Skip to main content

McEwen Inc.

For the period ended Mar 31, 2025. Filed May 7, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 7, 2025

MUX$15.48+4.1%Stored close · as of Nov 6, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Gold Bar Mine

The following table summarizes the operating and financial results for the Gold Bar Mine for the three months ended March 31, 2025, and 2024:

​​​​​​​
​ · ​ · Three months ended March 31,
​ · 2025 · ​ · 2024
Operating Results · ​ · ​
Mined mineralized material (kt)​451​678
Average grade (g/t Au)​0.81​0.77
Stacked mineralized material (kt)​468​683
Average grade (g/t Au)​0.79​0.80
Gold ounces:​​​​​​
Produced​7,686​11,715
Sold​7,935​12,190
Silver ounces:​​​​​​
Produced​138​127
Sold​—​—
GEOs:​​​​​​
Produced​7,688​11,716
Sold​7,935​12,190
Revenue from gold and silver sales, ($000s)​$22,391​$25,278
Cash costs (1), ($000s)​$9,094​$13,268
Cash costs per ounce ($/GEO sold) (1)​$1,146​$1,088
All‑in sustaining costs (1), ($000s)​$17,436​$14,639
AISC per ounce ($/GEO sold) (1)​$2,197​$1,201
Gold : Silver ratio​90 : 1​89 : 1
(1)This is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 34.

The Gold Bar Mine produced 7,688 GEOs in Q1/25, representing a 34% decrease from 11,716 GEOs produced in Q1/24 driven by lower mined and stacked tonnes. The operational focus in Q1/25 was to complete pre-stripping activities at the Pick III deposit, where we expect to begin production in early Q2/25.

Revenue from gold and silver sales was $22.4 million in Q1/25, down from $25.3 million in Q1/24, primarily due to a 35% decrease in GEOs sold resulting from lower production, partially offset by a 36% increase in the realized gold price.

Production costs applicable to sales were $9.1 million in Q1/25 down from $13.3 million in Q1/24, a 32% decrease. The decrease was primarily driven by a 16% reduction in crushing contractor costs, as the material currently processed from Gold Bar South does not require crushing, and a 35% decrease in GEOs sold discussed above.

Cash costs andAISC per GEO sold in Q1/25 were $1,146 and $2,197 respectively, compared to $1,088 and $1,201 in Q1/24, respectively. While a minor increase in unitary cash costs was driven by 34% lower GEOs sold, partially offset by a corresponding decrease in total production costs, the increase in AISC was attributable to $7.5 million in Pick III pre-stripping costs capitalized during Q1/25.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.