Skip to main content

Golden Minerals Co

For the period ended Dec 31, 2024. Filed Apr 15, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Apr 15, 2025

AUMN$0.20-6.0%Stored close · as of Nov 10, 2026

Extracted filing text, with the paragraph anchors used by the comparison.

See the whole filing, with its images and exhibits

Items 1 and 2. BUSINESS AND PROPERTIE S

Overview

We are an exploration company holding majority joint venture interests in the Desierto and Sarita Este concessions, adjoining gold-silver-copper exploration projects located in northwest Salta Province Argentina (the “Sarita Este/Desierto project”); a 60% joint venture interest in Sand Canyon, an exploration stage, gold-silver project in northwestern Nevada; and other mineral exploration properties located primarily in or near historical precious metals producing regions in Argentina and Mexico.

We are primarily focused on advancing exploration activities at the Sarita Este/Desierto project, as further described below under “Description of Properties — Sarita Este” and “—Desierto”.

We restarted mining at our former Velardeña and Chicago gold-silver mining properties (the “Velardeña Properties”) in December 2023 and continued operations through the end of February 2024. However, the initial performance of both the mine and processing plant did not meet expectations. By the end of March 2024, we had processed all mined mineralized material and subsequently shut down the sulfide processing plant. The Velardeña Properties were then classified as discontinued operations held for short-term sale. We have entered into four separate sales agreements (collectively, the “Velardeña Sales Agreements”) to sell the Velardeña and Chicago mines, including both sulfide and oxide processing plants, water wells, and related equipment, to a privately held Mexican company (the “Velardeña Buyer”) for an aggregate purchase price of $5.5 million in cash, plus value added tax (“VAT”). The transactions under the first three of the Velardeña Sales Agreements, which included the combined sales of the Velardeña and Chicago mines, the sulfide processing plant and various related equipment were completed on June 20, 2024. The Velardeña Buyer agreed to pay $3.0 million plus VAT on July 1, 2024, to complete the transaction covered by the fourth Velardeña Sales Agreement, which included the oxide processing plant and water wells. The Velardeña Buyer has made payments of approximately $1.8 million through December 31, 2024. Subsequent to December 31, 2024, the Velardeña Buyer made additional payments of approximately $1.0 million bringing the total amounts paid through April 4, 2025 to approximately $2.8 million, however the Velardeña Buyer remains in default. While we retain title to the plant, the Velardeña Buyer has operational control of the plant, and we have not had access to the property since mid-year 2024. We continue to hold our remaining interests in the oxide plant at Velardeña as assets held for sale. The Velardeña Buyer has been making periodic payments and the Company believes at this time that it will eventually collect the full amount, at which time the Company will record the sale under the fourth and final Velardeña Sales Agreement. The collection of the amount due from the final Velardeña Sales Agreement may satisfy a portion of our projected capital needs over the next twelve months.

In 2024, we also completed the sale of our wholly owned subsidiary, Silex Argentina S.A. (“Silex Argentina”), which was the sole owner of El Quevar, our former advanced exploration silver property in Argentina, for $3.5 million. We also completed the sale of our former Yoquivo gold-silver project located in Chihuahua State, Mexico (the “Yoquivo Project”) for $570,000 plus VAT, and the sale of a Mexican subsidiary holding tax losses for $445,000 plus VAT. In April 2025, the Company completed the sale of an additional Mexican subsidiary holding tax losses and five property concessions for $600,000 plus VAT. The Company is evaluating the potential sale of certain other Mexican subsidiaries that hold tax losses. Whether we can sell these subsidiaries, and the timing and price of any sale, is uncertain.

Because we no longer have operating properties to generate cash flow and do not hold any significant assets for sale, we are evaluating and pursuing alternatives to obtain funds to continue as a going concern, including the potential sale of the Company, collection of the $0.2 million plus VAT balance from the sale of the Velardeña Properties, seeking buyers or partners for certain of the Company’s other assets or obtaining equity or other external financing. In the absence of additional cash inflows, the Company anticipates that its cash resources will be exhausted in the first quarter of 2026. If we are unable to obtain additional cash resources or sell the Company, we will be forced to cease operations and liquidate.

