Skip to main content

Golden Minerals Co

For the period ended Dec 31, 2024. Filed Apr 15, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Apr 15, 2025

AUMN$0.20-0.4%Stored close · as of Jun 29, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-K

Period ended 2023-12-31; filed 2024-03-19.

0001558370-24-003526

ITEM 1A. RISK FACTORS

Current report: 10-K

Period ended 2024-12-31; filed 2025-04-15.

0001558370-25-004847

ITEM 1A. RISK FACTORS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 105 previous paragraphs and 96 current paragraphs.

36 unchanged; 49 reworded; 8 added; 18 removed; 2 previous and 3 current paragraphs rearranged.

Tables are not compared: 13 previous and 12 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (8)

Current report

Our common stock was delisted from the NYSE American LLC (the “NYSE American”) on December 16, 2024, due to our inability to maintain a minimum amount of stockholders’ equity in compliance with Sections 1003(a)(i), (ii) and (iii) of the NYSE American Company Guide (the “Company Guide”). Since our delisting, our common stock traded on the OTC Pink Market until February 3, 2025, when quotation of our common stock commenced on the OTCQB Venture Market. Our delisting from the NYSE American adversely impacted our share price and may make it more difficult for us to raise capital in the future.

Current report

The OTCQB market may remove our securities from trading on its marketplace, which could limit investors’ ability

Current report

to make transactions in our securities and subject us to additional trading restrictions.

Current report

Our common stock trades on the OTCQB. We cannot assure you that our securities will continue to trade on the OTCQB or any other marketplace in the future. To remain eligible for trading on the OTCQB, we must: (i) maintain a minimum bid price of $0.01; (ii) have a minimum freely traded float of at least 10% of our total issued and outstanding common stock; (iii) maintain at least 50 beneficial shareholders, each holding a minimum of 100 shares; (iv) not be in bankruptcy; (v) remain in good standing in each jurisdiction where we are organized or conduct business; and (vi) file all required applications and pay all necessary fees to the OTCQB. We cannot assure you that we will be able to meet these listing requirements in the future. If we are unable to maintain our quotation for trading on the OTCQB, it could significantly limit an individual investor’s ability to buy or sell our securities, if at all.

Current report

Mine employees in Mexico are typically represented by a union, and our relationship with most of our employees in Mexico was governed in part by a collective bargaining agreement which remains in effect. We have no certainty as to the terms under which the collective bargaining agreement may be terminated, if at all, and the negotiation process could involve risks that may further impact our financial condition.

Current report

Global and regional political and economic conditions could adversely impact our business.

Current report

Political and economic shifts, both domestic and international, may create uncertainty and pose risks to our operations. Policies related to populism, protectionism, economic nationalism, and attitudes toward multinational corporations could result in regulatory changes, trade barriers, or investment restrictions. Additionally, international trade disputes—including tariffs, counter-tariffs, export controls, sanctions, and currency regulations—may increase costs and disrupt supply chain, operating model, and customer relationships.

Current report

Further, market volatility, driven by shifts in U.S. and foreign trade policies, fluctuating interest rates, or currency controls may affect gold prices, capital availability, and investor confidence. Even the perception of these risks could lead to reduced investment, higher production costs, and operational challenges. If such trends continue, they may have a material adverse effect on the business and financial performance.
Removed paragraphs (18)

Previous report

Our common stock is listed on the NYSE American LLC (the “NYSE American”), and we are subject to its continued listing requirements, including maintaining certain share prices and a minimum amount of stockholders’ equity On June 6, 2023, we received written notification (the “Notice”) from the NYSE American that the Company was not in compliance with Section 1003(a)(iii) of the NYSE American Company Guide (the “Company Guide”). We are required to report a stockholders’ equity of $6.0 million or more if the Company has reported losses from continuing operations and/or net losses in its five most recent fiscal years. The Notice noted that the Company reported a stockholders’ equity of $4.1 million as of March 31, 2023, and losses from continuing operations and/or net losses in each of its five most recent fiscal years ended December 31, 2022. As a result, we have become subject to the procedures and requirements of Section 1009 of the Company Guide and were required to submit a plan of compliance by July 6, 2023, addressing how the Company intends to regain compliance with Section 1003(a)(iii) of the Company Guide by December 6, 2024 (the “Compliance Deadline”). We are currently attempting to re-gain compliance with the NYSE American listing requirements, however, there is no assurance that we will be successful in doing so.

Previous report

If we are not in compliance with the continued listing standards by the Compliance Deadline, or if we do not make progress consistent with the plan of compliance during the plan period, the NYSE American staff may initiate delisting proceedings as appropriate. If we are delisted from the NYSE American, it may have an adverse impact on our share price and may make it more difficult for us to raise capital in the future.

Previous report

Increased operating and capital costs could adversely affect our results of operations.

Previous report

Costs are affected by the price and availability of input commodities, such as fuel, electricity, labor, chemical reagents, explosives, steel, concrete and mining and processing related equipment and facilities. Commodity costs are, at times, subject to volatile price movements, including increases that could make mineral extraction less profitable. Further, changes in laws and regulations can affect commodity prices, uses and transport. Reported costs may also be affected by changes in accounting standards. A material increase in costs could have a significant effect on our results of operations and operating cash flow.

Previous report

We could have significant increases in capital and operating costs over the next several years in connection with the development of new projects in challenging jurisdictions and in the sustaining and/or expansion of existing mining and processing operations. Costs associated with capital expenditures may increase in the future as a result of factors beyond our control, such as inflation or due to supply chain constraints or delays. Increased capital expenditures may have an adverse effect on the results of operations and cash flow generated from existing operations, as well as the economic returns anticipated from new projects, or may make the development of future projects uneconomic.

Previous report

Mine employees in Mexico are typically represented by a union, and our relationship with our employees is, and we expect in the future will be, governed in part by collective bargaining agreements. Any collective bargaining agreement that we enter into with a union is likely to restrict our mining flexibility in and impose additional costs on our mining activities. In addition, relations between us and our employees in Mexico may be affected by changes in regulations or labor union requirements regarding labor relations that may be introduced by the Mexican authorities or by labor unions. Changes in legislation or in the relationship between us and our employees may have a material adverse effect on our mining activities and financial condition.

Previous report

Conditions of our mining and processing activities are dependent on the availability of sufficient water supplies to support our mining activities.

