A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2026 · Filed May 5, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-11-05.
0001955520-25-000069
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-03-31; filed 2026-05-05.
0001628280-26-030688
Item 2. Management's Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 154 previous paragraphs and 122 current paragraphs.
74 unchanged; 27 reworded; 21 added; 49 removed; 4 previous and 0 current paragraphs rearranged.
Tables are not compared: 19 previous and 19 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (21)
Current report
•Mountain: Idaho, Montana, Utah and Wyoming
Current report
teams to deliver training, support higher-margin bidding opportunities across regions and pursue targeted growth opportunities. Process Improvement Teams ("PIT Crews") have focused on improving operational efficiencies, reducing production costs across our materials product lines and optimizing product quality. In addition, we are rolling out new technologies designed to increase productivity and provide enhanced, real-time visibility into daily operations.
Current report
We could be subject to downward pressure on our margins due to competitive forces and fluctuations in the prices of raw materials, including diesel fuel, gasoline, natural gas, liquid asphalt, cement and steel. To help offset these pressures, we have utilized various mitigation strategies, such as dynamic pricing, energy escalation clauses in our contracting services contracts, securing materials in advance including the prepurchasing of diesel, fuel surcharges and pursuing other cost-saving measures. During the first quarter of 2026, our teams were successful with these mitigating controls and we have not seen a material impact to our results of operations as a result of the conflict in Iran. We will continue to monitor the effects these economic conditions could have on our business.
Current report
Seasonality. We typically experience seasonal losses in the first quarter due to a large portion of our markets being geographically located in the northern part of the country. Generally, construction activity increases in the second quarter and continues throughout the year, contributing to both materials and contracting services volumes. For this reason, we see more pre-production activity and site improvements in the first quarter as we prepare for the upcoming construction season, which provides a benefit to us for the remainder of the year as volumes and sales increase. Some of this pre-production work includes stripping and harvesting at our aggregate sites as well as repairing and mobilizing equipment.
Current report
Revenue increased $56.6 million, led mostly by ready-mix volumes contributing $35.8 million to the increase followed by an increase in aggregate volumes of $21.5 million, largely driven by recent acquisitions as well as favorable weather allowing for early season contracting services work. Partially offsetting the increased revenue was lower volumes in Hawaii due to significant flooding in the state.
Current report
Gross loss
Current report
Gross loss improved $6.8 million, largely the result of higher revenues noted above, as well as a decrease in maintenance and pre-production costs.
Current report
As a percentage of revenues, selling, general and administrative expense was 20.4 percent in the first quarter of 2026 compared to 20.7 percent in 2025. Due to the seasonality of our operations, our first quarter selling, general and administrative costs as a percent of revenue are higher than our annualized costs. For the first quarter of 2026, we experienced higher costs, largely as a result of the additional costs associated with the companies acquired in 2025 and the first quarter of 2026, including additional payroll and payroll-related costs and $2.1 million higher purchase accounting-related intangible asset amortization.
Current report
Other income (expense)
Current report
Income tax benefit
Current report
Income tax benefit increased $3.7 million, corresponding with higher loss before income taxes. Our effective tax rate for 2026 and 2025 was 26.4 percent.
Current report
Revenue increased $3.5 million for the quarter, primarily due to higher aggregate, ready-mix and asphalt sales volumes in Oregon of $16.8 million, driven by stronger demand in the private sector, timing of projects and contributions from acquisitions completed in 2025. In addition, California's public agency market remained strong and contributed an additional $10.6 million in contracting services and aggregate sales volumes. These improvements were partially offset by lower aggregate, cement and ready-mix sales volumes in Hawaii of $9.3 million due to significant flooding conditions, as well as a decline in contracting services in Oregon due to less available agency work.
Current report
EBITDA decreased 11 percent for the quarter, primarily related to the absence of a one-time gain of $3.5 million related to an acquisition recognized as a bargain purchase in the first quarter of 2025. In addition, the significant flooding in Hawaii contributed to the EBITDA decrease. This was partially offset by higher aggregate and ready-mix gross margins in Oregon due to improved volumes mentioned above.
Current report
Revenue increased $15.2 million in the quarter, mainly driven by favorable weather increasing volumes, along with higher pricing for ready-mix, aggregate and asphalt, which contributed $16.9 million of additional revenue to our legacy operations. The favorable weather also allowed for early season contracting services work across the segment, resulting in an additional $1.6 million of revenue. Acquisitions made during the quarter further added to the overall revenue growth.
Current report
EBITDA improved $8.1 million for the quarter, largely due to higher revenues as noted above, as well as production cost efficiencies for all product lines. Slightly offsetting was $2.4 million higher selling, general and administrative costs mostly related to additional overhead costs from the three acquired companies during the quarter and increased labor costs.
Current report
Revenue increased $33.3 million for the quarter, primarily driven by contributions from companies acquired in 2025. Among these, the acquisition of Texcrete in December led to ready-mix volumes that were more than twice as high in Texas as the prior year. In addition, legacy contracting services increased $3.3 million across the segment as a result of more available work and aggregate volumes increased $5.6 million, largely as a result of data center projects.
Current report
EBITDA decreased $2.5 million, largely the result of two additional months of seasonal losses at Strata in 2026 and higher selling, general and administrative expenses mostly related to additional overhead costs from the companies acquired in 2025 and increased labor costs. Partially offsetting these decreases was higher ready-mix gross profit as a result of the additional volumes mentioned above and higher contracting services gross profit at our legacy operations.
Current report
Revenue increased $6.5 million, primarily driven by higher sales volumes due to favorable weather across the segment.
Current report
EBITDA improved $3.2 million, largely as a result of increased sales volumes, as well as lower operating costs due to lower input costs and the absence of boiler repairs and railcar maintenance incurred in the prior year.