See “—Liquidity, Capital Resources and Going Concern—2025 Liquidity Forecast and Going Concern Qualification” below.

This discussion should be read in conjunction with the section entitled “Management’s Discussion and Analysis of Financial Condition and Results of Operation” included in this Form 10-K.

Our principal office is located at 1312 17th St., Unit 2136, Denver, CO 80202, and our registered office is the Corporation Trust Company, 1209 Orange Street, Wilmington, DE 19801.

Company History

We were incorporated in Delaware under the Delaware General Corporation Law in March 2009. From March 2009 through September 2011, we focused on the advancement of our El Quevar silver project in Argentina. In September 2011, we completed a business combination transaction with ECU Silver Mining Inc. (“ECU”), resulting in our ownership of the Velardeña and Chicago silver, gold and base metals mines located in the Velardeña mining district in the State of Durango, Mexico, which the Company most recently operated from December 2023 until March 2024.

Corporate Structure

Golden Minerals Company, headquartered in Denver, Colorado, is the operating entity through which we conduct our business. We have a number of wholly owned subsidiaries organized throughout the world, including in Mexico, Canada, South America, the Caribbean and Europe. We generally hold our exploration rights and properties through subsidiaries organized in the countries in which our rights and properties are located.

Summary of Mining Properties

We do not have mineral reserves as defined under S-K 1300 and therefore all of our mining properties are considered to be in the exploration stage. We have approximately eight mining properties, which are listed under “Summary of Certain Mining Properties” below. In total, Golden Minerals’ properties, including our options, cover approximately 17,200 hectares.

Property Locations

Argentina Properties

United States Property

Mexico Properties

Summary of Certain Mining Properties

Argentina

PropertyMine and Mineral TypesOwnership,Operator, andPermittingFacilities andProcessing PlantsRecent Activities
Desierto(1)Gold and silver exploration.33% ownership with an option to increase its ownership to 51%. Two mining concessions (totaling 2505 hectares).​No significant facilities.The Company has a proposed joint venture agreement with Cascadero for 51% ownership once option payment is complete.
Sarita Este(1)Gold, silver and copper exploration.51% ownership. Full JV documentation still in progress.​One concession totaling 830 hectares.​Drill permit received.No significant facilities.In January 2022, announced initial results from 2,516-meter diamond drill program and plans for trenching and drilling in 2022 field campaign.​In August 2022, announced results from second phase 1,286-meter diamond drill program.​In December 2022, announced results from third phase 1,120-meter diamond drill program.​
Carolina and TocotaPreliminary mineral exploration.100% ownership interest in three concessions in the San Juan and Santa Cruz provinces.​No significant facilities.No material exploration work has been conducted to date on Carolina. Historic drilling has been conducted on Tocota.

Nevada, United States

​​​​​
PropertyMine and Mineral TypesOwnership,Operator, andPermittingFacilities andProcessing PlantsRecent Activities
Sand Canyon (2)Gold and silver exploration.60% interest from Golden Gryphon Enterprises. Full JV documentation is in progress. 354 claims totaling 2,923 hectares.​Drill permit received.​No significant facilities.Results from initial drill program completed Q1 2020.​Currently evaluating results and considering future activities.​

Mexico

PropertyMine and Mineral TypesOwnership,Operator, andPermittingFacilities andProcessing PlantsRecent Activities
RodeoGold and silver.​Depleted open pit mine (surface).100% owned.​Two concessions covering 1,866 hectares.No significant facilities.Mining activities concluded during the second quarter of 2023 and processing of mined material in Q3 2023. The Company does not believe this property has material residual economic value and has a remaining asset retirement obligation.​​
VelardeñaNone100% owned.Oxide processing plant, three water wells and tailings facility.​The Company is holding this property for sale. 92% of purchase price has been paid as of April 4, 2025.​
FlechasGold and silver exploration.100% ownership. Four concessions (totaling 951 hectares).​No significant facilities.The property has historic production.
Miscellaneous​Preliminary mineral exploration.Ownership interest or right to acquire an ownership in three individual concessions located in Durango.​No significant facilities.No material exploration work has been conducted to date. Concessions were subsequently sold April 1, 2025.

