Skip to main content

CENTRUS ENERGY CORP

For the period ended Sep 30, 2025. Filed Nov 6, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2025 · Filed Nov 6, 2025

LEU$104.60+17.5%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-06-30; filed 2025-08-06.

0001065059-25-000058

Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-09-30; filed 2025-11-06.

0001628280-25-049844

Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 207 previous paragraphs and 210 current paragraphs.

121 unchanged; 65 reworded; 21 added; 15 removed; 6 previous and 3 current paragraphs rearranged.

Tables are not compared: 6 previous and 6 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (21)

Current report

Under the HALEU Operation Contract, the Company has submitted several change order requests for work being performed on infrastructure, facility repairs, and 5B Cylinders. The additional work is being performed under the DOE Contracting Officer’s approval or contract modifications. On September 28, 2023, the DOE modified the HALEU Operation Contract to incorporate additional scope for infrastructure and facility repairs, and costs associated with 5B Cylinder refurbishment, for an estimated additional contract value of $5.8 million, without a cost-share provision. DOE is now obligated for costs up to the contract value of $8.8 million for the additional scope work.

Current report

On June 30, 2025, the Company provided notice to the noteholders that the notes became convertible at the option of the holders beginning on July 1, 2025, and ending at the close of business on September 30, 2025. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of the calendar quarter ended June 30, 2025, was greater than 130% of the conversion price in effect on each applicable trading day. No notes were converted during that period.

Current report

On September 30, 2025, the Company provided notice to the noteholders that the notes became convertible at the option of the holders beginning on October 1, 2025, and ending at the close of business on December 31, 2025. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of the calendar quarter ended September 30, 2025, was greater than 130% of the conversion price in effect on each applicable trading day. As of October 31, 2025, no notes have been converted under this recent conversion period.

Current report

On August 18, 2025, the Company issued 0% Convertible Notes with an aggregate principal amount of $805.0 million, due August 15, 2032, unless earlier repurchased, redeemed or converted. The proceeds from the 0% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes.

Current report

Nine Months Ended September 30, 2025 Compared with Nine Months Ended September 30, 2024

Current report

Nine Months Ended September 30, 2025 Compared with Nine Months Ended September 30, 2024

Current report

We expect to increase our capital expenditures by approximately several hundred million, driven by ongoing investments and a strategic shift towards our Manufacturing Readiness plan and Ohio expansion. This is supported by our strong liquidity position, though we are monitoring inflationary pressures that may affect the cost of materials and equipment. There are no guarantees about whether or when funding by the DOE for such expansion would be awarded.

Current report

On September 25, 2025, Centrus announced plans for a major expansion of its uranium capacity in Piketon, Ohio, including plans for large-scale production of both LEU and HALEU to meet commercial and government requirements. The ultimate size and scale of this expansion depends on several factors, including upon federal funding decisions by the DOE - including potential funding for LEU enrichment, HALEU enrichment, HALEU deconversion, and national security - but a large-scale expansion would represent a multi-billion dollar private and public investment to expand Centrus’ uranium enrichment capacity.

Current report

The Company recognized income related to these events of $0.2 million $16.8 million in the three and nine months ended September 30, 2024, respectively, in Nonoperating Components of Net Periodic Benefit Loss (Income)in the Consolidated Statements of Operations.

Current report

Capital expenditures were $10.1 million and $3.4 million for the nine months ended September 30, 2025 and 2024, respectively.

Current report

For the nine months ended September 30, 2025, cash of $782.4 million was provided from net proceeds related to the issuance of the 0% Convertible Notes. Refer to Note 6, Debt, of the Consolidated Financial Statements regarding the accounting for the 0% Convertible Notes.

Current report

On August 18, 2025, the Company issued, in a Rule 144A offering, 0% Convertible Notes with an aggregate principal amount of $805.0 million, due August 15, 2032, unless earlier repurchased, redeemed or converted. The proceeds from the 0% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes. The 0% Convertible Notes will not bear regular interest, and the principal amount of the notes will not accrete. The Company incurred approximately $22.5 million in issuance costs for the issuance of the 0% Convertible Notes. Additional terms and conditions of the 0% Convertible Notes are described in Note 6, Debt, of the Consolidated Financial Statements.

Current report

On June 30, 2025, the Company provided notice to the noteholders that the notes became convertible at the option of the holders beginning on July 1, 2025, and ending at the close of business on September 30, 2025. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of the calendar quarter ended June 30, 2025, was greater than 130% of the conversion price in effect on each applicable trading day. No notes were converted during that period

Current report

On September 30, 2025, the Company provided notice to the noteholders that the notes became convertible at the option of the holders beginning on October 1, 2025, and ending at the close of business on December 31, 2025. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of the calendar quarter ended September 30, 2025, was greater than 130% of the conversion price in effect on each applicable trading day. As of October 31, 2025, no notes have been converted under this recent conversion period.
Removed paragraphs (15)

Previous report

1 International Atomic Energy Agency, “Global Inventories of Secondary Uranium Supplies” (IAEA-TECDOC-2030), p. 54 (2023).

Previous report

While the obligation to furnish compliant 5B Cylinders under the HALEU Operation Contract continues to rest with the DOE, Centrus has worked to help the DOE to secure additional cylinders. To support the DOE in mitigating the risk of further delays in delivery of 5B Cylinders, the Company received Contracting Officer approval and a contract modification from the DOE to procure compliant 5B Cylinders and components.

Previous report

Six Months Ended June 30, 2025 Compared with Six Months Ended June 30, 2024

Previous report

Selling, general and administrative costs were $9.2 million and $7.1 million for the six months ended June 30, 2025 and 2024, respectively, an increase of $2.1 million (or 30%). This increase was due primarily to an increase in marketing costs.

