Skip to main content

CENTRUS ENERGY CORP

For the period ended Dec 31, 2025. Filed Feb 11, 2026.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2025 · Filed Feb 11, 2026

LEU$104.60+17.5%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2024-12-31; filed 2025-02-07.

0001065059-25-000006

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2025-12-31; filed 2026-02-11.

0001628280-26-007117

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 211 previous paragraphs and 227 current paragraphs.

112 unchanged; 77 reworded; 35 added; 20 removed; 2 previous and 3 current paragraphs rearranged.

Tables are not compared: 5 previous and 4 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (35)

Current report

On June 17, 2025, the DOE amended the HALEU Operation Contract to divide the first three-year option period into a first option period of one year (“Option 1a”) and a second option period of two years (“Option 1b”). The amendment established a target cost and fee for Option 1a of approximately $99.3 million and $8.7 million, respectively, and a target cost and fee for Option 1b of $163.5 million and $15.2 million, respectively. The DOE exercised Option 1a and extended the period of performance to June 30, 2026. As of December 31, 2025, Option 1a is funded for the contract value of $108.2 million. Additionally, the amendment acknowledged that the estimated cost associated with Option 1b is insufficient to support full performance due to known cost increases since the award of the HALEU Operation Contract and indicated that the Company will need to submit a revised cost proposal for review and negotiation prior to DOE’s consideration of Option 1b.

Current report

Under the HALEU Operation Contract, the Company has submitted several change order requests for work being performed on infrastructure, facility repairs, and 5B Cylinders. The additional work is being performed under the DOE contracting officer’s approval or contract modifications. On September 28, 2023, the DOE modified the HALEU Operation Contract to incorporate additional scope for infrastructure and facility repairs, and costs associated with 5B Cylinder refurbishment, for an estimated additional contract value of $5.8 million, without a cost-share provision. As of December 31, 2025, DOE was obligated for costs up to the contract value of $8.8 million for the additional scope work. The DOE modified the HALEU Operation Contract and increased funding in January 2026 and is now obligated for costs up to the current contract value of $9.7 million. For further details refer to Part I, Item 1, Business - Technical Solutions - Government Contracting.

Current report

The DOE continues to pursue the availability of HALEU for the ARDP and for the advanced reactor market and the availability of domestically enriched uranium in a quantity that would be sufficient to address a supply disruption and gaps in domestic production and enrichment. Congress appropriated a total of approximately $3.4 billion to the DOE to jumpstart U.S. nuclear fuel production, including both LEU and HALEU enrichment. Based on this funding, the DOE issued a series of three RFPs covering HALEU production, HALEU deconversion, and LEU production. In late 2024, the DOE made initial selections under each of the RFPs. Centrus was among the awardees for all three RFPs under IDIQ structures (the HALEU Deconversion Contract, HALEU Production Contract, and the LEU Production Contract.

Current report

Each of these IDIQ awards carries a $2.0 million contract minimum for each awardee and is subject to an overall contract ceiling covering all awardees. Under the IDIQ awards, the DOE can issue task orders to the awardees and then allocate available funding to those task orders. The ultimate value of the awards to Centrus, and the scale of the expansion supported, will depend upon the scope of task orders that DOE may subsequently issue to Centrus under the contracts for which the Company intends to compete. There is no assurance that we will be awarded any additional task orders under any of our contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under any award.

Current report

On March 30, 2025, the Company submitted its proposal in response to a request for task order proposals from the DOE for a report and additional deliverables under the LEU Production Contract. On April 11, 2025, the Company was awarded a time and materials task order with a total award ceiling of approximately $0.5 million.

Current report

On September 25, 2025, Centrus announced plans for a major expansion of its uranium capacity in Piketon, Ohio, including plans for large-scale production of both LEU and HALEU to meet commercial and government requirements. In December 2025, the Company initiated design work on a 150,000 square foot training, operations and maintenance Facility in Piketon, Ohio – a critical piece of site infrastructure necessary to support the company's plans for a major expansion of its uranium enrichment capacity in Piketon. The project involves a significant renovation and rehabilitation of an existing, largely vacant building on the site of the American Centrifuge Plant, with construction activities set to begin early 2026. The facility is expected to include a mix of office space, training facilities, and maintenance bays to support plant operations. Also in December 2025, the Company began domestic centrifuge manufacturing to support commercial LEU enrichment activities at its Piketon, Ohio, facility. This strategic move enables the Company to capitalize on its many first-mover advantages in U.S.-owned domestic uranium enrichment, and marks one of the most consequential transformations in the Company's and the United States' uranium enrichment history. Centrus plans to leverage its multi-billion-dollar uranium enrichment expansion to meet its growing backlog of $2.3 billion in contingent LEU sales to U.S. and international customer contracts, and targets future commercial-scale production of HALEU, as well. There is no assurance that we will successfully complete our announced expansion of our uranium capacity in Piketon, Ohio, or execute plans for large-scale production of both LEU and HALEU to meet commercial and government requirements. For further details, see Part 1, Item 1, Business - Low Enriched Uranium – LEU Backlog and Technical Solutions - Technical Solutions Backlog.

Current report

On February 9, 2026, ACO entered into an engineering, procurement and construction contract with Fluor Federal Services, Inc. (“Fluor”), a third-party contractor, for the commercial expansion and deployment of LEU and HALEU production capability at the American Centrifuge Plant (ACP) in Piketon, Ohio. The contract provides for compensation on a time and materials basis at agreed labor rates and extends until the completion of performance.

Current report

Under the contract, Fluor’s services will include design, engineering, procurement, construction and construction management, and related services to support full commercial HALEU and LEU operations. Fluor will be paid a reimbursable amount for all costs incurred in connection with the relevant work (such as labor, equipment, materials, and other direct costs), plus other agreed upon margins. ACO will fund the services by establishing a zero-balance and escrow general disbursement account that will be administered in accordance with agreed-upon procedures. ACO will authorize funds incrementally in accordance with stage gates and Fluor’s performance is limited by the authorized funding. The Company has not incurred any costs under the contract and has not deposited any funds into the escrow account. The total price paid to the Contractor will depend on the scope of the services authorized by the ACO, in accordance with the terms of the contract.

Current report

The contract may be terminated or suspended by ACO or Fluor for cause, or by ACO for convenience, in which case Fluor is entitled to compensation for services and any applicable fee provided through termination. In the event of cancellation by ACO for reasons other than default, Fluor is also entitled to a cancellation fee in the initial amount of $24.0 million on the contract effective date, subsequently decreasing by $2.0 million per month until reaching $0.

Current report

Pursuant to a notice of redemption issued on February 24, 2025, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the $74.3 million aggregate principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million related to the extinguishment of the long-term debt.

Current report

On June 30, September 30, and December 31, 2025, the Company provided notice to holders of the 2.25% Convertible Notes that the notes became convertible at the option of the holders beginning on the first day of the respective subsequent quarter, and ending at the close of business on the last day of said quarter. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of each of the three calendar quarters, was greater than 130% of the conversion price in effect on each applicable trading day.

Current report

For further details on our notes refer to Part II, Item 7, Liquidity and Capital Resources.

Current report

On April 15, 2025, the President of the United States signed Executive Order 14272 initiating a U.S. Department of Commerce investigation under Section 232 of the Trade Expansion Act of 1962, to determine whether imports of processed critical minerals, including uranium, and their derivative products threaten to impair national security. Following the investigation, on January 14, 2026, the President issued Proclamation 11001, which directed the Secretary of Commerce and the United States Trade Representative (“USTR”) to pursue negotiations with trading partners over the next 180 days to ensure the United States maintains adequate supplies of critical minerals while mitigating supply-chain vulnerabilities affecting processed critical minerals and their derivative products. Proclamation 11001 indicated that, depending on the status or outcome of those negotiations, alternative remedies may be considered in the future, including the imposition of an additional sectoral tariff. The imposition of new or increased tariffs on these products or other trade restrictions from our international suppliers could significantly increase our costs and have a material adverse effect on our financial position and results of operations.

