Skip to main content

McEwen Inc.

For the period ended Mar 31, 2025. Filed May 7, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 7, 2025

MUX$15.48+4.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 139 previous paragraphs and 123 current paragraphs.

59 unchanged; 25 reworded; 39 added; 54 removed; 1 previous and 0 current paragraphs rearranged.

Tables are not compared: 94 previous and 87 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (39)

Current report

Q1/25 OPERATING AND FINANCIAL HIGHLIGHTS

Current report

*Revenue from gold and silver sales:*During Q1/25, revenue from our 100%-owned operations decreased by 13% to $35.7 million, from $41.2 million in Q1/24. This was primarily driven by a 34% decrease in GEOs sold and offset by a 31% increase in realized gold prices, from $2,131 per GEO in Q1/24 to $2,803 per GEO in Q1/25.

Current report

Production costs applicable to sales: During Q1/25, production costs applicable to sales decreased by 22% to $19.6 million, from $25.1 million in Q1/24. This reduction was primarily driven by the lower number of GEOs produced and sold.

Current report

Advanced project costswere $1.7 million in Q1/25, a decrease of $0.8 million compared to Q1/24. These costs are related to our Fenix Project which remains on care and maintenance*.*

Current report

Exploration costs were $3.7 million in Q1/25, a decrease of $0.2 million compared to Q1/24. Exploration expenditures totaled $2.3 million for drilling targeting the Gibson zone of the Grey Fox project. At Gold Bar, $1.4 million was spent on drill target planning and site preparation.

Current report

*Interest and other finance expense, net:*Interest and other finance expenses totaled $1.3 million in Q1/25, an increase of $0.4 million compared to $0.9 million in Q1/24. The increase was primarily driven by accrued interest on the Convertible Senior Notes issued in February 2025.

Current report

Other income: Other income of $1.6 million in Q1/25 increased from an expense of $0.1 million in Q1/24 mostly due to a $1.7 million gain on our investment in marketable securities.

Current report

Income and mining tax recovery: For Q1/25, the Company recorded an income tax recovery of $1.1 million, compared to $2.6 million for Q1/24, primarily due to amortization of the flow-through share premium.

Current report

Cash provided by financing activities of $70.5 million during Q1/25 consisted of $110.0 million in proceeds from the issuance of Senior Convertible Notes, offset by financing costs of $4.2 million, principal repayments on our term loan facility of $20.0 million, $15.1 million purchase of capped call options, and the repayment of finance lease obligations for $0.2 million.

Current report

The Gold Bar Mine produced 7,688 GEOs in Q1/25, representing a 34% decrease from 11,716 GEOs produced in Q1/24 driven by lower mined and stacked tonnes. The operational focus in Q1/25 was to complete pre-stripping activities at the Pick III deposit, where we expect to begin production in early Q2/25.

Current report

Revenue from gold and silver sales was $22.4 million in Q1/25, down from $25.3 million in Q1/24, primarily due to a 35% decrease in GEOs sold resulting from lower production, partially offset by a 36% increase in the realized gold price.

Current report

Production costs applicable to sales were $9.1 million in Q1/25 down from $13.3 million in Q1/24, a 32% decrease. The decrease was primarily driven by a 16% reduction in crushing contractor costs, as the material currently processed from Gold Bar South does not require crushing, and a 35% decrease in GEOs sold discussed above.

Current report

Cash costs andAISC per GEO sold in Q1/25 were $1,146 and $2,197 respectively, compared to $1,088 and $1,201 in Q1/24, respectively. While a minor increase in unitary cash costs was driven by 34% lower GEOs sold, partially offset by a corresponding decrease in total production costs, the increase in AISC was attributable to $7.5 million in Pick III pre-stripping costs capitalized during Q1/25.

Current report

Gold Bar Mine

Current report

During Q1/25, exploration activities focused on geologic modeling, drill planning, and drill site construction for the 2025 target areas at Jug Handle in Gold Bar South, where drilling is expected to begin in Q2/25. A notice to proceed has been received for Taurus and Cabin North, with drill pad and road construction currently in progress.

Current report

Timberline Properties

Current report

The 2025 drilling plans for the Lookout Mountain and Windfall projects are aimed at supporting future development opportunities. The primary focus at Windfall during Q1/25 was the completion of the block model to support future pit design. At Seven Troughs, exploration efforts were concentrated on converting geological data into digital formats, which will enable the team to generate exploration targets for further investigation through mapping, sampling, modeling, geophysical surveys, and potential drilling.

