A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 8, 2025

HUT$52.65+14.6%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-13.

0001558370-24-015423

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-05-08.

0001558370-25-006845

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 186 previous paragraphs and 133 current paragraphs.

37 unchanged; 31 reworded; 64 added; 116 removed; 2 previous and 1 current paragraphs rearranged.

Tables are not compared: 35 previous and 25 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (64)

Current report

Hut 8 is an energy infrastructure platform that integrates power, digital infrastructure, and compute at scale to fuel next-generation, energy-intensive use cases such as Bitcoin Mining and HPC. We take a power-first, innovation-driven approach to developing, commercializing, and operating the critical infrastructure that underpins the breakthrough technologies of today and tomorrow.

Current report

Our business is heavily dependent on the price of Bitcoin, which has historically experienced significant volatility. We generate revenue from Bitcoin rewards that we earn through mining in our facilities. We have also acquired, and may in the future acquire, additional Bitcoin through at-market purchases to build our strategic reserve of Bitcoin. Under ASU 2023-08,Intangibles-Goodwill and Other-Crypto Assets (Subtopic 350-60): Accounting for and Disclosure of Crypto Assets (“ASU 2023-08”), Bitcoin is revalued at fair value at the end of each reporting period, with changes in fair value recognized in net income. As a result, fluctuations in the price of Bitcoin may significantly impact our results of operations.

Current report

Our business is not only impacted by the volatility in Bitcoin prices, but also by increases in the competition for Bitcoin production. This increased competition is described as the network hashrate resulting from the growth in the overall quantity and quality of miners working to solve blocks on the Bitcoin blockchain, and the difficulty index associated with the secure hashing algorithm employed in solving the blocks. Increased difficulty reduces the mining proceeds of the equipment proportionally and eventually requires Bitcoin miners like us to upgrade their equipment to remain profitable and compete effectively with other miners. Conversely, a decline in network hashrate results in a decrease in difficulty, increasing mining proceeds and profitability.

Current report

Power is the foundation of our platform. We acquire, develop, and manage critical energy assets such as interconnects, powered land, and other electrical infrastructure to address the load demands of energy-intensive applications such as Bitcoin mining and HPC. We currently maintain a portfolio which has access to competitively priced electrical power based on the regions in which we operate. However, there is no guarantee that we will be able to procure additional power on similar terms, or at all. Market prices for power, capacity, and other ancillary services are unpredictable and tend to fluctuate substantially. See “Risk Factors—Risks Related to Our Business and Operations—We are subject to risks associated with our need for significant electrical power” in the Annual Report.

Current report

Our cost to mine a Bitcoin (excluding hosted facilities) for the three months ended March 31, 2025 was $58,757 compared to $20,419 for the three months ended March 31, 2024. The increase was primarily due to the halving event in April 2024, in addition to an increase in average network difficulty during the period (111.2T for the three months ended March 31, 2025 compared to 77.4T for the three months ended March 31, 2024). Additionally, the energy cost per MWh increased due to fixed costs incurred while new sites underwent a fleet upgrade during February and March of 2025.

Current report

Energy cost per MWh for the three months ended March 31, 2025 was $51.71 compared to $40.06 for the three months ended March 31, 2024. The increase was primarily due to fixed transmission and distribution charges at our Medicine Hat site that continued during downtime while fleet upgrades occurred, as well as higher seasonal pricing at our sites located in Texas.

Current report

Number of Bitcoin in strategic reserve represents the number of Bitcoin we own as of each reporting period end date, which is the aggregate number of our Bitcoin held in custody, pledged as collateral, or pledged for a miner purchase. We have the ability to leverage our Bitcoin in strategic reserve as a flexible financial asset to fund growth initiatives, optimize our balance sheet, and capitalize on emerging market opportunities. Our management uses this metric to assess the value of our Bitcoin in strategic reserve and determine when and how to deploy said reserve, including whether to continue to hold the Bitcoin. As of March 31, 2025, we had 10,264 Bitcoin in strategic reserve compared to 9,102 Bitcoin held in strategic reserve as of March 31, 2024. The increase was attributable to additional Bitcoin mined over the year as well as an at-market purchase of Bitcoin in December 2024.

Current report

Number of Bitcoin mined represents the number of Bitcoin produced by our Compute segment during the respective period. Management views this metric as a direct driver of Compute revenue for the respective periods.

Current report

Number of Bitcoin mined for the three months ended March 31, 2025 and March 31, 2024 was 167 and 716, respectively. The decrease in number of Bitcoin mined was mainly due to reduced mining activity due to our planned fleet upgrade as well as an increase in network difficulty, including as a result of the halving event in April 2024.

Current report

Energy capacity under management comprises energy capacity under management (mining) and all other energy-related assets including Power Generation, CPU Colocation infrastructure, and non-operational sites. Energy capacity under management (mining) represents the total power capacity related to Bitcoin mining infrastructure, including self-mining sites, ASIC Colocation agreements, and Managed Services agreements. Management reviews these metrics to assess total energy capacity utilization across our operations to drive an efficient allocation of resources.

Current report

Energy capacity under management for the three months ended March 31, 2025 was 1,020 MW compared to 1,239 MW for the three months ended March 31, 2024. The decrease was due the conclusion of operations at two Managed Service sites, Kearney and Granbury, which consisted of 100 MW and 300 MW, respectively, and the loss of our Managed Services contract with Ionic for four sites that consisted of 87 MW, partially offset by the addition of our Vega site, a 205 MW facility that is currently under development, and Salt Creek, a 63 MW site.