Previous report

Water is critical to our business, and the increasing pressure on water resources requires us to consider both current and future conditions in our management approach. Across the globe, water is a shared and regulated resource. Mining operations require significant quantities of water for mining, ore processing and related support facilities. Our properties in Mexico and Argentina are in areas where water is scarce and competition among users for continuing access to water is significant. Continuous production and mine development are dependent on our ability to acquire and maintain water rights and claims and to defeat claims adverse to current water uses in legal proceedings. Although we believe that our operations currently have sufficient water rights and claims to cover operating demands, we cannot predict the potential outcome of future legal proceedings relating to water rights, claims and uses. Water shortages may also result from weather or environmental and climate impacts out of our control. Shortages in water supply could result in production and processing interruptions. In addition, the scarcity of water in certain regions could result in increased costs to obtain sufficient quantities of water to conduct our operations. The loss of some or all water rights, in whole or in part, or ongoing shortages of water to which we have rights or significantly higher costs to obtain sufficient quantities of water (or the failure to procure sufficient quantities of water) could result in our inability to maintain mineral extraction at current or expected levels, require us to curtail or shut down mining operations and prevent us from pursuing expansion or any development opportunities. Laws and regulations may be introduced in some jurisdictions in which we operate which could also limit access to sufficient water resources, thus adversely affecting our operations.

Previous report

Processing activities at the Velardeña Properties require significant amounts of water. Water is provided for all of the mines comprising our Velardeña Properties by wells located in the valley adjacent to the Velardeña Properties. We hold title to three wells located near the sulfide plant and hold certificates of registration to three wells located near the oxide plant. We are licensed to pump water from all six wells up to a permitted amount. We are required to make annual payments to the Mexican government to maintain our rights to these wells. We are required to pay a fine to the Mexican Government each year if we use too much water from a particular well or alternatively if we do not use a minimum amount of water from a particular well. In addition to these fines, the Mexican Government reserves the right to cancel our title to the wells for abuse of these rules.

Previous report

If we began processing material through both the sulfide and oxide plants in the future, we may face shortages in our water supply, and therefore will need to obtain water from outside sources at higher costs. The loss of some or all water rights for any of our wells, in whole or in part, or shortages of water to which we have rights would require us to seek water from outside sources at higher costs and could require us to curtail or shut down mining and processing in the future. Laws and regulations may be introduced in the future which could limit our access to sufficient water resources in mining activities, thus adversely affecting our business.

Previous report

Our mineral resource estimates are inherently imprecise.

Previous report

We have released estimates of mineral resources at the Velardeña Properties and the Yoquivo Property. Mineral resource figures based on estimates made by geologists are inherently imprecise and depend on geological interpretation and statistical inferences drawn from drilling and sampling. We cannot assure you that these estimates are accurate.

Previous report

Recent amendments to the Mexican mining law may have an adverse impact on our operations in Mexico.

Previous report

A significant portion of our properties are located in Mexico, including the Rodeo property and the Velardeña Properties. In April 2023, the government of Mexico adopted a series of changes to the law governing mining operations in the country. Under the new mining law, among other changes, the maximum length of new mining concessions has been

Previous report

reduced from 50 to 30 years, the ability to obtain water extraction permits has been somewhat constrained, and a new mining profit tax has been established for the benefit of local communities. Government authorities will also be permitted to cancel concessions if no work has been done on them within two years. The full impact of the mining law reform is uncertain and may be subject to legal challenges in Mexico. However, we currently anticipate that the changes to the mining law will make it somewhat more difficult, time-consuming and expensive to conduct exploration activities in Mexico, as it will make it more challenging to obtain, maintain and develop mining concessions. Moreover, to the extent that investors perceive Mexico as being less attractive to mining investment, it may be more difficult and expensive for us to satisfy our future capital needs.

Previous report

In connection with our Velardeña Properties, we have contracts with two ejidos to secure surface rights with a total annual cost of approximately $25,000.** **The first contract is a ten-year contract with the Velardeña ejido, which provides surface rights to certain roads and other infrastructure at the Velardeña Properties through 2031. The second contract is a 25-year contract with the Vista Hermosa ejido signed in March 2013, which provides exploration access and access rights for roads and utilities for our Velardeña Properties. Our inability to maintain and periodically renew or expand these surface rights on favorable terms or otherwise could have a material adverse effect on our business and financial condition.

Previous report

One of our stockholders owns a significant percentage of our common stock and could block decisions or transactions that could be beneficial to other stockholders.

Previous report

One of our stockholders, The Sentient Group, through the Sentient executive funds (“Sentient”), owns approximately 11% of our outstanding common stock. With this level of ownership, Sentient could exert significant control over us, including over the election of directors, changes in the size or the composition of the board of directors, and mergers and other business combinations involving us. Through greater control of the board of directors and increased voting power, including the potential to prevent a quorum at stockholders meetings, Sentient could control certain decisions, including decisions regarding qualification and appointment of officers, operations of the business including acquisition or disposition of our assets or purchases and sales of mining or exploration properties, dividend policy, and access to capital (including borrowing from third-party lenders and the issuance of equity or debt securities). Sentient’s large share ownership will also make it difficult, if not impossible, for us to enter into a change of control transaction that may otherwise be beneficial for our other shareholders.
Reworded paragraphs (49)

Previous wording

Investors in Golden Minerals should consider carefully, in addition to the other information contained in, or incorporated by reference into, this annual report on Form 10-K, the following risk factors:

Current wording

Investors in Golden Minerals should consider carefully, in addition to the other information contained in, or incorporated by reference into, this Form 10-K, the following risk factors:

Previous wording

At February 29, 2024, our aggregate cash and cash equivalents totaled approximately $2.4 million. In the absence of sufficient sales of non-core assets, equity financing or other external funding the Company’s cash balance is expected to be depleted during the second quarter of 2024. Therefore, our continuation as a going concern is dependent upon our achieving future external funding or a strategic transaction. However, there is no assurance that we will be successful pursuing asset sales, financing or a strategic transaction. Accordingly, there is substantial doubt as to whether our existing cash resources and working capital are sufficient to enable us to continue our operations for the next 12 months as a going concern. Ultimately, in the event that we cannot obtain additional financial resources, we may have to liquidate our business interests and investors may lose their investment. The accompanying consolidated financial statements have been prepared assuming that our company will continue as a going concern. Continued operations are dependent on our ability to obtain additional financial resources. Such additional financial resources may not be available or may not be available on reasonable terms. Our consolidated financial statements do not include any adjustments that may result from the outcome of this uncertainty. Such adjustments could be material.

