approximately $573.1 million in capital infrastructure over the three-year capital cycle. The $573.1 million of infrastructure investment includes $17.7 million of advice letter capital investments to be filed for revenue recovery during the second and third year attrition increases when those projects are completed. In addition, the approved settlement agreement includes $58.2 million of advice letter capital investments, that began construction in 2023, to be filed for revenue recovery during the second and third year attrition increases when those projects are completed. All of the advice letter projects were allowed to accrue in a memorandum account (i) interest during the construction period at GSWC’s adopted cost of debt until the assets are in service, and (ii) the full rate of return that includes a debt and equity component and all applicable components of the revenue requirement for the projects from the period the assets are in service until the date of the attrition filings.
Previous wording
The final decision also addressed GSWC’s request for various regulatory mechanisms that were litigated during the proceeding. Among other things, the final decision rejected GSWC’s request for the continuation of a full sales and revenue decoupling mechanism such as the WRAM and a full cost balancing account for water supply such as the MCBA, and instead orders GSWC to transition to a modified rate adjustment mechanism (a Monterey-style WRAM or “M-WRAM”) and an incremental cost balancing account (“ICBA”) for supply costs. The final decision also adopted GSWC’s M-WRAM rate design proposal, authorizing GSWC to increase the revenue requirement in its fixed service charges to between 45-48% of the revenue requirement depending on the ratemaking area representing approximately 65% of GSWC’s fixed costs in aggregate. The M-WRAM tracks the difference between the revenue based on actual metered sales through a tiered volumetric rate and the revenue that would have been received with the same actual metered sales if a standard quantity rate had been in effect. The ICBA for supply costs tracks differences between the authorized per-unit prices of water production costs and actual per-unit prices of water production costs. The M-WRAM and ICBA were effective January 1, 2025. GSWC will not be able to recognize under-collections of revenue caused by fluctuations in consumption or changes in water supply cost mix beginning in 2025. However, the final decision did approve GSWC’s request for the continuation of a sales reconciliation mechanism, which would allow GSWC to adjust its sales forecast throughout the general rate case cycle to address significant fluctuations in consumption.
Current wording
The final decision also addressed GSWC’s request for various regulatory mechanisms that were litigated during the proceeding. Among other things, the final decision rejected GSWC’s request for the continuation of a full sales and revenue decoupling mechanism such as the WRAM and a full cost balancing account for water supply such as the MCBA, and instead ordered GSWC to transition to a modified rate adjustment mechanism (a Monterey-style WRAM or “M-WRAM”) and an incremental cost balancing account (“ICBA”) for supply costs. The final decision also adopted GSWC’s M-WRAM rate design proposal authorizing GSWC to increase the revenue requirement recovery in its fixed service charges to between 45-48% of the revenue requirement depending on the ratemaking area representing approximately 65% of GSWC’s fixed costs in aggregate, and approved GSWC’s request for the continuation of a sales reconciliation mechanism that would allow GSWC to adjust its sales forecast throughout the general rate case cycle to address significant fluctuations in consumption. The M-WRAM tracks the difference between the revenue based on actual metered sales through a tiered volumetric rate and the revenue that would have been received with the same actual metered sales if a standard single quantity rate had been in effect. The ICBA for supply costs tracks differences between the authorized per-unit prices and actual per-unit prices for each supply cost (purchased water, pump tax, and purchased power). The M-WRAM and ICBA were effective January 1, 2025.
Previous wording
Electric General Rate Case for the years 2023–2026
Current wording
Electric General Rate Cases:
Previous wording
General Rate Case Filings and Other Matters:
Current wording
General Rate Case for the Years 2023–2026
Previous wording
On January 16, 2025, the CPUC adopted a final decision in BVES’s general rate case proceeding that set new electric rates retroactive to January 1, 2023 and approves the settlement agreement reached between BVES, Cal Advocates and another intervenor in its entirety. Among other things, the settlement agreement, (i) settles and adopts the revenue requirements for each of the four years 2023 through 2026, (ii) authorizes BVES to invest approximately $52.5 million in capital infrastructure included in base rates over the four-year rate cycle and at least an additional $23.1 million (plus an allowance for funds used during construction, or “AFUDC”) to be filed for revenue recovery through advice letters when the projects are completed; (iii) adopts a cost of capital that increases BVES’s adopted return on equity from 9.6% to 10.0%, lowers the cost of debt from 6.6% to 5.51%, and maintains the capital structure of 57% equity and 43% debt, and (iv) approves for recovery the requested capital expenditures and other incremental operating costs already incurred in connection with BVES’s wildfire mitigation plans that were previously not included in customer rates.
Current wording
On January 16, 2025, the CPUC adopted a final decision in BVES’s general rate case proceeding that set new electric rates retroactive to January 1, 2023 and approved the settlement agreement reached between BVES, Cal Advocates and another intervenor in its entirety. Among other things, the settlement agreement, (i) settled and adopted the revenue requirements for each of the four years 2023 through 2026, and the rate increases for 2024 through 2026 are not subject to an earnings test, (ii) authorized BVES to invest approximately $52.5 million in capital infrastructure included in base rates over the four-year rate cycle and at least an additional $23.1 million (plus an allowance for funds used during construction, or “AFUDC”) to be filed for revenue recovery through advice letters when the projects are completed; (iii) adopted a cost of capital that increased BVES’s adopted return on equity from 9.6% to 10.0%, lowered the cost of debt from 6.6% to 5.51%, and maintained the capital structure of 57% equity and 43% debt, and (iv) approved for recovery the requested capital expenditures and other incremental operating costs already incurred prior to 2023 in connection with BVES’s wildfire mitigation plans that were previously not included in customer rates.