Current report

The Fox Complex produced 5,520 GEOs from the Froome mine in Q1/25, reflecting a 26% decrease from the 7,486 GEOs produced in Q1/24. Stock Mill processed less material in Q1/25 primarily due to weather related delays and labor challenges that impacted both mining and crushing operations, resulting in reduced mill feed. Additionally, the mill produced 39% fewer GEOs compared to Q1/24, as the 2024 results benefited from a significant stockpile carryover from Q4/23. In response, the Company accelerated hiring efforts and engaged contractors to support our mining and crushing operations.

Current report

Production costs applicable to sales were $10.5 million in Q1/25, compared to $11.8 million in Q1/24, an 11% decrease reflecting lower GEOs sold, partially offset by higher unitary costs due to a higher fixed cost component of underground development.

Current report

Cash costs andAISC per GEO sold were $2,061 and $2,504 for Q1/25, respectively, compared to $1,555 and $1,928 for Q1/24. The increase was primarily driven by a 33% reduction in GEOs sold with only an 11% corresponding decrease in production costs as discussed above. Sustaining capital investments remained consistent period over period.

Current report

During Q1/25, we invested $2.3 million in exploration activities at our Grey Fox property. This included 50,000 feet (15,200 meters) of diamond drilling, primarily focused on the Gibson zone, as well as the completion of a land-based infill geophysics survey. Our objectives for Q2/25 and the remainder of 2025 will center on identifying additional near-term and long-term mineral resources at Grey Fox, with key efforts directed toward expanding both shallow and deep mineralization, particularly in the Gibson and Grey Fox South zones.

Current report

We are currently awaiting key permits prior to a construction decision on the first phase of the Fenix Project, which is a gold heap leach reprocessing project. The decision to proceed with the project remains under review.

Current report

On a 100% basis, the San José mine produced 22,294 GEOs in Q1/25, compared to 26,396 GEOs in Q1/24. The decrease in GEOs produced during the period was primarily due to an 8% and 22% reduction in gold and silver head grades processed, respectively, and a 7% decline in gold and silver recovery rates. These impacts were partially offset by a 22% increase in tonnes processed.

Current report

Revenue from gold and silver sales was $71.9 million in Q1/25, compared to $65.9 million in Q1/24. This increase was primarily driven by 48% and 46% higher realized gold and silver prices, respectively, partially offset by a 26% decrease in GEOs sold.

Current report

Production costs applicable to sales were $56.6 million in Q1/25, compared to $47.9 million in Q1/24. An 18% increase in production costs was primarily driven by inflation outpacing the devaluation of the Argentine peso, impacting local currency expenditures. Additionally, contractor costs rose due to operational efforts focused on improving processing recoveries, material grades, and advancing delineation work at the Odin pit.

Current report

Cash costs andAISC per GEO sold were $2,575 and $3,047 in Q1/25, respectively, compared to $1,607 and $1,947 Q1/24. The increase in both cash costs and AISC was primarily due to 18% higher production costs and 26% lower GEOs sold, as noted above.

Current report

Our 49% attributable share of operations from our investment in MSC in Q1/25 resulted in an income of $0.5 million, compared to $1.3 million in Q1/24. Despite higher planned unit costs driven by adverse macroeconomic conditions in Argentina, the favorable metal price environment enabled the operation to maintain a working capital position of $83.7 million as of March 31, 2025 (December 31, 2024 – $87.0 million).

Current report

We received $2.2 million in dividends from MSC in Q1/25 (Q1/24 – $nil).

Current report

Since 2021, McEwen Copper has been advancing Los Azules through significant additional drilling, numerous studies, social consultation, and permitting; it is now focused on completing a definitive feasibility study. The Los Azules drilling database now contains an impressive 685,600 feet (209,000 meters) of drilling. The Los Azules team finalized the mineral resource model supporting our feasibility study following the 2024-25 drilling campaign. During Q1/25, Los Azules spent $21.3 million to support the remaining activities required for our feasibility study, expected to be published in summer 2025.

Current report

Drilling Program

Current report

The 2024-25 campaign comprised 36,000 feet (11,000 meters) of drilling, covering geotechnical, exploration, hydrological, and condemnation work. The objectives were to assess and model the site's water resources, carry out condemnation drilling to evaluate areas designated for the permanent mine infrastructure, and complete geotechnical and geophysical studies.

Current report

Additionally, exploration drilling has progressed in target areas near Los Azules, such as the Tango Area, located east of the planned open pit. Regional exploration efforts are also ongoing, guided by a recent helicopter-assisted magnetotelluric survey, to identify other target areas to investigate during the next exploration season beginning in October 2025.

Current report

Los Azules Exploration Results

Current report

Recent exploration results suggest that Los Azules has the potential to expand to the North and South of the current 2023 PEA pit shell as well as at depth. Drill highlights were published in a press release dated August 8, 2024.

