What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2024-02-02; filed 2024-03-20.
0001571123-24-000045
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2025-01-31; filed 2025-03-17.
0001571123-25-000022
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 114 previous paragraphs and 119 current paragraphs.
47 unchanged; 54 reworded; 14 added; 10 removed; 3 previous and 4 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (14)
Current report
Our profitability and cash flow may vary materially depending on the types of government contracts we are awarded, the nature of services performed under those contracts, the costs incurred in performing the work, the achievement of performance objectives, and the stage of performance at which the right to receive fees is determined, particularly under incentive and award fee contracts. Failure to perform to customer expectations and contract requirements may result in reduced fees or losses and may adversely affect our financial performance.
Current report
We generate revenues under several contract types, including cost-reimbursable, T&M, and FFP contracts. Under cost-reimbursable contracts, the government pays allowable costs incurred during performance of the contract plus a fee up to a ceiling based on the amount that has been funded. Cost, schedule, or technical performance issues on cost-reimbursable contracts could result in reduced fees, decreased profit, or program cancellation. Under T&M contracts, the government pays for the exact cost of all materials, plus a predetermined hourly rate for the labor involved. Under FFP contracts, the government pays a fixed price regardless of the actual costs of performance, meaning that we bear the risk of cost overruns, but we also have the opportunity for profit if we manage the program efficiently. Cost-reimbursable and T&M contracts are generally less profitable than FFP contracts. In fiscal 2025, approximately 16%, 22% and 62% of our total revenues came from FFP contracts, T&M and cost-reimbursable contracts, respectively.
Current report
To varying degrees, there is financial risk with each of these contract types if we underestimate the costs of performance or fail to manage the program efficiently and cost-effectively. Unexpected expenses and/or unanticipated delays (including those caused by contract disputes or other factors outside our control, such as poor performance by our subcontractors, rising inflation, natural disasters, or other force majeure events) could result in reduced profits or losses.
Current report
Our failure to comply with the laws and regulations governing organizational conflicts of interest (“OCIs”) could lead to penalties including, potentially, termination of one or more of our U.S. government contracts.
Current report
The U.S. government may issue or revise existing rules, regulations, and directives at any time, creating uncertainty and requiring unanticipated investments in related compliance efforts.
Current report
In recent quarters, the U.S. government customer has increasingly focused on affordability, efficiencies, and cost recovery when contracting with private companies. The new Department of Government Efficiency (“DOGE”) is currently evaluating federal agencies and existing government contracts, grants, and programs for affordability, efficiency, and alignment with U.S. government objectives. DOGE’s efforts to reduce federal spending create uncertainty and risk for government contractors, including potentially resulting in change in budgetary priorities and timing on issuing awards. Decreases in, or delays in contract awards and in government spending on the types of programs that we support, and terminations or stop-work-orders on government contracts on which we are currently performing could adversely affect our future revenues and profitability. At the same time, given the nature of our business, the administration’s focus on efficiency, along with the potential for certain traditionally government functions to be transferred to private entities, may present business opportunities for us.
Current report
Federal legislation, regulations, executive orders, and other initiatives dealing with, among other things, procurement reform, the mitigation of potential OCIs, the deterrence of fraud, the elimination of diversity, equity, and inclusion (“DEI”), and changes in corporate environmental obligations, could affect our business. Additionally, we are subject to the laws and regulations of the states in which we operate, which, at times, may conflict with federal laws and regulations, introducing ambiguity.
Current report
Recent executive orders relating to DEI and other social issues and “return-to-office” requirements, along with pending legal challenges, create uncertainty and may be temporarily unsettling for portions of our workforce. As always, we are committed to complying with all applicable laws and regulations, and we do not anticipate an adverse impact on our future operations and revenues related to these executive orders.
Current report
The ongoing reforms to the U.S. government acquisition process, including changes to procurement rules and regulations, could transform how contracts are awarded, negotiated, and managed, which could lead to delays in contract awards and/or modifications to the scope or terms of contracts we hold. We could face increased competition, greater scrutiny, a more complex regulatory environment, heightened compliance requirements, and additional administrative burdens, all of which have the potential to affect our profitability.
Current report
The FAR Council recently proposed significant revisions to the FAR related to OCIs, which, if adopted, could limit our ability to bid on certain contracts and/or require us to modify or restructure some business relationships. They could also impose additional compliance burdens and constraints on our business operations. Increased costs related to identifying, assessing, and mitigating OCI's could negatively impact our profitability.
Current report
Similarly, recent executive orders related to energy and the environment suggest a shift towards deregulation at the federal level. Although deregulation initiatives could provide short-term relief from regulatory obligations, the executive orders introduce uncertainty and risk, including the potential for legal challenges and the possibility of new environmental policies at the state or local levels that may impose stricter regulations. We are actively monitoring and adapting to changes in environmental laws, assessing the physical risks posed by climate change, and implementing sustainability initiatives aimed at reducing the environmental impact of our operations. However, the full extent of these risks and their potential impact on our business remains uncertain and could materially affect its financial performance.
Current report
to meet our contractual obligations. Climate-related limitations on individual employees may also create obstacles to meeting customer requirements or our contractual obligations.
Current report
Except where required by law, we expressly disclaim a duty to update or revise any forward-looking statements after the date of this Form 10-K to reflect subsequent events, changed circumstances or expectations, or revised
Current report
estimates and assumptions. The forward-looking statements in this Form 10-K are intended to be subject to the safe harbor protections in the federal securities laws.
Removed paragraphs (10)
Previous report
We generate revenues under various types of contracts, which include cost-reimbursement, T&M and FFP contracts. Our earnings and profitability may vary materially depending on changes in the proportionate amount of revenues derived from each type of contract, the nature of services or solutions provided, as well as the achievement of performance objectives and the stage of performance at which the right to receive fees, particularly under incentive and award fee contracts, is finally determined. Cost-reimbursement and T&M contracts generally have lower profitability than FFP contracts. To varying degrees, each of our contract types involves some risk that we could underestimate the costs and resources necessary to fulfill the contract. Our profitability is adversely affected when we incur costs on cost-reimbursement and T&M contracts that we cannot bill to our customers. While FFP contracts allow us to benefit from cost savings, these contracts also increase our exposure to the risk of cost overruns. Revenues derived from FFP contracts represented approximately 19% of our total revenues for fiscal 2024. When making proposals on FFP contracts, we rely heavily on our estimates of costs and timing for completing the associated projects, as well as assumptions regarding technical issues. In each case, our failure to accurately estimate costs or the resources and technology needed to perform our contracts or to effectively manage and control our costs during the performance of work could result, and in some instances has resulted, in reduced profits or in losses. More generally, any increased or unexpected costs or unanticipated delays in connection with the performance of our contracts, including costs and delays caused by contractual disputes or other factors outside of our control (such as performance failures of our subcontractors, rising inflation, natural disasters or other force majeure events including the outbreak of the coronavirus disease 2019 ("COVID-19")) could make our contracts less profitable than expected or unprofitable.
Previous report
Our failure to comply with a variety of complex procurement rules and regulations could result in our being liable for penalties, including termination of our U.S. government contracts, disqualification from bidding on future U.S. government contracts and suspension or debarment from U.S. government contracting.
Previous report
We must comply with various laws and regulations relating to the formation, administration and performance of U.S. government contracts, which affect how we do business with our customers and may impose added costs on our business.
Previous report
The U.S. government may adopt new contract rules and regulations or revise its procurement practices in a manner adverse to us at any time.
Previous report
Our industry continues to experience significant changes to business practices as a result of an increased focus on affordability, efficiencies and recovery of costs, among other items. U.S. government agencies may face restrictions or pressure regarding the type and amount of services that they may obtain from private contractors. Legislation, regulations and initiatives dealing with procurement reform, mitigation of potential OCI’s, deterrence of fraud, and environmental responsibility or sustainability could have an adverse effect on us. Federal and state laws, regulations and mandates that require significant progress to reduce the impact of climate change through carbon pollution-free electricity, net-zero emissions in vehicles, buildings, procurement and operations, and similar actions could diminish or weaken our ability to attain new contracts or garner renewals. As a government services provider, we anticipate that requirements around supply chain management and specific procurement strategies to reduce contractor emissions and emissions in products used or acquired could impair the Company from effectively competing. Further, requirements around the disclosure of greenhouse gas emissions, particularly Scope 3 emissions, emission reduction targets, climate risk, and other climate sustainability actions could potentially have a negative impact to our business and the ability to secure certain contracts or contract renewals. The risk of more rapidly shifting or changing government policies could have an equally adverse effect on government contractors such as ourselves. Moreover, shifts in the buying practices of U.S. government agencies (such as increased usage of fixed-price contracts, multiple award contracts and small business set-aside contracts) could have adverse effects on government contractors, including us. Any of these changes could impair our ability to obtain new contracts or contract renewals. Any new contracting requirements or procurement methods, including those related to climate change, could be costly or administratively difficult for us to implement and could adversely affect our future revenues, profitability and prospects.
Previous report
Misconduct by our employees, subcontractors, agents or business partners could subject us to fines and penalties, restitution or other damages, loss of security clearance, loss of current and future customer contracts and suspension or debarment from contracting with federal, state or local government agencies, any of which would adversely affect our business and our future results. Such misconduct could include fraud or other improper activities such as falsifying time or other records, failure to comply with our policies and procedures or violations of applicable laws and regulations.
Previous report
Our customers, both government and civil, may shift priorities, requirements and business processes in response to climate change, which could affect our business and revenues.
Previous report
You may not be able to rely on forward-looking statements.
Previous report
reflected in the forward-looking statements are reasonable when made, we cannot guarantee future results, levels of activity, performance or achievements. There are a number of important factors that could cause our actual results to differ materially from those results anticipated by our forward-looking statements, which include, but are not limited to, the risk factors discussed above.
Previous report
We do not undertake any obligation to update or revise any of the forward-looking statements to reflect events, circumstances, changes in expectations, or the occurrence of unanticipated events after the date of those statements or to conform these statements to actual results.
Reworded paragraphs (54)
Previous wording
In your evaluation of our Company and business, you should carefully consider the risks and uncertainties described below, together with information included elsewhere within this report and other documents we file with the SEC. These risks, as well as additional risks and uncertainties not currently known to us or that we currently believe are immaterial also may materially harm our business, financial condition or operating results and result in a decline in the price of our stock.
Current wording
In your evaluation of our Company and business, you should carefully consider the risks and uncertainties described below, together with information included elsewhere within this report and other documents we file with the SEC. These risks, as well as additional risks and uncertainties not currently known to us or that we currently believe are immaterial also may materially harm our business, financial condition or operating results and thus result in a decline in the price of our stock.
Previous wording
We depend on U.S. government agencies as our primary customer and, if our reputation or relationships with these agencies were harmed, our future revenues and cash flows would be adversely affected.
Current wording
We depend on U.S. government agencies as our primary customers and, if our reputation or relationships with these agencies were to be harmed, it could adversely impact our financial performance.
Previous wording
We generated 98% of our total revenues during each of the last three fiscal years from contracts with the U.S. government either as a prime contractor or a subcontractor to other contractors engaged in work for the U.S. government. We expect to continue to derive substantially all of our revenues from work performed under U.S. government contracts. Our reputation and relationship with the U.S. government, and in particular with the agencies of the DoD, are key factors in maintaining and growing these revenues. Negative press reports or publicity, regardless of accuracy, could harm our reputation. If our reputation is negatively affected, or if we are suspended or debarred from contracting with government agencies for any reason, the amount of business with government and other customers would decrease and our future revenues, cash flows, and financial results would be adversely affected.
Current wording
We generated 98% of our total revenues during each of the last three fiscal years from contracts with the U.S. government, either as a prime contractor or as a subcontractor to other companies performing prime contracts for the U.S. government. We expect to continue to derive substantially all of our revenues from work performed under U.S. government contracts. Our relationship with the U.S. government – particularly with DoD agencies – is key to maintaining these contracts, winning new work, and growing our revenues. Negative press reports or publicity, regardless of accuracy, could harm our reputation and jeopardize our business with our customers, potentially adversely affecting our revenues, cash flows, and financial results.
Previous wording
A decline in the U.S. government defense budget, changes in spending or budgetary priorities, the failure to approve U.S. government budgets on a timely basis or delays in contract awards and other procurement activity may significantly and adversely affect our future revenues, cash flow and financial results.
Current wording
Reduced U.S. government defense spending, changes in acquisition priorities, significant delays in U.S. government appropriations, and delays in contract awards, program starts, and other procurement activity, could adversely affect our future revenues, cash flow, and financial results.
Previous wording
Because we generate substantially all of our revenues from contracts with U.S. government agencies, our operating results could be adversely affected by spending caps or changes in budgetary priorities, as well as by delays in the government budget process, program starts or the award of contracts or task orders under contracts. Current U.S. government spending levels for defense-related and other programs may not be sustained through government fiscal year ("GFY") 2024. Future spending and program authorizations may not increase or may decrease or shift to programs in areas in which we do not provide services or are less likely to be awarded contracts. Such changes in spending authorizations and budgetary priorities may occur as a result of shifts in spending priorities. A change in administrations or changing national priorities may reduce defense-related and other programs as a result of competing demands for federal funds and the number and intensity of military conflicts or other factors.
Current wording
Because we generate substantially all of our revenues from contracts with U.S. government agencies, our operating results could be adversely affected by spending caps, changes in budgetary priorities, or delays in the government budget process, program starts, or the award of contracts or task orders under contracts. Current U.S. government spending levels for defense-related and other programs may not be sustained through government fiscal year ("GFY") 2025. Future spending and program authorizations may be stagnant or decrease, or spending priorities may shift to programs in areas in which we do not provide services or are less likely to be awarded contracts. A change in administration or changing national priorities may reduce defense-related and other programs due to competing demands for federal funds and the number and intensity of military conflicts or other factors.
Previous wording
When the U.S. Congress does not complete a budget before the end of the fiscal year, government operations typically are funded through one or more continuing resolutions that authorize agencies of the U.S. government to continue to operate, but do not authorize new spending initiatives. When the U.S. government operates under a continuing resolution, contract awards may be delayed, canceled, or funded at lower levels, which could adversely impact our operations, cash flows and financial results.
Current wording
When Congress fails to pass a budget before the end of the fiscal year, government operations typically are funded through one or more continuing resolutions ("CRs"), which enable government agencies to continue operating but do not allow new spending initiatives. CRs can lead to contract awards being delayed, canceled, or funded at lower levels, which could adversely impact our operations, cash flows, and financial results.
Previous wording
The U.S. government also conducts periodic reviews of U.S. defense strategies and priorities, which may shift DoD budgetary priorities, reduce overall spending or delay contract or task order awards for defense-related programs from which we would otherwise expect to derive a significant portion of our future revenues. A significant decline in overall U.S. government spending, a significant shift in spending priorities, the substantial reduction or elimination of particular defense-related programs or significant budget-related delays in contract or task order awards for large programs could adversely affect our future revenues and limit our growth prospects.
Current wording
The U.S. government also conducts periodic reviews of U.S. defense strategies and priorities, which may shift DoD budgetary priorities, reduce overall spending or delay contract or task order awards for defense-related programs from which we would otherwise expect to derive a significant portion of our future revenues. A significant decline in overall U.S. government spending, a significant shift in spending priorities, the substantial reduction or elimination of defense-related programs or significant budget-related delays in contract or task order awards for large programs could adversely affect our future revenues and limit our growth prospects.
Previous wording
We expect that a majority of the business that we seek in the foreseeable future will be awarded through a competitive bidding process as the U.S. government increasingly relies on IDIQ, GSA Schedule and other multi-award contracts, which has resulted in greater competition and increased pricing pressure. The competitive bidding process involves substantial costs and a number of risks, including significant cost and managerial time to prepare bids and proposals for contracts that may not be awarded to us, or that may be awarded but for which we do not receive meaningful task orders. Following contract award, we may encounter significant expense, delay, contract modifications or even contract loss as a result of our competitors protesting the award of contracts to us in competitive bidding. Any resulting loss or delay of startup and funding of work under protested contract awards may adversely affect our revenues and/or profitability. In addition, multi-award contracts require that we make sustained post-award efforts to obtain task orders under the contract. As a result, we may not be able to obtain these task orders or recognize revenues under these multi-award contracts. Our failure to compete effectively in this procurement environment would adversely affect our revenues and profitability.
Current wording
We expect that most of the contracts we pursue in the foreseeable future will be awarded through a competitive bidding process as the U.S. government increasingly relies on IDIQ, GSA Schedule, and other multi-award contracts, which has led to greater competition and increased pricing pressure. The competitive bidding process involves substantial resources and a number of risks, including significant cost and managerial time to prepare bids and proposals for contracts that may not be awarded to us, or that may be awarded but for which we do not receive meaningful task orders. Following contract award, we may encounter significant expense, delay, contract modifications, or even contract loss in the event our competitors protest the award of contracts to us in competitive bidding. Any resulting loss or delay of startup and funding of work under protested contract awards may adversely affect our revenues and/or profitability. In addition, multi-award contracts require that we make sustained post-award efforts to obtain task orders under the contract, failure of which may result in us not recognizing revenues under these multi-award contracts. Our failure to compete effectively in this procurement environment could adversely affect our revenues and profitability.
Previous wording
We compete with larger companies that have greater name recognition, financial resources and larger technical staffs and with smaller, more specialized companies that are able to concentrate their resources on particular areas. Additionally, we may compete with the U.S. government’s own capabilities. To remain competitive, we must consistently provide superior service, technology and performance on a cost-effective basis to our customers and there is no assurance that we will do so.
Current wording
We compete with larger companies that have more name recognition, greater financial resources, and larger technical staffs, and we also compete with smaller, more specialized companies that concentrate their resources on particular areas. Additionally, we may compete with the U.S. government’s own capabilities. To remain competitive, we must consistently provide superior service, technology, and performance on a cost-effective basis to our customers.
Previous wording
Our earnings and profitability may vary based on the mix of our contracts and may be adversely affected by our failure to accurately estimate and manage costs, time and resources.
Current wording
Our earnings and profitability may vary based on the mix of our contracts and may be adversely impacted if we fail to estimate and manage costs, time, and resources accurately.
Previous wording
We use estimates in recognizing revenues and, if we make changes to estimates used in recognizing revenues, our profitability may be adversely affected.
Current wording
We use estimates in recognizing revenues, and our profitability may be adversely affected if we make changes to those estimates.
Previous wording
A significant portion of our revenues are recognized on contracts using a cost input measure, which requires estimates of total costs at completion, fees earned, or both. Particularly due to the technical nature of the services being performed and the length of certain contracts, this estimation process is complex and involves significant judgment. Adjustments to original estimates are often required as work progresses, experience is gained and additional information becomes known, even though the scope of the work required under the performance obligation may not change. Any adjustment as a result of a change in estimate is recognized immediately. Changes in the underlying assumptions, circumstances or estimates could result in adjustments that may adversely affect future financial results.
Current wording
A significant portion of our revenues are recognized on contracts using a cost input measure, which requires estimates of total costs at completion, fees earned, or both. Due to the technical nature of our services and the length of certain contracts, this estimation process is complex and involves significant judgment. Adjustments to original estimates are often required as work progresses, experience is gained, and additional information becomes known, even though the scope of the work required under the performance obligation may not have changed. Changes in the underlying assumptions, circumstances, or estimates could necessitate adjustments that may adversely affect future financial results.
Previous wording
Our business is subject to reviews, audits and cost adjustments by the U.S. government, which, if resolved unfavorably to us, could adversely affect our profitability, cash flows or growth prospects.
Current wording
We are subject to government audits, cost adjustments, reviews, and investigations that could adversely affect our profitability, cash flows, or growth prospects.
Previous wording
The DCAA, DCMA and others routinely audit and review a contractor’s performance on government contracts, indirect cost rates and pricing practices, and compliance with applicable contracting and procurement laws, regulations and standards. They also review the adequacy of the contractor’s compliance with government standards for its business systems, which are defined as the contractor’s accounting, earned value management, estimating, materials management, property management and purchasing systems. A finding of significant control deficiencies in a contractor’s business systems or a finding of noncompliance with CAS can result in decremented billing rates to U.S. government customers until the control deficiencies are corrected and their remediation is accepted by the DCMA. The agencies conducting these audits and reviews have come under increased scrutiny. As a result, audits and reviews have become more rigorous and the standards to which we are held are being more strictly interpreted, which has increased the likelihood of an audit or review resulting in an adverse outcome.
Current wording
The DCAA, the DCMA, and others routinely audit a contractor’s performance on government contracts, indirect cost rates and pricing practices, and compliance with applicable government contracting and procurement laws, regulations, and standards. They also review the adequacy of the contractor’s compliance with government standards for its business systems, including its accounting, earned value management, estimating, materials management, property management, and purchasing systems. A finding of significant control deficiencies in a contractor’s business systems or a finding of noncompliance with the CAS can result in decremented billing rates until the control deficiencies are corrected and DCMA approves their remediation. Government audits and reviews have become more rigorous as the agencies that conduct them have come under increased scrutiny, leading to stricter interpretations of the standards to which government contractors are held and the increased likelihood of adverse outcomes.
Previous wording
Government audits and reviews may conclude that our practices are not consistent with applicable laws and regulations and result in adjustments to contract costs and mandatory customer refunds. Such adjustments can be applied retroactively, which could result in significant customer refunds. Receipt of adverse audit findings or the failure to obtain an “approved” determination on our various business systems could significantly and adversely affect our business by, among other things, restricting our ability to bid on new contracts and, for those proposals under evaluation, diminishing our competitive position. A determination of noncompliance could also result in the U.S. government imposing penalties and sanctions against us, including withholding of payments, suspension of payments and increased government scrutiny. Increased scrutiny could adversely impact our ability to perform on contracts, affect our ability to invoice for work performed, delay the receipt of timely payment on contracts, and weaken our ability to compete for new contracts with the U.S. government.
Current wording
Government audits may conclude that our practices are not consistent with applicable laws and regulations, leading to adjustments to contract costs and mandatory customer refunds. Such adjustments can be applied retroactively. Adverse audit findings or the failure to obtain an “approved” determination on our systems could adversely affect our business by, among other things, restricting our ability to bid on new contracts and diminishing our competitive position for proposals under evaluation. A determination of noncompliance could also result in the U.S. government imposing penalties and sanctions against us, including withholding of payments, suspension of payments, and increased government scrutiny. Increased scrutiny could adversely impact contract performance, impede our invoicing for work performed, delay our receipt of timely payment, and weaken our ability to compete for new contracts.
Previous wording
The indirect cost audits by the DCAA of the Company’s business remain open for certain prior years and the current year. We have recorded contract revenues based on an estimate of costs that we believe will be approved on final audit. However, we do not know the outcome of any ongoing or future audits or whether future adjustments will exceed our reserves for potential adjustments.
Current wording
As is typical in our industry, DCAA’s indirect cost audits of our business remain open for certain prior years and the current year. We have recorded contract revenues based on an estimate of costs that we believe will be approved. However, we cannot guarantee the outcome of any ongoing or future audits or that any required adjustments will not exceed our reserves.
Previous wording
Many of the U.S. government programs in which we participate as a contractor or subcontractor may extend for several years and include one or more base years and one or more option years. Under our contracts, the U.S. government generally has the right not to exercise options to extend or expand our contracts and may otherwise terminate, cancel, modify or curtail our contracts at its convenience. Any decision by the U.S. government not to exercise contract options or to terminate, cancel, modify or curtail our major programs or contracts would adversely affect our revenues, revenue growth and profitability.
Current wording
Many of the U.S. government programs for which we are a prime contractor or subcontractor may extend for several years, and may include one or more base years and one or more option years. The U.S. government generally has the right not to exercise options to extend or expand our contracts, and may otherwise terminate, cancel, modify, or curtail our contracts at its convenience. Any decision by the U.S. government not to exercise contract options or to terminate, cancel, modify, or curtail our major programs or contracts would adversely affect our revenues, revenue growth, and profitability.
Previous wording
We have experienced and continue to experience periodic performance issues under certain of our contracts. If a government customer terminates a contract for default, we may be exposed to liability, including for excess costs incurred by the customer in procuring undelivered services and solutions from another source. Depending on the nature and value of the contract, a performance issue or termination for default could cause our actual results to differ from those anticipated and could harm our reputation.
Current wording
We have experienced, and will continue to experience in the normal course of business, periodic performance issues under certain of our contracts. If a government customer terminates a contract for default, we may be exposed to liability, including for excess costs incurred by the customer in procuring undelivered services and solutions from another source. Depending on the nature and value of the contract, a performance issue or termination for default could cause our actual results to differ from those anticipated and could harm our reputation.
Previous wording
Our use of net operating loss carryforwards and other tax attributes to offset future taxable income may become limited in the event that we or the IRS determines that we have experienced an ownership change.
Current wording
Our use of net operating loss carryforwards and other tax attributes to offset future taxable income may become limited if we or the IRS determine that we have experienced an ownership change.
Previous wording
As of February 2, 2024, we have estimated $251 million of gross net operating loss carryforwards and tax basis in our acquired amortizable goodwill and other intangible assets of approximately $1.2 billion. Net operating loss carryforwards and other tax attributes are subject to various annual limitations under Sections 382 and 383 of the Internal Revenue Code, which restricts a corporation’s ability to use such carryforwards and attributes following an ownership change.
Current wording
As of January 31, 2025, we have estimated $223 million of gross net operating loss carryforwards and gross tax basis in our acquired amortizable goodwill, as well as other intangible assets of approximately $1.0 billion. Net operating loss carryforwards and other tax attributes are subject to various annual limitations under Sections 382 and 383 of the Internal Revenue Code, which restricts a corporation’s ability to use such carryforwards and attributes following an ownership change.
Previous wording
Changes in U.S. (federal or state) regulations, or their interpretation and application, including those with retroactive effect, could result in increases in our tax expense and affect profitability and cash flows. For example, beginning in fiscal 2023, the Tax Cuts and Jobs Act of 2017 eliminated the option to deduct research and development expenditures immediately in the year incurred and requires taxpayers to amortize such expenditures over five years for tax purposes. While the impact to income taxes payable was most significant in fiscal 2023, this impact will decrease over the five-year amortization period and is anticipated to be immaterial in year six. The actual impact will depend on the amount of research and development costs incurred by the Company, whether Congress modifies, or repeals this provision and whether new guidance and interpretive rules are issued by the U.S. Treasury, among other factors.
Current wording
Changes in federal or state tax regulations or in their interpretation and application, including those with retroactive effect, could cause increases in our tax expense and affect profitability and cash flows. For example, beginning in fiscal 2023, the Tax Cuts and Jobs Act of 2017 eliminated the option to deduct research and development expenditures in the year incurred, instead requiring taxpayers to amortize such expenditures over five years for tax purposes. The impact of this change is dependent on the amount of research and development expenses we incur, as well as the potential for Congress to modify or repeal the provision or for the U.S. Treasury Department to release new guidance or interpretive rules. The impact to our income taxes payable was most significant in fiscal 2023 decreasing over the five-year amortization period. By year six, we anticipate any impact to be immaterial.
Previous wording
Legal disputes could require us to pay potentially large damage awards and could be costly to defend, which would adversely affect our cash balances and profitability, and could damage our reputation.
Current wording
Legal disputes could require us to pay potentially large damage awards and could be costly to defend, which could adversely affect our cash balances and profitability, and could damage our reputation.
Previous wording
We are subject to a number of lawsuits and claims described under “Legal Proceedings” in Part I, Item 3 of this report. We are also subject to, and may become a party to, a variety of other litigation or claims and suits that arise from time to time in the ordinary course of our business. The Department of Justice and other enforcement agencies of the U.S. government may bring claims or lawsuits against us in connection with our performance of government contracts or our billing or record-keeping relating to those contracts. The Department of Justice has considerably more resources at its disposal than we do, and can bring suspension and debarment proceedings against us that would prevent us from working for some or all U.S. government customers. In addition, certain statutes under which the Department of Justice may bring claims (like the False Claims Act) provide for treble damages and penalties on a per invoice basis against government contractors. These circumstances generally give the Department of Justice significantly more leverage in any legal dispute with us than if we were defending ourselves against claims brought by a commercial enterprise. Adverse judgments or settlements in some or all of these legal disputes may result in significant monetary damages or injunctive relief against us. Any claims or litigation could be costly to defend, and even if we are successful or if fully indemnified or insured, could damage our reputation and make it more difficult to compete effectively or obtain adequate insurance in the future. Litigation and other claims, including those described under “Legal Proceedings” in Part I, Item 3 of this report, are subject to inherent uncertainties and management’s view of these matters may change in the future.
Current wording
We are subject to several lawsuits and claims described under “Legal Proceedings” in Part I, Item 3 of this report. We are also subject to, and may become a party to, a variety of other immaterial litigation or claims arising from time to time in the ordinary course of our business. The Department of Justice and other U.S. or foreign enforcement agencies may bring claims or lawsuits in connection with our performance of government contracts or our billing or record-keeping relating to those contracts. Although rare, government agencies can seek to suspend or debar government contractors they believe have engaged in misconduct. The government has considerably more resources at its disposal to pursue these matters than we do to defend ourselves against them, and certain statutes under which the Department of Justice may bring claims (like the False Claims Act) provide for treble damages and penalties on a per invoice basis. Consequently, the government generally has more leverage against us than a commercial plaintiff or other private party would have. Settlements or adverse judgments may result in significant monetary damages or injunctions, and litigation and claims could be costly to defend. Even if we are successful, fully indemnified, or insured, we could suffer damage to our reputation that impedes our ability to compete for work or obtain adequate insurance in the future. The outcome of litigation and other claims, including those described under “Legal Proceedings” in Part I, Item 3 of this report, is inherently uncertain, and management’s view of these matters may change in the future.
Previous wording
In addition to government contract procurement laws and regulations, we are subject to numerous other federal, state and foreign legal requirements on matters as diverse as data privacy and protection, employment and labor relations, immigration, taxation, anti-corruption, import/export controls, trade restrictions, internal and disclosure control obligations, securities regulation and anti-competition. Compliance with diverse and changing legal requirements is costly, time-consuming and requires significant resources. Violations of one or more of these requirements in the conduct of our business could result in significant fines and other damages, criminal sanctions against us or our officers, prohibitions on doing business and damage to our reputation. Violations of these regulations or contractual obligations related to regulatory compliance in connection with the performance of customer contracts could also result in liability for significant monetary damages, fines and/or criminal prosecution, unfavorable publicity and other reputational damage, restrictions on our ability to compete for certain work and allegations by our customers that we have not performed our contractual obligations.
Current wording
In addition to government contract procurement laws and regulations, we are subject to numerous other federal, state, and foreign legal requirements related to, among other things, fraud (including but not limited to falsifying time and other records), data privacy and protection, employment and labor relations, immigration, taxation, anticorruption, import/export controls, trade restrictions, internal and disclosure control obligations, securities regulations, and antitrust. Compliance with diverse and changing legal requirements is costly, time-consuming, and requires significant resources. Violations can result in fines, penalties, restitution, or other damages (which can be significant), criminal sanctions against our Company and/or our officers, the loss of security clearances, the cancellation of current contracts and the ineligibility for future contracts, and suspension or debarment from federal, state, or local contracting – any of which could adversely affect our business and financial results. Additionally, depending on the circumstances, our Company can be held liable for the misconduct of its employees, subcontractors, agents, or business partners.
Previous wording
Our business relies heavily upon the expertise and services of our employees. Our continued success depends on our ability to recruit and retain highly trained and skilled engineering, technical and professional personnel. Competition for skilled personnel is intense and competitors aggressively recruit key employees. In addition, many U.S. government programs require contractors to have security clearances. Depending on the level of required clearance, security clearances can be difficult and time-consuming to obtain and personnel with security clearances are in great demand. Particularly in highly specialized areas, it has become more difficult to retain employees and meet all of our needs for employees in a timely manner, which may affect our growth in the current and future fiscal years. Although we intend to continue to devote significant resources to recruit, train and retain qualified employees, we may not be able to attract, effectively train and retain these employees. Any failure to do so could impair our ability to efficiently perform our contractual obligations, timely meet our customers’ needs and ultimately win new business, all of which could adversely affect our future results. In addition, salaries and related costs are a significant portion of the cost of providing our services and, accordingly, our ability to efficiently utilize our workforce impacts our profitability. If our employees are under-utilized, our profitability could suffer.
Current wording
Our business relies heavily on the expertise and skills of our employees. Many government programs require our personnel to have security clearances. Our continued success depends on the ability to recruit and retain highly trained, skilled and, at times, cleared engineering, technical, and professional personnel. Competition for talent is intense, and competitors aggressively recruit key employees. Security clearances can be difficult and time-consuming to obtain, and cleared talent is in demand. Particularly in highly specialized areas, it has become more difficult to recruit and retain qualified employees, which could affect our growth in the current and future fiscal years. We will continue to devote significant resources to recruiting, training, and retaining top talent, but we cannot guarantee the outcome of these efforts. The failure to timely secure qualified employees could impair our ability to win new business or meet existing contractual obligations, which could adversely affect our future financial performance. In addition, salaries and related expenses are a significant portion of the cost of our services and, accordingly, our ability to utilize our workforce efficiently can impact our profitability. If our employees are under-utilized, our profitability could suffer.
Previous wording
We believe that our success also depends on the continued employment of a highly qualified and experienced senior management team and that team’s ability to retain existing business and generate new business. The loss of key personnel in critical functions could lead to lack of business continuity or disruptions in our business until we are able to hire and train replacement personnel.
Current wording
Our success also depends on the continued employment of a highly qualified and experienced senior management team that focuses on retaining existing business and generating new business. Although we have succession plans in place, the loss of key personnel in critical functions could temporarily impair our ability to win new contracts or perform existing work.
Previous wording
We may make acquisitions, investments, joint ventures and divestitures in the future that involve numerous risks, which if realized, may adversely affect our business and our future results.
Current wording
We may make acquisitions, investments, joint ventures, and divestitures in the future that involve numerous risks, which, if realized, may adversely affect our business and financial performance.
Previous wording
We may make strategic acquisitions, engage in joint ventures or divest existing businesses, which could cause us to incur unforeseen expenses and have disruptive effects on our business and may not yield the benefits we expect. Our Credit Facility also imposes limitations on our ability to make other acquisitions. Subject to those limitations, we may selectively pursue additional strategic acquisitions, investments and joint ventures in the future. Any future acquisitions, investments and joint ventures may pose many risks that could adversely affect our reputation, operations or financial results, including:
Current wording
Subject to the limitations of our credit facility (as further described in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in Part II, Item 7 of this report), we may make strategic acquisitions or investments, engage in joint ventures, or divest existing businesses, which could cause unforeseen expenses, disrupt our business, fail to yield the anticipated benefits, or pose other risks that could adversely affect our reputation, operations, or financial results, including:
Previous wording
•we may assume known as well as unknown material liabilities, legal or regulatory risks that were not identified as part of our due diligence or for which we are unable to receive a purchase price adjustment or reimbursement through indemnification;
Current wording
•we may assume known and unknown material liabilities, including legal or regulatory risks that were not identified as part of our due diligence or for which we are unable to receive a purchase price adjustment or reimbursement through indemnification.
Previous wording
business, distract management from other responsibilities and may result in losses on disposal or continued financial involvement in the divested business, including through indemnification, guarantee or other financial arrangements, for a period of time following the transaction, which could adversely affect our financial results.
Current wording
In addition, we may periodically divest businesses, including businesses that are no longer a part of our ongoing strategic plan. These divestitures similarly require significant investment of time and resources. They may disrupt our business, distract management from other responsibilities, and create losses on disposal or continued financial involvement in the divested business, including through indemnification, guarantee, or other financial arrangements, for a period of time following the transaction, which could adversely affect our financial results.
Previous wording
We use and deploy AI solutions for our customers which may result in harm to our reputation or liability if they do not function as predicted.
Current wording
We use and deploy AI solutions for our customers that could harm our reputation or create liability if they do not function as predicted.
Previous wording
We deploy and integrate AI solutions for our business operations and for customers, including AI solutions that assist with the design, deployment, and management of AI applications and allow customers to work with their complex and sensitive data to power the most demanding analytics, data science, and AI use cases. These AI solutions may be vulnerable to misuse, or cyberattack and because this technology is developing so rapidly we may be unable to keep up with new AI developments. The AI solutions we use are developed by us and obtained from third parties. The development methods and algorithms of these solutions could be flawed, and the datasets could contain incorrect or biased information. Content or code generated by AI systems may be vulnerable to cyber attack, require human review, be unreliable, illegal, or offensive, and could result in the AI solution not working as intended. If we deploy AI solutions that have unintended consequences or are more controversial than we anticipate, our customers may seek redress and we may experience reputational harm which could affect our business or financial results. Our use of AI solutions could be limited or subject to regulatory action or legal liability under proposed rules or legislation regarding privacy, intellectual property and other laws.
Current wording
We deploy and integrate AI solutions for our business operations and for customers, including AI solutions that assist with the design, deployment, and management of AI applications that allow customers to work with their complex and sensitive data to power the most demanding analytics, data science, and AI use cases. These AI solutions may be vulnerable to misuse or cyberattack. Additionally, because this technology is developing so rapidly, we may be unable to keep up with new AI developments. We use some AI solutions that we develop and some that we obtain others from third parties. The development methods and algorithms of these solutions could be flawed, and the datasets could contain incorrect or biased information. Content or code generated by AI systems may be vulnerable to cyberattack, require human review, be unreliable, illegal, or offensive, and could result in the AI solution not working as intended. If we deploy AI solutions that have unintended consequences or are more controversial than we anticipate, our customers may seek redress, and we may experience reputational harm that could affect our business or financial results. Our use of AI solutions could be limited by, or subject to regulatory action or legal liability under, proposed rules or legislation regarding privacy, intellectual property, and other laws.
Previous wording
We face various risks related to health epidemics, pandemics and similar outbreaks like the global outbreak of COVID-19. If significant portions of our workforce are unable to work effectively due to illness, quarantines, government actions, facility closures or other reasons in connection with an epidemic, our operations will likely be impacted. We may be unable to perform fully on our contracts and some of our costs may not be fully recoverable or adequately covered by insurance. Re-occurrence of an epidemic may also cause disruption in our supply chain; cause delay, or limit the ability of, the U.S. government and other customers to perform, including making timely payments to us; impact investment performance; and cause other unpredictable events.
Current wording
We face various risks related to health epidemics, pandemics, and similar outbreaks such as the global outbreak of COVID-19. If significant portions of our workforce cannot work effectively due to illness, quarantines, government actions, facility closures, or for other reasons in connection with an epidemic, our operations will be impacted. We may be unable to perform fully on our contracts and some of our costs may not be fully recoverable or adequately covered by insurance. Another epidemic could cause disruption in our supply chain, could delay or limit the operations of the U.S. government and other customers to perform (including making timely payments to us), could impact investment performance, and could cause other negative events.
Previous wording
Many of the systems and networks that we develop, install and maintain for our customers involve managing and protecting personal information and information relating to national security and other sensitive government functions. While we have programs designed to comply with relevant privacy and security laws and restrictions, if a system or network that we develop, install or maintain were to fail or experience a security breach or service interruption, whether caused by us, third-party service providers, cybersecurity threats or other events, we may experience loss of revenue, remediation costs or face claims for damages or contract termination. Any such event could cause serious harm to our reputation and prevent us from having access to or being eligible for further work on such systems and networks. Our errors and omissions liability insurance may be inadequate to compensate us for all of the damages that we may incur and, as a result, our future results could be adversely affected.
Current wording
Many of the systems and networks that we develop, install, and maintain for our customers involve managing and protecting personal information and information relating to national security and other sensitive government functions. While we have programs designed to comply with relevant privacy and security laws and restrictions, if a system or network that we develop, install, or maintain were to fail or experience a security breach or service interruption (whether caused by us, third-party service providers, cybersecurity threats, or other events), we may
Previous wording
We rely on teaming relationships with other prime contractors and subcontractors in order to submit bids for large procurements or other opportunities where we believe the combination of services, products and solutions provided by us and our teammates will help us to win and perform the contract. Our future revenues and growth prospects could be adversely affected if other contractors eliminate or reduce their contract relationships with us, or if the U.S. government terminates or reduces these other contractors’ programs, does not award them new contracts or refuses to pay under a contract. Companies that do not have access to U.S. government contracts or experience with our customers may perform services as our subcontractor that we cannot otherwise provide ourselves, and that exposure could enhance such companies’ prospect of securing a future position as a prime U.S. government contractor, which could increase competition for future contracts and impair our ability to win these contracts. Whenever our subcontractors fail to timely meet their contractual obligations, have regulatory compliance or other problems, our ability to fulfill our obligations as a prime contractor or higher tier subcontractor may be jeopardized.
Current wording
We rely on teaming relationships with other prime contractors and subcontractors to bids on large procurements and other opportunities when we believe the combination of services, products, and solutions we can offer with teammates will help us win and perform the contract. Our future revenues and growth could be adversely affected if our partners reduce or end their contract relationships with us, or if the U.S. government terminates or reduces programs of prime contractors to which we subcontract, does not award them new contracts, or refuses to pay under a contract. We may contract with subcontractors that do not have experience on U.S. government contracts or with our customers, providing them with the experience, relationships, and past performance to compete with us on future contracts and potential result in contract losses. If subcontractors fail to timely meet their contractual obligations or have regulatory compliance or other problems, our ability to fulfill our obligations as a prime contractor or higher tier subcontractor may be jeopardized.
Previous wording
We face risks related to climate change if associated increases in extreme weather events prohibit or adversely affect our employees’ ability to work.
Current wording
We face risks related to climate change if extreme weather events adversely affect our ability to work or our customers’ requirements or priorities.
Previous wording
Severe storms, increased precipitation and flooding, heat waves and other weather-related obstacles due to climate change could adversely affect our ability to execute our strategy and may disrupt our operations. Any failure of our employees’ ability to work could potentially impair our capability to efficiently perform and meet our contractual obligations, timely address our customers’ needs and ultimately win new business, all of which could adversely affect our business, financial position, results of operations, and/or cash flows. While we have a distributed workforce with employees working remotely across the U.S., we do have employees who, because of client requirements or contractual obligations, must work at specified locations. In these instances, if there was a severe weather event that impacted such a location we may not be able to meet the client’s requirements or our contractual obligations. In the shorter term, a climate-related event could temporarily suspend our ability to do the required work in person, produce operational or other unforeseen challenges, and in the longer term, threaten our ability to perform contracts in a timely manner or meet other requirements of the contract, any of which could harm our business and its results.