Current report
During the first quarter of 2026, Corporate Services contributed negative EBITDA of $18.0 million, which was comparable to the prior year, as a result of flat selling, general and administrative costs year-over-year. Lower due diligence and integration costs related to corporate development and completed acquisitions were offset by increased salaries and burden.
Current report
Cash flows provided by financing activities for the three months ended March 31, 2026 decreased compared to the three months ended March 31, 2025. In the first quarter of 2026, we borrowed $270 million against our revolving credit facility while in 2025 we issued a $500 million Term Loan B.
Removed paragraphs (49)
Previous report
•Mountain: Idaho, Montana and Wyoming
Previous report
Basis of Presentation
Previous report
In January 2025, we made a change to our organizational structure to better align with our business strategy. We reorganized our business segments to reflect changes in the way our chief operating decision maker evaluates performance, makes operating decisions and allocates resources. Our former Pacific and Northwest operating segments were combined to form the new West operating segment. Our former North Central and South operating segments were combined to form the new Central operating segment. The reorganization resulted in four operating segments: West, Mountain, Central and Energy Services, each of which is also a reportable segment. Each segment’s performance is evaluated based on segment results without allocating corporate expenses, which include corporate costs associated with accounting, legal, treasury, business development, information technology, human resources, and other corporate expenses that support the operating segments. Prior periods have been recast to conform to the current reportable segment presentation.
Previous report
In 2024, we created the position of Chief Excellence Officer. This newly formed position became effective January 1, 2025, and is focused on expanding our PIT Crews while leading our standardization efforts. Under the leadership of the Chief Excellence Officer, a broader process improvement framework was established, creating more teams focused on standardization, commercial excellence and operational excellence. In June 2025, we appointed a Senior Vice President of Aggregate and Rail. This role adds to the EDGE strategy by working with our PIT Crews to focus on identifying and driving cost reductions at our aggregate production facilities while also helping shape our corporate strategy and evaluating and supporting new aggregate opportunities.
Previous report
Under the current tariff environment, we have not experienced a material direct impact in the first nine months of 2025. We have clauses in most of our quotes that allows for us to pass-through increased costs associated with tariffs to our customers, and to date, we have been successful with passing those costs on. We continue to closely monitor the effects and changes to these announcements.
Previous report
Seasonality. Our operations have been and may continue to be impacted by weather. Generally, our construction activity in the northern states is from May into the first part of November. An unusually wet spring or early winter can lead to reduced construction activity, which will also impact our aggregate and asphalt product lines. In the second and third quarters of 2025, parts of our Central and Mountain segments were impacted by increased rainfall amounts, causing a delay in work. Further, the tragic July 4 flooding in Central Texas shut down production at our Honey Creek Quarry for 10 days and affected delivery of our products for 51 days while the rail and roads were being repaired.
Previous report
We continue to deploy resources to attract, develop and retain qualified and diverse talent. As the United States faces shortages in the availability of individuals to fill careers in our industry, we have taken significant steps to showcase construction as a career of choice. In April 2025, we created the position Chief People Officer, which oversees our team member relations, recruitment and retention and training and career development.
Previous report
We own and operate a state-of-the-art training facility, the Knife River Training Center. This unique, 230-acre facility, used corporatewide, provides ample space to enhance the skills of both new and existing employees through classroom education and hands-on experience. One of the most popular courses at the Knife River Training Center is the commercial driver's license training (CDL), which is helping to address an industry-wide labor shortage. In addition to CDL training for new truck drivers, the training center offers experienced truck driver training, new and experienced equipment operator training and the center offers a diverse array of courses designed to foster leadership and facilitate professional skills development in sales, instruction, and more. These courses are available to all Knife River employees, ensuring that our team members, from frontline workers to senior leadership, have access to the training and support they need to grow in their roles.
Previous report
Revenue increased $98.4 million, largely driven by contributions from acquired companies, as well as price increases of mid-single digits on aggregates and ready-mix. Partially offsetting the increased revenue was lower contracting services work and asphalt volumes in the Mountain segment, due in part to less public-agency work compared to the prior year. Parts of our Central and Mountain segments also faced increased rainfall in the quarter.
Previous report
Gross profit
Previous report
Gross profit improved $11.3 million, largely the result of acquired companies, as well as higher pricing for aggregates and ready-mix. Energy Services also saw a rise in gross profit due to decreased boiler repairs and maintenance costs compared to the prior year. In California, contracting services benefitted from public agency work and favorable project execution. Offsetting these increases was the effects of reduced work activity in the Mountain segment and a $1.9 million negative impact to the aggregates product line as a result of selling acquired inventory after markup to fair value as part of acquisition accounting.
Previous report
Selling, general and administrative expenses increased $5.2 million for the third quarter. Our reportable segments had higher costs of $6.4 million, primarily due to additional costs associated with the acquired companies and increased information technology-related costs of $645,000 to support our EDGE initiatives. This increase was offset in part by higher gains of $2.2 million on the sale of equipment throughout the West and Mountain segments and lower payroll-related costs as a result of lower incentive accruals.
Previous report
Corporate Services had a decrease in selling, general and administrative costs of $1.2 million compared to third quarter 2024. This decrease is largely related to lower payroll-related and business development costs. Offsetting the cost decrease was a less favorable adjustment to the incurred but not reported losses in our captive insurance program.
Previous report
Other income
Previous report
Income tax expense
Previous report
Income tax expense decreased $600,000, corresponding with lower income before income taxes.
Previous report
Revenue
Previous report
Revenue increased $149.1 million, largely driven by contributions of acquired companies, as well as price increases of mid-single digits on aggregates and ready-mix. California saw an increase in public-agency and commercial work, which positively impacted contracting services and ready-mix revenues. Partially offsetting the increased revenue was less contracting services work in Oregon, primarily the result of less public-agency work, and less contracting services work in the Mountain and Central segments, due in part to less public-agency work and increased rainfall during the second and third quarters, which also impacted asphalt and aggregate volumes.