Current report

Revenue from the Technical Solutions segment was $102.5 million and $92.1 million for the year ended December 31, 2025 and 2024, respectively, an increase of $10.4 million (or 11%). Revenue generated by the HALEU Operation Contract increased by $10.5 million. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phases 2 and 3 of the contract.

Current report

Cost of sales for the LEU segment was $234.7 million and $256.0 million for the year ended December 31, 2025 and 2024, respectively, a decrease of $21.3 million (or 8%). Uranium costs decreased while SWU costs increased as a result of a 23% increase in the volume of SWU sold, partially offset by a 13% decrease in the average unit cost of SWU sold.

Current report

Gross profit for the Technical Solutions segment was $6.0 million and $17.6 million for the year ended December 31, 2025 and 2024, respectively, a decrease of $11.6 million (or 66%). The decrease was primarily attributable to the factors discussed in Revenueand Cost of Sales above. Because of the delay in completing Phase 2 of the HALEU Operation Contract, DOE extended Phase 2 through January 31, 2026. Costs incurred subsequent to November 2024 have not yet been subject to a fee as this portion of Phase 2 remains undefinitized and is subject to negotiation.

Current report

Equity-related compensation expense was $5.8 million and $1.5 million for the year ended December 31, 2025 and 2024, respectively, an increase of $4.3 million (or 287%). This increase was primarily as a result of a non-cash charge of $3.6 million due to the reclassification of certain Board restricted stock unit grants from equity to liability.

Current report

Nonoperating Components of Net Periodic Benefit Loss (Income)

Current report

Interest expense was $14.0 million and $2.7 million for the year ended December 31, 2025 and 2024, respectively, an increase of $11.3 million (or 419%). This increase was due primarily to interest incurred on the 2.25% Convertible Notes issued in November 2024 and on the 0% Convertible Notes issued in August 2025.

Current report

Pursuant to a redemption notice, on March 26, 2025, the Company redeemed all of the outstanding 8.25% Notes at a redemption price equal to 100% of the principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million related to the extinguishment of the 8.25% Notes in the year ended December 31, 2025.

Current report

On January 5, 2026, the DOE announced that ACO was selected for award of a $900.0 million task order to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of HALEU. The award also includes options, at the DOE’s discretion, for up to $170.0 million to produce and deliver HALEU to the DOE. The task order is subject to negotiation of a definitive agreement and there are no guarantees about whether or when funding by the DOE for such expansion would be awarded.

Current report

We expect to increase our capital expenditures by approximately several hundred million, driven by ongoing investments and a strategic shift towards our manufacturing readiness plan and Ohio expansion. We expect that our strong liquidity position will support our capital expenditures, although we are monitoring inflationary pressures that may affect the cost of materials and equipment.

Current report

On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and expansion of its manufacturing capacity at its facility in Oak Ridge, Tennessee. The Company is investing $60.0 million over an 18 month period lays the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio. This was followed with an announcement on January 23, 2026 that the Company plans to invest more than $560.0 million over the next several years to transition the facility to a high-rate manufacturing plant and support the production of thousands of advanced centrifuges in Oak Ridge, Tennessee. The first new centrifuges produced in Oak Ridge are expected to come online in Ohio in 2029.

Current report

On September 25, 2025, Centrus announced plans for a major expansion of its uranium capacity in Piketon, Ohio, including plans for large-scale production of both LEU and HALEU to meet commercial and government requirements.

Current report

In December 2025, the Company initiated design work on a 150,000 square foot training, operations and maintenance Facility in Piketon, Ohio – a critical piece of site infrastructure necessary to support the Company's plans for a major expansion of its uranium enrichment capacity in Piketon. The project involves a significant renovation and rehabilitation of an existing, largely vacant building on the site of the American Centrifuge Plant, with construction activities set to begin in early 2026. The facility is expected to include a mix of office space, training facilities, and maintenance bays to support plant operations. Also in December 2025, the Company began domestic centrifuge manufacturing to support commercial LEU enrichment activities at the Piketon, Ohio, facility. This strategic move enables the Company to capitalize on its many first-mover advantages in U.S.-owned domestic uranium enrichment, and marks one of the most consequential transformations in the Company's and the United States' uranium enrichment history. Centrus plans to leverage its multi-billion-dollar uranium enrichment expansion to meet its growing backlog of $2.3 billion in contingent LEU sales to U.S. and international customer contracts, and targets future commercial-scale production of HALEU, as well. For further details, see Part 1, Item 1, Business - Low Enriched Uranium - LEU Backlog and Technical Solutions - Technical Solutions Backlog.

Current report

On August 18, 2025, the Company issued, in a Rule 144A offering, the 0% Convertible Notes with an aggregate principal amount of $805.0 million, due August 15, 2032, unless earlier repurchased, redeemed or converted. There are no required principal payments prior to the maturity of the 0% Convertible Notes. The 0% Convertible Notes do not bear regular interest, and the principal amount of the notes will not accrete. The Company incurred approximately $22.5 million in issuance costs for the issuance of the 0% Convertible Notes. Additional terms and conditions of the 0% Convertible Notes are described in Note 8, Debt, of the Consolidated Financial Statements in Part IV of this Annual Report.

Current report

On June 30, September 30, and December 31, 2025, the Company provided notice to the holders of the 2.25% Convertible Notes that the notes became convertible at the option of the holders beginning on the first day of the respective subsequent quarter, and ending at the close of business on the last day of said quarter. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of each of the three calendar quarters, was greater than 130% of the conversion price in effect on each applicable trading day.

Current report

Pursuant to a notice of redemption issued on February 24, 2025, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the $74.3 million aggregate principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million to Extinguishment of Long-Term Debt in the Consolidated Statements of Operations. As of December 31, 2025, none of the 8.25% Notes remained outstanding.

Current report

On February 9, 2026, the Company and Fluor, a third-party contractor, entered into an agreement for the commercial expansion and deployment of LEU and HALEU production capability at the American Centrifuge Plant (ACP) in Piketon, Ohio. The contract provides for compensation on a time and materials basis at agreed labor rates and extends until the completion of performance. The total price paid to the Contractor will depend on the scope of the services authorized by the ACO, in accordance with the terms of the contract. For further details, refer to Part II, Item 7, Overview.
Removed paragraphs (20)

Previous report

2 International Atomic Energy Agency, “Global Inventories of Secondary Uranium Supplies” (IAEA-TECDOC-2030), p. 54 (2023).

Previous report

The DOE continues to pursue the availability of HALEU for the ARDP and for the advanced reactor market and the availability of domestically enriched uranium in a quantity that would be sufficient to address a supply disruption and gaps in domestic production and enrichment and issued separate RFPs for the deconversion of HALEU, the production of HALEU and domestic production of LEU. The DOE awarded multiple IDIQ contracts to the successful bidders, after which the awardees will compete for individual task orders. The total aggregate funding to be awarded under the contracts is $3.4 billion with a minimum of $2.0 million for each contract which is partly funded through the IRA. Executive Order 14154, issued on January 20, 2025, directed executive agencies of the U.S. federal government to pause the distribution of federal funding, including funding appropriated under the IRA, pending a review of programs for issuing grants, loans, contracts, or any other financial disbursements. The timing of the pause and subsequent review, as well as the outcome of such review, remain uncertain.

Previous report

On October 4, 2024, DOE selected ACO and five other awardees under the November 28, 2023 solicitation aimed at HALEU deconversion, a subsequent step in the HALEU production process. The contract has a minimum value of $2.0 million and a maximum value of $0.8 billion for all awardees. On October 16, 2024, DOE selected ACO and three other awardees under the January 9, 2024 competitive solicitation aimed at expanding domestic commercial production of HALEU, which is needed to fuel many of the next-generation nuclear reactor designs currently under development. The contract has a minimum value of $2.0 million and a maximum value of $2.7 billion for all awardees. On December 10, 2024, DOE selected ACO and five other awardees under the June 27, 2024 solicitation aimed at expanding domestic commercial production of LEU. The award has a minimum contract value of $2.0 million and a maximum value of $3.4 billion over a ten-year period. The ultimate dollar amount under each contract and the potential scale of the expansion supported will depend upon the scope of task orders that DOE may subsequently issue under the contracts for which we will compete. Although we believe that we are well positioned, there is no assurance that we will be awarded any task orders under any of these contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under an award is uncertain. The aggregate total appropriated funding for all awardees is $3.4 billion.