Current wording

At April 4, 2025, our aggregate cash and cash equivalents totaled approximately $4.0 million. In the absence of sufficient sales of certain dormant subsidiary tax losses, the collection of the balance due from the sale of the Velardeña Properties, equity financing or other external funding, the Company’s cash balance is expected to be depleted during the first quarter of 2026. Therefore, our continuation as a going concern is dependent upon our achieving future external funding or a strategic transaction. However, there is no assurance that we will be successful in selling tax losses or collecting the balance from the fourth Velardeña Sales Agreement, or completing a financing or a strategic transaction. Accordingly, there is substantial doubt as to whether our existing cash resources and working capital are sufficient to enable us to continue our operations for the next twelve months as a going concern. Ultimately, in the event that we cannot obtain additional financial resources, we will have to liquidate our business interests and investors may lose their investment. The accompanying consolidated financial statements have been prepared assuming that our company will continue as a going concern. Continued operations are dependent on our ability to obtain additional financial resources. Such additional financial resources may not be available or may not be available on acceptable terms. Our consolidated financial statements do not include any adjustments that may result from the outcome of this uncertainty. Such adjustments could be material.

Previous wording

We are an exploration stage company and do not have a long-term source of revenue.

Current wording

We are an exploration stage company and do not have a source of revenue.

Previous wording

We have a history of operating losses. Although our Rodeo Property generated revenue and free cash flow in 2021 and 2022, that project concluded operations as expected in 2023. We restarted mineral extraction at the Velardeña Properties in late December 2023; however, we elected to shutdown mining operations in February 2024 because initial production did not achieve our expected results. Since we were unable to generate sufficient revenue and net operating margins from operating the Velardeña Properties, we are dependent on future external financing to fund our corporate expenses and exploration activities. There is no assurance that such financing will be available on acceptable terms or at all. See “—We may not have access to sufficient future capital.”

Current wording

We have a history of operating losses. Although our Rodeo Property generated revenue and free cash flow in 2021 and 2022, that project concluded operations as expected in 2023. We restarted mineral extraction at the Velardeña Properties in late December 2023; however, we elected to shut down mining operations in February 2024 because initial production did not achieve our expected results. Since we were unable to generate sufficient revenue and net operating margins from operating the Velardeña Properties, we are dependent on future external financing to fund our corporate expenses and exploration activities. There is no assurance that such financing will be available on acceptable terms or at all (see “—We may not have access to sufficient future capital.”).

Previous wording

Our results of operations, cash flows and the value of our properties are highly dependent on the market prices of gold and silver and certain base metals, and these prices can be volatile.

Current wording

Our results of operations, cash flows and the value of our exploration properties is highly dependent on the market prices of gold and silver and certain base metals, and these prices can be volatile.

Previous wording

The value of our mining properties is directly related to the market price of gold, silver, and certain base metals. The price of gold and silver may also have a significant influence on the market price of our common stock. The market prices of these metals historically have fluctuated significantly and are affected by numerous factors beyond our control, including (i) global or regional consumption patterns; (ii) supply of and demand for silver and gold on a worldwide basis; (iii) speculative and hedging activities; (iv) expectations for inflation; (v) political and economic conditions; (vi) supply of, and demand for, consumables required for extraction and processing of metals, and (vii) general economic conditions worldwide. In the event metal prices decline or remain low for prolonged periods of time, we might be unable to advance or develop our exploration properties, which may adversely affect our results of operations, financial performance, and cash flows. An asset impairment charge may result from the occurrence of unexpected adverse events that impact market value of our non-producing properties, including a material diminution in the price of metals.

Current wording

The value of our exploration properties is directly related to the market price of gold, silver, and certain base metals. The price of gold and silver may also have a significant influence on the market price of our common stock. The market prices of these metals historically have fluctuated significantly and are affected by numerous factors beyond our control, including: (i) global or regional consumption patterns; (ii) supply of and demand for gold and silver on a worldwide basis; (iii) speculative and hedging activities; (iv) expectations for inflation; (v) political and economic conditions; (vi) supply of, and demand for, consumables required for extraction and processing of metals; and (vii) general economic conditions worldwide. In the event metal prices decline or remain low for prolonged periods of time, we might be unable to advance or develop our exploration properties, which may adversely affect our results of operations, financial performance, and cash flows. An asset impairment charge may result from the occurrence of unexpected adverse events that impact the market value of our exploration properties, including a material diminution in the price of metals.

Previous wording

We do not have a credit, off-take or other commercial financing arrangement in place that would finance our general and administrative costs and other working capital needs to fund our continuing business activities in the future, and we believe that securing credit for these purposes would be challenging. In addition, commercial financing arrangements may not be available on favorable terms or on terms that would not further restrict our flexibility and ongoing ability to meet our cash requirements over a reasonable period of time.

Current wording

We do not have a credit or other commercial financing arrangement in place that would finance our general and administrative costs and other working capital needs to fund our continuing business activities in the future, and we believe that securing credit for these purposes would be challenging. In addition, commercial financing arrangements may not be available on favorable terms or on terms that would not further restrict our flexibility and ongoing ability to meet our cash requirements over a reasonable period of time.

Previous wording

We cannot assure you that we will be able to obtain financing to fund our general and administrative costs and other working capital needs to fund our continuing business activities in the future on favorable terms or at all. Failure to obtain financing could result in delay or indefinite postponement of further mining operations or exploration and construction and the possible partial or total loss of our interest in our properties, or liquidation of the Company.

Current wording

We cannot assure you that we will be able to obtain financing to fund our general and administrative costs and other working capital needs and to fund our continuing business activities in the future on favorable terms or at all. Failure to obtain financing could result in delay or indefinite postponement of exploration, the possible partial or total loss of our interest in our exploration properties, or liquidation of the Company.

Previous wording

Failure to meet the maintenance criteria of the NYSE American may result in the delisting of our common stock, which could result in lower trading volumes and liquidity, lower prices of our common shares and make it more difficult for us to raise capital.

Current wording

The December 2024 delisting of our common stock from the NYSE American may result in lower trading volumes and liquidity and lower prices of our common stock and make it more difficult for us to raise capital.

Previous wording

The impact of our 1-for-25 reverse stock split on the future market price of our common stock, and our ability to maintain the listing of our common stock on the NYSE American, is uncertain.

Current wording

The impact of our 1-for-25 reverse stock split on the future market price of our common stock is uncertain.