(1) See “Description of Properties — Desierto”and “Description of Properties — Sarita Este” for additional details.

(2) See “Exploration Properties — Sand Canyon” for additional details.

Quality Assurance and Quality Control

Our internal controls relating to Quality Assurance and Quality Control (“QA/QC”) consist of monitoring the chain of custody of samples and including blanks, duplicates, and reference material standards in each batch of samples for lab analysis, consistent with industry standards and best practices. Additionally, umpire check assays are regularly submitted and analyzed to ensure lab performance, as well as continuous oversight and review by senior staff to ensure all QA/QC procedures and protocols are followed under company standards and guidelines.

Qualified Persons

Scientific and technical information contained in this Form 10-K was reviewed and approved by Warren Rehn of Rehn Consulting LLC, who is a “qualified person” as defined by National Instrument 43-101. Mr. Rehn is the former President and Chief Executive Officer of the Company and entered into a consultant agreement with the Company in 2024 upon his resignation.

No Proven or Probable Mineral Reserves/Exploration Stage Company

We are considered an exploration stage company under the criteria of S-K 1300 because we have not demonstrated the existence of mineral reserves at any of our properties. Mineral reserves cannot be considered proven or probable unless and until they are supported by a preliminary feasibility study or feasibility study, indicating that the mineral reserves have had the requisite geologic, technical and economic work performed and are economically and legally extractable.

We have not completed a preliminary feasibility study or feasibility study with regard to any of our properties to date. We expect to remain an exploration stage company for the foreseeable future. We will not exit the exploration stage until such time, if ever, that we demonstrate the existence of proven or probable mineral reserves that meet the guidelines under S-K 1300.

Description of Properties

Golden Minerals does not currently have any material properties. However, the Company is providing information on two of its exploration stage projects, the Desierto and Sarita Este properties, to provide additional context regarding its ongoing exploration activities. Neither property has established reportable mineral resources as of December 31, 2024.

Desierto

Location and Access

The center of the 2,505 hectare property is located at 24.61 degrees S latitude and 67.77 degrees W longitude. Access to the Desierto property from the city of Salta is mostly by paved roads for approximately 176 km followed by all-weather gravel roads for 230 km via National Highway 51 and Provincial Highway 27. Numerous 4 x 4 trails cross the property. Travel time is 7 to 8 hours from the city of Salta. The Desierto I and Desierto II concessions are immediately adjacent to and south of the Sarita Este concession.

There is no permanent camp at the Desierto property. Accommodation and services for exploration workers are located at the village of Tolar Grande, about 30 km away. Tolar Grande has a population of approximately 175. Travel to the Desierto property includes crossing a portion of the Salar de Arizaro. The Salta - Antofagasta railway is located 9 km to the north and the Argentine to Chile high tension power line is 110 km to the east of the property. The area is sparsely populated and there is sufficient land for mining operations. Surface water is scarce but subsurface water can be obtained from the surrounding aquifers.

Property History

In July 2011 Golden Minerals acquired, through its wholly owned Argentina subsidiary, a one-third interest in the Desierto I and Desierto II concessions in the Tolar Grande municipality, Los Andes department, Salta Province, in the altiplano region of northwestern Argentina.

The first recorded exploration in the area was related to the Taca Taca Bajo copper-gold porphyry deposit, the center of which is located 5 km to the northeast of the Desierto property Mansfield Minerals was quite active in the area in the 1990’s, acquired the Desierto concessions and is thought to be the first company to recognize the gold mineralization in the Sarita Este/Desierto gold zone. In 2002, Mansfield entered into an agreement with Antares Minerals S.A. (“Antares”). Antares drilled four shallow angled core holes to test two quartz veins with high surface silver grades. The holes cut only low-grade silver mineralization, and the property was abandoned in 2010. No mineral resources or reserves have been established and no mineralized production has occurred on the Desierto property. The Desierto property does not have reportable mineral resources as of December 31, 2024.