Current report

Additionally, 2 miles east of the current Los Azules 2023 PEA perimeter, the Company has identified a new porphyry copper system named Tango. Tango exhibits the five key characteristics of a porphyry system: multiple intrusives, porphyry copper alteration, veining, geochemical anomalies, and a distinct geophysical signature.

Current report

Feasibility Study and Construction

Current report

In December 2024, the environmental impact statement for the construction and operation of Los Azules was issued by San Juan’s Provincial Government’s Ministry of Mines. This represents a key environmental permitting milestone, and with this approval in place, Los Azules is advancing toward the publication of a definitive feasibility study, with the potential start of construction as early as 2026.

Current report

Large Investment Incentive Regime (RIGI)

Current report

The RIGI aims to attract domestic and foreign investment to several sectors in Argentina, including the minerals industry, enhancing resource exploration and production, creating job opportunities and increasing energy security. On February 11, 2025, McEwen Copper, through its wholly owned subsidiary, Andes Corporación Minera S.A., applied for admission to RIGI. If approved, the Los Azules project would become eligible for a range of fiscal and regulatory benefits, including a reduction in the corporate income tax rate from 35% to 25%, exemption from sales tax payments during the construction phase, elimination of export duties, and relief from the requirement to repatriate export proceeds. Additionally, the project would benefit from a 30-year tax stability guarantee and access to international arbitration for dispute resolution.
Removed paragraphs (54)

Previous report

Q3/24 OPERATING AND FINANCIAL HIGHLIGHTS

Previous report

CONSOLIDATED****PERFORMANCE

Previous report

Driven by a 36% increase in revenue from $38.4 million in Q3/23 up to $52.3 million in Q3/24, and slightly offset by a 12% increase in production costs, we reported a gross profit of $13.8 million in Q3/24, compared to a gross profit of $3.8 million for Q3/23.

Previous report

Supported by our improvement in gross profit described above, we reported a net loss of $2.1 million (or $0.04 per share) and adjusted EBITDA of $10.5 million (or $0.20 per share) in Q3/24, compared to a net loss of $18.5 million (or $0.39 per share) and adjusted EBITDA of $1.5 million (or $0.03 per share) in Q3/23.

Previous report

Production from our 100% owned mines of 21,495 GEOs in Q3/24 increased by 814 GEOs, from 20,681 GEOs produced in Q3/23. At the Gold Bar mine, the production increase of 4,133 GEOs in Q3/24 compared to Q3/23 was attributable to a 21% increase in higher gold grades of stacked mineralized material, and higher heap leach recovery rates. At the Fox Complex, the production decrease of 3,319 GEOs in Q3/24 compared to Q3/23 was driven by a 9% decrease in tonnes processed and a 21% decrease in average head grades processed.

Previous report

Our attributable share of San José mine production was 13,684 GEOs in Q3/24, or 24% lower than the 17,932 GEOs produced in Q3/23. The decrease was primarily driven by temporary lower than expected metal grades mined and processed.

Previous report

Revenue from gold and silver salesfrom 100% owned operations increased to $52.3 million in Q3/24, compared to $38.4 million in Q3/23 due to higher average realized gold prices and consolidated gold sales, as described above. Our average realized gold price in Q3/24 was $2,499 per GEO, compared to $1,920 per GEO in Q3/23.

Previous report

Production costs applicable to sales increased to $29.7 million in Q3/24, compared to $26.5 million in Q3/23. Production costs increased primarily at Gold Bar compared to prior year, driven by higher mining rates and contractor unit costs.

Previous report

Advanced project costswere $2.5 million in Q3/24, compared to $20.4 million in Q3/23. Advanced project costs primarily relate to the Fenix Project in both Q3/23 and Q3/24, and Los Azules in Q3/23. Following the deconsolidation of McEwen Copper in Q4/23, the Company’s attributable costs for Los Azules are recognized through theLoss from investment in McEwen Copper line item on ourStatement of Operations and are no longer recognized withinAdvanced Project Costs.

Previous report

Exploration costs were $5.3 million in Q3/24, compared to $4.7 million in Q3/23. Exploration expenditures focused on the Grey Fox project at the Fox Complex, and on near-term production targets and mine life extension opportunities at Gold Bar.

Previous report

Interest and other finance expense, netwas $1.1 million in Q3/24, a $11.4 million decrease compared to income of $10.3 million in Q3/23. During Q3/23, interest and other finance income was impacted by the consolidation of McEwen Copper’s financial results, which included income earned from its investments of cash reserves not immediately required for exploration activities.

Previous report

Other expense was $0.1 million in Q3/24, compared to an expense of $10.1 million in Q3/23. The increase was primarily attributable to a decrease in foreign exchange losses following the deconsolidation of McEwen Copper, as a sizable portion of its treasury was held in Argentine pesos during Q3/23.