Current report

The Power business segment consists of Power Generation and Managed Services.

Current report

Starting April 1, 2025, we operated as the exclusive provider of managed services to American Bitcoin, our majority owned subsidiary.

Current report

The Digital Infrastructure business segment consists of CPU Colocation and ASIC Colocation services.

Current report

Our CPU Colocation business is based on a fixed-fee model. Customers pay a fixed recurring monthly fee based on a set amount of resources assigned.

Current report

During the fourth quarter of 2024, our agreement with Ionic Digital Inc. (“Ionic”) to host approximately 8,500 miners (0.8 EH/s) at our Alpha site was terminated. As a result, we ceased providing ASIC Colocation services at Alpha and utilize the site solely for self-mining purposes.

Current report

Looking ahead, we have secured a new ASIC Colocation contract with BITMAIN. The agreement features a fixed hosting fee with an option for us to purchase all or a portion of the hosted machines in up to three tranches at a fixed price within six months of energization of the relevant tranches. In July 2024, we entered into a power purchase agreement and other definitive agreements for our Vega site in the Texas Panhandle with exclusive access to 205 MW of immediately available power capacity and land. The data center construction at Vega is expected to be completed in the second quarter of 2025.

Current report

Starting April 1, 2025, we operated as the exclusive provider of ASIC colocation services to American Bitcoin, our majority owned subsidiary.

Current report

The Compute business segment consists of Bitcoin Mining, GPU-as-a-Service, and Data Center Cloud operations.

Current report

Until April 30, 2024, we also had Bitcoin Mining operations at Kearney and Granbury. We also own a Bitcoin Mining site in Drumheller, Alberta, which has been non-operational since March 2024. The closure was due to the profitability of Drumheller being significantly negatively impacted by several factors, including elevated energy costs and underlying voltage issues. We will consider re-energizing Drumheller if market conditions improve.

Current report

During the quarter ended March 31, 2025, our mining activity was reduced due to a planned fleet upgrade, which was completed on April 4, 2025. We expect that the fleet upgrade to higher efficiency Antminer S21+ miners will result in improved Bitcoin Mining operations in subsequent quarters.

Current report

On March 31, 2025, we launched American Bitcoin. Going forward, all Bitcoin Mining operations previously reported under our Compute segment will remain under this segment but operate through the American Bitcoin brand.

Current report

Our GPU assets are deployed under our wholly owned subsidiary, Highrise AI, Inc., at a third-party colocation site near Chicago, Illinois. This segment generates recurring revenue through payments made by the provider to us based on fixed infrastructure payments and a revenue share tied to GPU utilization.

Current report

Our Data Center Cloud services support both public and private cloud deployments, managed backup, business continuity and disaster recovery services, and high-performance, high-capacity storage solutions. We employ a consumption-based fee structure where customers commit to a baseline level of compute, storage, network, or power usage as defined in their service agreements. Any usage beyond this baseline is typically billed incrementally, so costs are aligned with actual resource consumption and customers are afforded flexibility as their needs evolve.

Current report

Power revenue was $4.4 million and $9.9 million for the three months ended March 31, 2025 and 2024, respectively. This $5.5 million decrease was primarily driven by an $8.2 million decrease in Managed Services revenue and cost reimbursements due to the termination of the Ionic managed services agreement in December 2024. This decrease was partially offset by a $2.7 million increase in electricity sales through the Far North JV reflecting a full quarter of activity in 2025, compared to a partial quarter of activity in the prior year period as the acquisition closed in February 2024.

Current report

Digital Infrastructure revenue was $1.3 million and $5.8 million for the three months ended March 31, 2025 and 2024, respectively. This $4.5 million decrease was primarily driven by a $4.3 million decrease in ASIC Colocation revenue as a result of the termination of our colocation agreement with Ionic during the fourth quarter of 2024 and a $0.2 million decrease in CPU Colocation revenue due to customer churn.

Current report

Compute revenue was $16.1 million and $32.1 million for the three months ended March 31, 2025 and 2024, respectively. This $16.0 million decrease was primarily driven by a $18.0 million decrease in Bitcoin Mining revenue, largely due to a decrease in Bitcoin mined. The decrease in Bitcoin mined was due to reduced uptime at our Medicine Hat and Salt Creek sites in order to complete our fleet upgrade, which not only involved the installation of higher-efficiency machines, but also targeted infrastructure upgrades at our sites to support higher rack-level power density. The decrease was also due to an increase in network difficulty and the halving event in April 2024 (we mined 135 Bitcoin during the three months ended March 31, 2025 versus 592 Bitcoin mined during the three months ended March 31, 2024), partially offset by an increase in the average revenue per Bitcoin mined from $51,769 to $92,224. The decrease was also driven by a $0.2 million decrease in revenue from our Data Center Cloud operations. These decreases were offset by a $2.2 million increase in revenue from our GPU-as-a-Service offering, which launched in September 2024.

Showing the first 40 of 64 passages. Open the source sections for the rest.

Removed paragraphs (116)

Previous report

Hut 8 is an energy infrastructure operator and Bitcoin miner with self-mining, hosting, managed services, and traditional data center operations across North America. We acquire, design, build, manage, and operate data centers that power compute-intensive workloads such as Bitcoin mining, high performance computing, and AI.