Previous wording

On May 30, 2023, we filed an amendment to our Amended and Restated Certificate of Incorporation with the Secretary of State of the State of Delaware to effectuate, effective June 9, 2023, a one-for-25 reverse stock split of the shares of the Company’s common stock, par value $0.01 per share. The Company’s common stock began trading on a split-adjusted basis on June 9, 2023. In connection with the reverse stock split, the total number of shares of common stock authorized for issuance was reduced from 350,000,000 shares to 28,000,000 shares in proportion to the reverse stock split. Our decision to undergo the reverse stock split was prompted by receipt of a notice letter from NYSE American citing our

Current wording

On May 30, 2023, we filed an amendment to our Amended and Restated Certificate of Incorporation with the Secretary of State of the State of Delaware to effectuate, effective June 9, 2023, a one-for-25 reverse stock split of the shares of the Company’s common stock, par value $0.01 per share. The Company’s common stock began trading on a split-adjusted basis on June 9, 2023. In connection with the reverse stock split, the total number of shares of common stock authorized for issuance was reduced from 350,000,000 shares to 28,000,000 shares in proportion to the reverse stock split. Our decision to undergo the reverse stock split was prompted by receipt of a notice letter from NYSE American citing our low stock price and NYSE American’s concerns about our compliance with its continued listing standards. Effective May 13, 2024, we increased our total number of shares of common stock authorized for issuance from 28,000,000 to

Previous wording

low stock price and NYSE American’s concerns about our compliance with its continued listing standards (see “—Failure to meet the maintenance criteria of the NYSE American may result in the delisting of our common stock, which could result in lower trading volumes and liquidity, lower prices of our common shares and make it more difficult for us to raise capital.”) If our stock price falls below the NYSE American’s listing requirements, NYSE American may suspend trading of our common stock and commence delisting proceedings.

Current wording

100,000,000. Then, effective December 16, 2024, our common stock was delisted from the NYSE American due to noncompliance with certain listing maintenance standards related to the Company’s stockholders’ equity (see “—The delisting of our common stock from the NYSE American may result in lower trading volumes and liquidity, lower prices of our common stock and make it more difficult for us to raise capital.”).

Previous wording

We are party to a collective bargaining agreement with a union in Mexico that, together with labor and employment regulations, could adversely affect our mining activities and financial condition.

Current wording

We are party to a collective bargaining agreement with a union in Mexico that, together with labor and employment regulations, could adversely affect our financial condition.

Previous wording

Competition in the mining industry for desirable properties, investment capital and human capital is intense. Numerous companies headquartered in the United States, Canada, and elsewhere throughout the world compete for properties and human capital on a global basis. We are a small participant in the mining industry due to our limited financial and human capital resources. We presently operate with a limited number of people and we anticipate operating in the same manner going forward. We compete with other companies in our industry to hire qualified employees and consultants when needed to successfully advance our exploration properties. We may be unable to attract the necessary human capital to fully explore, and if warranted, develop our properties and be unable to acquire other desirable properties. Additionally, if we lose key personnel or one or more members of our senior management team, and we fail to develop adequate succession plans, or if we fail to hire, retain and develop qualified and diverse employees, our business, financial condition, results of operations and cash flows could be harmed. We believe that competition for acquiring mineral properties, as well as the competition to attract and retain qualified human capital, will continue to be intense in the future.

Current wording

Competition in the mining industry for desirable properties, investment capital and human capital is intense. Numerous companies headquartered in the United States, Canada, and elsewhere throughout the world compete for properties and human capital on a global basis. We are a small participant in the mining industry due to our limited financial and human capital resources. We presently operate with a limited number of people and we anticipate operating in the same manner going forward. We compete with other companies in our industry to hire qualified employees and consultants when needed to successfully advance our exploration properties. We may be unable to attract the necessary human capital to fully explore our properties and to acquire other desirable properties. Additionally, if we lose key personnel or one or more members of our senior management team, and we fail to develop adequate succession plans, or if we fail to hire or contract for, retain and develop qualified and diverse employees, our business, financial condition, results of operations and cash flows could be harmed. We believe that competition for acquiring mineral properties, as well as the competition to attract and retain qualified human capital, will continue to be intense in the future.

Previous wording

Exploration for and the production of minerals is highly speculative and involves greater risk than many other businesses. Many exploration programs do not result in the discovery of mineralization, and any mineralization discovered may not be of sufficient quantity or quality to be profitably mined. Our potential mining activities, as well as the conduct of our exploration programs that frequently require rehabilitation of and drilling in underground mine workings and maintenance of the underground mines at Velardeña, are subject to numerous risks and hazards inherent in underground mines. Our operations are, and any future mining operations or construction we may conduct will be, subject to all of the operating hazards and risks normally incident to exploring for and mining of mineral properties, such as fluctuation in production costs; social, community or labor disputes resulting in work stoppages or delays, or related loss of social acceptance of community support; changes to legal and regulatory requirements; unanticipated variations in grade and other geologic problems; environmental hazards; ground and water conditions; difficult surface or underground conditions; industrial accidents; security and technology failures or incidents; metallurgical and other processing problems; mechanical and equipment issues; failure of pit walls, dams, declines, drifts and shafts; unusual or unexpected rock formations; personal injury; natural disasters; and decrease in the value of mineralized material due to lower gold, silver and metal prices, any of which could result in damage to, or destruction of, production facilities, damage to life or property, environmental damage and possible legal liability. We may also not be insured against all interruptions to our operations. Losses from these or other events may cause us to incur significant costs which could materially adversely affect our financial condition and our ability to fund activities on our properties. A significant loss could force us to reduce or suspend our operations and development. Adverse effects on operations and/or further development of our projects could also adversely affect our business, financial condition, results of operations and cash flow.

Current wording

Exploration for minerals is highly speculative and involves greater risk than many other businesses. Many exploration programs do not result in the discovery of mineralization, and any mineralization discovered may not be of sufficient quantity or quality to be profitably mined. Our operations are subject to all of the operating hazards and risks normally incident to exploring for minerals, such as; social, community or labor disputes resulting in work stoppages or delays, or related loss of social acceptance of community support; changes to legal and regulatory requirements; unanticipated variations in grade and other geologic problems; environmental hazards; ground and water conditions; access to water for exploration or future operations; difficult surface or underground conditions; industrial accidents; security and technology failures or incidents; metallurgical and other processing problems; mechanical and equipment issues; unusual or unexpected rock formations; personal injury; natural disasters; and decrease in the value of mineralized material due to lower gold, silver and metal prices, any of which could result in damage to, or destruction of, life or property, environmental damage and possible legal liability. We may also not be insured against all interruptions to our operations. Losses from

Previous wording

Our exploration and development activities, strategic transactions, or any acquisition activities may not be commercially successful and could fail to lead to gold production or fail to add value**.**

Current wording

Our exploration activities, strategic transactions, or any acquisition activities may not be commercially successful and could fail to lead to metal production or fail to add value.

Previous wording

Substantial expenditures are required to acquire gold properties, establish mineral reserves through drilling and analysis, develop metallurgical processes to extract metal from the ore and develop the mining and processing facilities and infrastructure at any site chosen for mining. We cannot be assured that any such activities will be commercially successful, lead to gold production, or add value.