Previous report

Income and mining tax expense was $0.8 million in Q3/24, compared to a recovery of $0.2 million in Q3/23. The decrease was primarily due to the Nevada net proceeds tax, partially offset by adjustments in temporary tax differences related to our McEwen Copper investment and the amortization of the flow-through share premium.

Previous report

Cash provided by financing activities of $19.5 million during 9M/24 consisted of proceeds from the issuance of flow-through common shares of $20.4 million in June 2024, offset by finance lease payments of $0.9 million.

Previous report

Q3/24 compared to Q3/23

Previous report

The Gold Bar mine produced 13,640 GEOs in Q3/24, representing a 43% increase from 9,507 GEOs produced in Q3/23. The increase in quarterly production was a result of higher average gold grades in stacked material of 0.84 g/t Au in Q3/24 compared to 0.69 g/t Au in Q3/23, as well as higher recoveries realized during Q3/24 from previously stacked material.

Previous report

Revenue from gold and silver sales increased 85% to $33.3 million in Q3/24, compared to $18.0 million in Q3/23. The increase in revenue was the result of higher GEOs sold during Q3/24 of 13,333 GEOs in Q3/24 compared to 9,420 GEOs in Q3/23 along with a higher average realized gold price of $2,499 per GEO in Q3/24 compared with $1,920 per GEO in Q3/23.

Previous report

Production costs applicable to sales increased 19% to $17.1 million in Q3/24 from $14.4 million in Q3/23. Higher mining rates, including for stripping, and contractor unit costs contributed to the increase in year-over-year costs.

Previous report

Cash costs andAISC per GEO sold in Q3/24 were $1,281 and $1,822 respectively, compared to $1,529 and $2,160 in Q3/23, respectively. Unit costs generally improved due to the higher GEOs sold in Q3/24 relative to Q3/23, offset by higher mining costs, including for capital development.

Previous report

At the Gold Bar mine, exploration activities focused on near-mine mine life extension opportunities at Cabin Creek, Gold Bar South and Hunter.

Previous report

In Q3/24, exploration at the Cabin Creek pit included drilling and updating of the resource model to evaluate the economic feasibility of mining shallow oxide resources in 2025. Assays from this drilling returned 90 feet of oxidized gold mineralization grading 0.63 g/t, starting at a depth of 105 feet. Additional holes were drilled late in the quarter, to fill in data gaps in the model and extend open mineralization. Drilling is expected to continue into Q4/24.

Previous report

At Gold Bar South, results from the North Zone drilling confirmed expansion of the near-surface gold resource. In the East Deep Zone, additional holes drilled during Q3/24 extended higher-grade oxidized gold mineralization along ENE-trending structural zones. This deeper mineralization remains open to the east and plans are being made for additional drilling.

Previous report

At the Hunter exploration target, additional core drilling completed in Q3/24 defined the outer edges of the deposit and provided data to construct a geologic model in preparation for resource modelling. Development of the Hunter target is expected to result in production for 2026 onwards.

Previous report

T**imberline Acquisition

Previous report

During August 2024, we closed the acquisition of Timberline Resources Corporation, which holds several exploration projects in Nevada, USA, two of which are located near current operations at the Gold Bar mine and have medium-term development potential. An initial phase of exploration is expected to begin at the historic Windfall project during Q4/24.

Previous report

Q3/24 compared to Q3/23

Previous report

The Fox Complex produced 7,855 GEOs from the Froome mine in Q3/24, which represented a 30% decrease from the 11,174 GEOs produced in Q3/23. Mine production was affected by a shortfall in development meters in H1/24 due to a stope failure, limiting stope availability in Q3/24 and negatively impacting planned mined and milled gold grades. Additional development was completed during Q3/24 to accelerate stope availability in Q4/24, including at our historic Black Fox underground mine.

Previous report

Production costs applicable to sales were $12.6 million, which increased in Q3/24 by $0.5 million from $12.1 million in Q3/23, driven primarily by higher mining contractor and labor costs required to complete work at Black Fox.

Previous report

Cash costs andAISC per GEO sold were $1,572 and $1,953 in Q3/24, respectively, compared to $1,572 and $1,909 in Q3/23, respectively. The increase in unit costs was driven primarily by lower GEOs sold as described above, as well as accelerated capital development costs to increase stope availability in respect of AISC.

Previous report

During Q3/24, $1.8 million was incurred primarily for exploration at the Grey Fox property. This included 29,918 feet (9,119 meters) of drilling at Grey Fox as well as the initiation of a mineralogical study, including laser-induced breakdown spectroscopy, of lithologies at the Gibson and Whiskey Jack zones at Grey Fox to better understand the nature of the mineralization. An infill geophysics program will be conducted at Grey Fox in Q4/24 to check for Black Fox-style mineralization believed to be below Grey Fox.