Previous report

We see incredible opportunities at the intersection of energy and infrastructure. As demand for energy increases over the coming years, we believe that building a scaled portfolio of energy infrastructure assets will create a sustainable competitive advantage for our business. Our vertically integrated model, including our ability to rapidly build new capacity and redeploy existing assets to new use cases, positions us to capture future demand as advancements in technology and the increasing demand for compute capacity necessitate significant growth in underlying energy infrastructure. We also leverage our operating scale, purpose-built technology, and sophisticated approach to energy management to drive efficiency across our business lines.

Previous report

As of September 30, 2024, our total energy capacity under management was 1,322 MW across twenty sites: 967 MW across ten Bitcoin mining sites in North America, 310 MW across four natural gas power generation facilities in Canada, 3 MW across five cloud and colocation data centers in Canada, and 42 MW at a non-operational site in Canada. During the quarter ended September 30, 2024, we also brought online 1,000 NVIDIA H100 GPUs for our GPU-as-a-Service business.

Previous report

On February 6, 2023, USBTC, Legacy Hut, and Hut 8 entered into a business combination agreement pursuant to which, among other things, Legacy Hut and its direct wholly-owned subsidiary amalgamated to continue as Hut Amalco and both Hut Amalco and USBTC became wholly-owned subsidiaries of Hut 8 Corp.

Previous report

On November 30, 2023, the Business Combination was completed, and Hut 8 Corp. began trading on the Nasdaq on December 4, 2023.

Previous report

Given that the Business Combination closed after the end of the quarterly period ended September 30, 2023, the information included in this Quarterly Report principally describes Hut 8’s business and operations following the closing of the Business Combination, but includes the historical financial statements of USBTC, the accounting acquirer, and related management’s discussion and analysis, which describes the business, financial condition, results of operations, liquidity and capital resources of USBTC prior to the Business Combination.

Previous report

Until April 30, 2024, we also had self-mining operations at two sites located in Kearney, Nebraska (“Kearney”) and Granbury, Texas (“Granbury”).

Previous report

As the adoption of Bitcoin continues to grow and the market valuation of Bitcoin rises, we anticipate a surge in demand for Bitcoin, prompting the entry of new miners into the market. This influx of participants results in the increase of the Bitcoin network’s hash rate. Consequently, existing miners must scale their own hash rate to maintain a competitive edge in solving blocks and acquiring rewards. While we anticipate this trend to persist, we aim to grow our hash rate as we continue to scale our portfolio of underlying energy infrastructure.

Previous report

As of September 30, 2024, including our net share of the King Mountain JV, we owned approximately 49,400 miners totaling approximately 4.7 EH/s with an average fleet efficiency of 32.0 J/TH. In addition to miners, this business segment also includes the mining infrastructure related to our owned and leased sites used for self-mining.

Previous report

The fee structure for our HPC business is based on two models:

Previous report

We believe high-density colocation services available in some of our locations position us well to support the increasing demand for power densities driven by AI and graphics processing unit (“GPU”) requirements, along with traditional central processing unit (“CPU”) performance increases. In addition to colocation services, our cloud services are a core product offering: we support public and private cloud, managed backup, business continuity and disaster as a recovery service, and high performance high-capacity storage solutions.

Previous report

As of September 30, 2024, we hosted approximately 8,500 miners (about 0.8 EH/s) at our wholly owned Alpha site, which has a total capacity of 50 MW.

Previous report

On September 26, 2024, we launched our GPU-as-a-Service offering as our inaugural GPU cluster came fully online. The cluster, hosted at a tier-three data center in Chicago, Illinois, comprises multiple HPE Cray supercomputers powered by 1,000 NVIDIA H100 GPUs. We have entered into a contract with an AI cloud services provider pursuant to which the provider pays us a fixed infrastructure fee and a share of its revenues from the sale of its services at the cluster.

Previous report

The Far North JV is an approximately 80/20 joint venture in partnership with Macquarie. We acquired an approximately 80% membership interest in the Far North JV in February 2024 through a stalking horse bid for the acquisition of certain assets of Validus Power Corp. and certain of its subsidiaries. The Far North JV holds certain mining and electrical equipment formerly owned by a subsidiary of Hut 8, in addition to four natural gas power plants totaling 310 MW in Ontario, Canada, including:

Previous report

We account for the Far North JV using the acquisition method of accounting, resulting in consolidation of the Far North entities with a non-controlling interest. As of September 30, 2024, the consolidated balance sheet included the following balances from Far North:

Previous report

On November 6, 2024, we entered into an agreement to purchase 31,145 BITMAIN Antminer S21+ ASIC miners at $15.00 per terahash with initial deliveries expected in Q1 2025.

Previous report

During October 2024, we sold covered call options on Bitcoin for proceeds of $2.9 million to generate cash flow on a portion of our digital assets. We have pledged Bitcoin as collateral with one of our digital asset custodians in a quantity equal to the notional amount for the covered call options sold. The covered call options are only exercisable upon the date of expiry, are automatically exercised if the underlying reference price is greater than the strike price of the call option, and are settled with delivery of the underlying Bitcoin. The reference price is the BRR at 4:00pm London time for a given date.