Current wording
Severe storms, increased precipitation and flooding, heat waves, forest fires, and other natural disasters tied to climate change could adversely affect our ability to execute our strategy and may disrupt our operations. Any climate event limiting our employees’ ability to work could potentially impair our capability to perform and meet our contractual obligations, address our customers’ needs, and ultimately win new business, all of which could adversely affect our business, financial position, results of operations, and/or cash flows. While we have a distributed workforce with employees working remotely across the U.S., we do have employees who, because of client requirements or contractual obligations, must work at specified locations. In these instances, if there were a severe weather event that impacted such a location, we might not be able to meet the client’s requirements or our contractual obligations. In the shorter term, a climate-related event could temporarily impede our ability to do the required work in person, produce operational or other unforeseen challenges, and in the longer term, threaten our performance of contracts, any of which could harm our business and its results.
Previous wording
Although SAIC has business continuity plans and other safeguards in place, there is no assurance that such plans and safeguards will be effective or that such measures will not adversely affect our operations or long-term plans. In addition, local conditions and regulations may delay the return of employees to business sites, which could impede our ability to meet the client’s requirements or our contractual obligations. The ability of individual employees, based on how severely the climate-related event has impacted them, may also impede our ability to meet the client’s requirements or our contractual obligations.
Current wording
Although we have business continuity plans and other safeguards in place, there is no assurance that such plans and safeguards will be effective in preventing adverse impacts on our operations or long-term plans. Local conditions and regulations may delay the return of employees to business sites, which could undermine our efforts
Previous wording
Customers could change priorities and approaches due to their operations experiencing a direct climate-change impact, have future concerns about their long-term sustainability, face external legislative or regulatory pressure, or other external market factors such as investor, consumer or societal requests or demands that a customer may feel obliged to respond to. Such changes and responses by our customers have the potential to adversely impact our future revenues, profitability and prospects.
Current wording
Additionally, our customers could change priorities or direction due to a direct climate-change impact, concerns about long-term sustainability, legislative or regulatory pressure, or market factors such as investor, consumer, or societal requests or demands. Such changes and responses by our customers have the potential to adversely impact our future revenues, profitability, and prospects.
Previous wording
We have developed and sold tsunami buoys and related services that are designed to assist in the detection of tsunamis or large waves that may have catastrophic consequences to coastal communities. Our buoys have been deployed by the U.S. National Oceanic and Atmospheric Administration and non-U.S. governments in other areas around the world. There are many factors, some of which are beyond our control, which could result in the failure of these buoys. We may develop other products or provide services for the detection of natural or man-made threats that could have catastrophic consequences if the threats are realized. In addition, we prepare reports for various government customers in the evaluation or assessment of the consequences of certain threats or natural disasters. The failure of our products and services to help detect the threats for which they were designed or the failure of our reports to accurately assess the consequences of certain threats could contribute to injury, death and extensive property damage and may lead to product liability, professional liability, or other claims against us. Further, if our products, services or reports fail to, or are perceived to have failed to help detect or adequately assess a threat, the negative publicity from such incident could have a material adverse effect on our business.
Current wording
Some of our contracts involve evaluating and/or assessing the likelihood or potential consequences of natural disasters and other threats. The failure of our products and services to help detect the threats for which they were designed, or the failure of our reports to accurately assess the consequences of certain threats could contribute to injury, death, or extensive property damage, potentially leading to product liability, professional liability, or other claims against us. Further, if our products, services, or reports fail to (or are perceived to have failed to) help detect or adequately assess a threat, the negative publicity could have a material adverse effect on our business.
Showing the first 40 of 54 pairs. Open the source sections for the rest.
Rearranged current paragraphs (4)
Current report — wording carried from elsewhere
We are also subject to government reviews and investigations relating to all aspects of our business, including our contracts and operations. If a review or investigation identifies improper or illegal activities, we may be subject to civil or criminal penalties or administrative sanctions, which could include the termination of contracts, forfeiture of profits, triggering of price reduction clauses, suspension of payments, imposition of fines, and/or suspension or debarment from doing business with the U.S. government. Allegations of impropriety, even if untrue, may cause us reputational harm and impede our ability to win new contract awards or receive contract renewals. Fines, penalties, and other sanctions are not uncommon in our industry and could negatively impact our profitability, cash position, and future opportunities.
Current report — wording carried from elsewhere
experience loss of revenue, remediation costs, claims for damages, or contract termination. This could cause serious harm to our reputation and prevent us from having access to, or being eligible for, further work involving these systems and networks. Our errors and omissions liability insurance may not adequately compensate us for the damages that we incur, and our results could be adversely affected.
Current report — wording carried from elsewhere
We have developed and sold tsunami buoys and related services that are designed to assist in the detection of tsunamis or large waves that may have catastrophic consequences to coastal communities. Our buoys have been deployed by the U.S. National Oceanic and Atmospheric Administration and non-U.S. governments in other areas around the world. There are many factors, some of which are beyond our control, that could result in the failure of these buoys. We may develop other products or provide services for the detection of catastrophic natural or man-made threats.
Current report — wording carried from elsewhere
We provide services and solutions in support of U.S. government customers in countries that are politically unstable, active conflict zones, or subject to high-risk intelligence operations. Operating in these environments may increase the risk of an incident resulting in injury or loss of life, property damage or destruction, or the inability to meet our contractual obligations. It is impossible to predict the impact that these regulatory, geopolitical, and other factors may have on our business in the future.
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
In addition, we may periodically divest businesses, including businesses that are no longer a part of our ongoing strategic plan. These divestitures similarly require significant investment of time and resources and may disrupt our
Previous report — wording carried elsewhere
with whom we do business with are affected by issues in the banking industry it may have an adverse impact on our operational and financial performance.
Previous report — wording carried elsewhere
We also face cybersecurity threats from our supply chain through threat actors who may seek and gain access to our systems through our business partners and suppliers.