Previous report
Gross profit decreased $23.7 million, largely due to less work performed, as previously discussed. The decrease in aggregate volumes further impacted our results as we experienced higher per-unit fixed costs. In addition, Energy Services saw a decrease in gross profit mostly due to competitive market conditions and higher repairs and maintenance costs. Also, the impact of selling acquired inventory after markup to fair value as part of acquisition accounting negatively impacted the aggregates product line by $3.0 million and liquid asphalt by $300,000. These decreases were offset in part by the contributions of acquired companies, higher gross profit in California from favorable construction project execution and higher margins in Alaska and Hawaii.
Previous report
Selling, general and administrative expenses
Previous report
Selling, general and administrative expenses increased $27.8 million for the first nine months of 2025. Our reportable segments had higher costs of $26.7 million, primarily due to additional costs associated with the acquired companies, an increase in labor-related costs partly due to additional employees and increased information technology-related costs to support our EDGE initiatives. Partially offsetting these increases was higher gains of $9.3 million on the sale of non-strategic assets and equipment throughout the West and Central segments and lower professional services fees of $1.2 million.
Previous report
Corporate Services had an increase in selling, general and administrative costs of $1.1 million. This increase was largely the result of higher business development costs of $6.5 million related to corporate development and completed acquisitions and a less favorable adjustment to the incurred but not reported losses in our captive insurance program. Offsetting the increased costs were lower payroll-related costs and the absence of one-time Separation costs in 2024 of $3.8 million.
Previous report
Interest expense
Previous report
Other income
Previous report
Income tax expense
Previous report
Income tax expense decreased $16.5 million, corresponding with lower income before income taxes.
Previous report
In January 2025, we made a change to our organizational structure to better align with our business strategy. We reorganized our business segments to reflect changes in the way our chief operating decision maker evaluates performance, makes operating decisions and allocates resources. Our former Pacific and Northwest operating segments were combined to form the new West operating segment. Our former North Central and South operating segments were combined to form the new Central operating segment. The reorganization resulted in four operating segments: West, Mountain, Central and Energy Services, each of which is also a reportable segment. Each segment’s performance is evaluated based on segment results without allocating corporate expenses, which include corporate costs associated with accounting, legal, treasury, information technology, human resources, and other corporate expenses that support the operating segments. Prior periods presented have been recast to conform to the current reportable segment presentation.
Previous report
Revenue increased $12.9 million mainly as a result of increased pricing in aggregates and ready-mix throughout the segment, which accounted for $6.4 million of the increase, and ready-mix volume increases in Alaska and Hawaii of $4.0 million driven by market demand. In addition, California's public agency market remained strong and contributed an additional $6.1 million in contracting services and asphalt volumes, while recent acquisitions in Oregon also positively contributed. Offsetting these increases were slightly lower aggregate volumes throughout the segment.
Previous report
EBITDA increased 8 percent for the quarter, resulting from increased pricing that outpaced costs for most product lines, along with increased ready-mix volumes in Alaska and Hawaii. California's contracting margins improved as a result of favorable project execution on completed work and higher revenues. The segment also benefitted from an increase of $1.1 million in gains on asset sales throughout the segment. Partially offsetting these increases was reduced contracting services margins in Oregon related to less public-agency and data center work in the quarter.
Previous report
Revenue increased $6.8 million. In California, more available public-agency and private work and increased pricing largely contributed to the increase compared to the prior year. Hawaii experienced increased ready-mix and cement volumes of $10.7 million driven by increased market demand, while Alaska saw its aggregate and ready-mix volumes increase by $6.9 million due to stronger demand in the private sector. Partially offsetting these increases were lower revenues across most Oregon product lines due to less available public-agency and private work.
Previous report
EBITDA increased 2 percent year-over-year, primarily driven by a $9.4 million improvement in contracting services margins as a result of favorable project executions in California, while Hawaii and Alaska also saw increased margins overall. In addition, the segment benefitted from an increase of $4.0 million in gains on the sale of assets throughout the segment and a one-time gain of $3.5 million on the bargain purchase of an aggregate quarry operation in the first quarter of 2025, as discussed in Note 10. Offsetting theses increases were higher selling, general and administrative costs of $5.3 million, mostly attributed to increased labor-related costs, and lower aggregate and contracting services margins in Oregon as a result of fewer projects, as previously mentioned.
Previous report
Revenue decreased $31.3 million in the quarter, primarily due to decreased contracting services work, which also brought asphalt and aggregate volumes down. The decrease in contracting services revenue was largely due to lower asphalt paving work as a result of competitive bid dynamics, type and location of available DOT projects, the timing of public-agency jobs and increased rainfall amounts in certain markets. Partially offsetting the decrease was higher ready-mix and aggregate pricing of $3.8 million.
Previous report
EBITDA decreased $8.7 million for the quarter, largely due to lower contracting service margins as a result of less paving work and the type of work performed, as discussed above, which also impacted asphalt and aggregate gross profit. Slightly offsetting was higher ready-mix and aggregate pricing.
Previous report
Revenue decreased $43.0 million, primarily due to decreased contracting services work, which was driven by lower asphalt paving work as a result of the type and location of available DOT projects, the timing of public-agency jobs and increased rainfall amounts in certain markets. The decrease in contracting services also brought aggregate and asphalt volumes down by $33.6 million. Partially offsetting the decrease was higher aggregate and ready-mix pricing of $9.7 million.
Previous report
EBITDA decreased $31.1 million year-over-year. Contracting services experienced lower margins throughout the segment due to less available work, while lower margins on aggregates and asphalt were largely the result of lower sales volumes due to fewer construction projects, as previously discussed, and higher repairs and maintenance costs which contributed to an increase in per-unit fixed costs. Selling, general and administrative costs were $1.9 million higher, largely from increased labor-related costs.