Previous report

On September 27, 2024, we entered into a Debt Repayment Agreement with Anchorage to exchange the $37.9 million outstanding balance of the Anchorage Loan (exclusive of $1.5 million of deferred financing costs) as of the agreement date for 2,313,435 shares of our common stock (the “Conversion”). Upon completion of the Conversion, the outstanding loan and all of our other related obligations, including those of our subsidiaries, under the Anchorage Loan were satisfied, and we recorded a gain on debt extinguishment of $6.0 million. See Note 10.Loans and notes payable in our Unaudited Condensed Consolidated Statements included elsewhere in this Quarterly Report for additional information.

Previous report

On September 26, 2024, we launched our GPU-as-a-Service offering as our inaugural GPU cluster came fully online under our wholly owned subsidiary Highrise AI, Inc., which has its own management team. The cluster, hosted at a tier-three data center in Chicago, Illinois, comprises multiple HPE Cray supercomputers powered by 1,000 NVIDIA H100 GPUs. We have entered into a contract with an AI cloud services provider pursuant to which the provider pays us a fixed infrastructure fee and a share of its revenues from the sale of its services at the cluster.

Previous report

On September 19, 2024, we expanded our partnership with Bitmain by launching a next-generation ASIC miner. These miners will be hosted at the 205 MW Texas Panhandle site (“Vega”) through a hosting agreement with Bitmain that includes a capacity of approximately 15 EH/s. Deployment of these miners is planned for the second quarter of 2025.

Previous report

The agreement includes a fixed hosting fee and provides us with an option to purchase all or a portion of the hosted machines at a set price within six months of their energization. As of the three months ended September 30, 2024, we made a $32.0 million deposit toward this purchase option.

Previous report

We primarily mine Bitcoin, which has historically experienced significant price volatility. We record revenue upon receipt of Bitcoin at its spot price at the beginning of the day (midnight UTC time), and we have also elected to adopt ASU 2023-08, effective July 1, 2023, under which Bitcoin is revalued every reporting period at fair value with changes in fair value recognized in net income, so any fluctuations in the price of Bitcoin may impact our results of operations.

Previous report

During the three months ended September 30, 2024 and 2023, the price of Bitcoin ranged from approximately $49,100 to $70,000 and $24,900 to $31,900, respectively. During the nine months ended September 30, 2024 and 2023, the price of Bitcoin ranged from approximately $38,500 to $73,800 and $16,500 to $31,900, respectively.

Previous report

Bitcoin network difficulty, which varies directly with Bitcoin network hash rate, directly affects the results of our operations. We define Bitcoin network difficulty, multiplied by two to the thirty-second power (difficulty * 2˄32), as the measure of how many SHA-256d hashes, on average, are required to record a new block on the Bitcoin blockchain. The Bitcoin protocol is designed such that one block is generated, on average, every 10 minutes, no matter how much hash rate is on the network. To keep the time interval between blocks fixed at 10 minutes, the Bitcoin network adjusts its “network difficulty” every 2,016 blocks (or roughly every two weeks) such that the average number of SHA-256d hashes needed to find a new block is normalized at 10 minutes based on the time interval between blocks for the last 2,016 blocks.

Previous report

For example, as Bitcoin network hash rate increases, the time interval between new blocks decreases. The Bitcoin network will then adjust its difficulty upward to require more hashes, on average, to record a new block. Network difficulty is an integer.

Previous report

Average network difficulty and average network hash rate were 87.0T and 622.6 EH/s, respectively, for the three months ended September 30, 2024, compared to 53.3T and 381.3 EH/s, respectively, for the three months ended September 30, 2023. Average network difficulty and average network hashrate were 83.1T and 594.6 EH/s, respectively, for the nine months ended September 30, 2024, compared to 47.7T and 341.2 EH/s, respectively, for the nine months ended September 30, 2023.

Previous report

Electricity prices are a significant factor affecting our results of operations. We manage our cost of electricity through participation in various demand response programs, power purchase agreements, and curtailment of miners when electricity prices make it unprofitable to mine Bitcoin.

Previous report

Our cost to mine a Bitcoin (excluding hosted facilities) for the three months ended September 30, 2024 was $31,482 compared to $15,020 for the three months ended September 30, 2023. The increase was primarily due to the Halving event in April 2024 which decreased the Bitcoin reward from 6.25 Bitcoin per block to 3.125 Bitcoin per block, in addition to an increase in average network difficulty during the period (87.0T for the three months ended September 30, 2024 compared to 53.3T for the three months ended September 30, 2023). This was partially offset by a decrease in our energy cost per MWh (see below for further discussion on energy cost per MWh).

Showing the first 40 of 116 passages. Open the source sections for the rest.

Reworded paragraphs (31)

Previous wording

The following discussion and analysis of our financial condition and results of operations should be read together with our unaudited condensed consolidated financial statements and the related notes and the other financial information included elsewhere in this Quarterly Report and with our audited consolidated financial statements included in our Annual Report. This discussion contains forward-looking statements that involve risks and uncertainties. Our actual business, financial condition, and results of operations could differ materially from those anticipated in these forward-looking statements as a result of various factors, including those discussed below and elsewhere in this Quarterly Report and in our Annual Report, particularly under “Item 1A. Risk Factors.” See also “Cautionary Statement Regarding Forward-Looking Statements.” Our historical results are not necessarily indicative of the results that may be expected for any period in the future.

