What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-02-15.
0001628280-24-005035
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-27.
0001628280-25-008747
Item 7. — Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 281 previous paragraphs and 295 current paragraphs.
126 unchanged; 81 reworded; 79 added; 63 removed; 11 previous and 9 current paragraphs rearranged.
Tables are not compared: 14 previous and 10 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (79)
Current report
We continue to innovate our solid oxide platform to offer energy solutions to our customers. In February 2024, we announced our Be Flexible TM offering which introduced load following capabilities on our Bloom Energy Server system to enable customers and utilities to meet variable electricity load and demand. We believe that our Be Flexible offering is critical for data centers, as their power needs typically vary widely throughout the day. Our products are also designed to work with existing carbon capture utilization and storage (“CCUS”) and combined heat and power (“CHP”) technologies offered by third parties. CCUS can mitigate emissions from natural gas as an Energy Server system generates a relatively pure stream of CO 2 that can be used or sequestered. In our experience, CCUS is an important capability for customers who need reliable power beyond what can be provided by renewable sources, while also reducing their greenhouse gas emissions. CHP allows the exhaust heat generated by an Energy Server system to be channeled and made available for use, including for heating and cooling, further increasing the efficiency of the system. This capability is important to data centers and other large power users seeking to repurpose generated heat to improve efficiency.
Current report
Policy changes commencing in 2025 may also affect customers’ demand for power solutions. Changes in permitting rules could boost domestic fossil fuel production and infrastructure, while proposals to limit environmental reviews under the National Environmental Policy Act and other statutes could incentivize investment in, and lower the cost of, fossil fuels, including natural gas. At the same time, proposals to halt new permits for wind projects, particularly offshore wind, could slow renewable energy adoption and the projected available supply of renewable energy. Bloom stands ready to meet these new opportunities with our low-emission Energy Server systems.
Current report
Key Macro Trends
Current report
Increases in Demand for Power, Driven by Data Centers and Artificial Intelligence (AI)
Current report
Demand for power has continued to significantly outpace the available power generation supply from the grid, with the need for power becoming more acute in 2024. Key factors driving the increasing demand include the transition towards the electrification of transportation and buildings, the rapid adoption of AI that has led to the expansion of existing data centers and plans for new greenfield data centers, and Federal incentives for domestic manufacturing, including semiconductor and battery production. These factors along with economic growth have put significant stress on the supply from the grid and has led companies to consider on-site distributed power, including Bloom Energy Server systems, to meet their power needs.
Current report
Time to Power Increases as Power Demand/Supply Mismatch Grows
Current report
In part because of the increases in demand for power, the importance of time to power has increased. According to a study published in April 2024 by the Lawrence Berkeley National Laboratory, the time from initiating a request for interconnection to the grid to the start of commercial operations has more than doubled from less than two years during the period from 2000-2007, to more than four years from 2018-2023. Bloom Energy Server systems can be configured as on-site fully-islanded, microgrid solutions that are not interconnected to the grid, which often can provide a customer power in months instead of years. Many utilities have informed data center and manufacturing customers that they cannot interconnect for a period of years because the utility has no power available to serve a customer’s needs, thus making the Bloom Energy Server system an attractive alternative. In addition, our fully-islanded microgrid solutions can provide power on-site, without the need for costly transmission and distribution system upgrades that often are required before a customer can interconnect to the electrical grid. We are seeing greater interest in fully-islanded, microgrid solutions among data center customers because of these interconnection-related delays. If a customer desires back up power or a “grid parallel” solution in combination with the
Current report
Co-locating Large Loads with Distributed Generation Configured as Islanded Microgrids are Gaining in Traction as Energy Solutions to Bypass Long Interconnection Queues and Transmission Upgrades
Current report
Our islanded microgrid solution allow data center and other customers the ability to skip the interconnection queue and start construction. A key to this solution is that our Be Flexible TM load following capability allows us to follow a customer’s variable loads without the need to import power from the transmission grid. We believe avoiding lengthy interconnection queues is key to unlocking time to power for our customers. Our islanded microgrid solution also creates ratepayer savings by reducing congestion charges resulting from constraints on the transmission grid and avoiding the need for network transmission investments and upgrades that may be allocated to all ratepayers. In addition to our distributed generation microgrid solution serving a single customer, utility companies can employ it to serve as an energy transmission asset, helping utility companies to serve their customers while avoiding the costs of new transmission and distribution infrastructure.
Current report
Utilities are Turning to Distributed Energy Solutions to Decrease their Customers’ Time to Power
Current report
Our utility customers are recognizing the challenge of keeping pace with the growing demand for power. Aging infrastructure, coupled with transmission and distribution bottlenecks, are making it more difficult for utilities to integrate additional sources of energy to add capacity. Building new transmission and distribution infrastructure is expensive, takes many years, and would likely cause utility rates to increase. As demand for power continues to grow, utility companies are struggling to meet the soaring demand of data centers, while customers’ time to power becomes increasingly important. Utility companies are exploring alternative means of producing and supplying energy to their end customers, including our Energy Server systems. We entered into multiple agreements with utilities in 2024, including a landmark 1 GW supply agreement with a customer that included a 100 MW order in 2024. We expect more utility customers in the future to supplement their power generation with the Bloom Energy Server system. As we work to reduce our product costs, and with utility rates expected to increase with new significant infrastructure investments projected to be needed over the next five years to meet rapid demand growth, we expect our energy solutions to become more cost competitive in more countries, communities, and industries around the world.
Current report
Fuel Flexible Solutions Address Reliability Concerns as well as Near- and Long-term Sustainability Considerations
Current report
The impacts of climate change, including more severe and unpredictable weather events, have placed further strain on aging utility grids and led to periods of power outages for those reliant on the grid. In addition, the recognition of the threat of climate change has led companies and governments to set ambitious emissions goals to reduce the release of carbon dioxide to the atmosphere. Large increases in demand for power are expected to challenge prevailing carbon reduction trajectories when large power users turn to conventional solutions to meet their needs. The Energy Server system is able to provide highly available power to displace dirtier and less efficient conventional combustion solutions like turbines and engines. Deeper decarbonization potential is enabled through fuel flexibility, CHP offerings and CCUS capability. In addition to natural gas, our non-combustion power solutions are designed to run on biofuels or hydrogen, emit near-zero criteria pollutants, and use no water during steady state operation.
Current report
Other Factors Affecting our Performance
Current report
Delayed Project
Current report
In the fourth quarter of 2022, we entered into a Power Purchase Agreement (the “Project PPA”) for the sale of electricity to a customer for three greenfield sites that were at various stages of development (the “Project”). The first site was expected to be operational with power by the third quarter of 2024. We sold 73 megawatts of the Energy Server systems to a distributor with the expectation that the distributor would support installation on the Project and install the Energy Server systems at the three Project sites. For site specific reasons, in the first quarter of 2024, the end customer decided not to deploy the Energy Server systems at the originally selected sites (the “Project Servers”) and commenced exploring alternative sites for deployment of the Energy Server systems. In the interim, the end customer commenced payments under the Project PPA and agreed to continue such payments for the earlier of the full term of the Project PPA or deployment of the Energy Server systems. During the fourth quarter of 2024, the end customer identified an alternative location to deploy the Project Servers (the “Alternative Project”) that is expected to be operational in 2027. Bloom and the end customer have agreed that the payments under the Project PPA will be suspended unless the end customer terminates the Alternative Project prior to it becoming operational in 2027, at which point, all suspended payments will be due and payable to us.
Current report
Shifting Regulatory Environment
Current report
In the U.S., the Investment Tax Credit (“ITC”) for fuel cells running on a non-zero carbon fuel expired at the end of fiscal year 2024. Although the Company and its customers utilized compliant safe harbor mechanisms to secure deployment of a certain dollar amount of Energy Server systems through 2028, since the ITC was not extended for fuel cells running on a non-zero carbon fuel, U.S. bookings, revenue and gross margins could be materially impacted in 2025 and beyond. Also, it is possible that the expiration of the ITC increased demand for ITC-compliant sales of our solutions in 2024 due to customer desire to secure ITC for their projects through safe harboring.
Current report
Working with Utilities
Current report
The imbalance between power demand and supply has contributed to utilities seeking alternative sources of power to supply to their end customers. Utilities have been unable to meet this demand through the deployment of renewable sources of energy such as solar and wind power. Bloom Energy Server systems can be installed at the utility’s point of distribution or directly on the customer’s site. The energy produced by our systems can be utilized by utilities to provide power to a specific customer or customers or may be used by customers generally. As demand for power continues to grow, and time to power becomes increasingly important, utilities are exploring alternative means of producing and supplying energy to their end customers, including our Energy Server systems. We entered into multiple agreements with utilities in 2024, including a landmark 1 GW supply agreement with a customer that included a 100 MW order in 2024. We expect more utility customers in the future to supplement their power generation with the Bloom Energy Server system. Increasing the supply of available power can allow utilities to encourage end customers to remain in their current locations rather than relocating to areas where power is more available. In addition, co-locating our Energy Server systems on-site with large loads, can enable a utility to provide power to a large energy user without impacting its rate base and providing the onsite power as an islanded microgrid can avoid interconnection studies and wait times.
Current report
Hydrogen Market Developments
Current report
Lengthening Sales Cycles
Current report
Financing Constraints
Current report
As we grow our business globally and increase the size and number of customer orders, we will need to secure new customer financing options, the amount of financing available as well as the number of financing partners. As we offer an innovative new technology solution, obtaining new financing partners and available funds for customer financings often involves a rigorous and timely due diligence process on our technology, manufacturing and service capabilities. If we are unable to obtain adequate financing for our customers who desire to use third-party financing rather than purchasing the Energy Server systems for their own balance sheet, our revenue could be delayed or impacted. In addition, our ability to arrange financing for our products depends partly on the creditworthiness of our customers, and deterioration of our customers’ credit ratings could impact this financing. When interest rates rise, the cost of financing for our customers also increases, and the financiers of our installations demand a higher rate of return, putting pressure on our margins.