Previous report
Revenue increased 22 percent year-over-year to $434.4 million, primarily driven by contributions from acquired companies and price increases across our legacy aggregate and ready-mix product lines. This increase was offset in part by a reduction in contracting services work due to increased rainfall in the period, which also impacted asphalt volumes, and reduced volumes from our Honey Creek Quarry due to the historic flooding as previously mentioned.
Previous report
EBITDA improved $19.9 million, largely the result of acquired companies. Slightly offsetting the increase was reduced contracting services work primarily due to unfavorable weather in most parts of the segment, as previously discussed. In addition, the impact of selling acquired inventory after markup to fair value as part of acquisition accounting of $1.9 million negatively impacted the aggregate product line.
Previous report
Revenue increased $126.9 million, largely driven by contributions from acquired companies, as well as the impact of our legacy operations price increases in the aggregate product line of $10.3 million and ready-mix product line of $5.0 million. Partially offsetting these increases was less contracting services work throughout the segment due to increased rainfall in the second and third quarters, which also caused decreased aggregate and ready-mix volumes.
Previous report
EBITDA improved 23 percent, largely the result of acquired companies and $4.9 million of increased gains on asset sales. Offsetting these increases were fewer job incentives compared to 2024, as well as less contracting services work largely due to unfavorable weather in most parts of the segment. In addition, the impact of selling acquired inventory after markup to fair value as part of acquisition accounting of $3.0 million negatively impacted the aggregate product line.
Previous report
Revenue increased $43.3 million, primarily due to contributions from the acquisition of Albina Asphalt in November 2024. In addition, the new polymer modified asphalt processing plant in South Dakota contributed an additional $10.7 million in revenue. These increases were partially offset by lower volumes and lower pricing in some locations driven by current liquid asphalt market pricing.
Showing the first 40 of 49 passages. Open the source sections for the rest.
Reworded paragraphs (27)
Previous wording
This Quarterly Report on Form 10-Q contains forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended ("Exchange Act"). Forward-looking statements are all statements other than statements of historical fact, including without limitation those statements that are identified by the words "anticipates," "estimates," "expects," "intends," "plans," "predicts" and similar expressions, and include statements concerning plans, projections, objectives, goals, strategies, future events or performance, and underlying assumptions (many of which are based, in turn, upon further assumptions) and other statements that are other than statements of historical facts. From time to time, Knife River Corporation ("Knife River," the "Company," "we," "our," or "us") may publish or otherwise make available forward-looking statements of this nature, including statements related to its Competitive EDGE strategy (EDGE) implemented to improve margins and to execute on other strategic initiatives aimed at generating long-term profitable growth, shareholder value creation, expected long-term goals, expected backlog margin, acquisitions, financing plans, expected federal and state funding for infrastructure or other proposed strategies.
Current wording
This Quarterly Report on Form 10-Q contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended ("Exchange Act"). Forward-looking statements are all statements other than statements of historical fact, including without limitation those statements that are identified by the words "anticipates," "estimates," "expects," "intends," "plans," "predicts" and similar expressions, and include statements concerning plans, projections, objectives, goals, strategies, future events or performance, and underlying assumptions (many of which are based, in turn, upon further assumptions) and other statements that are other than statements of historical facts. From time to time, Knife River Corporation ("Knife River," the "Company," "we," "our," or "us") may publish or otherwise make available forward-looking statements of this nature, including statements related to its Competitive EDGE strategy (EDGE) implemented to improve margins and to execute on other strategic initiatives aimed at generating long-term profitable growth, shareholder value creation, expected long-term goals, expected backlog margin, acquisitions, financing plans, expected federal and state funding for infrastructure or other proposed strategies.
Previous wording
At Knife River, we are a people-first construction materials and contracting services company. We provide construction materials and contracting services to build safe roads, bridges, airport runways and other critical infrastructure needs that connect people with where they want to go and with the supplies they need. We also champion a positive workplace culture by focusing on safety, training, inclusion, compensation and work-life balance.
Current wording
At Knife River, we are a people-first construction materials and contracting services company. We provide construction materials and contracting services to build safe roads, bridges, airport runways and other critical infrastructure needs that connect people with where they want to go and with the supplies they need. We also champion a positive workplace culture by focusing on safety, training, compensation and work-life balance.
Previous wording
We are one of the leading providers of crushed stone and sand and gravel in the U.S. and operate through four operating segments, which are also our reportable segments, across 14 states: West, Mountain, Central and Energy Services. The geographic segments primarily provide aggregates, asphalt and ready-mix concrete, as well as related contracting services such as heavy-civil construction, asphalt paving, concrete construction, site development and grading. The Energy Services segment produces and supplies liquid asphalt and related services, primarily for use in asphalt road construction.
Current wording
We are one of the leading providers of crushed stone and sand and gravel in the United States and operate through four reportable segments across 15 states: West, Mountain, Central and Energy Services. The geographic segments primarily provide aggregates, asphalt and ready-mix concrete, as well as related contracting services such as heavy-civil construction, asphalt paving, concrete construction, site development and grading. The Energy Services segment produces and supplies liquid asphalt and related services, primarily for use in asphalt road construction.
Previous wording
As an aggregates-led construction materials and contracting services company, we have 1.2 billion tons of aggregate reserves supporting our vertically integrated business strategy. About 37 percent of these aggregates are used internally to support value-added downstream products like ready-mix concrete and asphalt, as well as contracting services such as heavy-civil construction, asphalt paving, concrete construction, bridges and in some segments the manufacturing of prestressed concrete products. Our strategically located aggregate sites and associated asphalt and ready-mix plants near mid-sized, high-growth markets offer transportation advantages, enabling competitive pricing and higher margins. We serve both public and private markets, with public projects making up most of our work and providing stability through economic cycles, which helps offset the cyclical nature of the private markets.