Current wording

The following discussion and analysis of our financial condition and results of operations should be read together with our unaudited condensed consolidated financial statements and the related notes and the other financial information included elsewhere in this Quarterly Report and with our audited consolidated financial statements included in the Annual Report. This discussion contains forward-looking statements that involve risks and uncertainties. Our actual business, financial condition, and results of operations could differ materially from those anticipated in these forward-looking statements as a result of various factors, including those discussed below and elsewhere in this Quarterly Report and in the Annual Report, particularly under “Item 1A. Risk Factors.” See also “Cautionary Statement Regarding Forward-Looking Statements.” Our historical results are not necessarily indicative of the results that may be expected for any period in the future.

Previous wording

During the three and nine months ended September 30, 2023, the Bitcoin reward for solving a block was 6.25 Bitcoin. Since April 19, 2024, the Bitcoin reward for solving a block has decreased to 3.125 Bitcoin. The Bitcoin network is programmed such that the Bitcoin block reward is halved every 210,000 blocks mined, or approximately every four years (the “Halving”). This reduction in reward spreads out the release of Bitcoin over a long period of time as an ever smaller number of coins are mined with each Halving. The maximum supply of Bitcoin is 21,000,000 Bitcoin, which is projected to be fully mined around the year 2140.

Current wording

The current Bitcoin reward for solving a block is 3.125 Bitcoin. The Bitcoin network is programmed such that the Bitcoin block reward is halved every 210,000 blocks mined, or approximately every four years. This reduction in reward spreads out the release of Bitcoin over a long period of time as fewer Bitcoin are mined with each halving event. Bitcoin halving events impact the amount of Bitcoin we mine which, in turn, may have a potential impact on our results of operations. The last halving event occurred in April 2024, and the next halving event is expected to occur in 2028.

Previous wording

In addition to our financial results and non-GAAP financial measures, we use certain key performance indicators to evaluate our business, identify trends, and make strategic decisions.

Current wording

In addition to our financial results, financial measures under generally accepted accounting principles in the United States of America (“GAAP”) financial measures, and non-GAAP financial measures, we use certain key performance indicators to evaluate our business, identify trends, and make strategic decisions.

Previous wording

The following table presents our key performance indicators for the three and nine months ended September 30, 2024 and 2023.

Current wording

The following table presents our key performance indicators for the three months ended March 31, 2025 and 2024.

Previous wording

Our profitability in self-mining is heavily dependent upon our cost to mine a Bitcoin, calculated as the sum of total all-in electricity expense, net of credits from participation in ancillary demand response programs, and hosting costs divided by Bitcoin mined during the respective periods and includes our net share of the King Mountain JV. Our management reviews the cost to mine a Bitcoin excluding hosted facilities and inclusive of hosted facilities.

Current wording

Our profitability in self-mining is heavily dependent upon our cost to mine a Bitcoin, calculated as all-in electricity and hosting costs divided by Bitcoin mined during the respective periods and includes our net share of a 50/50 joint venture for a site with a facility in McCamey, Texas (the “King Mountain JV”). Our management reviews the cost to mine a Bitcoin excluding hosted facilities and inclusive of hosted facilities in order to assess performance under both cost structures. As of March 31, 2025, we had no Bitcoin operations in hosted facilities.

Previous wording

Inclusive of hosted facilities, our cost to mine a Bitcoin for the three months ended September 30, 2024 was $31,482 compared to $17,274 for the three months ended September 30, 2023. As of April 30, 2024, we were no longer self-mining at hosted facilities, and we did not incur hosting costs during the three months ended September 30, 2024, so our cost to mine a Bitcoin for the three months ended September 30, 2024 consisted solely of energy costs.

Current wording

Inclusive of hosted facilities, our cost to mine a Bitcoin for the three months ended March 31, 2025 was $58,757 compared to $24,594 for the three months ended March 31, 2024. As of April 30, 2024, we were no longer self-mining at hosted facilities, and we did not incur hosting costs during the three months ended March 31, 2025, so our cost to mine a Bitcoin for the three months ended March 31, 2025 consisted solely of energy costs, which increased compared to the prior period primarily as a result of the halving event in April, increased average network difficulty, and increased fixed costs incurred as a result of our fleet upgrade.

Previous wording

In addition to the cost to mine a Bitcoin, our management reviews the energy cost per MWh at facilities we own and hosting cost per MWh at hosted facilities. Energy cost per MWh is calculated by dividing our total energy expense by the total MWh utilized at owned facilities during the respective periods and includes our net share of the King Mountain JV. Hosting cost per MWh is calculated by dividing our total hosting expense by the total MWh utilized at hosted facilities during the respective periods.

Current wording

In addition to the cost to mine a Bitcoin, our management reviews the energy cost per MWh at facilities we own and the hosting cost per MWh at hosted facilities to better understand cost efficiency, operational performance, and identify opportunities for overall profitability improvements. Energy cost per MWh is calculated by dividing our total energy expense by the total MWh utilized at owned facilities during the respective periods and includes our net share of the King Mountain JV. Hosting cost per MWh is calculated by dividing our total hosting expense by the total MWh utilized at hosted facilities during the respective periods.

Previous wording

Hosting cost per MWh for the three months ended September 30, 2024 was nil compared to $60.33 for the three months ended September 30, 2023. The decrease was due to us no longer self-mining at the Kearney and Granbury sites as of April 30, 2024, and we did not incur any hosting costs during the current quarter.

Current wording

Hosting cost per MWh for the three months ended March 31, 2025 was nil compared to $68.72 for the three months ended March 31, 2024. The decrease was due to us no longer self-mining at hosted facilities as of April 30, 2024.

