Skip to main content

Riot Platforms Inc

For the period ended Mar 31, 2025. Filed May 1, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2025 · Filed May 1, 2025

RIOT$16.71+13.2%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-09-30; filed 2024-11-04.

0001558370-24-014179

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-03-31; filed 2025-05-01.

0001558370-25-006119

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 142 previous paragraphs and 135 current paragraphs.

36 unchanged; 53 reworded; 45 added; 44 removed; 9 previous and 1 current paragraphs rearranged.

Tables are not compared: 19 previous and 25 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (45)

Current report

We are a vertically-integrated Bitcoin Mining company principally engaged in enhancing our power infrastructure and utilizing our vertical integration strategy to mine Bitcoin in support of the Bitcoin blockchain. We are also exploring the feasibility of developing a portion of our power capacity for AI/HPC uses.

Current report

We operate in two reportable business segments: Bitcoin Mining and Engineering.

Current report

We own and operate multiple Bitcoin Mining sites in the United States, consisting of the Rockdale Facility, the Corsicana Facility, and the Kentucky Facility. The Rockdale Facility in Texas is believed to be one of the largest Bitcoin Mining facilities in North America, as measured by developed capacity, and currently provides 700 MW in total developed capacity. Additionally, we are developing our second large-scale facility in Texas, the Corsicana Facility. During 2024, we completed the 400 MW Phase I of development of the Corsicana Facility. Upon completion, the Corsicana Facility is expected to have approximately one GW of operational capacity available for our business purposes. During 2024, we capitalized on our positioning within the market and acquired Block Mining, a Kentucky-based vertically-integrated Bitcoin miner, and E4A Solutions, a leading provider of electrical engineering services to a diverse customer base of energy developers and data center operators. The Block Mining Acquisition added 60 MW of operational capacity for self-mining operations, which we plan to expand to 110 MW in 2025, and provided us access to a secondary electrical grid. The E4A Solutions Acquisition added engineering expertise to service our electrical infrastructure and allows us to provide electrical solutions and services to support the rapidly growing market for electrical infrastructure.

Current report

Our market environment is highly competitive, both globally and regionally. We compete with other large-scale Bitcoin miners, as well as individual participants, to earn the Bitcoin reward that is central to our operations. Our industry continues to evolve alongside

Current report

the proliferation of Bitcoin and cryptocurrencies in general, and we believe we are well positioned within the digital commodities industry in which we operate.

Current report

Our current focus is evaluating the feasibility of developing the approximately 600 MW of remaining power capacity at the Corsicana Facility for AI/HPC uses, with the goal of maximizing the potential of our assets and enhancing our Bitcoin Mining operations.

Current report

During the three months ended March 31, 2025, we continued to deploy miners across all our Facilities, with the objective of increasing our operational efficiency and performance moving forward. As of March 31, 2025, we had a total deployed hash rate capacity of 33.7 EH/s, as compared to 31.5 EH/s as of December 31, 2024, an increase of 6.9%.

Current report

For the three months ended March 31, 2025 and 2024, Bitcoin Mining revenue was approximately $142.9 million and $71.4 million, respectively.

Current report

In December 2024, we completed the E4A Solutions Acquisition. This acquisition is consistent with our vertically integrated strategy by adding engineering expertise to service our own existing and future electrical infrastructure and allows us to provide electrical solutions and services to support the rapidly growing market for electrical infrastructure.

Current report

For the three months ended March 31, 2025 and 2024, Engineering revenue was approximately $13.9 million and $4.7 million. respectively.

Current report

Our Bitcoin acquisition strategy (“Bitcoin Treasury Strategy”) involves mining Bitcoin utilizing vertical integration, and from time to time, subject to market conditions, purchasing Bitcoin with our liquid assets derived from issuing debt or equity securities or selling Bitcoin to fund our operations and pursue our business strategy. Our vertical integration strategy has supported our stability during market fluctuations and allows us to capitalize on industry consolidation while building on our liquidity position.

Current report

See Part I, Item 1A. “Risk Factors” of our 2024 Annual Report for additional discussion regarding potential impacts our competitive and evolving industry may have on our business.

Current report

For the three months ended March 31, 2025 and 2024, Engineering revenue was $13.9 million and $4.7 million, respectively. The increase of $9.2 million was primarily attributable to the accelerated completion of certain custom products, and, therefore, the recognition of revenue. Additionally, $4.1 million of the increase was due to the E4A Solutions Acquisition in December 2024.

Current report

We generate non-cash revenue through mining Bitcoin at our Facilities, which we manage based on our Bitcoin Treasury Strategy, while financing operations and other expenses with cash typically raised through the issuance of our common stock under our ATM offering program. During the three months ended March 31, 2025 and 2024, we issued and sold approximately 5.4 million shares and 26.2 million shares, respectively, of our common stock under our ATM offering program for aggregate net proceeds (net of commissions and expenses) of $68.4 million and $345.7 million, respectively.

Current report

We monitor our balance sheet on an ongoing basis and evaluate the level of Bitcoin retained from monthly production in consideration of our cash requirements for ongoing operations and expansion.

Current report

As of March 31, 2025, we had a remaining commitment of approximately $54.0 million due to MicroBT for the contractual purchase of miners, which we expect to pay during 2025.

Current report

During 2025, 2024, 2023 and 2022, we offered and sold shares of our common stock through ATM offering programs pursuant to sales agreements with sales agents (each, an “ATM Program”). See Note 14.Stockholders’ Equity for the terms and provisions of each sales agreement.

Current report

The following table sets forth shares sold and net proceeds received (net of sales commissions and expenses) from shares sold under each ATM Program during the three months ended March 31, 2025 and 2024:

Current report

As of March 31, 2025, approximately $292.2 million of our common stock remained available for issuance and sale pursuant to the August 2024 ATM Program. The remaining sales agreements were terminated as of August 9, 2024.

Current report

We have been named a defendant in several lawsuits as more fully described in Note 17.Commitments and Contingencies.

Showing the first 40 of 45 passages. Open the source sections for the rest.

Removed paragraphs (44)

Previous report

We are a vertically-integrated Bitcoin mining company principally engaged in enhancing our capabilities to mine Bitcoin in support of the Bitcoin blockchain. Our Rockdale Facility is believed to be the largest Bitcoin mining facility in North America, as measured by developed capacity, and we are currently evaluating further growing its capacity. Additionally, we are developing the Corsicana Facility, a second large-scale Bitcoin mining facility, which, upon completion, is expected to have approximately 1.0 gigawatts (“GW”) of capacity available for our own Bitcoin Mining activities. On July 23, 2024, we completed a transaction to acquire Block Mining, a Kentucky-based vertically-integrated Bitcoin miner consisting of two operational sites, both in Kentucky, totaling 60 MW of operational capacity with potential to expand up to 155 MW. We intend to expand Block Mining’s two sites, targeting 110 MW for self-mining operations by the end of 2024. Additionally, Block Mining owns a greenfield expansion opportunity, adjacent to an existing substation, presenting an opportunity to develop 60 MW and with potential to expand to 150 MW. Block Mining is a capital efficient developer and operator of Bitcoin mining facilities that will add to our ability to execute our leading vertically-integrated strategy.