Title and Ownership Rights

By mutual agreement with two other parties who were also successful in a 2011 province-run lottery process to acquire the concessions, ownership of the Desierto I and Desierto II concessions is shared with a subsidiary of Cascadero, which is publicly listed on the TSXV, and a private Argentinian company, Pacha Minerals, each of the three parties with a one-third interest. The concessions total 2505 hectares and are located immediately south of the Sarita Este concession and southwest of the Taca Taca copper-gold deposit owned by First Quantum Minerals. In July 2019 Golden Minerals entered into an option agreement with Pacha Minerals to acquire its one-third interest in the Desierto Concessions. The agreement calls for payments of $1.5 million over 6 years for 28.33% of the 33.33% interest controlled by Pacha Minerals. Remaining annual payments required under the option are $200,000, $200,000, and $800,000 due in July of each year beginning in 2025. Golden Minerals holds a further option to purchase the remaining 5% for an additional payment of $1 million with no defined time limit. Pacha will retain a 0.5% NSR royalty interest upon the sale of the entirety of its one-third interest.

Cascadero Joint Venture

In 2021 Cascadero and Golden Minerals signed a non-binding letter agreement to form a joint venture on the Desierto concessions, 51% controlled by Golden Minerals and 49% by Cascadero. The letter agreement provided that Golden Minerals would contribute its option on the Pacha Minerals interest to the joint venture. The parties agreed to split

the payments for the option according to the proposed joint venture interests. The parties agreed to delay the formation of the joint venture while legal action was underway to unwind the cancelation of the Desierto I concession, a decision made in error by the Salta Ministry of Mines. That legal action was successfully completed in November of 2024. The parties are now in the process of negotiating the formation of the joint venture.

Geology and Mineralization

The properties are located in the southern portion of the Sierra de Taca Taca, a mountain range formed of uplifted Ordovician granite along a fault located at the western margin of the Salar de Arizaro. To the west and paralleling the salar margin, lies a 2 km wide graben that likely postdates the uplift faulting. The properties of La Sarita Este and Desierto I and II lie between these two major structures. Although the granite is cut by numerous dykes from the Late Permian through to Triassic, it is thought that the Oligocene rhyodacitic intrusions are responsible for the majority of the copper porphyry mineralization in the area. It is unclear what is responsible for volcanic hosted gold veining on the La Sarita Este and Desierto I properties, but there is strong evidence of a larger system at depth.

The prominent feature on the eastern portion of the concessions is the Ordovician Taca Taca granitic batholith which has been intruded by Permo - Triassic syenite to trachyte dykes and local monzonite plugs. The north-central portion of the area is dominated by a Late Permian volcanic unit. The northwest central portion of the area is covered by a recent dacitic dome and related intermediate to felsic volcanic rocks. The dome and related volcanics occupy what appears to be a large 2 km wide graben structure. West of the graben lie granite and quartz monzonite of the Sierra de Taca Taca Range, hosting the Taca Taca Alto porphyry. Intermediate to felsic Tertiary volcanic tuffs, flows, and volcaniclastic sediments cover most of the southern portion of the concession area.

Alteration and Mineralization

Hydrothermal alteration related to prospective mineralization is parallel to, and zoned away from, the margins of the salar. The southern region is characterized by potassic and alunite-clay alteration in the vicinity of syenite/trachyte dykes. The central region is characterized by a weak sericite-clay-limonite alteration reminiscent of hanging wall alteration around a porphyry system. The westernmost alteration, before entering the large graben structure, is predominantly moderate to strong hematite. The surface alteration pattern suggests a deeper mineralizing system could be found at depth, centered in the region of the monzonite plugs. The volcanic unit, separating Taca Taca Bajo from the La Sarita Este and Desierto I, has moderate hornfelsing.

Structurally the region is cut by an abundance of strong NW-SE and NNW-SSE linear features which are likely fault-related although there is little evidence of fault displacement. Regardless of their origin, the linear structures appear to control alteration and mineralization patterns. A 3 km x 1 km trend of silica ‘ribs’ representing veins extends south from the dacite dome into Desierto II. Sampling of the silica ribs has defined gold and silver grades of potential economic significance.