Previous wording

In addition to our results determined in accordance with GAAP, we rely on Adjusted EBITDA to evaluate our business, measure our performance, and make strategic decisions. Adjusted EBITDA is a non-GAAP financial measure. We define Adjusted EBITDA as net income (loss) before interest expense, income tax provision, depreciation and amortization, further adjusted by the removal of gains on the extinguishment of debt (if applicable), gain (loss) on derivatives, depreciation and amortization embedded in the equity in earnings (losses) from an unconsolidated joint venture, foreign exchange gain, gain on the sale of property and equipment (if applicable), non-recurring transactions, net income attributable to noncontrolling interest, and stock-based compensation expense in the period presented. You are encouraged to evaluate each of these adjustments and the reasons our Board and management team consider them appropriate for supplemental analysis.

Current wording

In addition to our results determined in accordance with GAAP, we rely on Adjusted EBITDA to evaluate our business, measure our performance, and make strategic decisions. Adjusted EBITDA is a non-GAAP financial measure. We define Adjusted EBITDA as net (loss) income, adjusted for impacts of interest expense, income tax provision or benefit, depreciation and amortization, our share of unconsolidated joint venture depreciation and amortization, foreign exchange gain or loss, gain or loss on sale of property and equipment, the removal of non-recurring transactions, asset contribution costs, gain on derivatives, gain on other financial liability, loss from discontinued operations, net loss attributable to non-controlling interests before taxes, and stock-based compensation expense in the period presented. You are encouraged to evaluate each of these adjustments and the reasons our Board and management team consider them appropriate for supplemental analysis.

Previous wording

Our Board and management team use Adjusted EBITDA to assess our financial performance because it allows them to compare our operating performance on a consistent basis across periods by removing the effects of our capital structure (such as varying levels of interest expense and income), asset base (such as depreciation and amortization), and other items (such as non-recurring transactions mentioned above) that impact the comparability of financial results from period to period.

Current wording

Our board of directors and management team use Adjusted EBITDA to assess our financial performance because it allows them to compare our operating performance on a consistent basis across periods by removing the effects of our capital structure (such as varying levels of interest expense and income), asset base (such as depreciation and amortization), and other items (such as non-recurring transactions mentioned above) that impact the comparability of financial results from period to period.

Previous wording

We have four reportable business segments: Digital Asset Mining, Managed Services, High Performance Computing – Colocation and Cloud, and Other.

Current wording

We have four reportable business segments: Power, Digital Infrastructure, Compute, and Other.

Previous wording

We provide capacity and energy to the grid through the natural gas power plants in Ontario, Canada through the majority-owned Far North entities. The power generation facilities that are connected to the IESO, which operates Ontario’s power grid, primarily generate revenue from capacity sales. Revenue generated from electricity sales is variable and depends on several factors including but not limited to the supply and demand for electricity, generation capacity in the market, and the prevailing price of natural gas. Power revenue is strictly derived from the 80% interest we have in the Far North JV.

Current wording

We generate revenue from our 80.1% interest in a joint venture between us and Macquarie, which provides capacity and energy to the electrical grid through four natural gas power plants in Ontario, Canada that were acquired in February 2024 (the “Far North JV”). The power generation facilities are connected to the Independent Electricity System Operator, which operates Ontario’s power grid, and primarily generate revenue from capacity and electricity sales. Revenue generated from capacity and electricity sales is variable and depends on several factors, including generation capacity in the market, the supply and demand for electricity, and the prevailing price of natural gas.

Previous wording

Under this model, partners can enter into infrastructure projects with confidence: renewable energy companies can utilize our modular data centers as a flexible load, investors can deploy capital into energy infrastructure without the need for specialized expertise in site design, construction, and operations and site owners can monetize their assets with minimal operational requirements on their end. Meanwhile, the scalable and capital-light nature of this business allows us to generate cash flow without significant upfront capital investment while driving attractive project-level economics for our partners. Cash flows are generated through a fee structure that is typically fixed based on power capacity under management, with reimbursement of passthrough costs. In addition to the fixed fee, further cash flows may be driven from incentive bonuses and certain energy management services.

Current wording

Cash flows are generated through a fee structure that is typically fixed based on power capacity under management, with reimbursement of passthrough costs. In addition to the fixed fee, under certain agreements, further cash flows may be driven from incentive bonuses and certain energy management services.

Previous wording

As of September 30, 2024, we managed 582 MW of energy capacity under this program across six sites in the United States, which included 280 MW owned by the King Mountain JV and 302 MW owned by Ionic.

Current wording

As of March 31, 2025, we managed 280 MW of energy capacity under this program at one site in the United States owned by the King Mountain JV.

Previous wording

Our HPC business spans five locations in Canada (Mississauga, Ontario; Vaughan, Ontario; Kelowna, British Columbia; and two locations in Vancouver, British Columbia) with a total energy capacity of 3 MW and more than 36,000 square feet of geo-diverse data center space powered by predominantly emission-free energy sources. Our infrastructure is designed to support a variety of compute, storage, and network workloads across traditional enterprise, B2B, machine learning, visual effects, and AI. This segment serves computing needs unrelated to Digital Asset Mining. The data centers are geo-diverse and carrier neutral with network diversity and redundancy from multiple telecommunications providers.