Current report
Pursuant to that certain Investor Agreement, dated as of December 29, 2021, by and between us and SK ecoplant, as amended from time to time (the “Investor Agreement”), SK ecoplant has granted an irrevocable proxy to our Chief Executive Officer and Chief Financial Officer, as our designees, to vote all of SK ecoplant’s shares, in their sole discretion on all matters to be voted upon by stockholders. The proxy will terminate upon the earlier of the expiration or termination of the standstill term and the voting agreement set forth in Section 4.1 of the Investor Agreement. The standstill term continues until the later of (i) March 23, 2025, (ii) the date on which SK ecoplant ceases to have the right to designate a director to our board of directors, and (iii) the date on which SK ecoplant and its subsidiaries beneficially own less than five percent of the shares of our Class A common stock then issued and outstanding.
Current report
Sustainability
Current report
The IRA introduces and updates several crediting mechanisms and incentive provisions that are relevant for us including:
Current report
•Section 48E— Clean Electricity Investment Credit, which starting December 31, 2024, replaces the previous investment tax credit framework for named clean energy technologies with a “tech neutral” framework anchored around the net carbon neutrality of energy generation from qualifying facilities. It provides incentives of up to 50% for qualifying energy property meeting domestic content and labor requirements.
Current report
•Section 45Q— Credit for Carbon Oxide Sequestration, which provides up to a $60/tonne credit for carbon utilization and $85/tonne credit for geologic sequestration and can improve the cost effectiveness of Bloom’s carbon capture offerings.
Current report
•Section 45Z— Clean Fuel Production Credit, which provides a tax credit for the production of clean transportation fuels with lifecycle GHG emissions below certain levels. The credit can reach levels of up to $1.00/gallon for non-aviation fuel and $1.75/gallon for non-aviation fuel and is influenced by emissions associated with energy use including on-site power provided by Bloom.
Current report
On December 21, 2023, we submitted the application for qualifying advanced energy project credit allocation under Internal Revenue Code Section 48C(e) for the manufacturing facility in Fremont, California (the “Facility”). On March 29, 2024, we received notification from the Internal Revenue Service (the “IRS”) of the acceptance of our application for a Qualifying Advanced Energy Project Credit of up to $75.3 million. After a technical review of Bloom’s Section 48C(e) application, the Department of Energy provided a recommendation to the IRS to grant a $75.3 million credit allocation for the Facility. The approval is subject to satisfaction of the underlying certification requirements, including the prevailing wage and apprenticeship requirements, within two years from the date of the application acceptance, and potential clearance by the Office of Management and Budget due to President Trump’s executive order halting the disbursement of funds under the IRA.
Current report
The U.S. Treasury Department has issued implementation guidance, and we intend to engage with the new U.S. federal administration to understand how shifting policy priorities might impact the revised guidance or changes to the law itself. Current Section 48E guidance places Bloom Energy Server systems running on natural gas in a class of Combustion and Gasification facilities required to demonstrate net-zero emissions in the production of electricity. If the U.S. federal administration does not clarify key aspects of the guidance related to our unique technology, our projects will no longer be
Current report
beneficiaries of the ITC. If the ITC is not extended for fuel cells, U.S. bookings, revenue and gross margins could be materially impacted in 2025 and beyond. Also, it is possible that the expiration of the ITC may have increased demand for ITC-compliant sales of our Energy Server systems in 2024 due to customer desire to secure ITC for their projects through safe harboring. Bloom, its customers and financing partners executed safe harbor mechanisms in 2024 that permit deployment of Energy Server systems with the ITC Section 48 credit through 2028. However, if our customers or project-level investors prove reluctant to make sufficient cash outlays for purchases of Energy Server systems for future projects based on their safe harbor, our sales could be negatively impacted in future years.
Current report
The IRA also creates certain bonus tax credits relevant to our products placed in service in fiscal years 2023 and 2024, available by satisfying domestic content criteria and/or other criteria if such products are located within an “energy community,” as defined by the IRA. In fiscal years 2023 and 2024, contracts that included price adjustments related to the domestic content bonus tax credit were evaluated as variable consideration and we estimated variable consideration by using the most likely amount method of meeting the IRA domestic content criteria. When recognizing revenue, we constrained the estimate of variable consideration to an amount that was not probable of a significant revenue reversal.
Current report
Net cash provided by operating activities during the year ended December 31, 2024, was $92.0 million, an improvement of $464.5 million compared to the prior year period. The change in cash provided by operating activities during the year ended December 31, 2024, as compared to the prior year period, was primarily driven by an increase of $187.2 million and $97.0 million attributable to inventories and accounts receivable, respectively, a $182.5 million increase attributable to deferred revenue and customer deposits, partially offset by a decrease of $109.2 million and $14.7 million attributable to contract assets and deferred cost of revenue, respectively.
Current report
Net cash provided by financing activities for the year ended December 31, 2024, consisted of (1) the proceeds from issuance of the 3% Green Notes due June 2029 of $402.5 million, (2) the proceeds from issuance of common stock of $12.4 million, (3) the contribution from a noncontrolling interest of $4.0 million, (4) the proceeds from financing obligations of $1.8 million, (5) the partial repurchase of the 2.5% Green Notes of $141.0 million, (6) the repayment of financing obligations of $90.2 million, (7) the repayment of debt issuance costs of $12.8 million pertaining to the 3% Green Notes due June 2029, and (8) a dividend payment of $1.5 million.
Current report
To appeal to a wide range of customers, we arrange several financing options. In the U.S., we also provide access to our Energy Server system through a Power Purchase Agreement, which is the purchase of electricity generated by the Energy Server system in exchange for a scheduled dollars per kilowatt hour rate, through a Capacity Agreement where the customer pays a capacity based flat payment, through a Lease Agreement where the customer pays for a monthly fixed fee for the use of the equipment, and through a Managed Services Agreement, whereby we sell and lease back the Energy Server system to supply energy services to our customers. Each of the foregoing are made possible through third-party financing arrangements by assembling such contracts into portfolios which are sold to investors.
Current report
Energy Server System Sales
Current report
We have determined that the foregoing metrics no longer reflect key operating metrics of the company and therefore we will no longer report on these metrics in our reports for the following reasons. We are increasingly transitioning from selling our Energy Server system as a standalone product to offering energy and hydrogen solutions to our customers. This trend is occurring across our offerings, as we find ways to deliver additional value to customers. We are solving critical problems for our customers and bringing new technologies to the market. This requires us to expand the scope of what is delivered beyond our conventional “electricity-only” solution to electricity, heat, carbon capture, storage, and molecule solutions. As a result of these developments, our Energy Server product (electricity-only power module) cost is becoming a widely varying portion of the overall value of the energy solution we provide, and trends in costs and selling prices per kilowatt are less representative of our overall business performance. In management’s view, this trend will only continue to get stronger in the future. Specific highlights of our business evolution to offering energy and hydrogen solutions include:
Current report
•Time to power. Customers are looking for energy solutions that can be provided quickly. In order to speed up installation, we are now shipping solutions that are pre-packaged Energy Server systems mounted on pre-fabricated skids in the factory. This minimizes the sitework that is needed and allows us to deploy the solution quickly, giving the customer a faster path to power. This effort requires more factory costs, but it reduces installation costs and increases the value delivered to the customer.
Showing the first 40 of 79 passages. Open the source sections for the rest.
Removed paragraphs (63)
Previous report
Certain Factors Affecting our Performance
Previous report
Corporate procurement policies are also undergoing change that creates uncertainty; while some customers are increasingly focused on decarbonizing their own direct energy supply, including aligning the timing of their zero-carbon power generation with their energy consumption, others are shifting to prioritize overall carbon emissions from the energy system, both of which are impacting our sales.
Previous report
Customer Financing Constraints
Previous report
Our ability to obtain financing for our Energy Servers depends partially on the creditworthiness of our customers, and deterioration of our customers’ credit ratings can impact the financing for their use of our Energy Servers. Regional banking and financial institution instability, such as the failure of Silicon Valley Bank in the first quarter of 2023, may make it more difficult for our customers to obtain financing. Rising interest rates have also increased the cost of financing for our customers. As interest rates rise, the financiers of our installations demand a higher rate of return, which puts pressure on our margins. We continue to work on obtaining the financing required for our 2024 installations, but if we are unable to secure such financing, our revenue, cash flow, and liquidity could be materially impacted. We expect that in the U.S., the IRA and the transferability of tax credits, should make the financing market more robust in 2024, thereby easing some of these customer financing constraints, but this cannot be assured.
Previous report
Environmental, Social and Governance (“ESG”)
Previous report
The IRA contains several credits and incentive provisions that may be relevant to us, which we have summarized below:
Previous report
•Section 48 – the ITC, which provides a tax credit based on capital investment in a variety of renewable and conventional energy technologies to incentivize investment in new energy resources and more efficient use of fuel, including fuel cell technology;
Previous report
•Section 45Q – Carbon Capture Sequestration, which provides a credit ranging from $12-$17 or $60-$85 per metric ton based on the amount of carbon oxides captured from a qualified facility over a 12-year period.
Previous report
We believe that the programs and credits included in the IRA align well with our business model and could provide significant benefits with respect to incentivizing the purchase of our current product offerings and technologies. In particular, the IRA authorized a competitive process to apply for credits to expand or enhance manufacturing capacity under IRC 48C, and we have applied for a credit under this provision; at this time, we cannot be assured our application will ultimately be accepted or result in our receipt of credits. Also, the new PTC for qualified clean hydrogen and credit for carbon capture could result in increased demand for commercial solutions to hydrogen production technology and carbon capture, including our solid oxide fuel-cell based Electrolyzer and Energy Servers.
Previous report
On August 24, 2023, as part of the PPA V Upgrade, we paid off the outstanding balance and related accrued interest of $118.5 million and $0.5 million, respectively, of our 3.04% Senior Secured Notes due June 30, 2031.
Previous report
For further information on issuance of 3% Green Notes, redemption of our 10.25% Senior Secured Notes, and repayment of 3.04% Senior Secured Notes, please see Part II, Item 8, Note 7 —Outstanding Loans and Security Agreements.
Previous report
Net cash provided by (used in) our PPA Entities (as defined below), which are incorporated into the consolidated statements of cash flows, was as follows (in thousands):
Previous report
1 The PPA Entities’ operating and financing cash flows are a subset of our consolidated cash flows and represent the stand-alone cash flows prepared in accordance with U.S. GAAP. Operating activities consist principally of cash used to run the operations of the PPA Entities, the purchase of Energy Servers from us, and principal reductions in loan balances. Financing activities consist primarily of changes in debt carried by our PPAs, and payments from and distributions to noncontrolling partnership interests. We believe this presentation of net cash provided by (used in) PPA activities is useful to provide the reader with the impact on consolidated cash flows of the PPA Entities in which we had only a minority interest. In fiscal 2022 we sold PPA IIIa and PPA IV entities. In August 2023, we sold our last consolidated PPA entity — PPA V. For more details, please see Part II, Item 8, Note 10 —Portfolio Financings.
Previous report
result of SK ecoplant Second Tranche Closing, (3) proceeds from the issuance of common stock of $16.9 million, (4) a contribution from noncontrolling interest of $7.0 million, (5) proceeds from financing obligations of $5.0 million, and (6) proceeds from issuance of non-recourse debt of $4.6 million. This was partially offset by (1) a settlement of the 3.04% Senior Secured Notes due June 30, 2031 of $127.4 million, (2) repayment of 10.25% Senior Secured Notes due March 2027 of $64.0 million, (3) purchases of Capped Calls of $54.5 million, (4) repayment of financing obligations of $18.4 million, and (5) the acquisition of all interest in the PPA V for $6.9 million net of distributions to Intel’s noncontrolling interest of $2.3 million.
Previous report
Energy Server Sales
Previous report
Moving forward, we plan to finance PPAs by selling a portfolio of Energy Servers or a Portfolio Company to an investor or tax equity partnership (in either case, an “Equity Investor”) in which we do not have an equity interest (a “Third-Party PPA”). The Equity Investor owns the Portfolio Company or the Energy Servers directly, and in each case, sells the electricity generated by the Energy Servers contemplated by the PPAs to the customers.
Previous report
When we finance a portfolio of the Energy Servers and the PPAs through a Portfolio Financing, we typically enter into, with the Portfolio Company or directly with the Equity Investor, as the case may be, a sale, engineering, procurement, and construction agreement (“EPC Agreement”) and an O&M Agreement, including the provision of performance warranties and guaranties. As owner of the portfolio of the PPAs and related Energy Servers, the portfolio owner receives all customer payments generated under the PPAs, the benefits of the ITC and accelerated tax depreciation, and any other available state or local benefits arising out of the ownership or operation of the Energy Servers, to the extent not already allocated to the customer under the PPA.
Previous report
The sales of our Energy Servers in connection with a Portfolio Financing have many of the same terms and conditions as a direct sale. Payment of the purchase price is generally broken down into multiple installments, which may include payments prior to shipment, upon delivery, when the Energy Servers are physically ready for startup and commissioning (i.e., “Mechanical Completion”), and upon substantial completion (i.e., “Commencement of Operations”, “COO”).
Previous report
Obligations to Portfolio Companies
Previous report
Our Portfolio Financings involve many obligations on our part to the Portfolio Company or Equity Investor, as applicable. These obligations are set forth in the applicable EPC Agreements and O&M Agreements, and may include some or all of the following obligations:
Previous report
•designing, manufacturing, and installing the Energy Servers, and selling such Energy Servers to the Portfolio Company or Equity Investor;
Previous report
•obtaining all necessary permits and other governmental approvals necessary for the installation and operation of the Energy Servers, and maintaining such permits and approvals throughout the term of the EPC Agreements and O&M Agreements;
Previous report
•operating and maintaining the Energy Servers in compliance with all applicable laws, permits and regulations;
Previous report
•satisfying the performance warranties and guaranties set forth in the applicable O&M Agreements; and
Previous report
•complying with any other specific requirements contained in the PPAs with customers.
Previous report
The O&M Agreement grants the Equity Investor the right to obligate us to repurchase the Energy Servers in the event the Energy Servers fail to comply with the performance warranties and guaranties in the O&M Agreement and we do not cure such failure in the applicable warranty cure period, or that a PPA terminates as a result of any failure by us to perform the obligations in the O&M Agreement.
Previous report
In some Portfolio Financings, we have also agreed to pay liquidated damages to the applicable Portfolio Company or Equity Investor, as the case may be, in the event of delays in the manufacture, installation, and commissioning of our Energy Servers, either in the form of a cash payment or a reduction in the purchase price for the applicable Energy Servers.
Previous report
Administration of Portfolio Companies
Previous report
In August 2023, we sold our last consolidated PPA Entity, PPA V. Before the sale, as we had determined that we were the primary beneficiary of this VIE, we consolidated 100% of the assets, liabilities, and operating results of PPA V, including the Energy Servers and lease income, in our consolidated financial statements. We recognized the Equity Investors’ share of the net assets of the investment entity as noncontrolling interests in the subsidiary in our consolidated balance sheets. We recognized the amounts that are contractually payable to these investors in each period as distributions to noncontrolling interests in our consolidated statements of changes in stockholders’ equity (deficit). PPA V contained debt that was non-recourse to us.
Previous report
Our consolidated statements of cash flows reflect cash received from the Equity Investors in PPA V as proceeds from investments by noncontrolling interests in the subsidiary. Our consolidated statements of cash flows also reflect cash paid to these investors as distributions paid to noncontrolling interests in the subsidiary. We reflect any unpaid distributions to these Equity Investors in PPA V as distributions payable to noncontrolling interests in the subsidiary on our consolidated balance sheets.
Previous report
For further information about our Portfolio Financings, see Part II, Item 8, Note 11 —Portfolio Financings.
Previous report
Product Acceptances
Previous report
The product acceptances in the years ended December 31, 2023 and 2022 were as follows:
Previous report
Product accepted increased approximately by 401 systems, or 17.6%, for the year ended December 31, 2023, as compared to the prior year period, which is the equivalent of 40 megawatts. Acceptance volume increased as demand increased for the Energy Servers.
Previous report
The increase in acceptances of 268 megawatts achieved for the year ended December 31, 2023 was added to our installed base and, therefore, increased our total megawatts accepted, net, from 973 megawatts to 1,241 megawatts.
Previous report
Costs Related to Our Products
Previous report
Total product related costs for the years ended December 31, 2023 and 2022 was as follows:
Previous report
Product costs of product accepted decreased by $345 per kilowatt, or 14.1%, for the year ended December 31, 2023, as compared to the prior year period. The decrease in costs was primarily driven by our continued efforts to reduce material costs, implement cost reduction programs with our vendors, and reduce our labor and overhead costs through increased volume, improved processes, and automation at our manufacturing facilities.
Previous report
Period costs of manufacturing related expenses increased by $8.3 million, or 14.6%, for the year ended December 31, 2023, as compared to the prior year period. Our period costs of manufacturing related expenses increased primarily as a result
Previous report
of costs incurred to support capacity expansion efforts, which are expected to be brought online in future periods, partially offset by a $5.3 million release from one-time benefit related to a grant from the Delaware Economic Development Authority.
Showing the first 40 of 63 passages. Open the source sections for the rest.
Reworded paragraphs (81)
Previous wording
Our mission is to make clean, reliable energy affordable for everyone in the world. We created the first large-scale, commercially viable solid oxide fuel-cell based power generation platform that empowers businesses, essential services, critical infrastructure and communities to responsibly take charge of their energy.
Current wording
Our mission is to make clean, reliable energy affordable for everyone in the world. We developed the first large-scale, commercially viable solid oxide fuel cell based power generation platform that empowers businesses, essential services, critical infrastructure and communities to responsibly take charge of their energy.
Previous wording
Our technology, invented in the U.S., is one of the most advanced electricity and hydrogen producing technologies on the market today. Our fuel-flexible Bloom Energy Servers can use biogas, hydrogen, natural gas, or a blend of fuels to create resilient, sustainable and cost-predictable power at typically significantly higher efficiencies than traditional, combustion-based resources. In addition, our same solid oxide platform that powers our fuel cells can be used to create hydrogen with our Bloom Electrolyzer. Hydrogen is increasingly recognized as a critically important tool for the decarbonization of the energy economy. Our enterprise customers include some of the largest multinational corporations in the world. We also have strong relationships with some of the largest utility companies in the U.S. and the Republic of Korea, with a growing presence in various international markets.
Current wording
Our technology, invented and manufactured in the U.S., is one of the most advanced electricity and hydrogen producing technologies on the market today. Our fuel-flexible Bloom Energy Server systems can use biogas, hydrogen, natural gas, or a blend of fuels to create resilient, reliable and sustainable power at typically significantly higher efficiencies than traditional, combustion-based resources. In addition, the same fuel cell based platform that powers our Energy Server systems can be used to create hydrogen with our Bloom Electrolyzer. Hydrogen is increasingly recognized as a critically important tool for the decarbonization of the energy economy. Our enterprise customers include some of the largest multinational corporations in the world. We also have relationships with some of the largest utility companies in the U.S. and the Republic of Korea, with a growing presence in various international markets in Europe and Asia.
Previous wording
At Bloom Energy, we look forward to a net-zero future. Our technology is designed to help enable this future by delivering reliable, low-carbon electricity in a world facing unacceptable levels of power disruptions. Our resilient platform has kept electricity available for our customers through hurricanes, earthquakes, typhoons, forest fires, extreme heat and grid failures. Unlike traditional combustion power generation, our platform is community-friendly and designed to significantly reduce emissions of criteria air pollutants. We have made tremendous progress towards renewable fuel production through our biogas, hydrogen and electrolyzer programs, and we believe that we are well-positioned as a core platform and fixture in the new energy paradigm to help organizations and communities achieve their net-zero objectives.
Current wording
At Bloom Energy, we look forward to a net-zero future. Our technology is designed to help enable this future by delivering reliable, low-carbon electricity in a world facing unacceptable levels of power disruptions. Our resilient solid oxide fuel cell platform has kept electricity available for our customers through hurricanes, earthquakes, typhoons, forest fires, extreme heat and grid failures. Unlike traditional combustion power generation, our platform is community-friendly — emitting no noise, installed on movable skids and designed to significantly reduce emissions of criteria air pollutants. Our Energy Server systems provide electricity using natural gas, biofuels or hydrogen as feedstock and have applications that can provide both heat and power as well as enable carbon capture. We provide energy solutions that help organizations obtain reliable, resilient, lower emissions power today, thereby supporting net-zero objectives.
Previous wording
We market and sell our Energy Servers primarily through our direct sales organization in the U.S., and we also have direct and indirect sales channels internationally. Recognizing that deploying our solutions requires a significant financial commitment, we have developed a number of financing options to support sales of our Energy Servers to customers who lack the financial capability to purchase our Energy Servers directly, and who may prefer to finance the acquisition using third-party financing or to contract for our services on a pay-as-you-go model.
Current wording
We market and sell our Energy Server systems primarily through our direct sales organization in the U.S. and in certain international markets. We also work with utilities to offer our energy solutions to their end customers, which can be either in front of the meter or on-site. Recognizing that deploying our solutions requires significant financial commitment, we have developed a number of financing options to support sales of our Energy Server systems to customers who may prefer to finance the acquisition using third-party financing and ownership.
Previous wording
Our typical target commercial or industrial customer has historically been either an investment-grade entity or a customer with investment-grade attributes such as size, assets and revenue, liquidity, geographically diverse operations and general financial stability. We have also expanded our product and financing options to below-investment-grade customers and have also expanded internationally, including deployments on a wholesale grid. Given that our customers are typically large institutions with multi-level decision-making processes, we generally experience a lengthy sales process. Once the sale is completed, we have a large multi-disciplined team to facilitate the deployment of our projects in a wide variety of locations under a myriad of regulatory environments.
Current wording
Our typical target commercial or industrial customer has historically been either an investment-grade entity or a customer with investment-grade attributes such as size, assets and revenue, liquidity, geographically diverse operations and general financial stability. Given that our customers are typically large institutions with multi-level decision-making processes, we generally experience a lengthy sales process. Once the sale is completed, we are able to deploy our Energy Server systems in a matter of months, subject to permitting requirements. We have a large multi-disciplinary team to facilitate the deployment of our projects in a wide variety of locations under a myriad of regulatory environments.
Previous wording
The global energy transition to a zero-carbon environment has created new challenges and opportunities for utilities, suppliers of energy solutions and customers. Shifts and uncertainty in market and regulatory dynamics and corporate and governmental policies are currently impacting the selling process and extending sales cycles and timelines for our natural gas-, biogas- and hydrogen-related products. Increasing electricity rates, decreasing energy reliability, and delays in the development of transmission infrastructure and grid interconnection have led to increased customer interest in our power solutions. At the same time, natural gas supply and pricing concerns due to geopolitical stresses and resulting market changes as well as increasing focus on sustainability targets have led to increased caution from potential customers. The increased use of renewable power generation and the weather effects of climate change have exacerbated aging grid fragilities, increased the occurrence of power outages, created grid transmission shortages, and lengthened already extensively delayed interconnection cycles. Low- and zero-carbon sources of baseload energy have also been curtailed and even banned in some locations, forcing utilities, states and countries to revisit less clean sources of baseload and intermediate power in an attempt to ensure energy reliability. This supply and demand mismatch globally has threatened energy security reliability, reduced the availability of energy, and increased the cost of energy.
Current wording
The global energy transition towards a net-zero environment has created new challenges and opportunities for utilities, suppliers of energy solutions, and customers. Shifts and uncertainty in market and regulatory dynamics and corporate and governmental policies are currently impacting the selling process and impacting sales cycles and timelines for our products. Increasing electricity rates, decreasing energy security and reliability, and delays in the development of transmission infrastructure and grid interconnection as well as other time-to-power challenges have led to increased customer interest in our
Previous wording
Bloom’s power solutions enable customers to address these energy market challenges by offering fuel flexible solutions that are designed to provide cost predictable, resilient, and reliable energy in a timely fashion. As customers and utilities navigate the energy transition and evolving landscape, the ability of our power solutions to fit their economic, regulatory, and policy needs depends on a number of factors, including natural gas availability and pricing, electrical interconnection needs and availability, redundant back up power requirements, cost requirements, and sustainability profile. Even in those situations where the time to power from the utility is years away in light of the need to build out energy transmission infrastructure, these factors still may impact a customer’s buying decision. For example, although our power generation solutions can operate as microgrids, independent from the grid, if a customer desires back up power or a “grid parallel” solution in combination with the Bloom microgrid, required interconnection studies and lengthy interconnection queues remain, eroding the time to power value proposition. According to the Lawrence Berkeley National Lab, U.S. interconnection queue delays are growing, with a forty percent year over year increase in 2022. The typical project interconnection process for large scale projects grew to five years in 2022 compared to three years in 2015 and two years in 2008. In addition, many data center customers and other large power users have signed exclusivity arrangements with their utilities, and this often creates a more complicated dynamic for them to move to a behind the meter solution. To add to this, the rising cost of natural gas, increases in gas distribution rates, limited availability of natural gas supply, as well as disruptions to the world gas markets, has increased the cost of our power solutions for customers and, in certain cases where there is a lack of fuel supply, a complete inability to operate the systems. In the U.S., the lack or slow development of pipeline infrastructure is impacting the timing of customers being able to take advantage of our power solution opportunities. In certain jurisdictions in the U.S. and Europe, natural gas bans have been enacted that prevent the use of our power solutions unless alternative fuels are available. In addition, there is a growing hesitancy among potential customers to purchase our power solutions to run on natural gas. Increasingly, customers want a zero-carbon solution for power, and, although our power solutions are designed to run on biofuels or hydrogen (in addition to natural gas) and help our customers achieve their sustainability goals, these fuels continue to have very limited availability and, for most customers, are not yet economical. This impetus by customers to use zero-carbon solutions today, combined with the current lack of availability of zero-carbon fuels, is adversely impacting our power solution selling oppo…
Excerpt shortened here; the source contains the full paragraph.
Current wording
Bloom enables customers to address these energy market challenges by offering fuel flexible solutions that are designed to provide cost predictable, resilient, and reliable energy in a timely fashion. As customers and utilities navigate the energy transition and evolving landscape, the ability of our power solutions to fit their economic, regulatory, and policy needs depends on a number of factors, including natural gas availability and pricing, electrical interconnection needs and availability, redundant back up power requirements, cost requirements, and sustainability profiles. These factors may impact a customer’s buying decision for an alternative power solution such as ours, even in those situations where the time to power from a utility is measured in years because the total cost to interconnect, including the cost to build out energy transmission infrastructure, is unknown before all interconnection studies are completed.
Previous wording
potential data center and industrial customers are pursuing greenfield opportunities where the development cycle is long and laden with permitting requirements and the uncertainty of these factors is leading to a more difficult customer decision-making process and longer sales cycles. For example, in the fourth quarter of 2022, we entered into a PPA contract for the sale of electricity to a customer for three greenfield sites that were at various stages of development (the “Project”). The first site was expected to be operational with power by the third quarter of 2024. We sold 73 megawatts of the Energy Servers to a Distributor with the expectation that the Distributor would support installation on the Project and install the Energy Servers at the three Project sites. The Project is currently delayed, and we are in discussions with the end customer regarding if and how to move forward. If the Project continues to be delayed or is terminated we may work with the Distributor to deploy the Energy Servers at our future installation sites with a different customer or customers or the Distributor may decide to reduce future orders or cancel existing orders until the Energy Servers are deployed, and either action could materially and adversely affect our product revenue and the timing of the associated cash flows in 2024.
Current wording
In addition, many of our potential data center and industrial customers are pursuing greenfield opportunities where the development cycle is long and laden with permitting requirements, and the uncertainty of these factors is leading to a more complex customer decision-making process and longer sales cycles. Data center greenfield projects require significant investments in real estate, facility costs, and technology, among other elements, in addition to the investment in our power solutions, and the timing and sequencing of those investments is largely outside of our control.
Previous wording
The regulatory environment for energy solutions continues to shift. In South Korea, the government recently moved to a new, government-run bidding process for fuel cell purchases, which has impacted and may continue to impact demand for our power solutions. In the U.S., the ITC for fuel cells running on a non-zero carbon fuel currently expires at the end of 2024. In Ireland, which is a large data center market, a directive from the Minister of the Department of the Environment, Climate and Communications to restrict grid connections to data centers and other large power users, along with a halt in high-pressure gas installations has delayed our selling activities in Ireland. Delays in adoption of Renewable Fuel Standard regulations in the U.S. for the use of biogas to generate electricity for electric vehicles, and minimal governmental focus on utilization of biogas outside of its direct use by methane-fueled vehicles, have created uncertainty in prospects for broader biogas availability for industrial uses, including our power solutions. In addition, in most jurisdictions, air permits and various land use permits are required for installation of our solutions over a certain amount of mega-watts, and generally the length of time to obtain these permits increased, while the level of certainty of issuance has decreased and if issued, the cost of compliance requirements can be cost prohibitive. We have experienced a reluctance in certain states to issue permits for gas generation equipment. Even if issued, states may require a blend of costly renewable fuels or other measures to advance climate goals. This has adversely impacted our selling activities.
Current wording
The Inflation Reduction Act of 2022 (“IRA”) established a new clean electricity production credit and a clean electricity investment credit. Although the U.S. Treasury Department developed rules to implement credits and incentives for clean energy resources under President Biden’s administration, there is considerable uncertainty around whether, or the conditions under which such credits will be available for transactions involving our solutions in the future. In addition, delays in adoption of Renewable Fuel Standard regulations in the U.S. for the use of biogas to generate electricity for electric vehicles, along with minimal governmental focus on utilization of biogas outside of use by methane-fueled vehicles, have created uncertainty in prospects for broader biogas availability for industrial uses, including our power solutions. Furthermore, in most jurisdictions, air permits and various land use permits are required for installation of our solutions over a certain amount of megawatts, and generally the length of time to obtain these permits increased, while the level of certainty of issuance has decreased and if issued, the cost of compliance requirements can be cost prohibitive. We have experienced a reluctance in certain states to issue permits for gas generation equipment. Even if issued, states may require a blend of costly renewable fuels or other measures to advance climate goals.
Previous wording
Significant governmental interest, investment and stimulation of clean hydrogen in the U.S., Europe and in many other regions across the globe have not yet had significant impacts on demand for hydrogen. To date, while the number of proposed hydrogen production projects has grown rapidly, only a small fraction has reached the final investment decision (FID) stage, and an even smaller fraction have been deployed. In addition, the infrastructure needed to transport hydrogen, whether through pipelines or maritime or land-based tankers, is currently only sufficient for existing uses, and has not begun to be extended for anticipated future uses, with hydrogen blending and other approaches remaining at pilot stages. It remains unclear whether regulators in some jurisdictions will allow hydrogen to be introduced into gas distribution systems, which could effectively preclude or severely limit our ability to transport hydrogen from the point of production to the point of consumption.
Current wording
The interest, investment, and stimulation of clean hydrogen in the U.S., Europe and in many other regions across the globe have not yet had significant impacts on the supply of hydrogen. To date, while the number of proposed hydrogen production projects has grown rapidly, only a small fraction has reached the final investment decision stage, and an even smaller fraction has been deployed. In addition, the infrastructure needed to transport hydrogen, whether through pipelines or maritime or land-based tankers, is currently only sufficient for existing uses, and has not begun to be significantly extended for anticipated future uses, with hydrogen blending and other approaches remaining at pilot stages. It remains unclear whether regulators in some jurisdictions will allow hydrogen to be introduced into gas distribution systems, which could limit our customers’ ability to transport hydrogen from the point of production to the point of consumption. Additionally, while U.S. Treasury Department rules regarding the use of market-based renewable energy have been clarified, hurdles remain that could make it more difficult for hydrogen projects to scale significantly, and uncertainty exists as potential changes may be sought by the new U.S. federal administration and U.S. Congress.
Previous wording
All of these factors have lengthened the selling cycles for our electrolyzer product and power solutions, and we have experienced delays in our anticipated bookings. Our revenue, margins, and cash flow in any given year are largely dependent on bookings during the prior year. Historically, the majority of our bookings have occurred in the second half of the year, with a significant portion occurring in the fourth quarter. That trend did not continue to the same degree in 2023. If a substantial portion of our anticipated bookings continue to be delayed, our future revenue, margins and cash flow could be materially adversely impacted.
Current wording
Many of the factors discussed above have lengthened the selling cycles for our products and we have experienced delays in our anticipated bookings as a result. Our revenue, margins, and cash flow in any given year are dependent on bookings during previous years in addition to current bookings. Historically, the majority of our bookings occurred in the second half of the year, with a significant portion occurring in the fourth quarter, and this occurred once again in 2024. However, if a substantial portion of our anticipated bookings are delayed beyond our expectations, our revenue, margins, and cash flow in a particular period could be materially adversely impacted.
Previous wording
We continue to see effects from global supply chain tightness due to the current inflationary environment, war in Ukraine, and trade tensions between the U.S. and China. We are not aware of, and do not expect any significant direct impact on our business or supply chain from the Israel-Gaza Strip armed conflict. While we have not experienced any significant component shortages to date, we are facing pressures from inflation. These dynamics could worsen as a result of continued geopolitical instability. In the event we are unable to mitigate the impacts of delays and/or price increases in raw materials and components, it could delay the manufacturing and installation, and increase the costs of, our products, which would adversely impact our cash flows and results of operations, including our revenues and gross margin. We expect these supply chain challenges to continue in the short term.
Current wording
We continue to see effects from global supply chain tightness due to the current inflationary environment, war in Ukraine, and trade tensions between the U.S. and China. We are not aware of, and do not expect any significant direct impact on our business or supply chain from the armed conflict in Israel and neighboring areas. While we have not experienced any significant component shortages to date, we are facing pressures from inflation. These dynamics could worsen as a result of continued geopolitical instability or escalation of current military conflicts or trade tensions. The new U.S. federal administration has implemented tariffs on steel and aluminum and has discussed implementing a number of other trade tariffs which may impact our operations. Our supply chain does not have significant exposure to China, but significant tariffs on imports from other countries where we do source materials could materially impact our costs. We are also reliant on third party providers of storage equipment, infrastructure equipment and pipelines, and other materials and technologies that work with our products to provide an energy solution for customers. In the event we are unable to mitigate the impacts of delays and/or price increases in raw materials and components, including as a result of new tariffs, it could delay the manufacturing and installation of, and increase the costs of, our products, which would adversely impact our cash flows and results of operations, including our revenues and gross margin. For example, we expect the 25% tariffs imposed on U.S. imports of steel and aluminum to adversely impact our cost of raw materials for our products.
Previous wording
Installations and Maintenance of Energy Servers
Current wording
Installations and Maintenance of our Products
Previous wording
In 2023, our installation projects experienced some delays relating to, among other things, permitting, utility delays, and access to customer facilities. However, these delays did not significantly impact our revenue.
Current wording
In fiscal year 2024, our installation projects experienced some delays relating to, among other things, permitting, utility delays, and access to customer facilities. However, these delays did not significantly impact our revenue. If we are delayed in or unable to perform maintenance, our previously installed products would likely experience adverse performance impacts, including reduced output and/or efficiency, which could result in warranty and/or guaranty claims by our customers. If we experience a significant increase of product failure in the future, our service expense may increase and we may fail to achieve the performance commitments to our customers, which could result in warranty and/or guaranty claims. Additionally, product failure and service costs may increase as we initially deploy new applications for our Energy Server system, including Be Flexible TM load following, CCUS, and CHP.
Previous wording
As recently as 2022, we experienced impacts from labor shortages and challenges in hiring for our manufacturing facilities. While these constraints abated in 2023 and we reduced headcount as part of the Restructuring Plan adopted in September 2023, we may still experience difficulties with hiring and retention, and may face additional labor shortages in the future. The Restructuring Plan included (i) an optimization of our workforce across multiple functions, (ii) a relocation of a portion of our R&O department of our manufacturing and warehousing facility in Newark, Delaware, to Mexico, and (iii) a closure of a manufacturing, warehousing, R&D facility in Sunnyvale, California. According to the Restructuring Plan, 74 full-time employees and 48 contractors separated from the Company in September 2023. An additional 71 full-time employees and 8 contractors separated from the Company in October 2023. Also, in October 2023 we communicated to 61 full-time manufacturing employees about their forthcoming separation from the Company. These employees were sent on paid leave and left the Company in January 2024. For additional information, please see Part II, Item 8, Note 12 —Restructuring. In addition, the current inflationary environment has led to rising wages and labor costs as well as increased competition for labor. In the event these constraints return, and we are unable to continue to mitigate the impacts of these challenges, it could delay the manufacturing and installation of our Energy Servers or Electrolyzers, and we may be unable to meet customer demand, which could adversely impact our cash flows and results of operations, including our revenues and gross margin.
Current wording
As recently as 2022, we experienced impacts from labor shortages and challenges in hiring for our manufacturing facilities. While these constraints have since abated, and we reduced headcount as part of the Restructuring Plan adopted in September 2023, we may still experience difficulties with hiring and retention and may face additional labor shortages in the future. For details on the Restructuring Plan refer to Part II, Item 8, Note 12 —Restructuring. In addition, the current inflationary environment has led to rising wages and labor costs as well as increased competition for labor.
Previous wording
Simultaneous with the execution of the SPA, we and SK ecoplant executed an amendment to the Joint Venture Agreement (the “JVA”), an amendment and restatement to our Preferred Distribution Agreement (“PDA Restatement”), and a new Commercial Cooperation Agreement regarding initiatives pertaining to the hydrogen market and general market expansion for the Bloom Energy Server and Bloom Energy Electrolyzer.
Current wording
Simultaneous with the execution of the SPA, we and SK ecoplant executed an amendment to the Joint Venture Agreement (the “JVA”), an amendment and restatement to our Preferred Distribution Agreement (“PDA Restatement”), and a new Commercial Cooperation Agreement regarding initiatives pertaining to the hydrogen market and general market expansion for Bloom solutions.
Previous wording
On March 20, 2023, in connection with the Amended SPA, we also entered into the Loan Agreement, pursuant to which we were entitled to draw down on a loan from SK ecoplant with a maximum principal amount of $311.0 million, if SK ecoplant sent a redemption notice to us under the Amended SPA or otherwise had reduced any portion of its current holdings of our Class A common stock. On September 23, 2023, all 13,491,701 shares of the Series B RCPS were automatically converted into shares of our Class A common stock. For further information on the strategic investment with SK ecoplant, see Part II, Item 8, Note 17 —SK ecoplant Strategic Investment.
Current wording
On March 20, 2023, in connection with the Amended SPA, we also entered into a Shareholders’ Loan Agreement with SK ecoplant (the “Loan Agreement”), pursuant to which we had the option to draw on a loan from SK ecoplant with a maximum principal amount of $311.0 million, a maturity of five years and an interest rate of 4.6%, should SK ecoplant have sent a redemption notice to us under the Amended SPA. As of September 30, 2023, the loan commitment asset from SK ecoplant was derecognized as a result of automatic conversion of all shares of the Series B RCPS into shares of our Class A common stock.
Previous wording
On September 15, 2023, we entered into the Amended and Restated JVA and the Share Purchase Agreement (together, the “Amended JV Agreements”) with SK ecoplant which changed the share of our voting rights in the Korean joint venture to 40% and increased the scope of assembly done by the joint venture facility in the Republic of Korea to full assembly.
Current wording
On September 15, 2023, we entered into the Amended and Restated JVA and the Share Purchase Agreement (together, the “Amended JV Agreements”) with SK ecoplant which allowed SK ecoplant to increase its share of the voting rights in the Korean JV to 60% and increased the scope of assembly done by the joint venture facility in the Republic of Korea to full assembly. In January 2024, according to the Amended JV Agreements, SK ecoplant made a capital contribution to Korean JV of $4.0 million.
Previous wording
On September 23, 2023, all 13,491,701 shares of the Series B RCPS were automatically converted into shares of our Class A common stock pursuant to the Certificate of Designation, dated as of March 20, 2023, setting forth the rights, preferences, privileges, and restrictions of the Series B RCPS, as amended by the Certificate of Amendment to the Certificate of Designation, dated as of April 18, 2023. Upon conversion of all the Series B RCPS into shares of our Class A common stock, SK ecoplant became a related party to us with the beneficial ownership of 10.5% of our outstanding Class A common stock.
Current wording
On September 23, 2023, all 13,491,701 shares of the Series B RCPS were automatically converted into shares of our Class A common stock pursuant to the Certificate of Designation, dated as of March 20, 2023, setting forth the rights, preferences, privileges, and restrictions of the Series B RCPS, as amended by the Certificate of Amendment to the Certificate of Designation, dated as of April 18, 2023. Upon conversion of all the Series B RCPS into shares of our Class A common stock, SK ecoplant became a related party to us.
Previous wording
We are committed to a goal of providing consistent returns to our stockholders while maintaining a strong sense of good corporate citizenship that places a high value on the environment, welfare of our employees, the communities in which we operate, the customers we serve, and the world as a whole. We believe that prioritizing, improving, and managing our ESG related risks, opportunities, and programs help us to better create long-term value for our investors.
Current wording
We are committed to the goal of providing consistent returns to our stockholders with a focus on corporate citizenship that places a high value on the environment, the welfare of our employees, the communities in which we operate, and the customers we serve. We believe that effectively managing our sustainability-related risks, opportunities, and programs provides financial and reputational benefits that create long-term value for our investors.
Previous wording
Our mission is to make clean, reliable energy affordable for everyone in the world. To that end, we strive to empower businesses and communities to responsibly take charge of their energy while addressing both the causes and consequences of climate change. We aim to serve our customers with products that are resilient, providing uninterrupted power with predictable pricing over the long-term, while addressing sustainability issues by developing an increasingly broad portfolio of solutions for decarbonization.
Current wording
We strive to empower businesses and communities to responsibly take charge of their energy while addressing both the causes and consequences of climate change. We aim to serve our customers with products that are resilient, providing uninterrupted power with predictable pricing over the long-term, while developing an increasingly broad portfolio of decarbonized solutions.
Previous wording
In April 2023, we released our 2022 Sustainability Report, Advancing the Mission of Decarbonization (the “Sustainability Report”), using generally accepted ESG frameworks and standards, including alignment with Sustainability Accounting Standards Board standards and the Task Force on Climate-related Financial Disclosures recommendations. In addition, the Sustainability Report also utilized certain Global Reporting Initiative standards and was mapped against the United Nations Sustainable Development Goals. We plan to issue a sustainability report on an annual basis.
Current wording
In April 2024, we released our 2023 Sustainability Report, Transforming Energy for the Digital Age (the “Sustainability Report”), using generally accepted sustainability frameworks and standards, including alignment with Sustainability Accounting Standards Board standards and the Task Force on Climate-related Financial Disclosures recommendations. In addition, the Sustainability Report also utilized certain Global Reporting Initiative Standards and was mapped against the United Nations Sustainable Development Goals. We plan to issue a sustainability report on an annual basis.
Previous wording
On August 16, 2022, President Biden signed into law the IRA. It contains provisions which have a significant impact on the development and financing of clean energy projects in the U.S. The IRA includes the extension and expansion of the ITC and the Production Tax Credit (the “PTC”) and the addition of expanded tax credits for other technologies and for manufacturing of clean energy equipment as well as terms allowing parties to more easily monetize the tax credits. The IRA also includes some targeted bonus credit incentives intended to encourage development in low-income communities, the use of domestically produced materials, and compliance with certain labor-related requirements.
Current wording
On August 16, 2022, President Biden signed into law the IRA. It contains provisions that have had a significant impact on the development and financing of clean energy projects in the U.S. However, President Trump has expressed skepticism about the IRA and clean energy projects, thus creating uncertainty about its future. The IRA includes expanded tax credits for projects across the Bloom product portfolio as well as for manufacturing of clean energy equipment. It also introduces new mechanisms for tax credit monetization and transferability. The IRA includes targeted incentives intended to encourage development in low-income communities, the use of domestically produced materials, and compliance with certain labor-related requirements. We believe that the programs and credits included in the IRA align well with our business model and could provide significant benefits for our projects. Some or all of these benefits, however, may be at risk from the new U.S. Congress and federal administration, which have expressed interest in repealing, restricting or clawing back IRA funding and expanded tax credits.
Previous wording
•Section 45V – Clean Hydrogen, which provides a PTC of up to $3 per kg of qualified clean hydrogen over a 10-year credit period for the production of qualified clean hydrogen at a qualified facility in the U.S.; and
Current wording
•Section 45V— Credit for the Production of Clean Hydrogen, which provides a PTC of up to $3 per kg of qualified clean hydrogen produced at qualified facilities in the US, including Bloom’s Electrolyzer projects.
Previous wording
•Section 48C – Qualified Advanced Energy Project (reenacted), which provides the ITC through a competitive application process administered through the Department of Energy equal to 6% or 30% of the investment with respect to advanced energy projects;
Current wording
•Section 48C— Qualified Advanced Energy Project, which provides an ITC through a competitive application process administered through the Department of Energy equal to 6% or 30% of the investment with respect to advanced energy projects
Previous wording
We raised cash and supplemented liquidity through financing activities with SK ecoplant in the first quarter of 2023 and issuing the 3% Green Convertible Senior Notes due June 2028 (the “3% Green Notes”) in the second quarter of 2023. At the same time, we increased our working capital spent. In addition, we expanded our warehouse space in Delaware and California to store more inventory to meet the anticipated increase in demand. If this increase in demand does not materialize to the degree we anticipated, our liquidity and financial condition may be adversely impacted.
Current wording
We raised cash and supplemented liquidity by issuing the 3% Green Convertible Senior Notes due June 2029 (the “3% Green Notes due June 2029”) in the second quarter of 2024, as well as through financing activities with SK ecoplant in the first quarter of 2023 and issuing the 3% Green Convertible Senior Notes due June 2028 (the “3% Green Notes due June 2028”) in the second quarter of 2023. We expanded our warehouse space in Delaware and California to store more inventory to meet the anticipated increase in demand. If this increase in demand does not materialize to the degree we anticipated, our liquidity and financial condition may be adversely impacted.
Previous wording
On May 16, 2023, we issued the 3% Green Notes with an aggregate principal amount of $632.5 million due June 2028, unless earlier repurchased, redeemed, or converted, resulting in net cash proceeds of $612.8 million. On June 1, 2023, we used approximately $60.9 million of the net proceeds from this offering to redeem all of the outstanding principal amount of our 10.25% Senior Secured Notes due March 2027. The redemption price equaled 104% of the principal amount redeemed plus accrued and unpaid interest. We also used approximately $54.5 million of the net proceeds from the offering to purchase the privately negotiated capped call options (the “Capped Calls”). The remaining portion of the 3% Green Notes was planned to be used for working capital investment and general corporate purposes.
Current wording
On May 29, 2024, we issued the 3% Green Notes due June 2029 in an aggregate principal amount of $402.5 million due June 2029, unless earlier repurchased, redeemed or converted, less the initial purchasers’ discount of $12.1 million and other issuance costs of $0.7 million, resulting in net cash proceeds of $389.7 million. On May 29, 2024, we used approximately $141.8 million of the net proceeds from this issuance to repurchase $115.0 million, or 50%, of the outstanding principal amount of our 2.5% Green Convertible Senior Notes due August 2025 (the “2.5% Green Notes”) in privately negotiated transactions. The repurchase amount equaled 122.6% of the principal amount repurchased plus related accrued and unpaid interest.
Previous wording
As of December 31, 2023, we had cash and cash equivalents of $664.6 million. Our cash and cash equivalents consist of highly liquid investments with maturities of three months or less, including money market funds of $601.1 million. We maintain these balances with high credit quality counterparties, regularly monitor the amount of credit exposure to any one issuer and diversify our investments in order to minimize our credit risk.
Current wording
As of December 31, 2024, we had unrestricted cash and cash equivalents of $802.9 million. Our cash and cash equivalents consist of highly liquid investments with maturities of three months or less, including money market funds of $749.4 million. We seek to maintain these balances with high credit quality counterparties, regularly monitor the amount of our credit exposure to any one issuer and diversify our investments in order to minimize our exposure.
Previous wording
As of December 31, 2023, we had $842.0 million of recourse debt, $4.6 million of non-recourse debt and $9.0 million of other long-term liabilities. As of December 31, 2023, all of our debt was classified as long-term liabilities. For a complete description of our outstanding debt, please see Part II, Item 8, Note 7 —Outstanding Loans and Security Agreements.
Current wording
As of December 31, 2024, we had $1,124.7 million of recourse debt, $4.1 million of non-recourse debt, and $9.2 million of other long-term liabilities. As of December 31, 2024, $114.4 million and $1,014.4 million of our debt were classified as short-term and long-term, respectively. For a complete description of our outstanding debt, please see Part II, Item 8, Note 7 —Outstanding Loans and Security Agreements.
Previous wording
The combination of our cash and cash equivalents and cash flow to be generated by our operations is expected to be sufficient to meet our anticipated cash flow needs for at least the next 12 months. If these sources of cash are insufficient or are not received in a timely manner to satisfy our near-term or future cash needs, we may require additional capital from equity or debt financings to fund our operations, our manufacturing capacity, product development, and market expansion requirements and to timely respond to competitive market pressures or strategic opportunities, among other things. We may, from time to time, engage in a variety of financing transactions for such purposes, including factoring our accounts receivable. During the year ended December 31, 2023, we factored $291.4 million of accounts receivable. However, we may not be able to secure timely additional financing on favorable terms, or at all. The terms of any additional financing may place limits on our financial and operating flexibility. Although currently we do not have any floating-rate notes on the balance sheet, rising interest rates may increase our overall cost of capital, if and when we refinance our fixed-rate convertible notes. If we raise additional funds through further issuances of equity or equity-linked securities, our existing stockholders could suffer dilution in their percentage ownership of us, and any new securities we issue could have rights, preferences, and privileges senior to those of holders of our common stock.
Current wording
debt financings to fund our operations, our manufacturing capacity, product development, and market expansion requirements and to timely respond to competitive market pressures or strategic opportunities, among other things. We may, from time to time, engage in a variety of financing transactions for such purposes, including factoring our accounts receivable. During the year ended December 31, 2024, we factored $184.2 million of accounts receivable. However, we may not be able to secure timely additional financing on favorable terms, or at all. The terms of any additional financing may place limits on our financial and operating flexibility. Although currently we do not have any floating-rate notes on the balance sheet, our overall cost of capital may increase if interest rates rise, if and when we refinance our fixed-rate convertible notes. If we raise additional funds through further issuances of equity or equity-linked securities, our existing stockholders could suffer dilution in their percentage ownership of us, and any new securities we issue could have rights, preferences, and privileges senior to those of holders of our common stock.
Previous wording
Our future capital requirements depends on many factors, including our rate of revenue growth, the timing and extent of spending on research and development efforts and other business initiatives, the rate of growth in the volume of system builds and the need for additional manufacturing space, the expansion of sales and marketing activities both in domestic and international markets, market acceptance of our products, our ability to secure financing for customer use of our Energy Servers, the timing of installations and of inventory build in anticipation of future sales and installations, and overall economic conditions. In order to support and achieve our future growth plans, we may need or seek advantageously to obtain additional funding through equity or debt financing. Failure to obtain this financing in future quarters may affect our results of operations, including our revenues and cash flows.
Current wording
Our future capital requirements depend on many factors, including our rate of revenue growth, the timing and extent of spending on research and development efforts and other business initiatives, the rate of growth in the volume of system builds and the need for additional working capital, the expansion of sales and marketing activities both in domestic and international markets, market acceptance of our products, our ability to secure financing for customer use of our products, the timing of installations and of inventory build in anticipation of future sales and installations, and overall economic conditions. In order to support and achieve our future growth plans, we may need or seek advantageously to obtain additional funding through equity or debt financing. Failure to obtain this financing in future quarters may affect our results of operations, including our revenues and cash flows.
Previous wording
Our operating activities consisted of net loss adjusted for certain non-cash items plus changes in our operating assets and liabilities or working capital. Net cash used in operating activities during the year ended December 31, 2023, was $372.5 million, an increase of $180.8 million compared to the prior year period. The increase in cash used in operating activities during the year ended December 31, 2023, as compared to the prior year period, was primarily a result of an increase in working capital of $379.4 million due to (1) an increase in inventory levels of $231.7 million to support future demand, (2) an increase in accounts receivable of $89.8 million, which was primarily due to the timing of revenue transactions and corresponding collections, and (3) the timing of payments to vendors.
Current wording
Our operating activities consisted of net loss adjusted for certain non-cash items plus changes in our operating assets and liabilities or working capital. Net cash provided by operating activities for the year ended December 31, 2024, related primarily to the changes in our working capital of $66.4 million predominantly due to an increase in deferred revenue and customer deposits by $115.9 million driven primarily by receipt of new customer deposits, partially offset by (1) an increase in contract assets by $103.8 million triggered by timing of achieving billing milestones, (2) an increase in inventory levels by $44.5 million to support future demand, (3) an increase in deferred cost of revenue by $12.9 million, and (4) the timing of payments to vendors.
Previous wording
Our investing activities have consisted of capital expenditures, including investments to increase our production capacity. We expect to continue such investing activities as our business grows. Cash used in investing activities during the year ended December 31, 2023, was $83.7 million, a decrease of $33.1 million compared to the prior year period and was primarily due to the decrease in expenditures on tenant improvements for a newly leased engineering and manufacturing building in Fremont, California, which opened in July 2022. We expect to continue to make capital expenditures over the next few quarters to expand production capacity at our new manufacturing facility in Fremont, California, which includes the purchase of new equipment and other tenant improvements. We intend to fund these capital expenditures from cash on hand as well as cash flow to be generated from operations. We may also evaluate and arrange equipment lease financing to fund these capital expenditures.
Current wording
Our investing activities have consisted of capital expenditures, including investments to increase our production capacity. Cash used in investing activities during the year ended December 31, 2024, was $58.8 million, an improvement of $24.9 million compared to the prior year period, and was primarily due to the decrease in expenditures on tenant improvements for a newly leased engineering and manufacturing building in Fremont, California, which opened in July 2022. We expect to continue to make capital investments over the next few quarters to expand production capacity at our new manufacturing facility in Fremont, California, which includes the purchase of new equipment and other tenant improvements. We intend to fund these capital expenditures from cash on hand as well as cash flow to be generated from operations or through equity or debt financing. We may also evaluate and arrange equipment lease financing to fund this capital expenditures.
Previous wording
Historically, our financing activities consisted of borrowings and repayments of debt, proceeds and repayments of financing obligations, distributions paid to noncontrolling interests, contributions from noncontrolling interests, and proceeds from the issuances of our common stock. Net cash provided by financing activities during the year ended December 31, 2023, was $683.3 million, an increase of $472.0 million compared to the prior year period. The increase was primarily due to (1) proceeds from the issuance of the 3% Green Notes of $612.8 million, net of paid issuance costs of $19.7 million, (2) proceeds from the issuance of redeemable convertible preferred stock of $310.6 million, net of paid issuance costs of $0.4 million, as a
Current wording
Our financing activities consist of borrowings and repayments of debt, proceeds, and repayments of financing obligations, distributions paid to noncontrolling interests, contributions from noncontrolling interests, payments of dividends, proceeds from the issuances of our common stock, and other financing activities. Net cash provided by financing activities during the year ended December 31, 2024, was $175.2 million, a decrease of $508.1 million compared to the prior year period, predominantly due to (1) a decrease in the proceeds from the issuance of redeemable convertible preferred stock of $311.0 million, net of paid issuance costs, as a result of the SK ecoplant Second Tranche Closing in the year ended December 31, 2023, (2) a decrease in proceeds from the issuance of debt by $234.6 million, and (3) an increase in repayment of financing obligations by $71.8 million. The decrease was partially offset by (1) the purchase in fiscal year 2023 of the capped call options of $54.5 million related to the 3% Green Notes due June 2028 issued in the second quarter of fiscal year 2023, and (2) a decrease in the repayment of debt by $50.4 million.
Previous wording
We believe we have sufficient capital to operate our business over the next 12 months. Our working capital was strengthened with the supplemented liquidity through financing activities with SK ecoplant in the first quarter of 2023 and issuing the 3% Green Notes in the second quarter of 2023. In addition, we may still enter the equity or debt market as needed to support the expansion of our business. Please refer to Part II, Item 8, Note 7 —Outstanding Loans and Security Agreements, and Part I, Item 1A, Risk Factors— Risks Related to Our Liquidity—Our indebtedness, and restrictions imposed by the agreements governing our outstanding indebtedness, may limit our financial and operating activities and may adversely affect our ability to incur additional debt to fund future needs, for more information regarding the terms of and risks associated with our debt.
Current wording
We believe we have sufficient capital to operate our business over the next 12 months. Our working capital was strengthened with the supplemented liquidity through issuing the 3% Green Notes due June 2029 and the 3% Green Notes due June 2028 in the second quarter of 2024 and 2023, respectively, as well as financing activities with SK ecoplant in the first quarter of 2023. In addition, we may still enter the equity or debt market as needed to support the expansion of our business. Please refer to Part II, Item 8, Note 7 —Outstanding Loans and Security Agreements, and Part I, Item 1A, Risk Factors— Risks Related to Our Liquidity—Our indebtedness, and restrictions imposed by the agreements governing our outstanding indebtedness, may limit our financial and operating activities and may adversely affect our ability to incur additional debt to fund future needs, for more information regarding the terms of and risks associated with our debt.
Previous wording
In order to appeal to the largest variety of customers, we make available several options to them. Both in the U.S. and abroad, we sell the Energy Servers directly to customers. In the U.S., we also enable customers’ use of the Energy Servers through a power purchase arrangement or a managed services financing (whereby we sell and lease back the Energy Servers in order to supply energy to our customers), both made possible through third-party financing arrangements.
Current wording
In order to appeal to the largest variety of customers, we make available several options to them. Both in the U.S. and abroad, we sell our solutions directly to customers.
Previous wording
Often our offerings take advantage of local incentives. In the U.S., our financing arrangements are structured to optimize both federal and local incentives, including the ITC and accelerated depreciation. Internationally, our sales are made primarily to distributors who sell to, and install for, customers; these deals are also structured to use local incentives applicable to our Energy Servers. Increasingly, we use trusted installers in the U.S. to generate transactions.
Current wording
Often our offerings take advantage of local incentives. In the U.S., our financing arrangements are structured to optimize both federal and local incentives, including the ITC (when available) and accelerated depreciation.
Previous wording
Whichever option is selected by a customer in the U.S. or internationally, the contract structure will include obligations (“O&M Obligations”) on our part to operate and maintain the Energy Server (“O&M Agreement”). The O&M Agreement may either be (i) for a one-year period, subject to annual renewal at the customer’s option, which historically are almost always renewed year-over-year, or (ii) for a fixed term. In the U.S., the contract structure often includes obligations on our part to install the Energy Servers (“Installation Obligations”). Consequently, our transactions may generate revenue from the sale of the Energy Servers and electricity, performance of the O&M Obligations, and performance of the Installation Obligations.
Current wording
Whichever option is selected by a customer in the U.S. or internationally, the contract structure will include obligations (“O&M Obligations”) on our part to operate and maintain our products (“O&M Agreement”). In the U.S., the contract structure often includes obligations on our part to install our products (“Installation Obligations”). Consequently, our transactions may generate revenue from the sale of our products and electricity, the performance of the O&M Obligations, and performance of the Installation Obligations.
Previous wording
In addition to customary workmanship and materials warranties offered with the sale of Energy Servers, we provide warranties and guaranties regarding the efficiency and output of our Energy Servers to the customer and, in certain financing structures, to the financing parties as well. We refer to a “performance warranty” as an obligation to repair or replace the Energy Servers as necessary to return performance of the Energy Servers to the warranted performance level. We refer to a “performance guaranty” as an obligation to make a payment to compensate for the failure of the Energy Servers to meet the guaranteed performance level. Our obligation to make payments under a performance guaranty is always contractually capped.
Current wording
In addition to customary workmanship and materials warranties offered with the sale of our products, we provide warranties and guaranties regarding the efficiency and output of our products to the customer and, in certain financing structures, to the financing parties as well. We refer to a “performance warranty” as an obligation to repair or replace Bloom products as necessary to return performance of our products to the warranted performance level. We refer to a “performance guaranty” as an obligation to make a payment to compensate for the failure of our products to meet the guaranteed performance level. Our obligation to make payments under a performance guaranty is always contractually capped.
Previous wording
There are customers who purchase our Energy Servers directly from us pursuant to customary equipment sales contracts. In connection with the purchase of the Energy Servers, the customers also enter into a contract with us for the O&M Obligations. The customer may elect to engage us to provide the Installation Obligations or engage a third-party provider. Internationally, sales often occur through distribution arrangements pursuant to which local construction service providers perform the Installation Obligations, as is the case in the Republic of Korea, and we contract directly with the customer to provide the O&M Obligations.
Current wording
There are customers who purchase our Energy Server systems directly from us pursuant to customary equipment sales contracts. In connection with the purchase of the Energy Server systems, the customers also enter into a contract with us for the O&M Obligations. The customer may elect to engage us to provide the Installation Obligations or engage a third-party provider. Internationally, we are sometimes required to use a local construction company to perform the Installation Obligations, as is the case in the Republic of Korea, and we contract directly with the customer to provide the O&M Obligations.
Showing the first 40 of 81 pairs. Open the source sections for the rest.
Rearranged current paragraphs (9)
Current report — wording carried from elsewhere
power solutions. At the same time, ongoing natural gas supply and pricing concerns due to geopolitical stresses, as well as customers’ interest in meeting sustainability targets, have led to increased caution from potential customers in their buying decision for energy solutions. Increasing demand for power has forced utilities, states and countries to revisit less clean sources of baseload and intermediate power, which our technology is designed to replace. This supply and demand mismatch globally has threatened energy security, reliability, and availability.
Current report — wording carried from elsewhere
Many data center customers and other large power users have signed exclusivity arrangements with their utilities, and this often creates a more complicated dynamic for them to move to an on-site solution. The rising cost of natural gas in some locations, increases in gas distribution rates, limited availability of natural gas supply, as well as disruptions to the world’s gas markets, has increased the cost of our power solutions for customers and, in certain cases where there is a lack of fuel supply, a complete inability to operate the systems. In the U.S., the lack or slow development of pipeline infrastructure in the past has impacted the timing of customers being able to take advantage of our power solution opportunities. In certain jurisdictions in the U.S. and Europe, natural gas bans have prevented the use of our power solutions unless alternative fuels are available.
Current report — wording carried from elsewhere
Bloom Energy Server system, required interconnection studies and lengthy interconnection queues may remain, eroding the time to power value proposition.
Current report — wording carried from elsewhere
In Ireland, which is a large data center market, a directive from the Minister of the Department of the Environment, Climate and Communications under the former administration to restrict grid connections to data centers and other large power users, along with a halt in high-pressure gas installations has delayed our selling activities. In 2023, the South Korean government moved to a new, government-run bidding process for fuel cell purchases, which has adversely impacted and may continue to impact demand for our power solutions.
Current report — wording carried from elsewhere
A discussion regarding our liquidity and capital resources for 2024 compared to 2023 is presented in this section. A discussion of our liquidity and capital resources for 2023 compared to 2022 can be found under Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations of Part II of our Annual Report on Form 10-K for the year ended December 31, 2023.
Current report — wording carried from elsewhere
The combination of our cash and cash equivalents and cash flow to be generated by our operations is expected to be sufficient to meet our anticipated cash flow needs for at least the next 12 months. If these sources of cash are insufficient or are not received in a timely manner to satisfy our near-term or future cash needs, we may require additional capital from equity or
Current report — wording carried from elsewhere
megawatts through 2027 and extended the timing of delivery of the remaining take-or-pay commitment under the original agreement. For additional information, please see Part II, Item 8, Note 17 —SK ecoplant Strategic Investment.
Current report — wording carried from elsewhere
On September 15, 2023, we entered into the Amended and Restated JVA and the Share Purchase Agreement (together, the “Amended JV Agreements”) with SK ecoplant which allowed SK ecoplant to increase its share of the voting rights in the Korean JV to 60% and increased the scope of assembly done by the joint venture facility in the Republic of Korea to full assembly. In January 2024, according to the Amended JV Agreements SK ecoplant made a capital contribution to Korean JV of $4.0 million.
Current report — wording carried from elsewhere
input measure of progress to determine the amount of revenue to recognize during each reporting period when such revenue is recognized over time, based on the costs incurred to satisfy the performance obligation.
Rearranged previous paragraphs (11)
Previous report — wording carried elsewhere
On March 20, 2023, in connection with the Amended SPA, we also entered into a Shareholders’ Loan Agreement with SK ecoplant (the “Loan Agreement”), pursuant to which we had the option to draw on a loan from SK ecoplant with a
Previous report — wording carried elsewhere
maximum principal amount of $311.0 million, a maturity of five years and an interest rate of 4.6%, should SK ecoplant have sent a redemption notice to us under the Amended SPA.
Previous report — wording carried elsewhere
If we are delayed in or unable to perform maintenance, our previously installed Energy Servers would likely experience adverse performance impacts, including reduced output and/or efficiency, which could result in warranty and/or guaranty claims by our customers. Further, due to the nature of our Energy Servers, if we are unable to replace worn parts in accordance with our standard maintenance schedule, we may incur higher costs in the future. During the year ended December 31, 2023, we experienced no significant delays in servicing our Energy Servers.
Previous report — wording carried elsewhere
On March 20, 2023, we entered intothe Amended SPA, with SK ecoplant, pursuant to which we issued and sold to SK ecoplant 13,491,701 shares of Series B RCPS for cash proceeds of $311.0 million, excluding issuance cost of $0.5 million.
Previous report — wording carried elsewhere
customer as a dollar per kilowatt flat payment. In some cases, the structure may also include a variable payment based on the Energy Servers’ performance or a performance-related set-off. As of December 31, 2023, we had incurred no liabilities due to failure to repair or replace our Energy Servers pursuant to these performance warranties.
Previous report — wording carried elsewhere
partnership with SK ecoplant, the parties agreed to amend the joint venture agreement (“JVA”) to increase the scope of assembly work done in the joint venture facility. The joint venture was further developed in 2022 and 2023.
Previous report — wording carried elsewhere
We use acceptances as a key operating metric to measure the volume of our completed Energy Server installation activity from period to period. Acceptance typically occurs upon transfer of control to our customers, which depending on the contract terms is when the system is shipped and delivered to our customer, when the system is shipped and delivered and is physically ready for startup and commissioning (i.e., “Mechanical Completion”), or when the system is shipped and delivered and is turned on and producing power (i.e., “Commencement of Operations”, “COO”).
Previous report — wording carried elsewhere
The portion of total revenue attributable to each purchase option in the years ended December 31, 2023 and 2022 was as follows:
Previous report — wording carried elsewhere
(Loss) Gain on Revaluation of Embedded Derivatives
Previous report — wording carried elsewhere
Given that we typically sell the Energy Servers with a maintenance service agreement and have not provided maintenance services to a customer who does not have use of the Energy Servers, standalone selling prices are estimated using a cost-plus approach. Costs relating to the Energy Servers include all direct and indirect manufacturing costs, applicable overhead costs and costs for normal production inefficiencies (i.e., variances). We then apply a margin to the Energy Servers which may vary with the size of the customer, geographic region and the scale of the Energy Servers deployment. Costs relating to installation include all direct and indirect installation costs. The margin we apply reflects our profit objectives relating to
Previous report — wording carried elsewhere
commitment asset from SK ecoplant was derecognized as a result of automatic conversion of all shares of the Series B RCPS into shares of our Class A common stock.