CHESAPEAKE UTILITIES CORP
For the period ended Dec 31, 2024. Filed Feb 26, 2025.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2024 · Filed Feb 26, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-02-21.
0001628280-24-005944
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-02-26.
0001628280-25-008213
Item 7. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 247 previous paragraphs and 254 current paragraphs.
128 unchanged; 73 reworded; 48 added; 45 removed; 1 previous and 5 current paragraphs rearranged.
Tables are not compared: 23 previous and 22 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (48)
Current report
In February 2025, FCG filed a depreciation study with the Florida PSC. The application is requesting approval of revised annual depreciation rates, as well as a reduction related to a reserve imbalance that would be amortized over a two-year period. The outcome of the application is subject to review and approval by the Florida PSC.
Current report
Gross Margin (GAAP) for the Regulated Energy segment for 2024 was $341.8 million, an increase of $83.9 million, or 32.5 percent, compared to 2023. Higher gross margin reflects contributions attributable to the acquisition of FCG, incremental margin from regulatory initiatives and infrastructure programs, natural gas organic growth and pipeline expansion projects.
Current report
Gross Margin (GAAP) for the Unregulated Energy segment for 2024 was $78.2 million, an increase of $6.4 million, or 8.9 percent, compared to 2023. Higher gross margin resulted from increased levels of virtual pipeline services and increased propane consumption, margins and service fees.
Current report
(1)Transaction and transition-related expenses represent non-recurring costs attributable to the acquisition and integration of FCG including, but not limited to transaction costs, transition services, consulting, system integration, rebranding, and legal fees.
Current report
(2)Weighted average shares reflect the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG. See Notes 4 and 15 for additional details on the acquisition and related equity offering.
Current report
(1) Weighted average shares reflect the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG.
Current report
(2) Transaction and transition-related expenses represent costs attributable to the acquisition and integration of FCG including, but not limited to, transaction costs, transition services, consulting, system integration, rebranding and legal fees.
Current report
measures of adjusted net income and adjusted EPS. See reconciliations above for a detailed comparison to the related GAAP measures.
Current report
*** Reflects the impact of 4.4 million common shares issued in November 2023 in connection with the acquisition of FCG and shares also issued in 2024.
Current report
(3) Includes adjusted gross margin attributable to interim rates during 2024. See additional information provided below.
Current report
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of an amendment to its Transportation Service Agreement with FPU for a project that will support additional supply to communities in the St. Cloud, Florida area. The project is driven by the need to expand gas service to future communities that are expected in that area. Peninsula Pipeline will construct pipeline expansions that will allow FPU to serve the expected new growth. The expansion will provide FPU with an additional 10,000 Dts/d. The Florida PSC approved the project in May 2024, and it is expected to be complete in the fourth quarter of 2025. We expect this expansion to generate approximately $2.2 million of adjusted gross margin in 2025 and $3.2 million thereafter.
Current report
Warwick Pipeline Project
Current report
In July 2024, we announced plans to extend Eastern Shore's transmission deliverability by constructing an additional 4.4 miles of six inch steel pipeline. The project will reinforce the supply and growth for our Delaware division distribution system and expand natural gas service further into Maryland for anticipated future growth. This project was placed into service during the fourth quarter of 2024, generated adjusted gross margin of $0.4 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $1.9 million in 2025 and thereafter.
Current report
Pioneer Supply Header Pipeline Project
Current report
In March 2024, Peninsula Pipeline filed a petition with the Florida PSC for its approval of Firm Transportation Service Agreements with both FCG and FPU for a project that will support greater supply growth of natural gas service in southeast Florida. The project consists of the transfer of a pipeline asset from FCG to Peninsula Pipeline. Peninsula Pipeline will proceed to provide transportation service to both FCG and FPU using the pipeline asset, which supports continued customer growth and system reinforcement of these distribution systems. The Florida PSC approved the petition in July 2024 and the project was completed in September 2024.
Current report
Renewable Natural Gas Supply Projects
Current report
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for its approval of its Transportation Service Agreements with FCG for projects that will support the transportation of additional renewable energy supply to FCG. The projects, located in Florida’s Brevard, Indian River and Miami-Dade counties, will bring renewable natural gas produced from local landfills into FCG’s natural gas distribution system. Peninsula Pipeline will construct several pipeline extensions which
Current report
Chesapeake Utilities Corporation 2024 Form 10-K Page 37 will support FCG's distribution system in Brevard County, Indian River County, and Miami-Dade County. Benefits of these projects include increased gas supply to serve expected FCG growth, strengthened system reliability and additional system flexibility. The Florida PSC approved the petition in July 2024 with the projects estimated to be completed in the first half of 2025. These three renewable projects are projected to generate total adjusted gross margin of approximately $5.7 million in 2025 and $6.7 million thereafter.
Current report
Regulatory Initiatives (with recent regulatory actions)
Current report
In April 2024, FCG filed a petition with the Florida PSC to more closely align the SAFE Program with FPU's GUARD program. Specifically, the requested modifications will enable FCG to accelerate remediation related to problematic pipe and facilities consisting of obsolete and exposed pipe. These efforts will serve to improve the safety and reliability of service to FCG's customers, and the modifications will result in an estimated additional $50.0 million in capital expenditures associated with the SAFE Program which would increase the total projected capital expenditures to approximately $255.0 million over a 10-year period. The Florida PSC approved the modifications in September 2024.
Current report
Maryland Natural Gas Depreciation Study
Current report
In January 2024, our Maryland natural gas distribution businesses filed a joint petition for approval of their proposed unified depreciation rates with the Maryland PSC. A settlement agreement between the Company, PSC staff and the OPC was reached and the final order approving the settlement agreement went into effect in July 2024, with new depreciation rates effective as of
Current report
January 1, 2023. The approved depreciation rates resulted in an annual reduction in depreciation expense of approximately $1.2 million.
Current report
Delaware Natural Gas Rate Case
Current report
In August 2024, our Delaware natural gas division filed an application for a natural gas rate case with the Delaware PSC. In connection with the application, we are seeking approval of the following: (i) permanent rate relief of approximately $12.1 million with a ROE of 11.5 percent; (ii) proposed changes to depreciation rates which were part of a depreciation study also submitted with the filing; and (iii) authorization to make certain changes to tariffs. Annualized interim rates were approved by the Delaware PSC in the amount of $2.5 million and became effective October 2024. The hearing for the proceeding has been scheduled for May 2025, and the outcome of the application is subject to review and approval by the Delaware PSC.
Current report
FPU Electric Rate Case
Current report
In August 2024, our Florida Electric division filed a petition with the Florida PSC seeking a general base rate increase of $12.6 million with a ROE of 11.3 percent based on a 2025 projected test year. Annualized interim rates of approximately $1.8 million were approved with an effective date of November 1, 2024. The outcome of the application is subject to review and approval by the Florida PSC. The hearings for the approval of the revenue requirement and rates are scheduled to occur in March 2025.
Current report
Weather Impact
Current report
In 2024, higher consumption which includes the effects of colder weather compared to the prior year resulted in a $0.3 million increase in adjusted gross margin. While temperatures in our Delmarva service territories were colder than the prior year, our Ohio service territories experienced warmer temperatures compared to 2023. In addition, temperatures in the Delmarva and Ohio service territories in 2024 were both approximately 10 percent warmer compared to normal temperatures. The following table summarizes HDD and CDD variances from the 10-year average HDD/CDD ("Normal") for the years ended 2024 compared to 2023, and 2023 compared to 2022.
Current report
(2) Transaction and transition-related expenses represent costs attributable to the acquisition and integration of FCG including, but not limited to, transaction costs, transition services, consulting, system integration, rebranding and legal fees.
Current report
FCG contributed incremental adjusted gross margin of $88.6 million for the year ended December 31, 2024.
Current report
Margin from Regulated Infrastructure Programs
Current report
Interim Rates from Recent Rate Case Activities
Current report
Interim rates associated with the Delaware natural gas rate case and Florida Electric base rate case contributed additional adjusted gross margin of $0.9 million for the year ended December 31, 2024. Refer to Note 18, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.
Current report
Expiration of Regulatory Recovery for Pandemic Related Costs
Current report
The expiration of regulatory recovery for pandemic related costs offset adjusted gross margin by $1.2 million for the year ended December 31, 2024.
Current report
(1) Transaction and transition-related expenses represent costs attributable to the acquisition and integration of FCG including, but not limited to, transaction costs, transition services, consulting, system integration, rebranding and legal fees.
Current report
Operating income for the Unregulated Energy segment for 2024 increased by $7.3 million or 29.9 percent compared to 2023. Adjusted gross margin in the Unregulated Energy segment increased primarily due to increased levels of virtual pipeline services, increased propane consumption including the impact of the December 2023 acquisition, and increased gathering fees and rate changes at Aspire. These increases were partially offset by reduced customer consumption at Aspire primarily from agricultural customers and reduced propane margins and service fees. The increase in operating expenses included higher vehicle expenses and insurance costs which were largely offset by lower payroll, benefits and other employee-related expenses compared to the prior year.
Current report
•Contributions from acquisition- Adjusted gross margin increased by $1.0 million from the acquisition of J.T. Lee and Son's that was completed in December 2023.
Current report
•Increased levels of virtual pipeline services -Adjusted gross margin increased by $4.5 million over 2023 largely due to increased demand for CNG and RNG hold services.
Showing the first 40 of 48 passages. Open the source sections for the rest.
Removed paragraphs (45)
Previous report
The impact of FCG's results from the acquisition date and effects on our liquidity are discussed further below and throughout Item 7, Management's Discussion and Analysis of Financial Condition and Results of Operations.
Previous report
Adjusted Gross Margin
Previous report
Gross Margin (GAAP) for the Regulated Energy segment for 2023 was $257.9 million, an increase of $43.9 million, or 20.5 percent, compared to 2022. Higher gross margin reflects contributions from the Company's Florida Natural Gas base rate proceeding, organic growth in the Company's natural gas distribution businesses and continued pipeline expansion projects, and contributions attributable to the acquisition of FCG. These increases were partially offset by reduced customer consumption resulting from the significantly warmer temperatures in our northern service territories throughout the year and increased employee costs related to growth initiatives, the ongoing competitive labor market and higher benefits costs.
Previous report
Gross Margin (GAAP) for the Unregulated Energy segment for 2023 was $71.8 million, which was largely consistent with gross margin for the prior year. The effects of changes in customer consumption due primarily to significantly warmer weather in our Mid-Atlantic and North Carolina service areas throughout the year and increased operating expenses and depreciation were largely offset by increased propane margins and fees and increased gathering charges and consumption for Aspire Energy.
Previous report
(1)Transaction-related expenses for the year ended December 31, 2023 represent costs incurred attributable to the acquisition of FCG, including pretax operating expenses of $10.4 million associated with legal, consulting and audit fees and $4.1 million of interest charges related to pretax fees and expenses associated with the Bridge Facility.
Previous report
(1) Transaction-related expenses for the year ended December 31, 2023 represent costs incurred attributable to the acquisition of FCG, including pretax operating expenses of $10.4 million associated with legal, consulting and audit fees and $4.1 million of interest charges related to pretax fees and expenses associated with the Bridge Facility.
Previous report
(1) Includes adjusted gross margin generated from interim services through the project in-service date in September 2023.
Previous report
Guernsey Power Station
Previous report
Guernsey Power Station and our affiliate, Aspire Energy Express, are engaged in a firm transportation capacity agreement whereby Guernsey Power Station has constructed a power generation facility and Aspire Energy Express provides firm natural gas transportation service to this facility. Guernsey Power Station commenced construction of the project in October 2019, Aspire Energy Express completed construction of the gas transmission facilities in the fourth quarter of 2021, and the facility went into service during the first quarter of 2023. The project generated additional adjusted gross margin of $0.1 million for the year ended December 31, 2023, and is expected to produce adjusted gross margin of approximately $1.5 million in 2024 and beyond.
Previous report
Winter Haven Expansion
Previous report
In May 2021, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with Florida Natural Gas for an incremental 6,800 Dts/d of firm service in the Winter Haven, Florida area. As part of this agreement, Peninsula Pipeline constructed a new interconnect with FGT and a new regulator station for Florida Natural Gas. Florida Natural Gas is using the additional firm service to support new incremental load due to growth in the area, including providing service, most immediately, to a new can manufacturing facility, as well as reliability and operational benefits to Florida Natural Gas's existing distribution system in the area. In connection with Peninsula Pipeline’s new regulator station, Florida Natural Gas also extended its distribution system to connect to the new station. This expansion was placed in service in the third quarter of 2022. The project generated additional adjusted gross margin of $0.4 million for the year ended December 31, 2023, and is expected to produce adjusted gross margin of approximately $0.6 million in 2024 and beyond.
Previous report
North Ocean City Connector
Previous report
During the second quarter of 2022, we began construction of an extension of service into North Ocean City, Maryland. Our Delaware natural gas division and Sandpiper installed approximately 5.4 miles of pipeline across southern Sussex County, Delaware to Fenwick Island, Delaware and Worcester County, Maryland. The project reinforces our existing system in Ocean City, Maryland and enables incremental growth along the pipeline. Construction of this project was completed in the second quarter of 2023. The Company filed a natural gas rate case application with the PSC for the state of Maryland in January 2024 as discussed below. Adjusted gross margin in connection with this project is contingent upon the completion of the rate case and inclusion of the project in rate base. As a result, we expect this expansion to generate annual adjusted gross margin of approximately $0.5 million beginning in 2025, with additional margin opportunities from incremental growth.
Previous report
Clean Energy Expansion
Previous report
During the fourth quarter of 2022, Clean Energy Fuels ("Clean Energy") and Florida Natural Gas entered into a precedent agreement for firm transportation services associated with a CNG fueling station Clean Energy is constructing. We installed approximately 2.2 miles of main extension in Davenport, Florida to support the filling station which was placed into service during September 2023. Our subsidiary, Marlin Gas Services, provided interim services to Clean Energy during the construction phase of the project. The project generated additional adjusted gross margin of $0.9 million for the year ended December 31, 2023, and is expected to contribute adjusted gross margin of approximately $1.0 million in 2024 and $1.1 million in 2025 and beyond.
Previous report
East Coast Reinforcement Projects
Previous report
Regulatory Initiatives
Previous report
COVID-19 Regulatory Proceeding
Previous report
In October 2020, the Florida PSC approved a joint petition of our natural gas and electric distribution utilities in Florida to establish a regulatory asset to record incremental expenses incurred due to COVID-19. The regulatory asset allows us to obtain recovery of these costs in the next base rate proceedings. Our Florida regulated business units reached a settlement with the Florida OPC in June 2021, enabling the business units to establish a regulatory asset of $2.1 million. This amount includes COVID-19 related incremental expenses for bad debt write-offs, personnel protective equipment, cleaning and business information services for remote work. Our Florida regulated business units are currently amortizing the amount over two years effective January 1, 2022 and recovering the regulatory asset through the Purchased Gas Adjustment and Swing Service mechanisms for the natural gas business units and through the Fuel Purchased Power Cost Recovery clause for the electric
Previous report
Chesapeake Utilities Corporation 2023 Form 10-K Page 40 division. This resulted in additional adjusted gross margin of $1.0 million annually for both 2022 and 2023, which was offset by a corresponding amortization of regulatory asset expense in each year.
Previous report
Weather and Consumption
Previous report
Weather had a significant impact on customer consumption during 2023, resulting in adjusted gross margin being negatively impacted by approximately $13.6 million compared to 2022 driven largely by significantly warmer weather in some of the Company's service territories resulting in reduced consumption. The following table summarizes heating degree day ("HDD") and cooling degree day (“CDD”) variances from the 10-year average HDD/CDD ("Normal") for the years ended 2023 compared to 2022, and 2022 compared to 2021.
Previous report
(2) Transaction-related expenses referred to in this table represent pretax operating expenses of $10.4 million associated with legal, consulting and audit fees incurred in connection with the acquisition of FCG.
Previous report
FCG contributed adjusted gross margin of $8.7 million from the acquisition date.
Previous report
Contributions from Regulated Infrastructure Programs
Previous report
Customer Consumption - Inclusive of Weather
Previous report
We experienced reduced customer consumption for the year ended December 31, 2023, largely the result of significantly warmer weather experienced in the Delmarva service territory throughout the year resulting in reduced adjusted gross margin of $5.1 million compared to 2022.
Previous report
The major components of the increase in other operating expenses are as follows:
Previous report
(1) Transaction-related expenses referred to in this table represent pretax operating expenses of $10.4 million associated with legal, consulting and audit fees incurred in connection with the acquisition of FCG.
Previous report
Operating income for the Unregulated Energy segment for 2023 decreased by $2.9 million compared to 2022. Operating results were impacted by changes in customer consumption due to significantly warmer weather in our Mid-Atlantic and North Carolina service areas throughout the year as well as conversion of propane customers to our natural gas distribution service. Additionally, we experienced increased operating expenses associated with increased payroll, benefits and employee related expenses driven by competition in the current labor market, depreciation, amortization and property taxes, as well as increased costs for facilities, maintenance and outside services. These factors were partially offset by increased propane margins and fees and increased gathering charges and customer consumption for Aspire.
Previous report
Adjusted Gross Margin
Previous report
•Reduced customer consumption due to conversion of customers to natural gas -Adjusted gross margin was reduced by $0.8 million as more customers converted from propane to our natural gas distribution service.
Previous report
Eight Flags
Previous report
•Increased electric generation margin -Adjusted gross margin increased by $1.0 million due to increased electric generation compared to the prior year.
Previous report
(1)Includes amounts for the acquisition of FCG net of cash acquired and their capital expenditures from the date of the acquisition through December 31, 2023. For additional information on the FCG acquisition, refer to Note 4, Acquisitions, in the consolidated financial statements.
Previous report
As a result of the Company’s most recent 5-year strategic plan review where we revisited growth projections over the next five years for our legacy businesses and with the increased scale and investment opportunities related to FCG, the Company previously announced new capital expenditure guidance for the five-year period ended 2028 that will range from $1.5 billion to $1.8 billion.
Previous report
We have entered into Shelf Agreements with Prudential and MetLife, whom are under no obligation to purchase any unsecured debt. In February 2023, we amended these Shelf Agreements, which expanded the total borrowing capacity and extended the term of the agreements for an additional three years from the effective dates to 2026. The following table summarizes our Shelf Agreements at December 31, 2023:
Previous report
(1) The amended Prudential and MetLife Shelf Agreements both expire in February 2026.
Previous report
The 364-day tranche of the Revolver expires in August 2024 and the five-year tranche expires in August 2026. Borrowings under both tranches of the Revolver are subject to a pricing grid, including the commitment fee and the interest rate charged based upon our total indebtedness to total capitalization ratio for the prior quarter. As of December 31, 2023, the pricing under the 364-day tranche of the Revolver included a commitment fee of 9-basis points on undrawn amounts and an interest rate of 75-basis points over SOFR plus a 10-basis point SOFR adjustment on outstanding balances. As of December 31, 2023, the pricing under the five-year tranche of the Revolver included a commitment fee of 9-basis points on undrawn amounts and an interest rate of 95-basis points over SOFR plus a 10-basis point SOFR adjustment on outstanding balances.
Previous report
•Changes in net regulatory assets and liabilities due primarily to the change in fuel costs collected through the various cost recovery mechanisms resulted in a $20.1 million source of cash; and
Showing the first 40 of 45 passages. Open the source sections for the rest.
Reworded paragraphs (73)
Previous wording
Earnings per share information is presented on a diluted basis, unless otherwise noted.
Current wording
Earnings per share ("EPS") and Adjusted EPS information is presented on a diluted basis, unless otherwise noted.
Previous wording
On November 30, 2023, we completed the acquisition of FCG for $923.4 million in cash, including working capital adjustments as defined in the agreement, pursuant to the previously disclosed stock purchase agreement with Florida Power & Light Company. Upon completion of the acquisition, FCG became a wholly-owned subsidiary of the Company and is included within our Regulated Energy segment. FCG serves approximately 120,000 residential and commercial natural gas customers across eight counties in Florida, including Miami-Dade, Broward, Brevard, Palm Beach, Hendry, Martin, St. Lucie and Indian River. Its natural gas system includes approximately 3,800 miles of distribution main and 80 miles of transmission pipe. Results for FCG are included within our consolidated results from the acquisition date.
Current wording
On November 30, 2023, we completed the acquisition of FCG for $922.8 million in cash, including working capital adjustments as defined in the agreement that were settled during the first quarter of 2024, pursuant to the stock purchase agreement with Florida Power & Light Company. Upon completion of the acquisition, FCG became a wholly-owned subsidiary of the Company and is included within our Regulated Energy segment. FCG serves approximately 123,000 residential and commercial natural gas customers across eight counties in Florida, including Miami-Dade, Broward, Brevard, Palm Beach, Hendry, Martin, St. Lucie and Indian River. Its natural gas system includes approximately 3,982 miles of distribution main and 80 miles of transmission pipe. Results for FCG are included within our consolidated results from the acquisition date.
Previous wording
In June 2023, FCG received approval from the Florida PSC for a $23.3 million total increase in base revenue in connection with its May 2022 rate case filing. The new rates, which became effective as of May 1, 2023, included the transfer of its SAFE program provisions from a rider clause to base rates, an increase in rates associated with a liquefied natural gas facility, and approval of FCG's proposed reserve surplus amortization mechanism ("RSAM") with a $25.0 million reserve amount. The RSAM is recorded as either an increase or decrease to accrued removal costs on the balance sheet, with a corresponding increase or decrease to depreciation and amortization expense.
Current wording
In June 2023, FCG received approval from the Florida PSC for a $23.3 million total increase in base revenue in connection with its May 2022 rate case filing. The new rates, which became effective as of May 1, 2023, included the transfer of its SAFE program provisions from a rider clause to base rates, an increase in rates associated with a liquefied natural gas facility, and approval of FCG's proposed reserve surplus amortization mechanism ("RSAM") with a $25.0 million reserve amount. The RSAM is recorded as either an increase or decrease to accrued removal costs on the balance sheet, with a corresponding increase or decrease to depreciation and amortization expense. At December 31, 2024, the RSAM reserve had been completely utilized.
Previous wording
(1)Operations & maintenance expenses within the Consolidated Statements of Income are presented in accordance with regulatory requirements and to provide comparability within the industry. Operations & maintenance expenses which are deemed to be directly attributable to revenue producing activities have been separately presented above in order to calculate Gross Margin as defined under U.S. GAAP.
Current wording
(1)Operations & maintenance expenses within the Consolidated Statements of Income are presented in accordance with regulatory requirements and to provide comparability within the industry. Operations & maintenance expenses which are deemed to be directly attributable to revenue producing activities have been separately presented above in order to calculate Gross Margin as defined under GAAP.
Previous wording
Net income (GAAP) for the year ended December 31, 2023 was $87.2 million, or $4.73 per share, compared to $89.8 million, or $5.04 per share in 2022. Net income for the year ended December 31, 2023 included $10.6 million of transaction-related expenses in connection with the FCG acquisition. Excluding these costs, net income increased by $8.0 million or 9 percent compared to the prior year.
Current wording
Net income (GAAP) for the year ended December 31, 2024 was $118.6 million, or $5.26 per share, compared to $87.2 million, or $4.73 per share in 2023. Net income for the years ended December 31, 2024 and 2023 included $2.9 million and $10.6 million, respectively, of transaction and transition-related expenses in connection with the acquisition and integration of FCG. Excluding these costs, net income increased by $23.7 million or 24.2 percent compared to the prior year.
Previous wording
** Transaction-related expenses attributable to the acquisition of FCG have been excluded from the Company’s non-GAAP measures of adjusted net income and adjusted EPS. See previous tables for a reconciliation of these items against the related GAAP measures.
Current wording
** Transaction and transition-related expenses attributable to the acquisition and integration of FCG have been excluded from the Company’s non-GAAP
Previous wording
We constantly pursue and develop additional projects and initiatives to serve existing and new customers, further grow our businesses and earnings, and increase shareholder value. The following table includes the major projects and initiatives recently completed and currently underway. Major projects and initiatives that have generated consistent year-over-year adjusted gross margin contributions are removed from the table at the beginning of the next calendar year. Our practice is to add new projects and initiatives to this table once negotiations or details are substantially final and/or the associated earnings can be estimated.
Current wording
We constantly pursue and develop additional projects and regulatory initiatives to serve existing and new customers, further grow our businesses and earnings, and increase shareholder value. The following table includes the major projects and initiatives that are currently underway or recently completed. Our practice is to add incremental margin associated with new projects and regulatory initiatives to this table once negotiations or details are substantially final and/or the associated earnings can be estimated. Major projects and initiatives that have generated consistent year-over-year adjusted gross margin contributions are removed from the table at the beginning of the next calendar year.
Previous wording
(3) Rate case application filed with the Maryland PSC in January 2024. See additional information provided below.
Current wording
(2) Rate case application and depreciation study filed with the Maryland PSC in January 2024. See additional information provided below.
Previous wording
Eastern Shore installed a new natural gas driven compressor skid unit at its existing Bridgeville, Delaware compressor station that provides 7,300 Dts of incremental firm transportation pipeline capacity. The project was placed in service in the fourth quarter of 2023 and generated adjusted gross margin of $0.6 million for the year ended December 31, 2023 and is expected to produce adjusted gross margin of approximately $2.3 million in 2024 and beyond.
Current wording
Eastern Shore installed a new natural gas driven compressor skid unit at its existing Bridgeville, Delaware compressor station that provides 7,300 Dts of incremental firm transportation pipeline capacity. The project was placed in service in the fourth quarter of 2023. The project generated additional adjusted gross margin of $1.7 million for the year ended December 31, 2024, and is expected to produce adjusted gross margin of approximately $2.3 million in 2025 and thereafter.
Previous wording
In June 2021, Peninsula Pipeline and FCG entered into a Transportation Service Agreement for an incremental 10,176 Dts/d of firm service in Indian River County, Florida, to support Florida City Gas’ growth along the Indian River's barrier island. As part of this agreement, Peninsula Pipeline constructed approximately 11.3 miles of pipeline from its existing pipeline in the Sebastian, Florida, area east under the Intercoastal Waterway and southward on the barrier island. Construction was completed and the project went into service in April 2023. Subsequent to the acquisition of FCG, the agreement is now an affiliate agreement. The project generated additional adjusted gross margin of $1.8 million for the year ended December 31, 2023, and is expected to produce adjusted gross margin of approximately $2.5 million in 2024 and $2.4 million in 2025 and beyond.
Current wording
In June 2021, Peninsula Pipeline and FCG entered into a Transportation Service Agreement for an incremental 10,176 Dts/d of firm service in Indian River County, Florida, to support FCG's growth along the Indian River's barrier island. As part of this agreement, Peninsula Pipeline constructed approximately 11.3 miles of pipeline from its existing pipeline in the Sebastian, Florida. The project went into service in April 2023. Subsequent to the acquisition of FCG, the agreement is now an affiliate agreement. The project generated additional adjusted gross margin of $0.6 million for the year ended December 31, 2024, and is expected to produce adjusted gross margin of approximately $2.4 million in 2025 and thereafter.
Previous wording
In July 2022, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 2,400 Dt/day of firm service in the St. Cloud, Florida area. As part of this agreement, Peninsula Pipeline constructed a pipeline extension and regulator station for FPU. The extension supports new incremental load due to growth in the area, including providing service, most immediately, to the residential development, Twin Lakes. The expansion also improves reliability and provides operational benefits to FPU’s existing distribution system in the area, supporting future growth. This project was placed into service in July 2023 and generated additional adjusted gross margin of $0.3 million for the year ended December 31, 2023. We expect this extension to generate additional annual adjusted gross margin of approximately $0.6 million in 2024 and beyond.
Current wording
In July 2022, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 2,400 Dts/d of firm service in the St. Cloud, Florida area. As part of this agreement, Peninsula Pipeline constructed a pipeline extension and regulator station for FPU. The extension supports new incremental load due to growth in the area, including providing service, most immediately, to the residential development, Twin Lakes. The expansion also improves reliability and provides operational benefits to FPU’s existing distribution system in the area, supporting future growth. This project was placed into service in July 2023 and generated additional adjusted gross margin of $0.3 million for the year ended December 31, 2024. We expect this extension to generate annual adjusted gross margin of $0.6 million in 2025 and thereafter.
Previous wording
In August 2022, Peninsula Pipeline and FPU filed a joint petition with the Florida PSC for approval of its Transportation Service Agreement associated with the Wildlight planned community located in Nassau County, Florida. The project enables us to meet the significant growing demand for service in Yulee, Florida. The agreement will enable us to build the project during the construction and build-out of the community, and charge the reservation rate as each phase of the project goes into service. Construction of the pipeline facilities will occur in two separate phases. Phase one consists of three extensions with associated facilities, and a gas injection interconnect with associated facilities. Phase two will consist of two additional pipeline extensions. Various phases of the project commenced in the first quarter of 2023, with construction on the overall project continuing through 2025. The project generated additional adjusted gross margin of $0.5 million for the year ended December 31, 2023, and is expected to contribute adjusted gross margin of approximately $2.0 million in 2024 and beyond.
Current wording
In August 2022, Peninsula Pipeline and FPU filed a joint petition with the Florida PSC for approval of its Transportation Service Agreement associated with the Wildlight planned community located in Nassau County, Florida. The project enables us to meet the significant growing demand for service in Yulee, Florida. The agreement enables us to construct the project during the build-out of the community and charge the reservation rate as each phase of the project goes into service. Construction of the pipeline facilities will occur in two separate phases. Phase one consists of three extensions with associated facilities, and a gas injection interconnect with associated facilities. Phase two will consist of two additional pipeline extensions. The petition was approved by the Florida PSC in November 2022. The various phases of the project commenced in the first quarter of 2023, with construction on the overall project continuing through 2025. The project generated additional adjusted gross margin of $1.0 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $3.0 million in 2025 and $4.3 million thereafter.
Previous wording
In February 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with our Florida Natural Gas distribution business, FPU, for an additional 9,000 Dt/d of firm service in the Lake Wales, Florida area. The PSC approved the petition in April 2023. Approval of the agreement enabled Peninsula Pipeline to complete the acquisition of an existing pipeline in May 2023 that is being utilized to serve both current and new natural gas customers. The project generated additional adjusted gross margin of $0.3 million for the year ended December 31, 2023, and is expected to contribute adjusted gross margin of approximately $0.5 million in 2024 and beyond.
Current wording
In February 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 9,000 Dts/d of firm service in the Lake Wales, Florida area. The PSC approved the petition in April 2023 and Peninsula Pipeline completed the acquisition of an existing pipeline in May 2023 that is being utilized to serve both current and new natural gas customers. The project generated additional adjusted gross margin of $0.2 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $0.5 million in 2025 and thereafter.
Previous wording
In April 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 8,000 Dt/d of firm service in the Newberry, Florida area. The petition was approved by the Florida PSC in the third quarter of 2023. Peninsula Pipeline will construct a pipeline extension, which will be used by FPU to support the development of a natural gas distribution system to provide gas service to the City of Newberry. A filing to address the acquisition and conversion of propane community gas systems in Newberry was made in November 2023, and the Florida PSC is scheduled to vote on this in March 2024. The project is expected to contribute adjusted gross margin of approximately $0.9 million in 2024 and $2.6 million in 2025 and beyond.
Current wording
In April 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreement with FPU for an additional 8,000 Dts/d of firm service in the Newberry, Florida area. The petition was approved by the Florida PSC in the third quarter of 2023. Peninsula Pipeline will construct a pipeline extension, which will be used by FPU to support the development of a natural gas distribution system to provide gas service to the City of Newberry. A filing to address the acquisition and conversion of existing Company owned propane community gas systems in Newberry was made in November 2023. The Florida PSC approved it in April 2024, and conversions of the community gas systems commenced in the second quarter of 2024. The project generated adjusted gross margin of $1.4 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $2.6 million in 2025 and thereafter.
Previous wording
In August 2023, Eastern Shore filed an application with the FERC requesting authorization to construct the Worcester Resiliency Upgrade, which consists of a mixture of storage and transmission facilities in Sussex County, DE and Wicomico, Worcester, and Somerset Counties in Maryland. The project will provide long-term incremental supply necessary to support the growing demand of the participating shippers. Eastern Shore has requested certificate authorization by December 2024, with a target in-service date by the third quarter of 2025.
Current wording
In August 2023, Eastern Shore filed an application with the FERC requesting authorization to construct the Worcester Resiliency Upgrade, which consists of a mixture of storage and transmission facilities in Sussex County, DE and Wicomico, Worcester, and Somerset Counties in Maryland. The project will provide long-term incremental supply necessary to support the growing demand of the participating shippers. In January 2025, the FERC approved the project, and construction is expected to be complete in the third quarter of 2025. The project is expected to contribute adjusted gross margin of approximately $3.0 million in 2025 and $13.7 million thereafter.
Previous wording
In December 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities on the East Coast of Florida. The projects are driven by the need for increased supply to coastal portions of the state that have experienced an increase in population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Boynton Beach and New Smyrna Beach with an additional 15,000 Dts/day and 3,400 Dts/day, respectively. The Florida PSC is scheduled to vote on the projects in March 2024.
Current wording
In December 2023, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities on the East Coast of Florida. The projects are driven by the need for increased supply to coastal portions of the state that have experienced an increase in population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Boynton Beach and New Smyrna Beach with an additional 15,000 Dts/d and 3,400 Dts/d, respectively. The Florida PSC approved the projects in March 2024. Construction is projected to be complete in the second and fourth quarters of 2025 for New Smyrna Beach and Boynton Beach, respectively. The projects are expected to contribute adjusted gross margin of approximately $4.8 million in 2025 and $6.0 million in 2026 and thereafter.
Previous wording
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities located in Central Florida. The projects are driven by the need for increased supply to communities in central Florida that have experienced an increase in population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Plant City and Lake Mattie with an additional 5,000 Dts/day and 8,700 Dts/day, respectively.
Current wording
In February 2024, Peninsula Pipeline filed a petition with the Florida PSC for approval of its Transportation Service Agreements with FPU for projects that will support additional supply to communities located in Central Florida. The projects are driven by the need for increased supply to communities in central Florida that are experiencing significant population growth. Peninsula Pipeline will construct several pipeline extensions which will support FPU’s distribution system in the areas of Plant City and Lake Mattie with an additional 5,000 Dts/d and 8,700 Dts/d, respectively. The Florida PSC approved the projects in May 2024. The Plant City project was completed in the fourth quarter of 2024, and the Lake Mattie project is projected to be completed during the fourth quarter of 2025. The completed project generated adjusted gross margin of $0.1 million for the year ended December 31, 2024, and is expected to contribute adjusted gross margin of approximately $2.0 million in 2025 and $4.3 million thereafter.
Previous wording
We have made a commitment to meet customer demand for CNG, RNG and LNG in the markets we serve. This has included making investments within Marlin Gas Services to be able to transport these products through its virtual pipeline fleet to customers. To date, we have also made an infrastructure investment in Ohio, enabling RNG to fuel a third-party landfill fleet and to transport RNG to end use customers off our pipeline system. Similarly, we announced in March 2022, the opening of a high-capacity CNG truck and tube trailer fueling station in Port Wentworth, Georgia. As one of the largest public access CNG stations on the East Coast, it will offer a RNG option to customers in the near future. We constructed the station in partnership with Atlanta Gas Light, a subsidiary of Southern Company Gas.
Current wording
We have made a commitment to meet customer demand for CNG, RNG and LNG in the markets we serve. This has included making investments within Marlin Gas Services to be able to transport these products through its virtual pipeline fleet to customers. To date, we have also made an infrastructure investment in Ohio, enabling RNG to fuel a third party landfill fleet and to transport RNG to end use customers off our pipeline system.
Previous wording
We are also involved in various other projects, all at various stages and all with different opportunities to participate across the energy value chain. In many of these projects, Marlin will play a key role in ensuring the RNG is transported to one of our many pipeline systems where it will be injected. We include our RNG transportation service and infrastructure related adjusted gross margin from across the organization in combination with our CNG and LNG projects.
Current wording
We are also involved in various other projects, all at various stages and all with different opportunities to participate across the energy value chain. In many of these projects, Marlin will play a key role in ensuring the RNG is transported to one of our many pipeline systems where it will be injected. We include our RNG transportation services and infrastructure related adjusted gross margin from across the organization in combination with our CNG and LNG projects.
Previous wording
For the year ended December 31, 2023, we generated $0.1 million in additional adjusted gross margin associated with the transportation of CNG and RNG by Marlin's virtual pipeline and Aspire Energy's Noble Road RNG pipeline. We estimate annual adjusted gross margin of approximately $12.5 million in 2024, and $14.0 million in 2025 for these transportation related services, with potential for additional growth in future years.
Current wording
For the year ended December 31, 2024, we generated $5.3 million in additional adjusted gross margin including the margin attributable to the Full Circle Dairy and Noble Road projects described below. We estimate annual adjusted gross margin of approximately $20.0 million in 2025, and $20.7 million in 2026 for these transportation related services, with potential for additional growth in future years.
Previous wording
In February 2023, we announced plans to construct, own and operate a dairy manure RNG facility at Full Circle Dairy in Madison County, Florida. The project consists of a facility converting dairy manure to RNG and transportation assets to bring the gas to market. The first injection of RNG is projected to occur in the first half of 2024.
Current wording
In February 2023, we announced plans to construct, own and operate a dairy manure RNG facility at Full Circle Dairy in Madison County, Florida. The project consists of a facility converting dairy manure to RNG and transportation assets to bring the gas to market. The first injection of RNG occurred in the second quarter of 2024.
Previous wording
In October 2021, Aspire Energy completed construction of its Noble Road Landfill RNG pipeline project, a 33.1-mile pipeline, which transports RNG generated from the Noble Road landfill to Aspire Energy’s pipeline system, displacing conventionally produced natural gas. In conjunction with this expansion, Aspire Energy also upgraded an existing compressor station and installed two new metering and regulation sites. The RNG volume is expected to represent nearly 10 percent of Aspire Energy’s gas gathering volumes.
Current wording
In October 2021, Aspire Energy completed construction of its Noble Road Landfill RNG pipeline project, a 33.1-mile pipeline, which transports RNG generated from the Noble Road landfill to Aspire Energy’s pipeline system, displacing conventionally produced natural gas. In conjunction with this expansion, Aspire Energy also upgraded an existing compressor station and installed two new metering and regulation sites. The RNG volume represents more than 10 percent of Aspire Energy’s gas gathering volumes.
Previous wording
In February 2023, FPU filed a petition with the Florida PSC for approval of the GUARD program. GUARD is a ten-year program to enhance the safety, reliability, and accessibility of portions of our natural gas distribution system. We identified various categories of projects to be included in GUARD, which include the relocation of mains and service lines located in rear easements and other difficult to access areas to the front of the street, the replacement of problematic distribution mains, service lines, and maintenance and repair equipment and system reliability projects. In August 2023, the Florida PSC approved the GUARD program, which included $205 million of capital expenditures projected to be spent over a 10-year period. For the year ended December 31, 2023, there was $0.4 million of incremental adjusted gross margin generated pursuant to the program. The program is expected to generate $2.4 million of adjusted gross margin in 2024 and $5.1 million in 2025.
Current wording
In February 2023, FPU filed a petition with the Florida PSC for approval of the GUARD program. GUARD is a ten-year program to enhance the safety, reliability, and accessibility of portions of our natural gas distribution system. We identified various categories of projects to be included in GUARD, which include the relocation of mains and service lines located in rear easements and other difficult to access areas to the front of the street, the replacement of problematic distribution mains, service lines, and maintenance and repair equipment and system reliability projects. In August 2023, the Florida PSC approved the GUARD program, which included $205 million of capital expenditures projected to be spent over a 10-year period. For the year ended December 31, 2024, there was $3.2 million of incremental adjusted gross margin generated pursuant to the program. The program is expected to generate $6.3 million of adjusted gross margin in 2025 and $8.8 million in 2026.
Previous wording
In June 2023, the Florida PSC issued the approval order for the continuation of the SAFE program beyond its 2025 expiration date and inclusion of 150 miles of additional mains and services located in rear property easements. The SAFE program is designed to relocate certain mains and facilities associated with rear lot easements to street front locations to improve FCG's ability to inspect and maintain the facilities and reduce opportunities for damage and theft. In the same order, the Commission approved a replacement of 160 miles of pipe that was used in the 1970s and 1980s and shown through industry research to exhibit premature failure in the form of cracking. The program includes projected capital expenditures of $205 million over a 10-year period. The program is expected to generate $2.7 million of adjusted gross margin in 2024 and $5.3 million in 2025.
Current wording
In June 2023, the Florida PSC issued the approval order for the continuation of the SAFE program beyond its 2025 expiration date and inclusion of 150 miles of additional mains and services located in rear property easements. The SAFE program is designed to relocate certain mains and facilities associated with rear lot easements to street front locations to improve FCG's ability to inspect and maintain the facilities and reduce opportunities for damage and theft. In the same order, the Commission approved a replacement of 160 miles of pipe that was used in the 1970s and 1980s and shown through industry research to exhibit premature failure in the form of cracking. The program includes projected capital expenditures of $205 million over a 10-year period. For the year ended December 31, 2024, there was $3.8 million of adjusted gross margin generated pursuant to the program. The program is expected to generate $8.3 million of adjusted gross margin in 2025 and $10.9 million in 2026.
Previous wording
In December 2019, the FERC approved Eastern Shore’s capital cost surcharge to become effective January 1, 2020. The surcharge, an approved item in the settlement of Eastern Shore’s last general rate case, allows Eastern Shore to recover capital costs associated with mandated highway or railroad relocation projects that required the replacement of existing Eastern Shore facilities. In 2023, there was$0.8 million of incremental adjusted gross margin generated pursuant to the program. Eastern Shore expects to produce adjusted gross margin of approximately$4.0 million in 2024 and$4.4 million in 2025 from relocation projects, which is ultimately dependent upon the timing of filings and the completion of construction.
Current wording
In December 2024, Eastern Shore submitted a filing with the FERC regarding a capital cost surcharge to recover capital costs associated with the replacement of existing Eastern Shore facilities because of mandated highway relocation projects as well as compliance with a PHMSA regulation. The capital cost surcharge mechanism was approved in Eastern Shore's last rate case. In conjunction with the filing of this surcharge, a cumulative adjustment to the existing surcharge to reflect additional depreciation was included. The FERC issued an order approving the surcharge as filed in December 2024. The combined revised surcharge became effective January 1, 2025. For the year ended December 31, 2024, there was$0.4 million of incremental adjusted gross margin generated pursuant to the program. Eastern Shore expects to produce adjusted gross margin of approximately$5.3 million in 2025 and$6.7 million in 2026 from relocation projects, which is ultimately dependent upon the timing of filings and the completion of construction.
Previous wording
In May 2022, our legacy natural gas distribution businesses in Florida filed a consolidated natural gas rate case with the Florida PSC. The application included a request for the following: (i) permanent rate relief of approximately $24.1 million, effective January 1, 2023, (ii) a depreciation study also submitted with the filing; (iii) authorization to make certain changes to tariffs to include the consolidation of rates and rate structure across the businesses and to unify the Florida Natural Gas distribution business under FPU; (iv) authorization to retain the acquisition adjustment recorded at the time of the FPU merger in our revenue requirement; and (v) authorization to establish an environmental remediation surcharge for the purposes of addressing future expected remediation costs for FPU MGP sites. In August 2022, interim rates were approved by the Florida PSC in the amount of approximately $7.7 million on an annualized basis, effective for all meter readings in September 2022. The discovery process and related hearings were concluded during the fourth quarter of 2022 and briefs were submitted in the same quarter of 2022. In January 2023, the Florida PSC approved the application for consolidation and permanent rate relief of approximately $17.2 million on an annual basis. Actual rates in connection with the rate relief were approved by the Florida PSC in February 2023 with an effective date of March 1, 2023. For the year ended December 31, 2023, there was $15.8 million of adjusted gross margin generated pursuant to this proceeding, and it is expected to generate $17.2 million of total adjusted gross margin in 2024 and 2025.
Current wording
In May 2022, our legacy natural gas distribution businesses in Florida filed a consolidated natural gas rate case with the Florida PSC. The application included a request for the following: (i) permanent rate relief of approximately $24.1 million, effective January 1, 2023, (ii) a depreciation study also submitted with the filing; (iii) authorization to make certain changes to tariffs to include the consolidation of rates and rate structure across the businesses and to unify the Florida Natural Gas distribution business under FPU; (iv) authorization to retain the acquisition adjustment recorded at the time of the FPU merger in our revenue requirement; and (v) authorization to establish an environmental remediation surcharge for the purposes of addressing future expected remediation costs for FPU MGP sites. In August 2022, interim rates were approved by the Florida PSC in the amount of approximately $7.7 million on an annualized basis, effective for all meter readings in September 2022. In January 2023, the Florida PSC approved the application for consolidation and permanent rate relief of approximately $17.2 million on an annual basis. Actual rates were approved by the Florida PSC in February 2023 with an effective date of March 1, 2023. The proceeding is expected to generate $17.2 million of total adjusted gross margin in 2025 and thereafter.
Previous wording
In January 2024, our natural gas distribution businesses in Maryland, CUC-Maryland Division, Sandpiper Energy, Inc., and Elkton Gas Company (collectively, “Maryland natural gas distribution businesses”) filed a joint application for a natural gas rate case with the Maryland PSC. In connection with the application, we are seeking approval of the following: (i) permanent rate relief of approximately $6.9 million; (ii) authorization to make certain changes to tariffs to include a unified rate structure and to consolidate the Maryland natural gas distribution businesses under the new corporate entity which we anticipate will be called Chesapeake Utilities of Maryland, Inc.; and (iii) authorization to establish a rider for recovery of the costs associated with our new technology systems. The outcome of the application is subject to review and approval by the Maryland PSC.
Current wording
In January 2024, our natural gas distribution businesses in Maryland, CUC-Maryland Division, Sandpiper Energy, Inc., and Elkton Gas Company (collectively, “Maryland natural gas distribution businesses”) filed a joint application for a natural gas rate case with the Maryland PSC. In connection with the application, we sought approval of the following: (i) permanent rate relief of approximately $6.9 million with an ROE of 11.5 percent; (ii)authorization to make certain changes to tariffs to include a unified rate structure and to consolidate the Maryland natural gas distribution businesses which we anticipate will be called Chesapeake Utilities of Maryland, Inc.; and (iii) authorization to establish a rider for recovery of the costs associated with our new technology systems. In August 2024, the Maryland natural gas distribution businesses, the Maryland Office of Peoples' Counsel ("OPC") and PSC Staff reached a settlement agreement which provided for, among other things, an increase in annual base rates of $2.6 million. In September 2024, the Maryland Public Utility Judge issued an order approving the settlement agreement in part. The $2.6 million increase in annual base rates was approved and the Company filed the Phase II filing in November 2024 to determine rate design across the Maryland natural gas distribution businesses, consolidation of the applicable tariffs and recovery of technology costs. The hearing has been scheduled for March 2025 and the outcome of the application is subject to review and approval by the Maryland PSC.
Previous wording
In 2020, the Florida PSC implemented the Storm Protection Plan ("SPP") and Storm Protection Plan Cost Recovery Clause ("SPPCRC"), which require electric utilities to petition the Florida PSC for approval of a Transmission and Distribution Storm Protection Plan that covers the utility’s immediate 10-year planning period with updates to the plan at least every 3 years. The SPPCRC rules allow the utility to file for recovery of associated costs related to its SPP. Our Florida electric distribution operation's SPP and SPPCRC were filed during the first quarter of 2022 and approved in the fourth quarter of 2022, with modifications, by the Florida PSC. For the year ended December 31, 2023, this initiative generated incremental adjusted gross margin of $0.8 million, and is expected to generate$2.4 million in 2024 and$4.0 million in 2025. We expect continued investment under the SPP going forward.
Current wording
In 2020, the Florida PSC implemented the Storm Protection Plan ("SPP") and Storm Protection Plan Cost Recovery Clause ("SPPCRC"), which require electric utilities to petition the Florida PSC for approval of a Transmission and Distribution Storm Protection Plan that covers the utility’s immediate 10-year planning period with updates to the plan at least every 3 years. The SPPCRC rules allow the utility to file for recovery of associated costs related to its SPP. Our Florida electric distribution operation's SPP and SPPCRC were filed during the first quarter of 2022 and approved in the fourth quarter of 2022, with modifications, by the Florida PSC. In October 2024, the Florida PSC approved the Company's projected 2025 SPP costs for both capital and operating expenses. For the year ended December 31, 2024, this initiative generated incremental adjusted gross margin of $1.9 million, and is expected to generate$5.6 million in 2025 and 2026. We expect continued investment under the SPP going forward.
Previous wording
The average number of residential customers served on the Delmarva Peninsula and our legacy Florida Natural Gas distribution business increased by approximately 5.4 percent and 3.9 percent, respectively, during 2023.
Current wording
The average number of residential customers served on the Delmarva Peninsula and our legacy Florida Natural Gas distribution business increased by approximately 4.0 percent and 3.9 percent, respectively, during 2024.
Previous wording
On the Delmarva Peninsula, a larger percentage of the adjusted gross margin growth was generated from residential growth given the expansion of gas into new housing communities and conversions to natural gas as our distribution infrastructure continues to build out. In Florida, as new communities continue to build out due to population growth and the additional infrastructure to support the growth, there is increased load from both residential customers as well as new commercial and industrial customers. The details are provided in the following table:
Current wording
The details are provided in the following table:
Previous wording
(1)Customer growth amounts for our legacy Florida operations include the effects of revised rates associated with the Company's natural gas base rate proceeding, but exclude the effects of the FCG acquisition.
Current wording
(1)Includes growth amounts for our legacy Florida operations, but excludes the effects of FCG.
Previous wording
Operating income for the Regulated Energy segment for 2023 was $126.2 million, an increase of $10.9 million, or 9.4 percent, compared to 2022. Excluding transaction-related expenses associated with the acquisition of FCG, operating income increased $21.2 million or 18.4 percent compared to the prior year. Higher operating income reflects contributions from our regulatory initiatives, organic growth in our natural gas distribution businesses and continued pipeline expansion projects, and contributions from the acquisition of FCG. These increases were partially offset by changes in customer consumption resulting from the significantly warmer temperatures in our northern service territories throughout the year. Excluding the transaction-related expenses described above, operating expenses increased by $10.1 million compared to the prior year primarily attributable to increased employee costs driven by growth initiatives, the ongoing competitive labor market and higher benefits costs and higher property taxes compared to the prior year. Increases in depreciation and amortization expense attributable to growth projects that were placed into service during the current year were offset by reductions related to revised depreciation rates approved in the Company's Florida Natural Gas rate case and electric depreciation study filing, and a $5.1 million RSAM adjustment from FCG.
Current wording
Operating income for the Regulated Energy segment for 2024 was $196.2 million, an increase of $70.0 million or 55.5 percent compared to 2023. Excluding transaction and transition-related expenses associated with the acquisition of FCG, operating income increased $63.6 million or 46.6 percent compared to the prior year. Higher operating income reflects incremental contributions from the acquisition of FCG, incremental margin from our regulatory initiatives and infrastructure programs, and organic growth in our natural gas distribution businesses and pipeline expansion projects. Excluding the transaction and transition-related expenses described above, operating expenses increased by $42.0 million compared to the prior year primarily attributable to increased FCG operating expenses, higher depreciation, amortization and property taxes and increased facilities expenses, maintenance costs and outside services. Increases in depreciation, amortization and property taxes attributable to growth projects and FCG were offset by lower depreciation rates that were approved as part of the rate filings for our Florida electric operations and Maryland natural gas utilities and a $10.4 million increase in the RSAM adjustment from FCG in 2024 compared to the prior year.
Previous wording
(1) Includes adjusted gross margin contributions from interim rates and permanent base rates that became effective in March 2023.
Current wording
(1)Includes adjusted gross margin contributions from permanent base rates that became effective in March 2023.
Previous wording
Contributions from regulated infrastructure programs generated incremental adjusted gross margin of $2.6 million for the year. The increase in adjusted gross margin was primarily related to FPU Electric's storm protection plan, Eastern Shore's capital surcharge program and Florida's GUARD program. Refer to Note 18, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.
Current wording
Regulated infrastructure programs generated incremental adjusted gross margin of $6.2 million for the year ended December 31, 2024. The increase in adjusted gross margin was primarily related to Florida's GUARD program and FPU Electric's SPP. Refer to Note 18, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.
Previous wording
We generated additional adjusted gross margin of $6.2 million from natural gas customer growth. Adjusted gross margin increased by $3.7 million for our Florida Natural Gas distribution business and $2.5 million on the Delmarva Peninsula compared to 2022, due primarily to residential customer growth of 3.9 percent and 5.4 percent in Florida and on the Delmarva Peninsula, respectively.
Current wording
We generated additional adjusted gross margin of $5.8 million from natural gas customer growth. Adjusted gross margin increased by $3.7 million for our Florida Natural Gas distribution business and $2.1 million on the Delmarva Peninsula compared to 2023, due primarily to residential customer growth of 3.9 percent and 4.0 percent in Florida and on the Delmarva Peninsula, respectively.
Previous wording
Natural Gas Transmission Service Expansions
Current wording
Natural Gas Transmission Service Expansions, including interim services
Previous wording
We generated increased adjusted gross margin of $4.8 million from natural gas transmission service expansions of Peninsula Pipeline, Eastern Shore and Aspire Energy Express.
Current wording
We generated increased adjusted gross margin of $5.2 million for the year ended December 31, 2024 from natural gas transmission service expansions of Peninsula Pipeline and Eastern Shore.
Previous wording
In August 2022, the Florida PSC approved interim rates starting in September 2022. In February 2023, we obtained a final rate order in connection with the Florida Natural Gas base rate proceeding with permanent rates effective on March 1, 2023. These interim and permanent rates contributed additional adjusted gross margin of $13.4 million. Refer to Note 18, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.
Current wording
Permanent rates associated with the Florida Natural Gas base rate proceeding, effective on March 1, 2023, contributed additional adjusted gross margin of $1.6 million for the year ended December 31, 2024. Refer to Note 18, Rates and Other Regulatory Activities, in the consolidated financial statements for additional information.
Previous wording
Items contributing to the period-over-period increase in other operating expenses are listed in the following table:
Current wording
Items contributing to the year-over-year increase in other operating expenses are listed in the following table:
Previous wording
(1)Adjusted Gross Margin is a non-GAAP measure utilized by Management to review business unit performance. For a more detailed discussion on the differences between Gross Margin (GAAP) and Adjusted Gross Margin, see the Reconciliation of GAAP to Non-GAAP Measures presented above.
Current wording
(1) Adjusted Gross Margin is a non-GAAP measure utilized by Management to review business unit performance. For a more detailed discussion on the differences between Gross Margin (GAAP) and Adjusted Gross Margin, see the Reconciliation of GAAP to Non-GAAP Measures presented above.
Showing the first 40 of 73 pairs. Open the source sections for the rest.
Rearranged current paragraphs (5)
Current report — wording carried from elsewhere
East Coast Reinforcement Projects (Boynton Beach and New Smyrna Beach)
Current report — wording carried from elsewhere
CNG/RNG/LNG Transportation and Infrastructure
Current report — wording carried from elsewhere
Items contributing to the year-over-year increase in other operating expenses are listed in the following table:
Current report — wording carried from elsewhere
Chesapeake Utilities Corporation 2024 Form 10-K Page 51
Current report — wording carried from elsewhere
Chesapeake Utilities Corporation 2024 Form 10-K Page 52
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
The capital expenditure projection is subject to continuous review and modification. Actual capital requirements may vary from the above estimates due to a number of factors, including changing economic conditions, supply chain disruptions, capital