Skip to main content

SANDRIDGE ENERGY INC

For the period ended Mar 3, 2026. Filed Mar 5, 2026.

View on SEC.gov

About this filing

A notice of a major event between regular reports, such as results, a deal or a change of executives. It is often the first formal record of the news.

Mar 3, 2026 · Filed Mar 5, 2026

SD$12.49-1.0%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits

EX-99.1 · Outlook

Outlook

We remain committed to growing the value of our asset base in a safe, responsible and efficient manner, while prudently allocating capital to high-return, growth projects. Currently, these projects include: (1) one-rig development in the Cherokee Shale Play (2) evaluation of accretive merger and acquisition opportunities, with consideration of our strong balance sheet and commitment to our capital return program (3) production optimization program through artificial lift conversions to more efficient and cost-effective systems and (4) a leasing program that will bolster future development and extend development in our Cherokee assets. We are developing our term acreage in the Cherokee Play, and our total leasehold position, inclusive of the Cherokee, NW Stack and legacy assets, is approximately 95% held by production, which cost-effectively maintains our development option over a reasonable tenor. We will continue to monitor forward-looking commodity prices, project results, costs, impacts of tariffs and other factors that could influence returns and cash flows, and will adjust our program accordingly, to include curtailment of capital activity and wells, if needed, or conversely, well reactivations in higher commodity price environments. These and other factors, including reasonable reinvestment rates, maintaining our cash flows and prioritizing our regular-way dividend, will continue to shape our development decisions for 2026 and beyond.

Environmental, Social, & Governance ("ESG")

SandRidge maintains its Environmental, Social, and Governance ("ESG") commitment to harvesting the Company's resources in a safe and environmentally conscious manner, to include no routine flaring of produced natural gas, transporting more than 90% of our produced water via pipeline instead of truck, and powering nearly all of our well sites with electricity, mitigating the need for less efficient power sources. Via a 24-hour manned operations center and dedicated personnel trained in the use of infrared leak detection and other specialized equipment, the Company continually monitors our asset base for potential emissions and continually works to optimize efficiency through initiatives such as proactive artificial lift upgrades that reduce SandRidge's electric power consumption. Additionally, SandRidge maintains an emphasis on the safety and training of our workforce with a demonstrable safety track record, including more than four years without a recordable safety incident, as integral to our culture. The Company has personnel dedicated to the close monitoring of our safety standards and daily operations.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.