Current wording

Our CPU Colocation business spans five locations in Canada (Mississauga, Ontario; Vaughan, Ontario; Kelowna, British Columbia; and two locations in Vancouver, British Columbia) with a total energy capacity of 3 MW and more than 36,000 square feet of geo-diverse data center space powered by predominantly emission-free energy sources. Our infrastructure is designed to support a variety of compute, storage, and network workloads across traditional enterprise, B2B, machine learning, visual effects, and AI. This segment serves computing needs unrelated to Bitcoin Mining. These data centers are geo-diverse and carrier neutral with network diversity and redundancy from multiple telecommunications providers.

Previous wording

We also enter into hosting contracts to operate mining equipment on behalf of third parties within our facilities. Hosting services include the provision of mining equipment and energized space and the monitoring, troubleshooting, repair, and maintenance of customer mining equipment. Hosting services revenue is generated through fees that may be fixed or based on a profit-sharing arrangement, typically with reimbursement for passthrough costs.

Current wording

Under our ASIC Colocation business, we enter into contracts to host and operate mining equipment on behalf of third parties within our facilities. These services include the provision, if applicable, and hosting of mining equipment as well as the monitoring, troubleshooting, repair, and maintenance of such equipment. Revenues from ASIC Colocation services are generated through fees that may be fixed or based on profit-sharing arrangements, often with reimbursement for certain pass-through costs such as electricity.

Previous wording

Currently, one of our largest revenue streams is derived from Digital Asset Mining (also referred to as self-mining), which consists entirely of mining Bitcoin (43% of total revenue for the nine months ended September 30, 2024 and 26% of total revenue for the three months ended September 30, 2024).

Current wording

Currently, one of our largest revenue streams is derived from Bitcoin Mining (also referred to as self-mining).

Previous wording

Our self-mining business spanned four sites during the three months ended September 30, 2024:

Current wording

Our Bitcoin Mining business spanned four sites as of March 31, 2025:

Previous wording

We receive digital asset mining rewards via third party mining pool operators, Foundry Digital LLC and Luxor Technology Corporation. Mining pools allow us to combine our computing power with other miners, increasing the chances of solving a block and getting paid by the network. The pools distribute our pro-rata share of Bitcoin rewards based on the computing power we contribute. On April 19, 2024, the Bitcoin reward for solving a block was halved from 6.25 Bitcoin to 3.125 Bitcoin.

Current wording

We receive Bitcoin rewards from our mining activity through third-party mining pool operators, which allow miners to combine their processing power, increasing their chances of solving a block and getting paid by the network. We provide computing power to mining pools, which use this computing power to operate nodes and validate blocks on the blockchain. The pools then distribute our pro-rata share of Bitcoin mined to us based on the computing power we contribute.

Previous wording

We may enter into equipment sale contracts when we believe there is an opportunity to generate profit from selling machines and other mining equipment. For example, as market prices of miners fluctuate, there may be opportunities where we believe the market value of miners exceeds the prices that we can procure them for. We may also repair miners for third parties in exchange for a fee, as we have a fully equipped, MicroBT-certified repair center space at our Medicine Hat site.

Current wording

We may sell mining equipment when profitable opportunities arise (e.g., if market prices exceed our procurement cost). We may also repair miners for third parties in exchange for a fee, as we have a fully equipped, MicroBT-certified repair center space at our Medicine Hat site.

Previous wording

Total revenue for the three months ended September 30, 2024 and 2023 was $43.7 million and $21.7 million, respectively, and consisted of Digital Asset Mining, Managed Services, HPC, and Other.

Current wording

Total revenue was $21.8 million and $51.7 million for the three months ended March 31, 2025, and 2024, respectively, and consisted of Power, Digital Infrastructure, Compute, and Other.

Previous wording

Total revenue for the nine months ended September 30, 2024 and 2023 was $130.7 million and $57.9 million, respectively, and consisted of Digital Asset Mining, Managed Services, HPC, and Other.

Current wording

Total cost of revenue was $18.7 million and $28.1 million for the three months ended March 31, 2025 and 2024, respectively, and consisted of Power, Digital Infrastructure, Compute, and Other.

Previous wording

The King Mountain JV is a 50/50 joint venture with one of the world’s largest renewable energy producers. The King Mountain JV has 280 MW of self-mining and hosting operations colocated behind-the-meter at a wind farm in McCamey, Texas.

Current wording

The King Mountain JV is a 50/50 joint venture with one of the world’s largest renewable energy producers. The King Mountain JV has 280 MW of self-mining and hosting operations located behind-the-meter at a wind farm in McCamey, Texas.

Previous wording

As of September 30, 2024, the King Mountain JV owned approximately 18,000 miners for self-mining (about 1.8 EH/s) and hosted approximately 68,200 miners (about 7.7 EH/s) for MARA Holdings at its wholly owned King Mountain site, which has a total capacity of 280 MW.

Current wording

As of March 31, 2025, the King Mountain JV owned approximately 18,000 miners for self-mining (about 1.8EH/s) and hosted approximately 68,200 miners (about 7.7 EH/s) for a single hosting customer at its wholly-owned King Mountain site, which has a total capacity of 280 MW.

Previous wording

We account for the King Mountain JV using the equity method of accounting, resulting in reporting the King Mountain JV as an unconsolidated joint venture. As part of the acquisition of our 50% interest in the King Mountain JV, we also assumed the TZRC Secured Promissory Note. Our 50% portion of any distributions made from the King Mountain JV are swept to pay down the TZRC Secured Promissory Note. See Note 9.Investments in unconsolidated joint venture and Note 10.Loans and notes payable to the Unaudited Condensed Consolidated Statements found elsewhere in this Quarterly Report for additional information on the King Mountain JV and TZRC Secured Promissory Note.