A permit has been approved for exploration drilling on the concessions, which is expected to commence in 2025 once the potential Cascadero joint venture agreement is formalized, to test for the extension of gold mineralization encountered on the Sarita Este concession immediately north of Desierto I and to test several other prospective geochemical and geophysical anomalies on the Desierto property.

Sarita Este

Location and Access

Access to the Sarita Este property from the city of Salta is mostly by paved roads for approximately 176 km followed by all-weather gravel roads for 230 km via National Highway 51 and Provincial Highway 27. Numerous 4 x 4

trails cross the property. Travel time is 7 to 8 hours from the city of Salta. The center of the concession is located at 24.58 degrees S latitude and 67.77 degrees W longitude.

There is no permanent camp at the Sarita Este property. Accommodation and services for exploration workers are located at the village of Tolar Grande, about 30 km away. Tolar Grande has a population of approximately 175. Travel to the property includes crossing a portion of the Salar de Arizaro. The Salta - Antofagasta railway is located 9 kilometers to the north and the Argentine to Chile high tension power line is 110 km to the east of the property. The area is sparsely populated and there is sufficient land for mining operations. Surface water is scarce but subsurface water can be obtained from the surrounding aquifers.

Property History

There has been historical prospecting on the Sarita Este property, commencing with its discovery by Mansfield Minerals in 1996. Three small trenches were dug but not sampled in 2012. Historically, no systematic sampling had occurred on the property; however, grab samples from prospecting have yielded high grade gold results in excess of one ounce per ton. Limited historic mapping outlined encouraging sericitic and phyllic alteration that is coincident with the known mineralization.

Soil sampling, trench sampling, mapping and prospecting, ground and air magnetic surveys, and analysis of spectral imagery was carried out by Cascadero up to 2018 and by the Company after the option agreement was signed in 2019. Soil sampling delineated a gold in soil anomaly covering an area of about 1 square kilometer in the south central portion of the Sarita Este concession and extending south onto the Desierto I concession.

In the fourth quarter of 2021, we completed the first drill program ever conducted at Sarita Este, which involved drilling 10 diamond drill holes totaling 2,518 meters to explore untested epithermal gold-silver and copper porphyry targets. In January 2022, we announced assay results from the drill program, which we believe indicate the potential for a significant gold system. We completed a second drill program in June 2022 designed to offset and further delineate mineralization associated with the gold intervals encountered in the first drill program. The Sarita Este property does not have reportable mineral resources as of the year ended December 31, 2024.

Title and Ownership Rights

The Sarita Este concession is titled to Cascadero. There is a 1% NSR royalty on the Sarita Este concession to Northwestern Enterprises Ltd.

In December 2019, we paid $150,000 to enter into an option agreement with Cascadero to acquire a 51% interest in the Sarita Este concession (830 hectares). The option agreement called for us to spend at least $0.3 million in exploration expenditures and complete a 2,000-meter drill program by the end of 2021, another $0.5 million by the end of 2022, and another approximately $1.6 million by 2023 for a total $2.5 million. We have exceeded the drilling requirements and have spent approximately $3.0 million since entering into the agreement in December 2019. We have completed the earn-in requirements and are working with Cascadero to complete the joint venture documents. The concessions are on Argentine federal land within the municipality of Tolar Grande. The surface rights are not allocated or granted to any party. Salta province has set a 3% royalty on production value subject to deductions for some costs of production.

Geology and Mineralization

The basement lithologies in the map area consist of granodiorite and granite of Ordovician age referred to as the Taca Taca granite. The Taca Taca granite has been intruded by Late Permian granite and aplite rocks and overlain by Late Permian sediments and volcaniclastics. These have been cross cut and overlain by Eocene-Oligocene volcanic rocks of the Santa Inez complex, including rhyodacitic hypabyssal intrusions, dykes, flow domes, crystal lapilli tuff and crystal tuff. The west central portion of the property is covered by a recent dacitic dome. This large feature occupies an interpreted 2

km wide graben structure. The structural fabric observed in the Ordovician granite host rock of the Taca Taca Bajo deposit is characterized by the presence of discrete but widespread NNE-SSW and NW-SE trending, steeply dipping proto-mylonite to mylonite zones. The emplacement of Oligocene rhyodacitic dykes, quartz veining related to the porphyry system, fractures, and small scale faults were controlled by these pre-existing zones of structural weakness. The Sierra de Taca Taca region also contains an abundance of strong NW-SE and NNW-SSE lineaments.