Previous report

Six Months Ended June 30, 2025 Compared with Six Months Ended June 30, 2024

Previous report

Selling, general and administrative costs were $17.0 million and $15.0 million for the six months ended June 30, 2025 and 2024, respectively, an increase of $2.0 million (or 13%). This increase was due primarily to an increase in marketing costs.

Previous report

Capital expenditures of approximately $44.7 million are anticipated over the next 12 months.

Previous report

Capital expenditures were $5.7 million and $2.4 million for the six months ended June 30, 2025 and 2024, respectively.
Reworded paragraphs (65)

Previous wording

LEU is a critical component in the production of nuclear fuel for reactors that produce electricity. We supply LEU and its components to both domestic and international utilities for use in nuclear reactors worldwide. We provide LEU from multiple sources, including medium- and long-term supply contracts, and spot purchases and our inventory. As a long-term supplier of LEU to our customers, our objective is to provide value through the reliability and diversity of our supply sources.

Current wording

LEU is a critical component in the production of nuclear fuel for reactors that produce electricity. We supply LEU and its components to both domestic and international utilities for use in nuclear reactors worldwide. We provide LEU from multiple sources, including medium- and long-term supply contracts, spot purchases and our inventory. As a long-term supplier of LEU to our customers, our objective is to provide value through the reliability and diversity of our supply sources.

Previous wording

Published spot price indicators for SWU reached previous historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a period of price increases, which reached $195 per SWU by December 31, 2024, which surpassed the previous historic high. As of June 30, 2025, spot prices were $190 per SWU. This represents a decrease of 3% since the beginning of the year but an increase of 459% over the 2018 historic low. This surge in the SWU spot price beginning in 2022 has been driven primarily by uncertainty created as a result of the war in Ukraine, coupled with growing interest in nuclear power as a source of reliable carbon-free energy. The contemplation of imposition of tariffs on LEU, and if ultimately imposed, may put additional upward pressure on the price of SWU.

Current wording

Published spot price indicators for SWU reached previous historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a period of price increases, which reached $195 per SWU by December 31, 2024, which surpassed the previous historic high. As of September 30, 2025, spot prices were $220 per SWU. This represents an increase of 13% since the beginning of the year and an increase of 547% over the 2018 historic low. This surge in the SWU spot price beginning in 2022 has been driven primarily by uncertainty created as a result of the war in Ukraine, coupled with growing interest in nuclear power as a source of reliable carbon-free energy. The contemplation of the imposition of tariffs on LEU, if ultimately imposed, may put additional upward pressure on the price of SWU.

Previous wording

When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied. But without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy. A report issued by the International Atomic Energy Agency in 2023 reported that while U.S. utilities may have enough inventory to cover one reload of their reactors, “truly strategic physical stockpiles are almost non-existent.”1

Current wording

When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied. But without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy.

Previous wording

On November 10, 2022, the DOE notified Centrus that the Company had been awarded the HALEU Operation Contract and work began on December 1, 2022. The base contract value was approximately $150.0 million with two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF 6 by no later than December 31, 2023. On November 7, 2023, the Company announced that it made its first contractual delivery of HALEU to the DOE, completing Phase 1 by successfully demonstrating its HALEU production process.

Current wording

On November 10, 2022, the DOE awarded the HALEU Operation Contract to the Company with a base contract value of approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF 6. On November 7, 2023, the Company announced that it made its first contractual delivery of HALEU to the DOE, completing Phase 1.

Previous wording

During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract, which included production of 900 kilograms of HALEU UF 6 per year, as well as continued operations and maintenance. Phase 2 had an initial contract value of approximately $90.0 million and the Company is being compensated on a cost-plus-incentive-fee-basis. The DOE owns the HALEU produced from the demonstration cascade. The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. Pursuant to an amendment to the Company’s lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.

Current wording

During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract, which included production of 900 kilograms of HALEU UF 6 for one production year, as well as continued operations and maintenance of the cascade. Phase 2 included an initial contract value of approximately $90.0 million and compensation on a cost-plus-incentive-fee-basis. The DOE owns any HALEU produced from the demonstration cascade. The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE’s sole discretion and subject to the availability of Congressional appropriations. Pursuant to an amendment to the Company’s lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.

Previous wording

Under the HALEU Operation Contract, DOE is contractually obligated to provide the 5B Cylinders necessary to collect the output of the cascade, but supply chain challenges had created difficulties for DOE in securing enough 5B Cylinders for the entire production year under Phase 2. During time periods when 5B Cylinders were insufficient, the Company was able to continue operations of the cascade, but did not produce HALEU as it did not have 5B Cylinders to store the enriched uranium. Due to these delays, Centrus was unable to achieve contractual delivery of the 900 kilograms of HALEU UF 6 by the date set for the end of Phase 2 performance. Centrus’ contractual delivery obligation of 900 kilograms by November 2024, was conditioned on DOE’s ability to provide the 5B Cylinders on a timeline that allowed for continuous production throughout Phase 2 of the contract. In light of the delays, on November 5, 2024, the HALEU Operation Contract was modified to extend the Phase 2 period of performance to June 30, 2025. On June 25, 2025, the Company announced that it had produced and contractually delivered to the DOE 900 kilograms of HALEU under the HALEU Operation Contract, thereby achieving the Phase 2 production target. As of June 30, 2025, the total Phase 2 contract value and funded value is $169.1 million. The fee for the Phase 2 period of performance that was extended beyond November 30, 2024 was not definitized and is subject to negotiation.