Previous report

The Bitcoin mining industry recently experienced an increase in transaction fees on the Bitcoin network, as well as an increase in overall demand for Bitcoin. Various protocols on the Bitcoin network gained popularity during 2023, and at various times temporarily resulted in a significant increase in the transaction fee paid to add a certain Bitcoin transaction to the blockchain. These

Previous report

The Bitcoin subsidy issued by the Bitcoin network for solving a block is subject to periodic incremental halving. The network halving is a preprogrammed, fixed process of the Bitcoin network where the Bitcoin subsidy for solving a block received by miners is reduced by half approximately every four years. The network halving is a process designed to implement a periodic decreasing schedule of the issuance of new Bitcoin into the market which results in a predictable and controlled inflationary rate. The network halving will continue to occur on this schedule until the amount of Bitcoin in existence reaches the cap of 21.0 million. Historically, many Bitcoin miners have been a source of selling pressure on Bitcoin as miners have sold their production to fund operations. After each halving, the decrease in the subsidy provided to miners from the Bitcoin network may lead to fewer rewards for miners and thus may result in a decrease in the supply of bitcoin sold by miners into the market. The network halving occurred in April 2024, cutting the subsidy from 6.25 to 3.125 Bitcoin per block.

Previous report

Prior to the halving event, shifts in strategy by prominent Bitcoin miners focused on implementing vertically-integrated business models whereby Bitcoin miners own and operate their own facilities rather than renting out space from a third-party’s data center. Vertical integration provides additional control over operational outcomes as well as better management of any input costs such as power and overhead fees. Flexibility, and the ability to manage expenses, becomes increasingly important as the amount of competition on the Bitcoin network expands and the subsidy in Bitcoin provided by the network contracts decreases.

Previous report

We anticipate the Bitcoin network will continue to see increased competition and that 2024 will be a period of consolidation in the Bitcoin mining industry. Further, given our relative position, liquidity, and absence of any significant long-term debt, we believe we are well positioned to benefit from such consolidation. We are continuously evaluating opportunities which we may decide to undertake as part of our strategic growth initiatives; however, we can offer no assurances that any strategic opportunities which we decide to undertake will be achieved on the schedule or within the budget we anticipate, if at all, and our business and financial results may change significantly as a result of such strategic growth.

Previous report

We own and operate one of the largest Bitcoin Mining operations in North America. During the nine months ended September 30, 2024, we continued to deploy miners at our Rockdale Facility, continued development activities and commencement of deployment of miners at the Corsicana Facility, with the objective of increasing our operational efficiency and performance in the future, and acquired the Kentucky Facility.

Previous report

As of September 30, 2024, our Bitcoin Mining business segment had a total deployed hash rate capacity of approximately 28.2 EH/s, as compared to 12.4 EH/s as of December 31, 2023, and 10.9 EH/s as of September 30, 2023, resulting in increases of 127.4% and 158.7%, respectively. We anticipate achieving a total self-mining hash rate capacity of approximately 34.9 EH/s by the end of 2024.

Previous report

Pursuant to the Digital Asset Custodial Agreement, dated as of November 1, 2023, between us and NYDIG Trust Company LLC (“NYDIG”) (as may be amended, modified or supplemented from time to time, the “NYDIG Custodial Agreement”), NYDIG, a well-known U.S.-based third-party digital asset-focused custodian, holds our Bitcoin in cold storage wallets in a digital asset account in our name. In exchange for its custodial services, NYDIG charges an annual fee equal to a percentage of our custodied Bitcoin based on the daily average value in U.S. dollars of the Bitcoin we custody with NYDIG. Our Bitcoin held in such digital asset accounts does not constitute “deposits” within the meaning of U.S. federal or state banking law and the digital asset accounts are not subject to Federal Deposit Insurance Corporation or Securities Investor Protection Corporation protections. The cold storage wallets in which our Bitcoin is held are all located in the United States. The NYDIG Custodial Agreement contains certain mutual indemnification provisions, including that NYDIG will indemnify us against direct claims for loss of custodied assets that arise directly from NYDIG’s or NYDIG’s nominees’ grossly negligent action, grossly negligent failure to act, bad faith or willful misconduct.

Previous report

For more information on the NYDIG Custodial Agreement, see the full text of the NYDIG Custodial Agreement included hereto as Exhibit 10.2, which qualifies the forgoing descriptions of the NYDIG Custodial Agreement in its entirety.

Previous report

We are also a party to a Digital Asset Execution Agreement with NYDIG Execution LLC (“NYDIG Execution”), pursuant to which NYDIG Execution executes or arranges transactions of our Bitcoin (“Orders”) as our agent. NYDIG Execution earns a commission on each trade determined by the net trade proceeds in U.S. dollars. NYDIG Execution does not charge us additional fees for principal trades. We deliver our Orders to NYDIG Execution via a designated security procedure, and each Order is affirmatively accepted by NYDIG Execution. While our Bitcoin may temporarily be processed through a NYDIG Execution customer account, NYDIG has covenanted that our assets will not be commingled with the assets of NYDIG Execution. NYDIG Execution is required to deposit any cash from the sale of our Bitcoin into our bank account at a U.S. depositary institution, less any applicable commissions. NYDIG Execution does not guarantee the value of our Bitcoin and is not responsible for any delay or failure to complete any Order caused by a digital asset network. If NYDIG Execution fails to (1) execute a properly executable Order and (2) give us notice of such failure, NYDIG Execution will only be liable for our actual damages.

Previous report

As of September 30, 2024, our Bitcoin Mining segment had a total hash rate, deployed of approximately 28.2 EH/s, as compared to 10.9 EH/s as of September 30, 2023.

Previous report

During the nine months ended September 30, 2024, we executed an additional purchase order with MicroBT under the Master Agreement to acquire new air-cooled miners with a total hash rate of 5.9 EH/s, for a total purchase price of approximately $96.7 million. This purchase order is in addition to the four purchase options remaining under the Master Agreement. Delivery of these miners occurred in the third quarter of 2024, with deployment commencing upon delivery.

Previous report

For the three and nine months ended September 30, 2024, Bitcoin Mining revenue was approximately $67.5 million and $194.7 million, respectively.

Previous report

In 2023, we made the decision to stop pursuing new hosting contracts and end our legacy contracts, to focus on our self-mining efforts. During the nine months ended September 30, 2024, all agreements with Data Center Hosting customers were terminated, and we have no plans to offer data center hosting services to new customers. For the three and nine months ended September 30, 2024, we no longer report Data Center Hosting as a separate reportable segment.

Previous report

For the three and nine months ended September 30, 2024, Engineering revenue was approximately $12.6 million and $26.9 million. respectively.

Previous report

We continue to monitor developments in the global supply chain and assess their potential impact on our expansion plans.

Previous report

For the three months ended September 30, 2024 and 2023, Engineering revenue was $12.6 million and $15.5 million, respectively. The decrease of $2.9 million was primarily attributable to supply chain constraints resulting in decreased receipts of materials, delaying the completion of certain custom products, and, therefore, the recognition of revenue. Our custom electrical products such as switchgear and power distribution centers are used as important components in data center development and in power generation and distribution facilities, and there has been increased demand for these products due to the continued increase in data center construction by developers, as well as the continually increasing worldwide demand for power.

Previous report

to the average of the forward prices increasing from $44.12 per mWh as of June 30, 2023 to $45.55 per mWh as of September 30, 2023.