Previous report

Stock Development Activities

Previous report

During 9M/24, we invested $5.5 million in developing our Stock project. Earthworks have been completed in preparation for our mine portal construction later in 2024, with the objective of driving a ramp from the Stock East to the Stock West zones. We are also reviewing engineering plans for rehabilitation of the historic Stock shaft in 2025 to provide alternative means of access to the Stock ore bodies.

Previous report

On December 31, 2020, we announced the results of a feasibility study for the development of our 100%-owned Fenix Project, which includes existing heap leach material at the El Gallo mine and the El Gallo Silver deposit. Key environmental permits for Phase 1 were received in 2019, including the approval for an in-pit tailings storage facility and process plant construction. We are currently awaiting the renewal of key mining permits prior to a construction decision.

Previous report

The processing plant is expected to employ proven and conventional mineral processing and precious metal recovery technologies. Phase 1 is projected to have a processing rate of 3,400 tons per day.

Previous report

Tailings generated during operations are expected to be stored in the depleted Samaniego pit at the El Gallo site. This approach provides increased safety by avoiding the construction of embankment structures, focusing solely on the geochemical stability of the dam, rather than its physical stability.

Previous report

Q3/24 compared to Q3/2023

Previous report

On a 100% basis, the San José mine produced 27,927 GEOs in Q3/24, compared to 36,597 in Q3/23. The decrease in GEOs produced was driven by a 24% and 16% decrease in gold and silver head grades processed, respectively.

Previous report

Revenue from gold and silver sales was $70.4 million in Q3/24, compared to $64.5 million in Q3/23. The increase was driven by a higher average realized gold price per ounce of $2,639/oz gold in Q3/24 compared with $2,138/oz gold in Q3/23, and offset by an 11% decrease in GEOs sold.

Previous report

Production costs applicable to sales were $58.0 million during Q3/24, compared to $43.4 million during Q3/23. While cost inflation remained high from an Argentine perspective, the relative strength of the peso against the US Dollar continued to increase costs in US Dollar terms.

Previous report

Cash costs andAISC per GEO sold were $2,173 and $2,675 in Q3/24, respectively, compared to $1,445 and $1,953 in Q3/23, respectively. Negative foreign exchange impacts, combined with temporary lower than expected mined grades, resulted in higher than expected unit costs.

Showing the first 40 of 54 passages. Open the source sections for the rest.

Reworded paragraphs (25)

Previous wording

The discussion also analyzes our results of operations for the three and nine months ended September 30, 2024 and compares those to the results for the three and nine months ended September 30, 2023. Regarding properties or projects that are not in production, we provide some details of our plan of operation. We suggest that you read this discussion in conjunction with MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS and our audited consolidated financial statements contained in our annual report on Form 10-K for the year ended December 31, 2023.

Current wording

The discussion also analyzes our results of operations for the three months ended March 31, 2025, and compares those to the results for the three months ended March 31, 2024. Regarding properties or projects that are not in production, we provide some details of our plan of operation. We suggest that you read this discussion in conjunction with MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS and our audited consolidated financial statements contained in our annual report on Form 10-K for the year ended December 31, 2024.

Previous wording

For a reconciliation of these non-GAAP measures to the amounts included in ourConsolidated Statements of Operations and Comprehensive Loss for the three and nine months ended September 30, 2024, and 2023 and to ourConsolidated Balance Sheets as of September 30, 2024, and December 31, 2023, and certain limitations inherent in such measures, please see the discussion under “Non-GAAP Financial Performance Measures,” beginning on page 33.

Current wording

For a reconciliation of these non-GAAP measures to the amounts included in ourConsolidated Statements of Operations and Comprehensive Loss for the three months ended March 31, 2025, and 2024 and to ourConsolidated Balance Sheets as of March 31, 2025, and December 31, 2024, and certain limitations inherent in such measures, please see the discussion under “Non-GAAP Financial Performance Measures,” beginning on page 34.

Previous wording

This discussion also includes references to “advanced-stage properties,” which are defined as properties for which advanced studies and reports have been completed indicating the presence of measured, indicated, and inferred resources or proven and probable reserves, or that have obtained or are in the process of obtaining the required permitting. Our designation of certain properties as “advanced-stage properties” should not suggest that we have or ever will have proven or probable reserves at those properties as defined by S-K 1300.

Current wording

This discussion also includes references to “advanced-stage properties,” which are defined as properties for which advanced studies and reports have been completed indicating the presence of measured, indicated, and inferred resources or proven and probable reserves, or that have obtained or are in the process of obtaining the required permitting. Our designation of certain properties as “advanced-stage properties” should not suggest that we have or ever will have proven or probable reserves at those properties as defined by S-K 1300. This section provides information up to the date of the filing of this report.