Previous wording
The final decision provides for an increase in adopted operating revenues of $2.2 million for 2025 and $3.3 million in 2026. The rate increases for 2024 - 2026 are not subject to an earnings test. Furthermore, the previously mentioned advice letter projects of at least $23.1 million are expected to generate additional annual operating revenues of approximately $3 million when the respective projects are completed, placed in service, and filed for recovery in customer rates. These projects also accrue AFUDC during construction that will further increase the revenue requirement. In the settlement agreement, the parties agreed to remove portions of the requested capital budgets from rates until they were completed and placed in service. For all of the advice letter projects, BVES will be allowed to accrue AFUDC during the construction period at the adopted rate of return, which will be added to the cost of the assets and recovered in customer rates when the assets are placed in service. On April 1, 2025, BVES implemented new base rates to recover the revenue requirement associated with $11.6 million of capital projects approved for recovery through advice letters.
Current wording
The final decision provides for an increase in adopted operating revenues of $3.3 million in 2026. In addition, the advice letter projects of at least $23.1 million are expected to generate additional annual operating revenues of approximately $3 million when the respective projects are completed, placed in service, and filed for recovery in customer rates. These projects also accrued AFUDC during construction that further increases the revenue requirement. In 2025, BVES implemented new base rates to recover the revenue requirement associated with $23.8 million (including AFUDC) of capital projects approved for recovery through advice letters that were completed and placed in service.
Previous wording
ASUS’s revenues, operating income and cash flows are earned by providing water and/or wastewater services, including operation and maintenance services and construction of facilities for the water and/or wastewater systems at various military installations, pursuant to an initial 50-year, firm-fixed-price contract, additional firm-fixed-price contracts, task order agreements and subcontracts with third party prime contractors on military bases. Currently, ASUS has one subsidiary that has entered into a task order agreement with the U.S. government that has a term of 15 years. The contract prices for each of the contracts and recurring task order agreements are subject to annual economic price adjustments. Additional revenues generated by contract operations are primarily dependent on annual economic price adjustments, and new construction activities under contract modifications with the U.S. government or agreements with other third-party prime contractors. During the nine months ended September 30, 2025, ASUS was awarded approximately $28.7 million in new construction projects, which are expected to be completed beginning in 2025 through 2028. ASUS’s subsidiaries expect to continue to enter into U.S. government-awarded contract modifications and agreements with third-party prime contractors for new construction projects at the military bases served.
Current wording
ASUS’s revenues, operating income and cash flows are earned by providing water and/or wastewater services, including operation and maintenance services and construction of facilities for the water and/or wastewater systems at various military installations, pursuant to an initial 50-year, firm-fixed-price contract, additional firm-fixed-price contracts, task order agreements and subcontracts with third party prime contractors on military bases. Currently, ASUS has one subsidiary that has entered into a task order agreement with the U.S. government that has a term of 15 years. The contract prices for each of the contracts and recurring task order agreements are subject to annual economic price adjustments. Additional revenues generated by contract operations are primarily dependent on annual economic price adjustments, and new construction activities under contract modifications with the U.S. government or agreements with other third-party prime contractors. ASUS’s subsidiaries expect to continue to enter into U.S. government-awarded contract modifications and agreements with third-party prime contractors for new construction projects at the military bases served.
Previous wording
Effective October 1, 2025, the U.S. government announced its shutdown. Amid the current U.S. government shutdown, the subsidiaries of ASUS have not experienced and are not expected to experience any earnings impact to their existing operations and maintenance and renewal and replacement services, as utility privatization contracts are an “excepted service.” Management expects that any future impact on ASUS and its operations through its subsidiaries will likely be limited to (a) the timing of funding to pay for services rendered, (b) delays in the processing of EPAs and/or REAs, (c) the timing of the issuance of contract modifications for new construction work not already funded by the U.S. government, (d) the timing of construction work associated with delays in receiving construction permits from furloughs at government agencies, and/or (e) delays in solicitation for and/or awarding of new contracts under the Department of Defense contracting programs. In the event the U.S. government shutdown extends for an unprecedented and much longer period, ASUS’s liquidity and earnings could be impacted.
Current wording
Early in 2026, the U.S. government experienced partial shutdowns affecting mainly the Department of Homeland Security and other federal departments. Amid the recent U.S. government shutdown, the subsidiaries of ASUS have not experienced and are not expected to experience any earnings impact to their existing operations and maintenance and renewal and replacement services, as utility privatization contracts are an “excepted service.” Management expects that any future impact on ASUS and its operations through its subsidiaries will likely be limited to (a) the timing of funding to pay for services rendered, (b) delays in the processing of economic price adjustments (“EPAs”) and/or requests for equitable adjustments (“REAs”), (c) the timing of the issuance of contract modifications for new construction work not already funded by the U.S. government, (d) the timing of construction work associated with delays in receiving construction permits from furloughs at government agencies, and/or (e) delays in solicitation for and/or awarding of new contracts under the Department of Defense contracting programs. In the event the U.S. government shutdown extends for an unprecedented and much longer period, ASUS’s liquidity and earnings could be impacted.
Previous wording
The table below sets forth the third quarter diluted earnings per share by business segment and for the parent company:
Current wording
The table below sets forth a comparison of the first quarter of 2026 diluted earnings per share contribution reported by business segment and for the parent company with amounts reported during the same period in 2025.
Previous wording
For the three months ended September 30, 2025, AWR’s recorded consolidated diluted earnings were $1.06 per share, as compared to $0.95 per share for the same period in 2024, an increase of $0.11 per share, primarily generated from higher construction activities that resulted in higher earnings at the contracted services segment, and higher earnings at the water and electric utility segments resulting from the implementation of new customer rates. AWR’s consolidated diluted earnings for the third quarter of 2025 were negatively impacted by approximately $0.03 per share due to the continued dilutive effects from the issuance of equity under AWR’s at-the-market (“ATM”) offering program.