Previous report

For the nine months ended September 30, 2024 and 2023, Bitcoin Mining revenue was $194.7 million, and $129.0 million, respectively. The increase of $65.7 million was primarily due to higher Bitcoin prices in the 2024 period, which averaged $58,771 per coin, as compared to $25,818 per coin for the 2023 period, which was partially offset by a decrease of 1,684 Bitcoin mined in the 2024 period as compared to the 2023 period, primarily due to the substantial increase in the Bitcoin network difficulty and April 2024 halving.

Previous report

For the nine months ended September 30, 2024 and 2023, Engineering revenue was $26.9 million and $51.0 million, respectively. The decrease of $24.1 million was primarily attributable to supply chain constraints resulting in decreased receipts of materials, delaying the completion of certain custom products, and, therefore, the recognition of revenue. Our custom electrical products such as switchgear and power distribution centers are used as important components in data center development and in power generation and distribution facilities, and there has been increased demand for these products due to the continued increase in data center construction by developers, as well as the continually increasing worldwide demand for power.

Previous report

Cost of revenue for Engineering for the nine months ended September 30, 2024 and 2023, was $27.8 million and $46.9 million, respectively, a decrease of approximately $19.1 million. The costs consisted primarily of direct materials and labor, as well as indirect manufacturing costs. Consistent with the causes of decreased Engineering revenue noted above, the decrease was primarily due to decreased receipts of materials resulting from increased competition for direct materials due to supply chain constraints.

Previous report

Depreciation and amortization for the nine months ended September 30, 2024 and 2023, was $129.7 million and $190.1 million, respectively, a decrease of approximately $60.4 million. The decrease was primarily due to the change in the estimated lives of our Bitcoin miners from 2 years to 3 years, partially offset by increased depreciation from the Corsicana Facility coming online in April 2024 and additional miners being deployed.

Previous report

Casualty-related charges (recoveries), net, were ($2.5) million and $1.5 million for the nine months ended September 30, 2024 and 2023, respectively. In December 2022, the Rockdale Facility was damaged during severe winter storms in Texas, resulting in casualty-related charges being recognized in 2023. The income recognized during the nine months ended September 30, 2024, was the result of cash recoveries from insurance claims related to the December 2022 winter storms.

Previous report

For the nine months ended September 30, 2024 and 2023, total other income (expense) was $7.6 million and $3.4 million, respectively. The increase was primarily attributable to higher interest income earned as a result of higher cash balances and increased interest rates, partially offset by unrealized losses on marketable securities of $13.6 million.

Previous report

During the nine months ended September 30, 2024, we sold 212 Bitcoin for proceeds of approximately $9.5 million. Subsequent to those sales, we made the strategic decision to temporarily halt the sale of all our Bitcoin production and instead, increase our Bitcoin holdings.

Previous report

Through September 30, 2024, we have paid approximately $448.5 million in total deposits and payments to MicroBT for the purchase of miners. The remaining commitment of approximately $112.5 million is due in installments through approximately December 2024 based on the estimated miner delivery schedule.

Previous report

Through September 30, 2024, we paid $72.4 million in total deposits and payments for the purchase of immersion cooling systems. The remaining commitment of approximately $7.7 million is due upon commissioning of the systems, which is expected to occur in the fourth quarter of 2024.

Previous report

In 2022, we announced our planned development of the Corsicana Facility, our second large-scale Bitcoin mining facility located on a 265-acre site in Navarro County, Texas. The Corsicana Facility is expected, upon completion, to have 1.0 GW of developed capacity for Bitcoin mining, with an additional 200 MW of electrical capacity available for development, at our discretion, which is securely supplied with power by a substation being developed for us on the premises that will be interconnected with the nearby Navarro Switch. The strategic decision to locate the Corsicana Facility next to the Navarro Switch was made to limit electricity lost in transmission and maximize the efficiency of our substation’s power distribution facilities. The initial phase of the development of the Corsicana Facility involved the construction of a 400 MW substation and an equal amount of immersion-cooled Bitcoin mining infrastructure spread across multiple buildings, as well as construction of various utilities, offices, warehouses, and infrastructure to support the facility’s operations. Our Bitcoin mining operations commenced in April 2024, following commissioning of the substation. As of September 30, 2024, Corsicana deployed 300 MW of Bitcoin mining infrastructure comprised of three 100 MW buildings, Buildings A1, A2 and B1, which were completed, and the fourth 100 MW building, Building B2, was under construction. Development of Building B2 continues on schedule and is expected to be completed during the fourth quarter of 2024.

Previous report

We estimate that the total cost of the first 400 MW phase of the development will be approximately $381.4 million. Through September 30, 2024, we had incurred costs of approximately $377.6 million related to the development of the Corsicana Facility, including $10.1 million for land. We expect to incur the remaining $3.8 million during the remainder of 2024.

Showing the first 40 of 44 passages. Open the source sections for the rest.

Reworded paragraphs (53)

Previous wording

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (this “MD&A”) should be read in conjunction with our Condensed Consolidated Financial Statements and the related notes (the “Notes”) and other financial information included elsewhere in this Quarterly Report and with our audited consolidated financial statements for the year ended December 31, 2023, as included in our 2023 Annual Report.

Current wording

The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (“MD&A”) provides information that will assist the reader in understanding our results of operations and financial condition. This MD&A should be read in conjunction with our Condensed Consolidated Financial Statements and the related notes (the “Notes”) and other financial information included elsewhere in this Quarterly Report and with our audited consolidated financial statements for the year ended December 31, 2024, as included in our 2024 Annual Report.

Previous wording

Unless otherwise indicated, amounts are stated in thousands of U.S. Dollars except for: share, per share, and miner amounts; Bitcoin quantities, prices, and hash rate; cost to mine one Bitcoin; and production value of one Bitcoin mined.

Current wording

Unless otherwise indicated, amounts are stated in thousands of U.S. Dollars except for: share, per share, per MWh, and miner amounts; Bitcoin quantities, prices, and hash rate; cost to mine one bitcoin; and production value of one bitcoin mined.

Previous wording

This MD&A contains statements of management’s beliefs, expectations and assumptions regarding our future business, and any statements other than statements of historical fact are “forward-looking statements” within the meaning of the PSLRA, which are made in reliance of the safe harbor provisions of Section 27A of the Securities Act, Section 21E of the Exchange Act, and the PSLRA. Such statements express management’s beliefs, opinions, projections and expectations regarding future events and circumstances, based on information available to management as of the date of this Quarterly Report, and are subject to risks and uncertainties, and our actual results could differ materially from those discussed in these forward-looking statements. Further, these forward-looking statements should not be construed either as assurances of performance or as promises of a given course of action. You should review the sections of this Quarterly Report entitled “Cautionary Note Regarding Forward-Looking Statements” and “Risk Factors” for a discussion of factors that could cause actual results to differ materially – and potentially adversely – from the results described in or implied by the forward-looking statements contained in this MD&A and elsewhere in this Quarterly Report.

Current wording

This MD&A includes forward-looking statements based upon current expectations that involve risks and uncertainties, such as our plans, objectives, expectations, and intentions. Actual results and the timing of events could differ materially from those anticipated in these forward-looking statements as a result of a number of factors. See “Cautionary Note Regarding Forward-Looking Statements” and “Risk Factors” for a discussion of factors that could cause actual results to differ materially – and potentially adversely – from the results described in or implied by the forward-looking statements contained in this MD&A and elsewhere in this Quarterly Report.