Previous wording

Throughout this Management’s Discussion and Analysis (“MDA”), the reporting periods for the three months ended September 30, 2024, and 2023 are abbreviated as Q3/24 and Q3/23, respectively, and the reporting periods for the nine months ended September 30, 2024, and 2023 are abbreviated as 9M/24 and 9M/23, respectively.** **

Current wording

Throughout this Management’s Discussion and Analysis (“MDA”), the reporting periods for the three months ended March 31, 2025, and 2024 are abbreviated as Q1/25 and Q1/24, respectively.** **

Previous wording

Disclosed gold equivalent ounces (“GEO”) includes gold and silver ounces calculated based on a gold to silver ratio of 85:1 for Q3/24 and 82:1 for Q3/23, and 85:1 for 9M/24 and 83:1 for 9M/23, which is based on the average per ounce price of gold and silver during each period.

Current wording

Disclosed gold equivalent ounces (“GEO”) includes gold and silver ounces calculated based on a gold to silver ratio of 90:1 for Q1/25 and 89:1 for Q1/24, which is based on the average per ounce price of gold and silver during each period.

Previous wording

The Company owns a 100% interest in the Gold Bar mine in Nevada, United States, the Fox Complex in Ontario, Canada, the Fenix Project in Sinaloa, Mexico and a portfolio of exploration properties in the United States, Canada, Mexico and Argentina. As of September 30, 2024, the Company also holds a 48.3% interest in McEwen Copper Inc. (“McEwen Copper”), which owns the Los Azules copper project in San Juan, Argentina and the Elder Creek exploration project in Nevada, United States, and a 49.0% interest in Minera Santa Cruz S.A. (“MSC”), which owns the producing San José silver-gold mine in Santa Cruz, Argentina and is operated by MSC’s majority owner, Hochschild Mining plc. The Company reports its investments in McEwen Copper and MSC using the equity method of accounting.

Current wording

The Company owns a 100% interest in the Gold Bar mine in Nevada, United States, the Fox Complex in Ontario, Canada, the Fenix Project in Sinaloa, Mexico and a portfolio of exploration properties in the United States, Canada, Mexico and Argentina. As of March 31, 2025, the Company also holds a 46.4% interest in McEwen Copper Inc. (“McEwen Copper”), which owns the Los Azules copper project in San Juan, Argentina and the Elder Creek exploration project in Nevada, United States, and a 49.0% interest in Minera Santa Cruz S.A. (“MSC”), which owns the producing San José silver-gold mine in Santa Cruz, Argentina and is operated by MSC’s majority owner, Hochschild Mining plc. The Company reports its investments in McEwen Copper and MSC using the equity method of accounting.

Previous wording

Highlights for Q3/2024 are summarized below and discussed further under “Consolidated Performance”:

Current wording

Highlights for Q1/25 are summarized below and discussed further under “Consolidated Performance”:

Previous wording

*(2)*As used here and elsewhere in this report, this is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 33.

Current wording

(2) T**his is a Non-GAAP financial performance measure. See “Non-GAAP Financial Performance Measures” beginning on page 36.

Previous wording

The following tables present consolidated selected financial and operating results of the Company for the three and nine months ended September 30, 2024 and 2023:

Current wording

The following tables present consolidated selected financial and operating results of the Company for the three months ended March 31, 2025, and 2024:

Previous wording

Loss from investment in McEwen Copper:During Q3/24 we recorded a loss of $1.9 million representing our attributable portion of the costs of McEwen Copper to advance the Los Azules project to feasibility. Prior to Q4/23, the financial results of McEwen Copper were consolidated. Details of McEwen Copper’s operating results are presented in the “Operations Review” section of this MDA and Note 9 to theConsolidated Financial Statements.

Current wording

Loss from investment in McEwen Copper:During Q1/25, we recorded a loss of $8.6 million from our investments in McEwen Copper, compared to $18.0 million during Q1/24. This loss represents our proportion of McEwen Copper’s net loss, which is driven primarily by exploration expenditures. Details of McEwen Copper’s operating results are presented in the “Operations Review” section of this MDA and Note 9 to theConsolidated Financial Statements.

Previous wording

Loss from investment in MSC: During Q3/24 we recorded a loss of $1.2 million, compared to a loss of $2.7 million in Q3/23. Details of MSC’s operating results are presented in the “Operations Review” section of this MDA and Note 9 to theConsolidated Financial Statements.