The predominant style of mineralization on the property is oxidized gold bearing quartz-limonite after pyrite micro veins that also yield anomalous values in lead, zinc and copper. These veins occur within sinuous zones of mostly quartz-sericite and lesser clay altered crystal lapilli tuff. The Sarita Este soil geochemistry grid and resulting anomalous gold zone is positioned over these zones. Mineralization at the Taca Taca Bajo porphyry deposit to the northeast is Oligocene in age. Although no geochronology has been performed on the Sarita Este mineralization, it is believed to be of similar age.

Drill Results

Golden Minerals drilled 4,923 meters in 51 diamond drill holes between 2020 and 2022. Results indicate a contiguous area of gold mineralization along the south-central property boundary over an area of about 40,000 square meters defined by gold results in 25 drill holes. The best drill hole to date yielded 52.5m of 1.49 g/t Au and 5.2 g/t Ag from 0m, including 3.7m of 7.27 g/t Au and 12.1 g/t Ag. Other significant mineralized intervals are:

●2.2m of 27.47 g/t Au and 3.1 g/t Ag from 14.8m, including 0.6m of 102.5 g/t Au and 10.6 g/t Ag
●20.6m of 1.37 g/t Au and 3.0 g/t Ag from19.5m, including 10.9m of 2.01 g/t Au and 4. g/t Ag
●5.2m of 1.65 g/t Au, 1.5 g/t Ag from 0m
●16.3m of 1.56 g/t Au and 6.0 g/t Ag from 12m, including 2.8m of 3.04g/t Au and 8.5 g/t Ag
●12.5m of 2.11 g/t Au and 2.5 g/t Ag from 23.5m, including 1.5m of 10.29 g/t Au and 2.7 g/t Ag
●15.8m of 2.76g/t Au and 0.8 g/t Ag from 32.5m, including 4.3m of 8.39 g/t Au and 2.3 g/t Ag
●9.5m of 2.39 g/t Au and 5.6 g/t Ag from 40.5m, including 3.5m of 4.84 g/t Au and 11.2 g/t Ag
●6.3m of 4.38 g/t Au and 7.5 g/t Ag from 0m, including 2.5m of 9.14 g/t Au and 11.7 g/t
●12.8m of 1.68 g/t Au and 6.2 g/t Ag from 7.0m
●2.5m of 3.98g/t Au and 4.3g/t Ag from 28.5m
●9.9m of 1.91 grams per tonne (“g/t”) Au and 5.0 g/t Ag including 3.7m of 2.52 g/t Au and 5.3 g/t Ag
●8.0m of 1.74 g/t Au and 1.0 g/t Ag including 1.0m of 12.0 g/t Au and 1.9 g/t Ag
●3.7m of 1.64 g/t Au and 0.3 g/t Ag including 1.0m of 5.17 g/t Au and 0.3 g/t Ag

The gold mineralized area is open to the south, north, and east. The largest untested portion of the soil gold anomaly is to the south on the Desierto I concession. We believe that the assay results from these programs point to a potentially economic shallow oxidized gold system.

Exploration Properties

We currently control a portfolio of six exploration properties located primarily in certain traditional precious metals producing regions of Mexico, Argentina, and Nevada, USA. We do not consider any of our exploration properties to be individually material, including those noted above.