Previous wording

We operate in an environment which is constantly evolving based on the proliferation of Bitcoin and cryptocurrencies in general. A significant component of our strategy is to effectively and efficiently allocate capital between opportunities that generate the highest return on investment.

Current wording

We operate in an environment which is frequently evolving based on the proliferation of Bitcoin and cryptocurrencies in general. We have determined that it is in the best interest of our business to undertake a formal process to evaluate the feasibility of developing the approximately 600 MW of remaining power capacity at the Corsicana Facility for AI/HPC uses with the goal of maximizing the potential of our assets. We have engaged a leading consultant in the data center industry to conduct a feasibility assessment of the Corsicana Facility. A significant component of our overall business strategy is to effectively and efficiently allocate capital toward opportunities that generate the highest return on investment.

Previous wording

During the nine months ended September 30, 2024, we mined 3,312 Bitcoin, which represented a decrease of 1,684 Bitcoin from the 4,996 Bitcoin we mined during the nine months ended September 30, 2023. The decrease was primarily due to the increase in the Bitcoin network difficulty, which has more than doubled since January 2023, and the halving that occurred in April 2024, partially offset by higher Bitcoin prices and our increase in deployed hash rate.

Current wording

During the three months ended March 31, 2025, we mined 1,530 bitcoin, reflecting an increase of 166 bitcoin compared to the 1,364 bitcoin we mined during the three months ended March 31, 2024. The increase was primarily due to our increase in deployed hash rate and significantly improved operational efficiency, partially offset by the increase in the global network hash rate and the halving that occurred in April 2024.

Previous wording

As Bitcoin is a decentralized cryptocurrency, it is not required that Bitcoin be held by a custodian, and we may elect to self-custody. However, we believe our private keys relating to our Bitcoin are better safeguarded by the secure environment provided by custodians. Self-custodying poses an increased risk to our private keys and we may not have the same level of protection as custody providers who are well versed in industry best practices to protect digital assets from potential theft, loss, or destruction.

Current wording

As Bitcoin is a decentralized cryptocurrency, it is not required that Bitcoin be held by a custodian, and we may choose to self-custody. However, we believe that our private keys associated with our Bitcoin are better safeguarded within the secure environment provided by custodians. Self-custody poses an increased risk to our private keys, and we may not have the same level of protection as that offered by custody providers who are well-versed in industry best practices for safeguarding digital assets from potential theft, loss, or destruction.

Previous wording

Our custodian and brokerage services relationships are non-exclusive, and we may freely change our Bitcoin custodian and brokerage relationships at any time. We continually monitor our Bitcoin assets held by third-party custodians, and we have unlimited audit rights with respect to such custodial accounts. The Company performs monthly reconciliations of our Bitcoin assets held by our custodian(s) and the records of our mining pool, and our independent auditors verify the location and quantity of our Bitcoin assets annually, as part of the year-end audit process of our financial statements and internal controls over financial reporting. The Company’s insurance providers do not have inspection rights associated with our Bitcoin assets held in cold storage.

Current wording

Our Bitcoin custodian and brokerage services relationships are non-exclusive, and we may change our custodian and brokerage relationships at any time. We continually monitor our Bitcoin assets held by our custodians. The Company’s insurance providers do not have inspection rights associated with our Bitcoin assets held in cold storage. For additional information regarding our relationships with our custodians, NYDIG Trust Company LLC and Coinbase, Inc., on behalf of itself and Coinbase Custody Trust Company, LLC, and, if applicable, Coinbase or Coinbase Custody International Ltd., and a description of our underlying agreements with them, see Part I, Item 7 “Management’s Discussion and Analysis of Financial Condition and Results of Operations” of our 2024 Annual Report.

Previous wording

The following table presents our cost to mine one Bitcoin (amounts in thousands, except value of one Bitcoin amounts):

Current wording

The following table presents our cost to mine one bitcoin (amounts in thousands, except Quantity of Bitcoin mined and Production value of one Bitcoin mined amounts):

Previous wording

During 2023, we entered into two purchase orders under the Master Agreement to acquire new immersion miners from MicroBT with a total hash rate of 25.6 EH/s, for a total purchase price of approximately $453.4 million, subject to downward price adjustment as provided by the Master Agreement. These new miners are primarily for use at our new Corsicana Facility, which commenced operations in April 2024. Delivery of these miners began in 2023, with all miners expected to be received by the end of 2024. The Master Agreement also provides us with four annual options to purchase additional miners, on the same or better terms as the second purchase order executed under the Master Agreement, for a total hash rate of approximately 75.0 EH/s, assuming exercise of all four annual purchase options.

Current wording

During 2023, 2024, and 2025, we entered into purchase orders under the Master Agreement to acquire new miners from MicroBT. These purchase orders represented a total hash rate of 34.6 EH/s, with a total purchase price of approximately $615.1 million, subject to downward price adjustments as provided by the Master Agreement. These miners are primarily intended for deployment at the Corsicana Facility, which commenced operations in April 2024. Delivery of these miners began in 2023, and all miners are expected to be received and deployed by mid-2025. The Master Agreement provided us with four additional annual options to purchase miners, on the same or more favorable terms as the second purchase order executed under the Master Agreement. Assuming all four annual purchase options are exercised, these additional miners would represent a total hash rate of approximately 75.0 EH/s.

Previous wording

Our Engineering business segment designs and manufacturers power distribution equipment and custom engineered electrical products that provide us with the ability to vertically-integrate many of the critical electrical components and engineering services necessary for our Corsicana Facility development and Rockdale Facility expansions and to reduce our execution and counter-party risk in ongoing and future expansion projects. Engineering and other specialized talent employed in our Engineering business segment also allows us to continue to explore new methods to optimize and develop a best-in-class Bitcoin Mining operation and has been instrumental in the development of our industrial-scale immersion-cooled Bitcoin mining hardware.

Current wording

Our Engineering business designs and manufactures power distribution equipment and custom-engineered electrical products. These products support our vertical integration strategy by enabling internal development of critical electrical components and engineering services necessary for our site developments. This integration helps mitigate our execution and counter-party risk in ongoing and future expansion projects. The specialized talent employed in our Engineering business allows us the opportunity to explore new methods to optimize and develop best-in-class Bitcoin Mining operations and have been instrumental in the development of our industrial-scale immersion-cooled Bitcoin Mining hardware.

Previous wording

Our Engineering business segment also provides electricity distribution product design, manufacturing, and installation services primarily focused on large-scale commercial and governmental customers and serves a broad scope of clients across a wide range of markets including data center, power generation, utility, water, industrial, and alternative energy. Products are custom built to client and industry specifications.

Current wording

Our Engineering business also provides electricity distribution product design, manufacturing, and installation services primarily focused on large-scale commercial and governmental customers and serves a broad scope of clients across a wide range of markets including data center, power generation, utility, water, industrial, and alternative energy.