Current wording

We account for the King Mountain JV using the equity method of accounting, resulting in reporting the King Mountain JV as an unconsolidated joint venture. Additionally, our 50% portion of any distributions from the King Mountain JV are used to pay down the TZRC Secured Promissory Note. See Note 9.Investment in unconsolidated joint venture and Note 10.Loans, notes payable, and other financial liabilities to the consolidated financial statements found elsewhere in this Quarterly Report for additional information on the King Mountain JV and TZRC Secured Promissory Note.

Previous wording

Below is the condensed consolidated income statement for the King Mountain JV for the three and nine month periods ended September 30, 2024 and 2023.

Current wording

Below are the condensed consolidated income statements for the King Mountain JV for the three* *months ended March 31, 2025 and March 31, 2024.

Previous wording

Our board of directors and management team also evaluate Adjusted EBITDA for the King Mountain JV, which is a non-GAAP financial measure. We define Adjusted EBITDA as net (loss) income before depreciation and amortization and interest income. We use Adjusted EBITDA to assess the King Mountain JV’s financial performance because it allows us to compare the operating performance on a consistent basis across periods by removing the effects of the King Mountain JV’s capital structure.

Current wording

Our Board and management team also evaluate Adjusted EBITDA for the King Mountain JV, which is a non-GAAP financial measure. We define Adjusted EBITDA as net income (loss) before depreciation and amortization and interest income. We use Adjusted EBITDA to assess the King Mountain JV’s financial performance because it allows us to compare the operating performance on a consistent basis across periods by removing the effects of the King Mountain JV’s capital structure.

Previous wording

Net (loss) income is the GAAP measure most directly comparable to Adjusted EBITDA. This non-GAAP financial measure should not be considered as an alternative to the most directly comparable GAAP financial measure. In evaluating Adjusted EBITDA, you should be aware that in the future we may incur expenses that are the same as or similar to some of the adjustments in such presentation. Our presentation of Adjusted EBITDA should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items. There can be no assurance that we will not modify the presentation of Adjusted EBITDA in the future, and any such modification may be material. Adjusted EBITDA has important limitations as an analytical tool and you should not consider Adjusted EBITDA in isolation or as a substitute for analysis of our results as reported under GAAP. Because Adjusted EBITDA may be defined differently by other companies in our industry, our definition of this non-GAAP financial measure may not be comparable to similarly titled measures of other companies, thereby diminishing its utility.

Current wording

Net income (loss) is the GAAP measure most directly comparable to Adjusted EBITDA. This non-GAAP financial measure should not be considered as an alternative to the most directly comparable GAAP financial measure. In evaluating Adjusted EBITDA, you should be aware that in the future we may incur expenses that are the same as or similar to some of the adjustments in such presentation. Our presentation of Adjusted EBITDA should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items. There can be no assurance that we will not modify the presentation of Adjusted EBITDA in the future, and any such modification may be material. Adjusted EBITDA has important limitations as an analytical tool, and you should not consider Adjusted EBITDA in isolation or as a substitute for analysis of our results as reported under GAAP. Because Adjusted EBITDA may be defined differently by other companies in our industry, our definition of this non-GAAP financial measure may not be comparable to similarly titled measures of other companies, thereby diminishing its utility.

Previous wording

Our ability to meet our anticipated cash requirements will depend on factors including our ability to expand our business or enter into new lines of business and provide new offerings, services, and features and make enhancements to our business, our ability to compete with existing and new competitors in existing and new markets and offerings, our ability to acquire new businesses or pursue strategic transactions and global and domestic economic conditions and their impact on demand for our markets and offering.

Current wording

Our ability to meet our anticipated cash requirements will depend on various factors including our ability to maintain our existing business, enter into new lines of business, provide new offerings, compete with existing and new competitors in existing and new markets and offerings, acquire new businesses or pursue strategic transactions, and respond to global and domestic economic, geopolitical, social conditions and their impact on demand for our offerings.

Previous wording

We believe that cash flows generated from operating activities and our Bitcoin held in reserve will meet our anticipated cash requirements in the short-term. On a long-term basis, we would rely on access to the capital markets for any long-term funding not provided by operating cash flows, cash on hand, and our Bitcoin held in reserve.

Current wording

We believe that cash flows generated from operating activities, our strategic Bitcoin reserve, and the 2024 ATM will meet our anticipated cash requirements in the short-term. On a long-term basis, we plan to rely on access to the capital markets for any long-term funding not provided by operating cash flows, cash on hand, and our strategic Bitcoin reserve.

Previous wording

See Note 2.Basis of presentation, summary of significant accounting policies and recent accounting pronouncements to our Unaudited Condensed Consolidated Financial Statements found elsewhere in this Quarterly Report for more detail on these accounting policies and estimates.

Current wording

There have been no material changes to our critical accounting policies and estimates disclosed in the Annual Report other than as described in Note 2.Basis of Presentation, Summary of Significant Accounting Policies and Recent Accounting Pronouncements in our Unaudited Condensed Consolidated Financial Statements included elsewhere in this Quarterly Report.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

Bitcoin Halving events impact the amount of Bitcoin we mine which, in turn, may have a potential impact on our results of operations. The next Halving is expected to occur in March 2028.