Current wording
For the three months ended March 31, 2026, AWR’s recorded consolidated diluted earnings were $0.76 per share, as compared to $0.70 per share for the same period in 2025, an increase of $0.06 per share or 8.6%, primarily generated from higher earnings at the water and electric utility segments resulting from the implementation of new customer rate increases approved by the CPUC, and higher construction activities that resulted in higher earnings at the contracted services segment. AWR’s consolidated diluted earnings for the first quarter of 2026 were negatively impacted by $0.02 per share from the higher number of dilutive shares in the first quarter of 2026 compared to the same period 2025 due to the continued dilutive effects from the issuance of equity under AWR’s at-the-market (“ATM”) offering program.
Previous wording
For the three months ended September 30, 2025, recorded diluted earnings from the water utility segment were $0.86 per share, as compared to $0.84 per share for the same period in 2024, an increase of $0.02 per share. The discussion below presents the major variances in earnings for the two periods.
Current wording
For the three months ended March 31, 2026, recorded diluted earnings from the water utility segment were $0.55 per share, as compared to $0.52 per share for the same period in 2025, an increase of $0.03 per share. The discussion below presents the major variances in earnings for the two periods.
Previous wording
•An increase in water operating revenues of approximately $29.3 million largely as a result of the CPUC-authorized new rate increases effective January 1, 2025 in connection with the approved general rate case. GSWC transitioned from a full revenue decoupling mechanism to the M-WRAM effective January 1, 2025. As a result, GSWC’s revenues and earnings may be subject to future volatility from significant fluctuations in customer consumption compared to adopted levels.
Current wording
•An increase in water operating revenues of $11.1 million was largely as a result of the CPUC-authorized second-year rate increases and additional revenues for capital projects approved in advice letter filings, both of which were effective January 1, 2026. Water consumption for the three months ended March 31, 2026 was consistent with the same period in 2025 and adopted levels. However, as a result of transitioning from a full revenue decoupling mechanism to the M-WRAM effective January 1, 2025, GSWC’s revenues and earnings will continue to be subject to future volatility from significant fluctuations in customer consumption.
Previous wording
•An increase in water supply costs of $3.5 million, which consist of purchased water, purchased power for pumping, groundwater production assessments and changes in the water supply cost balancing accounts. The increase in water supply costs compared to the same period in 2024 is largely due to an increase in the overall per-unit purchased water costs covered in customer rates. As a result of transitioning from a full cost balancing account for water supply to the ICBA, GSWC’s earnings will be subject to future volatility from favorable and unfavorable changes in the water supply source mix compared to the adopted mix incorporated in the revenue requirement.
Current wording
•An increase in water supply costs of $4.8 million, which consist of purchased water, purchased power for pumping, groundwater production assessments and changes in the water supply cost balancing accounts. The increase in water supply costs compared to the same period in 2025 is largely because of (i) an overall increase in the per-unit purchased water costs that are covered in current rates resulting in no impact to net earnings, and (ii) an increase in purchased water volume compared to the same period in 2025 resulting from certain wells being temporarily offline in a few customer service areas. As a result, GSWC’s earnings for the three months ended March 31, 2026 were impacted by an actual water supply source mix that included more purchased water than in the same period of 2025. Due to transitioning from a full cost balancing account for water supply to the ICBA effective January 1, 2025, GSWC’s earnings have been and will be subject to future volatility from favorable and unfavorable changes in the water supply source mix compared to the adopted mix incorporated in the revenue requirement.
Previous wording
•An overall increase in operating expenses of $2.2 million (excluding supply costs) due primarily to increases in (i) overall labor costs, (ii) maintenance expense, (iii) depreciation and amortization expenses, which is impacted by increases in capital additions placed in service and are reflected and recovered in customer rates, and (iv) property and other non-income taxes; partially offset by a decrease in administrative and general expenses (excluding labor) primarily due to lower outside services costs, insurance reserves, and other employee-related benefits as compared to the same period in 2024.
Current wording
•An overall increase in operating expenses of $2.4 million (excluding supply costs) due primarily to increases in (i) overall labor costs and other employee-related benefits, (ii) overall operation-related costs including lab fees for water quality testing and conservation spending, (iii) depreciation and amortization expenses, which are impacted by increasing capital additions placed in service and are reflected and recovered in customer rates, and (iv) property and other non-income taxes.
Previous wording
•An overall decrease in interest expense (net of interest income) of $0.3 million resulting largely from an overall decrease in average borrowing levels and interest rates as well as the impact of capitalizing debt costs related to certain advice letter projects approved by the CPUC in the latest general rate case effective January 1, 2025; partially offset by a decrease in interest income earned on regulatory assets due to decreasing regulatory balances as GSWC recovers the amounts through surcharges.
Current wording
•An overall increase in interest expense (net of interest income) of $0.9 million resulting largely from (i) the impact of capitalizing debt costs related to certain advice letter projects approved by the CPUC in the latest general rate case effective January 1, 2025, as previously discussed, that was recorded in 2025 with no similar item in 2026, and (ii) a decrease in interest income earned on regulatory assets due to decreasing regulatory balances as GSWC recovers the amounts through surcharges; partially offset by decreases in overall borrowing levels and average interest rates. The advice letter projects discussed are now included in adopted rate base and are part of the rate increases effective January 1, 2026.
Previous wording
•An overall increase in other income (net of other expense) of $0.5 million due largely to gains totaling $2.5 million generated on investments held to fund one of the company’s retirement plans during the three months ended September 30, 2025, as compared to gains on investments of $2.1 million recorded during the same period in 2024 due to financial market conditions.
Current wording
•An overall increase in other expense (net of other income) of $0.2 million due largely to losses totaling $1.3 million generated on investments held to fund one of the company’s retirement plans during the three months ended March 31, 2026, as compared to losses on investments of $0.6 million recorded during the same period in 2025 due to financial market conditions; partially offset by a decrease in the non-service cost components related to GSWC’s benefit plans resulting from changes in actuarial assumptions. However, as a result of GSWC’s two-way pension balancing accounts authorized by the CPUC, changes in total net periodic benefits costs related to the pension plan have no material impact to earnings.
Previous wording
•A decrease in earnings of approximately $0.02 per share due to the dilutive effects from the issuance of equity under AWR’s ATM offering program beginning in February 2024. Under the ATM offering program, AWR may offer and sell its Common Shares, with an aggregate gross offering price of up to $200 million, from time to time at its sole discretion, with $68 million currently remaining available for sale. Through September 30, 2025, AWR has sold 1,680,979 Common Shares through this ATM offering program.
Current wording
•A decrease in earnings of approximately $0.01 per share due to the dilutive effects from the issuance of equity under AWR’s ATM offering program beginning in February 2024. Under the ATM offering program, AWR may offer and sell its Common Shares, with an aggregate gross offering price of up to $200 million, from time to time at its sole discretion, with $34.3 million currently remaining available for sale. Through March 31, 2026, AWR has sold 2,133,225 Common Shares through this ATM offering program.
Previous wording
Diluted earnings from the contracted services segment increased $0.08 per share for the third quarter of 2025 when compared to the same period in 2024 largely resulting from an increase in (i) construction activities, from timing of when work is performed, (ii) management fee revenues resulting from the resolution of various economic price adjustments, and (iii) lower interest expense from lower borrowing levels, partially offset by higher overall operating expenses (excluding construction expenses). The contracted services segment is expected to contribute $0.59 to $0.63 per share for the full 2025 year.
Current wording
Diluted earnings from the contracted services segment increased $0.02 per share for the first quarter of 2026 when compared to the same period in 2025 largely resulting from (i) an increase in construction activities, (ii) an increase in management fee revenues resulting from the resolution of various economic price adjustments, and (iii) a decrease in interest expense (net of interest income) due to lower average borrowing levels and average interest rates. These favorable variances were partially offset by an increase in overall operating expenses (excluding construction expenses). The contracted services segment is expected to contribute $0.63 to $0.67 per share for the full year of 2026.
Previous wording
Electric revenues for the three months ended September 30, 2025 increased by $4.3 million to $13.3 million largely resulting from an increase in revenues from third-year electric rate increases implemented in 2025, as compared to 2022 rates used to record revenues during the same period of 2024. A final decision from the CPUC issued in January 2025 in connection with BVES’s general rate case proceeding set new rates for 2023 - 2026 (retroactive to January 1, 2023).
Current wording
Electric revenues for the three months ended March 31, 2026 increased by $3.7 million to $18.7 million largely resulting from an increase in revenues from fourth-year electric rate increases implemented in 2026 as compared to the same period of 2025, and an increase in additional revenues from the approval of certain advice letter projects that were implemented after the first quarter of 2025.
Previous wording
Electric usage for thethird quarter of 2025 was 3.1% lower than the same period in 2024. Due to the CPUC-approved Base Revenue Requirement Adjustment Mechanism, which adjusts certain revenues to adopted levels authorized by the CPUC, changes in usage do not have a significant impact on earnings.
Current wording
Electric usage for thefirst quarter of 2026 was 5.0% lower than the same period in 2025. Due to the CPUC-approved Base Revenue Requirement Adjustment Mechanism, which adjusts certain revenues to adopted levels authorized by the CPUC, changes in electric usage do not have a significant impact on earnings.
Previous wording
Revenues from contracted services are composed of construction revenues (including renewal and replacements) and management fees for operating and maintaining water and/or wastewater systems at various military bases. For the three months ended September 30, 2025, revenues from contracted services increased by $8.4 million to $37.1 million as compared to $28.7 million for the same period in 2024. The increase was primarily due to an increase in construction activities largely due to timing and an increase in management fees from economic price adjustments.
Current wording
Revenues from contracted services are composed of construction revenues (including renewal and replacements) and management fees for operating and maintaining water and/or wastewater systems at various military bases. For the three months ended March 31, 2026, revenues from contracted services increased by $6.4 million to $37.4 million as compared to $31.0 million for the same period in 2025. The increase was primarily due to an increase in construction activities and an increase in management fees from economic price adjustments.
Previous wording
Total supply costs at the regulated utilities comprise the largest portion of total consolidated operating expenses. Supply costs accounted for 34.8% and 35.7% of total operating expenses for the three months ended September 30, 2025 and 2024, respectively.
Current wording
Total supply costs at the regulated utilities comprise the largest portion of total consolidated operating expenses. Supply costs accounted for 29.4% and 28.8% of total operating expenses for the three months ended March 31, 2026 and 2025, respectively.
Previous wording
Two of the principal factors affecting water supply costs are the amount of water produced and the source of the water. Generally, the variable cost of producing water from wells is less than the cost of water purchased from wholesale suppliers. The overall actual percentages of purchased water for the three months ended September 30, 2025 and 2024 were 44.2% and 43.2%, respectively.
Current wording
Two of the principal factors affecting water supply costs are the amount of water produced and the source of the water. Generally, the variable cost of producing water from wells is less than the cost of water purchased from wholesale suppliers.
Previous wording
Since the implementation in 2008 of the previously CPUC-approved MCBA, GSWC was able to track adopted and actual expense levels for purchased water, power purchased for pumping and pump taxes. GSWC recorded the variances (which include the effects of changes in both rate and volume) between adopted and actual purchased water, purchased power and pump tax expenses as a regulatory asset or liability. GSWC recovered from, or refunded to, customers the amount of such variances. Without the MCBA mechanism in place, beginning in 2025, there may be volatility to Registrant’s earnings as a result of changes in water supply source mix. The MCBA has been replaced with an incremental supply cost balancing account that will not include the impact from changes in water supply source mix compared to the adopted mix incorporated in the revenue requirement, but allows GSWC to track differences between the authorized per-unit prices of water production costs and actual per-unit prices of water production costs.
Current wording
Prior to 2025, GSWC was able to track in the CPUC-approved MCBA the differences in adopted and actual expense levels for purchased water, power purchased for pumping and pump taxes. GSWC recorded the variances (which include the effects of changes in both rate and volume) between adopted and actual purchased water, purchased power and pump tax expenses as a regulatory asset or liability. GSWC recovered from, or refunded to, customers the amount of such variances. Without the MCBA mechanism in place there may be volatility to Registrant’s earnings as a result of changes in water supply source mix. The MCBA has been replaced with an incremental supply cost balancing account that will not include the impact from changes in water supply source mix compared to the adopted mix incorporated in the revenue requirement, but allows GSWC to track differences between the authorized per-unit prices of water production costs and actual per-unit prices of water production costs. As of March 31, 2026, the balances recorded in the ICBA were not significant.
Previous wording
For the three months ended September 30, 2025, the cost of power purchased for resale to BVES’s electric customers increased by $0.8 million to $3.3 million as compared to $2.5 million during the same period in 2024 due to higher overall average prices per megawatt-hour that include all fixed costs. The change in the electric supply cost balancing account in 2025 when compared to 2024 is also due to increases in energy prices.
Current wording
For the three months ended March 31, 2026, the cost of power purchased for resale to BVES’s electric customers decreased by $1.3 million to $4.8 million as compared to $6.1 million during the same period in 2025 due to lower customer usage, partially offset by higher overall average prices per megawatt-hour that include all fixed costs. The change in the electric supply cost balancing account in 2026 when compared to 2025 is also due to increases in energy prices.
Previous wording
The increase in other operation expenses at the electric segment was primarily due to higher operation-related labor costs and an increase in bad debt expense.
Current wording
The increase in other operation expenses at the electric segment was primarily due to higher operation-related outside service costs.
Previous wording
The increase at the contracted services segment was due to higher labor costs and an increase in chemical and water treatment costs.
Current wording
The increase at the contracted services segment was due to higher labor costs.
Previous wording
The increase in other operation expenses at the water segment was primarily due to an increase of $0.6 million in billed surcharges to recover previously incurred costs that had been tracked in CPUC-authorized memorandum accounts, partially offset by lower chemical and water treatment costs. Increases in revenues from billed surcharges have a corresponding and offsetting increase in other operation expenses, resulting in no impact to earnings. Excluding the impact of an increase in billed surcharges, administrative and general expenses at the water segment decreased $0.4 million due to lower chemical and water treatment costs incurred as compared to the same period in 2024.
Current wording
Administrative and general expenses increased at the electric segment due primarily to an increase of $0.7 million in billed surcharges to recover previously incurred costs that had been tracked in CPUC-authorized memorandum accounts, partially offset by lower outside-service costs. Increases in revenues from billed surcharges have a corresponding and offsetting increase in administrative and general expenses, resulting in no impact to earnings.
Previous wording
Administrative and general expenses increased at the contracted services segment due to higher labor costs, employee-related benefits, and insurance costs at the legacy bases, and from the new operations at Joint Base Cape Cod and Naval Air Station Patuxent River, partially offset by lower overall legal costs.
Current wording
Administrative and general expenses increased at the contracted services segment due to higher labor costs, employee-related benefits, and legal costs.
Previous wording
Property and other taxes increased at the water and electric segments due largely to an increase in franchise fees from higher revenues and property taxes from capital additions.
Current wording
Property and other taxes increased at both the water and electric segments were due mainly to higher property taxes from capital additions.
Previous wording
For the three months ended September 30, 2025, construction expenses for contracted services were $16.5 million, an increase of $4.8 million compared to the same period in 2024, primarily resulting from an increase in construction activity as compared to the same period of 2024 due to timing.
Current wording
For the three months ended March 31, 2026, construction expenses for contracted services were $17.3 million, an increase of $4.4 million compared to the same period in 2025, primarily resulting from an increase in new construction activities as compared to the same period of 2025.
Previous wording
AWR’s borrowings consist of revolving credit facilities, while GSWC and BVES borrowings consist of revolving credit facilities and long-term debt issuances. Interest expense at the regulated utilities and contracted services segment decreased as compared to the same period in 2024 resulting primarily from an overall decrease in interest rates and lower total average borrowing levels at the water and contracted services segments. In addition, the decrease in the water segment’s interest expense was also attributed to the impact of capitalizing debt costs related to certain advice letter projects approved by the CPUC in the latest general rate case effective January 1, 2025. Lastly, the increase in interest expense at AWR (parent) was attributed to higher average net borrowings on its credit facility compared to the same period in 2024, partially offset by lower average interest rates when compared to the same period in 2024. The overall combined average interest rates were 5.06% and 5.36% for the three months ended September 30, 2025 and 2024, respectively.
Current wording
AWR’s borrowings consist of revolving credit facilities, while GSWC and BVES borrowings consist of revolving credit facilities and long-term debt issuances. Interest expense at the water segment increased as compared to the same period in 2025 due primarily to the impact of capitalizing debt costs in 2025 related to certain advice letter projects approved in the latest water general rate case, with no similar item in 2026; partially offset by decreases in overall borrowing levels and average interest rates. Interest expense at the electric services segment increased as compared to the same period in 2025 resulting primarily from overall higher average borrowing levels. The interest expense at the contracted services segment decreased as compared to the same period in 2025 resulting primarily from lower average borrowing levels and lower interest rates. The overall combined average interest rates were 5.04% and 5.14% for the three months ended March 31, 2026 and 2025, respectively.
Previous wording
For the three months ended September 30, 2025, interest income decreased at the water segment when compared to the same period in 2024 due primarily to a decrease in interest income earned on regulatory assets. Regulatory asset balances will decrease as surcharges are approved and implemented. Interest income increased at the electric segment when compared to the same period in 2024 primarily due to higher levels of regulatory asset balances earning interest.
Current wording
For the three months ended March 31, 2026, interest income decreased at both the water and electric segments when compared to the same period in 2025 largely due to decreases in interest income earned on regulatory assets. Regulatory asset balances will decrease as surcharges are approved and implemented. As a result of receiving final CPUC decisions in early 2025 for both the water and electric general rate cases, surcharges were implemented during 2025 to recover balances previously tracked in CPUC-authorized balancing and memorandum accounts.
Previous wording
For the three months ended September 30, 2025, other income (net of other expense) increased largely because of gains of $2.5 million recorded on investments held to fund one of the Company’s retirement plans in 2025, compared to gains of $2.1 million recorded in 2024. The increase in other income for the electric segment is due primarily to AFUDC (equity) earned on certain CPUC-approved advice letter projects while under construction. The increase in other income for AWR (parent) is due primarily to an increase in non-regulated-related activities.
Current wording
The decrease in other income for the electric segment is due primarily to a decrease in AFUDC (equity) earned on certain CPUC-approved advice letter projects while under construction compared to same period in 2025 as projects were completed and placed into service.
Previous wording
AWR’s ETR was 23.9% and 21.9% for the three months ended September 30, 2025 and 2024, respectively. GSWC’s ETR was 24.6% and 22.6% for each of the periods ended September 30, 2025 and 2024, respectively. The increase in the ETRs during the three months ended September 30, 2025 was primarily due to changes in certain flowed-through income taxes at the regulated utilities.
Current wording
AWR’s ETR was 24.8% and 24.0% for the three months ended March 31, 2026 and 2025, respectively. GSWC’s ETR was 25.9% and 24.7% for each of the periods ended March 31, 2026 and 2025, respectively. The increase in the ETRs during the three months ended March 31, 2026 was primarily due to changes in certain flowed-through income taxes at the regulated utilities.
Previous wording
AWR funds its operating expenses and pays dividends on its outstanding Common Shares primarily through dividends from its wholly owned subsidiaries. The ability of GSWC and BVES to pay dividends to AWR is restricted by California law. Under these restrictions, approximately $901.9 million was available for GSWC to pay dividends to AWR on September 30, 2025. Approximately $107.6 million was available for BVES to pay dividends to AWR as of September 30, 2025. ASUS’s ability to pay dividends to AWR is dependent upon state laws in which each ASUS subsidiary operates, as well as ASUS’s ability to pay dividends under California law.
Current wording
AWR funds its operating expenses and pays dividends on its outstanding Common Shares primarily through dividends from its wholly owned subsidiaries. The ability of GSWC and BVES to pay dividends to AWR is restricted by California law. Under these restrictions, approximately $937.6 million was available for GSWC to pay dividends to AWR on March 31, 2026. Approximately $121.0 million was available for BVES to pay dividends to AWR as of March 31, 2026. ASUS’s ability to pay dividends to AWR is dependent upon state laws in which each ASUS subsidiary operates, as well as ASUS’s ability to pay dividends under California law.
Previous wording
On February 27, 2024, AWR entered into an Equity Distribution Agreement with third-party sales agents, under which AWR may offer and sell Common Shares, from time to time at its sole discretion, through an ATM offering program having an aggregate gross offering price of up to $200 million over a three-year period and pursuant to AWR’s effective shelf registration statement on Form S-3. AWR intends to use the net proceeds from these sales, after deducting commissions on such sales and offering expenses, for general corporate purposes, including, but not limited to, repayment of debt and making equity contributions to its subsidiaries. During the nine months ended September 30, 2025, AWR sold 535,760 Common Shares through this ATM offering program and raised net proceeds of $40.2 million, bringing the total raised through September 30, 2025 to $130.0 million, net of $2.0 million of commissions paid under the terms of the Equity Distribution Agreement. As of September 30, 2025, approximately $68.0 million remained available for sale under the ATM offering program.
Current wording
In February 2024, AWR entered into an Equity Distribution Agreement with third-party sales agents, under which AWR may offer and sell Common Shares, from time to time at its sole discretion, through an ATM offering program having an aggregate gross offering price of up to $200 million over a three-year period and pursuant to AWR’s effective shelf registration statement on Form S-3. AWR has used the net proceeds from these sales, after deducting commissions on such sales and offering expenses, for general corporate purposes, including, but not limited to, repayment of debt and making equity contributions to its subsidiaries. During the three months ended March 31, 2026, AWR sold 84,237 Common Shares through this ATM offering program and raised net proceeds of $6.2 million, bringing the total raised through March 31, 2026 to $165.7 million, net of $2.5 million of commissions paid under the terms of the Equity Distribution Agreement. As of March 31, 2026, approximately $34.3 million remained available for sale under the ATM offering program.
Previous wording
In June 2023, AWR and GSWC each entered into credit agreements with an original term of five years provided by a syndicate of banks and financial institutions. Both credit agreements, as amended, are now scheduled to mature in June 2029. As of September 30, 2025, the credit agreements, as amended, provide AWR and GSWC unsecured revolving credit facilities with borrowing capacities of $195.0 million and $200.0 million, respectively. Under the terms of the credit agreements, as of September 30, 2025, the borrowing capacities for AWR and GSWC may be expanded up to an additional $30.0 million and $75.0 million, respectively, subject to the lenders’ approval. AWR’s credit facility primarily provides support to AWR (parent) and ASUS, while GSWC’s credit agreement provides support to its water operations and capital expenditures. As of September 30, 2025, AWR’s outstanding borrowings under its credit facility of $119.0 million have been classified as non-current liabilities on AWR’s Consolidated Balance Sheet. As of September 30, 2025, there were no outstanding borrowings under GSWC’s facility.
Current wording
In June 2023, AWR and GSWC each entered into credit agreements with an original term of five years provided by a syndicate of banks and financial institutions. Both credit agreements, as amended, are now scheduled to mature in June 2029. As of March 31, 2026, the credit agreements provide AWR and GSWC unsecured revolving credit facilities with borrowing capacities of $195.0 million and $200.0 million, respectively. Under the terms of the credit agreements, as of March 31, 2026, the borrowing capacities for AWR and GSWC may be expanded up to an additional $30.0 million and $75.0 million, respectively, subject to the lenders’ approval. AWR’s credit facility primarily provides support to AWR (parent) and ASUS, while GSWC’s credit agreement provides support to its water operations and capital expenditures. As of March 31, 2026, AWR’s outstanding borrowings under its credit facility of $110.0 million have been classified as non-current liabilities on AWR’s Consolidated Balance Sheet. The CPUC requires GSWC to completely pay off all borrowings under its revolving credit facility within a 24-month period after which GSWC may again borrow under its facility. GSWC’s pay-off period for its credit facility currently ends in November 2027. As of March 31, 2026, there were $22.0 million of outstanding borrowings under GSWC’s facility and have been classified as non-current liabilities in both AWR’s Consolidated Balance Sheet and GSWC’s Balance Sheet.
Previous wording
Our primary sources of liquidity to fund operations continue to be from the recovery of costs charged to customers at our regulated utilities and the collection of payments from the U.S government. We believe that capital investment costs associated with our capital programs at our regulated utilities will continue to be recovered through water and electric rates charged to customers, as well as funds from credit facilities from our regulated utilities. In addition, AWR’s credit facility will continue to be used to support ASUS’s operations and AWR (parent). The long-term capital-intensive nature of our regulated utilities have required us to continually seek future financing opportunities beyond the short-term. Future long-term financing at GSWC and BVES is expected to consist of both long-term debt and equity issuances in order to manage to the CPUC-authorized capital structure. Under the current financing applications authorized by the CPUC, GSWC and BVES have $600.0 million and $88.0 million, respectively, remaining and available under each utility’s authorized applications that provide for long-term financing and which are expected to be used over the next 2-6 years to pay down outstanding borrowings under their respective credit facilities and support operations.
Current wording
Our primary sources of liquidity to fund operations continue to be from the recovery of costs charged to customers at our regulated utilities and the collection of payments from the U.S government. We believe that capital investment costs associated with our capital programs at our regulated utilities will continue to be recovered through water and electric rates charged to customers, as well as funds from credit facilities from our regulated utilities. In addition, AWR’s credit facility will continue to be used to support ASUS’s operations and AWR (parent). The long-term capital-intensive nature of our regulated utilities have required us to continually seek future financing opportunities beyond the short-term. Future long-term financing at GSWC and BVES is expected to consist of both long-term debt and equity issuances in order to manage to the CPUC-authorized capital structure. Under the current financing applications authorized by the CPUC, GSWC and BVES have $588.0 million and $82.0 million, respectively, remaining and available under each utility’s authorized applications that provide for long-term financing and which are expected to be used over the next 1-6 years to pay down outstanding borrowings under their respective credit facilities and support operations.
Showing the first 40 of 60 pairs. Open the source sections for the rest.
Rearranged current paragraphs (2)
Current report — wording carried from elsewhere
General Rate Case for the Years 2027–2030
Current report — wording carried from elsewhere
In addition, financing activities in 2025 included the issuance of long-term debt of $50.0 million by BVES with a large portion of the proceeds used to pay down outstanding borrowings under its credit facility. During the three months ended March 31, 2026, AWR did not issue any long-term debt and had net payments on its credit facilities of $9.0 million. Credit facilities have been used to support its operations and ongoing capital expenditure programs.
Rearranged previous paragraphs (26)
Previous report — wording carried elsewhere
•An increase in water operating revenues of $8.3 million was largely as a result of the CPUC-authorized new rate increases effective January 1, 2025. GSWC transitioned from a full revenue decoupling mechanism to the M-WRAM effective January 1, 2025. As a result, GSWC’s revenues and earnings may be subject to future volatility from significant fluctuations in customer consumption compared to adopted levels.
Previous report — wording carried elsewhere
The following is a computation and reconciliation of diluted earnings per share from the measure of net income (loss) by business segment and for the parent company as disclosed in Note 10 to the Unaudited Consolidated Financial Statements, to AWR’s consolidated fully diluted earnings per common share, for the nine months ended September 30, 2025 and 2024:
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025, recorded diluted earnings from the water utility segment were $2.11 per share, as compared to $1.99 per share for the same period in 2024, an increase of $0.12 per share. The discussion below presents the major variances in earnings for the two periods.
Previous report — wording carried elsewhere
•An overall increase in operating expenses of $7.4 million (excluding supply costs) mainly due to increases in (i) overall labor costs, (ii) maintenance expense, (iii) depreciation and amortization expenses, which are impacted by increasing capital additions placed in service and are reflected and recovered in customer rates, and (iv) property and other non-income taxes; partially offset by a decrease in administrative and general expenses (excluding labor) primarily due to lower outside services costs including those related to regulatory filings as compared to the same period in 2024.
Previous report — wording carried elsewhere
•A decrease in earnings of approximately $0.06 per share due to the dilutive effects from the issuance of equity under AWR’s ATM offering program. Under the program, AWR may offer and sell its Common Shares, with an aggregate gross offering price of up to $200 million, from time to time at its sole discretion, with $68 million currently remaining available for sale. Through September 30, 2025, AWR has sold 1,680,979 Common Shares through this ATM offering program.
Previous report — wording carried elsewhere
Since the implementation in 2008 of the previously CPUC-approved MCBA, GSWC was able to track adopted and actual expense levels for purchased water, power purchased for pumping and pump taxes. GSWC recorded the variances (which include the effects of changes in both rate and volume) between adopted and actual purchased water, purchased power and pump tax expenses as a regulatory asset or liability. GSWC recovered from, or refunded to, customers the amount of such variances.
Previous report — wording carried elsewhere
Without the MCBA mechanism in place, beginning in 2025, there may be volatility to Registrant’s earnings as a result of changes in water supply source mix. The MCBA has been replaced with an incremental supply cost balancing account that will not include the impact from changes in water supply source mix compared to the adopted mix incorporated in the revenue requirement, but allows GSWC to track differences between the authorized per-unit prices of water production costs and actual per-unit prices of water production costs.
Previous report — wording carried elsewhere
Consolidated Results of Operations — Nine Months Ended September 30, 2025 and 2024 (amounts in thousands, except per share amounts):
Previous report — wording carried elsewhere
GSWC and BVES rely upon approvals by the CPUC of rate increases to recover operating expenses and to provide for a return on invested and borrowed capital used to fund utility plant. ASUS relies on economic price and equitable adjustments by the U.S. government in order to recover operating expenses and provide a profit margin for ASUS. Current operating revenues and earnings can be negatively impacted if ASUS’s subsidiaries do not receive adequate rate relief or adjustments in a timely manner. ASUS’s earnings are also impacted by the level of additional construction projects at its subsidiaries, which may or may not continue at current levels in future periods.
Previous report — wording carried elsewhere
Electric usage for the nine months ended September 30, 2025 was lower by 1.3% compared to the same period in 2024. Due to the CPUC-approved Base Revenue Requirement Adjustment Mechanism, which adjusts certain revenues to adopted levels authorized by the CPUC, changes in usage do not have a significant impact on earnings.
Previous report — wording carried elsewhere
ASUS’s subsidiaries expect to continue to enter into U.S. government-awarded contract modifications, agreements with third-party prime contractors for new construction projects at the military bases served and task order agreements. Earnings and cash flows from modifications to the initial 15- and 50-year contracts with the U.S. government and agreements with third-party prime contractors for additional construction projects may or may not continue at current levels in future periods.
Previous report — wording carried elsewhere
Total supply costs at the regulated utilities comprise the largest portion of total consolidated operating expenses. Supply costs accounted for approximately 32.3% and 31.2% of total operating expenses for the nine months ended September 30, 2025 and 2024, respectively.
Previous report — wording carried elsewhere
Two of the principal factors affecting water supply costs are the amount of water produced and the source of the water. Generally, the variable cost of producing water from wells is less than the cost of water purchased from wholesale suppliers. The overall actual percentages of purchased water for the nine months ended September 30, 2025 and 2024 were approximately 42.7% and 41.7%, respectively.
Previous report — wording carried elsewhere
Supply costs for the water segment consist of purchased water, purchased power for pumping, groundwater production assessments and changes in the water supply cost balancing accounts. For the nine months ended September 30, 2025 and 2024, water supply costs consisted of the following amounts (in thousands):
Previous report — wording carried elsewhere
Supply costs for the electric segment consist primarily of purchased power for resale, the cost of natural gas used by BVES’s generating unit, the cost of renewable energy credits and changes in the electric supply cost balancing account. For the nine months ended September 30, 2025 and 2024, electric supply costs consisted of the following amounts (in thousands):
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025, the cost of power purchased for resale to BVES’s electric customers increased to $12.8 million as compared to $8.3 million during the same period in 2024 primarily due to higher overall average prices per megawatt-hour including fixed costs. The change in the electric supply cost balancing account during the nine months ended September 30, 2025 compared to the same period in 2024 was due primarily to increases in energy prices.
Previous report — wording carried elsewhere
The primary components of other operation expenses include payroll costs, materials and supplies, chemicals and water treatment costs and outside-services costs of operating the regulated water systems, including the costs associated with water transmission and distribution, pumping, water quality, meter reading, billing, and operations of district offices and the electric system. Registrant’s contracted services operations incur many of the same types of expenses. For the nine months ended September 30, 2025 and 2024, other operation expenses by business segment consisted of the following (dollar amounts in thousands):
Previous report — wording carried elsewhere
Administrative and general expenses include payroll costs related to administrative and general functions, all employee-related benefits, insurance expenses, outside legal and consulting fees, regulatory-utility-commission expenses, expenses associated with being a public company and general corporate expenses charged to expense accounts. For the nine months ended September 30, 2025 and 2024, administrative and general expenses by business segment, including AWR (parent), consisted of the following (dollar amounts in thousands):
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025 and 2024, depreciation and amortization by business segment consisted of the following (dollar amounts in thousands):
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025 and 2024, maintenance expense by business segment consisted of the following (dollar amounts in thousands):
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025 and 2024, property and other taxes by business segment consisted of the following (dollar amounts in thousands):
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025 and 2024, interest expense by business segment, including AWR (parent), consisted of the following (dollar amounts in thousands):
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025 and 2024, interest income by business segment, including AWR (parent), consisted of the following (dollar amounts in thousands):
Previous report — wording carried elsewhere
The decrease in interest income at the water segment was due primarily to a decrease in interest income earned on regulatory assets. Regulatory asset balances will decrease as surcharges are approved and implemented. The increase at the electric segment was due to higher levels of regulatory asset balances earning interest.
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025 and 2024, other income and (expenses), net by business segment, including AWR (parent), consisted of the following (dollar amounts in thousands):
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025 and 2024, income tax expense by business segment, including AWR (parent), consisted of the following (dollar amounts in thousands):