Previous wording

Long-term power contracts form the basis of our power strategy. We utilize our 345 MW PPA in three ways:

Current wording

Long-term power contracts form the basis of our power strategy. We utilize the Rockdale PPA and the Corsicana PPA (together, the “PPAs”) in place at our Facilities in the following ways:

Previous wording

We power down operations and return power back to the utility when market prices for electricity provide the potential for us to receive more power curtailment credits than the Bitcoin Mining revenues we would have generated had we not curtailed our mining operations. We receive power credits for the difference in the market power price and our fixed power price, which provides us the ability to maximize our overall profitability between Bitcoin Mining and supporting the grid by not drawing power from the grid when electricity is most scarce.

Current wording

We power down operations and return power to the utility when market prices for electricity provide the potential for us to receive more power curtailment credits than the Bitcoin Mining revenues we would have generated had we not curtailed our mining operations. We receive power credits for the difference in the market power price and our fixed power price, which provides us the ability to maximize our overall profitability between Bitcoin Mining and supporting the grid by not drawing power from the grid when electricity is most scarce.

Previous wording

We competitively bid to sell ERCOT the option to control our electrical load during certain hours. ERCOT compensates us in the form of Demand Response Credits, which are received whether or not ERCOT calls on us to power down.

Current wording

We competitively bid to sell ERCOT and MISO the option to control our electrical load during certain hours. ERCOT and MISO compensate us in the form of Demand Response Service Programs’ Credits, which are received whether or not we are called on to power down.

Previous wording

We voluntarily power down operations during times of peak demand in summer months. Participation provides us substantial savings on transmission costs in the subsequent year’s power bills, reducing our overall power costs.

Current wording

At the Rockdale Facility and the Corsicana Facility, we voluntarily power down operations during times of peak demand in summer months. Participation provides us with substantial savings on transmission costs in the subsequent year’s power bills, reducing our overall power costs.

Previous wording

The price of Bitcoin increased during the first quarter of 2024 due to a new source of demand, the eleven Bitcoin spot Exchange Traded Funds (“ETFs”) approved to begin trading by the SEC on January 11, 2024. Significant interest in the ETFs followed their introduction. One such ETF earned recognition as the fastest ETF ever to surpass $10 billion in assets under management since its launch. The ETFs, as an investment vehicle, provided a new access point for investors to gain exposure to Bitcoin through more traditional methods resulting in the ETFs seeing a combined net inflow of approximately $18.5 billion through September 30, 2024.

Current wording

The price of Bitcoin increased during the first quarter of 2024 due to a new source of demand, the 11 Bitcoin spot Exchange Traded Funds (“ETFs”), which were approved to begin trading by the SEC on January 11, 2024. These ETFs, as investment vehicles, provide investors with a new way to gain exposure to Bitcoin through more traditional financial markets.

Previous wording

During 2023 and 2024, the Bitcoin mining industry saw record growth as the price of Bitcoin increased from the lows experienced in early 2023. The increasing Bitcoin price renewed opportunities to access capital markets to fund growth, leading to unprecedent expansion in mining operations and resulting in a doubling in the size of provisioned hash calculation services on the network, as measured by total hash rate. Many Bitcoin mining companies heavily invested in infrastructure, upgrading and expanding mining fleets in advance of the April 2024 Bitcoin network halving. We expect competition within the mining industry to continue as long as Bitcoin prices remain elevated or increase further.

Current wording

During 2023 and 2024, the Bitcoin mining industry experienced record growth as the price of Bitcoin increased from the lows experienced in early 2023. The rising Bitcoin price renewed opportunities to access capital markets to fund growth, leading to unprecedented expansion in mining operations and resulted in a doubling of the size of provisioned hash calculation services on the network, as measured by total hash rate. In advance of the April 2024 Bitcoin network halving, many Bitcoin mining companies heavily invested in implementing vertically-integrated business models, infrastructure, and upgrading and expanding mining fleets. Competition on the Bitcoin network has expanded in kind and we expect competition within the mining industry to intensify as long as Bitcoin prices remain elevated or increase further.

Previous wording

Network difficulty, which is a measure of how hard it is for miners to solve a block on the Bitcoin blockchain (and, thus, earn a mining reward), is determined by the network’s total hash rate (i.e., the total computational power devoted to solving a block), which is adjusted every 2,016 blocks (with a new block being added approximately every ten minutes). Therefore, as more miners join the network and the network’s global hash rate increases, its difficulty will increase. Conversely, if miners leave the network and its hash rate decreases, its difficulty will decrease. We have observed that when the market price for Bitcoin experiences a sustained increase (as it did across 2023), new miners are introduced onto the Bitcoin network, increasing its network hash rate, and network difficulty has increased as a result. Thus, despite increasing our hash rate by approximately 158.7% from September 30, 2023, to September 30, 2024, the halving in April 2024 and increased network difficulty following increased network hash rate across the periods resulted in an approximately 33.7% decrease in the number of Bitcoin we mined for the nine months ended September 30, 2024, as compared to the same period in 2023.

Current wording

We have observed that when the market price for Bitcoin experiences sustained increases (as it had through January 2025), new miners are introduced onto the Bitcoin network, contributing to an increase in the global network hash rate. Despite the halving in April 2024 and increase in the global network hash rate, our hash rate grew by approximately 170.0% from December 31, 2023 to March 31, 2025. This growth contributed to an increase of approximately 12.1% in the number of Bitcoin we mined during the three months ended 2025 as compared to the same period in 2024.

Previous wording

Accordingly, as market prices for Bitcoin increase and more miners and hash rate are drawn onto the Bitcoin network, network difficulty will continue to increase, meaning existing miners like us will need to increase their hash rate to maintain and improve their chances of earning a Bitcoin mining reward. To do this, we continually seek out new Bitcoin mining capacity, including through our acquisition and development of new Bitcoin mining facilities (such as the Corsicana Facility and our acquisition of Block Mining) and the electricity supply and distribution facilities to service them, as well as other strategic growth opportunities. Further, we have adopted new and improved technology to increase both our mining power and efficiency, including our industrial-scale adoption of immersion cooling and our strategic acquisitions of large quantities of the newest, most powerful and most efficient miners available.

Current wording

Accordingly, as the global network hash rate continues to rise, existing miners must increase their hash rate to maintain or improve their chances of earning a Bitcoin mining reward. In response, we actively pursue new Bitcoin Mining capacity, including through our acquisition and development of new Bitcoin Mining facilities, such as the Corsicana Facility and the Block Mining Acquisition, as well as electricity supply and distribution infrastructure to support these operations. We are also focused on other strategic growth opportunities that enhance our long-term competitiveness. Further, we have adopted new and improved technology to increase both our mining power and efficiency, including our industrial-scale adoption of immersion cooling and our strategic acquisitions of large quantities of the latest powerful and efficient miners available.

Previous wording

transaction fees are volatile in nature but are paid directly to miners and are representative of public interest in transacting in Bitcoin. Transaction fees are packaged with the block subsidy issued by the Bitcoin network to combine for the total reward paid to miners upon solving a block.

Current wording

The Bitcoin mining industry recently experienced an increase in transaction fees on the Bitcoin network, alongside growing overall demand for Bitcoin. While transaction fees remain inherently volatile, they are paid directly to miners and are representative of the public interest in transacting on the Bitcoin network. These transaction fees, combined with the block subsidy issued by the Bitcoin network, make up the total reward paid to miners upon solving a block.