Previous report

On December 20, 2024, the Department of Energy’s National Nuclear Security Administration (“NNSA”) announced that it had released a Request for Information (“RFI”) for industry input on an AC100 Deployment Demonstration to address the need for a new domestic uranium enrichment capability. This AC100 deployment demonstration will provide a limited early production capability, demonstrate one of the available centrifuge technologies, and reduce risk to meeting the NNSA defense mission requirements. The deployment demonstration will provide NNSA with data required to determine which technology or technologies may be deployed for the full range of NNSA defense mission requirements. This effort is consistent with NNSA’s approach to meet its defense mission requirements by incrementally deploying centrifuge technologies, with candidates including the AC100 centrifuge and the Domestic Uranium Enrichment Centrifuge Experiment (“DUECE”) centrifuge being developed by Oak Ridge National Laboratory (“ORNL”). NNSA’s incremental approach enables the phase-in of low-enriched uranium (LEU) production capacity as soon as possible to ensure timely delivery of LEU for defense mission requirements. The Company intends to respond to the RFI.

Previous report

On July 13, 2023, the Company and TerraPower, LLC (“TerraPower”) entered into a memorandum of understanding (“MOU”) to expand their collaboration aimed at establishing commercial-scale, domestic production capabilities for HALEU to fuel the Natrium TM reactor that TerraPower is building in Wyoming. Under this MOU, the Company and TerraPower will explore collaboration to ensure the Natrium demonstration reactor has access to HALEU at the milestones necessary to meet the project's 2030 operation date. Subject to a definitive agreement to be negotiated, Centrus would work toward scaling up production capacity with additional centrifuge cascades to meet TerraPower's fuel requirements.

Previous report

On August 28, 2023, the Company and Oklo Inc. (“Oklo”) announced a new MOU to support the deployment of Oklo’s advanced fission powerhouses and advanced nuclear fuel production in Southern Ohio subject to a definitive agreement to be negotiated. Oklo and Centrus plan to enter into a broad range of collaboration programs supporting the development and operation of Oklo’s Aurora powerhouses, including supply of HALEU produced by Centrus at the Piketon, Ohio facility. Centrus also intends to buy clean, reliable, and affordable energy from Oklo’s planned Ohio plants to power its HALEU production facility.

Previous report

Revenue from the Technical Solutions segment was $92.1 million and $51.2 million for the year ended December 31, 2024 and 2023, respectively, an increase of $40.9 million (or 80%). Revenue generated by the HALEU Operation Contract increased by $41.3 million primarily due to the transition from Phase 1 to Phase 2, in late 2023, which shifted the arrangement from a cost-share to a cost-plus-incentive-fee.

Previous report

Cost of sales for the LEU segment was $256.0 million and $163.9 million for the year ended December 31, 2024 and 2023, respectively, an increase of $92.1 million (or 56%). SWU costs increased as a result of a 67% increase in the average unit cost of SWU sold, partially offset by a 4% decrease in the volume of SWU sold. Of the $256.0 million cost of sales, 25% is attributable to the release of costs related to previously deferred sales. Excluding the impact of current year deferred sales deliveries, the average unit cost of SWU sold would have only increased 27%. Uranium costs increased as a result of a 33% increase in the average unit cost of uranium sold and a 13% increase in the volume of uranium sold.

Previous report

Gross profit for the Technical Solutions segment was $17.6 million and $7.0 million for the year ended December 31, 2024 and 2023, respectively, an increase of $10.6 million (or 151%). The increase was primarily attributable to the HALEU Operation Contract and the transition from Phase 1 (cost-share) to Phase 2 (cost-plus-incentive-fee) in late 2023.

Previous report

Amortization of intangible assets was $9.8 million and $6.3 million for the year ended December 31, 2024 and 2023, respectively, an increase of $3.5 million (or 56%). Amortization expense for the intangible asset related to the September 2014 sales backlog is a function of SWU sales volume under that backlog, and amortization expense for the intangible asset related to customer relationships is amortized on a straight-line basis.

Previous report

Refer to Note 15, Net Income per Common Share, of the Consolidated Financial Statements in Part IV of this Annual Report.

Previous report

The Company measures Net Income and Net Income per Share both on a GAAP basis and on an adjusted basis to exclude deemed dividends allocable to the warrant modification (“Adjusted Net Income” and “Adjusted Net Income per Share”). We believe Adjusted Net Income and Adjusted Net Income per Share, which are non-GAAP financial measures, provide investors with additional understanding of the Company’s financial performance as well as its strategic financial planning analysis and period-to-period comparability. These metrics are useful to investors because they reflect how management evaluates the Company’s ongoing operating performance from period-to-period after removing certain transactions and activities that affect comparability of the metrics and are not reflective of the Company’s core operations.

Previous report

(a) For details related to average shares outstanding, refer to Note 15, Net Income Per Common Share, of the Consolidated Financial Statements in Part IV of this Annual Report.

Previous report

The Company believes its LEU segment backlog is a source of stability for our liquidity position. Subject to market conditions, we see the potential for growing uncommitted demand for LEU during the next few years with accelerated open demand in 2025 and beyond.

Previous report

The indenture governing the 8.25% Notes includes restrictions on the ability of Enrichment Corp. to transfer cash and other assets to the Company, which could constrain the Company’s ability to pay dividends on its Common Stock or to fund its commitments or the commitments of its other subsidiaries, subject to certain exceptions, such as the transfer of inventory and other assets in the ordinary course of business of Enrichment Corp. The indenture also restricts the Company’s ability to engage in certain mergers or acquisitions and requires the Company to offer to repurchase all such outstanding notes at 101% of their outstanding principal amount in the event of certain change of control events.

Previous report

Capital expenditures of approximately $25.1 million are anticipated over the next 12 months.

Previous report

Interest on the 8.25% Notes is payable semi-annually in arrears as of February 28 and August 31 based on a 360-day year consisting of twelve 30-day months. The 8.25% Notes are guaranteed on a subordinated and limited basis by, and secured by substantially all assets of, Enrichment Corp. The 8.25% Notes mature on February 28, 2027. Additional terms and conditions of the 8.25% Notes are described in Note 8, Debt, of the Consolidated Financial Statements in Part IV of this Annual Report.

Previous report

On May 28, 2024, the Company entered into a Sixth Amendment approved by the Board and makes clarifying changes relating to the definition of “Beneficial Owner”, “beneficially owned” and “Beneficial Ownership” contained in the Rights Agreement. The Sixth Amendment was not adopted as a result of or in response to, any effort to acquire control of the Company.
Reworded paragraphs (77)

Previous wording

Centrus operates two business segments: (a) LEU, which supplies various components of nuclear fuel to commercial customers from our global network of suppliers, and (b) Technical Solutions, which provides advanced uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing and other technical services to government and private sector customers and advanced uranium enrichment for the nuclear industry and the U.S. government.

Current wording

Centrus operates two business segments: (a) LEU, which supplies various components of nuclear fuel to commercial customers from our global network of suppliers, and (b) Technical Solutions, which provides advanced uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing and other technical services to government and private sector customers.

Previous wording

Published spot price indicators for SWU reached historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a period of price increases, which reached $155 per SWU by December 31, 2023. In 2024, spot prices continued to increase, reaching $195 per SWU by December 31, 2024, which surpasses the previous historic high. This represents an increase of 26% since the beginning of the year and 474% over the 2018 historic low. This surge in the SWU spot price beginning in 2022 has been driven by primarily by uncertainty created as a result of Russia’s invasion of Ukraine, coupled with growing interest in nuclear power as a source of secure and carbon-free energy.

