ITEM 1A. RISK FACTORS

Current report: 10-K

Period ended 2025-12-31; filed 2026-03-03.

0001628280-26-013574

ITEM 1A. RISK FACTORS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 165 previous paragraphs and 159 current paragraphs.

131 unchanged; 24 reworded; 3 added; 9 removed; 1 previous and 1 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (3)

Current report

We may enter into forward sale contracts for SRECs and other environmental attributes to support project financing or to mitigate price volatility. If our facilities do not generate the volume of environmental attributes sold under such forward contracts or if regulatory changes prevent the generation or qualification of such attributes, we may be required to purchase attributes in the open market or make payments of liquidated damages.

Current report

The regulatory frameworks supporting RECs, SRECs, RINs, LFCS and other environmental attributes are subject to ongoing legislative, regulatory, and policy uncertainty at both the federal and state levels. Changes in program design, eligibility criteria, compliance obligations, enforcement practices, or market structure, or the repeal or weakening of existing programs, could reduce the availability or value of environmental attributes or limit the market for such attributes. Any such developments could materially adversely affect the revenues we generate from environmental attributes and, as a result, our business, financial condition, and results of operations.

Current report

Legislative changes enacted in the One Big Beautiful Bill Act (the “OBBB”) on July 4, 2025 further modified the tax incentive landscape. The OBBB phases out the clean electricity investment credit for certain solar and battery projects, extends certain clean fuel production credits, and imposes additional restrictions related to foreign entities participating in the construction or ownership of clean energy facilities. In particular, solar and battery projects for which construction begins more than 12 months after enactment or that are placed in service after December 31, 2027 may no longer qualify for the ITC. If we are unable to utilize these credits as anticipated, our financial results could be adversely affected.
Removed paragraphs (9)

Previous report

For example, we are dependent on the continued supply of lithium-ion battery cells for our energy storage products, and we will require substantially more cells to grow our battery storage business based on our current plans. Currently, we rely on limited number of suppliers for these cells. Any disruption in the supply of battery cells from our suppliers could limit our growth for projects involving battery energy storage. In addition, the cost and mass production of battery cells, depends in part upon the prices and availability of raw materials such as lithium, nickel, cobalt and/or other metals. The prices for these materials fluctuate and their available supply may be unstable, depending on market conditions, regulation and global demand for these materials. As a result of increased global production of energy storage products and electric vehicles, suppliers of these raw materials may be unable to meet our volume or timing needs. Any reduced availability of these materials may adversely impact our access to battery cells and our growth, and any increases in their prices may reduce our profitability if we cannot recoup such costs in our project pricing. Moreover, our inability to meet demand may harm our brand, growth, prospects and operating results.

Previous report

We sometimes seek to sell forward a portion of our SRECs and other environmental attributes under contracts to fix the revenues from those attributes for financing purposes or hedge against future declines in prices of such environmental attributes. If our renewable energy facilities do not generate the amount of renewable energy attributes sold under such forward contracts or if for any reason the renewable energy we generate does not produce SRECs or other environmental attributes for a particular state, we may be required to make up the shortfall of SRECs or other environmental attributes under such forward contracts through purchases on the open market or make payments of liquidated damages. RECs are created through state law requirements for utilities to purchase a portion of their energy from renewable energy sources and changes in state laws or regulation relating to RECs may adversely affect the availability of RECs or other environmental attributes and the future prices for RECs or other environmental attributes, which could have an adverse effect on our business, financial condition, and results of operations. The current regulatory regime also creates uncertainty related to the future market for such environmental attributes and this could have an adverse effect on the earnings we generate from such attributes.

Previous report

Though we may repurchase shares of our Class A common stock pursuant to our share repurchase program, we are not

Previous report

obligated to do so and if we do, we may purchase only a limited number of shares of Class A common stock.

Previous report

In 2016, we announced a stock repurchase program under which the Company is authorized to repurchase, in the aggregate, up to

Previous report

$17.6 million of our Class A common stock. We are not obligated to acquire any shares of our Class A common stock, and

Previous report

holders of our Class A common stock should not rely on the share repurchase program to increase their liquidity. Our utilization of the share repurchase program depends upon a variety of factors, including the trading price of our Class A common stock,

Previous report

liquidity, securities laws restrictions, tax and other regulatory restrictions, alternative uses of capital, and market and economic

Previous report

conditions. Any stock repurchase would be through open market transactions or in privately negotiated transactions, in accordance with applicable securities laws and regulatory limitations. We may reduce or eliminate our share repurchase program in the future. The reduction or elimination of our share repurchase program, particularly if we do not repurchase the full number of shares authorized under the program, could adversely affect the market price of our common stock.
Reworded paragraphs (24)

Previous wording

The sales cycle for energy efficiency and renewable energy projects in general take from 18 to 42 months, with sales to federal government and housing authority customers tending to require the longest sales processes. Our sales cycle has been further lengthened as a result of macroeconomic conditions as well as uncertainly stemming from changes in regulations and policies that may be implemented by the new U.S. administration, and we cannot predict the timeline for our selling cycle in the current conditions. Our existing and potential customers generally follow extended budgeting and procurement processes and sometimes must engage in regulatory approval processes related to our services. Our customers often use outside consultants and advisors, which contributes to a longer sales cycle. Most of our potential customers issue an RFP, as part of their consideration of alternatives for their proposed project. In preparation for responding to an RFP, we typically conduct a preliminary audit of the customer’s needs and the opportunity to reduce its energy costs. For projects involving a renewable energy plant that is not located on a customer’s site or that uses sources of energy not within the customer’s control, the sales process also involves the identification of sites with attractive sources of renewable energy, such as a landfill or a favorable site for solar PV, and it may involve obtaining necessary rights and governmental permits to develop a project on that site. If we are awarded a project, we then perform a more detailed audit of the customer’s facilities, which serves as the basis for the final specifications of the project. We then must negotiate and execute a contract with the customer. In addition, we or the customer typically need to obtain financing for the project.