Current wording

Under the HALEU Operation Contract, DOE is contractually obligated to provide the 5B Cylinders necessary to collect the output of the cascade, but supply chain challenges created difficulties for DOE in securing enough 5B Cylinders for the entire Phase 2 production year. During time periods when 5B Cylinders were insufficient, the Company was not able to produce HALEU as it did not have 5B Cylinders to store the enriched uranium. Due to these delays, Centrus was unable to achieve contractual delivery of the 900 kilograms of HALEU UF 6 by November 2024, which was the date set for the end of Phase 2 performance. On November 5, 2024, the HALEU Operation Contract was modified to extend the Phase 2 period of performance to June 30, 2025 which allowed the Company to produce and contractually deliver the Phase 2 production target of 900 kilograms of HALEU to DOE. On August 20, 2025, the DOE modified the HALEU Operation contract to further extend the Phase 2 period of performance through October 31, 2025 to allow the Company to complete outstanding change orders. As of September 30, 2025, the total Phase 2 contract value and funded value is $170.1 million. The fee for the Phase 2 period of performance that was extended beyond November 30, 2024 was not definitized and is subject to negotiation.

Previous wording

On June 17, 2025, the DOE issued an amendment to the HALEU Operation Contract that split the first three-year option period into a first option period of one year (“Option 1a”) and a second option period of two years (“Option 1b”). The amendment establishes a target cost and fee for Option 1a of approximately $99.3 million and $8.7 million, respectively, and a target cost and fee for Option 1b of $163.5 million and $15.2 million, respectively. Additionally, the Amendment acknowledges that the estimated cost associated with Option 1b is insufficient to support full performance due to known cost increases since award of the HALEU Operation Contract, and indicates that the Company will need to submit a revised cost proposal for review and negotiation prior to DOE’s consideration of Option 1b. In conjunction with the amendment, the DOE exercised Option 1a and extended the period of performance to June 30, 2026. As of June 30, 2025, Option 1a is funded for the contract value of $108.0 million.

Current wording

On June 17, 2025, the DOE issued an amendment to the HALEU Operation Contract that split the first three-year option period into a first option period of one year (“Option 1a”) and a second option period of two years (“Option 1b”). The amendment established a target cost and fee for Option 1a of approximately $99.3 million and $8.7 million, respectively, and a target cost and fee for Option 1b of $163.5 million and $15.2 million, respectively. Additionally, the Amendment acknowledges that the estimated cost associated with Option 1b is insufficient to support full performance due to known cost increases since award of the HALEU Operation Contract and indicates that the Company will need to submit a revised cost proposal for review and negotiation prior to DOE’s consideration of Option 1b. In conjunction with the amendment, the DOE exercised Option 1a and extended the period of performance to June 30, 2026. As of September 30, 2025, Option 1a is funded for the contract value of $108.2 million.

Previous wording

Congress has appropriated a total of $3.4 billion to the DOE to jumpstart U.S. nuclear fuel production, including both LEU and HALEU. Based on this funding, the DOE issued a series of three RFPs covering HALEU production, HALEU deconversion, and LEU production. In late 2024, the Department made initial selections under each of the RFPs. Centrus was among the awardees for all three RFPs under an IDIQ structure.

Current wording

Congress has appropriated a total of approximately $3.4 billion to the DOE to jumpstart U.S. nuclear fuel production, including both LEU and HALEU enrichment. Based on this funding, the DOE issued a series of three RFPs covering HALEU production, HALEU deconversion, and LEU production. In late 2024, the DOE made initial selections under each of the RFPs. Centrus was among the awardees for all three RFPs under IDIQ structures.

Previous wording

Each of these IDIQ awards carries a $2.0 million contract minimum for each awardee, and is subject to an overall contract ceiling covering all awardees. Under the IDIQ awards, the DOE can issue task orders to the awardees and then allocate available funding to those task orders. The ultimate value of the awards to Centrus -- and the potential scale of the expansion supported -- will depend upon the scope of task orders that DOE may subsequently issue under the contracts for which the Company intends to compete.

Current wording

Each of these IDIQ awards carries a $2.0 million contract minimum for each awardee and is subject to an overall contract ceiling covering all awardees. Under the IDIQ awards, the DOE can issue task orders to the awardees and then allocate available funding to those task orders. The ultimate value of the awards to Centrus, and the scale of the expansion supported, will depend upon the scope of task orders that DOE may subsequently issue under the contracts for which the Company intends to compete.

Previous wording

Of the $3.4 billion in appropriated funds, $700 million specifically related to HALEU is from the Inflation Reduction Act (“IRA”). Executive Order 14154, issued on January 20, 2025, directed executive agencies of the U.S. federal government to pause the distribution of federal funding, including funding appropriated under the IRA, pending a review of programs for issuing grants, loans, contracts, or any other financial disbursements. While implementation of the funding pause is currently subject to legal challenges, the ultimate outcomes, and DOE actions during the pendency, of these legal challenges remain uncertain. Should the pause continue to be implemented, the timing of the pause and subsequent review, as well as the outcome of such review, remain uncertain.

Current wording

Of the approximately $3.4 billion in appropriated funds, $700 million specifically related to HALEU is from the Inflation Reduction Act (“IRA”). Executive Order 14154, issued on January 20, 2025, directed executive agencies of the U.S. federal government to pause the distribution of federal funding, including funding appropriated under the IRA, pending a review of programs for issuing grants, loans, contracts, or any other financial disbursements. While implementation of the funding pause is currently subject to legal challenges, the ultimate outcomes, and DOE actions during the pendency, of these legal challenges remain uncertain. Should the pause continue to be implemented, the timing of the pause and subsequent review, as well as the outcome of such review, remain uncertain.

Previous wording

On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and the expansion of its manufacturing capacity at its facility in Oak Ridge, Tennessee. The Company is investing approximately $60.0 million over an 18 month period in this effort, which will help lay the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio.

Current wording

On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and the expansion of its manufacturing capacity at its facility in Oak Ridge, Tennessee. The Company is investing approximately $60.0 million over an 18-month period for this effort, which will help lay the groundwork to support the planned large-scale expansion of uranium enrichment in Piketon, Ohio.

Previous wording

The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The §48C program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the Internal Revenue Service (“IRS”) granted our request for a $62.4 million credit allocation for this facility. Centrus now has two years from that date to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation. It is uncertain how Executive Order 14154 will impact the IRS determination regarding our application request. For further details refer to Liquidity and Capital Resources in this Quarterly Report on Form 10-Q.

Current wording

The Qualifying Advanced Energy Project Credit (“§48C”) was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The §48C program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the Internal Revenue Service (“IRS”) granted our request for a $62.4 million credit allocation for this facility. Centrus has two years from that date to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation. It is uncertain how Executive Order 14154 will impact the IRS determination regarding our application request. For further details refer to Liquidity and Capital Resources in this Quarterly Report on Form 10-Q.

Previous wording

On November 7, 2024, the Company issued 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. The proceeds from the 2.25% Convertible Notes were to be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes. Pursuant to a notice of redemption issued on February 24, 2025, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the $74.3 million aggregate principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million related to the extinguishment of the long-term debt.

Current wording

On November 7, 2024, the Company issued 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. The proceeds from the 2.25% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes.

Previous wording

While the monthly price indicators have increased for several years, the uranium enrichment segment of the nuclear fuel market remains oversupplied and faces uncertainty about future demand for nuclear power generation. However, without Russian supply, the global market would be undersupplied for uranium enrichment. Recent data from the International Trade Commission shows a significant increase in the importation of enriched uranium into the U.S. from China beginning in 2023. If this trend continues, it will likely result in significant changes in the competitive landscape that will affect pricing trends and customer spending patterns and create uncertainty and likely have a negative impact on our business. To address these changes, we have taken steps to adjust our cost structure; we may seek further adjustments to our cost structure and operations and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.

Current wording

While the monthly price indicators have increased for several years, the uranium enrichment segment of the nuclear fuel market remains oversupplied and faces uncertainty about future demand for nuclear power generation. However, without Russian supply, the global market would be undersupplied for uranium enrichment. Recent data from the International Trade Commission shows a significant increase in the importation of enriched uranium into the U.S. from China beginning in 2023. If this trend continues, it will likely result in significant changes in the competitive landscape that will affect pricing trends, affect customer spending patterns, create uncertainty and likely have a negative impact on our business. To address these changes, we have taken steps to adjust our cost structure; we may seek further adjustments to our cost structure and operations and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.

Previous wording

According to the WNA, as of June 2025, there were 69 reactors under construction worldwide, approximately one-half of which are in China. The United States, with over 90 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years. Eight U.S. reactors have prematurely shut down in the past ten years, and others could shut down in the next few years. At the same time, construction was completed and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart.

Current wording

According to the WNA, as of September 2025, there were 70 reactors under construction worldwide, approximately one-half of which are in China. The United States, with over 90 operating reactors, remains the world’s largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years. Eight U.S. reactors have prematurely shut down in the past ten years, and others could shut down in the next few years. At the same time, construction was completed, and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart.

Previous wording

The war in Ukraine escalated tensions between Russia and the international community. As a result, the United States and other countries imposed, including through the United States’s enactment of the Import Ban Act discussed below, and may continue imposing, additional sanctions, tariffs, and export controls against certain Russian products, services, organizations, and/or individuals. Such additional restrictions could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business. Further, tariffs or sanctions by the United States, Russia or other countries may impact our ability and cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the current validity of the permit for continued shipments of LEU imports.

Current wording

The war in Ukraine escalated tensions between Russia and the international community. As a result, the United States and other countries imposed, including through the United States’ enactment of the Import Ban Act discussed below, and may continue imposing, additional sanctions, tariffs, and export controls against certain Russian products, services, organizations, and/or individuals. Such additional restrictions could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business. Further, tariffs or sanctions by the United States, Russia or other countries may impact our ability and the cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the expiration of the permit for continued shipments of LEU imports.

Previous wording

In response to the war in Ukraine, on May 13, 2024, the Import Ban Act was enacted. This law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. In accordance with the instructions published by the DOE on May 24, 2024, the Company filed its first waiver request application on May 27, 2024, to permit the importation of LEU already committed for delivery to its U.S. customers in 2024 through 2027. On July 18, 2024, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025. For the years 2026 and 2027, the DOE deferred its decision to an unspecified date closer in time to the deliveries. On June 7, 2024, the Company filed a second waiver request application to allow for importation of LEU from Russia for processing and reexport to the Company's foreign customers. On October 31, 2024, the DOE issued its determination waiving the prohibition of the importation of such material to our foreign customers scheduled in 2025. On December 11, 2024, the Company filed a third waiver request application to allow for importation of LEU from Russia in 2026 and 2027 for use in future sales to our U.S. customers. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, would have a negative material impact on our business. Through 2027, well over one-half of the LEU that we expect to deliver to customers was sourced under the TENEX Supply Contract. While we have other sources of supply, they are not sufficient to replace the TENEX supply. It is uncertain whether any waiver would be granted in response to our pending or any potential future applications and, if granted, whether any waiver would be granted in a timely manner for us to benefit from it.

Current wording

In response to the war in Ukraine, on May 13, 2024, the U.S enacted the Import Ban Act. This law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. In accordance with the instructions published by the DOE on May 24, 2024, the Company filed its first waiver request application on May 27, 2024, to permit the importation of LEU already committed for delivery to its U.S. customers in 2024 through 2027. On July 18, 2024, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025. For the years 2026 and 2027, the DOE deferred its decision to an unspecified date closer in time to the deliveries. On August 4, 2025, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2026 and 2027. On June 7, 2024, the Company filed a second waiver request application to allow for importation of LEU from Russia for processing and reexport to the Company's foreign customers. On October 31, 2024, the DOE issued its determination waiving the prohibition of the importation of such material to our foreign customers scheduled in 2025. On December 11, 2024, the Company filed a third waiver request application to allow for importation of LEU from Russia in 2026 and 2027 for use in future sales to our U.S. customers. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, would have a negative material impact on our business. Through 2027, well over one-half of the LEU that we expect to deliver to customers was sourced under the TENEX Supply Contract. While we have other sources of supply, they are not sufficient to replace the TENEX supply. It is uncertain whether any waiver would be granted in response to our pending or any potential future applications and, if granted, whether any waiver would be granted in a timely manner for us to benefit from it.

Previous wording

On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2025, that rescinded TENEX’s general license to export LEU to the United States or to entities registered in the United States. Accordingly, TENEX is required to obtain a specific export license from the Russian authorities for each shipment to Centrus through 2025. Except for the initial delay, TENEX has received specific licenses to satisfy shipments to Centrus in the regular course of business. But Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner and not rescinded prior to the shipment taking place.

Current wording

On November 14, 2024, the government of the Russian Federation passed the Russian Decree, effective through December 31, 2025, that rescinded TENEX’s general license to export LEU to the United States or to entities registered in the United States. Accordingly, TENEX is required to obtain a specific export license from the Russian authorities for each shipment to Centrus through 2025. Except for the initial delay, TENEX has received specific licenses to satisfy shipments to Centrus in the regular course of business. However, Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner and not rescinded prior to the shipment taking place.

Previous wording

Since the enactment of the Import Ban Act and through the issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses to make future deliveries or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, including a material adverse effect on the Company.

Current wording

Since the enactment of the Import Ban Act and through the issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses to make future deliveries or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, which would have a material adverse effect on the Company.

Previous wording

On April 15, 2025, the President of the United States signed an Executive Order initiating a Department of Commerce investigation under Section 232 of the Trade Expansion Act of 1962, to determine whether imports of processed critical minerals, including uranium, and their derivative products threaten to impair national security. The Executive Order acknowledges the United States manufacturing and defense industrial bases’ dependence on foreign sources, which are at risk of long-term supply chain issues which may impact the United States’ access to critical minerals. The results of the investigation could result in an imposition of, or increase in tariffs, on these products or other trade restrictions from our international suppliers which could significantly increase our costs and have a material adverse effect on our financial position and results of operations. The administration may impose tariffs before the outcome of the referenced investigation or may decide not to impose tariffs if the outcome of the investigation would justify the imposition of tariffs.

Current wording

On April 15, 2025, the President of the United States signed an Executive Order initiating a Department of Commerce investigation under Section 232 of the Trade Expansion Act of 1962, to determine whether imports of processed critical minerals, including uranium, and their derivative products threaten to impair national security. The Executive Order acknowledges the United States manufacturing and defense industrial bases’ dependence on foreign sources, which are at risk of long-term supply chain issues which may impact the United States’ access to critical minerals. The results of the investigation could result in an imposition of, or increase in tariffs, on these products or other trade restrictions from our international suppliers which could significantly increase our costs and have a material adverse effect on our financial position and results of operations. The administration may impose tariffs before the outcome of the investigation or may decide not to impose tariffs if the outcome of the investigation would justify the imposition of tariffs.

Previous wording

In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. For example, effective January 10, 2025, the U.S. Secretary of the Treasury, made a determination pursuant to section l(a)(i) of Executive Order 14024, to apply certain sanctions to any person determined, pursuant to that section, to operate or have operated in “the energy sector of the Russian Federation economy.” TENEX’s financial institutions have had challenges in accepting payments denominated in U.S. dollars and the Company and TENEX have agreed to delay certain payments under the TENEX Supply Contract as the parties review payment processing options. Additionally, on April 17, 2025, the Office of the United States Trade Representative (“USTR”) released a notice issuing the results of its investigation into China’s dominance in the maritime, logistics, and shipbuilding sectors pursuant to Section 302(a) of the Trade Act of 1974, as amended. The USTR imposed new service fees on Chinese-built vessels entering U.S. ports above certain capacity. Our shipper of Russian LEU from Russia to the U.S. uses ships manufactured in China which happen to be exempt from the new fees under this notice. However, these fees would be significant if they were to be imposed on our shipper of Russian LEU. If the USTR changes its position and does not exempt the type of vessel our shipper uses, then the additional fees imposed on our shipper for docking at U.S. ports would be cost prohibitive and would have a significant impact on our ability to transport Russian LEU and would also have a material adverse effect on our financial position and results of operations. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.

Current wording

In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. For example, effective January 10, 2025, the U.S. Secretary of the Treasury, made a determination pursuant to section l(a)(i) of Executive Order 14024, to apply certain sanctions to any person determined, pursuant to that section, to operate or have operated in “the energy sector of the Russian Federation economy.” TENEX’s financial institutions have had challenges in accepting payments denominated in U.S. dollars and the Company and TENEX have agreed to delay certain payments under the TENEX Supply Contract as the parties review payment processing options. Additionally, on April 17, 2025, the Office of the United States Trade Representative (“USTR”) released a notice issuing the results of its investigation into China’s dominance in the maritime, logistics, and shipbuilding sectors pursuant to Section 302(a) of the Trade Act of 1974, as amended. The USTR imposed new service fees on Chinese-built vessels entering U.S. ports above certain capacity. Our shipper of Russian LEU from Russia to the U.S. uses ships manufactured in China which happen to be exempt from the new fees under this notice. However, these fees would be significant if they were to be imposed on our shipper. If the USTR changes its position and does not exempt the type of vessel our shipper uses, then the additional fees imposed on our shipper for docking at U.S. ports would be cost prohibitive, would have a significant impact on our ability to transport Russian LEU and would also have a material adverse effect on our financial position and results of operations. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.

Previous wording

For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2024.

Current wording

For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors in our Annual Report on Form 10-K for the year ended December 31, 2024 and under Part II, Item 1A, Risk Factors of this Quarterly Report on Form 10-Q.

Previous wording

•Our ability to obtain waivers to allow us to import LEU from Russia in 2026 and 2027 so that we may continue supplying LEU to our customers, given the enactment of the Import Ban Act in May 2024;

Current wording

•Our ability to obtain additional waivers to allow us to import LEU from Russia in 2026 and 2027 so that we may continue supplying LEU to our customers, given the enactment of the Import Ban Act in May 2024;

Previous wording

•Our ability to be awarded task orders under any of the HALEU Production Contract, LEU Production Contract or HALEU Deconversion Contract;

Current wording

•Our ability to be awarded additional task orders under any of the HALEU Production Contract, LEU Production Contract or HALEU Deconversion Contract;

Previous wording

For further discussion of these uncertainties, refer to Part I, Item 1A, Risk Factors, in our Annual Report on Form 10-K for the year ended December 31, 2024.

Current wording

For further discussion of these uncertainties, refer to Part I, Item 1A, Risk Factors, in our Annual Report on Form 10-K for the year ended December 31, 2024 and under Part II, Item 1A, Risk Factors of this Quarterly Report on Form 10-Q.

Previous wording

The Company’s backlog is $3.6 billion and $3.7 billion as of June 30, 2025 and December 31, 2024, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.

Current wording

The Company’s backlog is $3.9 billion and $3.7 billion as of September 30, 2025 and December 31, 2024, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.

Previous wording

Our backlog in the LEU segment extends to 2040. As of June 30, 2025 and December 31, 2024, our backlog was approximately $2.7 billion and $2.8 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments and approximately $2.1 billion in contingent LEU sales commitments, with $1.7 billion of the total under definitive agreements and $0.4 billion of the total subject to entering into definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. The contingent sales commitments depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.2 billion of deferred revenue and advances from customers as of June 30, 2025, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to significant risks and uncertainties, including existing import laws and restrictions such as the RSA, which limits imports of Russian uranium products into the United States and applies to our sales using material procured under the TENEX Supply Contract, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.

Current wording

Our backlog in the LEU segment extends to 2040. As of September 30, 2025 and December 31, 2024, our backlog was approximately $3.0 billion and $2.8 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments and approximately $2.3 billion in contingent LEU sales commitments, with $2.1 billion of the total under definitive agreements and $0.2 billion of the total subject to entering into definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. The contingent sales commitments depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.2 billion of deferred revenue and advances from customers as of September 30, 2025, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to other significant risks and uncertainties, including existing trade laws and restrictions such as the RSA, Import Ban Act, and the Russian Decree, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.

Previous wording

Revenue from our LEU segment accounted for approximately 81% and 78% of our total revenue for the three and six months ended June 30, 2025, respectively. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 37% of revenue from our LEU segment since 2023. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in the six months ended June 30, 2025 averaged approximately $12.6 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results period over period.

Current wording

Revenue from our LEU segment accounted for approximately 60% and 73% of our total revenue for the three and nine months ended September 30, 2025, respectively. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 37% of revenue from our LEU segment since 2023. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride or uranium concentrates to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in the nine months ended September 30, 2025 averaged approximately $12.5 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results period over period.

Previous wording

The Import Ban Act, which bans the importation of LEU from Russia, may severely limit importation through 2027, unless we are successful in securing waivers for 2026 and 2027, and will cut off supply of LEU from Russia after 2027. Notwithstanding our ability to obtain waivers under the Import Ban Act, the Russian Decree, which prohibits the exportation of Russian LEU from Russia unless TENEX secures a permit for each shipment, may severely limit exportation of LEU from Russia through December 31, 2025. This has drawn attention to the potential for significant tightening of supplies in the market. Russian enrichment plants represent 44% of the world’s capacity, and Russian capacity significantly exceeds its domestic needs. According to data from the WNA, the annual enrichment requirements of reactors worldwide outside of Russia vastly exceeds the available supply of non-Russian enrichment, which potentially threatens the viability of some reactors, including those in the United States. While inventories and increased production at non-Russian plants may partially mitigate the shortfall, these options would not fully replace Russian supply. Deployment of new capacity ultimately could replace Russian enrichment, but this capacity will take a number of years and significant funding from private and/or government sources to come online. Centrus is seeking public and private funding to deploy new production capacity at its Piketon, Ohio, plant to help meet the need for new, domestic supplies of enriched uranium.

Current wording

The Import Ban Act, which bans the importation of LEU from Russia, may severely limit importation through 2027, unless we are successful in securing additional waivers for 2026 and 2027, and will cut off supply of LEU from Russia after 2027. Notwithstanding our ability to obtain waivers under the Import Ban Act, the Russian Decree, which prohibits the exportation of Russian LEU from Russia unless TENEX secures a permit for each shipment, may severely limit exportation of LEU from Russia through December 31, 2025. This has drawn attention to the potential for significant tightening of supplies in the market. Russian enrichment plants represent 43% of the world’s capacity, and Russian capacity significantly exceeds its domestic needs. According to data from the WNA, the annual enrichment requirements of reactors worldwide outside of Russia vastly exceeds the available supply of non-Russian enrichment, which potentially threatens the viability of some reactors, including those in the United States. While inventories and increased production at non-Russian plants may partially mitigate the shortfall, these options would not fully replace Russian supply. Deployment of new capacity ultimately could replace Russian enrichment, but this capacity will take a number of years and significant funding from private and/or government sources to come online. Centrus is seeking public and private funding to deploy new production capacity at its Piketon, Ohio plant to help meet the need for new, domestic supplies of enriched uranium.

Previous wording

Cost of sales for SWU and uranium is based on the amount of SWU and uranium hexafluoride sold and delivered during the period and unit inventory costs, which are determined using the average cost method. Changes in purchase costs have an effect on inventory costs and cost of sales. Cost of sales includes costs for inventory management at off-site licensed locations, as well as, certain legacy costs related to former employees of the Portsmouth GDP and Paducah GDP.

Current wording

Cost of sales for SWU and uranium is based on the amount of SWU, natural uranium hexafluoride and uranium concentrate sales delivered during the period and unit inventory costs, which are determined using the average cost method. Changes in purchase costs have an effect on inventory costs and cost of sales. Cost of sales includes costs for inventory management at off-site licensed locations as well as certain legacy costs related to former employees of the Portsmouth GDP and Paducah GDP.

Previous wording

Revenue from the LEU segment was $125.7 million and $169.6 million for the three months ended June 30, 2025 and 2024, respectively, a decrease of $43.9 million (or 26%). Uranium revenue decreased by $29.9 million as a result of a decrease in the volume of uranium sold. SWU revenue decreased by $14.0 million as a result of a 27% decrease in the volume of SWU sold, partially offset by a 24% increase in the average price of SWU sold.

Current wording

Revenue from the LEU segment was $44.8 million and $34.8 million for the three months ended September 30, 2025 and 2024, respectively, an increase of $10.0 million (or 29%). The Company had uranium revenue of $34.1 million for the three months ended September 30, 2025. SWU revenue decreased by $24.1 million as a result of a 69% decrease in the average price of SWU sold.

Previous wording

Revenue from the Technical Solutions segment was $28.8 million and $19.4 million for the three months ended June 30, 2025 and 2024, respectively, an increase of $9.4 million (or 48%). The increase in revenue is primarily attributable to a $9.1 million increase in revenue generated by the HALEU Operation Contract, while the remaining increase is related to other contracts. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phase 2 of the contract.

Current wording

Revenue from the Technical Solutions segment was $30.1 million and $22.9 million for the three months ended September 30, 2025 and 2024, respectively, an increase of $7.2 million (or 31%). The increase in revenue is primarily attributable to a $7.3 million increase in revenue generated by the HALEU Operation Contract, while the remaining change is related to other contracts. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phases 2 and 3 of the contract.

Previous wording

Cost of sales for the LEU segment was $75.0 million and $136.6 million for the three months ended June 30, 2025 and 2024, respectively, a decrease of $61.6 million (or 45%). SWU costs decreased as a result of a 27% decrease in the volume of SWU sold and an 8% decrease in the average unit cost of SWU sold. Uranium costs decreased primarily as a result of a decrease in the volume of uranium sold. Cost of sales for both the three months ended June 30, 2025 and 2024, included $1.5 million for the revaluation of inventory loans.

Current wording

Cost of sales for the LEU segment was $52.6 million and $29.6 million for the three months ended September 30, 2025 and 2024, respectively, an increase of $23.0 million (or 78%). Uranium costs increased primarily as a result of an increase in the volume of uranium sold. SWU costs decreased as a result of a 41% decrease in the average unit cost of SWU sold. Cost of sales for the three months ended September 30, 2025 and 2024, included $0.5 million and $1.9 million, respectively, for the revaluation of inventory loans.

Previous wording

Cost of sales for the Technical Solutions segment was $25.6 million and $15.9 million for the three months ended June 30, 2025 and 2024, respectively, an increase of $9.7 million (or 61%). The increase is primarily attributable to a $9.7 million increase in costs incurred under the HALEU Operation Contract.

Current wording

Cost of sales for the Technical Solutions segment was $26.6 million and $19.2 million for the three months ended September 30, 2025 and 2024, respectively, an increase of $7.4 million (or 39%). The increase is primarily attributable to an $8.5 million increase in costs incurred under the HALEU Operation Contract, while the remaining change is attributable to other contracts.

Previous wording

Gross profit for the LEU segment was $50.7 million and $33.0 million for the three months ended June 30, 2025 and 2024, respectively, an increase of $17.7 million (or 54%). LEU customers generally have multi-year contracts that carry annual purchase commitments, not quarterly commitments. The gross profit in our LEU business varies based upon the timing of those contracts. The pricing applied to deliveries varies depending upon the market conditions at the time the contract was signed. The increase for the three months ended June 30, 2025 was due to the composition of contracts in the current quarter, compared to the prior quarter.

Current wording

Gross profit (loss) for the LEU segment netted to a loss of $7.8 million and profit of $5.2 million for the three months ended September 30, 2025 and 2024, respectively, a decrease of $13.0 million (or 250%). LEU customers generally have multi-year contracts that carry annual purchase commitments, not quarterly commitments. The gross profit in our LEU business varies based upon the timing of those contracts. The pricing applied to deliveries varies depending upon the market conditions at the time the contract was signed. The decrease for the three months ended September 30, 2025 was primarily due to the composition of contracts in the current quarter, compared to the prior quarter.

Previous wording

Gross profit for the Technical Solutions segment was $3.2 million and $3.5 million for the three months ended June 30, 2025 and 2024, respectively, a decrease of $0.3 million (or 9%). The decrease was primarily attributable to the factors discussed above. Because of the delay in completing Phase 2 of the HALEU Operation Contract, in November 2024, DOE extended the Phase 2 period of performance to June 30, 2025. Costs incurred subsequent to the extension have not yet been subject to a fee as this portion of Phase 2 remains undefinitized and is subject to negotiation.

Current wording

Gross profit for the Technical Solutions segment was $3.5 million and $3.7 million for the three months ended September 30, 2025 and 2024, respectively, a decrease of $0.2 million (or 5%). The decrease was primarily attributable to the factors discussed above. Because of the delay in completing Phase 2 of the HALEU Operation Contract, DOE extended the Phase 2 period of performance through October 31, 2025. Costs incurred subsequent to November 2024 have not yet been subject to a fee as this portion of Phase 2 remains undefinitized and is subject to negotiation.

Previous wording

Revenue from the LEU segment was $177.0 million and $193.2 million for the six months ended June 30, 2025 and 2024, respectively, a decrease of $16.2 million (or 8%). Uranium revenue decreased by $29.9 million as a result of a decrease in the volume of uranium sold. SWU revenue increased by $13.7 million as a result of a 24% increase in the average price of SWU sold, partially offset by a 12% decrease in the volume of SWU sold.

Current wording

Revenue from the LEU segment was $221.8 million and $228.0 million for the nine months ended September 30, 2025 and 2024, respectively, a decrease of $6.2 million (or 3%). SWU revenue decreased by $10.4 million as a result of a 11% decrease in the volume of SWU sold, partially offset by a 7% increase in the average price of SWU sold. Uranium revenue increased by $4.2 million.

Previous wording

Revenue from the Technical Solutions segment was $50.6 million and $39.5 million for the six months ended June 30, 2025 and 2024, respectively, an increase of $11.1 million (or 28%). The increase in revenue is primarily attributable to a $11.0 million increase in revenue generated by the HALEU Operation Contract, while the remaining increase is related to other contracts. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phase 2 of the contract.

Current wording

Revenue from the Technical Solutions segment was $80.7 million and $62.4 million for the nine months ended September 30, 2025 and 2024, respectively, an increase of $18.3 million (or 29%). The increase in revenue is primarily attributable to a $18.4 million increase in revenue generated by the HALEU Operation Contract, while the remaining change is related to other contracts. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phases 2 and 3 of the contract.

Previous wording

Cost of sales for the LEU segment was $95.1 million and $159.7 million for the six months ended June 30, 2025 and 2024, respectively, a decrease of $64.6 million (or 40%). SWU costs decreased as a result of a 22% decrease in the average unit cost of SWU sold and a 12% decrease in the volume of SWU sold. Uranium costs decreased primarily as a result of a decrease in the volume of uranium sold. Cost of sales for the six months ended June 30, 2025 and 2024, included $3.6 million and $1.8 million, respectively, for the revaluation of inventory loans.

Current wording

Cost of sales for the LEU segment was $147.7 million and $189.3 million for the nine months ended September 30, 2025 and 2024, respectively, a decrease of $41.6 million (or 22%). SWU costs decreased as a result of a 25% decrease in the average unit cost of SWU sold and a 11% decrease in the volume of SWU sold. Uranium costs increased for the nine months ended September 30, 2025. Cost of sales for the nine months ended September 30, 2025 and 2024, included $4.1 million and $3.7 million, respectively, for the revaluation of inventory loans.

Previous wording

Cost of sales for the Technical Solutions segment was $45.7 million and $32.2 million for the six months ended June 30, 2025 and 2024, respectively, an increase of $13.5 million (or 42%). The increase is primarily attributable to a $13.8 million increase in costs incurred under the HALEU Operation Contract, partially offset by a decrease in costs related to other contracts.

Current wording

Cost of sales for the Technical Solutions segment was $72.3 million and $51.4 million for the nine months ended September 30, 2025 and 2024, respectively, an increase of $20.9 million (or 41%). The increase is primarily attributable to a $22.3 million increase in costs incurred under the HALEU Operation Contract, partially offset by a decrease in costs related to other contracts.

Showing the first 40 of 65 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

Pursuant to a notice of redemption issued on February 24, 2025, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the $74.3 million aggregate principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million related to the extinguishment of the long-term debt.

Current report — wording carried from elsewhere

Advanced technology costs were $8.0 million and $13.9 million for the nine months ended September 30, 2025 and 2024, respectively, a decrease of $5.9 million (or 42%). Advanced technology costs consist of American Centrifuge work and related expenses that are outside of our customer contracts in the Technical Solutions segment, including bid and proposal activities and work to improve our enrichment capability.

Current report — wording carried from elsewhere

The shares of Class A Common Stock were issued pursuant to the Company’s shelf registration statement on Form S-3 as noted above.
Rearranged previous paragraphs (6)

Previous report — wording carried elsewhere

On June 30, 2025, the Company provided notice to the noteholders that the notes became convertible at the option of the holders beginning on July 1, 2025, and ending at the close of business on September 30, 2025. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of the calendar quarter ended June 30, 2025, was greater than 130% of the conversion price in effect on each applicable trading day.

Previous report — wording carried elsewhere

Stock compensation expense was $4.7 million and $0.7 million for the six months ended June 30, 2025 and 2024, respectively, an increase of $4.0 million (or 571%). This increase was primarily as a result of a non-cash charge of $3.6 million due to the reclassification of certain Board restricted stock unit grants from equity to liability.

Previous report — wording carried elsewhere

Nonoperating Components of Net Periodic Benefit Loss (Income)

Previous report — wording carried elsewhere

Nonoperating components of net periodic benefit loss (income) netted to a loss of $1.9 million and income of $16.2 million for the six months ended June 30, 2025 and 2024, respectively, a change of $18.1 million (or 112%). The change is primarily due to the $16.6 million remeasurement gain driven by the partial annuitization of two pension plans in May 2024. The remaining change is primarily related to the expected return on plan assets, partially offset by interest cost as the discounted present value of benefit obligations nears payment, as described in Note 8, Pension and Postretirement Health and Life Benefits of the Consolidated Financial Statements.

Previous report — wording carried elsewhere

Pursuant to a redemption notice, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the principal amount together with any accrued and unpaid interest. As of June 30, 2025, none of the 8.25% Notes remained outstanding.

Previous report — wording carried elsewhere

On June 30, 2025, the Company provided notice to the noteholders that the notes became convertible at the option of the holders beginning on July 1, 2025, and ending at the close of business on September 30, 2025. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of the calendar quarter ended June 30, 2025, was greater than 130% of the conversion price in effect on each applicable trading day.