Sand Canyon

During the second quarter of 2019 we entered into an earn-in agreement with Golden Gryphon Explorations, Inc. (“Golden Gryphon”) for the Sand Canyon project located in northwestern Nevada, where surface work has identified a large system of epithermal veins with potential for gold and silver deposits. The Sand Canyon property consists of 354 unpatented mining claims totaling approximately 7,223 acres (2,923 hectares). We have since amended that agreement on

three occasions in order to extend the time period during which we are able to satisfy the spending commitments, which were completed in 2024. We earned a 60% interest in the Sand Canyon project by spending $2.5 million in exploration expenses over six years. In January 2025, we notified Golden Gryphon of our intent to exercise our earn-in right for a 60% interest in the project, and we are working to complete the joint venture documentation.

We completed an initial drill program of approximately 1,800 meters in 4 diamond drill holes in Q1 2020. The drill holes were placed to target surface geochemical and geophysical anomalies associated with epithermal veining observed in outcrops. Drill holes tested two epithermal vein target areas on the property, the DeLong Canyon target and the Sand Canyon target. The drill hole collared to test the DeLong Canyon target did not encounter any veins or significant anomalous geochemical values. Interpretation shows that a fault offset and rotation due to faulting likely caused the drill hole to miss the vein system as projected from surface. The three drill holes collared to test the veins and anomalies in the Sand Canyon target area all intersected narrow vein and breccia structures with low anomalous values of Ag, As, Sb, and Mo. No potentially economic concentrations of precious metals were encountered in any of the four drill holes. Plans for further testing of the mineralized system are being considered, including further drill targeting studies in areas of favorable geochemical anomalies and geologic structures.

Mexican Properties

We hold a 100% interest in the Rodeo gold mine (“the Rodeo Property”) in Durango State, Mexico. We believe the mineral resource at the Rodeo Property is depleted and is no longer considered to have reasonable prospects for economic extraction. The Company has a remaining asset retirement obligation for which it has accrued approximately $450,000. The Company also holds four concessions at Flechas and seven other minor concessions at various sites, all of which have had no material exploration work conducted on them.

In December 2023, we sold the Santa Maria gold-silver exploration property in Mexico to a private party for $1.5 million in cash plus VAT, plus a 1.5% NSR royalty on gold and silver production, capped at $1.0 million.

In November 2024, we sold the Yoquivo Project to Advance Metals Limited (“AVM”) for $570,000 in cash, plus VAT.

Our Competitive Strengths and Business Strategy

We are focused on evaluating and advancing properties currently under company control in North and South America. Our exploration efforts will continue primarily at the Sarita Este/Desierto and Sand Canyon projects.

Experienced Management Team. Our board of directors and management combined have decades of experience in exploration, project development, and operations management, primarily in the Americas.

Executive Officers of Golden Minerals

Name​Age​Position
Pablo Castanos​53​President and Chief Executive Officer; Director
Joseph G. Dwyer56Senior Vice President and Chief Financial Officer

Pablo Castanos (53). Mr. Castanos joined Golden Minerals in July of 2023 as Executive Vice President and was appointed President and Chief Executive Officer in June 2024. Prior to joining Golden Minerals, since 2016, Mr. Castanos acted as a private investor in real estate development and construction companies located in Querétaro, Mexico and Austin, Texas. Mr. Castanos has more than twenty years of global and strategic expertise, including fifteen years in the mining industry, in positions focusing on strategic planning, finance, compliance, sustainability, government affairs and risk

management. He holds a Master of Business Administration in Finance from Gabriela Mistral University in Santiago, Chile.

Joseph G. Dwyer (56). Mr. Dwyer joined Golden Minerals as Corporate Controller in September 2022 and was appointed Chief Financial Officer and Corporate Secretary in August 2024. Previously, he served as a consultant at Bridgepoint Consulting in 2022, Vice President and Corporate Controller at Kärcher North America from 2020 to 2022, and Director of Business Operations at Westmoreland Coal Company from 2016 to 2019. Mr. Dwyer has over twenty years of experience with publicly held companies in corporate accounting, financial process and internal audit and as a manager within Deloitte’s assurance practice. Mr. Dwyer has informed the Company that he will resign from this position effective May 31, 2025, and has agreed to provide consulting services for a limited period following his resignation.

Metals Market Overview

We are an emerging precious metals exploration company with silver and gold exploration properties in Argentina and Nevada. Descriptions of the markets for these metals are provided below.