Current wording

The sales cycle for energy efficiency and renewable energy projects in general take from 18 to 42 months, with sales to federal government and housing authority customers tending to require the longest sales processes. Our sales cycle has been further lengthened as a result of macroeconomic and geopolitical conditions, and these conditions make it difficult to predict the timeline for our selling cycle. Our existing and potential customers generally follow extended budgeting and procurement processes and sometimes must engage in regulatory approval processes related to our services. Our customers often use outside consultants and advisors, which contributes to a longer sales cycle. Most of our potential customers issue an RFP, as part of their consideration of alternatives for their proposed project. In preparation for responding to an RFP, we typically conduct a preliminary audit of the customer’s needs and the opportunity to reduce its energy costs. For projects involving a renewable energy plant that is not located on a customer’s site or that uses sources of energy not within the customer’s control, the sales process also involves the identification of sites with attractive sources of renewable energy, such as a landfill or a favorable site for solar PV, and it may involve obtaining necessary rights and governmental permits to develop a project on that site. If we are awarded a project, we then perform a more detailed audit of the customer’s facilities, which serves as the basis for the final specifications of the project. We then must negotiate and execute a contract with the customer. In addition, we or the customer typically need to obtain financing for the project.

Previous wording

As of December 31, 2024 and 2023, we had backlog of approximately $2.5 billion and $1.3 billion, respectively, in expected future revenues under signed customer contracts for the installation or construction of projects, which we sometimes refer to as fully-contracted backlog; and we also had been awarded projects for which we do not yet have signed customer contracts with estimated total future revenues of an additional $2.3 billion and $2.6 billion, respectively. As of December 31, 2024 and 2023, we had O&M backlog of approximately $1.4 billion and $1.2 billion, respectively. Our O&M backlog represents expected future revenues under signed, multi-year customer contracts for the delivery of O&M services, primarily for energy efficiency and renewable energy construction projects completed by us for our customers.

Current wording

As of December 31, 2025 and 2024, we had backlog of approximately $2.5 billion in expected future revenues under signed customer contracts for the installation or construction of projects, which we sometimes refer to as fully-contracted backlog; and we also had been awarded projects for which we do not yet have signed customer contracts with estimated total future revenues of an additional $2.6 billion and $2.3 billion, respectively. As of December 31, 2025 and 2024, we had O&M backlog of approximately $1.5 billion and $1.4 billion, respectively. Our O&M backlog represents expected future revenues under signed, multi-year customer contracts for the delivery of O&M services, primarily for energy efficiency and renewable energy construction projects completed by us for our customers.

Previous wording

Historically, including for the years ended December 31, 2024 and 2023, 67% and 72%, respectively, of our revenues have been derived from sales to federal, state, provincial, or local governmental entities, including public housing authorities, public universities, and municipal utilities. We expect revenues from this market sector to continue to comprise a significant percentage of our revenues for the foreseeable future. A significant decline in the fiscal health of these existing and potential customers may make it difficult for them to enter into contracts for our services, to obtain financing necessary to fund such contracts, or may cause them to seek to renegotiate or terminate existing agreements with us. In addition, if there is a partial or full shutdown of any federal, state, provincial or local governing body this may adversely impact our financial performance. Furthermore, a significant reduction of the federal workforce could delay federal contracting and otherwise have an adverse effect on our federal projects and our financial performance.

Current wording

Historically, including for the years ended December 31, 2025 and 2024, 61.0% and 67.3%, respectively, of our revenues have been derived from sales to federal, state, provincial, or local governmental entities, including public housing authorities, public universities, and municipal utilities. We expect revenues from this market sector to continue to comprise a significant percentage of our revenues for the foreseeable future. A significant decline in the fiscal health of these existing and potential customers may make it difficult for them to enter into contracts for our services, to obtain financing necessary to fund such contracts, or may cause them to seek to renegotiate or terminate existing agreements with us. In addition, if there is a partial or full shutdown of any federal, state, provincial or local governing body this may adversely impact our financial performance. Furthermore, a significant reduction of the federal workforce could delay federal contracting and otherwise have an adverse effect on our federal projects and our financial performance.

Previous wording

A significant majority of our fully-contracted backlog and awarded projects is attributable to customers that are governmental entities. Our contracts with the federal government and its agencies, and with state, provincial, and local governments, customarily contain provisions that give the government substantial rights and remedies, many of which are not typically found in commercial contracts, including provisions that allow the government to:

Current wording

A significant portion of our fully-contracted backlog and awarded projects is attributable to customers that are federal, state, provincial, or local governmental entities. The contracts for these customers customarily contain provisions that give the government substantial rights and remedies, many of which are not typically found in commercial contracts, including provisions that allow the government to:

Previous wording

In ESPCs for governmental entities, the methodologies for computing energy savings may be less favorable than for non-governmental customers and may be modified during the contract period. We may be liable for price reductions if the projected savings cannot be substantiated. In addition to the right of the federal government to terminate its contracts with us, federal government contracts are conditioned upon the continuing approval by Congress of the necessary spending to honor such contracts. Congress often appropriates funds for a program on a September 30 fiscal-year basis even though contract performance may take more than one year. Consequently, at the beginning of many major Governmental programs, contracts often may not be fully funded, and additional monies are then committed to the contract only if, as and when appropriations are made by Congress for future fiscal years. Similar practices are likely to also affect the availability of funding for our contracts with Canadian, as well as state, provincial, and local government entities. If one or more of our government contracts were terminated or reduced, or if appropriations for the funding of one or more of our contracts is delayed or terminated, our business, financial condition and operating results could be adversely affected. Furthermore, recent presidential executive orders directing the review and potential termination of funds appropriated through the IRA and the Infrastructure Investment and Jobs Act (“IIJA”) has resulted in delays in construction on some of our projects and may cause further delays or cancellations of projects and existing contracts, which could have an adverse affect on our financial condition and results of operations.