Current wording

Income from investment in MSC: During Q1/25, we recorded an income of $0.5 million from our investment in MSC, compared to $1.3 million during Q1/24. Details of MSC’s operating results are presented in the “Operations Review” section of this MDA and Note 9 to theConsolidated Financial Statements.

Previous wording

Our cash, cash equivalents and restricted cash balance increased by $4.8 million during 2024, from $27.5 million as at December 31, 2023 to $32.3 million as at September 30, 2024.

Current wording

Our cash, cash equivalents and restricted cash balance increased by $55.0 million during 2025, from $17.5 million as at December 31, 2024 to $72.5 million as at March 31, 2025.

Previous wording

Cash from operating activities of $30.7 million during 9M/24 reflects the net loss of $35.5 million for the period, adjusted for non-cash impacts, including net losses from equity method investments of $31.9 million, depreciation, amortization, and depletion of $24.0 million, income and mining tax recovery of $6.3 million, an increase in non-cash working capital of $12.5 million, stock-based compensation of $2.1 million, and reclamation accretion and adjustments to estimate of $1.1 million. Further details are provided in the* Consolidated Statements of Cash Flows.*

Current wording

Cash used in operating activities of $1.9 million during Q1/25 reflects the net loss of $6.3 million for the period, adjusted for non-cash impacts, including net losses from equity method investments of $8.1 million, depreciation, amortization, and depletion of $6.2 million, unrealized gains on marketable securities of $1.8 million, reclamation accretion and adjustments to estimate of $0.8 million, income and mining tax recovery of $2.9 million, stock-based compensation of $0.2 million, and $6.4 million in changes in non-cash working capital. Further details are provided in the* Consolidated Statements of Cash Flows.*

Previous wording

Cash used in investing activities of $45.1 million during 9M/24 consisted of additions to mineral property interests and plant and equipment of $30.3 million, driven primarily by capital development at the Fox Complex, and the investment of an additional $14.0 million in McEwen Copper during the 2024 period, notes receivable acquired of $1.9 million. This was slightly offset by $1.1 million of cash and restricted cash received from the acquisition of Timberline.

Current wording

Cash used in investing activities of $13.6 million during Q1/25 consisted of additions to mineral property interests, plant and equipment of $14.5 million, driven primarily by capital development at the Fox Complex and capitalized pre-stripping at the Gold Bar mine, and investments in marketable securities of $1.4 million. This was offset by $2.2 million of dividends received from MSC.

Previous wording

Working capital as at September 30, 2024 was $8.6 million, and decreased by 62% from $22.7 million as at December 31, 2023. The decrease in working capital was driven by the reclassification of $9.0 million of long-term debt to current liabilities, an increase in accounts payables and accrued liabilities of $6.2 million, a $4.7 million increase in flow-through share premium liabilities, offset by a $6.2 million increase in cash and cash equivalents described above, and a $0.7 million increase in other current assets.

Current wording

Working capital as at March 31, 2025 was $61.1 million, a $67.6 million increase from negative $6.5 million as at December 31, 2024. The increase in working capital was driven by an increase in cash and cash equivalents of $54.8 million driven by the issuance of Senior Convertible Notes, as well as a $9.1 million increase in marketable securities, a $2.6 million increase in inventories, a $1.4 million decrease in accounts payable and accrued liabilities, and a $1.5 million decrease in flow-through share premium, partially offset by a $1.1 million increase in tax liabilities.

Previous wording

The following table summarizes the operating results for the Gold Bar mine for the three and nine months ended September 30, 2024, and 2023:

Current wording

The following table summarizes the operating and financial results for the Gold Bar Mine for the three months ended March 31, 2025, and 2024:

Previous wording

The following table summarizes the operating results for the Fox Complex for the three and nine months ended September 30, 2024, and 2023:

Current wording

The following table summarizes the operating and financial results for the Fox Complex for the three months ended March 31, 2025, and 2024:

Previous wording

Revenue from gold saleswas $19.0 million in Q3/24, a decrease of $1.3 million compared to $20.3 million in Q3/23, A 28% decrease in GEOs sold was largely offset by an increase in the average realized gold price from $1,920 per GEO in Q3/23 to $2,499 per GEO in Q3/24. Realized gold prices at the Fox Complex are impacted by historic streaming arrangements, which require the sale of a portion of gold produced from the Froome and Black Fox mines at $601 per ounce as of Q3/24.

Current wording

Revenue from gold saleswas $13.3 million for Q1/25, compared to $14.7 million for Q1/24. This decrease was primarily driven by a 33% reduction in GEOs sold, partially offset by a 35% increase in the average realized gold price. Realized gold prices at the Fox Complex are impacted by historic streaming arrangements, which require the sale of a portion of gold produced from the Froome and Black Fox mines at $613 per ounce as of Q1/25.