Previous wording

The Company has led the industry by focusing on a vertically-integrated business model since 2021. We continue to focus on building long-term stockholder value by taking strategic actions to further vertically-integrate our business at the current Rockdale Facility, developing the Corsicana Facility, and having acquired the Kentucky Facility. Management believes a focus on vertical integration will positively affect each of our business segments by providing increased capacity for our Bitcoin Mining operations, more opportunities for implementing our proprietary power strategy, and by capitalizing on supply chain efficiencies garnered through our Engineering segment. We continue to focus on deploying our efficient Bitcoin mining fleet, at scale, while realizing the benefits of being an owner and operator of our Bitcoin Mining facilities.

Current wording

Since 2021, we have led the industry by focusing on a vertically-integrated business model. We remain committed to building long-term stockholder value by taking strategic actions to further vertically-integrate our business at the current Rockdale Facility, developing the Corsicana Facility, and integrating our acquisitions including the Kentucky Facility and E4A Solutions. Management believes that vertical integration will strengthen each of our business segments by providing increased capacity for our Bitcoin Mining operations, expanding opportunities for implementing our proprietary power strategy, and positioning us to capitalize on supply chain efficiencies and electrical engineering services through our Engineering segment. We continue to focus on deploying our efficient Bitcoin Mining fleet, at scale, while realizing the benefits of being an owner and operator of our Bitcoin Mining facilities.

Previous wording

The Public Utility Commission of Texas (“PUCT”), ERCOT, and Oncor Electric Delivery Company (“Oncor”) collectively oversee the regulatory, administrative, and delivery aspects of our power supply in Texas. In recent years, regulatory scrutiny on Bitcoin mining facilities and their energy consumption has intensified as the practice has become more widespread.

Current wording

The Public Utility Commission of Texas, ERCOT, and Oncor Electric Delivery Company (“Oncor”) collectively oversee the regulatory, administrative, and delivery aspects of our power supply in Texas. In Kentucky, our power supply is overseen by MISO. As the Bitcoin mining industry has expanded in recent years, regulatory scrutiny on Bitcoin mining facilities and their energy consumption has intensified accordingly.

Previous wording

As the grid operator, ERCOT is responsible for monitoring and testing market participants, including our Bitcoin mining data centers in Rockdale and Corsicana, to evaluate their impact on grid reliability. During this process, ERCOT may issue curtailment notices to reduce the power usage at our Texas operations. We are periodically tested and monitored, and have experienced curtailment of power based on instructions we receive from Oncor and ERCOT. Due to the uncertainties regarding the duration or extent of power curtailments and testing procedures, we are currently unable to reasonably estimate any potential impacts to our business. If we

Current wording

As Texas’s grid operator, ERCOT is responsible for monitoring and testing market participants, including our Bitcoin Mining facilities at the Rockdale Facility and the Corsicana Facility, to evaluate their impact on grid reliability. As part of this process, ERCOT may issue curtailment notices to reduce the power usage at our Texas operations. Our Facilities in Texas are subject to periodic testing and monitoring and have experienced power curtailments in response to instructions we receive from Oncor and

Previous wording

cannot secure adequate access to electrical power, we may be forced to reduce or shut down our operations, which would have a material adverse effect on our business, prospects, financial condition, and operating results.

Current wording

ERCOT. Given the inherent uncertainty regarding the duration or extent of power curtailments and testing procedures, we are currently unable to reasonably estimate their potential impact to our operations. If we cannot secure adequate access to electrical power, we may be forced to reduce or shut down our operations, which would have a material adverse effect on our business, prospects, financial condition, and operating results.

Previous wording

Global supply logistics have caused delays across all channels of distribution. We have also experienced delays in our Engineering segment’s manufacturing and delivery schedule, and in our infrastructure development schedules, resulting from constraints on the globalized supply chains for miners, electricity distribution equipment and construction materials. Through the date of this Quarterly Report, we have been able to effectively and efficiently mitigate delivery delays to avoid materially impacting our miner deployment schedule; however, we cannot guarantee that we will be able to continue to mitigate any such delivery delays in the future.

Current wording

An inflationary environment marked by global supply chain logistic disruptions across multiple distribution channels, has in the past contributed to delays in certain of our miner delivery schedules and in our infrastructure development schedules, driven by constraints in the globalized supply chains for miners, electricity distribution equipment, and construction materials, and these conditions may contribute to delays in the future. We have also experienced delays in our Engineering business segment’s manufacturing and delivery schedule, and in our infrastructure development schedules, resulting from constraints on the globalized supply chains for miners, electricity distribution equipment and construction materials.

Previous wording

Additionally, the development of the Corsicana Facility requires large quantities of construction materials, specialized electricity distribution equipment, and other component parts that are in high demand and can be difficult to source. To help mitigate the impacts of global supply chain constraints and increasing demand for these goods, including any inflationary pricing concerns that may result, we procured all the required components and materials for development of the first 400 MW phase of the Corsicana Facility, and we have procured and already hold many of the components and materials required for development of the next 600 MW phase of our development of the Corsicana Facility, as well as replacement components and parts for our existing systems, to help shorten the impact of potential damage to installed equipment.

Current wording

During the three months ended March 31, 2025, we continued to operate under such conditions; however, we effectively and efficiently mitigated delivery delays to avoid material impacts to our miner deployment schedule, although we cannot guarantee continued success in mitigating any such delivery delays in the future. Additionally, the development and potential expansion of our Facilities requires large quantities of construction materials, specialized electricity distribution equipment, and other critical components, all of which are in high demand and may be difficult to source. To help mitigate the impacts of increasing demand for these goods, global supply chain constraints, and uncertainty arising from recently imposed U.S. tariffs on imports and retaliatory tariffs imposed by other countries, including any inflationary pricing that may result from such impacts, we procured and already hold many electrical infrastructure components and materials required to develop the next 600 MW phase of the Corsicana Facility and expand the Kentucky Facility, as well as replacement components and parts for our existing systems, to help shorten the impact of potential damage to installed equipment.

Previous wording

Total revenue for the three months ended September 30, 2024 and 2023, was $84.8 million and $51.9 million, respectively. Total revenue consists of our Bitcoin Mining revenue, Engineering revenue, and Other revenue. Other revenue consists almost entirely of residual activity related to our ceased Data Center Hosting segment.

Current wording

Total revenue for the three months ended March 31, 2025 and 2024 was $161.4 million and $79.3 million, respectively. Total revenue consists of our Bitcoin Mining revenue, Engineering revenue, and Other revenue. Other revenue consists almost entirely of residual activity related to our remaining data center hosting operations.

Previous wording

For the three months ended September 30, 2024 and 2023, Bitcoin Mining revenue was $67.5 million and $31.2 million, respectively. The increase of $36.3 million was primarily due to higher Bitcoin prices in the 2024 period, which averaged $61,133 per coin, as compared to $28,228 per coin for the 2023 period. Despite the substantial increase in the Bitcoin network difficulty and the April 2024 halving, Bitcoin production was consistent for each of the periods presented.

Current wording

For the three months ended March 31, 2025 and 2024, Bitcoin Mining revenue was $142.9 million and $71.4 million, respectively. The increase of $71.5 million was primarily due to higher Bitcoin prices in the 2025 period, which averaged $93,385 per bitcoin, as compared to $52,343 per bitcoin for the 2024 period. Despite the substantial increase in the global network hash rate and the April 2024 halving, Bitcoin production increased by 12.2% during the three months ended March 31, 2025 compared to the same period in 2024.