Current wording

In ESPCs for governmental entities, the methodologies for computing energy savings may be less favorable than for non-governmental customers and may be modified during the contract period. We may be liable for price reductions if the projected savings cannot be substantiated. In addition to the right of the federal government to terminate its contracts with us, federal government contracts are conditioned upon the continuing approval by Congress of the necessary spending to honor such contracts. Congress often appropriates funds for a program on a September 30 fiscal-year basis even though contract performance may take more than one year. Consequently, at the beginning of many major Governmental programs, contracts often may not be fully funded, and additional monies are then committed to the contract only if, as and when appropriations are made by Congress for future fiscal years. Similar practices are likely to also affect the availability of funding for our contracts with Canadian, as well as state, provincial, and local government entities. If one or more of our government contracts were terminated or reduced, or if appropriations for the funding of one or more of our contracts is delayed or terminated, our business, financial condition and operating results could be adversely affected.

Previous wording

Our success depends on our ability to provide services and complete projects in a timely manner, which in part depends on the ability of third parties to provide us with timely and reliable products and services at acceptable prices. In providing our services and completing our projects, we rely on products that meet our design specifications and components manufactured and supplied by third parties, as well as on services performed by subcontractors. We also rely on subcontractors to perform substantially all of the construction and installation work related to our projects; and we often need to engage subcontractors with whom we have no experience for our projects. We, our subcontractors and other third parties have been impacted by the global supply chain delays and challenges. This has resulted in and may continue to result in delays in our ability to provide our services and complete our projects in a timely manner. In addition, some of the third parties we engage for our design, construction and operation projects operate internationally and our reliance on their products and services may be impacted by economic, political, and labor conditions in those regions.

Current wording

Our success depends on our ability to provide services and complete projects in a timely manner, which in part depends on the ability of third parties to provide us with timely and reliable products and services at acceptable prices. In providing our services and completing our projects, we rely on products that meet our design specifications and components manufactured and supplied by third parties, as well as on services performed by subcontractors. We also rely on subcontractors to perform substantially all of the construction and installation work related to our projects; and we often need to engage subcontractors with whom we have no experience for our projects. We, our subcontractors and other third parties have been impacted by the global supply chain delays and challenges and some of the equipment we use for our projects and assets have not met our quality requirements. This has resulted in and may continue to result in delays in our ability to provide our services, complete our projects in a timely manner and operate our assets in a profitable manner. In addition, some of the third parties we engage for our design, construction and operation projects operate internationally and our reliance on their products and services may be impacted by economic, political, and labor conditions in those regions.

Previous wording

For our energy efficiency projects, we typically enter into ESPCs under which we commit that the projects will satisfy agreed-upon performance standards appropriate to the project. These commitments are typically structured as guarantees of increased energy efficiency that are based on the design, capacity, efficiency, or operation of the specific equipment and systems we install. Our commitments generally fall into three categories: pre-agreed, equipment-level and whole building-level. Under a pre-agreed efficiency commitment, our customer reviews the project design in advance and agrees that, upon or shortly after completion of installation of the specified equipment comprising the project, the pre-agreed increase in energy efficiency will have been met.

Current wording

For our energy efficiency projects, we typically enter into ESPCs under which we commit that the projects will satisfy agreed-upon performance standards appropriate to the project. These commitments are typically structured as guarantees of increased energy efficiency that are based on the design, capacity, efficiency, or operation of the specific equipment and systems we install. Our commitments generally fall into three categories: pre-agreed, equipment-level and whole building-level. Under a pre-agreed efficiency commitment, our customer reviews the project design in advance and agrees that, upon or shortly after completion of installation of the specified equipment comprising the project, the pre-agreed increase in energy efficiency will have been met. Under an equipment-level commitment, we commit to a level of increased energy efficiency based on the difference in use measured first with the existing equipment and then with the replacement equipment upon completion of installation. A whole building-level commitment requires future measurement and verification of increased energy efficiency for a whole building, often based on readings of the utility meter where usage is measured. Depending on the project, the measurement and verification may be required only once, upon installation, based on an analysis of one or more sample installations, or may be required to be repeated at agreed upon intervals generally over periods of up to 25 years.

Previous wording

We typically do not take responsibility under our contracts for a wide variety of factors outside our control. We have, however, in a limited number of contracts assumed some level of risk and responsibility for certain factors — sometimes only to the extent that variations exceed specified thresholds — and may also do so under certain contracts in the future, particularly in our contracts for renewable energy projects. For example, under a contract for the construction and operation of a cogeneration facility at the U.S. Department of Energy Savannah River Site in South Carolina, a subsidiary of ours is exposed to the risk that the price of the biomass that will be used to fuel the cogeneration facility may rise during the remainder of the 18-year performance period of the contract. Several provisions in that contract mitigate the price risk. In addition, although we typically structure our contracts so that our obligation to supply a customer with biogas, electricity or steam, for example, does not exceed the quantity produced by the production facility, in some circumstances we commit to supply a customer with specified minimum quantities based on our projections of the facility’s production capacity. In such circumstances, if we are unable to meet such commitments, we may be required to incur additional costs or face penalties. We may also not be able to pass on to our customers cost increases we may experience as a result of the various tariffs that have been imposed on a variety of components needed for our projects. Despite the steps we have taken to mitigate risks under these and other contracts, such steps may not be sufficient to avoid the need to incur increased costs to satisfy our commitments, and such costs could be material. Increased costs that we are unable to pass through to our customers could have a material adverse effect on our operating results.