Current wording
As an aggregates-based construction materials and contracting services company, we have 1.3 billion tons of aggregate reserves supporting our vertically integrated business strategy. About 35 percent of these aggregates are used internally to support value-added downstream products like ready-mix concrete and asphalt, as well as contracting services such as heavy-civil construction, asphalt paving, concrete construction, bridges and in some segments the manufacturing of prestressed concrete products. Our strategically located aggregate sites and associated asphalt and ready-mix plants near mid-sized, higher-growth markets offer transportation advantages, enabling competitive pricing and higher margins. We serve both public and private markets, with public projects making up most of our work and providing stability through economic cycles, which helps offset the cyclical nature of the private markets.
Previous wording
Expected margins on backlog at September 30, 2025, were slightly lower compared to the expected margins on backlog at September 30, 2024. Of the $995 million of backlog at September 30, 2025, we expect to complete approximately $764 million in the 12 months following September 30, 2025. Approximately 87 percent of our backlog at September 30, 2025, related to publicly funded projects, including street and highway construction projects, which are driven primarily by public works projects for state departments of transportation (DOT). Further, there continues to be infrastructure development, as discussed in the following section on Public Funding, which is expected to continue to provide bidding opportunities in our markets. Oregon, however, has seen challenges with both public and private projects contributing to lower backlog in the West segment. On the public side, delays with the Oregon DOT budget, as discussed in the following section on Public funding, have created a headwind in 2025.
Current wording
Expected margins on backlog at March 31, 2026, were lower compared to the expected margins on backlog at March 31, 2025. Of the $1.2 billion of backlog at March 31, 2026, we expect to complete approximately $914 million in the 12 months following March 31, 2026. Approximately 88 percent of our backlog at March 31, 2026, is related to publicly funded projects, including street and highway construction projects, which are driven primarily by public works projects for state departments of transportation (DOT). Further, there continues to be infrastructure development, as discussed in the following section on Public Funding, which is expected to continue to provide bidding opportunities in our markets.
Previous wording
Public Funding. Funding for public projects is dependent on federal and state funding, such as appropriations to the Federal Highway Administration. Currently, states have continued moving forward with allocating funds from federal programs, such as the Infrastructure Investment and Jobs Act (IIJA), which is authorized to provide $1.2 trillion in funding from 2022 through 2026. As of August 2025, approximately 52 percent of IIJA formula funding had yet to be spent in our 14 state operating market. Additionally, DOT budgets in most of the states where we operate remain strong, which is expected to favorably affect bidding through the remainder of this year and into next year. Ten of our 14 states have record DOT budgets going into the 2026 fiscal year. In the second quarter of 2025, Washington, Idaho and North Dakota all passed bills that support their transportation funding. We continue to monitor the implementation and impact of these legislative items. Year-to-date, projects in Oregon have been delayed and funding has been diverted from maintenance and repair work, which includes asphalt paving, to megaprojects as a result of the state's DOT budget shortfall and general uncertainty for funding. However, in September 2025, Oregon passed a transportation bill to raise $4.3 billion over the next 10 years; approximately 50% of the funds from the new bill will be routed to cities and counties for road maintenance programs, which we expect will begin to become available in 2026. While the state DOT budget is not yet final, it is expected that the contributions from the new bill will bring total funding for the 2025-27 biennium to approximately $6.1 billion, compared to the record $6.2 billion for the previous two-year cycle.
Current wording
Public Funding. Funding for public projects is dependent on federal and state funding, such as appropriations to the Federal Highway Administration. Currently, states have continued moving forward with allocating funds from federal programs, such as the Infrastructure Investment and Jobs Act (IIJA), which is authorized to provide $1.2 trillion in funding from 2022 through 2026. As of March 2026, approximately 43 percent of IIJA formula funding had yet to be spent in our 15 state operating market. While each market is unique, the DOT budgets in most of the states where we operate remain strong. Eleven of our 15 states have record DOT budgets for the 2026 fiscal year, representing a combined 15 percent increase over 2025.
Previous wording
Earlier this year, the American Society of Civil Engineers published its 2025 Report Card for America's Infrastructure, assigning the United States roads a "D+" grade and estimating that between 2024 and 2033, the country will require more funding than what is currently authorized. It is estimated that a total of $2.2 trillion in funding will be needed for our roadway systems to reach a state of good repair during that time period.
Current wording
In 2025, the American Society of Civil Engineers published its 2025 Report Card for America's Infrastructure, assigning the United States roads a "D+" grade and estimating that between 2024 and 2033, the country will require more funding than what is currently authorized. It is estimated that a total of $2.2 trillion in funding will be needed for our roadway systems to reach a state of good repair during that time period.
Previous wording
Profitability. The management team consistently monitors profit margins and has adopted a proactive approach in supporting long-term profitability objectives and creating shareholder value. In 2023, we began the implementation of our EDGE initiatives and established specialized teams tasked with delivering training, facilitating the pursuit of higher-margin bidding opportunities across various regions, and identifying growth prospects. Furthermore, these teams have been engaged in the identification and execution of measures aimed at increasing operational efficiency and reducing costs. Since its establishment, the Materials Process Improvement Team, also referred to as the Materials PIT Crew, has conducted visits at 27 locations within the organization’s operational footprint, encompassing 178 individual aggregate, asphalt, and ready-mix concrete plants, representing approximately 70% of our materials sales volumes. This PIT Crew has rolled out new technologies and training programs to boost productivity across the product lines and provide more real-time visibility into daily operations.
Current wording
Profitability. The management team consistently monitors profit margins and has adopted a proactive approach in supporting long-term profitability objectives and creating shareholder value. In 2023, we launched our EDGE initiatives and established specialized
Previous wording
Growth. Our management team continues to evaluate growth opportunities, both through organic growth and acquisitions they believe will generate shareholder value. Our business development team is focused on our growth with materials-led businesses in mid-size, high growth markets, and has several targets at various stages of completion in our acquisition pipeline. In the third quarter of 2025, we acquired High Desert Aggregate and Paving, an aggregates-led construction materials and contracting services business in central Oregon. This is in addition to the acquisitions completed in the first half of 2025 that included an aggregates and contracting services business in central Minnesota and Strata Corporation, which are both included in our Central segment, as well as an aggregate quarry operation in Washington, adding to the West segment.
Current wording
Growth. Our management team continues to evaluate growth opportunities, both through organic growth and acquisitions they believe will generate shareholder value. Our business development team is focused on our growth with materials-led businesses in mid-size, higher growth markets, and has several targets at various stages of completion in our acquisition pipeline. During the first quarter of 2026, we finalized three acquisitions within the Mountain region. Two of these transactions will allow us to broaden our presence in Montana, enhancing our ability to supply aggregates and ready-mix concrete to the expanding market in western Montana. Additionally, the acquisition of Morgan Asphalt marks our entry into the Utah market. This acquisition includes aggregate crushing and production operations with reserves projected to last over 30 years, an asphalt manufacturing facility and a range of contracting services such as asphalt paving, excavation and grading, serving both public and private sector customers.
Previous wording
In addition, we are investing in multiple organic projects, including an aggregates expansion project in South Dakota that will increase our production capabilities in the Sioux Falls market. This project is scheduled to be operational in 2027. Earlier this year we completed construction of a processing plant to manufacture polymer modified asphalt (PMA) and add liquid asphalt storage in our South Dakota operations, which will allow us to more cost effectively supply this local market. In Twin Falls, Idaho, we are greenfielding new ready-mix operations, which allows us to build a local team in this high-growth market, and are expected to be operating in the first quarter of 2026.
Current wording
In addition, we are investing in multiple organic projects, including an aggregates expansion project in South Dakota that will increase our production capabilities in the Sioux Falls market. This project is scheduled to be operational in 2027. In Twin Falls, Idaho, we greenfielded new ready-mix operations, which allows us to build a local team in this higher-growth market. The Twin Falls plant is expected to be fully operational in the second quarter of 2026.
Previous wording
Our training and development team, based out of the Knife River Training Center, is comprised of professional instructors, who bring a wealth of knowledge and experience to the learning environment. This dedicated team has a long-standing tradition of delivering quality training programs that are both comprehensive and practical. Their expertise helps ensure that every employee receives the highest standard of education and skill development.
Current wording
Our training and development team, based out of the Knife River Training Center, is comprised of professional instructors, who bring a wealth of knowledge and experience to the learning environment. This dedicated team has a long-standing tradition of delivering quality training programs that are both comprehensive and practical. Their expertise helps ensure that our team members receive the highest standard of education and skill development.
Previous wording
Gross profit includes revenue less cost of revenue, as defined above, and is the difference between revenue and the cost of making a product or providing a service, before deducting selling, general and administrative expenses, income taxes and interest expense.
Current wording
Gross (loss) profit includes revenue less cost of revenue, as defined above, and is the difference between revenue and the cost of making a product or providing a service, before deducting selling, general and administrative expenses, income taxes and interest expense.
Previous wording
projects in process and the number of employees assigned to estimating and bidding activities. Other general and administrative expenses include outside services; information technology; depreciation and amortization; training, travel and entertainment; office supplies; allowance for expected credit losses; gains or losses on the sale of assets; and other miscellaneous expenses.
Current wording
Selling, general and administrative expenses include the costs for estimating, bidding and business development, as well as costs related to corporate and administrative functions. Selling expenses can vary depending on the volume of projects in process and the number of employees assigned to estimating and bidding activities. Other general and administrative expenses include outside services; healthcare; information technology; depreciation and amortization; training, travel and entertainment; office supplies; allowance for expected credit losses; gains or losses on the sale of assets; and other miscellaneous expenses.
Previous wording
Other income includes net periodic benefit costs for our benefit plan expenses, other than service costs; interest income; realized and unrealized gains and losses on investments for our nonqualified benefit plans; earnings or losses on joint venture arrangements; gain on bargain purchase; and other miscellaneous income or expenses, including expenses related to the transition services agreement with MDU Resources Group, Inc.
Current wording
Other (expense) income includes net periodic benefit costs for our benefit plan expenses, other than service costs; interest income; realized and unrealized gains and losses on investments for our nonqualified benefit plans; earnings or losses on joint venture arrangements; gain on bargain purchase; and other miscellaneous income or expenses.
Previous wording
Interest expense increased $9.1 million due primarily to higher average debt balances with the issuance of a new Term Loan B in March of 2025 and borrowings under our revolving credit facility, offset in part by lower average interest rates.
Current wording
Interest expense increased $5.4 million due primarily to higher average debt balances with the issuance of a Term Loan B in March of 2025 and borrowings under our revolving credit facility, offset in part by lower average interest rates.
Previous wording
Other income increased $500,000, largely driven by a one-time gain of $3.5 million on the bargain purchase of an aggregate quarry operation in the West segment, offset in part by a decrease in interest income of $2.2 million as a result of less cash on hand and lower investment returns on our nonqualified defined benefit plans.
Current wording
Other income decreased $5.2 million, largely due to the absence of a one-time gain of $3.5 million on the bargain purchase of an aggregate quarry operation in the West segment in prior year, as well as decreased interest income as a result of less cash on hand.
Previous wording
At September 30, 2025, we had unrestricted cash and cash equivalents of $30.7 million, working capital of $660.9 million and borrowing capacity of $456.6 million on our revolving credit facility, net of our outstanding letters of credit. Working capital is calculated as current assets less current liabilities. As of September 30, 2025, we had sufficient liquid assets and borrowing capacity to meet our financial commitments, debt obligations and anticipated capital expenditures for at least the next 12 months.