Current wording

Published spot price indicators for SWU reached historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a period of price increases, which reached $195 per SWU by December 31, 2024. In 2025, spot prices continued to increase, reaching $200 per SWU by December 31, 2025, which surpasses the previous historic high. This represents an increase of 3% since the beginning of the year and 488% over the 2018 historic low. This surge in the SWU spot price beginning in 2022 has been driven primarily by uncertainty created as a result of Russia’s invasion of Ukraine, coupled with growing interest in nuclear power as a source of secure and carbon-free energy. The contemplation of the imposition of tariffs on LEU, if ultimately imposed, may put additional upward pressure on the price of SWU. For further details, refer to Part I, Item 1A, Risk Factors - The current war in Ukraine and related international or U.S. sanctions, tariffs and restrictions on trade, and the Russian response thereto, could have a material adverse impact on our business, results of operations, and financial condition.

Previous wording

When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied, but without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy. A report issued by the International Atomic Energy Agency in 2023 reported that while U.S. utilities may have enough inventory to cover one reload of their reactors, “truly strategic physical stockpiles are almost non-existent.”2

Current wording

When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied, but without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy.

Previous wording

Changes in the supply-demand balance and in the competitive landscape arising from the war in Ukraine may affect pricing trends, change customer spending patterns, and create uncertainty in the uranium market. At the same time, uncertainty remains about future demand for nuclear power generation. To address such changes and uncertainty, we continue to evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.

Current wording

Changes in the supply-demand balance and in the competitive landscape arising from the war in Ukraine or the imposition of tariffs may affect pricing trends, change customer spending patterns, and create uncertainty in the uranium market. At the same time, uncertainty remains about future demand for nuclear power generation. To address such changes and uncertainty, we continue to evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.

Previous wording

Under the HALEU Demonstration Contract, Centrus was engaged by the DOE to construct a cascade of 16 AC100M centrifuges in Piketon, Ohio, to demonstrate HALEU production. The DOE has funded the HALEU Demonstration Contract up to $173.0 million with a period of performance that ended November 30, 2022. Closeout activities on the HALEU Demonstration Contract are ongoing. The DOE elected to change the scope of the HALEU Demonstration Contract and moved the operational portion of the demonstration to a new, competitively-awarded contract that would provide for operations beyond the term of the existing HALEU Demonstration Contract.

Current wording

The Company’s work on HALEU began under the HALEU Demonstration Contract, executed with the DOE in 2019, to construct a cascade of 16 AC100M centrifuges in Piketon, Ohio to demonstrate HALEU production. The DOE has funded the HALEU Demonstration Contract up to $173.0 million with a period of performance that ended November 30, 2022.

Previous wording

On November 10, 2022, the Company was awarded the HALEU Operation Contract and work began December 1, 2022. The base contract value was approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF 6 by no later than December 31,2023. On October 11, 2023, the Company announced that it began enrichment operations in Piketon, Ohio. On November 7, 2023, the Company announced that it made its first delivery of HALEU to the DOE, completing Phase 1 by successfully demonstrating its HALEU production process. During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract.

Current wording

On November 10, 2022, the DOE awarded the HALEU Operation Contract to the Company with a base contract value of approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF 6. On November 7, 2023, the Company made its first contractual delivery of HALEU to the DOE, completing Phase 1 of the HALEU Operation Contract.

Previous wording

Phase 2 of the HALEU Operation Contract includes continued operations and maintenance, and production for a full year at an annual production rate of 900 kilograms of HALEU UF 6. The DOE will own the HALEU produced from the demonstration cascade and Centrus will be compensated on a cost-plus-incentive-fee basis, with an initial Phase 2 contract value of approximately $90.0 million, subject to Congressional appropriations. DOE has increased the Phase 2 contract value and related funding to $129.0 million. The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. Concurrently, pursuant to an amendment to our lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.

Current wording

During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract, which included production of 900 kilograms of HALEU UF 6 for one production year, as well as continued operations and maintenance of the cascade. Phase 2 included an initial contract value of approximately $90.0 million and compensation on a cost-plus-incentive-fee-basis. The DOE owns the HALEU produced from the demonstration cascade. The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. Pursuant to an amendment to the Company’s lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.

Previous wording

Under the HALEU Operation Contract, DOE is contractually required to provide the 5B Cylinders necessary to collect the output of the cascade, but ongoing supply chain challenges had created difficulties for DOE in securing enough 5B Cylinders for the entire production year under Phase 2. To support the DOE in mitigating the risk of further delays in delivery of 5B Cylinders, the Company received technical direction and a contract modification from the DOE to procure compliant 5B Cylinders and components while the contractual obligation to furnish compliant 5B Cylinders under the HALEU Operation Contract continues to rest with the DOE. During the time periods when 5B Cylinders were insufficient, the Company was able to continue operations of the cascade, but did not produce HALEU as it did not have cylinders to store the enriched uranium. Due to these delays, Centrus was unable to achieve delivery of the 900 kilograms of HALEU UF 6 for Phase 2 by November 2024. On November 5, 2024, the HALEU Operation Contract was modified to extend the Phase 2 period of performance to June 30, 2025. Centrus began to receive deliveries of additional 5B Cylinders in October 2024 and currently expects to have adequate cylinders to complete Phase 2. In accordance with the HALEU Operation Contract, the Company has submitted several change requests for work being performed on infrastructure, facility repairs, and 5B Cylinders. The additional work is being performed under the DOE’s technical direction. As of February 7, 2025, Centrus has delivered approximately 545 kilograms of HALEU UF 6 to DOE. For further details refer to Item 1 - Business - Technical Solutions - Government Contracting.

Current wording

Under the HALEU Operation Contract, DOE is contractually obligated to provide the 5B Cylinders necessary to collect the output of the cascade, but supply chain challenges created difficulties for DOE in securing enough 5B Cylinders for the entire Phase 2 production year. During time periods when 5B Cylinders were insufficient, the Company was not able to produce HALEU as it did not have 5B Cylinders to store the enriched uranium. Due to these delays, Centrus was unable to achieve contractual delivery of the 900 kilograms of HALEU UF 6 by November 2024, which was the date set for the end of Phase 2 performance. On November 5, 2024, the HALEU Operation Contract was modified to extend the Phase 2 period of performance to June 30, 2025, which allowed the Company to produce and contractually deliver the Phase 2 production target of 900 kilograms of HALEU UF 6 to DOE. The DOE further extended the Phase 2 period of performance through January 31, 2026, to allow the Company to complete outstanding change orders. As of December 31, 2025, the total Phase 2 contract value and funded value is $170.1 million. The fee for the Phase 2 period of performance that was extended beyond November 30, 2024 was not definitized and is subject to negotiation.

Previous wording

On November 6, 2024, DOE issued requests for task order proposals under the HALEU Deconversion Contract and the HALEU Enrichment Contracts. DOE contemplates issuing the task orders on a time-and-material basis with a two year period of performance for the purpose of describing the technical approach and price in a optimization study to support DOE in establishing the commercial production of HALEU and commercial deconversion of HALEU, respectively. On January 9, 2025, we submitted our proposals in response to these requests for task order proposals.

Current wording

On November 6, 2024, DOE issued requests for task order proposals under each of the HALEU Production Contract and the HALEU Deconversion Contract for respective optimization studies to support DOE in establishing the commercial production of HALEU and commercial deconversion of HALEU. On January 9, 2025, we submitted our proposals in response to these requests for task order proposals. On August 14, 2025, DOE, without making any awards under the first task order proposal request, issued a second request for task order proposals under the HALEU Production Contract. The second request provided $900.0 million to support the deployment of commercial HALEU enrichment capacity. On January 5, 2026, the DOE announced that ACO was selected for award of a $900.0 million task order to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of HALEU. The award also includes options, at the DOE’s discretion, for up to $170.0 million to produce and deliver HALEU to the DOE. The task order is subject to negotiation of a definitive agreementand there are no guarantees about whether or when funding by the DOE for such expansion would be awarded or whether we will successfully perform any awarded contract.