Silver Market

Silver has traditionally served as a medium of exchange, much like gold. Silver’s strength, malleability, ductility, thermal and electrical conductivity, sensitivity to light and ability to endure extreme changes in temperature combine to make it a widely used industrial metal. While silver continues to be used as a form of investment and a financial asset, the principal uses of silver are industrial, primarily in electrical and electronic components, photography, jewelry, silverware, batteries, computer chips, electrical contacts, and high technology printing. Silver’s anti-bacterial properties also make it valuable for use in medicine and in water purification. Additionally, the use of silver in the photovoltaic and solar panel industries is growing rapidly, and new uses of silver are being developed in connection with the use of superconductive wire and radio frequency identification devices.

The following table sets forth for the periods indicated on the London Fix high and low silver fixes in U.S. dollars per troy ounce. On April 4, 2025, the closing price of silver was $29.59 per troy ounce.

​​​​​​​​
​ · ​ · Silver
Year · High · Low
2013​$32.23​$18.61​
2014​$22.05​$15.28​
2015​$18.23​$13.71​
2016​$20.71​$13.58​
2017​$18.56​$15.22​
2018​$17.52​$14.13​
2019​$19.31​$14.38​
2020​$19.31​$12.01​
2021​$28.89​$21.53​
2022​$29.59​$17.77​
2023​$26.03​$20.09​
2024​$24.50​$22.09​
2025*​$34.57​$28.84​
​​​​​​​​
  • Through April 4, 2025.

Gold Market

Gold has two main categories of use: fabrication and investment. Fabricated gold has a variety of end uses, including jewelry, electronics, dentistry, industrial and decorative uses, medals, medallions and official coins. Gold investors buy gold bullion, official coins and jewelry. The supply of gold consists of a combination of production from mining and the draw-down of existing stocks of gold held by governments, financial institutions, industrial organizations and private individuals.

The following table sets forth for the periods indicated on the London Fix PM high and low gold fixes in U.S. dollars per troy ounce. On April 4, 2025, the closing price of gold was $3,037 per troy ounce.

​ · ​ · ​ · ​ · ​ · ​ · ​ · ​
​ · ​ · Gold
Year · High · Low
2013​$1,694​$1,192​
2014​$1,385​$1,142​
2015​$1,296​$1,049​
2016​$1,366​$1,077​
2017​$1,346​$1,151​
2018​$1,355​$1,178​
2019​$1,546​$1,270​
2020​$1,672​$1,527​
2021​$1,957​$1,685​
2022​$2,039​$1,629​
2023​$2,078​$1,811​
2024​$2,171​$1,985​
2025*​$3,167​$2,616​
  • Through April 4, 2025.

Employees

As of April 4, 2025 we have four full-time employees in the United States.

Competition

There is aggressive competition within the mining industry for the acquisition of a limited number of mineral resource opportunities, and many of the mining companies with which we compete have greater financial and technical resources than we do. Accordingly, these competitors may be able to spend greater amounts on acquisitions of mineral properties, as well as on exploration and advancement of their mineral properties. We also compete with other mining companies for the acquisition and retention of skilled mining engineers and mechanics, geologists, geophysicists and other experienced technical personnel. Our competitive position depends upon our ability to successfully and economically advance new and existing silver and gold properties. Failure to achieve and maintain a competitive position could adversely impact our ability to obtain the financing necessary for us to advance our exploration properties.

Available Information

We make available, free of charge through our website at www.goldenminerals.com, our annual report on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K, and amendments to those reports filed or furnished pursuant to Section 13(a) or 15(d) of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), as soon as reasonably practicable after such material is electronically filed with or furnished to the SEC. Information on our website

is not incorporated into this Form 10-K and is not a part of this report. The SEC also maintains an Internet site that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC at http://www.sec.gov. The Company also files reports under Canadian regulatory requirements on the System for Electronic Document Analysis and Retrieval (“SEDAR+”). The Company’s reports which are filed on SEDAR+ can be found under the Company’s SEDAR+ profile at www.sedarplus.ca.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.