Previous wording

The increase of approximately $27.0 million of Cost of revenue for Bitcoin Mining was primarily due to the increase in Bitcoin mining capacity at the Rockdale Facility and commencement of Bitcoin mining activities at the Corsicana Facility, both of which require additional headcount and direct costs necessary to maintain and support our expanded Bitcoin mining operations, as well as the absorption of other costs previously included in our former Data Center Hosting segment. Cost of revenue for Bitcoin Mining excludes depreciation and amortization, which are stated separately on our Condensed Consolidated Statements of Operations.

Current wording

The increase of approximately $38.3 million of Cost of revenue for Bitcoin Mining was primarily due to the increase in Bitcoin Mining capacity at the Corsicana Facility, which requires additional headcount and direct costs necessary to maintain and support our expanded Bitcoin Mining operations. Cost of revenue for Bitcoin Mining excludes depreciation and amortization, which are stated separately on our Condensed Consolidated Statements of Operations.

Previous wording

Cost of revenue for Engineering for the three months ended September 30, 2024 and 2023, was $13.5 million and $13.2 million, respectively, an increase of approximately $0.3 million. The costs consisted primarily of direct materials and labor, as well as indirect manufacturing costs, all of which increased slightly as supply chain constraints began to ease during the three months ended September 30, 2024.

Current wording

Cost of revenue for Engineering for the three months ended March 31, 2025 and 2024, was $11.8 million and $6.0 million, respectively, an increase of approximately $5.8 million. The costs consisted primarily of direct materials and labor, as well as indirect manufacturing costs, which increased along with the increase in revenue as compared to the three months ended March 31, 2024.

Previous wording

Selling, general and administrative expenses for the three months ended September 30, 2024 and 2023, were $66.9 million and $29.1 million, respectively, an increase of approximately $37.8 million. Selling, general and administrative expenses consist of stock-based compensation, legal and professional fees, and other personnel and related costs. The increase was primarily due to increases in stock compensation expenses of $17.0 million, which was primarily due to new grants under our long-term incentive program that was implemented in July 2023, compensation expenses of $7.6 million as a result of hiring additional employees to support our ongoing growth, increased legal and professional fees of $6.8 million primarily related to ongoing litigation and public company compliance, and $5.3 million for additional insurance and other costs primarily attributable to ongoing growth.

Current wording

Selling, general and administrative expenses for the three months ended March 31, 2025 and 2024, were $71.4 million and $57.7 million, respectively, an increase of approximately $13.7 million. Selling, general and administrative expenses consist of stock-based compensation, legal and professional fees, and other personnel and related costs. The increase was primarily due to anincrease in legal and professional fees of $6.4 million primarily related to ongoing litigation and public company-related expenses and an increase of $3.0 million in compensation expense as a result of hiring additional employees to support our ongoing growth. The remaining increase was due to an increase in other general operating costs such as insurance and information technology projects to support our growth, partially offset by a decrease in stock-based compensation of $2.4 million due to the vesting of awards during 2024.

Previous wording

Depreciation and amortization for the three months ended September 30, 2024 and 2023, was $60.0 million and $64.6 million, respectively, a decrease of approximately $4.6 million. The decrease was primarily due to the change in the estimated lives of our Bitcoin miners from 2 years to 3 years, partially offset by increased depreciation from the Corsicana Facility coming online in April 2024 and additional miners being deployed.

Current wording

Depreciation and amortization for the three months ended March 31, 2025 and 2024, was $77.9 million and $32.3 million, respectively, an increase of approximately $45.6 million. The increase was primarily due to increased depreciation from the Corsicana Facility coming online in April 2024 and additional miners being deployed.

Previous wording

The change in fair value of Bitcoin for the three months ended September 30, 2024 and 2023, were gains of $8.6 million and losses of $25.3 million, respectively, and were recognized to adjust the fair value of our Bitcoin held at the end of each period.

Current wording

The change in fair value of Bitcoin for the three months ended March 31, 2025 and 2024, was a loss of $208.0 million and a gain of $234.1 million, respectively, and were recognized to adjust the fair value of our Bitcoin held at the end of each period.

Previous wording

The change in fair value of our derivative asset for the nine months ended September 30, 2024 and 2023, were gains of $23.4 million and $11.3 million, respectively, and was recorded to adjust the fair value of our PPA, which was classified as a derivative asset and measured at fair value. The changes in fair value were due to changes in future power prices over the applicable period. The gain incurred during the nine months ended September 30, 2024, was primarily attributable to the average of the forward prices utilized in the discounted cash flow estimation models increasing from $45.15 per mWh as of December 31, 2023 to $48.80 per mWh as of September 30, 2024. The gain recognized during the three months ended September 30, 2023, was primarily attributable to the average of the forward prices increasing from $43.59 per mWh as of December 31, 2022 to $45.55 per mWh as of September 30, 2023.

Current wording

The change in fair value of our derivative asset for the three months ended March 31, 2025 and 2024, were gains of $41.9 million and $20.2 million, respectively, and was recorded to adjust the fair value of our PPAs, which was classified as a derivative asset and measured at fair value. The changes in fair value were due to changes in future power prices over the applicable period. The gain incurred during the three months ended March 31, 2025, was primarily attributable to the average of the forward prices utilized in the discounted cash flow estimation models increasing from $51.98 per MWh as of December 31, 2024 to $55.41 per MWh as of March 31, 2025. The gain recognized during the three months ended March 31, 2024, was primarily attributable to the average of the forward prices increasing from $43.80 per MWh as of December 31, 2023 to $47.46 per MWh as of March 31, 2024.

Previous wording

Power curtailment credits for the three months ended September 30, 2024 and 2023, were $12.4 million and $49.6 million, respectively, and represent sales of unused power under our PPA and participation in ancillary services under ERCOT Demand Response Services Programs. The amount of these credits varies from period to period depending on various factors impacting the supply of power to, and the demand for power on, the ERCOT grid, such as weather and global fuel costs.

Current wording

Power curtailment credits for the three months ended March 31, 2025 and 2024, were $7.8 million and $5.1 million, respectively, and represent sales of unused power under certain of our PPAs and participation in ancillary services under ERCOT Demand Response Services Programs. The amount of these credits varies from period to period depending on various factors impacting the supply of power to, and the demand for power on, the ERCOT grid, such as weather and global fuel costs.

Previous wording

For the three months ended September 30, 2024 and 2023, total other income (expense) was ($32.8) million and $2.3 million, respectively. The change was primarily attributable to unrealized losses on marketable securities of $38.1 million, partially offset by higher interest income earned as a result of higher cash balances and increased interest rates.

Current wording

For the three months ended March 31, 2025 and 2024, total other income (expense) was ($62.1) million and $7.8 million, respectively. The change was primarily attributable to unrealized losses on marketable securities of $63.2 million.

Previous wording

In addition to financial measures presented under generally accepted accounting principles in the United States (“GAAP”), we consistently evaluate our use of and calculation of non-GAAP performance measures such as “Adjusted EBITDA.” EBITDA is computed as net income before interest, taxes, depreciation, and amortization. Adjusted EBITDA is a performance measure defined as EBITDA adjusted to eliminate the effects of certain non-cash and/or non-recurring items that do not reflect our ongoing strategic business operations, which management believes results in a performance measurement that represents a key indicator of our core business operations of Bitcoin mining. The adjustments include fair value adjustments such as derivative power contract adjustments, equity securities value changes, and non-cash stock-based compensation expense, in addition to financing and legacy business income and expense items.