Previous wording

Meanwhile, on November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and the expansion of its manufacturing capacity at our facility in Oak Ridge, Tennessee. The Company is investing an additional $60.0 million over an 18 month period to lay the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio.

Current wording

On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and expansion of its manufacturing capacity at its facility in Oak Ridge, Tennessee. Additionally, the Company is investing an additional $60.0 million over an 18 month period lays the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio. This was followed with an announcement on January 23, 2026 that the Company plans to invest more than $560.0 million over the next several years to transition the facility to a high-rate manufacturing plant and support the production of thousands of advanced centrifuges in Oak Ridge, Tennessee. The first new centrifuges produced in Oak Ridge are expected to come online in Ohio in 2029.

Previous wording

The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The §48C program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the IRS has granted our request for $62.4 million credit allocation for this facility. Centrus now has two years to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation. It is uncertain how Executive Order 14154 will impact the IRS determination regarding our application request. For further details refer to Liquidity and Capital Resources.

Current wording

The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The §48C program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the Internal Revenue Service (“IRS”) granted our request for a $62.4 million credit allocation for this facility. Centrus has two years from that date to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation. It is uncertain how Executive Order 14154 will impact the IRS determination regarding our application request. For further details refer to Part II, Item 7, Liquidity and Capital Resources in this Annual Report on Form 10-K.

Previous wording

On November 7, 2024, the Company issued, in a Rule 144A offering, 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. The proceeds from the 2.25% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes. There are no required principal payments prior to the maturity of the 2.25% Convertible Notes. The 2.25% Convertible Notes bear interest at an annual rate of 2.25%, payable semi-annually in arrears on May 1 and November 1 of each year, beginning on May 1, 2025. The Company incurred approximately $13.8 million in issuance costs for the issuance of the 2.25% Convertible Notes. For further details refer to Liquidity and Capital Resources.

Current wording

On November 7, 2024, the Company issued 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. On August 18, 2025, the Company issued 0% Convertible Notes with an aggregate principal amount of $805.0 million, due August 15, 2032, unless earlier repurchased, redeemed or converted. The proceeds from both the 2.25% Convertible Notes and the 0% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes. The 2.25% Convertible Notes bear interest at an annual rate of 2.25%, payable semi-annually in arrears on May 1 and November 1, of each year, beginning on May 1, 2025. There are no required principal payments prior to the maturity of the 0% Convertible Notes or the 2.25% Convertible Notes.

Previous wording

While the monthly price indicators have increased for several years, the uranium enrichment segment of the nuclear fuel market remains oversupplied and faces uncertainty about future demand for nuclear power generation. However, without Russian supply, the global market would be undersupplied for uranium enrichment. Changes in the competitive landscape affect pricing trends, change customer spending patterns, and create uncertainty. To address these changes, we have taken steps to adjust our cost structure; we may seek further adjustments to our cost structure and operations and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.

Current wording

While the monthly price indicators have increased for several years, the uranium enrichment segment of the nuclear fuel market remains oversupplied and faces uncertainty about future demand for nuclear power generation. However, without Russian supply, the global market would be undersupplied for uranium enrichment. Recent data from the International Trade Commission shows a significant increase in the importation of enriched uranium into the U.S. from China beginning in 2023. If this trend continues, it will likely result in significant changes in the competitive landscape that will affect pricing trends, affect customer spending patterns, create uncertainty and likely have a negative impact on our business. To address these changes, we have taken steps to adjust our cost structure; we may seek further adjustments to our cost structure and operations and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.

Previous wording

The global nuclear industry outlook has begun to improve after many years of decline and stagnation. The development of advanced small and large-scale reactors, the innovation of advanced fuel types, and the commitment of nations to begin deploying nuclear power or to increase the share of nuclear power in their nations has created optimism in the market. Part of the momentum has resulted from efforts to lower greenhouse gas emissions to combat climate change and improve health and safety.

Current wording

The global nuclear industry outlook began to improve after many years of decline and stagnation. The development of advanced small and large-scale reactors, the innovation of advanced fuel types, and the commitment of nations to begin deploying nuclear power or to increase the share of nuclear power in their nations has created optimism in the market. Part of the momentum has resulted from efforts to lower greenhouse gas emissions to combat climate change and improve health and safety.

Previous wording

According to the WNA, as of January 2025, there were approximately 65 reactors under construction worldwide, approximately one-half of which are in China. The United States, with over 90 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years, although natural gas prices in the U.S. electricity sector tripled between 2020 and 2022 according to data from the EIA. Nine U.S. reactors have prematurely shut down in the past ten years and others could shut down in the next few years. At the same time, construction was completed and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart. In 2023, the DOE released a report outlining a pathway to deployment of approximately 200 gigawatts of additional capacity by 2050 which would triple the nuclear energy capacity in the United States.

Current wording

According to the WNA, as of January 2026, there were approximately 70 reactors under construction worldwide, approximately one-half of which are in China. The United States, with over 90 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years. Eight U.S. reactors have prematurely shut down in the past ten years and others could shut down in the next few years. At the same time, construction was completed and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart.

Previous wording

The IEA projects that global nuclear energy generation will grow substantially in the next three decades. In the IEA’s 2024 World Energy Outlook, nuclear generation is forecasted to grow by 18% by 2030 and 47% by 2040 under the “Stated Policies” scenario. In the “Net Zero Emissions by 2050” scenario, nuclear generation would grow by 41% by 2030 and more than double by 2040.

Current wording

The IEA projects that global nuclear energy generation will grow substantially in the next three decades. In the IEA’s 2025 World Energy Outlook, nuclear generation is forecasted to grow 38% by 2035 and 62% by 2040 under the “Stated Policies” scenario. In the “Net Zero Emissions by 2050” scenario, nuclear generation would grow 70% by 2035 and more than double by 2040.

Previous wording

As a consequence of the March 2011 earthquake and tsunami in Japan, over 60 reactors in Japan and Germany were taken offline, and other countries curtailed or slowed their construction of new reactors or accelerated the retirement of existing plants. In Japan, 14 reactors have restarted and an additional 11 reactors are in the process of restart approval. As a result of the war in Ukraine, the EU is encouraging its member countries to reconsider the planned early retirement of existing plants in order to reduce reliance on Russian gas imports.

Current wording

As a consequence of the March 2011 earthquake and tsunami in Japan, over 60 reactors in Japan and Germany were taken offline, and other countries curtailed or slowed their construction of new reactors or accelerated the retirement of existing plants. In Japan, 15 reactors have restarted and an additional 10 reactors are in the process of restart approval. As a result of the war in Ukraine, the EU is encouraging its member countries to reconsider the planned early retirement of existing plants in order to reduce reliance on Russian gas imports.

Previous wording

In October 2020, the DOC reached an agreement with the Russian Federation on an extension of the RSA, a trade agreement which allows for Russian-origin nuclear fuel to be exported to the United States in limited quantities. The two parties agreed to extend the agreement through 2040 and to set aside a significant portion of the annual quota for Centrus’ shipments to the United States through 2028 to execute our long-term TENEX Supply Contract with TENEX. This outcome allows for sufficient quota for Centrus to continue serving its utility customers and support its investments in building new capacity. Use of this quota is subject to compliance with limitations under the RSA. These limitations include a requirement that we return natural uranium to TENEX for the LEU we receive under the TENEX Supply Contract at approximately the same time that we deliver the LEU to our customers. Our ability to meet this requirement depends on the capacity or willingness of the facilities where natural uranium is supplied to us by customers, to allow us to deliver this natural uranium to TENEX. In 2023, we were notified by one facility that it will no longer receive natural uranium for TENEX. As a result, we will need to rely to a greater extent on deliveries at other processors or explore other options in order to comply with the RSA’s natural uranium delivery requirement.