Current wording

Substantial expenditures are required to acquire mining or exploration properties, establish mineral reserves through drilling and analysis, develop metallurgical processes to extract metal from the ore and develop the mining and processing facilities and infrastructure at any site chosen for mining. We cannot be assured that any such activities will be commercially successful, lead to metal production, or add value.

Previous wording

We have not established that our properties contain any mineral reserve, nor can there be any assurance that we will be able to do so. A mineral reserve is defined by the SEC in Regulation S-K 1300 as that part of a mineral deposit which could be economically and legally extracted or produced at the time of the reserve determination. The probability of an individual prospect ever having a “reserve” that meets the requirements of Regulation S-K 1300 is extremely remote; in all probability our mineral properties do not contain any “reserves” and any funds that we spend on exploration could be lost. Even if we do eventually discover mineral reserves on our properties, there can be no assurance that they can be developed into producing mines and we can extract those minerals. Both mineral exploration and development involve a high degree of risk and few mineral properties which are explored are ultimately developed into producing mines.

Current wording

We have not established that our current or previously owned properties contain any mineral reserve, nor can there be any assurance that we will be able to do so. A mineral reserve is defined by the SEC in Regulation S-K 1300 as that part of a mineral deposit which could be economically and legally extracted or produced at the time of the reserve determination. The probability of an individual prospect ever having a “reserve” that meets the requirements of Regulation S-K 1300 is extremely remote; in all probability our mineral properties do not contain any “reserves” and any funds that we spend on exploration could be lost. Even if we do eventually discover mineral reserves on our properties, there can be no assurance that they can be developed into producing mines and we can extract those minerals. Both mineral exploration and development involve a high degree of risk and few mineral properties which are explored are ultimately developed into producing mines.

Previous wording

The exploration of our mineral properties is highly speculative in nature, involves substantial expenditures and is frequently non-productive.

Current wording

The exploration of mineral properties is highly speculative in nature, involves substantial expenditures and is frequently non-productive.

Previous wording

We may acquire additional mining properties and our business may be negatively impacted if reserves are not located on acquired properties or if we are unable to successfully execute and/or integrate the acquisitions.

Current wording

We may acquire additional exploration or mining properties, and our business may be negatively impacted if reserves are not located on acquired properties or if we are unable to successfully execute and/or integrate the acquisitions.

Previous wording

We have in the past, and may in the future, acquire additional mining properties. There can be no assurance that reserves will be identified on any properties that we acquire. We may experience negative reactions from the financial markets if we complete acquisitions of additional properties and reserves are not located on acquired properties. There can be no assurance that we will be able to complete any acquisitions successfully, or that any acquisition will achieve anticipated synergies or other positive results. Any material problems that we encounter in connection with such an acquisition could have a material adverse effect on our business, results of operations and financial position. These factors may adversely affect the trading price of our common stock.

Current wording

We have in the past, and may in the future, acquire additional exploration or mining properties. There can be no assurance that reserves will be identified on any properties that we acquire. We may experience negative reactions from the financial markets if we complete acquisitions of additional properties and reserves are not located on acquired properties. There can be no assurance that we will be able to complete any acquisitions successfully, or that any acquisition will achieve anticipated synergies or other positive results. Any material problems that we encounter in connection with such an acquisition could have a material adverse effect on our business, results of operations and financial position. These factors may adversely affect the trading price of our common stock.

Previous wording

Our operations, including our ongoing exploration drilling programs, require ongoing permits from governmental and local authorities. The continued evaluation of the El Quevar project and other exploration activities will require additional permits from various governmental authorities. We may also be required to obtain certain property rights to access or use our properties. Obtaining or renewing licenses and permits, and acquiring property rights, can be complex and time-consuming processes. There can be no assurance that we will be able to acquire all required licenses, permits or property rights on reasonable terms or in a timely manner, or at all, and that such terms will not be adversely changed, that required extensions will be granted, or that the issuance of such licenses, permits or property rights will not be challenged by third parties. If we cannot obtain or maintain the necessary permits or if there is a delay in receiving future permits, our timetable and business plan will be adversely affected and may prevent or make future mining and processing activities economically unfeasible.

Current wording

Our operations, including our exploration drilling programs, require ongoing permits from governmental and local authorities. The continued evaluation of our Sarita Este/Desierto project and other exploration activities will require additional permits from various governmental authorities. We may also be required to obtain certain property rights to access or use our properties. Obtaining or renewing licenses and permits, and acquiring property rights, can be complex and time-consuming processes. There can be no assurance that we will be able to acquire all required licenses, permits or property rights on reasonable terms or in a timely manner, or at all, and that such terms will not be adversely changed, that required extensions will be granted, or that the issuance of such licenses, permits or property rights will not be challenged by third parties. If we cannot obtain or maintain the necessary permits or if there is a delay in receiving future permits, our timetable and business plan will be adversely affected and may prevent or make future exploration, mining and processing activities economically unfeasible.

Previous wording

Our exploration activities are in countries with developing economies and are subject to the risks of political and economic instability associated with these countries.

Current wording

Our primary exploration activities are in countries with developing economies and are subject to the risks of political and economic instability associated with these countries.

Previous wording

We currently conduct exploration activities almost exclusively in countries with developing economies, including Argentina and Mexico. These countries and other emerging markets in which we may conduct business have from time to time experienced economic or political instability. We may be materially adversely affected by risks associated with conducting exploration activities in countries with developing economies, including various levels of political, economic, legal and other risks and uncertainties, including local acts of violence, such as violence from drug cartels; military repression; extreme fluctuations in currency exchange rates; high rates of inflation; labor unrest; the risks of war or civil unrest; expropriation and nationalization; renegotiation or nullification of existing concessions, licenses, permits and contracts; illegal mining; acts of political corruption; changes in taxation policies; restrictions on foreign exchange and repatriation; and changing political conditions, currency controls and governmental regulations that favor or require the awarding of contracts to local contractors or require foreign contractors to employ citizens of, or purchase supplies from, a particular jurisdiction.

Current wording

We currently conduct exploration activities in Argentina and the United States. Argentina and other emerging markets in which we may conduct business have from time to time experienced economic or political instability. We may be materially adversely affected by risks associated with conducting exploration activities in countries with developing economies, including various levels of political, economic, legal and other risks and uncertainties, local acts of violence; military repression; extreme fluctuations in currency exchange rates; high rates of inflation; labor unrest; the risks of war or civil unrest; expropriation and nationalization; renegotiation or nullification of existing concessions, licenses, permits and contracts; illegal mining; acts of political corruption; changes in taxation policies; restrictions on foreign exchange and repatriation; and changing political conditions, currency controls and governmental regulations that favor or require the awarding of contracts to local contractors or require foreign contractors to employ citizens of, or purchase supplies from, a particular jurisdiction.

Previous wording

Our Mexican properties are subject to a variety of governmental regulations governing health and worker safety, employment standards, waste disposal, protection of historic and archaeological sites, mine development, protection of endangered and protected species, purchase, storage and use of explosives and other matters. Specifically, our activities related to the Velardeña properties are subject to regulation by SEMARNAT, the Comisión Nacional del Agua, which regulates water rights, and Mexican mining laws. Mexican regulators have broad authority to shut down and levy fines against facilities that do not comply with regulations or standards. As such, our properties and activities in Mexico may be adversely affected in varying degrees by changing government regulations relating to the mining industry or shifts in political conditions that increase the costs related to our mining and exploration activities or the maintenance of our properties.

Current wording

Our Mexican properties are subject to a variety of governmental regulations governing health and worker safety, employment standards, waste disposal, protection of historic and archaeological sites, mine development, protection of endangered and protected species, purchase, storage and use of explosives and other matters. Specifically, our discontinued activities related to the Rodeo and Velardeña Properties are subject to regulation by SEMARNAT, the Comisión Nacional del Agua, which regulates water rights, and Mexican mining laws. Mexican regulators have broad authority to shut down and levy fines against facilities that do not comply with regulations or standards. As such, our properties and activities in Mexico may be adversely affected in varying degrees by changing government regulations relating to the mining industry or shifts in political conditions that increase the costs related to our mining and exploration activities or the maintenance of our properties.

Previous wording

Future changes in applicable laws and regulations, changes in their enforcement or regulatory interpretation, or shifts in the prevailing political climate in any of the countries in which we conduct exploration activities could adversely affect our business could negatively impact current or planned exploration or mining activities at our properties or in respect of any of our projects currently in, or projects with which we become involved in, such countries. Any failure to comply with applicable laws and regulations, even if inadvertent, could result in the interruption of mining and exploration or material fines, penalties or other liabilities.

Current wording

Future changes in applicable laws and regulations, changes in their enforcement or regulatory interpretation, or shifts in the prevailing political climate in Argentina, the United States or any of the countries in which we may conduct exploration activities could adversely affect our business, could negatively impact current or planned exploration activities at our properties or in respect of any of our projects currently in, or projects with which we become involved in, such countries. Any failure to comply with applicable laws and regulations, even if inadvertent, could result in the interruption of exploration or material fines, penalties or other liabilities.

Previous wording

Environmental legislation in Mexico and in many other countries is evolving in a manner which will likely require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for companies and their officers, directors and employees. Future changes in environmental regulation in the jurisdictions where our Velardeña properties are located may adversely affect our business, make our business prohibitively expensive, or prohibit it altogether. We cannot predict what environmental legislation or regulations will be enacted or adopted in the future or how future laws and regulations will be administered or interpreted. Compliance with more stringent laws and regulations, as well as potentially more vigorous enforcement policies or regulatory agencies or stricter interpretation of existing laws, may (i) necessitate significant capital outlays, (ii) cause us to delay, terminate or otherwise change our intended activities with respect to one or more projects, or (iii) materially adversely affect our future exploration activities.

Current wording

Environmental legislation in Argentina and in many other countries is evolving in a manner which will likely require stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects, and a heightened degree of responsibility for companies and their officers, directors and employees. Future changes in environmental regulation in the jurisdictions where our properties are located may adversely affect our business, make our business prohibitively expensive, or prohibit it altogether. We cannot predict what environmental legislation or regulations will be enacted or adopted in the future or how future laws and regulations will be administered or interpreted. Compliance with more stringent laws and regulations, as well as potentially more vigorous enforcement policies or regulatory agencies or stricter interpretation of existing laws, may (i) necessitate significant capital outlays, (ii) cause us to delay, terminate or otherwise change our intended activities with respect to one or more projects, or (iii) materially adversely affect our future exploration activities.

Previous wording

The Velardeña Properties and many of our exploration properties are located in historic mining districts where prior owners, including ECU in the case of the Velardeña Properties, may have caused environmental damage that may not be known to us or to applicable regulators. At the Velardeña Properties and in most other cases, we have not conducted comprehensive environmental analyses of our mineral properties. Insurance fully covering many environmental risks (including potential liability for pollution or other hazards as a result of disposal of waste products occurring from exploration and mining) is not generally available. To the extent environmental hazards may exist on the properties in which we currently hold interests, or may hold interests in the future, that are unknown to us at present and that have been caused by us, or by previous owners or operators, or that may have occurred naturally, and to the extent we are subject to environmental requirements or liabilities, the cost of compliance with these requirements and satisfaction of these liabilities could have a material adverse effect on our financial condition and results of operations. If we are unable to fully fund the cost of remediation of any environmental condition, we may be required to suspend activities or enter into interim compliance measures pending completion of the required remediation.

Current wording

The Velardeña Properties and many of our exploration properties or sold properties are located in historic mining districts where prior owners, including ECU in the case of the Velardeña Properties, may have caused environmental damage that may not be known to us or to applicable regulators. At the Velardeña Properties and in most other cases, we have not conducted comprehensive environmental analyses of our mineral properties. Insurance fully covering many environmental risks (including potential liability for pollution or other hazards as a result of disposal of waste products occurring from exploration and mining) is not generally available. To the extent environmental hazards may exist on the properties in which we currently hold interests, have sold our interest or may hold interests in the future, that are unknown to us at present and that have been caused by us, or by previous owners or operators, or that may have occurred naturally, and to the extent we are subject to environmental requirements or liabilities, the cost of compliance with these requirements and satisfaction of these liabilities could have a material adverse effect on our financial condition and results of operations. If we are unable to fully fund the cost of remediation of any environmental condition, we may be required to suspend activities or enter into interim compliance measures pending completion of the required remediation.

Previous wording

We are subject to physical risks associated with climate change which could seriously harm our results of operations and increase our costs and expenses. The occurrence of severe adverse weather conditions, including increased temperatures and droughts, fires, longer wet or dry seasons, increased precipitation, floods, hail, snow, or more severe storms, may have a potentially devastating impact on our operations. Adverse weather may result in physical damage to our operations, instability of our infrastructure and equipment, washed-out roads to our projects, and alter the supply of water and electricity to our properties, mining sites, and oxide plant. Increased temperatures may also decrease worker productivity at our projects and raise cooling costs. Should the impacts of climate change be material in nature or occur for lengthy periods of time in the areas in which we operate, our financial condition or results of operations would be adversely affected.

Current wording

temperatures and droughts, fires, longer wet or dry seasons, increased precipitation, floods, hail, snow, or more severe storms, may have a potentially devastating impact on our operations. Adverse weather may result in physical damage to our operations, instability of our infrastructure and equipment, washed-out roads to our projects, and alter the supply of water and electricity to our properties. Increased temperatures may also decrease worker productivity at our projects and raise cooling costs. Should the impacts of climate change be material in nature or occur for lengthy periods of time in the areas in which we operate, our financial condition or results of operations would be adversely affected.

Previous wording

Changes in the quantity of water, whether in excess or deficient amounts, may impact exploration and development activities, mining and processing operations, water storage and treatment facilities, tailings storage facilities, closure and reclamation efforts, and may increase levels of dust in dry conditions and land erosion and slope stability in case of prolonged wet conditions. Increased precipitation, extreme rainfall events or increased snowfall may potentially impact tailings storage facilities through flooding of the water management infrastructure, exceeding surface water runoff network capacity, overtopping the facility, or undermining the slope stability of the structure. Increased amounts of water may also result in extended periods of mine pit flooding, maintenance and storage facilities; or may exceed current water treatment facility capacity to store and treat water physical conditions resulting in an unintended overflow either on or off of the mine site property.

Current wording

Changes in the quantity of water, whether in excess or deficient amounts, may impact exploration and development activities, mining and processing operations, water storage and treatment facilities, tailings storage facilities, closure and reclamation efforts, and may increase levels of dust in dry conditions and land erosion and slope stability in case of prolonged wet conditions. Increased precipitation, extreme rainfall events or increased snowfall may potentially impact tailings storage facilities through flooding of the water management infrastructure, exceeding surface water runoff network capacity, overtopping the facility, or undermining the slope stability of the structure. Increased amounts of water may also result in extended periods of flooding affecting exploration activities, maintenance and storage facilities, or may exceed current water treatment facility capacity to store and treat water or other physical conditions resulting in an unintended overflow either on or off of the mine site property.

Previous wording

U.S. and international legislative and regulatory action intended to ensure the protection of the environment are constantly changing and evolving in a manner expected to result in stricter standards and enforcement, larger fines and liability, and potentially increased capital expenditures and operating costs. Transitioning our business to meet regulatory, societal and investor expectations may cause us to incur lower economic returns than originally estimated for new exploration projects and development plans of existing operations.

Current wording

U.S. and international legislative and regulatory action intended to ensure the protection of the environment are constantly changing and evolving in a manner expected to result in stricter standards and enforcement, larger fines and liability, and potentially increased capital expenditures and operating costs. Transitioning our business to meet regulatory, societal and investor expectations may cause us to incur greater costs than originally estimated for new exploration projects and development plans of existing operations.

Previous wording

Title to the Velardeña Properties and our other properties and rights may be defective or may be challenged.

Current wording

Title to the Velardeña, Sarita Este/Desierto properties and our other properties and rights may be defective or may be challenged.

Previous wording

Our policy is to seek to confirm the validity of our rights to, title to, or contract rights with respect to, each mineral property in which we have a material interest. However, we cannot guarantee that title to our properties will not be challenged. Title insurance is not available for our mineral properties, and our ability to ensure that we have obtained secure rights to individual mineral properties or mining concessions may be severely constrained. Accordingly, the Velardeña Properties and our other mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. In addition, we may be unable to conduct activities on our properties as permitted or to enforce our rights with respect to our properties, and the title to our mineral properties may also be impacted by state action. We have not conducted surveys of all of the exploration properties in which we hold direct or indirect interests and, therefore, the precise area and location of these exploration properties may be in doubt.

Current wording

Our policy is to seek to confirm the validity of our rights to, title to, or contract rights with respect to, each mineral property in which we have a material interest. However, we cannot guarantee that title to our properties will not be challenged. Title insurance is not available for our mineral properties, and our ability to ensure that we have obtained secure rights to individual mineral properties or mining concessions may be severely constrained. Accordingly, the Velardeña, Sarita Este/Desierto properties and our other mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. In addition, we may be unable to conduct activities on our properties as permitted or to enforce our rights with respect to our properties, and the title to our mineral properties may also be impacted by government action. We have not conducted surveys of all of the exploration properties in which we hold direct or indirect interests and, therefore, the precise area and location of these exploration properties may be in doubt.

Previous wording

Under the laws of Mexico, mineral resources belong to the state, and government concessions are required to explore for or exploit mineral reserves. Mineral rights derive from concessions granted, on a discretionary basis, by the Ministry of Economy, pursuant to the Mexican mining law and regulations thereunder. We hold title to the Velardeña Properties and our other properties in Mexico through these government concessions, but there is no assurance that title to

Current wording

Under the laws of Mexico, mineral resources belong to the state, and government concessions are required to explore for or exploit mineral reserves. Mineral rights derive from concessions granted, on a discretionary basis, by the Ministry of Economy, pursuant to the Mexican mining law and regulations thereunder. We hold title to the Rodeo Property and our other properties in Mexico through these government concessions, but there is no assurance that title to our other properties will not be challenged or impaired. The properties may be subject to prior unregistered agreements, interests or native land mining claims, and title may be affected by undetected defects. A defect could result in our losing all or a portion of our right, title, and interest in and to the properties to which the title defect relates.

Previous wording

Our Velardeña Properties mining concessions and our other mining concessions in Mexico may be terminated if our obligations to maintain the concessions in good standing are not satisfied, including obligations to explore or exploit the relevant concession, to pay any relevant fees, to comply with all environmental and safety standards, to provide information to the Ministry of Economy and to allow inspections by the Ministry of Economy. In addition to termination, failure to make timely concession maintenance payments and otherwise comply strictly with applicable laws, regulations and local practices relating to mineral right applications and tenure could result in reduction or expropriation of entitlements. Additionally, in 2014, new mining concessions became subject to additional review and approval by the Mexico Ministry of Energy, and in recent years the federal government has been reluctant to issue new mining concessions at all.

Current wording

Our Sarita Este/Desierto mining concessions and our other mining concessions in Argentina and Mexico may be terminated if our obligations to maintain the concessions in good standing are not satisfied, including obligations to explore or exploit the relevant concession, to pay any relevant fees, to comply with all environmental and safety standards, to provide information or to allow inspections by appropriate agencies. In addition to termination, failure to make timely concession maintenance payments and otherwise comply strictly with applicable laws, regulations and local practices relating to mineral right applications and tenure could result in reduction or expropriation of entitlements.

Previous wording

agreements with surface landowners. Many of our mining properties are subject to the Mexican ejido system requiring us to contract with the local communities surrounding the properties in order to obtain surface rights to land needed in connection with our mining exploration activities. See “—Our ability to develop our Mexican properties is subject to the rights of the Ejido (agrarian cooperatives) who use or own the surface for agricultural purposes.” Our inability to maintain and periodically renew or expand these surface rights on favorable terms or otherwise could have a material adverse effect on our business and financial condition.

Current wording

Mining concessions in Mexico and Argentina give exclusive exploration and exploitation rights to the minerals located in the concessions but do not include surface rights to the real property, which requires that we negotiate the necessary agreements with surface landowners. Many of our mining properties are subject to the Mexican ejido system requiring us to contract with the local communities surrounding the properties in order to obtain surface rights to land needed in connection with our mining exploration activities (see “—Our ability to develop our Mexican properties is subject to the rights of the Ejido (agrarian cooperatives) who use or own the surface for agricultural purposes.”). Our inability to maintain and periodically renew or expand these surface rights on favorable terms or otherwise could have a material adverse effect on our business and financial condition.

Previous wording

Most of our costs are subject to exchange control policies, the effects of inflation, and currency fluctuations between the U.S. dollar and the Mexican peso.

Current wording

Some of our costs are subject to exchange control policies, the effects of inflation, and currency fluctuations between the U.S. dollar and the Mexican peso or the Argentine peso.

Previous wording

Our revenue and external funding are primarily denominated in U.S. dollars. However, certain mining, processing, maintenance and exploration costs at the Velardeña properties and most of our exploration properties are denominated in Mexican pesos. These costs principally include electricity, labor, water, maintenance, local contractors and fuel. The appreciation of the peso against the U.S. dollar increases expenses and the cost of purchasing capital assets in U.S. dollar terms in Mexico, which can adversely impact our operating results and cash flows. Conversely, depreciation of the Mexican peso decreases operating costs and capital asset purchases in U.S. dollar terms. When inflation in Mexico increases without

Current wording

Our general administrative costs and some exploration costs and external funding are primarily denominated in U.S. dollars. However, certain future costs at the Rodeo Property are denominated in Mexican pesos and at our Sarita Este/Desierto properties are denominated in Argentine pesos. These costs principally include electricity, labor, water, maintenance, local contractors and fuel. The appreciation of the foreign currency against the U.S. dollar increases expenses and the cost of purchasing capital assets in U.S. dollar terms in Mexico and Argentina, which can adversely impact our operating results and cash flows. Conversely, depreciation of the foreign currency decreases operating costs and capital asset purchases in U.S. dollar terms. When inflation in Mexico or Argentina increases without a corresponding devaluation of the Mexican or Argentine peso, our financial position, results of operations and cash flows could be adversely affected. The annual average inflation rate in Mexico was approximately 4.7% in 2024, 5.9% in 2023 and 7.9% in 2022, and in Argentina was approximately 117.8% in 2024, 211.4% in 2023, and 72.4% in 2022. At the same time, the local currency has been subject to fluctuation, which may not have been proportionate to the inflation rate and may not be proportionate

Previous wording

a corresponding devaluation of the Mexican peso, our financial position, results of operations and cash flows could be adversely affected. The annual average inflation rate in Mexico was approximately 5.9% in 2023 7.9% in 2022, 5.7% in 2021. At the same time, the peso has been subject to fluctuation, which may not have been proportionate to the inflation rate and may not be proportionate to the inflation rate in the future. The value of the peso decreased by 11.8% in 2023, decreased by 4.9% in 2022, decreased by 2.6% in 2021. Current and future inflationary effects may be driven by, among other things, supply chain disruptions and governmental stimulus or fiscal policies, and geopolitical instability, including the ongoing conflict between Ukraine and Russia. Continuing increases in inflation could increase our costs of labor and other costs related to our business, which could have an adverse impact on our business, financial position, results of operations and cash flows.

Current wording

to the inflation rate in the future. The value of the Mexican peso decreased by 18.7% in 2024, 11.8% in 2023, and 4.9% in 2022, and the value of the Argentine peso decreased by 21.4% in 2024, 77.9% in 2023 and 41.7% in 2022. Current and future inflationary effects may be driven by, among other things, supply chain disruptions and governmental stimulus or fiscal policies, and geopolitical instability, including ongoing conflicts between Ukraine and Russia and in the Middle East. Continuing increases in inflation could increase our costs of labor and other costs related to our business, which could have an adverse impact on our business, financial position, results of operations and cash flows.

Previous wording

In addition, fluctuations in currency exchange rates may have a significant impact on our financial results. There can be no assurance that the Mexican government will maintain its current policies with regard to the peso or that the peso’s value will not fluctuate significantly in the future. We cannot assure you that currency fluctuations, inflation and exchange control policies will not have an adverse impact on our financial condition, results of operations, earnings and cash flows.

Current wording

In addition, fluctuations in currency exchange rates may have a significant impact on our financial results. There can be no assurance that the Mexican government or the Argentine government will maintain their current policies with regard to their currencies or that the value of these currencies will not fluctuate significantly in the future. We cannot assure you that currency fluctuations, inflation and exchange control policies will not have an adverse impact on our financial condition, results of operations, earnings and cash flows.

Showing the first 40 of 49 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

these or other events may cause us to incur significant costs which could materially adversely affect our financial condition and our ability to fund activities on our properties. A significant loss could force us to reduce or suspend exploration of our properties, adversely affect our business, financial condition, results of operations and cash flow and cause us to have to liquidate our business interests and investors to lose their investments.

Current report — wording carried from elsewhere

We are subject to physical risks associated with climate change which could seriously harm our results of operations and increase our costs and expenses. The occurrence of severe adverse weather conditions, including increased

Current report — wording carried from elsewhere

have limited financial and personnel resources with which to compete.” If we experience periods where our employees are unable to perform their jobs for any reason, including as a result of illness, our business, financial condition, results of operations and cash flows could be adversely affected.
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

the concessions comprising the Velardeña Properties and other properties will not be challenged or impaired. The Velardeña Properties and other properties may be subject to prior unregistered agreements, interests or native land claims, and title may be affected by undetected defects. There could be valid challenges to the title of any of the claims comprising the Velardeña Properties that, if successful, could impair mining with respect to such properties in the future. A defect could result in our losing all or a portion of our right, title, and interest in and to the properties to which the title defect relates.

Previous report — wording carried elsewhere

Mining concessions in Mexico give exclusive exploration and exploitation rights to the minerals located in the concessions but do not include surface rights to the real property, which requires that we negotiate the necessary