Current wording

In addition to financial measures presented under generally accepted accounting principles in the United States (“GAAP”), we consistently evaluate our use of and calculation of non-GAAP financial measures such as “Adjusted EBITDA.” EBITDA is computed as net income before interest, taxes, depreciation, and amortization. Adjusted EBITDA is a financial measure defined as EBITDA adjusted to eliminate the effects of certain non-cash and/or non-recurring items that do not reflect our ongoing strategic business operations, which management believes results in a performance measurement that represents a key indicator of our core business operations of Bitcoin Mining. The adjustments include fair value adjustments such as derivative power contract adjustments, equity securities fair value changes, and non-cash stock-based compensation expense, in addition to financing and legacy business income and expense items.

Previous wording

We believe Adjusted EBITDA can be an important performance measure because it allows management, investors, and our board of directors to evaluate and compare our operating results, including our return on capital and operating efficiencies, from period-to-period by making such adjustments. Additionally, Adjusted EBITDA is used as a performance metric for share-based compensation.

Current wording

We believe Adjusted EBITDA can be an important financial performance measure because it allows management, investors, and our board of directors to evaluate and compare our operating results, including our return on capital and operating efficiencies, from period-to-period by making such adjustments. Additionally, Adjusted EBITDA is used as a performance metric for share-based compensation.

Previous wording

Adjusted EBITDA is provided in addition to, and should not be considered to be a substitute for, or superior to, net income, the most comparable measure under GAAP to Adjusted EBITDA. Further, Adjusted EBITDA should not be considered as an alternative to revenue growth, net income, diluted net income per share or any other performance measure derived in accordance with GAAP, or as an alternative to cash flow from operating activities as a measure of our liquidity. Adjusted EBITDA has limitations as an analytical tool, and you should not consider this performance measure either in isolation or as a substitute for analyzing our results as reported under GAAP.

Current wording

Adjusted EBITDA is provided in addition to, and should not be considered to be a substitute for, or superior to, net income, the most comparable measure under GAAP to Adjusted EBITDA. Further, Adjusted EBITDA should not be considered as an alternative to revenue growth, net income, diluted net income per share or any other performance measure derived in accordance with GAAP, or as an alternative to cash flow from operating activities as a measure of our liquidity. Adjusted EBITDA has limitations as an analytical tool, and you should not consider this financial measure either in isolation or as a substitute for analyzing our results as reported under GAAP.

Previous wording

As of September 30, 2024, we had net working capital of approximately $590.6 million, which included cash and cash equivalents of $355.7 million and marketable securities of $190.1 million. We reported a net loss of $27.0 million during the nine months ended September 30, 2024, which included $143.6 million in non-cash net gains, primarily consisting of revenue recognized from Bitcoin mined of $194.7 million, the change in fair value of Bitcoin of $166.2 million, and the change in fair value of the derivative asset of $23.4 million, partially offset by depreciation and amortization of $129.7 million, stock-based compensation of $94.7 million, and the unrealized loss on marketable securities of $13.6 million.

Current wording

As of March 31, 2025, we had net working capital of approximately $310.3 million, which included cash and cash equivalents of $163.7 million and marketable securities of $71.0 million. We reported a net loss of $296.4 million during the three months ended March 31, 2025, which included $187.1 million in non-cash net gains, primarily consisting of revenue recognized from Bitcoin mined of $142.9 million, and the change in fair value of the derivative asset of $41.9 million, partially offset by the change in fair value of Bitcoin of $208.0 million, depreciation and amortization of $77.9 million, stock-based compensation of $29.6 million, and the unrealized loss on marketable securities of $63.2 million.

Showing the first 40 of 53 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Generating Bitcoin rewards which exceed our production and overhead costs will determine our ability to report profit margins related to such Bitcoin Mining operations, although accounting for our reported profitability is significantly complex. Furthermore,
Rearranged previous paragraphs (9)

Previous report — wording carried elsewhere

The change in fair value of our derivative asset for the three months ended September 30, 2024 and 2023, were losses of $24.3 million and gains of $3.9 million, respectively, and was recorded to adjust the fair value of our PPA, which was classified as a derivative asset and measured at fair value. The changes in fair value were due to changes in future power prices over the applicable period. The loss incurred during the three months ended September 30, 2024, was primarily attributable to the average of the forward prices utilized in the discounted cash flow estimation models decreasing from $51.13 per mWh as of June 30, 2024 to $48.80 per mWh as of September 30, 2024. The gain recognized during the three months ended September 30, 2023, was primarily attributable

Previous report — wording carried elsewhere

Comparative Results for the nine months ended September 30, 2024 and 2023:

Previous report — wording carried elsewhere

Total revenue for the nine months ended September 30, 2024 and 2023, was $234.1 million and $201.9 million, respectively. Total revenue consists of our Bitcoin Mining revenue, Engineering revenue, and Other revenue.

Previous report — wording carried elsewhere

For the nine months ended September 30, 2024 and 2023, Cost of revenue for Bitcoin Mining consisted of the following:

Previous report — wording carried elsewhere

The increase of approximately $53.3 million was primarily due to the increase in Bitcoin mining capacity at the Rockdale Facility, and commencement of Bitcoin mining activities at the Corsicana Facility, both of which require more headcount and direct costs necessary to maintain and support our expanded Bitcoin mining operations, as well as the absorption of other costs previously included in our Data Center Hosting segment. Cost of revenue for Bitcoin Mining excludes depreciation and amortization, which are stated separately on our Condensed Consolidated Statements of Operations.

Previous report — wording carried elsewhere

Selling, general and administrative expenses for the nine months ended September 30, 2024 and 2023, were $185.8 million and $61.6 million, respectively, an increase of approximately $124.2 million. Selling, general and administrative expenses consist of stock-based compensation, legal and professional fees, and other personnel and related costs. The increase was primarily due to increases in stock compensation expenses of $80.3 million, which was primarily due to new grants under our long-term incentive program, compensation expenses of $15.8 million as a result of hiring additional employees to support our ongoing growth, increased legal and professional fees of $12.7 million primarily related to ongoing litigation and public company compliance, and $15.4 million for additional insurance and other costs primarily attributable to ongoing growth.

Previous report — wording carried elsewhere

The change in fair value of Bitcoin for the nine months ended September 30, 2024 and 2023, were gains of $166.2 million and $72.7 million, respectively, and were recognized to adjust the fair value of our Bitcoin held at the end of each period.

Previous report — wording carried elsewhere

Power curtailment credits for the nine months ended September 30, 2024 and 2023, were $31.4 million and $66.1 million, respectively, and represent sales of unused power under our PPA and participation in ancillary services under ERCOT Demand Response Services Programs. The amount of these credits varies from period to period depending on various factors impacting the supply of power to, and the demand for power on, the ERCOT grid, such as weather and global fuel costs.

Previous report — wording carried elsewhere

Long-lived assets are stated at cost and depreciated using the straight-line method over the estimated useful lives of the assets. Judgment is necessary in estimating the Company’s various assets’ useful lives. This includes evaluating the Company’s own usage experience with its currently owned assets, the quality of materials used in construction-related projects, and for its miners, the rate