Current wording

In October 2020, the DOC reached an agreement with the Russian Federation on an extension of the RSA, a trade agreement which allows for Russian-origin nuclear fuel to be exported to the United States in limited quantities. The two parties agreed to extend the agreement through 2040 and to set aside a significant portion of the annual quota for Centrus’ shipments to the United States through 2028 to execute our long-term TENEX Supply Contract with TENEX. This outcome allows for sufficient quota for Centrus to continue serving its utility customers and support its investments in building new capacity. Use of this quota is subject to compliance with limitations under the RSA. These limitations include a requirement that we return natural uranium to TENEX for the LEU we receive under the TENEX Supply Contract at approximately the same time that we deliver the LEU to our customers. Our ability to meet this requirement depends on the capacity or willingness of the facilities where natural uranium is supplied to us by customers, to allow us to deliver this natural uranium to TENEX. We were notified by one facility that it will no longer receive natural uranium for TENEX. As a result, we will need to rely to a greater extent on deliveries at other processors or explore other options in order to comply with the RSA’s natural uranium delivery requirement.

Previous wording

The war in Ukraine has escalated tensions between Russia and the international community, and particularly the United States. As a result, the United States and other countries have imposed, including through the U.S.’s enactment of the Import Ban Act discussed below, and may continue imposing, additional sanctions and export controls against certain Russian products, services, organizations and/or individuals. Such additional restrictions could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business. Further, sanctions or restrictions by the United States, Russia or other countries may impact our ability and cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the current validity of the permit for continued shipments of LEU imports. In addition, on June 24, 2024, members of the EU agreed to issue a 14th sanctions package, primarily targeting the export of Russian liquid natural gas and other services. The sanctions package includes restrictions on the transportation of empty containers to Russia. Since we supply empty cylinders under the TENEX Supply Contract that are filled and returned to us, this new sanctions package may impact the transportation of LEU from Russia to the extent such export activity has a nexus to an EU member state (e.g., through a ship’s flag, nationalities of crew members, etc.). This new sanctions package does not impact our near term deliveries. We are working with our shipper to determine the extent of the impact of the new sanctions on the transportation of LEU from Russia which may ultimately require our shipper to obtain special authorizations for the shipment of empty containers to Russia if a nexus with an EU member state exists. The U.S. and Canadian governments have indicated that the EU agrees that these sanctions should not apply to these containers and are working with the EU to clarify.

Current wording

The war in Ukraine has escalated tensions between Russia and the international community. As a result, the United States and other countries imposed, including through the U.S.’s enactment of the Import Ban Act discussed below, and may continue imposing, additional sanctions, tariffs, and export controls against certain Russian products, services, organizations and/or individuals, and Russia passed the Russian Decree as discussed below. Such additional restrictions, and any Russian response thereto, could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business. Further, tariffs or sanctions by the United States, Russia or other countries may impact our ability and the cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the expiration of the permit for continued shipments of LEU imports.

Previous wording

In response to the war in Ukraine, on May 13, 2024, the Import Ban Act was enacted. This new law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. In accordance with the instructions published by the DOE on May 24, 2024, the Company filed its first waiver request application on May 27, 2024, to permit the importation of LEU already committed for delivery to its U.S. customers in 2024 through 2027. On July 18, 2024, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025. For the years 2026 and 2027, the DOE deferred its decision to an unspecified date closer in time to the deliveries. On June 7, 2024, the Company filed a second waiver request application to allow for importation of LEU from Russia for processing and reexport to the Company's foreign customers. On October 31, 2024, the DOE issued its determination waiving the prohibition of the importation of such material to our foreign customers scheduled in 2025. On December 11, 2024, the Company filed a third waiver request application to allow for importation of LEU from Russia in 2026 and 2027 for use in future sales to our U.S. customers. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, would have a negative material impact on our business and financial condition. Through 2027, well over one-half of the LEU that we expect to deliver to customers was sourced under the TENEX Supply Contract. While we have other sources of supply that may be available, they are not sufficient to replace the TENEX supply or may not be available in 2025. It is uncertain whether any waiver would be granted in response to our pending or any potential future applications and, if granted, whether any waiver would be granted in a timely manner for us to benefit from it.

Current wording

In response to the war in Ukraine, on May 13, 2024, the Import Ban Act was enacted. This law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. In accordance with the instructions published by the DOE on May 24, 2024, the Company filed its first waiver request application on May 27, 2024, to permit the importation of LEU already committed for delivery to its U.S. customers in 2024 through 2027. On July 18, 2024, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025. For the years 2026 and 2027, the DOE deferred its decision to an unspecified date closer in time to the deliveries. On August 4, 2025, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2026 and 2027. On June 7, 2024, the Company filed a second waiver request application to allow for importation of LEU from Russia committed to the Company's foreign customers for processing and reexport. On October 31, 2024, the DOE issued its determination waiving the prohibition of the importation of such material committed to our foreign customers. On December 11, 2024, the Company filed a third waiver request application to allow for importation of LEU from Russia in 2026 and 2027 for use in future sales to our U.S. customers. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, would have a negative material impact on our business. Through 2027, well over one-half of the LEU that we expect to deliver to customers is expected to be sourced under the TENEX Supply Contract. While we have other sources of supply, they are not sufficient to replace the TENEX supply. It is uncertain whether any waiver would be granted in response to our pending or any potential future applications and, if granted, whether any waiver would be granted in a timely manner for us to benefit from it.

Previous wording

On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2025, that rescinded TENEX’s general license to export LEU to the United States or to entities registered in the United States. Accordingly, TENEX is required to obtain a specific export license from the Russian authorities in order for it to make shipments to Centrus through 2025. Centrus has been informed that TENEX has received three specific licenses to date which allow TENEX to export LEU to the U.S. for our pending orders. Centrus will use the majority of this LEU to satisfy pending orders to a single customer on a delayed basis in reliance on our contractual rights. TENEX has informed Centrus of its plan to seek additional export licenses to meet its delivery obligations under the TENEX Supply Contract for our other pending and future orders. Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner and not rescinded prior to the shipment taking place. Refer to Part 1, Item 1-Businessand Item 1A -Risk Factors, Operational Risks and - War in Ukraine Risks, for further discussion.

Current wording

On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2027, that rescinded TENEX’s general license to export LEU to the United States or to entities registered in the United States. TENEX is required to obtain a specific export license from the Russian authorities in order for it to make shipments to Centrus through 2027. Except for isolated delays, TENEX has received specific licenses to satisfy shipments to Centrus in the regular course of business. However, Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner and not rescinded prior to the shipment taking place.

Previous wording

There is draft legislation in the U.S. Congress designed to impose sanctions on Rosatom which would effectively prohibit (again, subject to government-issued waivers) transactions with TENEX, a subsidiary of Rosatom. Since the enactment of the Import Ban Act and through the issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE, and since the issuance of the Russian Decree TENEX has sought the necessary export licenses. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses to make future deliveries or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, including a material adverse effect on the Company.

Current wording

Since the enactment of the Import Ban Act and through the issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses to make future deliveries or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, which would have a material adverse effect on the Company. Refer to Part 1, Item 1-, Businessand Item 1A -, Risk Factors, - Operational Risks and - War in Ukraine Risks, for further discussion.

Previous wording

In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.