Current wording

We typically do not take responsibility under our contracts for a wide variety of factors outside our control. We have, however, in a limited number of contracts assumed some level of risk and responsibility for certain factors — sometimes only to the extent that variations exceed specified thresholds — and may also do so under certain contracts in the future, particularly in our contracts for renewable energy projects. For example, under a contract for the construction and operation of a cogeneration facility at the U.S. Department of Energy Savannah River Site in South Carolina, a subsidiary of ours is exposed to the risk that the price of the biomass that will be used to fuel the cogeneration facility may rise during the remainder of the performance period of the contract. Several provisions in that contract mitigate the price risk. In addition, although we typically structure our contracts so that our obligation to supply a customer with biogas, electricity or steam, for example, does not exceed the quantity produced by the production facility, in some circumstances we commit to supply a customer with specified minimum quantities based on our projections of the facility’s production capacity. In such circumstances, if we are unable to meet such commitments, we may be required to incur additional costs or face penalties. We may also not be able to pass on to our customers cost increases we may experience as a result of the various tariffs that have been imposed on a variety of components needed for our projects. Despite the steps we have taken to mitigate risks under these and other contracts, such steps may not be sufficient to avoid the need to incur increased costs to satisfy our commitments, and such costs could be material. Increased costs that we are unable to pass through to our customers could have a material adverse effect on our operating results.

Previous wording

The success of our business and construction projects depends in large part on the skill of our personnel and on trade labor resources, including with certain specialty subcontractor skills. Competition for personnel, particularly those with expertise in the energy services and renewable energy industries, is high. In the event we are unable to attract, hire and retain the requisite personnel and subcontractors, we may experience delays in compl eting projects in accordance with project schedules and budgets. Further, any increase in demand for personnel and specialty subcontractors may result in higher costs, causing us to exceed the budget on a project. Either of these circumstances may have an adverse effect on our business, financial condition, and operating results, harm our reputation among and relationships with our customers and cause us to curtail our pursuit of new projects.

Current wording

The success of our business and construction projects depends in large part on the skill of our personnel and on trade labor resources, including with certain specialty subcontractor skills. Competition for personnel, particularly those with expertise in the energy services, energy infrastructure and renewable energy industries, is high. In the event we are unable to attract, hire and retain the requisite personnel and subcontractors, we may experience delays in compl eting projects in accordance with project schedules and budgets and in expanding our operations into new growth areas. Further, any increase in demand for personnel and specialty subcontractors may result in higher costs, causing us to exceed the budget on a project. Either of these circumstances may have an adverse effect on our business, financial condition, and operating results, harm our reputation among and relationships with our customers and cause us to curtail our pursuit of new projects and offerings.

Previous wording

Our industry is highly competitive, with many companies of varying size and business models, many of which have their own proprietary technologies, competing for the same business as we do. Many of our competitors have longer operating histories and greater resources than we do and could focus their substantial financial resources to develop a competitive advantage, others may be smaller and able to adapt to the constantly changing demand of the market more quickly. The passage of the IRA and the opportunities it brings could intensify competition in our industry. Our competitors may also offer energy solutions at prices below cost, devote significant sales forces to competing with us or attempt to recruit our key personnel by increasing compensation, any of which could improve their competitive positions. Any of these competitive factors could make it more difficult for us to attract and retain customers, cause us to lower our prices in order to compete, and reduce our market share and revenues, any of which could have a material adverse effect on our financial condition and operating results. We can provide no assurance that we will continue to effectively compete against our current competitors or additional companies that may enter our markets. In addition, we may also face competition based on technological developments that reduce demand for electricity, increase power supplies through existing infrastructure or otherwise compete with our products and services. We also encounter competition in the form of potential customers electing to develop solutions or perform services internally rather than engaging an outside provider such as us.

Current wording

Our industry is highly competitive, with many companies of varying size and business models, many of which have their own proprietary technologies, competing for the same business as we do. Many of our competitors have longer operating histories and greater resources than we do and could focus their substantial financial resources to develop a competitive advantage, others may be smaller and able to adapt to the constantly changing demand of the market more quickly. Our competitors may also offer energy infrastructure solutions at prices below cost, devote significant sales forces to competing with us or attempt to recruit our key personnel by increasing compensation, any of which could improve their competitive positions. Any of these competitive factors could make it more difficult for us to attract and retain customers, cause us to lower our prices in order to compete, and reduce our market share and revenues and ability to grow and expand our offering, any of which could have a material adverse effect on our financial condition and operating results. We can provide no assurance that we will continue to effectively compete against our current competitors or additional companies that may enter our markets. In addition, we may also face competition based on technological developments that reduce demand for electricity, increase power supplies through existing infrastructure or otherwise compete with our products and services. We also encounter competition in the form of potential customers electing to develop solutions or perform services internally rather than engaging an outside provider such as us.

Previous wording

Historically, acquisitions have been a significant part of our growth strategy. We plan to continue to use acquisitions of companies or assets and co-investments with third parties using joint ventures to expand our project skill-sets and capabilities, expand our geographic markets, add experienced management, increase our product and service offerings and add to our energy producing asset portfolio. However, we may be unable to implement this growth strategy if we cannot identify suitable acquisition or joint venture candidates or partners, reach agreement with targets on acceptable terms or arrange required financing for acquisitions or joint ventures on acceptable terms. In addition, the time and effort involved in identifying acquisition or joint venture candidates and consummate transactions may divert the attention and efforts of members of our management from the operations of our company.

Current wording

Historically, acquisitions have been a significant part of our growth strategy. We plan to continue to use acquisitions of companies or assets and co-investments with third parties using joint ventures to expand our project skill-sets and capabilities, expand our geographic markets, add experienced management, increase our product and service offerings and add to our energy producing asset portfolio. However, we may be unable to implement this growth strategy if we cannot identify suitable acquisition or joint venture candidates or partners, reach agreement with targets on acceptable terms or secure financing or co-investors needed for acquisitions or joint ventures on acceptable terms. In addition, the time and effort involved in identifying acquisition or joint venture candidates and consummate transactions may divert the attention and efforts of members of our management from the operations of our company.

Previous wording

We depend in part on legislation and government policies that support energy efficiency and renewable energy projects that enhance the economic feasibility of our energy efficiency services and small-scale renewable energy projects. This support includes legislation and regulations that authorize and regulate the manner in which certain governmental entities do business with us; encourage or subsidize governmental procurement of our services; encourage or in some cases require other customers to procure power from renewable or low-emission sources, to reduce their electricity use or otherwise to procure our services; and provide us with tax and other incentives that reduce our costs or increase our revenues. In addition, the U.S. government historically has not taken action to materially burden the international supply chain, which has been important to the development of renewable energy facilities at acceptable prices. Any reductions or modifications to, or the elimination of, governmental incentives or policies that support renewable energy or the imposition of additional taxes, tariffs, duties or other assessments on renewable energy or the equipment necessary to generate or deliver it, could result in, among other things, the lack of a satisfactory market for the development and/or financing of renewable energy projects, or adversely impact our ability to complete projects for existing customers and obtain project commitments from new customers. Recent executive orders directing the review and potential termination of funds appropriated through the IRA and the IIJA may result in delays or cancellations of our projects and existing contracts, adversely affecting our financial condition and results of operations.

Current wording

We depend in part on legislation and government policies that support energy efficiency and renewable energy projects that enhance the economic feasibility of our energy efficiency services and small-scale renewable energy projects. This support includes legislation and regulations that authorize and regulate the manner in which certain governmental entities do business with us; encourage or subsidize governmental procurement of our services; encourage or in some cases require other customers to procure power from renewable or low-emission sources, to reduce their electricity use or otherwise to procure our services; and provide us with tax and other incentives that reduce our costs or increase our revenues. Any further reductions, delays, or eliminations of these incentives or policies, as well as changes in their scope, eligibility requirements, or interpretation, could materially reduce demand for our offerings or adversely affect the economics of our projects.

Previous wording

There is limited Battery Energy Storage System (“BESS”) supply capacity outside of China and a significant portion of electrical equipment used in our offerings are imported from Canada and Mexico and we also use a significant amount of imported steel in our products. Import duties or other import restrictions, including the Uyghur Forced Labor Protection Act, restrict the global supply of, and raise prices for, supplies needed for our business. Such duties or restrictions has increased and may further increase the overall cost of our product offerings and reduce our ability to offer competitive pricing in certain markets or cause our suppliers to cancel their supply contracts with us. With the 'America First' trade policy tariffs have been imposed on components needed for our offerings, and additional tariffs may come into effect. These tariffs, restrictions may cause strained trade relations and affect our ability to source materials and products and result in procurement schedule delays, increased costs and operational challenges and decreased demand for our offerings. Failure to comply with trade restrictions and other governmental restrictions could subject us to fines and penalties. This could have a negative impact on our business and results of operation.

Current wording

In addition, existing and potential tariffs, trade restrictions, and other governmental measures— including restrictions related to foreign entities of concern (“FEOC”) and the Uyghur Forced Labor Prevention Act—have affected, and may continue to affect, the supply, cost, and availability of products and components used in our offerings. There is limited Battery Energy Storage System (“BESS”) supply capacity outside of China and a significant portion of electrical equipment used in our offerings are imported from Canada and Mexico. We rely on a significant amount of imported steel in our products. Import duties, tariffs and other import restriction have increased and may further increase the overall cost of our product offerings and reduce our ability to offer competitive pricing in certain markets or cause our suppliers to cancel their supply contracts with us.

Previous wording

Due to the uncertainty in the regulatory and legislative processes, we cannot determine the effect any such legislation and regulation may have on our products and operations.

Current wording

Failure to comply with trade restrictions, sanctions and other governmental restrictions could subject us to fines, penalties or other enforcement actions have increased, and may further increase, the costs of materials and components necessary for our business, reduce the availability of qualified suppliers, or result in the cancellation of supply contracts..Due to ongoing uncertainty in regulatory and legislative processes, we cannot determine the effect any such legislation and regulation may have on our products and operations.

Previous wording

A substantial portion of our earnings are attributable to our sale of renewable energy certificates (“RECs”) and other environmental attributes generated by our energy assets. These attributes are used as compliance purposes for state-specific or U.S. federal policy. We own and operate solar PV installations which derive a significant portion of their revenues from the sale of solar renewable energy certificates (“SRECs”), which are produced as a result of generating electricity. The value of these SRECs is determined by the supply and demand of SRECs in the states in which the solar PV installations are installed. Supply is driven by the number of installations and demand is driven by state-specific laws relating to renewable portfolio standards.

Current wording

A substantial portion of our earnings is derived from the sale of renewable energy certificates (“RECs”) and other environmental attributes generated by our energy assets. These attributes are used as compliance purposes for state-specific or U.S. federal policy. We own and operate solar PV installations which derive a significant portion of their revenues from the sale of solar renewable energy certificates (“SRECs”), which are produced as a result of generating electricity. The value of these SRECs is determined by the supply and demand of SRECs in the states in which the solar PV installations are installed. Supply is driven by the number of installations and demand is driven by state-specific laws relating to renewable portfolio standards.

Previous wording

We also own and operate renewable natural gas plants that may deliver biofuels into to the nation’s natural gas pipeline grid. Such biofuel may qualify for certain environmental attribute mechanisms, such as RINs which are used for compliance purposes under the Renewable Fuel Standard (“RFS”) program. The RFS is a U.S. federal policy that requires transportation fuel to contain a minimum volume of renewable fuel. The U.S. Environmental Protection Agency (“EPA”) administers the RFS program and may periodically undertake regulatory action involving the RFS, including annual volume standards for renewable fuel. Some of our biofuel may also qualify for various state incentives, such as the Low Carbon Fuel Standard (“LCFS”), the pricing or availability of which may fluctuate.

Current wording

We also own and operate renewable natural gas plants that may deliver biofuels into to the nation’s natural gas pipeline grid. Such biofuel may qualify for certain environmental attribute mechanisms, such as RINs which are used for compliance purposes under the Renewable Fuel Standard (“RFS”) program administered by the U.S. Environmental Protection Agency (“EPA”). The EPA has discretion to establish annual renewable fuel volume obligations and to revise program rules and enforcement priorities, which may affect the availability, pricing, and market demand for RINs. In addition, certain of our RNG production may qualify for state‑level programs such as low carbon fuel standards (“LCFS”), the pricing and availability of which are subject to regulatory changes, market volatility, and policy developments.

Previous wording

We may have exposure to additional tax liabilities and our effective tax rate may increase or fluctuate, which could increase our income tax expense and reduce our net income. We may not be able to utilize the full value of tax credits and incentives available under the IRA or may become subject to penalties if we fail to meet requirements for these credits and incentives. This may have an adverse effect on our business and operating results.

Current wording

We may have exposure to additional tax liabilities and our effective tax rate may increase or fluctuate, which could increase our income tax expense and reduce our net income. We may not be able to utilize the full value of tax credits and incentives we or may become subject to penalties if we fail to meet requirements for these credits and incentives. This may have an adverse effect on our business and operating results.

Previous wording

Our provision for income taxes is subject to volatility and could be adversely affected by changes in tax laws or regulations, particularly changes in tax incentives in support of energy efficiency, clean electricity and biofuel production. The IRA extended and expanded clean energy tax credits such as the Investment Tax Credit (“ITC”), the Production Tax Credit (“PTC”), and created other financial incentives designed to promote the development of certain domestic clean energy projects. In order to receive the full value of such credits and incentives, our projects must satisfy a number of requirements including prevailing wage and apprenticeship requirements. If we fail to comply with these requirements, the value of the credits may be limited, and we may become subject to financial penalties. Uncertainty remains under the IRA on which types of projects are eligible for the tax credits and incentives and how projects can demonstrate compliance with various IRA requirements. As a result, we may not receive full value of the tax credits and incentives, which could increase our income tax expense, reduce our net income and adversely impact the profitability of our projects or our ability to finance our projects. In addition, the timing of when assets are placed in service has in the past and could in the future impact our tax rate. If we experience unexpected delays in this timing, we may not be able to take advantage of the ITC as expected. The U.S. Congress may look to alter or repeal various energy tax incentives included in the IRA, which could potentially impact projects in development or future project economics. Similarly, recent presidential executive orders directing the review and potential termination of funds appropriated through the IRA and IIJA are also creating uncertainty of whether these financial incentives could be reduced or repealed in the future. If we are not able to utilize the ITC as expected, this could have an adverse effect of our financial results.

Current wording

Our provision for income taxes is subject to volatility and could be adversely affected by changes in tax laws or regulations, particularly changes in tax incentives in support of energy efficiency, clean electricity and biofuel production. The IRA extended and expanded clean energy tax credits such as the Investment Tax Credit (“ITC”), the Production Tax Credit (“PTC”), and created other financial incentives designed to promote the development of certain domestic clean energy projects. To qualify for the full value of these credits and incentives, our projects must satisfy a number of requirements including prevailing wage and apprenticeship requirements. If we fail to comply with these requirements, the value of the credits may be limited, and we may become subject to financial penalties.

Previous wording

Our tax rate has historically been significantly impacted by the IRC Section 179D deduction. This deduction is related to energy efficient improvements we provide under government contracts. The Consolidated Appropriations Act, 2021 made permanent the Section 179D Energy Efficient Commercial Building Deduction. That Act, along with the IRA, also made changes to the way the deduction is calculated. If those changes or clarifying guidance issued by the IRS result in lower levels of energy efficiency improvements, it could impact the deduction available and the tax rate.

Current wording

Our effective tax rate has historically benefited from the IRC Section 179D deduction. This deduction is related to energy efficient improvements we provide under government contracts. The Consolidated Appropriations Act, 2021 made permanent the Section 179D Energy Efficient Commercial Building Deduction. However, the OBBB has endedthe Section 179D deduction for construction projects that begin after June 30, 2026.

Previous wording

Furthermore, the Organization for Economic Cooperation and Development (OECD) Inclusive Framework of 140 jurisdictions have joined a two-pillar plan to reform international taxation rules. The first pillar is focused on the allocation of taxing rights between countries for in-scope multinational enterprises that sell goods and services into countries with little or no local physical presence and is intended to apply to multinational enterprises with global turnover above 20 billion euros. The second pillar is focused on developing a global minimum tax rate of at least 15 percent applicable to in-scope multinational enterprises and is intended to apply to multinational enterprises with annual consolidated group revenue in excess of 750 million euro. While substantial work remains to be completed by the OECD and national governments on the implementation of these proposals, future tax reform resulting from these developments may result in changes to long-standing tax principles, which could adversely affect our effective tax rate or result in higher cash tax liabilities.

Current wording

Furthermore, the Organization for Economic Cooperation and Development (“OECD”) Inclusive Framework proposes to implement a global minimum tax, may result in changes to long‑standing tax principles. While the ultimate impact remains uncertain, such changes could increase our effective tax rate or cash tax liabilities.

Previous wording

In addition, the projects we perform for governmental agencies are governed by particular qualification and contracting regimes. Certain states require qualification with an appropriate state agency as a precondition to performing work or appearing as a qualified energy service provider for state, county, and local agencies within the state. For example, the Commonwealth of Massachusetts and the states of Colorado and Washington pre-qualify energy service providers and provide contract documents that serve as the starting point for negotiations with potential governmental clients. Most of the work that we perform for the federal government is performed under IDIQ agreements between a government agency and us or one of our subsidiaries. These IDIQ agreements allow us to contract with the relevant agencies to implement energy projects, but no work may be performed unless we and the agency agree on a task order or delivery order governing the provision of a specific project. The government agencies enter into contracts for specific projects on a competitive basis. We and our subsidiaries are currently party to an IDIQ agreement with the U.S. Department of Energy expiring in 2028. We are also party to similar agreements with other federal agencies, including the U.S. Army Corps of Engineers and the U.S. General Services Administration. If we are unable to maintain or renew our IDIQ qualification or similar federal or state qualification regimes, our business could be materially harmed.

Current wording

In addition, the projects we perform for governmental agencies are governed by particular qualification and contracting regimes. Certain states require qualification with an appropriate state agency as a precondition to performing work or appearing as a qualified energy service provider for state, county, and local agencies within the state. For example, the Commonwealth of Massachusetts and the states of Colorado and Washington pre-qualify energy service providers and provide contract documents that serve as the starting point for negotiations with potential governmental clients. Most of the work that we perform for the federal government is performed under IDIQ agreements between a government agency and us or one of our subsidiaries. These IDIQ agreements allow us to contract with the relevant agencies to implement energy projects, but no work may be performed unless we and the agency agree on a task order or delivery order governing the provision of a specific project. The government agencies enter into contracts for specific projects on a competitive basis. We and our subsidiaries are currently party to IDIQ agreements with the U.S. Department of Energy expiring in 2026 and 2028. We are also party to similar agreements with other federal agencies, including the U.S. Army Corps of Engineers and the U.S. General Services Administration. If we are unable to maintain or renew our IDIQ qualification or similar federal or state qualification regimes, our business could be materially harmed.

Previous wording

We have a $200 million revolving senior secured credit facility and $100 million term loan that mature December 28, 2028 (collectively, the “Senior Credit Facilities”) and a $100 million second lien term loan that matures June 2029. As of December 31, 2024, the balance of our Senior Credit Facilities was $148 million. These Senior Credit Facilities and second lien term loan may not be sufficient to meet our needs as our business grows, and we may be unable to extend or replace them on acceptable terms, or at all. The Senior Credit Facilities and second lien term loan are subject to quarter end ratio covenants, including a maximum ratio of total funded debt to EBITDA and a debt service coverage ratio (each as defined in the agreement and described in more detail in this Form 10-K) as well as certain other customary operational covenants. EBITDA for purposes of the facilities excludes the results of certain renewable energy projects that we own and which we finance in separate subsidiaries through project financing and the results of our joint ventures. In addition, our project financing term loans and construction loans require us to comply with a variety of financial and operational covenants. Our failure to comply with the covenants under our project financing debt, our Senior Credit Facilities or second lien term loan may result in the declaration of an event of default and cause us to be unable to borrow under our Senior Credit Facilities. In addition to preventing additional borrowings under the Senior Credit Facilities, an event of default, if not cured or waived, may result in the acceleration of the maturity of indebtedness outstanding under our Senior Credit Facilities, senior term loan or the applicable project financing term loan, which would require us to pay all amounts outstanding. If an event of default occurs under our project financing debt, our Senior Credit Facilities or second lien term loan, we may not be able to cure it within any applicable cure period, if at all. Certain of our debt agreements, including our Senior Credit Facilities and second lien term loan, also contain subjective acceleration clauses based on a lender deeming that a “material adverse change” in our business has occurred. If these clauses are implicated, and the lender declares that an event of default has occurred, the outstanding indebtedness would likely be immediately due and owing. If the maturity of our indebtedness is accelerated, we may not have sufficient funds available for repayment or we may not have the ability to borrow or obtain sufficient funds to replace the accelerated indebtedness on terms acceptable to us or at all.

Current wording

We have a $225 million revolving senior secured credit facility and $100 million term loan that mature December 28, 2028 (collectively, the “Senior Credit Facilities”) and a $100 million second lien term loan that matures June 2029. As of December 31, 2025, the balance of our Senior Credit Facilities was $245 million. These Senior Credit Facilities and second lien term loan may not be sufficient to meet our needs as our business grows, and we may be unable to extend or replace them on acceptable terms, or at all. The Senior Credit Facilities and second lien term loan are subject to quarter end ratio covenants, including a maximum ratio of total funded debt to EBITDA and a debt service coverage ratio (each as defined in the agreement and described in more detail in this Form 10-K) as well as certain other customary operational covenants. EBITDA for purposes of the facilities excludes the results of certain renewable energy projects that we own and which we finance in separate subsidiaries through project financing and the results of our joint ventures. In addition, our project financing term loans and construction loans require us to comply with a variety of financial and operational covenants. Our failure to comply with the covenants under our project financing debt, our Senior Credit Facilities or second lien term loan may result in the declaration of an event of default and cause us to be unable to borrow under our Senior Credit Facilities. In addition to preventing additional borrowings under the Senior Credit Facilities, an event of default, if not cured or waived, may result in the acceleration of the maturity of indebtedness outstanding under our Senior Credit Facilities, senior term loan or the applicable project financing term loan, which would require us to pay all amounts outstanding. If an event of default occurs under our project financing debt, our Senior Credit Facilities or second lien term loan, we may not be able to cure it within any applicable cure period, if at all. Certain of our debt agreements, including our Senior Credit Facilities and second lien term loan, also contain subjective acceleration clauses based on a lender deeming that a “material adverse change” in our business has occurred. If these clauses are implicated, and the lender declares that an event of default has occurred, the outstanding indebtedness would likely be immediately due and owing. If the maturity of our indebtedness is accelerated, we may not have sufficient funds available for repayment or we may not have the ability to borrow or obtain sufficient funds to replace the accelerated indebtedness on terms acceptable to us or at all.

Previous wording

We typically set up subsidiaries to own and finance our renewable energy projects. These subsidiaries incur various types of debt which can be used to finance one or more projects. This debt is typically structured as non-recourse or limited recourse debt, which means it is repayable solely from the revenues from the projects financed by the debt and is secured by such projects’ physical assets, major contracts and cash accounts and a pledge of our equity interests in the subsidiaries involved in the projects. Although our subsidiary debt is typically non-recourse to Ameresco, if a subsidiary of ours defaults on such obligations, or if one project financed by a particular subsidiary’s indebtedness encounters difficulties or is terminated, then we may from time to time determine to provide financial support to the subsidiary in order to maintain rights to the project or otherwise avoid the adverse consequences of a default. In the event a subsidiary defaults on its indebtedness, its creditors may foreclose on the collateral securing the indebtedness, which may result in our losing our ownership interest in some or all of the subsidiary’s assets. Furthermore, our $300 million construction and development loan, which we use to finance a number of our early stage development and construction projects, requires us, in the case of default under the facility, a default under our Senior Credit Facilities or a change in control of Ameresco, to make required capital contributions to the borrower entity who then would be required to use the proceeds from the capital contributions to repay the construction and development loan. The loss of our ownership interest in a subsidiary or some or all of a subsidiary’s assets or the requirement to make capital contributions under our construction and development loan could have a material adverse effect on our business, financial condition and operating results.

Current wording

We typically set up subsidiaries to own and finance our renewable energy projects. These subsidiaries incur various types of debt which can be used to finance one or more projects. This debt is typically structured as non-recourse or limited recourse debt, which means it is repayable solely from the revenues from the projects financed by the debt and is secured by such projects’ physical assets, major contracts and cash accounts and a pledge of our equity interests in the subsidiaries involved in the projects. Although our subsidiary debt is typically non-recourse to Ameresco, if a subsidiary of ours defaults on such obligations, or if one project financed by a particular subsidiary’s indebtedness encounters difficulties or is terminated, then we may from time to time determine to provide financial support to the subsidiary in order to maintain rights to the project or otherwise avoid the adverse consequences of a default. In the event a subsidiary defaults on its indebtedness, its creditors may foreclose on the collateral securing the indebtedness, which may result in our losing our ownership interest in some or all of the subsidiary’s assets. Furthermore, our $500 million construction and development loan, which we use to finance a number of our early stage development and construction projects, requires us, in the case of default under the facility, a default under our Senior Credit Facilities or a change in control of Ameresco, to make required capital contributions to the borrower entity who then would be required to use the proceeds from the capital contributions to repay the construction and development loan. The loss of our ownership interest in a subsidiary or some or all of a subsidiary’s assets or the requirement to make capital contributions under our construction and development loan could have a material adverse effect on our business, financial condition and operating results.

Previous wording

The trading price of our Class A common stock is volatile and could be subject to wide fluctuations, some of which are beyond our control. During the year ended December 31, 2024, our Class A common stock has traded at a low of $17.55 and a high of $39.68. The stock market in general has experienced extreme price and volume fluctuations that have often been unrelated or disproportionate to the operating performance of publicly traded companies. If the stock market in general experiences a significant decline, the trading price of our Class A common stock could decline for reasons unrelated to our business, financial condition, or operating results. As a result of this volatility, you may not be able to sell your Class A common stock at or above the price you paid for it, and you may lose some or all of your investment. Additionally, although historically there has not been a large short position in our Class A common stock, securities of certain companies have recently experienced extreme and significant volatility as a result of a large aggregate short position driving up the stock price over a short period of time, which is known as a “short squeeze.” Furthermore, some companies that have had volatile market prices for their securities have had securities class actions filed against them. If a suit were filed against us, regardless of its merits or outcome, it would likely result in substantial costs and divert management’s attention and resources. This could have a material adverse effect on our business, operating results, and financial condition.

Current wording

The trading price of our Class A common stock is volatile and could be subject to wide fluctuations, some of which are beyond our control. During the year ended December 31, 2025, our Class A common stock has traded at a low of $8.49 and a high of $44.93. The stock market in general has experienced extreme price and volume fluctuations that have often been unrelated or disproportionate to the operating performance of publicly traded companies. If the stock market in general experiences a significant decline, the trading price of our Class A common stock could decline for reasons unrelated to our business, financial condition, or operating results. As a result of this volatility, you may not be able to sell your Class A common stock at or above the price you paid for it, and you may lose some or all of your investment. Additionally, although historically there has not been a large short position in our Class A common stock, securities of certain companies have recently experienced extreme and significant volatility as a result of a large aggregate short position driving up the stock price over a short period of time, which is known as a “short squeeze.” Furthermore, some companies that have had volatile market prices for their securities have had securities class actions filed against them. If a suit were filed against us, regardless of its merits or outcome, it would likely result in substantial costs and divert management’s attention and resources. This could have a material adverse effect on our business, operating results, and financial condition.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Uncertainty remains regarding the interpretations and implementation of certain regulatory provisions related to tax credits, including which projects qualify for credits and incentives and how projects can demonstrate compliance with various regulatory requirements. As a result, we may not receive full value of these credits and incentives, which could increase our income tax expense, reduce our net income and adversely impact the profitability or limit our ability to finance projects. The timing of when assets are placed in service has in the past and could in the future impact our tax rate. If projects are delayed, we may not be able to take advantage of the ITC as expected.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

Under an equipment-level commitment, we commit to a level of increased energy efficiency based on the difference in use measured first with the existing equipment and then with the replacement equipment upon completion of installation. A whole building-level commitment requires future measurement and verification of increased energy efficiency for a whole building, often based on readings of the utility meter where usage is measured. Depending on the project, the measurement and verification may be required only once, upon installation, based on an analysis of one or more sample installations, or may be required to be repeated at agreed upon intervals generally over periods of up to 25 years.