Previous wording

The following table sets out certain operating results for the San José mine for the three and nine months ended September 30, 2024, and 2023 on a 100% basis:

Current wording

The following table sets out certain operating results for the San José mine for the three months ended March 31, 2025, and 2024 on a 100% basis:

Previous wording

As of September 30, 2024, we own a 48.3% interest in McEwen Copper, which owns a 100% interest in the Los Azules copper project in San Juan, Argentina, and the Elder Creek exploration project in Nevada, USA. Including amounts spent by Minera Andes Inc. prior to 2012, and directly by McEwen Mining prior to 2021, we have invested over $350 million in exploration expenditures to develop Los Azules as a world-class copper deposit.

Current wording

We own a 46.4% interest in McEwen Copper, which owns a 100% interest in the Los Azules copper project in San Juan, Argentina, and the Elder Creek exploration project in Nevada, USA. We have invested over $400 million in exploration expenditures to develop Los Azules into a world-class copper deposit, including amounts spent by Minera Andes Inc. before 2012 and directly by McEwen Mining prior to 2021.

Previous wording

The Los Azules project is one of the world’s largest undeveloped copper deposits and is located in the Province of San Juan, Argentina.

Current wording

The Los Azules project is one of the world's largest undeveloped copper deposits and is located in the northern Argentina.

Previous wording

The non-GAAP measures are presented for our wholly owned mines and our interest in the San José mine. The GAAP information used for the reconciliation to the non-GAAP measures for our minority interest in the San José mine may be found in Item 8. Financial Statements and Supplementary Data,Note 9, Equity Investments. The amounts in the reconciliation tables labeled “49% basis” were derived by applying to each financial statement line item the ownership percentage interest used to arrive at our share of net income or loss during the period when applying the equity method of accounting. We do not control the interest in or operations of MSC and the presentations of assets and liabilities and

Current wording

The non-GAAP measures are presented for our wholly owned mines and our interest in the San José mine. The GAAP information used for the reconciliation to the non-GAAP measures for our minority interest in the San José mine may be found in Item 8. Financial Statements and Supplementary Data,Note 9, Equity Investments. We do not control the interest in or operations of MSC and the presentations of assets and liabilities and revenues and expenses of MSC do not represent our legal claim to such items. The amount of cash we receive is based upon specific provisions of the Option and Joint Venture Agreement (“OJVA”) and varies depending on factors including the profitability of the operations.

Previous wording

Adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”) is a non-GAAP financial measure and does not have any standardized meaning. We use adjusted EBITDA to evaluate our operating performance and ability to generate cash flow from our wholly owned operations in production; we disclose this metric as we believe this measure provides valuable assistance to investors and analysts in evaluating our ability to finance our precious metal operations and capital activities separately from our copper exploration operations. The most directly comparable measure prepared in accordance with GAAP is net loss before income and mining taxes. Adjusted EBITDA is calculated by adding back McEwen Copper's income or loss impacts on our consolidated income or loss before income and mining taxes.

Current wording

Adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”) is a non-GAAP financial measure and does not have any standardized meaning. We use adjusted EBITDA to evaluate our operating performance and ability to generate cash flow from our wholly owned operations in production; we believe this measure provides valuable assistance to investors and analysts in evaluating our ability to finance our precious metal operations and capital activities separately from our copper exploration operations. The most directly comparable measure prepared in accordance with GAAP is net loss before income and mining taxes. Adjusted EBITDA is calculated by adding back McEwen Copper's income or loss impacts on our consolidated income or loss before income and mining taxes.

Previous wording

The term average realized price per ounce used in this report is also a non-GAAP financial measure. We prepare this measure to evaluate our performance against the market (London P.M. Fix). The average realized price for our 100% owned properties is calculated as gross sales of gold and silver, less streaming revenue, divided by the number of net ounces sold in the period, less ounces sold under the streaming agreement.

Current wording

The term average realized price per ounce used in this report is also a non-GAAP financial measure. We prepare this measure to evaluate our performance against the market (London P.M. Fix). The average realized price for our 100% owned properties is calculated as gross sales of gold and silver, less streaming revenue, divided by the number of net ounces sold in the period, less ounces sold under streaming agreements.

Previous wording

The following table reconciles the average realized prices to the most directly comparable U.S. GAAP measure, revenue from gold and silver sales. Ounces of gold and silver sold for the San José mine are provided to us by MSC.

Current wording

The following tables reconcile average realized prices to the most directly comparable U.S. GAAP measure, which is revenue from gold and silver sales.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

revenues and expenses of MSC do not represent our legal claim to such items. The amount of cash we receive is based upon specific provisions of the Option and Joint Venture Agreement (“OJVA”) and varies depending on factors including the profitability of the operations.