Current wording
At March 31, 2026, we had unrestricted cash and cash equivalents of $13.3 million, working capital of $590.0 million and borrowing capacity of $178.2 million on our revolving credit facility, net of our outstanding letters of credit. Working capital is calculated as current assets less current liabilities. As of March 31, 2026, we had sufficient liquid assets and borrowing capacity to meet our financial commitments, debt obligations and anticipated capital expenditures for at least the next 12 months.
Previous wording
We currently estimate total 2025 capital expenditures for maintenance and improvement to be between $160 million and $225 million. For the nine months ended September 30, 2025, we spent $154.8 million, largely on the replacement of depleting aggregate reserves, construction equipment and plant improvements.
Current wording
We currently estimate total 2026 capital expenditures for maintenance and improvement to be between $170 million and $235 million. For the three months ended March 31, 2026, we spent $42.3 million, largely on the replacement of construction equipment and plant improvements.
Previous wording
Additionally, for the nine months ended September 30, 2025, we spent $663.5 million on growth initiatives, which comprised of $528.0 million on acquisitions and $135.5 million on aggregate expansion and greenfield projects. In connection with the Strata acquisition, we also received proceeds of $14.5 million on the sale of four ready-mix plant operations. For the remainder of 2025, we estimate to spend $32.2 million on organic growth projects. Capital expenditures for future acquisitions and new organic growth opportunities would be incremental to our outlined capital program. It is anticipated that capital expenditures for the remainder of 2025 will be funded by various sources, including internally generated cash and debt facilities.
Current wording
Additionally, for the three months ended March 31, 2026, we spent $209.2 million on growth initiatives, which comprised of $174.2 million on acquisitions and $35.0 million on aggregate expansion and greenfield projects. For the remainder of 2026, we estimate to spend $101.4 million on organic growth projects. Capital expenditures for future acquisitions and new organic growth opportunities would be incremental to our outlined capital program. It is anticipated that capital expenditures for the remainder of 2026 will be funded by various sources, including cash flows from operations and debt.
Previous wording
Cash provided by operating activities at September 30, 2025, decreased $67.3 million, largely related to higher working capital needs and a decrease in net income. Cash used by working capital components totaled $189.8 million for the nine months ended September 30, 2025, compared to $146.5 million for the nine months ended September 30, 2024. This increase in cash usage was primarily the result of higher working capital needs due to the increase in revenues, as discussed in Business Segment Financial and Operating Data, and timing of prepaid insurance, offset in part by lower liquid asphalt and cement inventory balances.
Current wording
Cash used in operating activities at March 31, 2026, decreased $66.7 million, largely related to lower working capital needs, offset by a higher net loss in the period. Cash used by working capital components totaled $35.9 million for the three months ended March 31, 2026, compared to $97.9 million for the three months ended March 31, 2025. This reduction in cash usage in 2026 was primarily the result of decreased incentive payments, higher collections on receivables balances, timing of taxes paid, decreased aggregate inventory and the fluctuation in payments on accounts payable.
Previous wording
The increase in cash used in investing activities for the nine months ended September 30, 2025, compared to the nine months ended September 30, 2024, was primarily due to additional investments to grow our company. We spent $513.0 million more on acquisitions in 2025, including the acquisition of Strata, as discussed in Note 10. We also spent $163.1 million more on capital expenditures, including the replenishment of depleting aggregate reserves and greenfield projects. The increase in cash usage was offset in part by proceeds from the sale of ready-mix operations in the Central segment in the first quarter of 2025, as discussed in Note 10, and non-strategic asset sales in both the West and Central segments.
Current wording
The decrease in cash used in investing activities for the three months ended March 31, 2026, compared to the three months ended March 31, 2025, was primarily the result of decreased cash used in acquisition activity, partially offset by the absence of prior year proceeds from the sale of ready-mix operations in the Central segment.
Previous wording
At September 30, 2025, our long-term debt reflected an increase of approximately $514.1 million from the balance at December 31, 2024. This increase is due to issuing a new $500 million Term Loan B facility with the proceeds being used to fund a portion of Strata's purchase price in addition to borrowing $20 million under our revolving credit facility.
Current wording
At March 31, 2026, our long-term debt reflected an increase of approximately $267.1 million from the balance at December 31, 2025. This increase is due to borrowing $270 million under our revolving credit facility to fund seasonal working capital needs and additional acquisitions.
Previous wording
At September 30, 2025, our total estimated interest payments over the life of our debt reflected an increase of approximately $184.1 million from the total estimated interest payments at December 31, 2024. This increase is primarily due to the change in long-term debt outstanding related to the new Term Loan B and borrowings under our revolving credit facility, as previously mentioned.
Current wording
At March 31, 2026, our total estimated interest payments over the life of our debt reflected an increase of approximately $67.7 million from the total estimated interest payments at December 31, 2025. This increase is primarily due to the borrowings under our revolving credit facility, as previously mentioned.
Previous wording
At September 30, 2025, our purchase commitments reflected a decrease of approximately 22 percent from the balance at December 31, 2024. This decrease is primarily due to the seasonality of work and the third quarter being in our peak construction season, our purchase commitments saw an expected decrease from the balance at June 30, 2025. We expect purchase commitments to continue to decrease throughout the remainder of 2025 as obligations continue to be satisfied during the construction season.
Current wording
At March 31, 2026, our purchase commitments reflected an increase of approximately 12 percent from the balance at December 31, 2025. This increase is primarily due to the seasonality of work and preparing for our peak construction season during the first quarter. We expect purchase commitments to continue to decrease throughout the remainder of 2026 as obligations continue to be satisfied during the construction season.