Current wording

In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. For example, effective January 10, 2025, the U.S. Secretary of the Treasury, made a determination pursuant to section l(a)(i) of Executive Order 14024, to apply certain sanctions to any person determined, pursuant to that section, to operate or have operated in “the energy sector of the Russian Federation economy.” TENEX’s financial institutions have had challenges in accepting payments denominated in U.S. dollars and the Company and TENEX have agreed to delay certain payments under the TENEX Supply Contract as the parties review payment processing options. Additionally, on April 17, 2025, the Office of the USTR released a notice issuing the results of its investigation into China’s dominance in the maritime, logistics, and shipbuilding sectors pursuant to Section 302(a) of the Trade Act of 1974, as amended. The USTR imposed new service fees on Chinese-built vessels entering U.S. ports above certain capacity. Our shipper of Russian LEU from Russia to the U.S. uses ships manufactured in China which happen to be exempt from the new fees under this notice. However, these fees would be significant if they were to be imposed on our shipper. If the USTR changes its position and does not exempt the type of vessel our shipper uses, then the additional fees imposed on our shipper for docking at U.S. ports would be cost prohibitive, would have a significant impact on our ability to transport Russian LEU and would also have a material adverse effect on our financial position and results of operations. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.

Previous wording

Given all the foregoing, we continue to monitor the situation closely and assess the potential impact of any new sanctions or restrictions on the Company and possible mitigation thereof.

Current wording

Given all the foregoing, we continue to monitor the situation closely and assess the potential impact of any new sanctions or restrictions on the Company or potential tariffs on products it imports or purchases from foreign suppliers and possible mitigation thereof.

Previous wording

For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors - The current war in Ukraine and related international sanctions and restrictions on trade could have a material adverse impact on our business, results of operations, and financial condition.

Current wording

For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors - The current war in Ukraine and related international or U.S. sanctions, tariffs and restrictions on trade, and the Russian response thereto, could have a material adverse impact on our business, results of operations, and financial condition.

Previous wording

•Our ability to obtain additional waivers to allow us to import LEU from Russia so that we may continue supplying LEU to our customers, given the enactment of the Import Ban Act in May 2024;

Current wording

•Our ability to obtain additional waivers to allow us to import LEU from Russia for future sales to our U.S. customers, given the enactment of the Import Ban Act;

Previous wording

•The ability of TENEX to obtain, or timely obtain, and the willingness of TENEX to continue to request, additional licenses to export LEU from Russia so that we may continue supplying LEU to our customers, given the enactment of the Russian Decree in November 2024;

Current wording

•The ability of TENEX to obtain, or timely obtain, and the willingness of TENEX to continue to request, additional licenses to export LEU from Russia so that we may continue supplying LEU to our customers, given the enactment and extension of the Russian Decree;

Previous wording

•Recently enacted sanctions and the potential for additional sanctions and other measures that restrict with whom we may transact or affect the importation, sales or purchases of SWU or uranium or goods or services required for the sale, purchase, transportation or delivery of such SWU or uranium;

Current wording

•Recently enacted tariffs and sanctions and the potential for additional tariffs, sanctions and other measures that restrict with whom we may transact or affect the importation, sales or purchases of SWU or uranium or goods or services required for the sale, purchase, transportation or delivery of such SWU or uranium;

Previous wording

•Our ability to be awarded any task orders under any of the HALEU Production Contract, LEU Production Contract or HALEU Deconversion Contract;

Current wording

•Our ability to be awarded any additional task orders under the HALEU Deconversion Contract or HALEU Production Contract;

Previous wording

•Insufficient or untimely U.S. government funding and government appropriations to support our IDIQ contracts with the U.S. federal government;

Current wording

•Insufficient or untimely U.S. government funding and government appropriations to support our IDIQ contracts with the U.S. federal government, including the HALEU Operation Contract and HALEU Production Contract;

Previous wording

The Company’s backlog across both segments is $3.7 billion and $2.0 billion as of December 31, 2024 and 2023, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.

Current wording

The Company’s backlog across both segments was $3.8 billion and $3.7 billion as of December 31, 2025 and 2024, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.

Previous wording

Our backlog in the LEU segment extends to 2040. As of December 31, 2024 and 2023, our backlog is approximately $2.8 billion and $1.0 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments. Of the $2.8 billion, approximately $2.0 billion represents contingent LEU sales commitments, with $0.8 billion of the total under definitive agreements and $1.2 billion of the total subject to entering into definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. On February 4, 2025, we signed an agreement with Korea Hydro & Nuclear Power (“KHNP”) definitizing $0.8 billion of the $1.2 billion of contingent commitments, that were subject to contract definitization, as of December 31, 2024. The contingent sales commitments depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.2 billion of deferred revenue and advances from customers as of December 31, 2024, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to significant risks and uncertainties, including existing import laws and restrictions, such as the RSA, which limits imports of Russian uranium products into the United States and applies to our sales using material procured under the TENEX Supply Contract, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.

Current wording

Our backlog in the LEU segment extends to 2040. As of December 31, 2025 and 2024, our backlog was approximately $2.9 billion and $2.8 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments. Of the $2.9 billion, approximately $2.3 billion represents contingent LEU sales contracts and commitments, with $2.1 billion of the total under definitive agreements and $0.2 billion of the total subject to entering into definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. The contingent LEU sales contracts and commitments also depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.1 billion of deferred revenue and advances from customers as of December 31, 2025, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to significant risks and uncertainties, including existing import laws and restrictions, such as the RSA, which limits imports of Russian uranium products into the United States and applies to our sales using material procured under the TENEX Supply Contract, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.

Previous wording

Our backlog in the Technical Solutions segment extends to 2034. As of December 31, 2024 and 2023, our backlog is approximately $0.9 billion and $1.0 billion, respectively. Our backlog includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options.

Current wording

Our backlog in the Technical Solutions segment extends to 2034. As of both December 31, 2025 and 2024, our backlog was approximately $0.9 billion. Our backlog includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options.

Previous wording

Revenue from our LEU segment accounted for approximately 79% of our total revenue for the year ended December 31, 2024. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 40% of revenue from our LEU segment since 2022. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in 2024 averaged approximately $9.4 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results year over year.

Current wording

Revenue from our LEU segment accounted for approximately 77% of our total revenue for the year ended December 31, 2025. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 33% of revenue from our LEU segment since 2023. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in 2025 averaged approximately $10.2 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results year over year.

Previous wording

Our financial performance over time can be affected significantly by changes in prices for SWU and natural uranium hexafluoride. Market prices for SWU and uranium hexafluoride significantly declined from 2011 until mid-2018, when they began to trend upward. More recently, market uncertainty in the wake of the Russian invasion of Ukraine has driven SWU and uranium hexafluoride prices sharply higher. Since our backlog includes contracts awarded to us in previous years, the average SWU price billed to customers typically lags published price indicators by several years. Revenue in our LEU business varies based upon the timing of customer contracts. The pricing of deliveries varies depending upon the market conditions at the time the contract was signed and may not reflect current market prices.

Current wording

Our financial performance over time can be affected significantly by changes in prices for SWU and natural uranium hexafluoride. Market prices for SWU and uranium hexafluoride significantly declined from 2011 until mid-2018, when they began to trend upward. More recently, market uncertainty in the wake of the war in Ukraine has driven SWU and uranium hexafluoride prices sharply higher. Since our backlog includes contracts awarded to us in previous years, the average SWU price billed to customers typically lags published price indicators by several years. Revenue in our LEU business varies based upon the timing of customer contracts. The pricing of deliveries varies depending upon the market conditions at the time the contract was signed and may not reflect current market prices.

Previous wording

The Import Ban Act, which bans the importation of LEU from Russia, may severely limit importation through 2027 and will cut off supply of LEU from Russia after 2027. Notwithstanding our ability to obtain waivers under the Import Ban Act, the Russian Decree, which prohibits the exportation of Russian LEU without a license, may severely limit exportation of LEU from Russia through December 31, 2025. This has drawn attention to the potential for significant tightening of supplies in the market. Russian enrichment plants represent 44% of the world’s capacity, and Russian capacity significantly exceeds its domestic needs. According to data from the WNA, the annual enrichment requirements of reactors worldwide outside of Russia vastly exceeds the available supply of non-Russian enrichment, which potentially threatens the viability of some reactors, including those in the United States. While inventories and increased production at non-Russian plants may mitigate the shortfall, these options would not fully replace Russian supply. Deployment of new capacity ultimately could replace Russian enrichment but this capacity will take a number of years and significant funding from private and/or government sources to come online. Centrus is seeking public and private funding to deploy new production capacity at its Piketon, Ohio, plant to help meet the need for new, domestic supplies of enriched uranium.