Previous wording
GAAP measures, are useful to investors by providing meaningful information about operational efficiency compared to our peers by excluding the impacts of differences in tax jurisdictions and structures, debt levels and capital investment. We believe Adjusted EBITDA and Adjusted EBITDA margin are useful performance measures because they allow for an effective evaluation of our operating performance by excluding stock-based compensation, unrealized gains and losses on benefit plan investments and the impact of selling acquired inventory after markup to fair value as part of acquisition accounting as they are considered non-cash and not part of our core operations. We also exclude the one-time, non-recurring costs associated with the Separation as those are not expected to continue. We believe EBITDA and Adjusted EBITDA assist rating agencies and investors in comparing operating performance across operating periods on a consistent basis by excluding items management does not believe are indicative of our operating performance. Additionally, EBITDA and Adjusted EBITDA are important financial metrics for debt investors who utilize debt to EBITDA and debt to Adjusted EBITDA ratios. We believe these non-GAAP financial measures, including total segment measures, as applicable, are useful performance measures because they provide clarity as to our operational results. Our management uses these non-GAAP financial measures in conjunction with GAAP results when evaluating our operating results internally and calculating employee incentive compensation.
Current wording
EBITDA, EBITDA margin, Adjusted EBITDA and Adjusted EBITDA margin are most directly comparable to the corresponding GAAP measures of net income (loss) and net income (loss) margin. We believe these non-GAAP financial measures, in addition to corresponding GAAP measures, are useful to investors by providing meaningful information about operational efficiency compared to our peers by excluding the impacts of differences in tax jurisdictions and structures, debt levels and capital investment. We believe Adjusted EBITDA and Adjusted EBITDA margin are useful performance measures because they allow for an effective evaluation of our operating performance by excluding unrealized gains and losses on benefit plan investments and stock-based compensation as they are considered non-cash and not part of our core operations. We believe EBITDA and Adjusted EBITDA assist rating agencies and investors in comparing operating performance across operating periods on a consistent basis by excluding items management does not believe are indicative of our operating performance. Additionally, EBITDA and Adjusted EBITDA are important financial metrics for debt investors who utilize debt to EBITDA and debt to Adjusted EBITDA ratios. We believe these non-GAAP financial measures, including total segment measures, as applicable, are useful performance measures because they provide clarity as to our operational results. Our management uses these non-GAAP financial measures in conjunction with GAAP results when evaluating our operating results internally and calculating employee incentive compensation.
Previous wording
EBITDA is calculated by adding back income taxes, interest expense (net of interest income) and depreciation, depletion and amortization expense to net income (loss). EBITDA margin is calculated by dividing EBITDA by revenues. Adjusted EBITDA is calculated by adding back unrealized gains and losses on benefit plan investments, stock-based compensation, impact of selling acquired inventory after markup to fair value as part of acquisition accounting, and one-time Separation costs, to EBITDA. Adjusted EBITDA margin is calculated by dividing Adjusted EBITDA by revenues. These non-GAAP financial measures are calculated the same for both the total segment and consolidated metrics and should not be considered as alternatives to, or more meaningful than, GAAP financial measures such as net income or net income margin, and are intended to be helpful supplemental financial measures for investors’ understanding of our operating performance. Our non-GAAP financial measures are not standardized; therefore, it may not be possible to compare these financial measures with other companies’ EBITDA, EBITDA margin, Adjusted EBITDA and Adjusted EBITDA margin measures having the same or similar names.
Current wording
EBITDA is calculated by adding back income taxes, interest expense (net of interest income) and depreciation, depletion and amortization expense to net income (loss). EBITDA margin is calculated by dividing EBITDA by revenues. Adjusted EBITDA is calculated by adding back unrealized gains and losses on benefit plan investments and stock-based compensation to EBITDA. Adjusted EBITDA margin is calculated by dividing Adjusted EBITDA by revenues. These non-GAAP financial measures are calculated the same for both the total segment and consolidated metrics and should not be considered as alternatives to, or more meaningful than, GAAP financial measures such as net income or net income margin, and are intended to be helpful supplemental financial measures for investors’ understanding of our operating performance. Our non-GAAP financial measures are not standardized; therefore, it may not be possible to compare these financial measures with other companies’ EBITDA, EBITDA margin, Adjusted EBITDA and Adjusted EBITDA margin measures having the same or similar names.
Previous wording
Our critical accounting estimates include revenue recognized using the cost-to-cost measure of progress for contracts; fair values of acquired assets and liabilities assumed under the acquisition method of accounting; impairment testing of goodwill; and impairment testing of long-lived assets excluding goodwill. There were no material changes in the Company's critical accounting estimates from those that were previously reported in the Company's 2024 Annual Report.
Current wording
Our critical accounting estimates include revenue recognized using the cost-to-cost measure of progress for contracts; fair values of acquired assets and liabilities assumed under the acquisition method of accounting; impairment testing of goodwill; and impairment testing of long-lived assets excluding goodwill. There were no material changes in our critical accounting estimates from those that were previously reported in our 2025 Annual Report.
Rearranged previous paragraphs (4)
Previous report — wording carried elsewhere
Selling, general and administrative expenses include the costs for estimating, bidding and corporate development, as well as costs related to segment and corporate management and administrative functions. Selling expenses can vary depending on the volume of
Previous report — wording carried elsewhere
Other income decreased $1.3 million, largely driven by decreased interest income as a result of less cash on hand.
Previous report — wording carried elsewhere
Interest expense increased $18.8 million due primarily to higher average debt balances with the issuance of a new Term Loan B in March of 2025 and borrowings under our revolving credit facility, offset in part by lower average interest rates.
Previous report — wording carried elsewhere
EBITDA, EBITDA margin, Adjusted EBITDA and Adjusted EBITDA margin are most directly comparable to the corresponding GAAP measures of net income and net income margin. We believe these non-GAAP financial measures, in addition to corresponding