Current wording

The Import Ban Act, which bans the importation of LEU from Russia, may severely limit importation through 2027 and will cut off supply of LEU from Russia after 2027. Notwithstanding our ability to obtain waivers under the Import Ban Act, the Russian Decree, which prohibits the exportation of Russian LEU without a license, may severely limit exportation of LEU from Russia through December 31, 2027. This has drawn attention to the potential for significant tightening of supplies in the market. Russian enrichment plants represent 43% of the world’s capacity, and Russian capacity significantly exceeds its domestic needs. According to data from the WNA, the annual enrichment requirements of reactors worldwide outside of Russia vastly exceeds the available supply of non-Russian enrichment, which potentially threatens the viability of some reactors, including those in the United States. While inventories and increased production at non-Russian plants may mitigate the shortfall, these options would not fully replace Russian supply. Deployment of new capacity ultimately could replace Russian enrichment but this capacity will take a number of years and significant funding from private and/or government sources to come online. Centrus is seeking public and private funding to deploy new production capacity at its Piketon, Ohio, plant to help meet the need for new, domestic supplies of enriched uranium.

Previous wording

Our contracts with customers are denominated primarily in U.S. dollars, and, although revenue has not been materially affected by changes in the foreign exchange rate of the U.S. dollar, we may have a competitive price advantage or disadvantage obtaining new contracts in a competitive bidding process depending upon the weakness or strength of the U.S. dollar. Under a customer contract that commenced deliveries in 2023, prices are payable in a combination of U.S. dollars and euros. Costs of our primary competitors are denominated in other currencies. Our contracts with suppliers are primarily denominated in U.S. dollars. We have a SWU supply agreement, that commenced in 2023, with prices payable in a combination of U.S. dollars and euros.

Current wording

Our contracts with customers are denominated primarily in U.S. dollars, and, although revenue has not been materially affected by changes in the foreign exchange rate of the U.S. dollar, we may have a competitive price advantage or disadvantage obtaining new contracts in a competitive bidding process depending upon the weakness or strength of the U.S. dollar. Under a customer contract with deliveries from 2023 to 2025, prices are payable in a combination of U.S. dollars and euros. Costs of our primary competitors are denominated in other currencies. Our contracts with suppliers are primarily denominated in U.S. dollars. We have a SWU supply agreement, that commenced in 2023, with prices payable in a combination of U.S. dollars and euros but with a contract-defined exchange rate.

Previous wording

Intangible assets originated from our reorganization and application of fresh start accounting as of September 30, 2014. The intangible assets represented the fair value adjustment to the assets and liabilities for our LEU segment. The identifiable intangible assets relate to our LEU segment backlog and customer relationships. The backlog intangible asset is amortized as the backlog, valued at emergence, is reduced, principally as a result of deliveries to customers. The customer relationships intangible asset is amortized using the straight-line method over the estimated average useful life of 15 years, with 4 ¾ years of scheduled amortization remaining. The aggregate net balance of identifiable intangible assets was $29.6 million as of December 31, 2024.

Current wording

Intangible assets originated from our reorganization and application of fresh start accounting as of September 30, 2014. The intangible assets represented the fair value adjustment to the assets and liabilities for our LEU segment. The identifiable intangible assets relate to our LEU segment backlog and customer relationships. The backlog intangible asset is amortized as the backlog, valued at emergence, is reduced, principally as a result of deliveries to customers. The customer relationships intangible asset is amortized using the straight-line method over the estimated average useful life of 15 years, with 3 ¾ years of scheduled amortization remaining. The aggregate net balance of identifiable intangible assets was $21.2 million as of December 31, 2025.

Previous wording

Components of retirement benefit expense/income other than service cost are presented in our Consolidated Statements of Operations as Nonoperating Components of Net Periodic Benefit Income. These components consist primarily of the return on plan assets, offset by interest cost as the discounted present value of benefit obligations nears payment. Results also reflect claims experience, changes in mortality and healthcare claim assumptions and changes in market interest rates. Service cost is recognized in Cost of Sales (for the LEU segment) and Selling, General and Administrative expense.

Current wording

Components of retirement benefit expense/income other than service cost are presented in our Consolidated Statements of Operations as Nonoperating Components of Net Periodic Benefit Loss (Income). These components consist primarily of the return on plan assets, offset by interest cost as the discounted present value of benefit obligations nears payment. Results also reflect claims experience, changes in mortality and healthcare claim assumptions and changes in market interest rates. Service cost is recognized in Cost of Sales (for the LEU segment) and Selling, General and Administrative expenses.

Previous wording

Nonoperating Components of Net Periodic Benefit Income netted to income of $14.7 million, $23.2 million, and $6.6 million for the year ended December 31, 2024, 2023, and 2022, including a net actuarial gain of $17.9 million for the year ended December 31, 2024, net actuarial gain of $24.6 million for the year ended December 31, 2023, and net actuarial loss of $7.8 million for the year ended December 31, 2022. For the year ended December 31, 2024, the net actuarial gain reflected an annuitization in May 2024, favorable investment returns relative to the expected return assumption and an increase in interest rates from approximately 5.2% to 5.65%, partially offset by unfavorable investment returns relative to the expected return assumption. For the year ended December 31, 2023, the net actuarial gain reflected favorable investment returns relative to the expected return assumption, partially offset by a decrease in interest rates from approximately 5.5% to 5.2%. For the year ended December 31, 2022, the net actuarial loss reflected unfavorable investment returns relative to the expected return assumption, partially offset by an increase in interest rates from approximately 2.8% to 5.5%, favorable investment returns relative to the expected return assumption, and healthcare claims assumption, partially offset by changes in mortality, healthcare costs trend assumptions, and claims experience.

Current wording

Nonoperating Components of Net Periodic Benefit Loss (Income) netted to loss of $6.8 million, income of $14.7 million, and income of $23.2 million for the year ended December 31, 2025, 2024, and 2023, including a net actuarial loss of $2.9 million, gain of $17.9 million, and gain of $24.6 million for the year ended December 31, 2025, 2024, and 2023, respectively. For the year ended December 31, 2025, the net actuarial loss reflected unfavorable investment returns relative to the expected return assumption and a decrease in interest rates from approximately 5.7% to 5.6%. For the year ended December 31, 2024, the net actuarial gain reflected an annuitization in May 2024, favorable investment returns relative to the expected return assumption and an increase in interest rates from approximately 5.2% to 5.7%, partially offset by unfavorable investment returns relative to the expected return assumption. For the year ended December 31, 2023, the net actuarial loss reflected favorable investment returns relative to the expected return assumption, partially offset by a decrease in interest rates from approximately 5.5% to 5.2%.

Showing the first 40 of 77 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. On June 17, 2025, the DOE exercised Option 1a of Phase 3 of the HALEU Operation Contract with a period of performance extending through June 30, 2026. Option 1a of Phase 3 of the HALEU Operation Contract has a contract value and related funding of $108.2 million.

Current report — wording carried from elsewhere

The proceeds from both the 2.25% Convertible Notes and the 0.0% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes.

Current report — wording carried from elsewhere

The Company filed an automatic shelf registration statement on Form S-3 (File No. 333-291305) with the SEC on November 6, 2025, which was supplemented by a prospectus supplement dated November 6, 2025. Pursuant to these filings, the Company may offer and sell up to $1.0 billion in securities, in aggregate. The Company retains broad discretion over the use of the net proceeds from the sale of the securities offered.
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

Nonoperating Components of Net Periodic Benefit Income

Previous report — wording carried elsewhere

On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and expanding its manufacturing capacity at our facility in Oak Ridge, Tennessee. The Company is investing an additional $60.0 million over an 18 month period to lay the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio.